22
1 EA Capacity Market Auction for 2017/18 Provisional Auction Results

Provisional Auction Results - EMR Delivery Body Markets Document... · 2017. 2. 3. · National Grid in its role as EMR Delivery Body is required by the Capacity Market Rules 2014

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Provisional Auction Results - EMR Delivery Body Markets Document... · 2017. 2. 3. · National Grid in its role as EMR Delivery Body is required by the Capacity Market Rules 2014

1

EA Capacity Market Auction for 2017/18

Provisional Auction Results

Page 2: Provisional Auction Results - EMR Delivery Body Markets Document... · 2017. 2. 3. · National Grid in its role as EMR Delivery Body is required by the Capacity Market Rules 2014

Provisional Auction Results

2

Contents

Executive Summary…………………………………………………………………………………………………………. 3

The Auction Clearing Price………………………………………………………………………………………………. 4

The Aggregate Bidding Capacity of CMUs Awarded Capacity Agreements……………………….. 5

The Duration of Agreements Awarded……………………………………………………………………………. 7

Capacity that Exited the Auction above the Clearing Price…………………………………………….... 8

Appendix A – Complete List of CMUs and their Status…………………………………………………….. 10

Page 3: Provisional Auction Results - EMR Delivery Body Markets Document... · 2017. 2. 3. · National Grid in its role as EMR Delivery Body is required by the Capacity Market Rules 2014

Executive Summary National Grid in its role as EMR Delivery Body is required by the Capacity Market Rules 2014 (Rule 5.10.2) to notify the Secretary of State of the Provisional Results of the Capacity Market Auction as soon as reasonably practicable following the conclusion of the Capacity Auction. This report discharges that obligation. The Early Capacity Auction for delivery in 2017/18 concluded on 3rd February 2017, 12:30 GMT. The results of the auction are as follows, where any capacity figure refers to de-rated capacity, unless otherwise stated. The Clearing Price is: £6.95 kW / year

The aggregate Capacity of Capacity Market Units awarded Capacity Agreements is: 54,433.634 MW. The CMUs to which a Capacity Agreement has been provisionally awarded and the duration of those Capacity Agreements are listed in Appendix A. In addition to the results presented above, National Grid is required under Capacity Market Rule 5.10.3 to report any CMUs that were removed from the IT Auction System under Capacity Market Rule 5.3.3. The Auction concluded without any CMUs being removed from the system by National Grid. The remainder of this report gives further detail on the Capacity Market Auction Clearing, how the Clearing Price was reached and what makes up the capacity that has been procured.

The results of the auction remain provisional for the period of 8 working days after the completion of the Capacity Market Auction, during which time the Secretary of State may annul the auction on the grounds specified in Regulation 27 of the Electricity Capacity Regulations 2014. Final results will be published once this period has elapsed.

Provisional Auction Results

3

Page 4: Provisional Auction Results - EMR Delivery Body Markets Document... · 2017. 2. 3. · National Grid in its role as EMR Delivery Body is required by the Capacity Market Rules 2014

The Clearing Price is: £6.95 kW / year The Early Capacity Auction cleared in Bidding Round 14 on the 3rd February 2017, 12:30 GMT The Auction did not clear with an exact match of Aggregate Offered Capacity and target capacity (“Clearing Capacity”) and so the Net Welfare Algorithm was used to determine price and volume. The Net Welfare Algorithm evaluates the integral specified in Rule 5.9.6 to determine whether to include the marginal unit. The algorithm subtracts the additional cost of procuring the marginal unit from the welfare gained by procuring the marginal unit. If the result is positive i.e. the welfare gained by procuring the additional unit outweighs the cost, the unit is included, and the Clearing Price is set to the Exit Bid Price of that unit. The result of the Net Welfare Algorithm was negative and the marginal unit was not procured. Figure 1 shows the Demand Curve and the supply curve. The supply curve is found by cumulatively adding the Bidding Capacity of CMUs, according to their Exit Ranking.

The Auction Clearing Price

Provisional Auction Results

Round 15

Round 14

Round 13

Round 12

Round 11

Round 10

Round 9

Round 8

Round 7

Round 6

Round 5

Round 4

Round 3

Round 2

Round 1

0

5

10

15

20

25

30

35

40

45

50

55

60

65

70

75

0 10,000 20,000 30,000 40,000 50,000 60,000 70,000

Price (£/kW/y)

Capacity (MW)

Demand Curve Remaining Capacity Capacity Procured/Clearing Price

Figure 1: Demand and Possible Supply Range

4

Page 5: Provisional Auction Results - EMR Delivery Body Markets Document... · 2017. 2. 3. · National Grid in its role as EMR Delivery Body is required by the Capacity Market Rules 2014

50,128 MW

2,362 MW 1,734 MW

43 MW 166 MW

54.43 GW

0 10,000 20,000 30,000 40,000 50,000 60,000

Capacity Awarded Capacity Exited

Demand at £0 kW/y Demand at the Auction Price Cap

Target Demand

The Aggregate Bidding Capacity of CMUs Provisionally Awarded Agreements

The Aggregate Bidding Capacity of CMUs provisionally awarded Capacity Agreements is: 54,433.634 MW. A total of 59,286.062 MW entered the Auction, of which 91.82% received Capacity Agreements for delivery in 2017/18.

312

4

69

8 22

415 CMUs

Figure 2: Breakdown of the Capacity Entering the Auction Provisionally Awarded Agreements

Figure 3: Breakdown of Awarded Capacity by CMU Type

Figure 3 and Table 1 show the breakdown of the Total Awarded Capacity Agreements by CMU Type. A mixture of new and existing capacity was procured, 1,900.004 MW of the volume of Capacity Agreements awarded is for new capacity. This is the sum of the capacity of CMUs that have been awarded agreements that are Unproven DSR or New Build CMUs.

Provisional Auction Results

5

Page 6: Provisional Auction Results - EMR Delivery Body Markets Document... · 2017. 2. 3. · National Grid in its role as EMR Delivery Body is required by the Capacity Market Rules 2014

% %

92.09 75.18

4.34 0.96

3.19 16.63

0.08 1.93

0.31 5.30

54.43 #REF!

DSR 209.171 0.38%

Hydro

Unproven DSR 166.310 22

7,878.366

No. of CMUs

312

4

CMU Type Capacity (MW)

Existing Generating 50,128.309

Existing Interconnector 2,362.420

Proven DSR 42.861

New Build Generating 1,733.734 69

8

CMU Type Capacity (MW) %

CCGT 22,062.230 40.53%

678.671

10,479.595

Storage

OCGT & Recip (Gas) 2,204.394 4.05%

2,710.468 4.98%

Interconnector 2,362.420 4.34%

Oil-fired steam generators 16.775 0.03%

14.47%

OCGT & Reip (Other) 438.001 0.80%

CHP and autogeneration 4,604.366

19.25%

1.25%

1.45%

Nuclear

8.46%

Coal/biomass

OCGT & Recip (Diesel) 789.177

Table 1: Breakdown of Awarded Capacity by CMU Classification

Provisional Auction Results

Figure 4 shows the breakdown of CMUs provisionally awarded Capacity Agreements by technology type.

