Environmental Impact Assessment & Environmental Management Plan
For
Proposed Project for the Manufacture of Pesticides
(Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide
Technical)
At
Plot No. 4924, Notified Industrial Area, GIDC Sarigam,
District - Valsad, Gujarat
Plot Area: 2351.25 m2 (0.2351 hector)
Production capacity : 500TPM
Proposal No.: IA/GJ/IND2/75429/2018
[ToR Letter Dated: 22nd July, 2018] [Study Period: 1st October 2018 to 31st December 2018]
[Schedule 5(b), Category–A as per EIA Notification 2006, amended till date]
APPLICANT CONSULTANT
Integrated Chemisol Pvt. Ltd.
Plot No. 4924, Notified Industrial Area, GIDC Sarigam, Ta: Umbergaon, District- Valsad 396155, Gujarat.
E-mail: [email protected]
Tel No: +919227236524
Eco Chem Sales & Services
Office floor, Ashoka Pavilion ’A’
New Civil Road, Surat, 395001
(NABET Accredited-NABET/EIA/1417/ SA 2 002)
E-mail: [email protected]
Tel No: +912612231630
January – 2019
2017_ECSS_EIAI2_1700034
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat
Doc. No: 2017_ECSS_EIAI2_1700034
Declaration Page ii
DECLARATION
Declaration by experts contributing to the EIA Report for Proposed Project for the
Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide
Technical) at Plot No. 4924, Notified Industrial Area, GIDC Sarigam, District - Valsad,
Gujarat by Integrated Chemisol Pvt. Ltd. “I, hereby, certify that I was a part of the EIA team
in the following capacity that developed this Report”.
EIA COORDINATOR
Name : Jagdish Rathi
Signature & Date :
Sector No. : 17
Period of
involvement
: May 2018 to January, 2019
Contact Information : Eco Chem Sales & Services, Office Floor, Ashoka Pavilion-A,
Opp. Kapadia Health Club, New Civil Road, Surat, India-395
001 Landline No.: +91-261-2231630
FUNCTIONAL AREA EXPERTS
Functional Areas Name of
the Expert
Involvement (Period & Task) Signature & Date
Land Use
(LU)
Joshua Anand
Period of Involvement:
October 2018 – December 2018
Tasks:
Supervision in development of land use maps of study area using GIS /
related tools, site visit for ground truth survey, finalization of land use maps,
contribution to EIA documentation
Air Pollution Prevention,
Monitoring & Control
(AP)
Rekha shah
Period of Involvement:
May 2018 – January, 2019
Tasks:
Selection of monitoring locations, Supervision of air quality monitoring,
Identification of impacts on Air quality, suggesting mitigation measures and contribution to EIA documentation
Meteorology, Air Quality Modeling &
Prediction
Priyanka Verma
Period of Involvement:
May 2018 – January, 2019
Tasks:
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat
Doc. No: 2017_ECSS_EIAI2_1700034
Declaration Page iii
Functional Areas Name of
the Expert
Involvement (Period & Task) Signature & Date
(AQ) Evaluation of meteorological data with collected secondary data, modeling
and prediction, identification of impacts, finalization of mitigation measures and contribution to EIA
documentation
Water Pollution Prevention, Control
& Prediction of Impacts
(WP)
Rekha shah
Period of Involvement:
May 2018 – January, 2019
Tasks:
Water Balance, Water demand, Adequacy of ETP, Treatment
Technology, Resource Conservation, Mitigation Measures, EMP for water
pollution and report preparation
Ecology and Bio-diversity
Conservation (EB)
Dipti Patel
Period of Involvement:
May 2018 – January, 2019
Tasks:
Site visit and conduct of ecological survey, assessment of the impacts of
proposed project activities on the biological environment and
contribution to EIA documentation
Noise & Vibration (NV)
Dipti Patel
Period of Involvement:
May 2018 – January, 2019
Tasks:
Checking of noise sampling results, analysis of data, identification of
impacts and mitigation measures, and contribution to EIA documentation
Socio-economic (SE)
Ghanshyam
Patel
Period of Involvement:
May 2018 – January, 2019
Tasks:
Site visit and collection of secondary and primary from the surrounding
area/villages of the proposed project. for impact identification and mitigation
measures for incorporating to EIA documentation
Hydrology, Ground Water and Water
Conservation (HG)
Rekha shah
Period of Involvement:
May 2018 – January, 2019
Tasks:
Site visit, Understanding and representing groundwater conditions, supervision of groundwater sampling,
finalization of survey findings, identification of impacts, suggestion of mitigation measures and contribution
to the EIA documentation
Geology
(GEO)
Ravikant Sharma
Not involved as Functional Area is rationalized as per QCI Scheme for
Accreditation Version 3 --
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat
Doc. No: 2017_ECSS_EIAI2_1700034
Declaration Page iv
Functional Areas Name of
the Expert
Involvement (Period & Task) Signature & Date
Soil Conservation (SC)
B. K. Patel
Not involved as Functional Area is rationalized as per QCI Scheme for
Accreditation Version 3 --
Risk Assessment & Hazard
Management (RH)
Nilesh Jogal
Period of Involvement:
October 2018 – December 2018
Tasks:
Identification of impacts & mitigation measures, safety during construction
and operational phase and contribution to EIA documentation
Solid waste and Hazardous Waste
Management (SHW)
Jagdish Rathi
Period of Involvement:
May 2018 – January, 2019
Tasks:
Identification of waste generated from the site, studying adequacy of
mitigation measures for management of hazardous waste and contribution
to EIA documentation
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat
Doc. No: 2017_ECSS_EIAI2_1700034
Declaration Page v
Declaration by the Head of the Accredited Consultant Organization:
I, Rekha Shah, hereby, confirm that our experts prepared the EIA report of Proposed Project
for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium
Phosphide Technical) Located at Plot No. 4924, Notified Industrial Area, GIDC Sarigam,
District - Valsad, Gujarat by Integrated Chemisol Pvt. Ltd. I also confirm that I shall be fully
accountable for any misleading information mentioned in this statement. It is certified that no
unethical practice like „Copy and Paste‟, and used external data/text without proper
acknowledgement, while preparing this EIA Report”.
Signature :
Name : Rekha Shah
Designation : CEO
Name of the EIA Consultant Organization :
ECO CHEM SALES & SERVICES
Office Floor, Ashoka Pavillion – A, Opp.
Kapadia Health Club, Surat – 395 001
NABET Certificate Number :
NABET/EIA/1720/ RA 051, Valid up to
February 03, 2020.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat
Doc. No: 2017_ECSS_EIAI2_1700034
Declaration Page vi
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Table of Content vii
CONTENTS
1 INTRODUCTION ........................................................................................................... 1
1.1 PURPOSE OF THE REPORT ................................................................................ 1
1.2 IDENTIFICATION OF PROJECT & PROJECT PROPONENT ................................ 1
1.2.1 Identification of Project ..................................................................................... 1
1.2.2 Project Proponent ............................................................................................ 1
1.3 BRIEF DESCRIPTION OF THE PROJECT AND ITS IMPORTANCE TO THE
COUNTRY & REGION ...................................................................................................... 2
1.3.1 Brief Description of the Project ......................................................................... 2
1.3.2 Importance to the Country and the Region ....................................................... 2
1.4 REGULATORY FRAMEWORK ............................................................................... 2
1.4.1 Scope and methodology of the study ............................................................... 2
1.4.2 Statutory Clearance as Other Permissions ...................................................... 3
1.4.3 Approved ToR for EIA study by EAC ............................................................... 4
1.5 Structure of the EIA report .................................................................................... 15
2 PROJECT DESCRIPTION ........................................................................................... 16
2.1 TYPE OF PROJECT ............................................................................................. 16
2.2 NEED FOR THE PROJECT .................................................................................. 16
2.3 LOCATION OF THE PROJECT ............................................................................ 16
2.3.1 General Location of the Site ........................................................................... 16
2.3.2 Approach to the Project Site .......................................................................... 19
2.3.3 Site Details .................................................................................................... 19
2.4 SIZE OR MAGNITUDE OF OPERATION ............................................................. 21
2.4.1 Production Capacity and transportation details .............................................. 21
2.4.2 Cost of the Project ......................................................................................... 22
2.5 ASSOCIATED ACTIVITIES REQUIRES BY OR FOR THE PROJECT ................. 22
2.5.1 Utilities ........................................................................................................... 22
2.5.2 Power ............................................................................................................ 23
2.5.3 Water ............................................................................................................. 23
2.5.4 Manpower ...................................................................................................... 24
2.6 PROPOSED SCHEDULE FOR APPROVAL AND IMPLEMENTATION ................ 24
2.7 TECHNOLOGY AND PROCESS DESCRIPTION ................................................. 25
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Table of Content viii
2.7.1 Manufacturing Technology ............................................................................. 25
2.7.2 Raw Material details ....................................................................................... 29
2.7.3 Storage Facilities ........................................................................................... 30
2.7.4 Details of Air Pollution and APCM .................................................................. 34
2.7.5 Design Specifications of APCM:..................................................................... 34
2.7.6 Fugitive Emission & Control Measures........................................................... 35
2.7.7 Odour Control Measures ................................................................................ 36
2.7.8 Noise pollution ............................................................................................... 36
2.7.9 Water Consumption, Waste Water Generation & Disposal Details ................. 37
2.7.10 Solid and Hazardous Waste Identification, Quantification, Storage and
Disposal 40
2.7.11 Project Layout and Components .................................................................... 40
2.7.12 Mitigation Measures at Design Stage ............................................................. 43
2.7.13 Assessment of New and Untested Technology .............................................. 45
2.7.14 Condensed Description .................................................................................. 45
3 DESCRIPTION OF THE ENVIRONMENT ................................................................... 47
3.1 Baseline Study Area and Period ........................................................................... 47
3.2 METHODOLOGY.................................................................................................. 48
3.2.1 Frequency of Sampling .................................................................................. 48
3.2.2 Method of Environmental Sampling and Analysis .......................................... 49
3.3 MICROMETEOROLOGY ...................................................................................... 51
3.3.1 Temperature .................................................................................................. 52
3.3.2 Humidity ......................................................................................................... 52
3.3.3 Wind Speed and Wind Direction .................................................................... 54
3.3.4 Wind Rose ..................................................................................................... 54
3.3.5 Interpretation of Micrometeorological Data ..................................................... 56
3.4 AIR ENVIRONMENT ............................................................................................ 56
3.4.1 Selection of Sampling Locations .................................................................... 56
3.4.2 Frequency and Parameters for Sampling ....................................................... 57
3.4.3 Methodology for Sampling and Analysis ........................................................ 58
3.4.4 Quality of Ambient Air .................................................................................... 58
3.4.5 Summary of Ambient Air Quality .................................................................... 59
3.4.6 Interpretation of Ambient Air Quality Data ...................................................... 60
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Table of Content ix
3.5 NOISE ENVIRONMENT ....................................................................................... 60
3.5.1 Sources of Noise Pollution ............................................................................. 60
3.5.2 Noise Level in the Study Area ........................................................................ 60
3.5.3 Summary of Noise Data ................................................................................. 63
3.5.4 Interpretation of Noise Data ........................................................................... 63
3.6 LAND ENVIRONMENT ......................................................................................... 63
3.6.1 Land Use Pattern of the Study area ............................................................... 63
3.6.2 Summary and Interpretation of Land Use Map ............................................... 66
3.7 GEOLOGY ............................................................................................................ 66
3.8 HYDROGEOLOGY ............................................................................................... 66
3.9 Traffic Study.......................................................................................................... 67
3.9.1 Interpretation of Traffic Study ......................................................................... 68
3.10 SOIL QUALITY ..................................................................................................... 68
3.10.1 Summary of Soil Data .................................................................................... 70
3.10.2 Interpretation of Soil Data .............................................................................. 70
3.11 WATER ENVIRONMENT ...................................................................................... 70
3.11.1 Reconnaissance ............................................................................................ 71
3.11.2 Water Quality ................................................................................................. 71
3.11.3 Sampling and Analysis ................................................................................... 71
3.11.4 Ground Water ................................................................................................ 71
3.11.5 Summary of Ground Water Quality ................................................................ 76
3.11.6 Interpretation of Ground Water Quality Data .................................................. 76
3.11.7 Surface Water ................................................................................................ 76
3.11.8 Summary of Surface Water Quality ................................................................ 79
3.11.9 Interpretation of Surface Water Quality Data .................................................. 79
3.11.10 Marine water .............................................................................................. 80
3.11.11 SUMMARY OF MARINE WATER QUALITY .............................................. 82
3.11.12 INTERPRETATION OF MARINE WATER QUALITY DATA ....................... 82
3.12 ECOLOGY AND BIODIVERSITY .......................................................................... 82
3.12.1 Methodology Adopted for the Study of Flora and Fauna ................................ 83
3.12.2 Floral Diversity of the Study Area ................................................................... 83
3.12.3 Interpretation of Ecology and Biodiversity ...................................................... 88
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Table of Content x
3.13 SOCIO-ECONOMIC ENVIRONMENT .................................................................. 88
3.13.1 Socio-Economic Survey Methodology ............................................................ 89
3.13.2 Demography .................................................................................................. 89
3.13.3 Population Density ......................................................................................... 89
3.13.4 Sex Ratio ....................................................................................................... 91
3.13.5 Literacy Rate.................................................................................................. 93
3.13.6 Economic Aspects ......................................................................................... 96
3.13.7 Amenities ....................................................................................................... 99
3.13.8 Interpretation of Socio Economic Data ......................................................... 100
3.14 Summary ............................................................................................................ 101
4 ANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES ........ 103
4.1 INVESTIGATED ENVIRONMENTAL IMPACTS DUE TO THE PROPOSED
PROJECT ..................................................................................................................... 103
4.1.1 Investigated Environmental Impacts Due to the Proposed Project ............... 104
4.1.2 Air Environment ........................................................................................... 107
4.1.3 Noise Environment....................................................................................... 119
4.1.4 Water Environment ...................................................................................... 122
4.1.5 Solid and Hazardous Waste Management ................................................... 125
4.1.6 IMPACTS ON LAND ENVIRONMENT ......................................................... 127
4.1.7 Ecology & Biodiversity Environment ............................................................. 129
