GSPublisherVersion 0.0.100.100
PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN
BAIDOA DISTRICT, SOUTHWEST STATE
GSPublisherVersion 0.0.100.100
Sheet No. Content01/21
02/21
Site layout
Office building_ Floor Plan
Office building_foundation plan
Office building_ Ring beam layout
Office building_Electrical plan
Changing rooms_floor plan
Changing rooms_ Elevations
Office building_section view
Office building_Roof plan
Office building_Elevations
NOVEMBER 2018DRAWING INDEX
Changing rooms_ Electrical
Washrooms
3D Projection 01
3D Projection 02
3D Projection 033D Projection 04
Changing rooms_ Structural details
3D Projection 05
3D Projection 06
3D Projection 07
03/21
04/21
05/21
06/21
07/21
08/21
09/21
10/21
11/21
12/21
13/21
14/21
15/21
16/21
17/21
18/21
19/21
20/21
21/21 3D Projection 08
Offices Building
Changing rooms
Toilets
3D projections
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN
BAIDOA DISTRICT, SOUTHWEST STATE
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
NOVEMBER 2018
SOUTHWEST STATE,BAIDOA DISTRICT
100,000
67,500
30,000
21,800
52,600
5,400
50,000
8,600
4,000
200,000
150,000
150,000
Existing Boundarywall to be remained
A
C
B
E
D
F
LABEL
A Football Pitch
Proposed changing roomsBExisting spectators stand ( leave as it is)C
DProposed building officesEExisting washrooms (to be rehabilatated)
F Existing Guard house ( leave as it is)
F
Sept
ic ta
nk
Existing Boundarywall to be remained
MASTER PLAN
01/22
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN
BAIDOA DISTRICT, SOUTHWEST STATE
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
NOVEMBER 2018
SOUTHWEST STATE,BAIDOA DISTRICT
1a
1a
3
3
4
4
5
5
2
2
D D
C C
B B
A A
B1 B1
C1 C1
3a
3a
3b
3b
1
1
3,200 2,200 1,800 1,700 1,700 5,2001,000
5,200200
1,600200
1,500200
1,500200
5,0002,
800
1,40
03,
800
2,00
02,
200
200
5,00
020
04,
000
2,80
02,050 1,500 2,550
6001,200
6001,000
6002,450 1,500 1,950
1,25
01,
500
1,45
01,
950
1,50
01,
950
2,80
01,
400
3,80
02,
000
2,20
0
12,0
00
4,00
020
03,
600
200
1,80
020
02,
000
1,00
01,
200
800
1,50
095
01,
500
950
1,50
080
01,
200
1,00
0
1,000 3,200 2,200 1,800 1,700 1,700 5,200
2005,000
2005,000
2004,000
2002,000
1,950 1,500 3,700 1,500 1,950400
1,200400
2001,250 1,500 1,250
200
16,000
12,4
00
Y-Y1
Y-Y1
E-03
E-02
E-01
E-04
Office 3
Office 1
Offi
ce 2
Conf
eren
ce H
all
Washrooms
Corridor
Porch
W.C W.C W.C
Typical Floor Plan - offices building
UP
UP
UP
FLOOR PLAN
02/22
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN
BAIDOA DISTRICT, SOUTHWEST STATE
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
NOVEMBER 2018
SOUTHWEST STATE,BAIDOA DISTRICT
1
1
1a
1a
2
2
3
3
3a
3a
3b
3b
4
4
5
5
A
A
B
B
B1
B1
C
C
C1
C1
D
D
5
5
4
4
3b
3b
3a
3a
3
3
2
2
1a
1a
1
1
D
D
C1
C1
C
C
B1
B1
B
B
A
A
1,0003,200 2,200 1,800 1,700 1,700 5,200
17,000
2,800 1,400 3,800 2,000 2,200
12,400
1,20
0
1,500
200
750
200
2,700800
3,900
2,35
0
3,40
0
1,500
300
2,20
0
1,200 P.VP.V P.VP.V
P.V P.V P.V P.V
+0.00(G.Level)
+0.45(G.Floor Level)
+3.85(Roof Level)
+0.00(G.Level)
+0.45(G.Floor Level)
+3.85(Roof Level)
E-01
E-02
E-03
E-04
Elevations - offices building