Figure 4: Capacity Awarded by Technology Type

Table 2: Breakdown of Awarded Capacity by CMU Type

The majority of the Capacity Agreements provisionally awarded, by capacity, are to CCGT components.

22,062 MW

4,604 MW

10,480 MW

209 MW

679 MW

7,878 MW

438 MW

789 MW

2,204 MW

17 MW

2,710 MW 2,362 MW

GW 54.43

6

Page 7: Provisional Auction Results - EMR Delivery Body Markets Document... · 2017. 2. 3. · National Grid in its role as EMR Delivery Body is required by the Capacity Market Rules 2014

Delivery Year T-4 18/19 T-4 19/20 T-4 20/21 EA 17/18 Total

2017 - - - 54,433.634 54,433.634

2018 49,258.938 - - - 49,258.938

2019 5,524.317 46,353.569 - - 51,877.886

2020 5,524.317 982.520 51,984.523 - 58,491.360

2021 2,423.296 982.520 2,201.061 - 5,606.877

2022 2,423.296 982.520 2,201.061 - 5,606.877

2023 2,423.296 982.520 2,201.061 - 5,606.877

2024 2,423.296 982.520 2,201.061 - 5,606.877

2025 2,423.296 982.520 2,201.061 - 5,606.877

2026 2,423.296 982.520 2,201.061 - 5,606.877

2027 2,423.296 982.520 2,201.061 - 5,606.877

2028 2,423.296 982.520 2,201.061 - 5,606.877

2029 2,423.296 982.520 2,201.061 - 5,606.877

2030 2,423.296 982.520 2,201.061 - 5,606.877

2031 2,423.296 982.520 2,201.061 - 5,606.877

2032 2,391.004 982.520 2,201.061 - 5,574.585

2033 - 969.600 2,201.061 - 3,170.661

2034 - - 2,201.061 - 2,201.061

Provisional Auction Results

0

10,000

20,000

30,000

40,000

50,000

2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034

Capacity (MW)

Delivery Year Volume of Capacity Procured in theEA 17/18 Auction

Volume of Capacity Procured in theT-4 18/19 Auction

Volume of Capacity Procured in theT-4 19/20 Auction

Volume of Capacity Procured in theT-4 20/21 Auction

Figure 5: Volume of Capacity Procured by Delivery Year

Table 3: Capacity Procured by Delivery Year

The Duration of Agreements Awarded The maximum duration for Capacity Agreements received in the Early Capacity Auction is one year. The capacity procured for the period of 2017-2034 is shown in Figure 5 below.

7

Page 8: Provisional Auction Results - EMR Delivery Body Markets Document... · 2017. 2. 3. · National Grid in its role as EMR Delivery Body is required by the Capacity Market Rules 2014

% %

80.17 31.52

0.00 0.00

7.81 27.17

0.32 1.09

11.70 40.22

Proven DSR 15.543

0

No. of CMUs

Existing Interconnector 0.000

Existing Generating

Unproven DSR 567.707 37

3,890.308 29

New Build Generating

CMU TYPE Capacity (MW)

1

378.870 25

Provisional Auction Results

Capacity that Exited the Auction above the Clearing Price A total of 4,852.428 MW exited the auction above the clearing price. This Capacity is broken down by CMU classification and technology type below.

29

25 1

37

92 CMUs

3,890 MW

379 MW

16 MW

568 MW

4.85 GW

Figure 6: Breakdown of Exited Capacity by CMU Type

Existing Generating CMUs make up the largest group of Capacity that Exited the Auction by classification.

Table 4: Capacity Exited by CMU Classification

8

Page 9: Provisional Auction Results - EMR Delivery Body Markets Document... · 2017. 2. 3. · National Grid in its role as EMR Delivery Body is required by the Capacity Market Rules 2014

4.85 #REF!

0.99%

0.00%

0.00%

2.24%

30.62%

0.00%

0.00%

1.28%

4.13%

Hydro 0.000

CHP and autogeneration 108.872

Coal/biomass 1,485.882

OCGT & Recip (Diesel) 200.364

OCGT & Recip (Gas) 862.208

Nuclear 0.000

OCGT & Reip (Other) 62.213

DSR

Storage 48.145

Interconnector 0.000

Oil-fired steam generators 0.000

17.77%

CMU Type Capacity (MW) %

CCGT 1,501.494 30.94%

583.250 12.02%

Provisional Auction Results

Figure 7: Breakdown of Exited Capacity by Technology Type

Table 5: Capacity Exited by Technology Type

The technology type exiting the largest overall volume of capacity from the auction was CCGT (1,501.494 MW).

1,501 MW

109 MW

1,486 MW

583 MW

62 MW

200 MW

862 MW

48 MW

GW

4.85

9

Page 10: Provisional Auction Results - EMR Delivery Body Markets Document... · 2017. 2. 3. · National Grid in its role as EMR Delivery Body is required by the Capacity Market Rules 2014

