8,800 new housing units $2 billion+ in public benefits 32,000 new jobs DELIVERABLES / OUTCOMES 1 Nearly 16mn sq ft of space for new housing and jobs easily accessible by transit 2 Over $2B in public benefits, including 33% affordable housing, $500M for transit, substantial improvements to open space, streets, and environmental sustainability, and funding for cultural preservation and community services Central SoMa Plan WHY WE DO THIS WORK » Substantial demand for growth has increased rents so that both residential and non-residential space is unaffordable. » Central SoMa is an excellent location to accommodate some of this demand, given its central location, abundance of transit, and supply of developable land. » Through strategic planning and implementation, this demand can be accommodated in a way that yields substantial public benefits while keeping the things that are great about the neighborhood, such as its diversity and vibrancy. Daniel Austin Hoherd (CC BY-NC 2.0) The vision of the Central SoMa Plan is to create a sustainable neighborhood socially, economically, and environmentally. PROJECT SCHEDULE 2011 Project Launch 2013 Release of 1st Draft Plan and start of EIR 2016 Release of 2nd Draft Plan and release of Draft EIR Feb 2018 Introduction/Initiation of Legislation Dec 2018 Plan Adopted at Board of Supervisors PROJECT GOALS PRIORITY PLANNING PROJECT sfplanning.org

PRORTY PLANNNG PROJECT Central SoMa Plan€¦ · Central SoMa Plan WHY WE DO THIS WORK » Substantial demand for growth has increased rents so that both residential and non-residential

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PRORTY PLANNNG PROJECT Central SoMa Plan€¦ · Central SoMa Plan WHY WE DO THIS WORK » Substantial demand for growth has increased rents so that both residential and non-residential

8,800 new housing units

$2 billion+ in public benefits

32,000 new jobs

DELIVERABLES / OUTCOMES

1 Nearly 16mn sq ft of space for new housing and jobs easily accessible by transit

2 Over $2B in public benefits, including 33% affordable housing, $500M for transit, substantial improvements to open space, streets, and environmental sustainability, and funding for cultural preservation and community services

Central SoMa Plan

WHY WE DO THIS WORK

» Substantial demand for growth has increased rents so that both residential and non-residential space is unaffordable.

» Central SoMa is an excellent location to accommodate some of this demand, given its central location, abundance of transit, and supply of developable land.

» Through strategic planning and implementation, this demand can be accommodated in a way that yields substantial public benefits while keeping the things that are great about the neighborhood, such as its diversity and vibrancy.

Daniel Austin Hoherd (CC BY-NC 2.0)

The vision of the Central SoMa Plan is to create a sustainable neighborhood socially, economically, and environmentally.

PROJECT SCHEDULE

2011 Project Launch

2013 Release of 1st Draft Plan and start of EIR

2016 Release of 2nd Draft Plan and release of Draft EIR

Feb 2018 Introduction/Initiation of Legislation

Dec 2018 Plan Adopted at Board of Supervisors

PROJECT GOALS

PRIORITY PLANNING PROJECT

sfplanning.org

Page 2: PRORTY PLANNNG PROJECT Central SoMa Plan€¦ · Central SoMa Plan WHY WE DO THIS WORK » Substantial demand for growth has increased rents so that both residential and non-residential

Yerba BuenaGardens

MosconeCenter

South Park

UnionSquare

VictoriaManaloDravesPark

GeneFriend

RecreationCenter

AT&TPark

MISSION CREEK CHANNEL

POWELL STATION MONTGOMERY STATION

Ce

ntr

al S

ub

way

Ce

ntr

al S

ub

way

Cen

tral

Sub

way

CALTRAINSTATION

4T

H S

T

BRYANT ST

FOLSOM ST

MISSION ST

HOWARD ST

KING ST

BRANNAN ST

HARRISON ST

BERRY ST

TOWNSEND ST

PERRY ST

CLARA ST

SHIPLEY ST

BLUXOME ST

STILLMAN ST

TEHAMA ST

STEVENSON ST

TABER PL

FREELON ST

VARNEY PL

NATOMA ST

MARKET ST MARKET ST

MINNA ST

ELLIS ST

TURK ST

EDDY ST

POST ST

GEARY ST

BUSH ST

SUTTER ST

JON

ES

ST O’FARRELL ST

MA

SO

N S

T

CLEMENTINA ST

TAY

LOR S

T

KEA

RN

Y S

T

GR

AN

T A

VE

PO

WELL

ST

JESSIE ST

STO

CK

TON

ST

WELSH ST

GOLDEN GATE AVE

MO

NTG

OM

ER

Y S

T

SA

NSO

ME S

T

NE

W M

ON

TG

OM

ER

Y

ST

RIZAL ST

DOW PL

HA

WT

HO

RN

E

ST

ST

AN

FO

RD

S

T

RIT

CH

S

T

MA

RY

S

T

ME

RL

IN

ST

OA

K G

RO

VE

S

T

LA

PU

L

AP

U S

TZ

OE

S

TL

US

K S

T

CL

AR

EN

CE

P

L

MA

BIN

I S

T

MO

RR

IS

ST

2N

D

ST

3R

D

ST

5T

H S

T

6T

H

ST

7T

H

ST

OldMint

SFMOMA

CENTRAL SOMA

CALTRAIN

2,000 Feet

BART/Muni Metro Subway

Central Subwayunder construction, expected to open in 2019

Muni Metro (Surface)