ELEVATIONS
03/22
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN
BAIDOA DISTRICT, SOUTHWEST STATE
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
NOVEMBER 2018
SOUTHWEST STATE,BAIDOA DISTRICT
ABB1CC1D2,200 2,000 3,800 1,400 2,800
2,20
0
3,40
0
200x200mm RCCLintel beam Passage
WHBWC
Office1
12mm thick chip-boardceiling on 50X50mmcypress brandering at 600mm centres
Corrugated GI sheets gauge 28, fixed oncelcurised cypress structure: 50x50mmBattens on 200X50mm Rafters @700mm,on 100X50mm Wall-plate bolted @1200mm centres; structure to SE details. GIlining on ridges and cut-outs
Timber doorto schedule 10cm thick Ground floor slab
with 6mm bars @ 20cm centres in bothdirections on 1000 gauge polythenedamp proof membrane (dpm ) on 5cmthick sand blinding on 15cm thick wellcompacted hardcore all to Eng's approva
200mm thick masonary blockwall with exterior qualityemulsion paint on wood - floatrender to approval.
200x300mm white glazedceramic wall tiles up to2200mm high
Aluminum window tothe inside to schedule
200mm thick masonaryblock wall with exteriorquality emulsion paint onwood - float render toapproval.
Section view
SECTION VIEW
04/22
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN
BAIDOA DISTRICT, SOUTHWEST STATE
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
NOVEMBER 2018
SOUTHWEST STATE,BAIDOA DISTRICT
1a
1a
3
3
4
4
5
5
2
2
D D
C C
B B
A A
B1 B1
C1 C1
3a
3a
3b
3b
1
1
Corrugated GI sheets gauge 28, fixedon celcurised cypressstructure: 50x50mm Battens on200X50mm Rafters @700mm, on100X50mm Wall-plate bolted @1200mm centres; structure to SEdetails. GI lining on ridges and cut-outs
Gauge 28, 250mm girth bent twiceGI gutters fixed with andincluding brackets on 150X25mmHW facia (painted)
Roof Plan - offices building
FALL FALL
FALL
FALL FALL
FALL
FALL
FALL
FALL
FALL
FALL
FALL
FALL
FALL
ROOF PLAN
05/22
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN
BAIDOA DISTRICT, SOUTHWEST STATE
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
NOVEMBER 2018
SOUTHWEST STATE,BAIDOA DISTRICT
1a
1a
3
3
4
4
5
5
2
2
D D
C C
B B
B1 B1
C1 C1
3a
3a
3b
3b
1
1
A A
1,0003,200 2,200 1,800 1,700 1,700 5,200
5,000400
1,400400
1,300400
1,300400
4,800
16,200
11,8
00
3,80
040
03,
400
400
1,60
040
01,
800
2,40
040
04,
800
400
3,80
0
2,80
01,
400
3,80
02,
000
2,20
0
4,20
05,
600
2,80
0
12,6
00
2,44
0
16,2001,000 1,200
5,000400
4,800400
4,8001,000
3,200 2,200 1,800 1,700 1,700 5,200
A142
BRC MESH
A142
BRC MESHA142
BRC MESH
A142
BRC MESH
A142
BRC MESHA142
BRC MESH
A142
BRC MESH
Foundation plan - offices building
FOUNDATION PLAN
06/22
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN
BAIDOA DISTRICT, SOUTHWEST STATE
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
NOVEMBER 2018
SOUTHWEST STATE,BAIDOA DISTRICT
1a
1a
3
3
4
4
5
5
2
2
D D
C C
B B
B1 B1
C1 C1
3a
3a
3b
3b
1
1
A A
1,0003,200 2,200 1,800 1,700 1,700 5,200
16,000
4,20
05,
400
2,80
0
2,80
01,
400
3,80
02,
000
2,20
0
2,80
01,
400
3,80
02,
000
2,20
0
12,4
00
1,0003,200 2,200 1,800 1,700 1,700 5,200
17,000
5,200
4,00
0
1,600
2,00
0
1,500 1,500
1,80
0
5,000
7,200
3,60
0
2,000
5,000