16CR05 Yes 18.834 1

16CR10 Yes 16.951 1

16CR12 Yes 5.65 1

16CR13 Yes 7.534 1

16CR15 Yes 5.65 1

16CR21 Yes 18.834 1

16CR24 Yes 7.534 1

16CR28 Yes 22.601 1

16CR29 Yes 22.601 1

16CR35 Yes 18.834 1

16CR47 Yes 18.834 1

16CR48 No N/A N/A

16CR50 Yes 18.834 1

16CR53 Yes 16.951 1

16CR55 Yes 18.834 1

16CR57 Yes 18.834 1

16CR58 Yes 7.534 1

16CR64 Yes 18.834 1

16CR72 Yes 18.834 1

16CR79 Yes 18.834 1

16CR82 No N/A N/A

16CR84 Yes 4.332 1

16PR01 Yes 9.417 1

16PR02 Yes 9.417 1

16PR03 Yes 9.417 1

16PR04 Yes 9.417 1

16PR05 Yes 9.417 1

16PR06 Yes 9.916 1

16PR07 Yes 3.767 1

16PR08 Yes 9.134 1

16PR09 Yes 9.417 1

16PR10 Yes 9.417 1

16PR11 Yes 9.417 1

16PR13 Yes 4.713 1

16SR11 No N/A N/A

16SR12 No N/A N/A

16SR20 No N/A N/A

16SR23 No N/A N/A

16SR24 No N/A N/A

16SR26 No N/A N/A

16SR27 No N/A N/A

UK Power Reserve Limited

UK Power Reserve Limited

UK Power Reserve Limited

UK Power Reserve Limited

UK Power Reserve Limited

UK Capacity Reserve Ltd

UK Capacity Reserve Ltd

UK Capacity Reserve Ltd

UK Capacity Reserve Ltd

UK Power Reserve Limited

Capacity (MW)Duration

(Years)CMU ID Capacity AG

New Build Generating CMU

New Build Generating CMU

New Build Generating CMU

New Build Generating CMU

CMU Classification

New Build Generating CMU

New Build Generating CMU

New Build Generating CMU

New Build Generating CMU

New Build Generating CMU

New Build Generating CMU

New Build Generating CMU

New Build Generating CMU

New Build Generating CMU

New Build Generating CMU

New Build Generating CMU

New Build Generating CMU

New Build Generating CMU

UK Strategic Reserve Limited

UK Strategic Reserve Limited

UK Strategic Reserve Limited

Applicant Company

UK Capacity Reserve Ltd

UK Capacity Reserve Ltd

UK Capacity Reserve Ltd

UK Capacity Reserve Ltd

UK Capacity Reserve Ltd

UK Capacity Reserve Ltd

UK Capacity Reserve Ltd

UK Capacity Reserve Ltd

UK Capacity Reserve Ltd

UK Capacity Reserve Ltd

UK Capacity Reserve Ltd

UK Capacity Reserve Ltd

UK Capacity Reserve Ltd

UK Power Reserve Limited

UK Strategic Reserve Limited

UK Strategic Reserve Limited

UK Strategic Reserve Limited

UK Strategic Reserve Limited

UK Power Reserve Limited

UK Power Reserve Limited

UK Power Reserve Limited

UK Capacity Reserve Ltd

UK Capacity Reserve Ltd

UK Capacity Reserve Ltd

UK Capacity Reserve Ltd

UK Capacity Reserve Ltd

UK Power Reserve Limited

UK Power Reserve Limited

New Build Generating CMU

New Build Generating CMU

New Build Generating CMU

New Build Generating CMU

Existing Generating CMU

Existing Generating CMU

New Build Generating CMU

New Build Generating CMU

New Build Generating CMU

Existing Generating CMU

Existing Generating CMU

Existing Generating CMU

Existing Generating CMU

Existing Generating CMU

Existing Generating CMU

Existing Generating CMU

New Build Generating CMU

New Build Generating CMU

New Build Generating CMU

New Build Generating CMU

New Build Generating CMU

Existing Generating CMU

Existing Generating CMU

Existing Generating CMU

Provisional Auction Results

Appendix A – Complete List of CMUs and their Provisional Status. Note: Where a Capacity Agreement (AG) has been awarded, the Capacity and duration are the Capacity and duration provisionally awarded.

10

Page 11: Provisional Auction Results - EMR Delivery Body Markets Document... · 2017. 2. 3. · National Grid in its role as EMR Delivery Body is required by the Capacity Market Rules 2014

16SR28 No N/A N/A

ABTH7C Yes 491.606 1

ABTH8C Yes 491.606 1

ABTH9C Yes 491.606 1

AD3177 Yes 18.834 1

ADPPR2 Yes 12.755 1

AF3001 No N/A N/A

AggEpo No N/A N/A

AggLom No N/A N/A

AGPR03 No N/A N/A

ALKE08 Yes 3.442 1

ALKE09 Yes 2.364 1

ALKE10 Yes 2.73 1

ALL001 Yes 30.51 1

AMER07 No N/A N/A

AMER08 No N/A N/A

ANGEA1 Yes 34.033 1

ARDerf Yes 22.599 1

ARPNNa Yes 5.283 1

ARPPR6 Yes 2.871 1

ARPPR7 Yes 2.722 1

ARPPRc Yes 5.141 1

ARPPRd Yes 4.121 1

ARPR8A Yes 11.432 1

ASHFO2 Yes 19.889 1

AUKANb Yes 2.731 1

AUKANc Yes 2.383 1

AUKANd Yes 3.522 1

AUKNN7 Yes 7.534 1

AUKNNa Yes 5.292 1

AUKNNd Yes 4.059 1

AUKPR6 Yes 2.205 1

AUKPR7 Yes 8.164 1

AUKPR8 Yes 3.517 1

AUKPR9 Yes 9.22 1

BAGE1Z Yes 455.52 1

BAGE2b Yes 30.417 1

BALB02 No N/A N/A

BARKB1 No N/A N/A

BARKB2 No N/A N/A

BE3152 Yes 3.315 1

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

Green Frog Power Limited Existing Generating CMU

Duration

(Years)

UK Strategic Reserve Limited New Build Generating CMU

RWE Generation UK plc Existing Generating CMU

Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW)

Aggreko UK Limited Existing Generating CMU

UK Power Reserve Limited Unproven DSR CMU

Alkane Energy UK Limited Existing Generating CMU

Darent Power Limited Existing Generating CMU

Barton Hill Way Limited New Build Generating CMU

Aggreko UK Limited New Build Generating CMU

Ameresco Limited Unproven DSR CMU

Ameresco Limited Unproven DSR CMU

Anglian Water Services Limited Existing Generating CMU

Alkane Energy UK Limited Existing Generating CMU

Alkane Energy UK Limited Existing Generating CMU

FCC Recycling (UK) Ltd Existing Generating CMU

Regent Park Energy Limited Existing Generating CMU

Regent Park Energy Limited Existing Generating CMU

Regent Park Energy Limited Existing Generating CMU

Viridor Waste Management Limited Existing Generating CMU

Regent Park Energy Limited New Build Generating CMU

Regent Park Energy Limited Existing Generating CMU

Alkane Energy UK Limited New Build Generating CMU

Alkane Energy UK Limited New Build Generating CMU

Alkane Energy CM ltd New Build Generating CMU

Regent Park Energy Limited Existing Generating CMU

Ashford Power Ltd New Build Generating CMU

Alkane Energy UK Limited New Build Generating CMU

Alkane Energy UK Limited Existing Generating CMU

Alkane Energy UK Limited Existing Generating CMU

Alkane Energy UK Limited Existing Generating CMU

Alkane Energy CM ltd New Build Generating CMU

Alkane Energy UK Limited New Build Generating CMU

Alkane Energy UK Limited Existing Generating CMU

Barking Power Limited Existing Generating CMU

Barking Power Limited Existing Generating CMU

GF Power Peaking Limited Existing Generating CMU

Calon Energy Limited Existing Generating CMU

Calon Energy Limited Existing Generating CMU

BALBY POWER LIMITED New Build Generating CMU

Provisional Auction Results

11

Page 12: Provisional Auction Results - EMR Delivery Body Markets Document... · 2017. 2. 3. · National Grid in its role as EMR Delivery Body is required by the Capacity Market Rules 2014

BGTL01 Yes 1.946 1

BGTL02 No N/A N/A

BGTL03 Yes 1.848 1

BHRLH2 Yes 3.22 1

BOLC02 No N/A N/A

BRD001 Yes 2.133 1

BREH14 Yes 13.485 1

BRIST2 Yes 39.908 1

Brit16 Yes 888 1

BRST1A Yes 5.694 1

BRST2B Yes 5.661 1

BSBU17 Yes 55.549 1

BUCK02 Yes 23.642 1

BURG01 Yes 44.298 1

BUXT01 Yes 15.94 1

BYGEN2 Yes 18.834 1

CADO02 Yes 15.067 1

CARerf Yes 27.319 1

CarGe1 Yes 25.11 1

CARR01 Yes 398.58 1

CARR02 Yes 398.58 1

CARR13 No N/A N/A

CASQ14 Yes 3.038 1

CAST01 Yes 43.799 1

CDCL01 Yes 385.44 1

CEN002 Yes 2.656 1

CENES1 Yes 4.215 1

CENES2 Yes 1.867 1

CES003 Yes 5.382 1

CES004 Yes 7.354 1

CES006 Yes 2.851 1

CES007 Yes 5.09 1

CES008 Yes 4.123 1

CES009 Yes 6.061 1

CES010 Yes 5.169 1

CHEGT2 Yes 42.837 1

CHIC01 Yes 44.298 1

CHIP01 Yes 9.614 1

CHPWIN Yes 83.626 1

CIT001 Yes 7.586 1

CLAC-1 Yes 34.464 1

British Gas Trading Limited Unproven DSR CMU

Veolia UK Limited Existing Generating CMU

RYDBERG DEVELOPMENT COMPANY LIMITED New Build Generating CMU

Duration

(Years)

British Gas Trading Limited Unproven DSR CMU

British Gas Trading Limited Unproven DSR CMU

Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW)

BritNed Development Limited Existing Interconnector CMU

Infinis Alternative Energies Limited Existing Generating CMU

Infinis Alternative Energies Limited Existing Generating CMU

E.ON UK Cogeneration Ltd Existing Generating CMU

P3P Energy Management Limited Existing Generating CMU

Rolls-Royce Power Development Limited Existing Generating CMU

Buxton Power Limited New Build Generating CMU

BYGEN POWER (TREGEEN) LIMITED New Build Generating CMU

Cadoxton Reserve Power Limited Existing Generating CMU

British Sugar plc Existing Generating CMU

FCC Buckinghamshire Ltd New Build Generating CMU

SSEPG (Operations) Limited Existing Generating CMU

Carrington Power Limited New Build Generating CMU

CARRHILL POWER LIMITED New Build Generating CMU

P3P Energy Management AE Limited Existing Generating CMU

Viridor Waste Management Limited Existing Generating CMU

Cargill PLC Existing Generating CMU

Carrington Power Limited New Build Generating CMU

GB Gas Holdings Ltd Unproven DSR CMU

GB Gas Holdings Ltd Unproven DSR CMU

Industrial Energy Services Limited Existing Generating CMU

E.ON UK Cogeneration Ltd Existing Generating CMU

Uniper Global Commodities SE Existing Generating CMU

E.ON UK Plc Existing Generating CMU

Leicester District Energy Company Limited Existing Generating CMU

Southampton Geothermal Heating Company Limited Existing Generating CMU

Birmingham District Energy Company Limited Existing Generating CMU

Excel District Energy Company Limited Existing Generating CMU

East London Energy Limited Existing Generating CMU

East London Energy Limited Existing Generating CMU

Winnington CHP Limited Existing Generating CMU

Citigen (London) Limited Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

RWE Cogen UK Ltd Existing Generating CMU

SSEPG (Operations) Limited Existing Generating CMU

SSEPG (Operations) Limited Existing Generating CMU

Provisional Auction Results

12

Page 13: Provisional Auction Results - EMR Delivery Body Markets Document... · 2017. 2. 3. · National Grid in its role as EMR Delivery Body is required by the Capacity Market Rules 2014

CLEAT1 No N/A N/A

CLUNIE Yes 52.73 1

CNQPS1 Yes 328.5 1

CNQPS2 Yes 328.5 1

CNQPS3 Yes 328.5 1

CNQPS4 Yes 328.5 1

CORBY1 Yes 356.532 1

COW161 Yes 46.613 1

COW162 Yes 46.562 1

CPM001 No N/A N/A

CROYD2 Yes 47.264 1

CT1-16 Yes 430.53 1

CT2-16 Yes 438.975 1

CT3-16 Yes 440.013 1

CT4-16 Yes 430.094 1

CYNO02 Yes 15.067 1

DAFE02 Yes 9.417 1

DCPS02 Yes 3.27 1

DEEP_1 No N/A N/A

DERBY2 Yes 51.652 1

DID161 Yes 23.543 1

DID162 Yes 23.543 1

DID163 Yes 23.543 1

DID164 Yes 23.543 1

DIDCB5 Yes 700.8 1

DIDCB6 Yes 657 1

DINO_1 Yes 263.835 1

DINO_2 Yes 263.835 1

DINO_3 Yes 290.764 1

DINO_4 Yes 289.672 1

DINO_5 Yes 263.835 1

DINO_6 Yes 263.835 1

DN2116 Yes 462.215 1

DN2216 Yes 465.864 1

DSR_01 Yes 6.95 1

DSR_02 Yes 4.344 1

DSR009 Yes 20 1

DSR010 No N/A N/A

DSR011 Yes 10 1

DSR013 No N/A N/A

DSR020 Yes 4 1

Uniper Global Commodities SE Existing Generating CMU

Uniper Global Commodities SE Existing Generating CMU

Uniper Global Commodities SE Existing Generating CMU

Duration

(Years)

Cleator Battery Storage Limited New Build Generating CMU

SSE Generation Ltd. Existing Generating CMU

Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW)

RWE Generation UK plc Existing Generating CMU

Arjowiggins Chartham Limited Existing Generating CMU

Rolls-Royce Power Development Limited Existing Generating CMU

Uniper Global Commodities SE Existing Generating CMU

Corby Power Limited Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

EDF Energy plc Existing Generating CMU

Cynon Power Limited Existing Generating CMU

Dafen Reserve Power Limited Existing Generating CMU

EDF Energy plc Existing Generating CMU

EDF Energy plc Existing Generating CMU

EDF Energy plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

Veolia UK Limited Existing Generating CMU

Deeside Power (UK) Limited Existing Generating CMU

Rolls-Royce Power Development Limited Existing Generating CMU

First Hydro Company Existing Generating CMU

First Hydro Company Existing Generating CMU

First Hydro Company Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

Limejump Ltd. Unproven DSR CMU

First Hydro Company Existing Generating CMU

First Hydro Company Existing Generating CMU

First Hydro Company Existing Generating CMU

E.ON UK Plc Unproven DSR CMU

E.ON UK Plc Unproven DSR CMU

E.ON UK Plc Unproven DSR CMU

Limejump Ltd. Unproven DSR CMU

E.ON UK Plc Unproven DSR CMU

E.ON UK Plc Unproven DSR CMU

Provisional Auction Results

13

Page 14: Provisional Auction Results - EMR Delivery Body Markets Document... · 2017. 2. 3. · National Grid in its role as EMR Delivery Body is required by the Capacity Market Rules 2014

DSR024 Yes 2.25 1

DX0516 Yes 557.843 1

DX0616 Yes 556.588 1

DX0916 Yes 28.752 1

DX1016 Yes 29.786 1

DX1216 Yes 29.786 1

EBRGG2 Yes 93.228 1

EBRYP2 Yes 197.525 1

ECMU13 No N/A N/A

ECMU14 No N/A N/A

ECMU15 No N/A N/A

ECMU16 No N/A N/A

ECMU17 No N/A N/A

ECMU18 No N/A N/A

ECMU19 No N/A N/A

ECMU20 No N/A N/A

ECMU21 No N/A N/A

ECMU22 No N/A N/A

ECMU23 No N/A N/A

ECMU24 No N/A N/A

EDFSR1 No N/A N/A

EDFSR2 Yes 6.95 1

EDFSR3 Yes 2.606 1

EDFSR4 No N/A N/A

EECL01 Yes 357.408 1

EGGBGH Yes 1820.104 1

EM5-T4 Yes 124.34 1

END003 No N/A N/A

END004 Yes 2.84 1

EPO001 Yes 6.954 1

EPO002 Yes 17.542 1

EPO004 Yes 8.1 1

ERNESA Yes 18.834 1

ERPAL1 Yes 4.591 1

ERPMA1 Yes 6.441 1

ERRO01 Yes 21.739 1

ERRO02 Yes 21.801 1

ERRO03 Yes 21.805 1

EWIC15 Yes 151.5 1

EXC_02 Yes 3.014 1

EXC_03 Yes 1.8 1

Drax Power Limited Existing Generating CMU

Drax Power Limited Existing Generating CMU

Drax Power Limited Existing Generating CMU

Duration

(Years)