4.1.8 Socio Economic ........................................................................................... 130
4.1.9 Health and safety (RH) ................................................................................ 133
4.2 IMPACT ON TRAFFIC ........................................................................................ 135
5 ANALYSIS OF ALTERNATIVES ................................................................................ 137
5.1 SITE ALTERNATIVES ........................................................................................ 137
5.2 TECHNOLOGY ALTERNATIVES ....................................................................... 137
6 ENVIRONMENTAL MONITORING PROGRAM ......................................................... 139
6.1 ENVIRONMENTAL MONITORING PROGRAM .................................................. 139
6.1.1 Air Environment ........................................................................................... 139
6.1.2 Noise Environment....................................................................................... 142
6.1.3 Water Environment ...................................................................................... 143
6.1.4 Land Environment and Solid and Hazardous Waste Management ............... 144
6.1.5 Ecology & Biodiversity Environment ............................................................. 145
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Table of Content xi
6.1.6 Traffic Management Plan ............................................................................. 146
6.2 SOCIO ECONOMIC ............................................................................................ 147
6.2.1 Social Welfare & Upliftment Plan ................................................................. 147
6.2.2 Environmental Monitoring and Management Cost ........................................ 148
7 ADDITIONAL STUDIES ............................................................................................. 150
7.1 PUBLIC CONSULTATION .................................................................................. 150
7.2 RISK ASSESSMENT .......................................................................................... 151
7.3 Hazard identification ........................................................................................... 151
7.3.1 Storage Details & Layout ............................................................................. 151
7.3.2 Layout map .................................................................................................. 152
7.3.3 Chemical Properies...................................................................................... 152
7.4 QUALITATIVE RISK ASSESSMENT .................................................................. 153
7.4.1 Conclusion ................................................................................................... 158
7.5 CONTROL / MITIGATION MEASURES .............................................................. 158
7.5.1 General Safety Measures for Construction Phase ....................................... 158
7.5.2 Safety Measures for Transportation, Storage and Handling of Chemicals .... 159
7.5.3 Occupational Health and Safety ................................................................... 164
7.6 DISASTER MANAGEMENT PLAN (DMP) .......................................................... 165
7.6.1 Structure ...................................................................................................... 165
7.6.2 Policy ........................................................................................................... 165
7.6.3 Planning ....................................................................................................... 165
7.6.4 Setting up of Emergency Infrastructure ........................................................ 174
7.6.5 Occupational Health and Safety Programme ............................................... 176
7.7 Socio Economic ................................................................................................. 177
8 PROJECT BENEFITS ................................................................................................ 178
8.1 IMPROVEMENTS IN THE PHYSICAL INFRASTRUCTURE .............................. 178
8.2 IMPROVEMENTS IN THE SOCIAL INFRASTRUCTURE ................................... 178
8.2.1 Education ..................................................................................................... 178
8.2.2 Water (Drinking Water Facilities) .................................................................. 178
8.2.3 Health .......................................................................................................... 178
8.2.4 Employment Avenues .................................................................................. 178
8.3 EMPLOYMENT POTENTIAL SKILLED; SEMI-SKILLED AND UNSKILLED ....... 178
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Table of Content xii
8.4 OTHER TANGIBLE BENEFITS .......................................................................... 179
9 ENVIRONMENTAL COST BENEFIT ANALYSIS ....................................................... 180
9.1 PROJECT COST AND APPRAISAL ................................................................... 180
9.2 APPLICABILITY OF CBA AND SUMMARY ........................................................ 180
10 ENVIRONMENTAL MANAGEMENT PLAN ............................................................ 181
10.1 ENVIRONMENTAL MANAGEMENT PLAN (EMP) .............................................. 181
10.1.1 Objectives of EMP ....................................................................................... 181
10.1.2 Environment Management Plan ................................................................... 181
10.2 ENVIRONMENT AMELIORATION ...................................................................... 186
10.2.1 Green Belt Development .............................................................................. 186
10.2.2 Concept of Waste Minimization, Recycle, Reuse / Recover, Energy
Conservation and Natural Resource Conservation ..................................................... 188
10.2.3 RAIN WATER HARVESTING SCHEME ...................................................... 189
10.3 OCCUPATIONAL HEALTH OF WORKERS ........................................................ 189
10.3.1 Noise ........................................................................................................... 189
10.3.2 Heat ............................................................................................................. 189
10.3.3 Dust, other Chemicals and Metals being suspended in the Environment ..... 190
10.3.4 Occupational Hazards specific Pre-Placement and Periodical Health Checkup
190
10.4 ENVIRONMENTAL MANAGEMENT CELL ......................................................... 190
11 SUMMARY AND CONCLUSION ............................................................................ 191
11.1 INTRODUCTION ................................................................................................ 191
11.1.1 Proposed Project ......................................................................................... 191
11.1.2 Air Emissions & Control ............................................................................... 191
11.1.3 Wastewater Treatment &Disposal ................................................................ 191
11.1.4 Hazardous& Other Solid Waste ................................................................... 192
11.2 DESCRIPTION OF THE ENVIRONMENT .......................................................... 192
11.2.1 Study Period, Area & Monitoring/Sampling Locations .................................. 192
11.2.2 Land Use and Land Cover ........................................................................... 192
11.2.3 Micro Meteorology ....................................................................................... 192
11.2.4 Ambient Air Quality ...................................................................................... 193
11.2.5 Noise Level .................................................................................................. 193
11.2.6 Soil Quality .................................................................................................. 193
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Table of Content xiii
11.2.7 Groundwater Quality .................................................................................... 194
11.2.8 Surface water Quality ................................................................................... 194
11.2.9 Marine water Quality .................................................................................... 194
11.2.10 Ecology and Biodiversity .......................................................................... 195
11.2.11 Socio Economic ....................................................................................... 195
11.3 IMPACT AND MITIGATION MEASURES ........................................................... 195
11.3.1 Air Environment ........................................................................................... 195
11.3.2 Noise Environment....................................................................................... 196
11.3.3 Water Environment ...................................................................................... 196
11.3.4 Land Environment ........................................................................................ 196
11.3.5 Solid and Hazardous Waste Management ................................................... 196
11.3.6 Biological Environment ................................................................................ 196
11.3.7 Green Belt Development .............................................................................. 197
11.3.8 Socio-Economic Environment ...................................................................... 197
11.4 ENVIRONMENTAL MONITORING PLAN ........................................................... 197
11.5 ADDITIONAL STUDIES ...................................................................................... 197
11.5.1 Socio Economic Development Activities ...................................................... 197
11.5.2 Risk Assessment ......................................................................................... 197
11.6 PROJECT BENEFITS ......................................................................................... 198
11.7 ENVIRONMENTAL MANAGEMENT PLAN......................................................... 198
11.8 CONCLUSION .................................................................................................... 198
12 DISCLOSURE OF CONSULTANTS ....................................................................... 200
12.1 GENERAL .......................................................................................................... 200
12.2 BRIEF RESUME AND NATURE OF CONSULTANCY ....................................... 200
12.3 TEAM MEMBER FOR EIA REPORT .................................................................. 200
12.4 LABORATORY INVOLVED FOR BASELINE MONITORING AND OTHER
ANALYSIS ..................................................................................................................... 201
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Table of Content xiv
LIST OF TABLES
Table 1-1: Identification of the Project as per EIA notification ................................................ 1
Table 1-2: Identified Applicable Statutory .............................................................................. 3
Table 1-3: Compliance with the Terms of Reference ............................................................. 4
Table 2-1: Schedule and category as per EIA notification ................................................... 16
Table 2-2: Location Details and Project Site Specific Environmental Sensitivity Details ...... 19
Table 2-3: Proposed Production Capacity ........................................................................... 22
Table 2-4: Capital Cost Projection ....................................................................................... 22
Table 2-5: Utility List............................................................................................................ 23
Table 2-6: Equipment and Machinery List ........................................................................... 23
Table 2-7: Power and Fuel Requirement ............................................................................. 23
Table 2-8: Water requirement details .................................................................................. 24
Table 2-9: Manpower Details .............................................................................................. 24
Table 2-10: Proposed Schedule for Approval and Implementation ...................................... 24
Table 2-11: Mass Balance of Aluminium Phosphide ........................................................... 26
Table 2-12: Mass Blanace of Zinc Phosphide ..................................................................... 27
Table 2-13: Mass Blanace of Magnesium Phosphide .......................................................... 28
Table 2-14: Raw material for Technical grade ..................................................................... 29
Table 2-15: Storage Details................................................................................................. 31
Table 2-16: Flue Gas Emissions ......................................................................................... 34
Table 2-17: Process Gas Emissions ................................................................................... 34
Table 2-18: Specification of P2O5 Scrubbing System ........................................................... 34
Table 2-19: Sources of Noise with their Sound Pressure Levels ......................................... 37
Table 2-20: Water Consumption & Wastewater Generation ................................................ 37
Table 2-21: Wastewater generation, treatment and disposal details .................................... 38
Table 2-22: Design paramters of Effluent Treatment Plant .................................................. 39
Table 2-23: Effluent Treatment Scheme .............................................................................. 39
Table 2-24: Solid and hazardous Waste details .................................................................. 40
Table 2-25: Area breakup ................................................................................................... 40
Table 2-26: Details of Mitigation Measures at Design Stage ............................................... 43
Table 2-27: Details of Condensed Description .................................................................... 45
Table 3-1: Frequency of Environmental Monitoring ............................................................. 48
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Table of Content xv
Table 3-2: Method of Environmental Sampling and Analysis ............................................... 49
Table 3-3: Meteorological Condition of Study Area ............................................................. 51
Table 3-4:Ambient Air Quality Monitoring Locations in the Study Region ............................ 57
Table 3-5:Details of Analysis Method .................................................................................. 58
Table 3-6: Min, Max, 98th Percentile and Average Value of PM10 and PM2.5 .................... 58
Table 3-7: Min, Max, 98th Percentile and Average Value of SO2 and NOx .......................... 59
Table 3-8: Min, Max, 98th Percentile and Average Value of CO .......................................... 59
Table 3-9:Noise Monitoring Locations in the Study Region ................................................. 61
Table 3-10: Noise Monitoring report during day time ........................................................... 61
Table 3-11: Noise Monitoring report during night time ......................................................... 62
Table 3-12: Land use Statistics (10 km) .............................................................................. 65
Table 3-13:Traffic Study Report .......................................................................................... 67
Table 3-14: Existing Traffic Scenario with respect to LOS ................................................... 67
Table 3-15: Details of Soil sampling location ....................................................................... 69
Table 3-16:Soil Sample Analysis Result .............................................................................. 69
Table 3-17: Details of Ground Water sampling locations ..................................................... 72
Table 3-18: Ground water Analysis Results ........................................................................ 74
Table 3-19:Details of Surface Water Sampling Locations .................................................... 77
Table 3-20: Surface water Analysis Results ........................................................................ 77
Table 3-21:Bacteriological Analysis of surface Water .......................................................... 78
Table 3-22:Standard limit as per IS 10500:2012 for Microbiological parameters ................. 78
Table 3-23:Details of Surface Water Sampling Locations .................................................... 80
Table 3-24: Marine Water Analysis Result .......................................................................... 80
Table 3-25:Microbiological Analysis Report for Marine Water Sample ................................ 81
Table 3-26: Zooplankton Analysis Report for Marine Water Sample ................................... 81
Table 3-27:Pigment Analysis and Phytoplankton cell count for Marine Water ..................... 81
Table 3-28: Benthos Details ................................................................................................ 81
Table 3-29: Sediment Quality Analysis ................................................................................ 82
Table 3-30: Trees in the Study area .................................................................................... 83
Table 3-31:List of Shrubs in the study area ......................................................................... 84
Table 3-32:List of Herbs in the study area ........................................................................... 85
Table 3-33: List of Climbers in the study area ..................................................................... 86
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Table of Content xvi
Table 3-34: List of Mammals in the Study area ................................................................... 86
Table 3-35:List of Domestic animal in the Study area .......................................................... 86
Table 3-36: List of Birds in the Study area ........................................................................... 86
Table 3-37: List of Reptiles in the Study area ...................................................................... 87
