34
Prototype Development of Automated Ring Main Unit System TNB Distribution Presentation Meeting

Prototype Development of Automated Ring Main Unit System TNB Distribution Presentation Meeting

Embed Size (px)

Citation preview

Page 1: Prototype Development of Automated Ring Main Unit System TNB Distribution Presentation Meeting

Prototype Development ofAutomated Ring Main Unit SystemTNB Distribution Presentation Meeting

Page 2: Prototype Development of Automated Ring Main Unit System TNB Distribution Presentation Meeting

Project Background

Page 3: Prototype Development of Automated Ring Main Unit System TNB Distribution Presentation Meeting

RMUs Presently Used

•What is an RMU?•Who operates it?•Are there safety concerns?

Page 4: Prototype Development of Automated Ring Main Unit System TNB Distribution Presentation Meeting

RMU Operation

• Opening/closing of the load break switch or earthing switch: Key/lever Pushed to overcome spring force Turn 90˚ at ~20 N.m (clockwise or

counter-clockwise depending on usage)

• Who operates it?• Are there safety concerns?• Can it function remotely?

Page 5: Prototype Development of Automated Ring Main Unit System TNB Distribution Presentation Meeting

Project Objectives

•To design a motorized retrofit for automatic operation of (F&G*) Ring Main Unit (RMU) as per technical specifications provided by TNB Distribution.

Page 6: Prototype Development of Automated Ring Main Unit System TNB Distribution Presentation Meeting

Customer Requirements

•??•??

Page 7: Prototype Development of Automated Ring Main Unit System TNB Distribution Presentation Meeting

Deliverables

•A prototype RMU Motorization Unit for operation of manually operated F&G* Ring Main Units.

Page 8: Prototype Development of Automated Ring Main Unit System TNB Distribution Presentation Meeting

Project Impact

•The proposed system would be able to switch the RMU breakers in a safe manner via remote control.

•Reduce downtime via remote operation and enhance the safety of TNB’s personnel by eliminating the need for manual operation of the RMU.

Page 9: Prototype Development of Automated Ring Main Unit System TNB Distribution Presentation Meeting

Project Methodology

Stages of prototype development:1. Torque and dimension measurements2. Study of Actuation Mechanism3. Grip frame design and material selection4. Sensors & Alignment5. Power & Controls6. Testing & Trials

Page 10: Prototype Development of Automated Ring Main Unit System TNB Distribution Presentation Meeting

RMU Automation Operational Block Diagram

M1

M2

M3

Manual pushrelays & Indicators

Microcontroller

Motor Driver w max current

limit

28VDC 10A

SCADA

Auto/RemoteLocal/Manual

CWLocal/Manual

CCW

Load switch limit switch

Power Supply Unit

CW/CCWcontrol signal

Page 11: Prototype Development of Automated Ring Main Unit System TNB Distribution Presentation Meeting

Components List

1. Power supply unit2. Grip Frame3. Motor Mounting Rails Assembly4. Programmable Logic Controller5. Motor Driver/controller6. Auto/Manual Cam Selector Switch7. Push Power Relays8. Limit/position Sensors9. Geared DC Motors10.Miscellaneous

Page 12: Prototype Development of Automated Ring Main Unit System TNB Distribution Presentation Meeting

Features1. Light-weight (require only one person for

mounting & installation)2. Simple gripping and holding mechanism3. Ready for remote and local operation4. Completely detachable motor unit for manual

operation5. Continuous Breaker load switch status

indicator6. Motor over-current protection7. Response time of < 5 seconds8. Motor interlock operation

Page 13: Prototype Development of Automated Ring Main Unit System TNB Distribution Presentation Meeting

Estimated Costing* per 2+1 RMU (3 motor set)•Mechanical works (motor mounting and

grip frame) – ~ RM1300•Geared motors – 3 x RM700•Controller – RM400•Motor driver – RM700•Sensors and electronics components –

