Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
PTA LANDSCAPES - PROJECT SOLUTIONS 4
PTA LANDSCAPES - PROJECT SOLUTIONS 5
PTA LANDSCAPES - PROJECT SOLUTIONS 6
PTA LANDSCAPES - PROJECT SOLUTIONS 7
87.
18
87.
24
87.
20
87.
20
87.
18
87.
26
87.
17
87.
14
87.
27
CL:87.21
87.
26
87.
22 8
7.21 87.
20 8
7.31
87.
41 87.
50
87.
29
87.
30
87.
41
87.
26
87.
34
87.
30
87.
22
87.
30
87.
70
87.
62
87.
54
87.
61
87.
57
87.
65
87.
50
87.
33
87.
28
87.
96
87.
69 8
7.63
87.2
87.2
87.2
87.4
87.6
87.8
88
CONCRETE
BACK OF CONC> KERB
EDGE OF BITUMEN
ED
GE
OF
BIT
UM
EN
BITUMEN
CAR PARK
METAL PICKETS
GRATED PIT
UPFFL 87.495
FFL 87.52
3-LIN
4-ACE
9-ACE
2-AEM2-AEM
6-ACE
5810
572338
00
4000
87
87
88
89
90
90
88
89
88
89
FIRE HYDRANT10m ZONE
86.
76
88.
38
94.32
92.04
91.73
92.10
92.44
90.99
86.87
86.84
86.62
86.74
86.70
CL:86.46
86.44
86.33
86.55
86.64
86.69
86.71
86.75
86.68
86.78
87.00
86.98
87.04
87.32
87.52
87.72
87.75
CL:87.40
87.85
87.98
88.09
87.82
88.07
87.94
88.08
FFL:88.16
88.06
88.01
87.91
87.80
87.90
87.91
88.30
87.90
87.60
87.74
87.70
87.67
87.63
87.57
87.50
87.33
87.07
87.05
86.88
86.76
87.05
86.92
86.92
86.82 86.82
86.82
86.77
86.88
CL:86.90
87.27
87.23
87.18
87.15
86.92
86.82 86
.87
86.99
86.92
87.03
87.04
87.18
87.24 87.24
87.17
87.20
87.20
87.18
87.26
87.12
87.17
87.08 87
.09 87.08
87.14
87.27
86.96
87.03
87.04
87.04
87.01
87.19
CL:87.21
87.26
87.22
87.21 87
.20 87
.31
87.41 87
.50
87.29
87.30
87.41
87.26
87.34
87.30
87.22
87.30
87.48
87.37
87.74
87.83
87.70
87.62
87.54
87.61
87.57
87.65
87.50
87.33
87.28
87.58
87.60
87.62
87.91
87.81
88.24 88.19
88.13
88.01
88.53
88.48
91.02
88.08
88.07
88.07
88.07
CL:88.05
88.11
88.06
88.01
88.09
FFL:88.21
88.00
88.00
88.10
88.15
88.13
DRAINAGE PIT
88.03
88.07
88.34
88.54
88.60
88.70
88.93
89.01
89.01
89.07
88.96 88
.84
88.93
88.88
CL:88.77
88.94
88.94
88.52
88.47
GRATED PIT
88.57
88.54
88.55
88.54
88.53
88.55
88.43
88.32
87.96
87.69
87.63
86.6
86.6
86.8
86.8
87
87
87
87
87.