Table 3-38: List of Invertebrates in the Study area .............................................................. 88
Table 3-39:Details of Fishes................................................................................................ 88
Table 3-40: Details of Population in Study Area .................................................................. 89
Table 3-41: Details of Sex Ratio in Study Area.................................................................... 91
Table 3-42: Details of Literacy Rate in Study Area .............................................................. 93
Table 3-43:Details of Occupational Structure ...................................................................... 96
Table 3-44:Education Facilities ........................................................................................... 99
Table 3-45: Health Care Facilities ....................................................................................... 99
Table 3-46:Drinking Water Facilities .................................................................................... 99
Table 3-47: Sanitation Facilities .......................................................................................... 99
Table 3-48:Communication Facilities .................................................................................. 99
Table 3-49:Transportation Facilities .................................................................................... 99
Table 3-50: Road Facilities ............................................................................................... 100
Table 3-51: Bank Facilities ................................................................................................ 100
Table 3-52: Power Supply Facilities .................................................................................. 100
Table 4-1: Severity Criteria for Magnitude of Impacts ........................................................ 103
Table 4-2: Score ranges for Beneficial and Adverse Impacts ............................................ 104
Table 4-3: Aspect-Impact Identification from Proposed Project ......................................... 104
Table 4-4: Criteria of Significance / Consequence ............................................................. 107
Table 4-5: Proposed Stack Emission ................................................................................ 110
Table 4-6: Proposed Vent Emission & APCM ................................................................... 110
Table 4-7: 24 hourly average incremental increase in GLC – Flue gas stacks & vents ..... 114
Table 4-8: Impact Scoring and Mitigation Measures for Air Environment........................... 116
Table 4-9: Impact Scoring and Mitigation Measures for Noise Environment ...................... 119
Table 4-10:Impact Scoring and Mitigation Measures for Water Environment .................... 122
Table 4-11: Impact Scoring and Mitigation Measures for Solid and Hazardous Waste
Management ..................................................................................................................... 125
Table 4-12: Impact Scoring and Mitigation Measures for Land Environment ..................... 128
Table 4-13: Impact Scoring and Mitigation Measures for Ecology& Biodiversity ................ 129
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Table of Content xvii
Table 4-14: Impact Scoring and Mitigation Measures for Socio Economic ........................ 132
Table 4-15: Impact Scoring and Mitigation Measures for Health and safety ...................... 133
Table 5-1: Alternative for technology and other parameter ................................................ 137
Table 6-1: Environmental Monitoring Program for Air Environment ................................... 140
Table 6-2: Environment Monitoring Program for Noise Environment ................................. 142
Table 6-3: Environmental Monitoring Program for Water Environment .............................. 143
Table 6-4: Land Environment and Solid and Hazardous Waste Management ................... 144
Table 6-5: Manamgeent of Ecology and biodiversity Envieoronment ............................... 145
Table 6-6: Traffic Monitoring Program ............................................................................... 146
Table 6-7: Budget Break-up for CER Activities of 5 years ................................................. 147
Table 6-8: Summary of Environmental Monitoring Program .............................................. 148
Table 6-9: Capital Cost for Environmental Management System ...................................... 149
Table 6-10: Recurring/operating Cost Per Annum Environmental & Safety Management
System .............................................................................................................................. 149
Table 7-1: Chemical Storage Details ................................................................................. 151
Table 7-2: Physico-chemical properties of Chemicals ....................................................... 152
Table 7-3: Risk Matrix for Qualitative Risk Assessment .................................................... 154
Table 7-4: Risk Acceptability Criteria ................................................................................. 154
Table 7-5: Hazard Identification and Risk Assesement ..................................................... 155
Table 7-6: Emergency Types ............................................................................................ 166
Table 7-7: On-Site Emergency Planning ........................................................................... 167
Table 10-1: Environmental Management Plan .................................................................. 182
Table 10-2: List of plant species for Plantation in LIZ Area ................................................ 186
Table 10-3: Greenbelt Development Plan ......................................................................... 186
Table 10-4: Budget for Additional Greenbelt outside premises / Habitat Improvement
Programme ....................................................................................................................... 188
Table 10-5: Rainwater harvesting calculations .................................................................. 189
Table 12-1: EIA Team Member ......................................................................................... 200
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Table of Content xviii
LIST OF FIGURES
Figure 2-1: Aluminium Phosphide Flow Diagram ................................................................. 26
Figure 2-2: Zinc Phosphide Flow Diagram .......................................................................... 27
Figure 2-3: Magnesium Phosphide Flow Diagram .............................................................. 28
Figure 2-4: P2O5 Scrubbing system ..................................................................................... 35
Figure 2-5: Water Banlance Diagram .................................................................................. 38
Figure 2-6: Flow Diagram of Proposed Effluent Treatment Plant ......................................... 39
Figure 3-1: Graphical Presentation for the month wise Temperature Variation .................... 52
Figure 3-2: Graphical Presentation for the month wise Humidity Variation .......................... 53
Figure 3-3:Wind Rose Diagram ........................................................................................... 55
Figure 3-4:Methodology used for Land use Classification ................................................... 64
Figure 3-5: Land use Statistics (10 Km) .............................................................................. 65
Figure 3-6:Graph of Literacy Rate ....................................................................................... 95
Figure 3-7: Details of Occupational Structure ...................................................................... 98
Figure 4-1: Isopleth for Incremental GLC of Oxides of Sulphur (SO2) from Flue Gas Stack111
Figure 4-2: Isopleth for Incremental GLC of Oxides of Nitrogen (NOX) from Flue Gas Stack
......................................................................................................................................... 112
Figure 4-3: Isopleth for Incremental GLC of P2O5 from Reactor Vent ................................ 113
Figure 7-1: Emergency Organization Chart ....................................................................... 169
Figure 7-2: Emergency Organizational Chart .................................................................... 171
Figure 10-1: Organogram of Environmental Management Cell .......................................... 190
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Table of Content xix
LIST OF MAPS
Map 2-1: Map Showing Location of Project Site .................................................................. 17
Map 2-2: Project site marked on Google Earth .................................................................... 18
Map 2-3: Study Area Map ................................................................................................... 20
Map 2-4:Site map with Green Belt Development Planning .................................................. 42
Map 3-1: Study Area Map ................................................................................................... 47
Map 3-2: Map showing the Study Region location of Ambient Air........................................ 57
Map 3-3: Map showing the study region location of Noise ................................................... 61
Map 3-4:Land Use Map ....................................................................................................... 64
Map 3-5:Map showing the study region location of Soil ....................................................... 68
Map 3-6: Map showing the study region with locations for Ground Water ........................... 72
Map 3-7: Map showing the locations for Surface water ....................................................... 77
Map 3-8: Map showing the locations for Marine water ......................................................... 80
Map 7-1: Layout Plan Showing Storage Facilities ............................................................. 152
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Table of Content xx
LIST OF PHOTOGRAPHS
Photograph 2-1: Photographs of Project site ....................................................................... 21
Photograph 3-1: Photograph Showing The Sampling Activity .............................................. 49
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Table of Content xxi
LIST OF ANNEXURES
Annexure 1:ToR Letter ...................................................................................................... 203
Annexure 2: Land Allotment Letter .................................................................................... 211
Annexure 3: Letter Regarding the Unit is Located in Notified Industrial Area ..................... 212
Annexure 4: GIDC Water Permission Letter ...................................................................... 214
Annexure 5: Raw dfata of Ambient Air Modeling ............................................................... 215
Annexure 6: Undertaking regarding No manufacturing of Banned Pesticide product. ........ 218
Annexure 7: Environmnet Policy ....................................................................................... 219
Annexure 8: List OF MSDS ............................................................................................... 220
Annexure 9:Raw Data of Ambient Air ................................................................................ 297
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Abbreviations xxii
ABBREVIATIONS
AAQM - Ambient Air Quality Monitoring
AERMOD- AMS/EPA Regulatory Model
AMS- American Meteorological Society
AP/AQ- Air Pollution/ Air Quality
APCM- Air Pollution Control Measures
APHA- American Public Health Association
ARC/GIS- Arc geographical Information System
AWH- Air Water & Hazard Waste
AWMA- American Waste Management Association
BEIL- Bharuch Enviro Infrastructure Limited
BLEVE - Boiling Liquid Expanding Vapor Explosion
C&D- Construction and Demolition
CBSE- Central Board Secondary Education
CC&A- Consolidated Consent & Authorization
CEO- Chief Executive Officer
CGWA-Central Ground Water Authority
CO -Carbon Monoxide
CPCB- Central Pollution Control Board
CPCB-Central Pollution Control Board
Cr.: Cores
CTE: Consent to Establish
CTO- Consent to Operate
D.G- Diesel Generator
DALR -Dry Adiabatic Lapse Rate
DGVCL- Dakshin Gujarat Vij Co. Ltd.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Abbreviations xxiii
DIC- Deputy Incident Controllers.
Dist.- District
DMP- Disaster Management Plan
Doc.- Document
EC -Environmental Clearance
ECC - Emergency Control Center
EC-Environmental Clearance
EER - Evacuate, Escape and Rescue Plan
EHS - Environment, Health and Safety
EIA- Environmental Impact Assessment
ELCB -Earth-Leakage Circuit Breaker
ELR - Environment Lapse Rate
EMP - Environmental Management Plan
EMS- Environment Management System
EPA- Environment Protection Act
EPRG -Emergency Response Planning Guidelines
ERDAS- Earth Resource Development Assessment System
ERPG - Emergency Response Planning Guidelines
ETP- Effluent Treatment Plant
FAE- Functional Area Expert
FFE Firefighting Equipment‟s
GIDC - Gujarat Industrial Development Corporation
GLC- Ground Level Concentration
GOI- Government of India
GW- Ground Water
HAZCHEM- Hazardous Chemical Code
HAZOP- Hazard and Operability Study
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Abbreviations xxiv
HIRA- Hazard Identification and Risk Assessment
HSE- Health Safety and Environment
HW- Hazardous Waste
IC- incident controller
IDLH - Immediately Dangerous to Life or Health
IMD- Indian Meteorological Department
IS- Indian Standards
ISO-International Organization for Standardization
KLD- Kilo Liter Per Day
KVA- kilo-volt-ampere
LEL - Lower Flammability Limits
LOS- Level of Serviceability
LU/LC- Land Use/ Land Cover
MCA- Maximum Credible Accident
MCB-Miniature Circuit Breaker
MCLS - Maximum Credible Loss Scenarios
MCLS- Maximum Credible Loss Scenarios
MoEF&CC- Ministry of Environment, Forests and Climate Change
MSDS - Material Safety Data Sheet
MSIHC - Manufacture, Storage, Import & Hazardous Chemical Rules
MTPA- Million Tons Per Annum
NABL- National Accreditation Board for Testing and Calibration Laboratories
NFPA - National Fire Protection Association
NIHL- Noise Induced Hearing Loss
NOC-No Objection Certificate
Nox- Oxides of Nitrogen
NRSA- National Remote Sensing Agency
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Abbreviations xxv
NRSC- National Remote Sensing Centre
NRV- Non- return Valve
NV-Noise and Vibration
OGP- Oil and Gas Producers
OHC- Occupational Health Centre
OHS- Occupational Health Center
OSHA - Occupational Safety and Health Administration
PCU-Passenger Car Unit
PEL - Permissible Exposure Limits
PHAST- Process Hazard Analysis Software Tool)
PM- Particulate Matter
PPE- Personal Protective Equipment
PPEs- Personnel Protective Equipment
QC-Quality Control
QMS- Quality Management System
QRA- Quantitative Risk Assessment
R&D- Research and Development
RCC- Reinforced Cement Concrete
RD- Resource Depletion
RPE- Respiratory protective equipment
SCBA- Self-Contained Breathing Apparatus
SEIAA- State Environment Impact Assessment Authority
SMC - Site Main Controller
SO2- Sulphur Dioxide
SOP- Standard Operating Procedure
SS- Stainless Steel
STEL- Short Time Exposure Limit
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Abbreviations xxvi
SW- Surface Water
TL- Tank Lorry
TL- Threshold Limit
TLV - Threshold Limit Value
TOC- Total Organic Carbon
ToR - Terms of References
TPA – Ton Per Annum
TPH- Tones per Hour
TPM- Tones Per Month
TREM card - Transport Emergency Card
TREM- Transport Emergency Cards
TSDF - Treatment, Storage and Disposal facility
UEL- Upper Explosion Limit
UFL - Upper Flammable Limits
USEPA- United Stated Environment Protection Act
V/C-Volume/ Capacity
VEC's- Valuable Environment Components
VOC- Volatile Inorganic Carbon
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Abbreviations xxvii
EXECUTIVE SUMMARY
I. Project Name and Location
Integrated Chemisol Pvt. Ltd. proposes to establishe green field Technical grade pesticides
manufacture plant for Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide
Technical locted at Plot No. 4924, Notified Industrial Area, GIDC Sarigam, District - Valsad,
Gujarat.
II. Products & Capacities, If expansion proposal then existing products
with capacities and reference to early EC.
Integrated Chemisol Pvt. Ltd is new project.
S. No.
Product/s Quantity Unit Mode of
transportaion
1 Aluminium Phosphide / Zinc Phosphide /
Magnesium Phosphide Technical 500 TPM Road
III. Requirement of Land, Raw Material, Water, Power, Fuel with Source of
supply
Sr. no. Particulars Description
1. Total plot area m2 2351.25
2.
Fresh Water requirement (KL/day) 6.5
Source of water GIDC water supply
3. Power requirement (KVA) 125
Source of Power Dakshin Gujarat Vij Co. Ltd.
4. Manpower requirement
(Nos.)
75
5. Capital investment (Lakhs) 600
6. Steam Boiler TPH 0.2
7. Steam requirement (kg/h) 200
8. Cooling Tower, TR 300
9. Coal (kg/hr) 500
10. D. G set (KVA) 100
11. HSD (kg/hr) 15
IV. Process Description in brief and raw material specifically indication the
gaseous emission, liquid effluent and solid/hazardous waste:
The Company is manufacturing of pesticides with latest available process technology for the
production.
1. Aluminium Phosphide: Aluminium powder along with saw dust and graphite powder is
fed in the reaction pot. The lid is placed on the pot and is taken for mixing. Yellow
Phosphorus is then added gradually into reaction pot, keeping the inert gas blanketing and
stirring. After the proper mixing is done, reaction pot is taken to the reaction chamber, where
the reaction is carried out by removing inert blanketing. The Phosphorus is converted into
P2O5 producing heat up to 600°C which is used to start Aluminium Phosphide reaction. The
P2O5 generated during the reaction is scrubbed with water to form Phosphoric Acid. The
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Abbreviations xxviii
Phosphoric Acid thus generated is re-circulated at scrubber to get higher concentration of
Phosphoric Acid [H3PO4]. The tail gas scrubber is provided to scrub residual gas before
discharging to atmosphere through stack. After natural cooling, reacted mass is wax coated
in the rod mil and then formulated in the ribbon blender to convert Aluminium Phosphide in
powder form for the packing.
2. Zinc Phosphide: Zinc dust/Zinc dross is taken into the reactor. Phosphorous is added
gradually at control condition. The reaction between Zinc Dust & Phosphorous takes place in
the reaction vessel to form Zinc Phosphide which is an exothermic reaction. After natural
cooling, reacted mass is wax coated in the rod mil and then formulated in the ribbon blender
to convert Zinc Phosphide in powder form for the packing.The reacted Phosphorous is
converted into P2O5 which is scrubbed in absorption tower to form Phosphoric Acid as a
byproduct.