4,00
05,200
2,60
0
5,00
0
4,000
5,000
12,0
00
RING BEAM 01 RING BEAM 01 RING BEAM 01 RING BEAM 01
RING BEAM 01 RING BEAM 01 RING BEAM 01 RING BEAM 01
RING BEAM 03 RING BEAM 03
RING BEAM 02
RING BEAM 04
RING BEAM 05
RIN
G B
EAM
07
RIN
G B
EAM
06
RIN
G B
EAM
08
RIN
G B
EAM
06
RIN
G B
EAM
07
RIN
G B
EAM
09
RIN
G B
EAM
10
RIN
G B
EAM
10
RIN
G B
EAM
10
RIN
G B
EAM
10
RIN
G B
EAM
10
RIN
G B
EAM
10
RIN
G B
EAM
11
RIN
G B
EAM
11
Ring beam - offices building
RING BEAM
07/22
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN
BAIDOA DISTRICT, SOUTHWEST STATE
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
NOVEMBER 2018
SOUTHWEST STATE,BAIDOA DISTRICT
IOMMOG114
516-AAZ-MOG114
PROPOSED REHABILITATIONOF LOWYA CADE WARD -ABDUL AZIZ DISTRICT.
-ABDUL AZIZ DISTRICT-
JULY 2013
AHMED KIRISH
ALI HUSSEIN
PETER M.M.
N.T.S
IOM GRANT NO:A3
PROJECT. CLIENT. IMPLEMENTING AGENCY. SCALE
DATE
DRAWN BY:
DRAWING TITLE:
DRAWING NO:
PROJECT NO:SHEET NO:
DAN GUUD
REVIEWED AND APPROVED BY:
ECOTECH LIMITED
P.O. Box 5527-00100,Nairobi - KenyaTel: +254 712 388815Fax: +254 20 250809Email: [email protected]: www.ecotech.co.keLocation: Ecotech House, Woodlands Road, off Lenana Road, Nairobi - Kenya
BENADIR REGIONALADMINISTRATION,MOGADISHU,SOMALIA
CONSULTANT:-
IOM GRANT NO:
NOTES.
All drawings and concepts remain the propertyof ecotech limited
- All dimensions are in mm unless stated otherwise
- Any discrepancies in the drawings should be reported to the consultants before the contractor commences work on site.
ss
wp
s
SYMBOL MEANING
CEILING MOUNTEDLIGHT FIXTURE.CEILING MOUNTEDLIGHT FIXTURE (PENDANT)
WALL MOUNTED LIGHT FIXTURE
RECESSED SPOT LIGHT
FLUORESCENT LIGHT FIXTURE
FLUORESCENT LIGHT FIXTUREUNDER FALSE CEILING
WIRING CONNECTION
SINGLE PLEX RECEPTACLE
DUPLEX RECEPTACLE
SPECIAL RECEPTACLE & OUTLET(WITH PILOT LIGHT)
FLUORESCENT LIGHT FIXTURE WITHSHAVER SOCKET & LOCALISED SWITCHFLUORESCENT LIGHT FIXTURE WITHLOCALISED SWITCH
WATER PROOF RECEPTACLE (SINGLE)
CONSUMER UNIT
TELEPHONE/TV JACK
ALARM KEYPAD
DOORBELL PUSH BUTTON
DOORBELL TRANSFORMER
S3
S2
S
3 gang switch
2 gang switch
Single pole switch
Flood lamp
S SS
OFFICE 01 OFFICE 02 OFFICE 03 OFFICE 04 OFFICE 05
N E W C A N O P Y
SS
T-1 T-2
S3
31371-516-ELEC-09
ELECTRICAL DETAILS ELECTRICAL
09/09
16,000
4,20
05,
400
5,300 10,600
12,4
00
Electrical plan- offices building
S
S
S
S2S
S
S S S
S
S3
ELECTRICAL PLAN
08/22
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN
BAIDOA DISTRICT, SOUTHWEST STATE
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
NOVEMBER 2018
SOUTHWEST STATE,BAIDOA DISTRICT
EntrenceEntrence UP
A A
B B
C C
1
1
2
2
3
3
5
5
6
6
4
4
A A
B B
C C
1
1
2
2
3
3
5
5
6
6
4
4
1,900200
5,000200
4,000200
5,000200
1,900
850600
2,250 1,500 3,550 1,500 3,500 1,500 2,300600
850
5,00
0
2,30
020
02,
100
5,00
0
2,30
020
02,
100
1,900200
5,000200
4,000200
5,000200
1,900
2001,300 2,200 1,500 3,850 900 3,800 1,500 2,250 1,300
2001,700
2,100 5,200 4,200 5,200 2,100
2,50
02,
300
2,50
02,
300
2,100 5,200 4,200 5,200 2,10019,000
Y-Y
Y-Y
E-01
E-04
E-03
E-02
Roof Plan - Changing rooms
Team Room Team RoomRefrees RoomW.C. W.C.
