Test Report issued under the responsibility of: TEST REPORT IEC 60598-2-2 Luminaires Part 2: Particular requirements Section 2: Recessed luminaires Report Number. .............................. : SHES150500273001 Date of issue ................................... : 2015-07-14 Total number of pages .................... 38 Name of Testing Laboratory preparing the Report ...................... : SGS-CSTC Standards Technical Services (Shanghai) Co., Ltd. Applicant’s name............................ : Shanghai Winsun Electronics Co., Ltd Address ........................................... : No.62, Lane 99, Chun Guang Road, Min Hang District, Shanghai, China Test specification: Standard .......................................... : IEC 60598-2-2:2011 (Third Edition) used in conjunction with IEC 60598-1:2014 (Eighth Edition) Test procedure ............................... : SGS CSTC Non-standard test method............. : N/A Test Report Form No...................... : IEC60598_2_2D Test Report Form(s) Originator..... : Intertek Semko AB Master TRF ...................................... : 2014-09 Copyright © 2014 IEC System of Conformity Assessment Schemes for Electrotechnical Equipment and Components (IECEE System). All rights reserved. This publication may be reproduced in whole or in part for non-commercial purposes as long as the IECEE is acknowledged as copyright owner and source of the material. IECEE takes no responsibility for and will not assume liability for damages resulting from the reader's interpretation of the reproduced material due to its placement and context. If this Test Report Form is used by non-IECEE members, the IECEE/IEC logo and the reference to the CB Scheme procedure shall be removed. This report is not valid as a CB Test Report unless signed by an approved CB Testing Laboratory and appended to a CB Test Certificate issued by an NCB in accordance with IECEE 02. General disclaimer: The test results presented in this report relate only to the object tested. This report shall not be reproduced, except in full, without the written approval of the Issuing CB Testing Laboratory. The authenticity of this Test Report and its contents can be verified by contacting the NCB, responsible for this Test Report.

Provincial Standards for Early Exploration...Provincial Standards for Early Exploration Effective April 10, 2018 Introduction These Provincial Standards have been developed as part

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

  • Provincial Standards for Early Exploration Effective April 10, 2018

    Introduction These Provincial Standards have been developed as part of the implementation of the graduated regulatory regime for early exploration under the Mining Act, R.S.O. 1990, c. M.14 as amended by Bill 173, the Mining Amendment Act, 2009, S.O. 2009, c. 21 (the “Mining Act”), and the Exploration Plans and Exploration Permits regulation under the Mining Act, [O. Reg. 308/12].

    There are three Parts to these Provincial Standards:

    I) Requirements for Carrying Out Exploration Plan Activities; II) Requirements for Carrying Out Exploration Permit Activities; and III) Requirements for Rehabilitation of Exploration Plan and Exploration Permit Activities.

    The requirements of Parts I and II apply when the respective early exploration activities are being carried out, while Part III Rehabilitation applies when the early exploration activities have been completed. In the event there is any conflict between the content of this document and the requirements in the Mining Act or its regulations, the requirements in the legislation will prevail.

    Part I and II have unique lists of early exploration activities identified in Schedule 2 and Schedule 3 of the Exploration Plans and Exploration Permit Regulations under the Mining Act. The Early Exploration Proponent (“Proponent”) will refer to the appropriate categories depending on the type of undertaking being contemplated. Part III Standards apply to both Exploration Plan and Exploration Permit Activities.

    These Provincial Standards are mandatory minimum requirements. Proponents are encouraged to adopt industry best practices such as those set out in the Excellence in Environmental Stewardship for Responsible Exploration (E3) guideline published by the Prospectors & Developers Association of Canada.

    1.0 Definitions and Terminology

    “Contained” means to take preventative measures to ensure that early exploration materials do not make contact with a water body.

    “Early Exploration” has the same meaning as in the Exploration Plans and Exploration Permits regulation under the Mining Act, [O. Reg. 308/12].

    “Exploration Permit Activities” means those activities that fall within Schedule 2 of the Exploration Plans and Exploration Permits regulation under the Mining Act, [O. Reg. 308/12].

    “Exploration Plan Activities” means those activities that fall within Schedule 1 of the Exploration Plans and Exploration Permits regulation under the Mining Act, [O. Reg. 308/12].

    “Early Exploration Proponent” has the same meaning as in the Exploration Plans and Exploration Permits regulation under the Mining Act, [O. Reg. 308/12].

  • “Stripping” means the removal of overburden

    “Pitting and Trenching” means the excavation of bedrock

    "Water body” means lakes, rivers, creeks and streams and includes those wetlands that have a measurable or predictable response to a single runoff event.

  • Part I - Requirements for Carrying Out Exploration Plan Activities Early Exploration Proponents carrying out Exploration Plan Activities shall comply with the following requirements:

    1.0 Geophysical Surveys

    1.1 Where any geophysical survey involving a generator is being conducted, signs must be posted at exploration site access points to warn other persons of a potential electrical hazard and must remain in place for the duration of the survey activity.