3. Magnesium Phosphide: Magnesium powder is mixed with Red Phosphorus is presence
of groundnut oil to give Technical Magnesium Phosphide (86%). P2O5 generated during the
reaction is scrubbed with water to give H3PO4 acid as a byproduct. Technical Magnesium
Phosphide is then dilute with ingredients like Paraffin Wax, MR 17, T.G.Urea, Zinc Stearate
and Graphite to give required Magnesium Phosphide with 66%.This magnesium Phosphide
is then sent for either tableting or directly for pouch packing.
V. Measures for mitigating the impact on the environment and mode of
discharge or Disposal:
The following will be monitored on a regular basis during operation phase to ensure that a
high level of environmental performance is maintained:
Ambient air monitoring of PM10, PM2.5, SO2, NOx and P2O5 will be carried out during the
operational phase within site premises and nearby villages, location of downwind
direction, and once every season.
Groundwater sample from site or nearby location once every season
Post project sampling and effect on baseline data generated during construction and
operation;
The general effectiveness of pollution control measures shall also be monitored
VI. Capital Cost of the Project, Estimated time of completion:
Proposed project cost will Rs. 600 lakh. Project will be commissioned within 6 to 8 months
after receipt of EC.
VII. Site selected for the project- Natural of land – Agricultural (Single/double
crop), barren, Govt./Private land, status of is acquisition, nearby (in 2-3
km) water body, Population, with in 10 km other industries, forest. Eco-
sensitive zones, accessibility.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Abbreviations xxix
Sr. No.
Environmental Sensitivity Name Distance & Direction
1 Nearest City Vapi 1.90 km in NW
2 Nearest Highway SH- 5 3.86 km SE
3 Nearest River Takor River 1.3 Km towards S
4 Other River Kalu River 4.92 Km towards E
5 Nearest National Highway NH-8 (Surat-Mumbai) 4.65 Km, towards SE
6 Nearest Airport Daman Airport 16.2 Km towards N
7 Nearest Railway station Bhilad Railway Station 4.66 Km towards E
8 State/U.T National Boundaries Daman 3.30 km in W
9. WLS/ESA/ESZ Dadra & Nagar Haveli WLS 13.3 km in SW direction
10. Archeological Site Moti Mahal Fortwalls 13.5 km in N direction
VIII. Baseline environmental data – Air quality, Surface and Ground water
quality, Soil characteristic, Flora and Fauna, Socio-Economic condition
of the nearby population.
1. Ambient Air Quality
i. PM10 61.9 – 86.1 µg/m3
ii. PM2.5 32.0 – 47.1 µg/m3
iii. SO2 9.4 – 17.6 µg/m3
iV. NOx 16.2- 23.0 µg/m3
V P2O5 <9.03
All results have been found within the NAAQ Standard Limit
2. Noise Level Monitoring
i. Day Time (06:00 AM to 10:00 PM)
50.2 – 77.1 dB (A)
ii. Night Time (10:00 PM to 06:00 AM)
42.1 – 73.5 dB (A)
The observed noise levels are meeting the acceptable norms.
3. Soil Quality and Characteristics
i. pH 7.56 to 7.82
ii. electrical
Conductivity 0.86 to 1.18 dS/m
iii. Sodium 4.5 to 6.6 meq/100g
iV. Nitrogen 0.030 to 0.056 meq/100g
V. Phosphorous 9.8 to 19.0 meq/100g
4. Ground Water
i. pH 7.14 – 7.28
ii. TDS 602-924 mg/L
iii. Alkalinity 292-502 mg/L
iV. Total
hardness 384-584 mg/L
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Abbreviations xxx
V. Chloride 148-202 mg/L
5. Surface water
i. pH 7.96-8.02
ii. TDS 186 - 354 mg/L
iii. DO 4.7 - 4.9 mg/L
iV. COD 10 - 20 mg/L
V. BOD 4 - 6 mg/L
Marine Water
On the basis of test results it is interpreted that water quality of marine is as per expectation
and suitable for sustaining the aquatic life. Presence of certain bio indicators indicate that
water is being contaminated with sewage or industrial discharge. Organic load is not more
than the self-purification capacity.
Ecology and Biodiversity
Different species of flora were observed among which Mango and Chickoo species were
dominant, as the soil of the study region also support for the cultivation of same. Herbal
species were observed rarely. Looking to the density of plant it may also be suggested to
improve the quality of environment by planting more trees. Due to destruction of natural
habitat, less numbers of wild mammals were observed. Number of species and density of
wild mammals can be increased by promoting/ facilitating the growth of bush. There was no
endangered species observed during primary survey.
Socio economic
During the primary survey it was observed that almost pakka road facility is available in all
villages within 10 km radius. Literacy rate of the study region is from 54.06 to 86.98%. On
the basis of survey for literacy rate data it is interpreted that there is need to promote
educate more and more people. Almost all the villages have more than 50 % people as non-
workers. It indicates that the problem of unemployment can be solved by providing proper
training and education. There is also need to establish more industries so that maximum
number of employment can be generated. Basic amenities like Education facilities Health
care facilities, water supply, electric power supply, mode of transportation etc. are available
in all villages.
IX. Identification of hazards in handling processing and storage of
hazardous material and safety system provided to mitigate the risk.
S. No. Process Or
Activity
Associated Health & Safety Impact (Risk)
Control / Mitigation Measures
Hazards
A Hazard involving during Construction Phase
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Abbreviations xxxi
S. No. Process Or
Activity
Associated Health & Safety Impact (Risk)
Control / Mitigation Measures
Hazards
1. Site Clearance, excavation and paving of site
Dust generation & increase in
SPM/RSPM in air
Fall into pit due to caving the side
Health effect on workers and surrounding
People
Risk of injury to workers
Water spray on the ground before excavation.
Work permit procedure to be followed.
Shoring of the sides while manual is digging the ground.
Use of dust mask.
2.
Fabrication work for
erecting major plant
equipment including
operation of equipment like crane, concrete
mixtures, vibrators etc.
and preventive maintenance
work
Noise generation
Health effect on workers and surrounding
People.
Ear plugs will be provided / and use ensured. Grinding
will be carried out in a closed shed area to thick greenbelt will be developed to reduce the noise level going outside
factory premises
3.
Vehicular movement for transportation of construction
material
Emission of PM10, HC, NOx, & CO
Noise generation
Health effect
Risk of injury to workers due to
accidents
P.U.C Certified Vehicles
Regular Maintenance of Vehicles
Speed control of the vehicles.
B Storage and Handling of Red Phosphorus
1 Loading & Unloading
Fire Explosion due to leakage /spillage in
pipe/container/ valves etc. if contact with
heat/sparks/open flames/hot surfaces
Skin/Eye irritation.
Toxic Vapor inhalation etc.
Safety glasses with side-shields conforming to EN166
for Eye Protection.
Use proper glove removal technique (without touching
glove's outer surface) to avoid skin contact with this product
for skin Protection.
Flame retardant antistatic protective clothing, for body
Protection.
Store in cool place. Keep
container tightly closed in a dry and well-ventilated place.
C Storage and Handling of yellow Phosphorus
1 Handling / Charging
Fire Explosion due to leakage /spillage in
pipe/container/ valves etc. if
Eye irritation and respiratory disorder.
Inspection of Bags/Barrel.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Abbreviations xxxii
S. No. Process Or
Activity
Associated Health & Safety Impact (Risk)
Control / Mitigation Measures
Hazards
contact with heat/sparks/open
flames/hot surfaces
Use of eye goggle & nose mask.
D Manufacturing of Zinc Phosphide
1
Mixing of Yellow
Phosphorus and zinc
Powder into closed reactor.
Generation of P2O5
Health effect on workers and surrounding
People.
Scrubber is installed to avoid releasing of P2O5 into the
environment and treated as Phosphoric Acid.
Eye irritation and respiratory
disorder
Appropriate PPEs like Safety Goggles, Butyl or Nitrile rubber gloves, gumboot,
plastic apron etc. will be used.
E Manufacturing of Magnesium Phosphide
1
Mixing of Magnesium
Phosphate and Magnesium
ground nut Oil MgO into
reaction pot.
Generation of P2O5
Health effect on workers and surrounding
People.
Scrubber is installed to avoid releasing of P2O5 into the
environment and treated as Phosphoric Acid.
Eye irritation and respiratory
disorder
Appropriate PPEs like Safety Goggles, Butyl or Nitrile rubber gloves, gumboot,
plastic apron etc. will be used.
F Storage and Handling of Phosphine
Charging of Zinc Oxide,
Red phosphorus,
Yellow Phosphorus.
Releasing of Phosphine gas.
Health effect on workers and surrounding
People.
Keep away from heat, hot surfaces, sparks, open flames and other ignition sources. No
smoking. Use only non-sparking tools.
Eye irritation and respiratory
disorder
Select eye protection in accordance with OSHA 29
CFR 1910.133.
Likely impact of the project on Air, Water, Land, Flora-fauna nearby
population:
Air Environment
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Abbreviations xxxiii
The maximum 24 hourly average GLC‟s for NOx is observed to be 3.91 µg/m3.
These GLC‟s are expected to occur at a distance of 50 m from the source towards
the SW direction.
The maximum 24 hourly average GLC‟s for P2O5 is observed to be 0.0088 µg/m3.
These GLC‟s are expected to occur at a distance of 10 m from the source towards
the West direction.
The maximum 24 hourly average GLC‟s SO2 for is observed to be 0.0046 µg/m3.
These GLC‟s are expected to occur at a distance of 50 m from the source towards
the SW direction
Noise Environment
Due to the proposed activities the noise will be generated from Vehicular movement and
heavy fabrication work, mainly noise generating source are Compressors, Pumps and
vehicular movement for products transportation during operation phase for raw material and
products transportation during operation phase. This noise will be very negligible.
Where this is not possible, control measures in the form of use of suitable PPE (ear muffs or
ear plugs) will be provided.
Water Environment
Surface Water: The proposed unit does not involve disposal of effluent on Land directly.
Generated waste water will be treated into ETP, first waste water will be collected, pH will
be balanced and then the wastewater will be filtered and utilized for scrubber. Thus there will
be no discharge of any industrial effluent.
The domestic wastewater generated will be disposed off into soak pits / septic tanks.
Land Environment
Land clearance will be done leading to removal of top soil which will be used for greenbelt
management.
Solid and Hazardous Waste Management
Excavation and paving activity involve for proposed project will be utilized for leveling of low
lying area. The scraps generated during fabrication will be given to scrap vendors.
During operation phase the ETP waste Will be disposed off into TSDF, Vapi through SIA,
Sarigam, Used oil Will be sold to Registered re-processers and Discarded containers Will be
sold to authorized recycler
Biological Environment
Removal of common site specific floral species from project site will not have significant or
permanent impact on the habitat structure of associated faunal diversity.
As the emissions from the plant are regulated and minimal with respect to the specified
norms, and with a very healthy greenbelt proposed at the site in the form of several species,
it then follows that the biological environment will be protected.
Green Belt Development
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Abbreviations xxxiv
The total greenbelt area will be 500 m2. Plantation will be carried out around periphery of the
project site. Considering, greenbelt area, project site will have plantation of around 125 trees
and 20 shrub of local species like Bel, Neem, Shesham, Peepal etc. Plantation will be
carried out in around periphery and within the project site.
Socio-Economic Environment
Assessment of socio-economic and sociological impact including health impacts to
surrounding population. The proposed activities shall generate indirect employment in the
region due to the requirement of workers in trail making, supply of raw material, auxiliary and
ancillary works, which would marginally improve the economic status of the people.
X. Emergency preparedness plan in case of natural or in plant emergencies:
On Site Emergency Preparedness Plan
The main objective of the plan is to take immediate actions to meet any emergency for speedy and efficient rescue and relief operations. The major steps during an onsite emergency plan are described below:
Effect the rescue and Medical treatment of casualties.
Safeguard other people.
Minimize damage to property and the environment.
Initially contain and ultimately bring the incident under control.
Identify any dead.
Provide authoritative information to the news media.
Provide for the needs of relatives.
Secure the safe rehabilitation of affected area.
Preserve relevant records and equipment for the subsequent enquiry into the cause and circumstances of the Emergency.
XI. Issues raised during public hearing (if applicable) and response given:
Public hearing is not applicable.
XII. CSR/ESC/CER Budget:
Budget of CER is Rs. 12 Lakh.
XIII. Occupational Health Measures:
Safety Training is being/will be provided to the employees.
Assembly points are being/will be defined for safe gathering of the employees during
the time of emergency.
Mock drills are /will be periodically conducted and factors like response time shall be
evaluated.
First Aid Facility and training is being/will be provided.
Personal protective equipment is being/will be provided to employees.
Health checkups are /will be organized at regular intervals.
Safety / Health records are being/will be maintained
XIV. A capital Budget of Rs. 10 Lakhs and Rs. 5 Lakhs/Annum as recurring cost has
been allocated for Occupational Health and Safety. Appropriate PPEs will be made
available readily for workers.
XV. Post Project Monitoring Plan Sr. No Important Monitoring Particulate Monitoring Duration of
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Abbreviations xxxv
Parameters Frequency Sampling
Air Pollution
1 SO2, NOx /
As per CC&A
Selected locations in and around plant site specified by GPCB
As per CC&A 24 hr
continuously
2 SO2, NOx PM10 , PM 2.5 ,
HC, CO/ As per CC&A
Stack gas analysis in all stacks.
As per CC&A One time
3 SPM / As per CC&A
Fugitive dust sampling (if any) at work zone
as per CPCB or GPCB.