Entre
nce300x300mm cer.
tiles f.f300x300mm cer.
tiles f.f300x300mm cer.
tiles f.fEn
trenc
e
P.V
P.V
P.V
P.V P.V
P.VP.VP.VP.VP.V
Typical Floor Plan - Changing rooms
FALLFALLFALL
FALL FA
LL
FALLFALLFALL
FLOOR PLAN
09/22
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN
BAIDOA DISTRICT, SOUTHWEST STATE
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
NOVEMBER 2018
SOUTHWEST STATE,BAIDOA DISTRICT
A
A
B
B
C
C
C
C
C
C
B
B
B
B
A
A
A
A
2
2
3
3
4
4
5
5
1
1
6
6
6
6
5
5
4
4
3
3
2
2
1
1
3,400
2,100 5,200 4,200 5,200 2,100
1,300
3,00
0
3,40
045
0
1,500
1,20
0
900
2150 1,
200
1,00
0
1,20
0
19,000
19,0002,100 5,200 4,200 5,200 2,100
600
60020
0
1,500 3,500 1,500 3,550 1,500
1,20
0
2,500 2,300
5,000
700
2,300
3,40
03,
000
2,500
450
+0.00m
+0.45m
+3.85m
ROOF SPECIFICATION- pitch 25 deg Five box profile 28 guage roofing- 100x50mm rafters at 600mm c/c 50x50mm- 100x50mm ties and struts- 100x75mm wall plate- 200mm thick fascia board and gutter to S.E- all timber to be cured and painted with 2 coats of paint- 12mm thick chipboard ceiling
VRC Roof beam
200x200mm lintel beam
200mm thick block walling
VRC Ground beam
+0.45m
+0.00m
Foundation depth to bedetermined on site FOUNDATION SPECIFICATION
100mm thick plain concrete slab40cm width foundation wallinghardcore fill consolidated at 300mm level
Section X-X
Front elevation
+0.00(G.Level)
+0.45(G.Floor Level)
+3.85(Roof Level)
Rear elevation
Side elevation
ELEVATIONS
10/22
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN
BAIDOA DISTRICT, SOUTHWEST STATE
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
NOVEMBER 2018
SOUTHWEST STATE,BAIDOA DISTRICT
A A
B B
C C
1
1
2
2
3
3
5
5
6
6
4
4
EntrenceEntrence UP
A A
B B
C C
1
1
2
2
3
3
5
5
6
6
4
4
2,100 5,200 4,200 5,200 2,100
2,100 5,200 4,200 5,200 2,100
1,700
2,100 5,200 4,200 5,200 2,100
19,000
2,100 5,200 4,200 5,200 2,100
1,700400
4,800400
3,800400
4,800400
1,700
19,200
2,10
040
01,
900
5,20
0
2,10
040
01,
900
5,20
0
1,100 4005,400
4003,800
4005,400
400 1,100
19,200
2,50
02,
300
2,50
02,
300
2,50
02,
300
2,50
02,
300
1,900 5,000 4,000 5,000 1,900
2,10
02,
300
5,600
4,60
0
1,300 1,300
19,000
5,00
0
5,00
0
RING BEAM 01 RING BEAM 01 RING BEAM 01 RING BEAM 01
RING BEAM 01 RING BEAM 01 RING BEAM 01 RING BEAM 01
RING BEAM 02 RING BEAM 02
RIN
G B
EAM
03
RIN
G B
EAM
03
RIN
G B
EAM
03
RIN
G B
EAM
03
RIN
G B
EAM
04
RIN
G B
EAM
05
RIN
G B
EAM
04
RIN
G B
EAM
05
A142
BRC MESH
A142
BRC MESH
A142
BRC MESH
FOUNDATION PLAN
RING BEAM LAYOUT
STRUCTURALPLAN
11/22
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN
BAIDOA DISTRICT, SOUTHWEST STATE
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
NOVEMBER 2018
SOUTHWEST STATE,BAIDOA DISTRICT
Team Room Team RoomRefrees Room
W.C. W.C.