RM400•Power Supply Unit – RM900 (for prototype

only)•TOTAL COST – ~RM5000 (without PSU) * For large quantities of order

Page 14: Prototype Development of Automated Ring Main Unit System TNB Distribution Presentation Meeting

Initial survey and testing in ILSAS

Initial motor selection

Load breaker switch sizing

Page 15: Prototype Development of Automated Ring Main Unit System TNB Distribution Presentation Meeting

Motor mount and torque testing

Continuation of motor selection

Page 16: Prototype Development of Automated Ring Main Unit System TNB Distribution Presentation Meeting

DC Motor on mount

Testing torque capability

Page 17: Prototype Development of Automated Ring Main Unit System TNB Distribution Presentation Meeting

A closer look at the Motor Mounting Rail Assembly

Page 18: Prototype Development of Automated Ring Main Unit System TNB Distribution Presentation Meeting

Further testing on actual F&G RMU

Page 19: Prototype Development of Automated Ring Main Unit System TNB Distribution Presentation Meeting

Procurement of Test Bed RMU

Page 20: Prototype Development of Automated Ring Main Unit System TNB Distribution Presentation Meeting

Installation of Mount on Grip Frame

Page 21: Prototype Development of Automated Ring Main Unit System TNB Distribution Presentation Meeting

Motor mount installed on grip frame on an F&G RMU

Page 22: Prototype Development of Automated Ring Main Unit System TNB Distribution Presentation Meeting

Rear view of gripping clamp

Page 23: Prototype Development of Automated Ring Main Unit System TNB Distribution Presentation Meeting

F&G ZZTT and ZZT RMUs in UNITEN

ZZT F&G RMU ZZTT F&G RMU

Page 24: Prototype Development of Automated Ring Main Unit System TNB Distribution Presentation Meeting

Grip Frame

Page 25: Prototype Development of Automated Ring Main Unit System TNB Distribution Presentation Meeting

Detachable Motor Mounting Rail Assembly

Page 26: Prototype Development of Automated Ring Main Unit System TNB Distribution Presentation Meeting

Motor Selection and Testing – ILSAS

30VDC Circuit Breaker Motor

Page 27: Prototype Development of Automated Ring Main Unit System TNB Distribution Presentation Meeting

Gearbox Failure – Specified Torque 25N-m

Page 28: Prototype Development of Automated Ring Main Unit System TNB Distribution Presentation Meeting

Switching Key Failure

Page 29: Prototype Development of Automated Ring Main Unit System TNB Distribution Presentation Meeting

Testing on RMUs in UNITEN

Page 30: Prototype Development of Automated Ring Main Unit System TNB Distribution Presentation Meeting

Play Video

Motor Mounting Rail Assembly

Page 31: Prototype Development of Automated Ring Main Unit System TNB Distribution Presentation Meeting

Play Video

Motor Mounting Rail Assembly

Page 32: Prototype Development of Automated Ring Main Unit System TNB Distribution Presentation Meeting

Thank you.

Questions & Discussions

Page 33: Prototype Development of Automated Ring Main Unit System TNB Distribution Presentation Meeting

TimelineMonth 1 Month 2 Month 3 Month 4

Actuation Mechanism Assy

Fabrication and assy

Test and Trials

Cross Slide Traversing Assy

Design and Procurement

FabricationActuation and

Cross slide integration

Test and Trials

Sensors & Alignment

Selection Procurement Integration Test and Trials

Power & Controls System

Selection and Procurement

Programming Test and Trials

Networking and Communication

PDSB

Page 34: Prototype Development of Automated Ring Main Unit System TNB Distribution Presentation Meeting

Uniten Procurement Procedures

QuotationValue: ≤ RM 100 KFloat period: 3 - 14 daysMin. : 3 companies

TenderValue: > RM 100 KFloat period: 14 - 21 daysMin. : 5 companies