As per CC&A 8 hourly
Water and Wastewater Quality
A Industrial/Domestic
As per CC&A
Waste water from
operational activity
Daily/ As per CC&A
24 hr
B
Water quality in the study area
i. Parameters specified
under IS:10500
Surface Water Half yearly/ As per CC&A
Grab
ii. Water levels and
chemistry of water
Water level studies in well
or bore wells in plant and
surrounding areas
Yearly / As per CC&A
Once
iii. As per norms Marine water/hot water Yearly/ As per CC&A
Once
iv. As per CC&A Major noise generating
sources at plant site
Every fortnight/ As per CC&A
24 hr.
continuous
v. As per CC&A Along Road for
transportation noise
Fortnight/ As per CC&A
24 hr.
continuous
Ambient Noise Levels
1 Noise level in dB(A) 4 Locations Fortnight/ As per CC&A
24 hr
Continuous with 1 hr
interval
Soil Characteristics
1 Selected locations in core and buffer zone in nearby area
Half Yearly/ As per CC&A
One Grab
sample
2 Work
Zone / Dust, Noise, etc.
At plant site Yearly Once in
work place
3 Corporate
Environmental
Responsibility
In core and buffer zone in
nearby villages
Half Yearly Once
4 Occupational Health
Surveillance/ Employee health register
At plant premises Half Yearly Once
5 Greenbelt development/ Trees, survival rate,
landscape area.
Number of plantation
(Units), Number of
Survived Plants/ Trees,
Number of Poor Plant/
Trees
yearly once
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Abbreviations xxxvi
6 Environmental audit As per Directions of
Honorary High Court
Yearly/ As per GPCB
once
7 Consents
and
Authorization
Consent to Operate under
applicable acts
Renewing 90
days before
expiry of
validity
once
8 Compliance of EC
Conditions
Submission of 6 monthly Compliance
Reports
June and
December
Twice in a
Year/ As per EC conditions
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 1 1
1 INTRODUCTION
1.1 PURPOSE OF THE REPORT
Integrated Chemisol Pvt. Ltd. proposes to established green field Technical grade pesticides
manufacture plant for Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide
Technical located at Plot No. 4924, Notified Industrial Area, GIDC Sarigam, District - Valsad,
Gujarat.
The purpose of this report is to identify environmental aspects, impacts and mitigation
measures arising from the proposed project and to prepare EIA report as per Terms of
Reference (ToR) issued by Ministry of Environment, Forest and Climate Change, New Delhi
1.2 IDENTIFICATION OF PROJECT & PROJECT PROPONENT
1.2.1 Identification of Project
The proposed project by M/s Integrated Chemisol Pvt. Ltd. will be a small scale unit to be
located in a notified industrial area with total plot area 2351.25 m2. The proponent proposes
to manufacture
Aluminium Phosphide/ Zinc Phosphide / Magnesium Phosphide technical with total
capacity of 500 TPM
As per the Environment Impact Assessment (EIA) Notification dated 14th September 2006
and its amendment thereafter, the proposed project falls in „Category A„ under project activity
5(b).
Table 1-1: Identification of the Project as per EIA notification
Project or Activity Category Proposed Products*
5 (b) Pesticides industry and pesticide specific intermediates (excluding
formulations) A
Aluminium Phosphide / Zinc Phosphide / Magnesium Phosphide Technical: 500
TPM
* Detailed Production capacity is provided inTable 2-3.
1.2.2 Project Proponent
M/s. Integrated Chemisol Pvt. Ltd., established in 2018, is managed by the promoters and
whole time Managing Director Mr. Bhargav Desai. He sets and evolves the strategic
direction for the company and its portfolio of offerings. While nurturing a strong leadership
team to drive its execution, Mr. Bhargav Desai has more than decade of experience of the
pesticides manufacturing industry with a strong track record for executing business
turnarounds and manufacturing.
He holds Bachelor degrees in Commerce from South Gujarat University, Surat.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 1 2
Mr. Rohan Trivedi, as Director of the Company, drives and oversees the continuous renewal
of key processes, system and policies across the company in client relationship
management sales effectiveness, delivery excellence, quality, talent management and
leadership development. He has over a decade of experience in fumigation industry. He has
transformed M/s Shri Sai Pest Control from a small household local pest control agency to a
complete service provider for the exports related services like fumigation, lashing, belting,
etc.
Firm‟s strength is commitment, best quality, timely delivery at best price. Firm is always
engaged in R&D, quality control, marketing, production, logistics, import and export. Senior
personnels are available for providing support to the manufacturing unit in the areas of
technology, R&D, manufacturing, quality control and quality assurance.
1.3 BRIEF DESCRIPTION OF THE PROJECT AND ITS
IMPORTANCE TO THE COUNTRY & REGION
1.3.1 Brief Description of the Project
M/s Integrated Chemisol Pvt. Ltd. proposes to set up a plant for the manufacturing of
“Pesticides” which are used for stored grain insects and pests. The product will be used for
domestic and quarantine fumigation only.
The project is proposed within Notified Industrial Area at Plot No. 4924, Notofied Industrial
area, GIDC Sarigam, Umbergaon, Valsad (Gujarat).
Total investment for the proposed project will be Rs. 600 Lakhs.
1.3.2 Importance to the Country and the Region
The proposed project provides a potential growth opportunity for the already running
business of the company. The company is already engaged in the business of Pesticides
The project would increase the overall export and also increase the foreign revenue. Product
is now well established and acceptable in the international markets. Additional capacities of
product range required over and above our capacities, as the company expect strong growth
of exports to the extent of 40-50%. Local market also shows strong growth potential. This
project will generate employment of up to 15 people.
1.4 REGULATORY FRAMEWORK
1.4.1 Scope and methodology of the study
Compliance of ToR points as per the ToR letter issued on 22nd July, 2018 by Ministry of
Environment, forest and climent change New Delhi. This compliance includes:
Collection of baseline data with respect to Air, Noise, Water, Land, Biological and Socio-
economic components for one season.
Identification and assessment of impacts on environment and suggesting mitigation
measures.
Preparation of Environmental Monitoring, Management and RA/DMP Plan.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 1 3
1.4.2 Statutory Clearance as Other Permissions
The list of identified legislations applicable to the project is given in Table 1-2.
Table 1-2: Identified Applicable Statutory
Sr. No. Legal Instruments
1 The Factories Act, 1948
2 The Water (Prevention and Control of Pollution) Act, 1974 and Rules, 1975, as amended to
date.
3 The Air (Prevention and Control of Pollution) Act, 1981 and Rules, 1982, as amended to
date.
4 The Manufacture, Storage and Import of Hazardous Chemical rules, 1989, as amended to
date.
5 The Environment (Protection) Act, 1986 and Rules, 1986, as amended to date
6 Chemical accidents (Emergency Planning, preparedness and response) Rules, 1996
7 The Motor Vehicles Act, 1988 & The Central Motor Vehicle rules, 1989
8 Hazardous and Other Wastes (Management and Trans boundary Movement) Rules, 2016
as amended to date
9 Construction and Demolition Waste Management Rules, 2016
10 The Noise Pollution (Regulation and Control) Rules, 2000 as amended to date
11 Environmental Impact Assessment Notification, 2006 as amended to date
12 Public Liability Insurance Act, 1991 and Rules, 1991 as amended to date
13 The Poisons Act, 1919 as amended to date
14 The Insecticide Act, 1968 and Rules, 1971
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 2 4
1.4.3 Approved ToR for EIA study by EAC
The MoEF, New Delhi has finalized the Terms of References (TORs) for carrying out
Environmental studies.
Compliance of ToR
Summarized details of the compliance status of this report with the prescribed ToR are
provided in Table 1-3.
Table 1-3: Compliance with the Terms of Reference
S. No. ToR Points Reply Citation in EIA Report
A STANDARD TERMS OF REFERENCE
1 Executive Summary Summary and Conclusion
attached in Initial pages of EIA.
2 Introduction
i Details of the EIA Consultant
including NABET accreditation
Eco Chem Sales & Services is a NABET accredited
consultant, having NABET Certificate No.
NABET/EIA/1720/RA 051 valid up to Feb. 03, 2020.
Section 12.1, Ch. 12, Pg. 200 and NABETcertificated attached as Initil pages of
EIA report.
ii Information about the project
proponent
M/s. Integrated Chemisol Pvt. Ltd., established in
2018, is managed by the promoters and whole time
Managing Director Mr. Bhargav Desai
Detailed information is given in Section 1.2.2, Ch.
1, Pg.1
iii
Importance and benefits of the project
Importance and project benefits are given in Ch. 1
Detailed information provided in section 1.3,
Ch. 1, Pg. 2
3 Project Description
i Cost of project and time of
completion.
Total project cost will be ~6 Cr and time of completion will be ~6- 8 months after
getting EC
Sub-Section 2.4.2, Pg. 22 and Section 2.6 Pg. 24,
Ch.2,
ii Products with capacities for
the proposed project.
The production capacity of proposed project is 500
TPM
Details of proposed products along with their production capacities are provided in Section 2.4, Table 2-3, Ch.2, Pg. 22
iii
If expansion project, details of existing products with
capacities and whether adequate land is available for
expansion, reference of earlier EC if any.
Not applicable ---
iv List of raw materials required and their source along with
mode of transportation.
List of raw material is provided in chapter 2.
Details of Raw material quantity, source and mode of transportation is provided
inTable 2-14, Section
2.7.2, Ch. 2, Pg. 29.
v
Other chemicals and materials required with
Storage facilities of other chemicals are given in
Details of storage facilities is provided in
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 2 5
S. No. ToR Points Reply Citation in EIA Report
quantities and storage capacities
chapter 2. Table 2-15 Ch. 2, Pg. 31
vi Details of Emission, effluents, hazardous waste generation
and their management.
Emission
Flue Gas stack: PM, SO2 and NOx
Management: Adequate stack height of
chimney.
Process Stack: P2O5
Management: Two stage water scrubber
Effluent
Waste water genartion: 2.8 KLD
Manamgement: ETP
Hazardous Waste
ETP Waste will be disposed to TSDF site, Used Oil Will be sold to Registered re-processersand Discarded containers Will be sold to
authorized recycler Phosphoric acid(60%) will
be sell to rule 9.
Details provided in Section 2.7.4 Pg. 34, Section 2.7.9 Pg. 37, Section 2.7.10, Pg.
40 Ch 2.
vii
Requirement of water, power, with source of supply, status of approval, water balance
diagram, man-power requirement (regular and
contract)
Total fresh requirement of water is 6.5 KLD which will
be sourced from GIDC.
Manpower required are 75 and power requirement will
125 KVA,
Break up of water consumption, water
balance, approval letter is provided in chapter 2.
Details provided in Section 2.5.2, Pg. 23,section 2.5.3 Pg. 23 and Section 2.5.4
Pg. 24, Ch. 2.
Copy of Water supply letter is attached as Annexure 4,
Pg.214
viii
Process description along with major equipment‟s and machineries, process flow
sheet (quantitative) from raw material to products to be
provided
Detailed process description along with major equipment‟s and
machineries, process flow sheet are provided in
chapter 2.
Details provided in
Section 2.7, Ch. 2 Pg. 25
ix Hazard identification and details of proposed safety
systems.
Details on Hazard identification and proposed safety systems are provided
in chapter 7.
Details provided in Section 7.3, Table 7-5, pg. 155
x
Expansion/modernization proposals:
a. Copy of all the Environmental Clearance(s)
including Amendments thereto obtained for the
project from MOEF/SEIAA shall be attached as an
Annexure. A certified copy of the latest as per circular
dated 30th May, 2012 on the
status of compliance of
Not Applicable ---
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 2 6
S. No. ToR Points Reply Citation in EIA Report
conditions stipulated Monitoring Report of the Regional Office of the
Ministry of Environment and Forests in all the existing environmental clearances
including Amendments shall be provided. In addition, status of compliance of
Consent to Operate for the ongoing /existing operation of the project from SPCB shall be attached with the EIA-
EMP report.
b. In case the existing project has not obtained
environmental clearance, reasons for not taking EC under the provisions of the
EIA Notification 1994 and/or EIA Notification 2006 shall be provided. Copies of Consent
to Establish/No Objection Certificate and Consent to Operate (in case of units
operating prior to EIA Notification 2006, CTE and
CTO of FY 2005-2006) obtained from the SPCB shall
be submitted. Further, compliance report to the
conditions of consents from the SPCB shall be submitted.
Not Applicable ---
4 Site Details
i
Location of the project site covering village,
Taluka/Tehsil, District and State, Justification for
selecting the site, whether other sites were considered.
Location map of site covering village,
Taluka/Tehsil, District, and State is given in Chapter 3.
Details provided in Section 2.3 Map 2-1, pg.17, chp. 2
ii
A Toposheet of the study area of radius of 10km and
site location on 1:50,000/1:25,000 scale on
an A3/A2 sheet. (including all eco-sensitive areas and
environmentally sensitive places)
Study area of radius 10 Km and site location falls under Toposheet of F43S15 & 16 Map attached in Chapter 3.
Toposheet Map attached as Map 3-1, pg.47
iii
Details w.r.t. option analysis for selection of site
No alternate site analysis is done.
Details provided in ch. 5, pg. 137
iv
Co-ordinates (lat-long) of all four corners of the site.
Co-ordinates of project sites are given in Ch. 2
Provided in Map 2-2 Ch. 2, Pg. 18
v
Google map-Earth downloaded of the project
site.
Google Earth image with project boundary is shown in
Ch. 2.
Provided in Map 2-3 Ch. 2, Pg. 20
vi Layout maps indicating Layout Map of site provided Map shown as Map 2-3 Ch.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 2 7
S. No. ToR Points Reply Citation in EIA Report
existing unit as well as proposed unit indicating storage area, plant area,
greenbelt area, utilities etc. If located within an Industrial
area/Estate/Complex, layout of Industrial Area indicating location of unit within the
Industrial area/Estate.
in EIA report 2, Pg. 20
vii
Photographs of the proposed and existing (if applicable) plant site. If existing, show
photographs of plantation/greenbelt, in
particular.