Entr
ence
P.V
P.V
P.V
P.V P.V
P.VP.VP.VP.VP.V
4ft. Flourescent Light
1 gang 1 way switch
2 gang 1 way switch
Consumer unit
Twin sockets with switches
Lighting power circuit
Lighting circuit
Power circuit
LEGEND
CEILING MOUNTED LIGHT FIXTURE.
Power Layout
Entr
ence
Team Room Team RoomRefrees Room
W.C. W.C.
Entr
ence
P.V
P.V
P.V
P.V P.V
P.VP.VP.VP.VP.V
Lighting Layout
Entr
ence
ELECTRICAL
12/22
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN
BAIDOA DISTRICT, SOUTHWEST STATE
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
NOVEMBER 2018
SOUTHWEST STATE,BAIDOA DISTRICT
1
1
2
2
3
3
4
4
5
5
6
6
7
7
A A
B B
C C
A
A
B
B
C
C
1
1
2
2
3
3
4
4
5
5
6
6
7
7
C
C
B
B
A
A
7
7
6
6
5
5
4
4
3
3
2
2
1
1
1,200200
1,200200
1,200 1,400200
1,200200
1,200500 600
800600
800600
800600
800600
800600 500
1,400 1,400 1,400 1,400 1,400 1,4008,600
1,200200
1,200200
1,200 1,400200
1,200200
1,200
500 600800
600800
600800
600800
600800
600 500
1,400 1,400 1,400 1,400 1,400 1,400
8,600
200
2,350
200
2001,050
1,250
2,550
2,750
1,250
4,000
200
2,350
200
1,250
2,550
2,750
4,000
2,550 1,2501,400 1,400 1,400 1,400 1,400 1,400
1,250 2,5501,400 1,400 1,400 1,400 1,400 1,400
600800
600800
600800
600800
600800
600
600
500 500
200
3,000
2,400
200
1,050
3,000
4,000
200
2,400
1,085
XXE-01
E-03
E-02
E-04
Fall
Remove the destroyedvent blocks and providenew ones with sameshape and size
Carefully remove theexisting Iron sheet roof andreplace to new Iron sheet
Elevation -01
Elevation -03
Install new metalcasement windows
N.G.L
12.0 deg Roof with five boxprofile G.I sheets
plastered and painted wallto Archs' approval
200mm thick concretehollow block walling
12.0 deg Roof with five boxprofile G.I sheets
Latrine
Pit latrine
800mmx2200mmSteel casement door
Typical Floor Plan
Roof Plan
Section X-X
Elevation 02
WASHROOMS
13/22
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN
BAIDOA DISTRICT, SOUTHWEST STATE
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
NOVEMBER 2018
SOUTHWEST STATE,BAIDOA DISTRICT
200
600
200
300
100F1
(150
0)
F2
100
E
200 50
0
200 800 200 D 200 800 200
E
A B C
10 mm waterproof rendering150 mm base concrete
slab reinforced with BRC142 on well compacted
hardcore to S.E . approval
To sub-soil irrigation
T W L
Invert level ofincoming drain
G.L
190 mm masonry with10 mm rendering on bothsides .