E.ON UK Plc Unproven DSR CMU

Drax Power Limited Existing Generating CMU

Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW)

EnerNOC UK Limited Unproven DSR CMU

EnerNOC UK Limited Unproven DSR CMU

EnerNOC UK Limited Unproven DSR CMU

Drax Power Limited Existing Generating CMU

Centrica Brigg Limited Existing Generating CMU

Centrica Barry Limited Existing Generating CMU

EnerNOC UK Limited Unproven DSR CMU

EnerNOC UK Limited Unproven DSR CMU

EnerNOC UK Limited Unproven DSR CMU

EnerNOC UK Limited Unproven DSR CMU

EnerNOC UK Limited Unproven DSR CMU

EnerNOC UK Limited Unproven DSR CMU

EDF Energy Customers plc Unproven DSR CMU

EDF Energy Customers plc Unproven DSR CMU

EDF Energy Customers plc Unproven DSR CMU

EnerNOC UK Limited Unproven DSR CMU

EnerNOC UK Limited Unproven DSR CMU

EnerNOC UK Limited Unproven DSR CMU

Esso Petroleum Company Limited Existing Generating CMU

Endeco Technologies Limited Unproven DSR CMU

Endeco Technologies Limited Unproven DSR CMU

EDF Energy Customers plc Unproven DSR CMU

Uniper Global Commodities SE Existing Generating CMU

Eggborough Power Limited Existing Generating CMU

Attune Energy Limited New Build Generating CMU

Exeter RP Limited New Build Generating CMU

Exeter RP Limited New Build Generating CMU

Energy Pool UK limited Unproven DSR CMU

Energy Pool UK limited Unproven DSR CMU

Energy Pool UK limited Existing Generating CMU

EirGrid Interconnector Limited Existing Interconnector CMU

Limejump Ltd. Existing Generating CMU

Limejump Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

Provisional Auction Results

14

Page 15: Provisional Auction Results - EMR Delivery Body Markets Document... · 2017. 2. 3. · National Grid in its role as EMR Delivery Body is required by the Capacity Market Rules 2014

EXC_04 Yes 7.459 1

EXC_05 Yes 13.236 1

EXEerf Yes 3.067 1

EXETR2 Yes 45.21 1

FAS117 Yes 19.817 1

FAS217 Yes 19.817 1

FAS317 Yes 19.817 1

FFES_1 Yes 86.661 1

FFES_2 Yes 86.661 1

FFES_3 Yes 86.661 1

FFES_4 Yes 86.661 1

FID02G Yes 16.009 1

FID03G Yes 16.009 1

FID117 No N/A N/A

FIDL02 Yes 422.582 1

FIDL03 Yes 424.32 1

FIDL04 Yes 432.862 1

FLXT01 Yes 8.148 1

FLXT02 Yes 4.982 1

FLXT03 Yes 4.85 1

FLXT04 Yes 6.075 1

FLXT05 Yes 5.362 1

FLXT06 Yes 10.264 1

FLXT08 Yes 4.414 1

FLXT09 Yes 4.05 1

FLXT10 Yes 2.708 1

FLXT11 Yes 2.744 1

FLXT12 Yes 2.673 1

FLXT13 Yes 2.664 1

FLXT14 Yes 2.355 1

FLXT15 No N/A N/A

FLXT16 No N/A N/A

FLXT18 Yes 3.083 1

FLXT19 Yes 3.063 1

FLXT20 Yes 4.655 1

FLXT21 Yes 2.953 1

FLXT22 Yes 3.769 1

FLXT24 Yes 3.413 1

FLXT25 Yes 15.36 1

FLXT26 Yes 3.6 1

FLXT27 Yes 7.129 1

Viridor Waste Management Limited Existing Generating CMU

Rolls-Royce Power Development Limited Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

Duration

(Years)

Limejump Ltd. Existing Generating CMU

Limejump Ltd. Existing Generating CMU

Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW)

First Hydro Company Existing Generating CMU

First Hydro Company Existing Generating CMU

First Hydro Company Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

First Hydro Company Existing Generating CMU

Keadby Generation Limited Existing Generating CMU

Keadby Generation Limited Existing Generating CMU

Keadby Generation Limited Existing Generating CMU

Keadby Generation Limited Existing Generating CMU

Keadby Generation Limited Existing Generating CMU

Keadby Generation Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited New Build Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Provisional Auction Results

15

Page 16: Provisional Auction Results - EMR Delivery Body Markets Document... · 2017. 2. 3. · National Grid in its role as EMR Delivery Body is required by the Capacity Market Rules 2014

FLXT40 Yes 3.475 1

FLXT41 Yes 4.492 1

FLXT42 Yes 10.8 1

FLXT43 Yes 12.04 1

FLXT61 Yes 2.581 1

FLXT62 Yes 3.323 1

FLXT63 Yes 3.372 1

FLXT64 Yes 2.778 1

FLXT71 Yes 17.376 1

FLXT72 No N/A N/A

FLXT74 Yes 5.213 1

FLXT75 Yes 17.376 1

FLXT76 No N/A N/A

FLXT77 Yes 11 1

FLXT81 Yes 6.8 1

FMFE17 Yes 66.687 1

FOAK01 Yes 6.136 1

FOYE01 Yes 149.538 1

FOYE02 Yes 144.435 1

fulcru Yes 6.203 1

GCHPL1 Yes 128.208 1

GCMU02 Yes 3.6 1

GCMU03 Yes 3.6 1

GCMU04 Yes 3.78 1

GCMU05 Yes 3.24 1

GCMU06 Yes 3.96 1

GCMU07 Yes 3.96 1

GCMU08 Yes 2.61 1

GCMU09 Yes 2.61 1

GCMU10 Yes 2.61 1

GCMU11 Yes 9.45 1

GCMU14 Yes 2.025 1

GCMU15 Yes 3.6 1

GCMU17 Yes 6.03 1

GCMU18 Yes 7.02 1

GLAS16 Yes 9.9 1

GLASS2 No N/A N/A

GLENMS Yes 34.214 1

GRAI06 Yes 421.2 1

GRAI07 Yes 421.2 1

GRAI08 Yes 421.2 1

Flexitricity Limited Proven DSR CMU

Flexitricity Limited Proven DSR CMU

Flexitricity Limited Proven DSR CMU

Duration

(Years)

Flexitricity Limited Proven DSR CMU

Flexitricity Limited Proven DSR CMU

Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW)

Flexitricity Limited Unproven DSR CMU

Flexitricity Limited Unproven DSR CMU

Flexitricity Limited Unproven DSR CMU

Flexitricity Limited Proven DSR CMU

Flexitricity Limited Proven DSR CMU

Flexitricity Limited Proven DSR CMU

Flexitricity Limited Unproven DSR CMU

Ferrybridge MFE Limited New Build Generating CMU

SSEPG (Operations) Limited Existing Generating CMU

Flexitricity Limited Unproven DSR CMU

Flexitricity Limited Unproven DSR CMU

Flexitricity Limited Unproven DSR CMU

Grangemouth CHP Limited Existing Generating CMU

EnerNOC UK Limited Existing Generating CMU

EnerNOC UK Limited Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

Fulcrum Power Ltd Existing Generating CMU

EnerNOC UK Limited Existing Generating CMU

EnerNOC UK Limited Existing Generating CMU

EnerNOC UK Limited Existing Generating CMU

EnerNOC UK Limited Existing Generating CMU

EnerNOC UK Limited Existing Generating CMU

EnerNOC UK Limited Existing Generating CMU

EnerNOC UK Limited Existing Generating CMU

EnerNOC UK Limited Existing Generating CMU

EnerNOC UK Limited Existing Generating CMU

EnerNOC UK Limited Existing Generating CMU

EnerNOC UK Limited Existing Generating CMU

EnerNOC UK Limited Existing Generating CMU

Uniper Global Commodities SE Existing Generating CMU

Uniper Global Commodities SE Existing Generating CMU

Uniper Global Commodities SE Existing Generating CMU

TP LEASECO LIMITED Existing Generating CMU

Glassenbury Battery Storage Limited New Build Generating CMU

SSE Generation Ltd. Existing Generating CMU

Provisional Auction Results

16

Page 17: Provisional Auction Results - EMR Delivery Body Markets Document... · 2017. 2. 3. · National Grid in its role as EMR Delivery Body is required by the Capacity Market Rules 2014

GRG101 Yes 23.785 1

GRG40C Yes 25.897 1

GYAR01 Yes 359.16 1

HAMP02 Yes 28.413 1

HARB02 Yes 15.067 1

HARV16 Yes 9.9 1

Harwo1 Yes 3.168 1

HAVE02 No N/A N/A

HEAR2a Yes 46.021 1

HEAR2b Yes 47.085 1

HP7-16 Yes 450.698 1

HP8-16 Yes 444.362 1

HR1-16 Yes 510.44 1

HR2-16 Yes 510.908 1

HU7-16 Yes 452.563 1

HU8-16 Yes 453.464 1

HY1116 Yes 433.301 1

HY1216 Yes 502.543 1

HY2716 Yes 545.803 1

HY2816 Yes 546.171 1

HYTHE2 Yes 43.712 1

ICHP02 Yes 1188 1

IFA_16 Yes 1172.92 1

IGCOSX Yes 700.8 1

IGROCK Yes 727.08 1

IGSPLN Yes 791.028 1

IL3159 Yes 6.027 1

IMERS1 Yes 4.372 1

IMERS2 Yes 5.713 1

IMERS3 Yes 6.69 1

IMERS4 Yes 3.683 1

IMERS5 Yes 3.052 1

IMERS6 Yes 3.635 1

INDQ_1 Yes 131.838 1

INEOS1 Yes 45.9 1

INV117 Yes 21.54 1

KEADBY Yes 697.515 1

Kelli1 Yes 4.979 1

Keyst1 Yes 19.501 1

KILHM1 Yes 292.869 1

KILHM2 Yes 292.869 1

RWE Generation UK plc Existing Generating CMU

Veolia UK Limited Existing Generating CMU

Harbourne Power Limited New Build Generating CMU

Duration

(Years)

Uniper Global Commodities SE Existing Generating CMU

Uniper Global Commodities SE Existing Generating CMU

Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW)

Rolls-Royce Power Development Limited Existing Generating CMU

Rolls-Royce Power Development Limited Existing Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

TP LEASECO LIMITED Existing Generating CMU

Harworth Power Generation Limited Existing Generating CMU

RYDBERG DEVELOPMENT COMPANY LIMITED New Build Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

RWE Cogen UK (Hythe) Ltd Existing Generating CMU

VPI Immingham LLP Existing Generating CMU

National Grid Interconnectors Limited Existing Interconnector CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

GF Power Peaking Limited New Build Generating CMU

Imerys Minerals Existing Generating CMU

Imerys Minerals Existing Generating CMU

Coryton Energy Company Ltd Existing Generating CMU

Rocksavage Power Company Ltd Existing Generating CMU

Spalding Energy Company Ltd Existing Generating CMU

Imerys Minerals Existing Generating CMU

Indian Queens Power Limited Existing Generating CMU

INEOS Nitriles (UK) Ltd Existing Generating CMU

Imerys Minerals Existing Generating CMU

Imerys Minerals Existing Generating CMU

Imerys Minerals Existing Generating CMU

Keystone Power Limited Existing Generating CMU

Uniper Global Commodities SE Existing Generating CMU

Uniper Global Commodities SE Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

Keadby Generation Limited Existing Generating CMU

Harworth Power Generation Limited Existing Generating CMU

Provisional Auction Results

17

Page 18: Provisional Auction Results - EMR Delivery Body Markets Document... · 2017. 2. 3. · National Grid in its role as EMR Delivery Body is required by the Capacity Market Rules 2014

KIWI70 No N/A N/A

KIWI71 No N/A N/A

KIWI73 No N/A N/A

KIWI74 No N/A N/A

KIWI75 No N/A N/A

KIWI76 No N/A N/A

KIWI78 No N/A N/A

KIWI96 No N/A N/A

KPBL01 Yes 5.777 1

KPEG01 No N/A N/A

KPEG03 Yes 7.501 1

KPEG06 No N/A N/A

KR3010 No N/A N/A

LAKefw Yes 32.096 1

LARI02 Yes 15.067 1

LBA161 Yes 680.543 1

LCHART Yes 29.294 1

LEED02 No N/A N/A

LINC01 Yes 11.27 1

LOC117 Yes 40.495 1

LP3011 No N/A N/A

LWL100 Yes 33.446 1

MAIN16 Yes 4.98 1

MEDP01 Yes 648.532 1

MERC02 Yes 21.73 1

MN3012 No N/A N/A

Moyle2 Yes 150 1

MRWD-1 Yes 805.92 1

NBB_02 Yes 4.622 1

NDAFLS No N/A N/A

NDAMAN Yes 24.478 1

NEVE02 Yes 15.067 1

NEWH02 Yes 15.582 1

NG1POW Yes 19.925 1

OEL001 Yes 9.991 1

OR3165 Yes 7.458 1

PEH117 No N/A N/A

PEMB11 Yes 416.1 1

PEMB21 Yes 416.1 1

PEMB31 Yes 416.1 1

PEMB41 Yes 416.1 1

KiWi Power Ltd Unproven DSR CMU

KiWi Power Ltd Unproven DSR CMU

KiWi Power Ltd Unproven DSR CMU

Duration

(Years)

KiWi Power Ltd Unproven DSR CMU

KiWi Power Ltd Unproven DSR CMU

Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW)