2
87.2
87.2
87.2
87.4
87.4
87.6
87.6
87.8
87.8
88
88
88
88.2
88
.2
88.2
88.2
88.4
88.4
88.6
88.6 88.8
88.8
89
89
TOP ROOF
TOP ROOF
TOP GUTTER
TOP ROOF
TOP ROOF
TOP ROOF
TOP GUTTER
8^01
'20"
5
5m
342^52'20" 186.14
COLLEGE STREET
CONCRETE
CROSS-OVER
CONCRETE
CROSS-OVER
EDGE OF BITUMEN
CONCRETE FOOTPATH CONCRETE FOOTPATH
BACK OF CONCRETE KERBBACK OF CONRETE KERB
CONCRETE
DRIVECONCRETE
DRIVE
SINGLE STOREY
BRICK RESIDENCE
PAVING
PAVING
VERANDAH
VERANDAH
GRAVEL
GRAVEL
WATERTANK
G>ISHED
G>I FENCE
G>I
FE
NC
E
BACK OF CONC> KERB
EDGE OF BITUMEN
BA
CK
OF
C
ON
CR
ETE
K
ER
B
ED
GE
OF
BIT
UM
EN
BITUMEN
CAR PARK
GRASSED
AREA
METAL PICKETS
GRASSED
AREA
GRASSEDAREA
FIREHYDRANT
FIREHYDRANT
CONCRETE PATH
CONCRETE SLAB
GRATED PIT
SIDE ENTRY PITFIRE
HYD> PIT SIDE ENTRY PIT
CL:89.43
IL:88.66
IL:88.62
GRATED PIT
89.16
CL:89.32
IL:88.75
IL:88.72
IL:89.10
CL:89.66
PVC300¯
D D
GRATED PIT
D
D
D
D
D
D
D
D
D
D
D
D
D
D
CL:88.97
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
D
GRATED PIT
D
GRATED PIT
IL:88.26
IL:88.26
PVC300¯
IL:8
8.26
SYNTHETIC
COURTS
SYNTHETIC
COURTS
D
D
D
D
CL:88.09
LOW BRICK METAL PICKETS METAL PICKETS
GRATED PIT
CL:88.54
CONCRETE
BRICKBUILDING
GRATED PIT
G>I
FE
NC
E
G>I FEN
CE
HIGH
CYCLONE
FENCE
SCHOOL
CROSSING
CONC>PATH
SIGN
GARDEN
GARDEN
??? PIT
FIRE HYDRANT10m ZONE
RELOCATEDFIRE HYDRANT10m ZONE
col
col
col
col
col
UP
STAIR 02
1914
13108
1234514
16
FFL 88.55
FFL
89.10
FFL 87.495
FFL 87.52
FFL 88.60
FFL 87.950
5
4
3
2
1
1A
4A
A
B
C
D
E
F
G
H
F1
FFL 88.80
LEGEND
Existing Tree - Eucalyptus caesia
Granitic gravel (coarse) to match existing
Rock paving to match existing
Rock steppers inlaid in granitic gravel to match existing
Coloured concrete with aggregate to match exisitng
Proposed garden bed with M12 Organic Mulch
- see Planting Notes for details
Grassed area
PTA timber benches with galvanised steel footings
Water feature 800mm shallow ceramic bowl to be installed
by PTA Landscapes. See Images L1.02 for suggestted type.
Feature rock - Castlemaine rock or to match existing rock.
Dimensions approx. 1500x300 x1000mm height. See detail
for installation and rock profile.
SITE PLAN
LEGEND
Existing Tree - Eucalyptus caesia
Granitic gravel (coarse) to match existing
Rock paving to match existing
Rock steppers inlaid in granitic gravel to match existing
Coloured concrete with aggregate to match exisitng
Proposed garden bed with M12 Organic Mulch
- see Planting Notes for details
Grassed area
PTA timber benches with galvanised steel footings
Water feature 800mm shallow ceramic bowl to be installed
by PTA Landscapes. See Images L1.02 for suggestted type.
Feature rock - Castlemaine rock or to match existing rock.
Dimensions approx. 1500x300 x1000mm height. See detail
for installation and rock profile.
nom
.100
0
nom. 1500
nom
.500
1000
550
Using all the information gathered from the consultation and the feature survey a landscape design is prepared. These drawings include landscape plans and details showing overall lay outs, set outs and specifications for construction. Materials palettes and planting plans are produced along with any other relevant documentation required for the works. These are all put together and set out so they are easily read and understood. The landscape design is quantity surveyed and priced by the PTA Landscapes’ estimating team to produce a detailed cost analysis for the proposed project. This process ensures the landscape design to be implemented meets all the school’s requirements especially budget.
Once finalised PTA Landscapes will provide a presentation with all of the designs.
PTA LANDSCAPES - PROJECT SOLUTIONS 8
PTA LANDSCAPES - PROJECT SOLUTIONS 9
PTA LANDSCAPES - PROJECT SOLUTIONS 10
_90A6154
_90A6157
_90A6155
_90A6160
_90A6176
_90A6181
_90A6179
_90A6182
_90A6183
_90A6186
_90A6185
_90A6187
_90A6183
_90A6186
_90A6185
_90A6187
PTA LANDSCAPES - PROJECT SOLUTIONS 11
PTA LANDSCAPES - PROJECT SOLUTIONS 12
PTA LANDSCAPES - PROJECT SOLUTIONS 13
PTA LANDSCAPES - PROJECT SOLUTIONS 14
PTA LANDSCAPES - PROJECT SOLUTIONS 15