Photographs of plant and greenbelt are shown in in
EIA report
Plant photographs are provided in Photograph 2-1, Section 2.3, Ch. 2,
Pg. 21
viii
Landuse break-up of total land of the project site
(identified and acquired), government/ private -
agricultural, forest, wasteland, water bodies, settlements, etc. shall be included. (not required for
industrial area)
The proposed project is located within notified
Industrial Area of GIDC Sarigam.
--
ix
A list of major industries with name and type within study area (10km radius) shall be
incorporated. Land use details of the study area
List of Major industries is given in Ch. 2. Land use
details of the study area are given in Ch. 3.
List of Major Industries is provided in Section 2.3.3 Ch. 2, Pg19& Land use details are provided in
Section 3.6, Pg.63
x
Geological features and Geo-hydrological status of the
study area shall be included.
Geological and Geo-hydrological status is given
in Ch. 3.
Details are provided in
Section 3.7, Pg.66
xi
Details of Drainage of the project upto 5km radius of
study area. If the site is within 1 km radius of any major
river, peak and lean season river discharge as well as
flood occurrence frequency based on peak rainfall data of the past 30 years. Details of
Flood Level of the project site and maximum Flood Level of
the river shall also be provided. (mega green field
projects)
Site does not fall within 1 Km radius of any major
river.
Drainage Map is attached as Map 3-1, pg. 47
xii
Status of acquisition of land. If acquisition is not complete,
stage of the acquisition process and expected time of complete possession of the
land.
land is possession of project proponent
--
xiii
R&R details in respect of land in line with state Government
policy
NA NA
5 Forest and wildlife related
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 2 8
S. No. ToR Points Reply Citation in EIA Report
issues
(if applicable):
i
Permission and approval for the use of forest land
(forestry clearance), if any, and recommendations of the State Forest Department. (if
applicable)
No forest Land is involved. NA
ii
Land use map based on High resolution satellite imagery (GPS) of the proposed site
delineating the forestland (in case of projects involving
forest land more than 40 ha)
NA NA
iii
Status of Application submitted for obtaining the stage I forestry clearance
along with latest status shall be submitted.
NA NA
iv
The projects to be located within 10 km of the National
Parks, Sanctuaries, Biosphere Reserves,
Migratory Corridors of Wild Animals, the project
proponent shall submit the map duly authenticated by
Chief Wildlife Warden showing these features vis-à-
vis the project location and the recommendations or comments of the Chief
Wildlife Warden-thereon.
NA NA
v
Wildlife Conservation Plan duly authenticated by the
Chief Wildlife Warden of the State Government for
conservation of Schedule I fauna, if any exists in the
study area.
NA NA
vi
Copy of application submitted for clearance under the Wildlife (Protection) Act,
1972, to the Standing Committee of the National
Board for Wildlife.
NA NA
6 Environmental Status
i
Determination of atmospheric inversion level at the project
site and site-specific micrometeorological data
using temperature, relative humidity, hourly wind speed
and direction and rainfall.
Project site and site specific micrometeorological data
are given in Ch. 3.
Provided in Section 3.3, Ch.3, Pg. 51
ii
AAQ data (except monsoon) at 8 locations for PM10, PM2.5,
AAQ data along with locations and results in
Provided in Section 3.4, Ch.3, Pg. 56
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 2 9
S. No. ToR Points Reply Citation in EIA Report
SO2, NOX, CO and other parameters relevant to the
project shall be collected. The monitoring stations shall be based CPCB guidelines and
take into account the pre-dominant wind direction,
population zone and sensitive receptors including reserved
forests.
provided in Ch. 3
iii
Raw data of all AAQ measurement for 12 weeks of all stations as per frequency
given in the NAQQM Notification of Nov. 2009 along with - min., max.,
average and 98% values for each of the AAQ parameters from data of all AAQ stations
should be provided as an annexure to the EIA Report.
Raw data of all AAQ measurement is provided in
EIA report
Attached as Annexure 9, Pg. 297
iv
Surface water quality of nearby River (100m upstream and downstream of discharge
point) and other surface drains at eight locations as
per CPCB/MoEF & CC guidelines.
The proposed project does not involve discharge of
water in any surface water body
Details provided in section 3.11 Sub-Section 3.11.7,
pg.76, Ch.3,
v
Whether the site falls near to polluted stretch of river
identified by the CPCB/MoEF & CC, if yes give details.
The site does not fall near to polluted stretch of river identified by the CPCB/
MoEFCC
NA
vi Ground water monitoring at minimum at 8 locations shall
be included
Ground Water monitoring was carried out and details
of the same along with analysis results are given in
Ch. 3.
Details provided in section 3.11 Sub- Section Ch.3,
Pg. 71.
vii
Noise levels monitoring at 8 locations within the study
area.
Noise Monitoring was carried and details are given
in Ch. 3.
Details provided in Section 3.5, Ch.3, Pg 60
viii
Soil Characteristic as per CPCB guidelines.
Soil sampling was done and details with analytical results
are given in Ch. 3.
Details provided in Section 3.10, Ch.3, Pg. 68
ix
Traffic study of the area, type of vehicles, frequency of
vehicles for transportation of materials, additional traffic due to proposed project, parking arrangement etc.
Traffic Study of the area is given in Ch. 3.
Details provided in Section 3.9, Ch.3, Pg. 67
x
Detailed description of flora and fauna (terrestrial and
aquatic) existing in the study area shall be given with
special reference to rare,
Detailed description of Flora and Fauna is provided in
Ch. 3.
Details provided in Section 3.12 Ch.3, Pg. 82
Conservation Plan is provided in Section 10.2.1,
pg. 186
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 2 10
S. No. ToR Points Reply Citation in EIA Report
endemic and endangered species. If Schedule-I fauna are found within the study
area, a Wildlife Conservation Plan shall be prepared and
furnished.
xi
Socio-economic status of the study area.
Socio-economic status of the area is given in Ch. 3
Details provided in Section 3.13, Ch.3, , Pg. 88
7
Impact and Environment Management Plan
i
Assessment of ground level concentration of pollutants
from the stack emission based on site-specific
meteorological features. In case the project is located on
a hilly terrain, the AQIP Modeling shall be done using inputs of the specific terrain
characteristics for determining the potential
impacts of the project on the AAQ. Cumulative impact of
all sources of emissions (including transportation) on the AAQ of the area shall be
assessed. Details of the model used and the input
data used for modeling shall also be provided. The air quality contours shall be plotted on a location map showing the location of project site, habitation
nearby, sensitive receptors, if any.
Assessment of ground level concentration of pollutants with the help of AERMOD
software, mainly SO2, NOX, based on site specific meteorological data is
shown in Ch. 4.
Details provided in Section 4.1.2 Ch.4 Pg. 107
ii
Water Quality modeling - in case of discharge in water
body
No discharge of effluent in water body is envisaged
hence not applicable.
--
iii
Impact of the transport of the raw materials and end
products on the surrounding environment shall be
assessed and provided. In this regard, options for
transport of raw materials and finished products and wastes
(large quantities) by rail or rail-cum road transport or
conveyor-cum-rail transport shall be examined.
Detail impact of the transport of the raw
materials and end products on the surrounding
environment is assessed and is provided in Ch.4
Details provided in Section 4.1.1, Ch.4, Pg. 104
iv
A note on treatment of wastewater from different plant operations, extent recycled and reused for
different purposes shall be included. Complete scheme
The waste water generated from the process will be
treated in ETP
Domestic waste water will be treated in Septic tank. Complete scheme, and
Details provided in Sub-Section
2.7.9, Ch. 2, Pg. 37
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 2 11
S. No. ToR Points Reply Citation in EIA Report
of effluent treatment. Characteristics of untreated and treated effluent to meet the prescribed standards of discharge under E(P) Rules.
characteristics of untreated effluent are provided in Ch.
2
v Details of stack emission and
action plan for control of emissions to meet standards.
Details of Stack emission and action plan for the same
is provided in Ch.2
Details provided in
Sub-Section 2.7.4, Ch. 2,
Pg. 34
vi
Measures for fugitive emission control
Details are given in Ch. 2. Sub-Section 2.7.6, Ch. 2 Pg.35
vii
Details of hazardous waste generation and their storage, utilization and management.
Copies of MOU regarding utilization of solid and
hazardous waste in cement plant shall also be included.
EMP shall include the concept of waste-
minimization, recycle/reuse/recover techniques, Energy
conservation, and natural resource conservation.
Details of Hazardous waste and management is provided in Ch. 2.
Details provided in
Sub-Section 2.7.10 Ch. 2
Pg. 40
Concept of waste-minimization,
recycle/reuse/recover techniques, Energy
conservation, and natural resource conservation is
provided in Section 10.2.2,
Ch.10, Pg. 188
viii
Proper utilization of fly ash shall be ensured as per Fly Ash Notification, 2009. A
detailed plan of action shall be provided.
Not Applicable ---
ix
Action plan for the green belt development plan in 33 % area i.e. land with not less than 1,500 trees per ha. Giving details of species,
width of plantation, planning schedule etc. shall be
included. The green belt shall be around the project
boundary and a scheme for greening of the roads used for the project shall also be
incorporated.
Green belt will be developed in 500 m
2 within the plant
premises. Local trees and shrubs have been planted in
greenbelt area. Detail is incorporated in EIA report.
Action plan provided in Sub-Section 10.2.1,
Ch.10, Pg. 186
x
Action plan for rainwater harvesting measures at plant
site shall be submitted to harvest rainwater from the roof tops and storm water
drains to recharge the ground water and also to use for the
various activities at the project site to conserve fresh water and reduce the water
requirement from other sources.
Detailed Rain Water Harvesting and Recharge scheme is given in Ch. 10.
Action plan provided in Section 10.2.3, Ch.10, Pg.
189
xi
Total capital cost and recurring cost/annum for
Cost for EMS of propsed project Capital cost – Rs. 10
Detailed capital cost and recurring cost/annum for
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 2 12
S. No. ToR Points Reply Citation in EIA Report
environmental pollution control measures shall be
included.
Lakh and
Recurring cost of project – Rs. 5 Lakh/annum.
A detail is incorporated in EIA report.
environmental pollution control measures are
provided in Table 6-9 and Table 6-10.
Table 6-9Ch. 6, Pg. 149
xii
Action plan for post-project environmental monitoring
shall be submitted.
Detailed action plan for post-project monitoring is
given in Ch. 6.
Detailed action plan Ch. 6,
Pg. 139
xiii
Onsite and Offsite Disaster (natural and Man-made)
Preparedness and Emergency Management
Plan including Risk Assessment and damage
control. Disaster management plan should be linked with District Disaster
Management Plan.
Onsite and Offsite DMP and Risk Assessment is given in
Ch. 7.
Details provided in
Ch. 7 section 7.6, Pg.165
8 Occupational health
i
Plan and fund allocation to ensure the occupational
health & safety of all contract and casual workers
Rs. 2.0 Lacs has been allotted for occupational
health and safety for propsed project.
--
ii
Details of exposure specific health status evaluation of
worker. If the workers' health is being evaluated by pre designed format, chest x
rays, Audiometry, Spirometry, Vision testing (Far & Near
vision, colour vision and any other ocular defect) ECG, during pre-placement and
periodical examinations give the details of the same.
Details regarding last month analyzed data of above
mentioned parameters as per age, sex, duration of
exposure and department wise.
New Project hense in this not Applicable
---
iii
Details of existing Occupational & Safety Hazards. What are the
exposure levels of hazards and whether they are within Permissible Exposure level
(PEL). If these are not within PEL, what measures the company has adopted to
keep them within PEL so that health of the workers can be
preserved,
New Project hense in this not Applicable
---
iv
Annual report of health status of workers with special
reference to Occupational
Details ar provided in chapter 10.
Details provided in
Section 10.3, pg. 190
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 2 13
S. No. ToR Points Reply Citation in EIA Report
Health and Safety.
9
Corporate Environment Policy
i
Does the company have a well laid down Environment Policy approved by its Board of Directors? If so, it may be
detailed in the EIA report.
Environment Policy is attached in Annexure.
Environment Policy is attached Annexure 7,
pg.219
ii
Does the Environment Policy prescribe for standard
operating process / procedures to bring into focus any infringement / deviation / violation of the environmental or forest norms / conditions? If so, it may be detailed in the
EIA.
Environment Policy is attached in Annexure.
Environment Policy is attached Annexure 7,
pg.219
iii
What is the hierarchical system or Administrative
order of the company to deal with the environmental issues and for ensuring compliance
with the environmental clearance conditions? Details of this system may be given.
The hierarchical system or administrative order of the company to deal with the environmental issues and
for ensuring compliance with the EC conditions is provided in Ch.10.
Details provided in
Section 10.4 Ch.10, Pg. 190
iv
Does the company have system of reporting of non-compliances / violations of environmental norms to the
Board of Directors of the company and / or
shareholders or stakeholders at large? This reporting
mechanism shall be detailed in the EIA report
The reporting mechanism is provided in Ch.10
Details provided in
Section 10.4 Ch.10, Pg.
190
10
Details regarding infrastructure facilities such as sanitation, fuel, restroom
etc. to be provided to the labour force during
construction as well as to the casual workers including
truck drivers during operation phase.
Details are given in chapter 2 of EIA report.
Details provided in 2.5, Ch 2. , Pg. 22
11
Enterprise Social Commitment (ESC)
i
Adequate funds (at least 2.5 % of the project cost) shall be
earmarked towards the Enterprise Social
Commitment based on Public Hearing issues and item-wise details along with time bound action plan shall be included. Socio-economic development
activities need to be
Rs. 12 lakh is earmarked towards the Enterprise
Social Commitment and the same is incorporated in EIA
report.
Details provided in section 6.2 , Ch. 6, Pg. 147
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 2 14
S. No. ToR Points Reply Citation in EIA Report
elaborated upon.
ii
Any litigation pending against the project and/or any
direction/order passed by any Court of Law against the
project, if so, details thereof shall also be included. Has the unit received any notice
under the Section 5 of Environment (Protection) Act, 1986 or relevant Sections of
Air and Water Acts? If so, details thereof and
compliance/ATR to the notice(s) and present status
of the case.