Yerba BuenaGardens

MosconeCenter

South Park

UnionSquare

VictoriaManaloDravesPark

GeneFriend

RecreationCenter

AT&TPark

MISSION CREEK CHANNEL

POWELL STATION MONTGOMERY STATION

Ce

ntr

al S

ub

way

Ce

ntr

al S

ub

way

Cen

tral

Sub

way

CALTRAINSTATION

4T

H S

T

BRYANT ST

FOLSOM ST

MISSION ST

HOWARD ST

KING ST

BRANNAN ST

HARRISON ST

BERRY ST

TOWNSEND ST

PERRY ST

CLARA ST

SHIPLEY ST

BLUXOME ST

STILLMAN ST

TEHAMA ST

STEVENSON ST

TABER PL

FREELON ST

VARNEY PL

NATOMA ST

MARKET ST MARKET ST

MINNA ST

ELLIS ST

TURK ST

EDDY ST

POST ST

GEARY ST

BUSH ST

SUTTER ST

JON

ES

ST O’FARRELL ST

MA

SO

N S

T

CLEMENTINA ST

TAY

LOR S

T

KEA

RN

Y S

T

GR

AN

T A

VE

PO

WELL

ST

JESSIE ST

STO

CK

TON

ST

WELSH ST

GOLDEN GATE AVE

MO

NTG

OM

ER

Y S

T

SA

NSO

ME S

T

NE

W M

ON

TG

OM

ER

Y

ST

RIZAL ST

DOW PL

HA

WT

HO

RN

E

ST

ST

AN

FO

RD

S

T

RIT

CH

S

T

MA

RY

S

T

ME

RL

IN

ST

OA

K G

RO

VE

S

T

LA

PU

L

AP

U S

TZ

OE

S

TL

US

K S

T

CL

AR

EN

CE

P

L

MA

BIN

I S

T

MO

RR

IS

ST

2N

D

ST

3R

D

ST

5T

H S

T

6T

H

ST

7T

H

ST

OldMint

SFMOMA

CENTRAL SOMA

CALTRAIN

2,000 Feet

BART/Muni Metro Subway

Central Subwayunder construction, expected to open in 2019

Muni Metro (Surface)

Yerba BuenaGardens

MosconeCenter

South Park

UnionSquare

VictoriaManaloDravesPark

GeneFriend

RecreationCenter

AT&TPark

MISSION CREEK CHANNEL

POWELL STATION MONTGOMERY STATION

Ce

ntr

al S

ub

way

Ce

ntr

al S

ub

way

Cen

tral

Sub

way

CALTRAINSTATION

4T

H S

T

BRYANT ST

FOLSOM ST

MISSION ST

HOWARD ST

KING ST

BRANNAN ST

HARRISON ST

BERRY ST

TOWNSEND ST

PERRY ST

CLARA ST

SHIPLEY ST

BLUXOME ST

STILLMAN ST

TEHAMA ST

STEVENSON ST

TABER PL

FREELON ST

VARNEY PL

NATOMA ST

MARKET ST MARKET ST

MINNA ST

ELLIS ST

TURK ST

EDDY ST

POST ST

GEARY ST

BUSH ST

SUTTER ST

JON

ES

ST O’FARRELL ST

MA

SO

N S

T

CLEMENTINA ST

TAY

LOR S

T

KEA

RN

Y S

T

GR

AN

T A

VE

PO

WELL

ST

JESSIE ST

STO

CK

TON

ST

WELSH ST

GOLDEN GATE AVE

MO

NTG

OM

ER

Y S

T

SA

NSO

ME S

T

NE

W M

ON

TG

OM

ER

Y

ST

RIZAL ST

DOW PL

HA

WT

HO

RN

E

ST

ST

AN

FO

RD

S

T

RIT

CH

S

T

MA

RY

S

T

ME

RL

IN

ST

OA

K G

RO

VE

S

T

LA

PU

L

AP

U

ST

ZO

E

ST

LU

SK

S

T

CL

AR

EN

CE

P

L

MA

BIN

I S

T

MO

RR

IS

ST

2N

D

ST

3R

D

ST

5T

H S

T

6T

H

ST

7T

H

ST

OldMint

SFMOMA

CENTRAL SOMA

CALTRAIN

2,000 Feet

BART/Muni Metro Subway

Central Subwayunder construction, expected to open in 2019

Muni Metro (Surface)

CENTRAL SOMA PLAN PROJECT AREA

sf-planning.org/central-soma-planContact: Lisa Chen [email protected]

For more info on this project: