Provisional sum
A provisional sum is an allowance, usually est imated by the cost consultant, that is inserted into
tender documents for a specific element of the works that is not yet defined in enough detail for
tenderers to price. This, together with a brief description, allows tenderers to apply mark up and
attendance costs within their overall tender price and make allowance for the work in the contract
programme.
An example of a situation where a provisional sum might be appropriate is when work is required
below an existing structure, where the ground conditions cannot be determined until the existing
structure is demolished and the ground opened up.
Provisional sums can be 'defined' or 'undefined':
Defined provisional sums are considered to have been accounted for within the contractor's
price and programme. In effect the contractor is taking the risk that their estimate will be
sufficient.
Undefined provisional sums are not accounted for in the contractor's price and programme.
This means that the client is taking the risk for the works and the contractor may be entitled
to an extension of time and additional payments.
Provisional sums are provided for in different ways in different forms of contract, and some forms
of contract can be a little vague about how provisional sums should be handled, in particular
regarding adjustments to the programme.
Provisional sums place either the contractor or the client at risk of unexpected costs or delays.
Agreeing the cost of such work or extensions of time that might be claimed can result in tension
between the contractor and client. For this reason, they should only be used as a last resort,
they should not be an easy fall-back position for consultants (who are not bearing any of the risk)
when designs are incomplete or information is difficult to obtain. The risks are significant enough
that the NEC Engineering and Construction Contract (NEC3) does not have any allowance for
provisional sums.
Provisional sums should not be confused with prime cost sums, which are allowances for the
supply of work or materials to be provided by a contractor or supplier nominated by the client.
Prime cost sums might include items that have already been purchased by the client, such as
equipment, or a specific installation by a company with a strong existing relationship with a client
organisation.
Find out more
Related articles on Designing Buildings Wiki
Architects instruction. Attendance.
Bill of quantities.
Construction contract.
Contract sum.
Contract sum analysis.
Equipment.
Share Follow
Create an article
Related articles
Architects instruction.
Attendance.
Bill of quantities.
Construction contract.
Contract sum.
Contract sum analysis.
Equipment.
Extension of time.
Featured articles
Central Activities Zone
GLA publish supplementary planning guidance
for London’s commercial heartland.
Skills gap
BRE Academy skills gap survey finds key BIM
and management skills are lacking in
individuals, organisations and the wider
industry.
Government Construction Strategy
Last edited 13 Jan 2016
See full history
http://www.designingbuildings.co.uk/wiki/Designing_Buildings_Wikihttp://www.designingbuildings.co.uk/wiki/Equipmenthttp://www.designingbuildings.co.uk/wiki/Clienthttp://www.designingbuildings.co.uk/wiki/Provisional_sumshttp://www.designingbuildings.co.uk/wiki/Central_activities_zone_supplementary_planning_guidancehttp://www.designingbuildings.co.uk/wiki/Extension_of_timehttp://www.designingbuildings.co.uk/wiki/Extension_of_timehttp://www.designingbuildings.co.uk/wiki/Structurehttp://www.designingbuildings.co.uk/wiki/Contract_sum_analysishttp://www