No litigation is pending against the project and/or any direction/order passed
by any Court of Law against the project
--
iii A tabular chart with index for
point wise compliance of above TOR.
Complied Index for point wise compliance of above TOR
is prescribed in initial pages of EIA report.
B Specific ToR Points
i
Commitment that no banned pesticides will be
manufactured
Commitment that no banned pesticides is attached in
Annexures.
Details provided in Annexure 6, pg.218
ii
Details on solvents to be used,measuresfor solvent recovery and for emissions
control
No solvent will be used Not Applicable
iii Details of process emissions from the proposed unit and its
arrangement to control
Details of process emissions from the proposed unit and its arrangement to control
given in chapter 2.
Details provided in Section 2.7.5, Ch.2, pg.34
iv
Ambient air quality data should include VOC, other process- specific ollutants*
like NH3*,
chlorine*, HCl*, HBr*, H2S*, HF*, CS2 etc., (*-as
applicable)
Details are provided in Chapter 3.
Details provided in Section 3.4, Ch.3, pg.56
v Work zone monitoring
arrangements for hazardous chemicals
Work zone monitoring arrangements for hazardous chemicals is provided in ch.
10.
Details provided in Section 7.2, Ch.7, pg.151
vi
Detailed effluent treatment scheme including
ssegregation for units adopting 'Zero' liquid
discharge
Detailed effluent treatment scheme including
ssegregation for units adopting 'Zero' liquid
discharge is provided in ch. 2.
Details provided in
Sub-Section 2.7.9, Ch. 2, Pg. 37
vii Action plan for odour control
to be submitted
Odour control plan given in ch.2
Details provided in
Sub-Section 2.7.7, Pg. 36, Ch. 2,
viii
A copy of the Memorandum of Understanding signed with
cement manufacturers
Unit shall not generating any
organic solid/hazardous
Not Applicable
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 2 15
S. No. ToR Points Reply Citation in EIA Report
indicating clearly
that they co-process organic solid/hazardous waste
generated
waste which is used in co-
process of cement
manufacturer.
ix
Authorization/Membership for the disposal of liquid effluent in CETP and solid/hazardous
waste in
TSDF, if any
For TSDF membership will be obtained after getting
EC. There is no any discharge in CETP.
--
x
Material Safety Data Sheet for all the Chemicals are being used/will be used
MSDS of all the chemicals is attached as separate
document
Details provided in
Annexure 8, pg.220
xi
Authorization/Membership for the disposal of
solid/hazardous waste in TSDF
For TSDF membership will be obtained after getting
EC. There is no any discharge in CETP.
--
xii
Details of incinerator if to be installed
No incinerator if to be installed
Not Applicable
xiii
Risk assessment for storage and handling of hazardous chemicals/solvents. Action
plan for handling
& safety system to be incorporated
Risk assessment for storage and handling of hazardous chemicals/solvents is given
in ch. 7.
Details are provided in Table 7-5, pg. 155, ch. 7
xv
Arrangements for ensuring health and safety of workers engaged in handling of toxic
materials
Details for ensuring health and safety of workers
engaged in handling of toxic materials in ch. 7.
Details are provided in Section 7.4 pg.153, ch. 7
1.5 STRUCTURE OF THE EIA REPORT
The EIA Report has been prepared on the basis of EIA Notification, with special reference to
the TOR conditions received from MoEF&CC, vide letter No. IA – J – 11011/201/2018-IA II
(I) Dated: 22/07/2018 for proposed project for manufacture of pesticides. Copy of the said
TOR letter is enclosed as Annexure-I. The baseline data was collected in Post-Monsoon
season during October 2018 to December 2018.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 2 16
2 PROJECT DESCRIPTION
This chapter provides a condensed description of those aspects of the project likely to cause
environmental effects. Details are described in following sections with regards to type, need,
location, size or magnitude of project operations, technology and other related activities.
2.1 TYPE OF PROJECT
M/s Integrated Chemisol Pvt. Ltd. proposes to set up a plant for the manufacturing of
“Pesticides” which are used for stored grain insects and pests. The product will be used for
domestic and quarantine fumigation only.
As per the EIA notification- 2006 as amended thereof, products covered under category 5(b)
„A‟ requires prior Environmental Clearance
Details on schedule and category as per notification are shown in Table 2-1.
Table 2-1: Schedule and category as per EIA notification
Project or Activity Category
5 (b) Pesticides industry and pesticide specific intermediates
(excluding formulations) A
2.2 NEED FOR THE PROJECT
The proposed project provides a potential growth opportunity for the already running
business of the company. The company is already engaged in the business of Pesticides.
The project would increase the overall export and also increase the foreign revenue. Product
is now well established and acceptable in the international markets. Additional capacities of
product range required over and above our capacities, as the company expect strong growth
of exports to the extent of 40-50%. Local market also shows strong growth potential. This
project will generate employment of up to 25 people.
2.3 LOCATION OF THE PROJECT
2.3.1 General Location of the Site
The proposed project will be located in Notified Industrial area. The area is already having
number of pesticide industries. The industrial estate was notified in 1997. There are more
than 500 existing units within the notified estate.
The letter of plot allotment and Sarigam GIDC Notification are enclosed as Annexure 2 and
Annexure 3 respectively.
The general location of the site is shown in Map 2-1, project site marked on Google Earth along with coordinates of the site is shown in Map 2-2.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 2 17
Map 2-1: Map Showing Location of Project Site
INDIA GUJARAT STATE
PROJECT SITE VALSAD DISTRICT
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam Notified Industrial area, GIDC Sarigam, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 2 18
Map 2-2: Project site marked on Google Earth
M/s. Integrated Chemisol
Pvt. Ltd.
Proposed Project for the Manufacture of
Pesticides (Aluminium Phosphide, Zinc
Phosphide, Magnesium Phosphide
Technical)
Plot No. 4924, Notified Industrial Area, GIDC
Sarigam, District - Valsad, Gujarat
Coordinates of Site
S.No Latitude Longitude
A 20°17'12.31"N 72°50'46.79"E
B 20°17'11.58"N 72°50'45.68"E
C 20°17'12.84"N 72°50'44.64"E
D 20°17'13.86"N 72°50'46.24"E
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 2 19
2.3.2 Approach to the Project Site
By Road
The site is well connected with NH-8 (Surat-Mumbai) located at 4.65 Km towards SE.
The site is approachable through SH-5 located at 3.86 Km, towards SE.
By Air
Nearest is Daman Airport located at 16.2 KM towards N.
By Rail
Bhilad Railway Station is at 4.66 Km in E direction.
2.3.3 Site Details
Project site specific details are provided in Table 2-2 and study area map of 10 km radius of
the site is shown in Map 2-3.
Table 2-2: Location Details and Project Site Specific Environmental Sensitivity Details
Basic Location Details
Particular Details
Plot No./Survey No./Khasra No. of the Project Location*: Plot No. 4924
Address and Pincode GIDC Sarigam, 396155
District Valsad
State Gujarat
Bounded Longitudes(East) 72.84398° to 72.8448°
Bounded Latitudes (North) 20.28549° to 20.28598°
No. of SoI (Survey of India) Topo Sheet No. F43S15&
F43S16
Maximum Elevation Above Mean Sea Level(AMSL) 28 m
Seismic Zone 3
Environment Sensitivity
Environmental Sensitivity Name Distance & Direction
Nearest habiation Sarigam 2.2 km in E direction
Water Body (Buffer Zone) Takor Nadi
Kalu Nadi
1.3 km in S direction
4.92 km in E direction
WLS/ESA/ESZ Dadra & Nagar Haveli WLS 13.3 km in SW direction
Archeological Site Moti Mahal Fortwalls 13.5 km in N direction
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 2 20
Map 2-3: Study Area Map
M/s. Integrated Chemisol Pvt. Ltd.
Proposed Project for the Manufacture of Pesticides
(Aluminium Phosphide, Zinc Phosphide,
Magnesium Phosphide Technical)
Plot No. 4924, Notified Industrial Area, GIDC
Sarigam, District - Valsad, Gujarat
Study Area Map
Legend
Industrial/Habitation Area
Mining Area
Water Bodies
Railway Line
Roads
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 2 21
Photographs showing the unit and plant area is provided in Photograph 2-1
Photograph 2-1: Photographs of Project site
Entry Gate
Project Site- Ambient Air Monitoring
2.4 SIZE OR MAGNITUDE OF OPERATION
2.4.1 Production Capacity and transportation details
The proposed project will be a small scale unit and details of proposed products, their
production capacity and their mode of transport is provided below in Table 2-3.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 2 22
Table 2-3: Proposed Production Capacity
S. No.
Product/s Quantity Unit Mode of
transportaion
1 Aluminium Phosphide / Zinc Phosphide /
Magnesium Phosphide Technical 500 TPM Road
2.4.2 Cost of the Project
Estimated project cost is 600 lakh. Detailed breakup of project cost, both capital and
recurring, is provided below in Table 2-4.
Table 2-4: Capital Cost Projection
S. No. Particulars Cost in Rs. (Lakh)
1. Land 200
2. Building 100
3. Plant and Machinery 280
4. Utility 10
5. Environmental Management System 10
Total Project Cost 600
2.5 ASSOCIATED ACTIVITIES REQUIRES BY OR FOR THE
PROJECT
2.5.1 Utilities
Steam Boiler and Cooling tower will be required as major utility for the proposed project
along with other machinery and equipments. The details required are provided below in
Table 2-5 and Table 2-6 respectively.
33%
17% 46%
2% 2%
Capital Cost Projection
Land Building Plant and Machinery Utility Environmental Management System
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 2 23
Table 2-5: Utility List
S. No. Particulars Capacity
1 Steam Boiler, TPH 0.2
2 Cooling Tower, TR 300
Table 2-6: Equipment and Machinery List
S. No. Equipment / Utility Name
1 Firing Chamber with Scrubbing System
2 Reaction Pot
3 Mixing unit for Technical Use.
4 ALP Broker Unit
5 M.S Mixing tank ,jacketed
6 Master Tank
7 Outer side Hot Water Tank
8 Wax Mixing tank with Steam jacketed
9 S.S Water tank for Pos. transfer in Reaction Plot
10 Blower
11 Fresh Air Blower
12 Steam Boiler
13 Cooling Tower
14 Hydraulic Trolley 2 Ton Capacity
15 Lift 2 Ton Capacity.
2.5.2 Power
Steam required will be obtained from proposed steam boiler. As the proposed project will be
in GIDC, the electricity will be sourced from Dakshin Gujarat Vij Company Limited. Natural
gas will be used as fuel in boilers and it will be sourced from GSPC Limited. Details of power
and fuel requirements are provided in Table 2-7.
Table 2-7: Power and Fuel Requirement
S. No. Particulars Capacity Source
Steam requirements
1 Steam requirement 200 kg/h Will be obtained from proposed
steam boiler of 0.2 TPH capacity
Power requirements
2 Electricity requirement 125 kVA Dakshin Gujarat Vij Co. Ltd.
3 D.G. Set (Standby), KVA 100
Fuel requirement
4 Natural gas for steam boiler (0.2 TPH) 15 SCM/h GSPC Limited
5 Fuel (HSD) for 100 KVA D. G. Set 15 kg/h Local Dealer
2.5.3 Water
Total water consumption will be 9.3 KLD, out of which 6.5 KLD will be fresh water and 2.8
KLD will be recycled water. Fresh water will be sourced from Sarigam GIDC. Letter of water
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 2 24
permission is enclosed as Annexure 4. Details of water requirements is provided below in
Table 2-8.
Table 2-8: Water requirement details
Particular Details
Source GIDC
Mode of Transportation Pipeline
Letter No. GIDC/DEE/SRC/91
Permitted Quantity (Kilolitre per Day (KLD)) 10
Required Quantity (Kilolitre per Day (KLD)) 6.5
Distance of Source of Water from Project Location (Kilometers) * 2 km
Date of Issue 23/05/2018
2.5.4 Manpower
As it will be a small scale unit, employement of upto 15 people will be generated during
operational phase. But along with that indirect employment will be generated during
construction and operational phase, details of which are provided in Table 2-9.
Table 2-9: Manpower Details
Particular Number of employees
Permanent Employment-During Construction 30
Temporary Employment-During Construction 20
Permanent Employment-During Operation 15
Temporary Employment-During Operation 10
No. of working days 300
2.6 PROPOSED SCHEDULE FOR APPROVAL AND
IMPLEMENTATION
Detailed list of activities and approvals require after receipt of EC and tentative time frame
required is given in Table 2-10.
Project will be commissioned within 6 to 8 months after receipt of EC.
Table 2-10: Proposed Schedule for Approval and Implementation
ACTIVITY / MONTH, YEAR APR-19 MAY-19 JUNE-19 July-19 Aug-19 Sept-19
Receipt of EC
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 2 25
ACTIVITY / MONTH, YEAR APR-19 MAY-19 JUNE-19 July-19 Aug-19 Sept-19
Tender floating
Construction
Erection & completion
CTO/CCA
Commissioning of Plant
2.7 TECHNOLOGY AND PROCESS DESCRIPTION
2.7.1 Manufacturing Technology
The company will use the latest available process technology for the production. This
chapter includes the manufacturing process of the product, chemical reactions, and material
mass balance for the product.