KIWI POWER BATTERY LIMITED New Build Generating CMU

KiWi Power Ltd Existing Generating CMU

KiWi Power Ltd Existing Generating CMU

KiWi Power Ltd Unproven DSR CMU

KiWi Power Ltd Unproven DSR CMU

KiWi Power Ltd Proven DSR CMU

Larigan Power Limited New Build Generating CMU

RWE Generation UK plc Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

KiWi Power Ltd Existing Generating CMU

Goose House Limited New Build Generating CMU

LAKESIDE ENERGY FROM WASTE LIMITED Existing Generating CMU

Goose House Limited New Build Generating CMU

LondonWaste Limited Existing Generating CMU

The Isle of Wight Energy Company Limited Existing Generating CMU

Veolia UK Limited Existing Generating CMU

FCC Recycling (UK) Ltd Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

Moyle Interconnector Ltd Existing Interconnector CMU

SSE Energy Supply Ltd. Existing Generating CMU

Limejump Ltd. New Build Generating CMU

Medway Power Limited Existing Generating CMU

Mercia Waste Management Ltd New Build Generating CMU

Goose House Limited New Build Generating CMU

Veolia UK Limited Existing Generating CMU

NG 1 Power Ltd New Build Generating CMU

ORIGAMI ENERGY LIMITED Unproven DSR CMU

Nuclear Decommissioning Authority Existing Generating CMU

Nuclear Decommissioning Authority Existing Generating CMU

Nevern Power Limited New Build Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

New Power Generation N04 Limited New Build Generating CMU

SSE Generation Ltd. Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

Provisional Auction Results

18

Page 19: Provisional Auction Results - EMR Delivery Body Markets Document... · 2017. 2. 3. · National Grid in its role as EMR Delivery Body is required by the Capacity Market Rules 2014

PEMB51 Yes 416.1 1

PETEM2 Yes 230.87 1

PGP11B Yes 18.834 1

PGP13F Yes 18.834 1

PGP14E Yes 18.834 1

PGP18H Yes 18.834 1

PGP2PB Yes 18.834 1

PGP5LL Yes 18.834 1

PGP6BA Yes 18.834 1

PGPSOT Yes 3.767 1

POL001 Yes 29.344 1

PR_ALF No N/A N/A

PRIM02 Yes 5.707 1

PS3116 No N/A N/A

PWTFR1 Yes 4.591 1

PWTSR1 Yes 2.825 1

PWTTL3 Yes 6.441 1

PWTTL4 No N/A N/A

QMC001 Yes 3.969 1

QT3167 No N/A N/A

R092BE No N/A N/A

RANN-1 Yes 13.786 1

RANN-2 Yes 13.786 1

RANN-3 Yes 13.786 1

RATS01 No N/A N/A

RATS02 Yes 447.638 1

RATS03 No N/A N/A

RATSU4 Yes 463.647 1

RED002 Yes 15.067 1

REST01 Yes 4.454 1

REST02 Yes 6.08 1

REST03 Yes 4.279 1

REST04 Yes 7.205 1

REST05 Yes 33.206 1

REST07 Yes 35.904 1

REST08 Yes 6.123 1

REST09 Yes 6.027 1

RHE2_1 Yes 18.402 1

RHE3_1 Yes 18.367 1

RPTGC1 Yes 12.907 1

RRRF01 Yes 67.249 1

Peak Gen Power 11 Limited New Build Generating CMU

Peak Gen Power 13 Limited Existing Generating CMU

Peak Gen Power 14 Limited New Build Generating CMU

Duration

(Years)

RWE Generation UK plc Existing Generating CMU

Centrica PB Limited Existing Generating CMU

Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW)

Trinity Power Limited New Build Generating CMU

Peak Gen Power 6 Limited Existing Generating CMU

W4B Renewable Energy Limited Existing Generating CMU

E.ON UK CHP Limited Existing Generating CMU

Peak Gen Power 18 Limited New Build Generating CMU

Peak Gen Power 2 Limited Existing Generating CMU

Peak Gen Power 5 Limited Existing Generating CMU

Prime Energy Limited Existing Generating CMU

Green Frog Power Limited Existing Generating CMU

Powertree (Foxwood Road) Limited New Build Generating CMU

Powertree (Sidings Road) Limited New Build Generating CMU

Powertree (Taylor Lane) Limited New Build Generating CMU

Powertree (Taylor Lane) Limited New Build Generating CMU

E.ON Connecting Energies Limited Existing Generating CMU

Green Frog Power Limited Existing Generating CMU

G2 Energy Limited New Build Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

Uniper Global Commodities SE Existing Generating CMU

Uniper Global Commodities SE Existing Generating CMU

Uniper Global Commodities SE Existing Generating CMU

Uniper Global Commodities SE Existing Generating CMU

Redlake Power Limited New Build Generating CMU

REstore Flexpond UK Limited Existing Generating CMU

REstore Flexpond UK Limited Existing Generating CMU

REstore Flexpond UK Limited Existing Generating CMU

REstore Flexpond UK Limited Existing Generating CMU

REstore Flexpond UK Limited Existing Generating CMU

REstore Flexpond UK Limited Existing Generating CMU

REstore Flexpond UK Limited Existing Generating CMU

REstore Flexpond UK Limited Existing Generating CMU

Statkraft Markets GmbH Existing Generating CMU

Statkraft Markets GmbH Existing Generating CMU

Reserve Power Trading Limited New Build Generating CMU

Riverside Resource Recovery Limited Existing Generating CMU

Provisional Auction Results Provisional Auction Results

19

Page 20: Provisional Auction Results - EMR Delivery Body Markets Document... · 2017. 2. 3. · National Grid in its role as EMR Delivery Body is required by the Capacity Market Rules 2014

RTG20C Yes 16.009 1

RU3168 No N/A N/A

S17G01 Yes 37.539 1

S17G02 Yes 37.571 1

S17S11 Yes 21.738 1

SALTPS Yes 1080 1

SAND01 Yes 43.799 1

SEA1_2 Yes 1102.008 1

SEALS2 Yes 48.161 1

SEL-1b No N/A N/A

SEL-2b No N/A N/A

SEL-3b No N/A N/A

SEL-4b No N/A N/A

SELB02 Yes 15.067 1

SGH002 Yes 1.926 1

SHB1_2 Yes 1226.4 1

SHRO02 Yes 7.412 1

SLOY01 Yes 35.104 1

SLOY02 Yes 35.252 1

SLOY03 Yes 34.464 1

SLOY04 Yes 29.352 1

SP16BL Yes 52.56 1

SP16CR Yes 423.676 1

SP16DC Yes 705.18 1

SP16GL Yes 20.8 1

SP16KE Yes 20.82 1

SP16RH Yes 626.34 1

SP16SH Yes 372.3 1

SP16TO Yes 29.761 1

SPDR01 Yes 4.242 1

SPDR02 No N/A N/A

SPDR03 No N/A N/A

SPDR04 No N/A N/A

STAF02 No N/A N/A

STAY01 Yes 406.464 1

STAY02 Yes 406.464 1

STAY03 Yes 406.464 1

STAY04 Yes 406.464 1

SUEZ01 Yes 9.429 1

SUEZ02 Yes 17.02 1

SUEZ03 Yes 9.435 1

Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW)Duration

(Years)

