2
Our success is based on the success of our customers We are a valuable partner in the entire network of Siemens Power Generation. Siemens Cilegon Factory is a world- class competence center for large-steel fabrication of components for power plants worldwide. It is located in Cilegon, Banten, a province of Indone- sia about 110 km west of Indonesia’s capital Jakarta. The factory has a total area of 43,000 sqm with 22,000 sqm dedicated for production facilities. 480 people are working for the success of our customers worldwide! 25 years of experience 1987–1989 Foundation of Siemens Cilegon Factory, inauguration on February 28th, 1989. 1989–2000 Fabrication of steam turbine components, local support for service and maintenance work. 2000–2006 Development into a com- petence center of large-steel fabrica- tion components (LSF). 2006–2013 Machining and final assembly of complete steam turbine casings and combustion chambers. Investment into state-of-the-art machining facilities. 2014–present Implementation of Siemens Production System (lean production), portfolio extension e.g. assembly of small industrial turbines and round condenser. PT Siemens Indonesia Cilegon Factory Factsheet siemens.com/energy

PT Siemens Indonesia Cilegon Factory

Embed Size (px)

Citation preview

Page 1: PT Siemens Indonesia Cilegon Factory

Our success is based on the success of our customersWe are a valuable partner in the entire network of Siemens Power Generation.

Siemens Cilegon Factory is a world-class competence center for large-steel fabrication of components for power plants worldwide. It is located in Cilegon, Banten, a province of Indone-sia about 110 km west of Indonesia’s capital Jakarta. The factory has a total area of 43,000 sqm with 22,000 sqm dedicated for production facilities.

480 people are working for the success of our customers worldwide!

25 years of experience1987–1989 Foundation of Siemens Cilegon Factory, inauguration on February 28th, 1989.

1989–2000 Fabrication of steam turbine components, local support for service and maintenance work.

2000–2006 Development into a com-petence center of large-steel fabrica-tion components (LSF).

2006–2013 Machining and final assembly of complete steam turbine casings and combustion chambers. Investment into state-of-the-art machining facilities.

2014–present Implementation of Siemens Production System (lean production), portfolio extension e.g. assembly of small industrial turbines and round condenser.

PT Siemens Indonesia Cilegon Factory

Factsheet

siemens.com/energy

Page 2: PT Siemens Indonesia Cilegon Factory

Our product portfolio• Condenser• Steam Turbine Outer Casings• Steam Turbine Inner Casing Assembly• Steam Turbine Blade Rings• Combustion Chambers• Industrial Steam Turbines

Cilegon as a lean manufacturing facility supports Siemens business worldwide:

• ISO 9001-2008• ISO 14001-2004• ISO 18001-2007• DIN EN 3834-2• ASME U-Stamp• ASME S-Stamp

Our manufacturing capabilities• CNC drilling, milling and vertical

lathe• CNC multi-spindle drilling• Portable drilling• Welding equipment • Rolling machine• Blasting and painting facility• Gas fire furnace• CNC flame & plasma cutting• Assembly pits• Crane with capacity: up to 150 tons

Our references• Condenser for Israel, Germany,

Morocco, Italy, Finland, Brazil, Turkey, Argentina, Indonesia

• Steam Turbine Outer Casings for Japan, China, Australia, India, Brazil, Turkey, Argentina, Indonesia

• Low Pressure Steam Turbine Inner Casings for Germany, USA, Sweden

• Blade for Israel, Germany, Egypt, China, Hungary, Korea, USA, Kasakhstan

• Round Condenser for Germany, Portugal, China

• Combustion Chamber for Nigeria, China, Iraq, Bangladesh, Egypt, Russia

• High Pressure Steam Turbine, assembly for Indonesia

Highlights – orders for Cilegon from EgyptIn 2015 Siemens AG has signed the biggest contract ever in its history with an amount of eight billion EURO with the Egypt Government.

Siemens Cilegon will contribute to this project by supplying steam turbine outer casings, blade rings and con-denser resulting in a volume of 300,000 working hours for this project only.

PT Siemens Indonesia

Management Office Arkadia Office Park, Tower F, 18th Floor Jl. T.B. Simatupang Kav. 88 Jakarta 12520 Phone: +62 (21) 27 54-30 00 Fax: +62 (21) 27 54-33 33

Cilegon Factory

Krakatau Industrial Estate Cilegon Jl. Eropa Kav. B-2 Cilegon 42443, Banten Phone: +62 (254) 36 9-500 Fax: +62 (254) 36 9-505

Unrestricted © Siemens AG 2016 All rights reserved.