G.L G.L G.L
OutletMH
600x450mm mh cover & frame1200 mm R.C. Cover Slab
InletMH
PLAN
H
G
H
SECTION G - G SECTION H -H
G
TYPEDIMENSIONS IN MM
ACAPACITYIN LITRES
No. OFPERSONS
DESLUDGINGINTERVAL
(YRS ) B C D E F1 F2
A
B
E
D
C
800
4000
3000
6000
9000
800
12000
800
15000
1200
10 1000
1600
1600
1000
20
30
40
50
2
2
2
2
2
800
800
1400
1400
800
1200
1400
1400
3000
3600
3600
4000
1400
1800
2000
2400
1200
1500
1500
1500
1500
1400
1400
1400
1300
1200
1 . Cover slab to be reinforced with 10 mm dia. bar at100 mm c/c ( conc. 20 / 20 mix 1 :2:4)
2. Base slab to be conc . class mix 1 :3:63. Outlet and inlet pipes to be 100 mm dia. cast iron.4. Scum buffle to be 100 mm thick reinforced with 2 No.
100 mm at both ends conc 80(20)5. Dividing wall to be 100 mm thick conc. class 20(20)
reinforced with weld mesh No. 65.
NOTES,
SEPTIC TANK
14/22
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN
BAIDOA DISTRICT, SOUTHWEST STATE
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
NOVEMBER 2018
SOUTHWEST STATE,BAIDOA DISTRICT
3D 01
15/22
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN
BAIDOA DISTRICT, SOUTHWEST STATE
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
NOVEMBER 2018
SOUTHWEST STATE,BAIDOA DISTRICT
3D 02
16/22
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN
BAIDOA DISTRICT, SOUTHWEST STATE
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
NOVEMBER 2018
SOUTHWEST STATE,BAIDOA DISTRICT
3D 03
17/22
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN
BAIDOA DISTRICT, SOUTHWEST STATE
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
NOVEMBER 2018
SOUTHWEST STATE,BAIDOA DISTRICT
3D 04
18/22
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN
BAIDOA DISTRICT, SOUTHWEST STATE
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
NOVEMBER 2018
SOUTHWEST STATE,BAIDOA DISTRICT
3D 05
19/22
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN
BAIDOA DISTRICT, SOUTHWEST STATE
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
NOVEMBER 2018
SOUTHWEST STATE,BAIDOA DISTRICT
3D 06
20/22
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN
BAIDOA DISTRICT, SOUTHWEST STATE
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
NOVEMBER 2018
SOUTHWEST STATE,BAIDOA DISTRICT
3D 07
21/22
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN
BAIDOA DISTRICT, SOUTHWEST STATE
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
NOVEMBER 2018
SOUTHWEST STATE,BAIDOA DISTRICT
3D 08
22/22
GSPublisherVersion 0.0.100.100
Notes1. All dimensions are to be checked on site.Anydiscrepancy indimensions is to be reported to thearchitect before anywork commence.The Architect'sdrawings and specifications over rule any other. theStructural Engineers detail drawings. 2. All construction work to comply with theinternational standards codes protection.
3. The PV denotes permanent ventilation and must beprovided above alldoors and windows whereindicated.
4. All walls less than 200mm thick are to be reinforcedwith hoop iron sheet every alternate course.
5. All reinforced concrete works to be done accordingto structural detail drawings
No: Date: Description:
REVISION
Implemented by:
Client:
THE FEDERAL REPUBLICOF SOMALIA
Project Title:
Sheet No.
PROPOSED REHABILITATION OFDR.AYUB FOOTBALL STADIUM IN
BAIDOA DISTRICT, SOUTHWEST STATE
Drawing Title:
SCALE:
DATE:
DRAWN BY: ENG. Duale
REVIEWED BY:
A3
AS SHOWN
NOVEMBER 2018
SOUTHWEST STATE,BAIDOA DISTRICT
3D 10
22/22