.designingbuildings.co.uk/wiki/Attendancehttp://www.designingbuildings.co.uk/wiki/Tenderhttp://www.designingbuildings.co.uk/wiki/Cost_consultanthttp://www.designingbuildings.co.uk/w/index.php?title=Special:CreateArticlehttp://www.designingbuildings.co.uk/w/index.php?title=Provisional%20sum&action=historyhttp://www.designingbuildings.co.uk/w/index.php?title=Special:CreateArticlehttp://www.designingbuildings.co.uk/http://www.designingbuildings.co.uk/http://www.designingbuildings.co.uk/w/index.php?title=Special:UserLogin&type=signup&returnto=Homehttp://www.designingbuildings.co.uk/w/index.php?title=Special:UserLogin&returnto=Homehttps://www.ice.org.uk/http://www.bre.co.uk/bretrusthttp://www.ciob.org/http://www.designingbuildings.co.uk/wiki/Provisional_sumshttp://www.designingbuildings.co.uk/w/index.php?title=Provisional%20sum&action=historyhttp://www.designingbuildings.co.uk/wiki/Government_Construction_Strategy_2016_2020http://www.designingbuildings.co.uk/wiki/Boardroom_to_building_site_skills_gap_surveyhttp://www.designingbuildings.co.uk/wiki/Boardroom_to_building_site_skills_gap_surveyhttp://www.designingbuildings.co.uk/wiki/Central_activities_zone_supplementary_planning_guidancehttp://www.designingbuildings.co.uk/wiki/Extension_of_timehttp://www.designingbuildings.co.uk/wiki/Equipmenthttp://www.designingbuildings.co.uk/wiki/Contract_sum_analysishttp://www.designingbuildings.co.uk/wiki/Contract_sumhttp://www.designingbuildings.co.uk/wiki/Construction_contracthttp://www.designingbuildings.co.uk/wiki/Bill_of_quantitieshttp://www.designingbuildings.co.uk/wiki/Attendancehttp://www.designingbuildings.co.uk/wiki/Architects_instructionhttp://www.designingbuildings.co.uk/w/index.php?title=Special:CreateArticlehttp://www.youtube.com/user/designingbuildingshttp://www.linkedin.com/company/designing-buildingshttp://www.facebook.com/pages/Designing-Buildings-Wiki/349836558377133http://www.sharethis.com/share?publisher=832c94fd-9945-4b2b-b15f-599ff8a8df60&url=http%3A%2F%2Fwww.designingbuildings.co.uk%2Fwiki%2FProvisional_sum&title=Designing+Buildings+Wiki+-+Provisional+sum&img=http%3A%2F%2Fwww.designingbuildings.co.uk%2Fskins%2Fdesigningbuildings%2Fdesigning-buildings-logo-square.pnghttp://www.designingbuildings.co.uk/wiki/Equipmenthttp://www.designingbuildings.co.uk/wiki/Contract_sum_analysishttp://www.designingbuildings.co.uk/wiki/Contract_sumhttp://www.designingbuildings.co.uk/wiki/Construction_contracthttp://www.designingbuildings.co.uk/wiki/Bill_of_quantitieshttp://www.designingbuildings.co.uk/wiki/Attendancehttp://www.designingbuildings.co.uk/wiki/Architects_instructionhttp://www.designingbuildings.co.uk/wiki/Designing_Buildings_Wikihttp://www.designingbuildings.co.uk/wiki/Find_out_morehttp://www.designingbuildings.co.uk/wiki/Clienthttp://www.designingbuildings.co.uk/wiki/Equipmenthttp://www.designingbuildings.co.uk/wiki/Clienthttp://www.designingbuildings.co.uk/wiki/Prime_cost_sumhttp://www.designingbuildings.co.uk/wiki/Clienthttp://www.designingbuildings.co.uk/wiki/Supplierhttp://www.designingbuildings.co.uk/wiki/Contractorhttp://www.designingbuildings.co.uk/wiki/Prime_cost_sumhttp://www.designingbuildings.co.uk/wiki/Provisional_sumshttp://www.designingbuildings.co.uk/wiki/Provisional_sumshttp://www.designingbuildings.co.uk/wiki/NEC3http://www.designingbuildings.co.uk/wiki/NEC_Engineering_and_Construction_Contracthttp://www.designingbuildings.co.uk/wiki/Consultantshttp://www.designingbuildings.co.uk/wiki/Clienthttp://www.designingbuildings.co.uk/wiki/Contractorhttp://www.designingbuildings.co.uk/wiki/Extensions_of_timehttp://www.designingbuildings.co.uk/wiki/Clienthttp://www.designingbuildings.co.uk/wiki/Contractorhttp://www.designingbuildings.co.uk/wiki/Provisional_sumshttp://www.designingbuildings.co.uk/wiki/Provisional_sumshttp://www.designingbuildings.co.uk/wiki/Provisional_sumshttp://www.designingbuildings.co.uk/wiki/Extension_of_timehttp://www.designingbuildings.co.uk/wiki/Contractorhttp://www.designingbuildings.co.uk/wiki/Clienthttp://www.designingbuildings.co.uk/wiki/Contractorhttp://www.designingbuildings.co.uk/wiki/Provisional_sumshttp://www.designingbuildings.co.uk/wiki/Contractorhttp://www.designingbuildings.co.uk/wiki/Contractorhttp://www.designingbuildings.co.uk/wiki/Defined_Provisional_sumhttp://www.designingbuildings.co.uk/wiki/Provisional_sumshttp://www.designingbuildings.co.uk/wiki/Structurehttp://www.designingbuildings.co.uk/wiki/Ground_conditionshttp://www.designingbuildings.co.uk/wiki/Structurehttp://www.designingbuildings.co.uk/wiki/Tenderhttp://www.designingbuildings.co.uk/wiki/Attendancehttp://www.designingbuildings.co.uk/wiki/Tenderhttp://www.designingbuildings.co.uk/wiki/Tenderhttp://www.designingbuildings.co.uk/wiki/Tender_documentshttp://www.designingbuildings.co.uk/wiki/Cost_consultanthttp://www.designingbuildings.co.uk/http://www.designingbuildings.co.uk/http://www.designingbuildings.co.uk/w/index.php?title=Special:UserLogin&returnto=Homehttp://www.designingbuildings.co.uk/w/index.php?title=Special:UserLogin&type=signup&returnto=Homehttp://www.burohappold.com/http://www.rsh-p.com/https://www.bsria.co.uk/http://www.uandiplc.com/http://www.ciob.org/http://www.bre.co.uk/bretrusthttps://www.ice.org.uk/
8/19/2019 Provisional Sum - Designing Buildings Wiki
2/4
8/19/2019 Provisional Sum - Designing Buildings Wiki
3/4
3/28/2016 Provisional sum - Designing Buildings Wiki
http://www.designingbuildings.co.uk/wiki/Provisional_sum 3/4
Government publishes their spending strategy
for infrastructure projects together with a
commitment to make efficiency savings.
Development House, Shoreditch
Architects unveil plans for innovative all-timber
structure in London's Shoreditch.
Unusual building design of the week
Peter Cook's Kunsthaus Graz modern art
museum in Austria, a landmark piece of
'blobitecture'.
Buildings in film
http://www.designingbuildings.co.uk/wiki/Buildings_in_filmhttp://www.designingbuildings.co.uk/wiki/Kunsthaus_Grazhttp://www.designingbuildings.co.uk/wiki/Kunsthaus_Grazhttp://www.designingbuildings.co.uk/wiki/Development_House,_Shoreditchhttp://www.designingbuildings.co.uk/wiki/Development_House,_Shoreditchhttp://www.designingbuildings.co.uk/wiki/National_Infrastructure_Delivery_Plan_2016-2021
8/19/2019 Provisional Sum - Designing Buildings Wiki
4/4
3/28/2016 Provisional sum - Designing Buildings Wiki
http://www.designingbuildings.co.uk/wiki/Provisional_sum 4/4
© Designing Buildings Ltd. 2016 About Help Privacy Policy T&Cs Contact Feed Report Abuse Press
With 'High-Rise' in the cinemas, here is a
selection of famous buildings that have played
important film roles.
For more news, go to the home page.
http://www.designingbuildings.co.uk/http://www.designingbuildings.co.uk/wiki/Buildings_in_filmhttp://www.designingbuildings.co.uk/wiki/Press_contacthttp://www.designingbuildings.co.uk/wiki/Special:Contact/Report?request_uri=%2Fwiki%2FProvisional_sumhttp://www.designingbuildings.co.uk/w/index.php?title=Special:RecentChanges&feed=atomhttp://www.designingbuildings.co.uk/wiki/Special:Contact?request_uri=%2Fwiki%2FProvisional_sumhttp://www.designingbuildings.co.uk/wiki/Terms_and_Conditionshttp://www.designingbuildings.co.uk/wiki/Privacy_policyhttp://www.designingbuildings.co.uk/wiki/Helphttp://www.designingbuildings.co.uk/wiki/About