    2.0 Line Cutting

    2.1 All line cutting is to be done using hand-held tools.

    3.0 Mechanized Drilling

    3.1 The following requirements apply whenever the drill rig is removed and taken to a new location:

    3.1.1 Capping and Sealing of Drill Holes

    (a) if the drill hole is artesian or encounters underground mine openings or solution cavities the drill hole must be either:

    (i) sealed at the surface and into the upper bedrock by grouting the upper 30 metres of bedrock or the entire depth of the hole, whichever is the lesser; or

    (ii) capped with a screw-on or bolt on cap

    (b) if the drill hole is drilled through the bed of a water body, the drill hole must be sealed at the surface and into the upper bedrock by grouting the upper 30 metres of bedrock or the entire depth of the hole, whichever is the lesser, and the drill casing removed

    3.1.2 Marking Drill Holes (a) all drill hole locations where casings are not removed are marked with durable reflective markers which are clearly visible in all seasons.

    3.2 Drill core Drill Core samples must be stored not less than 30 metres from any water body.

  • 4.0 Mechanized Surface Stripping

    4.1 All stripped overburden must be stockpiled on site in a safe and stable manner, separately from waste rock and not less than 30 meters from any water body.

    Part II - Requirements for Carrying out Exploration Permit Activities Early Exploration Proponents carrying out Exploration Permit Activities shall comply with the following requirements:

    1.0 Mechanized Drilling

    1.1 The following requirements apply whenever the drill rig is removed and taken to a new location:

    1.1.1 Capping and Sealing of Drill Holes

    (a) if the drill hole is artesian or encounters underground mine openings or solution cavities the drill hole must be either:

    (i) sealed at the surface and into the upper bedrock by grouting the upper 30 metres of bedrock or the entire depth of the hole, whichever is the lesser; or

    (ii) capped with a screw-on or bolt on cap

    (b) if the drill hole is drilled through the bed of a water body, the drill hole must be sealed at the surface and into the upper bedrock by grouting the upper 30 metres of bedrock or the entire depth of the hole, whichever is the lesser, and the drill casing removed

    1.1.2 Marking Drill Holes (a) all drill hole locations where casings are not removed are marked with durable reflective markers which are clearly visible in all seasons.

    1.2 Drill Core samples must be stored not less than 30 metres from any water body.

    2.0 Mechanized Surface Stripping

    2.1 All stripped overburden must be stockpiled on site in a safe and stable manner, separately from waste rock and not less than 30 meters from any water body.

  • 3.0 Pitting and Trenching

    3.1 The following requirements apply where a pit wall or vertical man-made rock face is greater than three metres in height:

    a) fencing that is at the minimum a high visibility barrier fence of at least one metre in height must be installed with a set back of at least 3 metres from the brow of the rock face or pit wall;

    b) signs stating “Danger – Open Pit” in both English and French, measuring at least 30 centimetres by 30 centimetres, in letters that are at least 3.5 cm in size and made of durable weatherproof material must be posted in suitable locations to warn other persons of the potential hazard; and

    c) pits must be sloped to provide at least one ramp as a point of egress.

    3.2 Disturbed bedrock must be stockpiled on site in a safe and stable manner and not less than 30 meters from any water body.

    Part III - Requirements for Rehabilitation of Exploration Plan and Exploration Permit Activities

    Early Exploration Proponents who have carried out Exploration Plan Activities or Exploration Permit Activities shall comply with the following requirements upon completion of the activity and in any event, prior to the expiry of the applicable Exploration Plan or Exploration Permit.

    1.0 Drilling

    1.1 Capping and Sealing Drill Holes Drill holes must be sealed at surface and into the upper bedrock by grouting the upper 30 metres of bedrock or the entire depth of the hole, whichever is the lesser if the drill holes meet any of the following criteria:

    a) they produce water (artesian). b) they encounter underground mine openings or solution cavities.

    1.2. Marking Drill Holes Where Casings Left All drill hole locations where casings are not removed must be marked with durable reflective markers which are clearly visible in all seasons.

    1.3 Drilling Fluids and Cuttings All drilling fluids, cuttings and mud if left on site must be contained and must not be left less than 30 metres from any water body.

    1.4 Drill Core Where drill core is left on the exploration site, it must be cross-piled in an orderly manner to a height not exceeding 1.5 metres and not less than 30 metres from any water body.

    2.0 Stripping

  • 2.1 Disturbed overburden must be contoured to a stable angle of repose.

    2.2 Stripped areas if not backfilled must be contoured to a stable angle of repose.

    3.0 Pitting and Trenching

    3.1 All pit walls or man-made vertical rock faces greater than three metres in height must be backfilled or contoured to a stable angle of repose.

    3.2 All pits with walls greater than three metres in height if not backfilled must be sloped to provide at least one ramp as a point of egress.

    3.3 Disturbed bedrock must be stockpiled on site in a safe and stable manner and not less than 30 meters from any water body.