Uniper Global Commodities SE Existing Generating CMU

Green Frog Power Limited Existing Generating CMU

Sembcorp Utilities (UK) Limited Existing Generating CMU

Sembcorp Utilities (UK) Limited Existing Generating CMU

Sembcorp Utilities (UK) Limited Existing Generating CMU

Saltend Cogeneration Company Limited Existing Generating CMU

E.ON UK Cogeneration Ltd Existing Generating CMU

Seabank Power Limited Existing Generating CMU

RWE Cogen UK Ltd Existing Generating CMU

SmartestEnergy Limited Unproven DSR CMU

SmartestEnergy Limited Unproven DSR CMU

SmartestEnergy Limited Unproven DSR CMU

SmartestEnergy Limited Unproven DSR CMU

Selby Power Limited New Build Generating CMU

Veolia UK Limited Existing Generating CMU

Centrica SHB Limited Existing Generating CMU

Veolia UK Limited Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

ScottishPower Generation Limited Existing Generating CMU

ScottishPower Generation Limited Existing Generating CMU

ScottishPower Generation Limited Existing Generating CMU

ScottishPower Generation Limited Existing Generating CMU

ScottishPower Generation Limited Existing Generating CMU

ScottishPower Generation Limited Existing Generating CMU

ScottishPower Generation Limited Existing Generating CMU

ScottishPower Generation Limited Existing Generating CMU

ScottishPower Energy Retail Limited Unproven DSR CMU

ScottishPower Energy Retail Limited Unproven DSR CMU

ScottishPower Energy Retail Limited Unproven DSR CMU

ScottishPower Energy Retail Limited Unproven DSR CMU

Veolia UK Limited Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

SUEZ RECYCLING AND RECOVERY KIRKLEES LTD Existing Generating CMU

SUEZ RECYCLING AND RECOVERY TEES VALLEY LTD Existing Generating CMU

SITA Northumberland Limited Existing Generating CMU

Provisional Auction Results

20

Page 21: Provisional Auction Results - EMR Delivery Body Markets Document... · 2017. 2. 3. · National Grid in its role as EMR Delivery Body is required by the Capacity Market Rules 2014

SUEZ04 Yes 20.876 1

SUEZ05 Yes 20.846 1

SUEZ06 Yes 18 1

SUEZ07 Yes 28.597 1

SUTB1Z Yes 717.444 1

SV3169 No N/A N/A

SVR10Z Yes 372.3 1

SVR20Z Yes 372.3 1

SZ1-16 Yes 519.658 1

SZ2-16 Yes 519.658 1

TAYL12 Yes 46.614 1

TAYL13 Yes 46.148 1

THAT01 Yes 8.266 1

THRN01 Yes 43.8 1

TILL02 Yes 15.067 1

TLAGA1 Yes 792.78 1

TN1-16 Yes 525.93 1

TN2-16 Yes 534.788 1

TUM117 Yes 16.468 1

TUM217 Yes 16.512 1

TW3170 No N/A N/A

TYSE02 Yes 24.737 1

Uskone No N/A N/A

Usktwo No N/A N/A

UX3171 No N/A N/A

VIR101 Yes 5.65 1

VIR102 Yes 11.3 1

VIR103 Yes 14.126 1

VIR104 Yes 19.663 1

VIR105 Yes 19.604 1

VIR107 Yes 18.948 1

VIR109 Yes 18.204 1

VIR110 Yes 14.126 1

VIR201 Yes 19.604 1

VIR202 Yes 12.603 1

VIR203 Yes 5.601 1

VIR204 Yes 9.229 1

VIR205 Yes 3.955 1

VKING2 Yes 44.782 1

VW3021 No N/A N/A

VY3172 No N/A N/A

Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW)Duration

(Years)

SITA South Tyne and Wear Limited Existing Generating CMU

SUEZ RECYCLING AND RECOVERY SUFFOLK LTD Existing Generating CMU

Cornwall Energy Recovery Limited New Build Generating CMU

West London Energy Recovery Limited New Build Generating CMU

Calon Energy Limited Existing Generating CMU

Green Frog Power Limited Existing Generating CMU

Calon Energy Limited Existing Generating CMU

Calon Energy Limited Existing Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

Uniper Global Commodities SE Existing Generating CMU

Uniper Global Commodities SE Existing Generating CMU

SSEPG (Operations) Limited Existing Generating CMU

E.ON UK Cogeneration Ltd Existing Generating CMU

Tillingham Power Limited New Build Generating CMU

Centrica Langage Limited Existing Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

Green Frog Power Limited Existing Generating CMU

Veolia UK Limited Existing Generating CMU

Simec Uskmouth Power Limited Existing Generating CMU

Simec Uskmouth Power Limited Existing Generating CMU

Green Frog Power Limited Existing Generating CMU

Viridis 178 Ltd Existing Generating CMU

Viridis 178 Ltd Existing Generating CMU

Viridis 178 Ltd Existing Generating CMU

Viridis 178 Ltd Existing Generating CMU

Viridis 178 Ltd New Build Generating CMU

Viridis 178 Ltd New Build Generating CMU

Viridis 178 Ltd New Build Generating CMU

Viridis 178 Ltd New Build Generating CMU

Viridis 178 Ltd New Build Generating CMU

Viridis 178 Ltd New Build Generating CMU

Viridis 178 Ltd New Build Generating CMU

Viridis 178 Ltd New Build Generating CMU

Viridis 178 Ltd New Build Generating CMU

Rolls-Royce Power Development Limited Existing Generating CMU

Moorfield Way Limited New Build Generating CMU

Green Frog Power Limited Existing Generating CMU

Provisional Auction Results

21

Page 22: Provisional Auction Results - EMR Delivery Body Markets Document... · 2017. 2. 3. · National Grid in its role as EMR Delivery Body is required by the Capacity Market Rules 2014

WA1-16 Yes 434.339 1

WA2-16 Yes 434.513 1

WA3-16 Yes 434.513 1

WA4-16 Yes 434.6 1

water1 Yes 13.956 1

WB1-16 Yes 404.274 1

WB2-16 Yes 404.274 1

WB3-16 Yes 404.274 1

WG1-16 Yes 18.834 1

WG4-16 Yes 18.834 1

WSTNPT Yes 34.784 1

WZ3173 No N/A N/A

XA3174 No N/A N/A

YB3175 No N/A N/A

ZC3176 No N/A N/A

Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW)Duration

(Years)

EDF Energy plc Existing Generating CMU

EDF Energy plc Existing Generating CMU

EDF Energy plc Existing Generating CMU

EDF Energy plc Existing Generating CMU

Waterswallows Energy Limited New Build Generating CMU

EDF Energy plc Existing Generating CMU

EDF Energy plc Existing Generating CMU

EDF Energy plc Existing Generating CMU

EDF Energy plc Existing Generating CMU

EDF Energy plc Existing Generating CMU

SSE Energy Supply Ltd. Existing Generating CMU

Green Frog Power Limited Existing Generating CMU

Green Frog Power Limited Existing Generating CMU

Green Frog Power Limited Existing Generating CMU

Green Frog Power Limited Existing Generating CMU

Provisional Auction Results

22