1. Aluminium Phosphide
Chemical Reaction for Aluminum Phosphide (79-82%)
Process: Aluminium powder along with saw dust and graphite powder fed into the reaction pot. The lid is placed on the pot andis take for mixing. Yellow Phosphorous is then added gradually into reaction pot, keeping the inert gas blanketing and stirring.After the proper mixing is done, reaction pot is taken to the reaction chamber, where the reaction is carried out by removinginert blanketing. The Phosphorus is converting into P2O5 producing Heat up to 600oC to start Aluminium Phosphide reaction.The P2O5 generated during the reaction is scrubbed with water to form Phosphoric Acid. The Phosphoric Acid thus generated isre - circulated at scrubber to get higher concentration of Phosphoric Acid (H3PO4). The tail gas scrubber is provided to scrubresidual gas before discharging to atmosphere with high level stack. After natural cooling, reacted mass is wax coated in the rodmil and then formulated in the ribbon blender to give Aluminum Phosphide in powder form for the packing.
4 Al + P4 4 AlP
Aluminum Phosphorus Aluminum Phosphide107.92 123.9 231.8
Chemical reaction:
Chemical reaction to form Phosphoric acid:
4 P + 5 O2 2 P2O5
P2O5 + 3 H2O 2H3PO4
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 2 26
Figure 2-1: Aluminium Phosphide Flow Diagram
Aluminium powder along with saw dust and graphite powder is fed in the reaction pot. The
lid is placed on the pot and is taken for mixing. Yellow Phosphorus is then added gradually
into reaction pot, keeping the inert gas blanketing and stirring. After the proper mixing is
done, reaction pot is taken to the reaction chamber, where the reaction is carried out by
removing inert blanketing. The Phosphorus is converted into P2O5 producing heat up to
600°C which is used to start Aluminium Phosphide reaction. The P2O5 generated during the
reaction is scrubbed with water to form Phosphoric Acid. The Phosphoric Acid thus
generated is re-circulated at scrubber to get higher concentration of Phosphoric Acid
[H3PO4]. The tail gas scrubber is provided to scrub residual gas before discharging to
atmosphere through stack. After natural cooling, reacted mass is wax coated in the rod mil
and then formulated in the ribbon blender to convert Aluminium Phosphide in powder form
for the packing.
Table 2-11: Mass Balance of Aluminium Phosphide
Input Quantity(kg) Output Quantity(kg)
Yellow Phosphorus 480 Phosphoric Acid 240
Aluminium Powder 530 Aluminium Phosphide 1000
Graphite Powder 15 - -
Saw Dust 30 - -
Wax 45 - -
Water 140 - -
Total 1240 - 1240
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 2 27
2. Zinc Phosphide
Figure 2-2: Zinc Phosphide Flow Diagram
Zinc dust/Zinc dross is taken into the reactor. Phosphorous is added gradually at control
condition. The reaction between Zinc Dust & Phosphorous takes place in the reaction vessel
to form Zinc Phosphide which is an exothermic reaction. After natural cooling, reacted mass
is wax coated in the rod mil and then formulated in the ribbon blender to convert Zinc
Phosphide in powder form for the packing.The reacted Phosphorous is converted into P2O5
which is scrubbed in absorption tower to form Phosphoric Acid as a byproduct.
Table 2-12: Mass Blanace of Zinc Phosphide
Input Quantity (kg) Output Quantity (kg)
Yellow Phosphorous 265 Phospheric Acid 150
Zinc powder 785 Zinc Phosphide 1000
Water 100 - -
Total 1150 - 1150
Chemical Reaction for Zinc Phosphide (92-95%)
Process: Zinc Dust/Zinc Dross is taken into the reactor. Phosphorous is added gradually at control condition. The reaction betweenZinc Dust & Phosphorous takes place in the reaction Vessel to form Zinc Phosphide which is an exothermic reaction. The reactedPhosphorus is converted into P2O5 which is scrubbed in absorption tower to form phosphoric acid as a byproduct.
6 P (liquid) + 3 Zn (Metal) + 5 O2 Zn3P2 + 2 P2O5
Phosphorus Zinc Zinc Phosphide Phosphorous Pentoxide185.82 196.14 160 258.08 283.88
Chemical reaction:
Chemical reaction to form Phosphoric acid:
P2O5 + 3 H2O 2H3PO4
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 2 28
3. Magnesium Phosphide
Figure 2-3: Magnesium Phosphide Flow Diagram
Magnesium powder is mixed with Red Phosphorus is presence of groundnut oil to give
Technical Magnesium Phosphide (86%). P2O5 generated during the reaction is scrubbed
with water to give H3PO4 acid as a byproduct. Technical Magnesium Phosphide is then
dilute with ingredients like Paraffin Wax, MR 17, T.G.Urea, Zinc Stearate and Graphite to
give required Magnesium Phosphide with 66%.This magnesium Phosphide is then sent for
either tableting or directly for pouch packing.
Table 2-13: Mass Blanace of Magnesium Phosphide
Input Quantity (kg) Output Quantity (kg)
Red Phosphorus 513 Phospheric Acid 224
Magnesium 538 Magnesium Phosphide 1000
Ground nut Oil 12.8 - -
MgO 10.2 - -
Water 150 - -
Total 1224 - 1224
Chemical Reaction for Magnesium Phosphide (86%)
Process: Magnesium powder is mixed with Red Phosphorus in presence of groundnut oil to give Technical MagnesiumPhosphide (86%). P2O5 generated during the reaction is scrubbed with water to give H3PO4 acid as a byproduct.
Technical Magnesium Phosphide is then dilute with ingredients like Paraffin Wax, MR 17, T.G. Urea, Zinc Stearate and Graphiteto give required Magnesium Phosphide with 66%.
This Magnesium Phosphide is then sent for either tabletting or directly for Pouch Packing.
6 Mg + 8 P + 5 O2 2 Mg3P2 + 2P2O5
Magnesium Phosphorus 160 Magnesium Phosphide Phosphorus pentoxide 144 247.76 268 283.88
Chemical reaction:
Chemical reaction to form Phosphoric acid:
2P2O5 + 6 H2O 4H3PO4
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 2
29
2.7.2 Raw Material details
Details of productwise raw material requirement along with mode of transportation and sourcing details are provided below in Table 2-14.
Table 2-14: Raw material for Technical grade
S. No.
Raw Materials CAS No Quantity
(TPM) Unit Source
Mode of Transport*
Distance of Source from Project Site (Kms)
Type of Linkage*
Per ton of product (MT)
Aluminium Phosphide - Technical (79-82%)
1 Yellow Phosphorus 7723-14-0
240 TPM local Truck 50 -500 m -- 0.48
2 Aluminium powder 7429-90-5
265 TPM local Truck
50 -500 m -- 0.53
3 Graphite Powder 7782-42-5
7.5 TPM local Truck
50 -500 m -- 0.015
4 Saw Dust --
15 TPM local Truck
50 -500 m -- 0.03
5 Paraffin Wax 8002-74-2
22.5 TPM local Truck
50 -500 m -- 0.045
6 Water for Scrubber 7732-18-5
70 TPM local Truck
50 -500 m -- 0.14
Total
620 TPM 1.24
Zinc Phosphide – Technical (92-95%)
1 Yellow Phosphorous 7723-14-0
132.5 TPM local Truck
50 -500 m -- 0.265
2 Zinc Powder 7440-66-6
392.5 TPM local Truck
50 -500 m -- 0.785
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 2
30
S. No.
Raw Materials CAS No Quantity
(TPM) Unit Source
Mode of Transport*
Distance of Source from Project Site (Kms)
Type of Linkage*
Per ton of product (MT)
3 Water for scrubber 7732-18-5
50 TPM local Truck 50 -500 m -- 0.1
Total
575 TPM 1.15
Magnesium Phosphide – Technical (86%)
1 Red Phosphorus 7723-14-0
256.5 TPM local Truck
50 -500 m -- 0.513
2 Magnesium 7439-95-4
269 TPM local Truck
50 -500 m -- 0.538
3 Ground nut oil --
6.4 TPM local Truck
50 -500 m -- 0.0128
4 Magnesium oxide 1309-48-4
5.1 TPM local Truck
50 -500 m -- 0.0102
Total
537 TPM 1.074
The technica; grade products Aluminium Phosphide - Technical (79-82%), Zinc Phosphide – Technical (92-95%) and Magnesium Phosphide –
Technical (86%) Will be used as raw material for inhouse formulation.
2.7.3 Storage Facilities
Storage details of hazardous substances within the proposed project are provided in Table 2-15.
.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 2
31
Table 2-15: Storage Details
S.No. Name of hazardous
substance Max. storage
qty. Place of it’s
storage Operating Pressure
Operating
Temperature Type of hazard control measure provided
1 Phosphorus 50 MT
Store in covered area
(approx 25 MT in 200 kg MS
Barrel)
Atm. Around 30 Deg
C.
Dangerous goods of class 4:2 (Spontaneously combustible) hence it will be transported separately in closed container.
The Phosphorus drum will contain water above Phosphorus.
Drum transfer will be done by water pressure only. Tap water bath (Tank) will be provided for heating purposes during transfer of phosphorous from drum to reactor.
It will be stored in separate cool, well ventilated, out of direct sunlight area that will be away from oxidizing agents and source of heat or ignition. Shed will be provided.
Containers will be kept closed at all times.
Fire hydrant system will be provided in plant.
Yellow Phosphorous hazard and safety measures will be displayed in storage area.
Training will be provided to employees for safe handling of phosphorus.
First aid for phosphorus burn will be provided to employees.
2 Aluminium Powder 20 MT To keep in
separate Room 200 kg/m
2 Room temp.
Small particle of Aluminium powder spread-out during transportation, if it is not properly packed/covered. To control the same, material will be stored in close & separate room with proper ventilation. This room will be away from Electrical Wiring/Point. During transportation as well as discharging, adequate PPA will be provided.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 2
32
S.No. Name of hazardous
substance Max. storage
qty. Place of it’s
storage Operating Pressure
Operating
Temperature Type of hazard control measure provided
3 Graphite Powder 5 MT In plastic bag with liner at
storage area. 200 kg/m
2 Room Temp.
Material will be kept in packed condition
4 Paraffin Wax 5 MT In plastic bag with liner at
storage area. 200 kg/m
2 Room Temp.
Material will be kept in packed condition
5 Zinc Powder 20 MT To keep in
separate Room 200 kg/m
2 Room temp.
Small particle of Aluminium Powder spread-out during Transportation if not properly packed/covered in open atmosphere while transferring to Control the same the material must be in close & separate room with proper ventilation. This room must be away from Electrical Wiring/Point. During transportation as well as discharging adequate PPA must be wear.
6 Red Phosphorous 100 MT
Store in covered area
(approx 25 MT in 200 kg MS
Barrel)
Atm. Around 30 Deg
C.
Material will be transported separately in closed container.
The Phosphorus drum will contain water above Phosphorus.
Drum transfer will be done by water pressure only. Tap water bath (Tank) will be provided for heating purposes during transfer of phosphorous from drum to reactor.
It will be stored in separate cool, well ventilated, out of direct sunlight area that will be away from oxidizing agents and source of heat or ignition. Shed will be provided.
Containers will be kept closed at all times.
Fire hydrant system will be provided in plant.
Yellow Phosphorous hazard and safety measures will be displayed in storage area.
Training will be provided to employees for safe handling of phosphorus.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 2
33
S.No. Name of hazardous
substance Max. storage
qty. Place of it’s
storage Operating Pressure
Operating
Temperature Type of hazard control measure provided
First aid for phosphorus burn will be provided to employees.
7 Magnesium Oxide 2 MT In plastic bag with liner at
storage area.
Normal at STP
Normal at STP PPE‟s will be provided while handling the material
8 Magnesium Phosphide 100 MT
20 kg corrugated boxes at
storage area.
400 kg/m2 Room Temp.
Material will be packed in air tight Aluminium container and will be kept in proper ventilated closed godown.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 2 34
2.7.4 Details of Air Pollution and APCM
Flue gas emission:
The company proposes to install 0.2 TPH capacity of steam boiler for the
requirement of process steam. The unit shall use 15 SCM/hr of natural gas as a fuel.
Also the unit proposes to install 100 KVA capacity of D G set as a stand by in case of
power failure. 15 kg/hr of HSD will be used as a fuel in D G set. 11 meters height of
chimney will be provided to steam boiler and D G set.
Process gas emission:
There will be emission from the manufacturing of technical product in the form of
Phosphorous pentoxide, which will be scrubbed in two stage water scrubber to get
phosphoric acid of 60% concentration, a valuable by-product. 11 meters height of
vent with SMF will be provided.
Table 2-16: Flue Gas Emissions
Source Capacity Fuel Fuel
Consumption Stack
Height(m) Stack
Diameter(m) Pollutants
Steam boiler
0.2 TPH Natural
Gas 15 SCM/h 11 m 300 mm NOx, SO2
D.G.Set 100 KVA HSD 15 L/h 11m 150 mm PM,NOx,
SO2
Table 2-17: Process Gas Emissions
Sr. no Particulars Process Gas Emission
1. Pollutant P2O5
1.1 APC to be provided Two stage water scrubber
1.2 Scrubber attached to reactor
1.3 Height of vent 11 meters
2.7.5 Design Specifications of APCM:
1. Details of Process gas emission & its control measures:
Table 2-18: Specification of P2O5 Scrubbing System
S. No. Particulars Details
1 Type Packed Column 1 & 2 nos in series
2 Diameter 500 mm
3 Height 3 meters
4 Material of Construction SS
5 Type of packing SS
6 Height of packing 2 meters
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 2 35
S. No. Particulars Details
7 Water circulation tank 2 kl, SS x 2
8 Circulation pump 3 HP x 2
9 Blower CI , 15 HP
Figure 2-4: P2O5 Scrubbing system
2.7.6 Fugitive Emission & Control Measures
Fugitive emissions from storage & handling area for raw materials, finished products is
envisaged due to proposed project. Odor of raw materials & finished goods shall be limited
to plant area.
Raw materials such as Phosphorus, Aluminium Powder, Ammonium Carbamate, and
products such as Aluminium Phosphide / Zinc Phosphide / Magnesium Phosphide Technical
have an unpleasant odour.
All the joints, flanges, pumps, glands, seals, valves are/ will be maintained in good
conditions through timely predictive and preventive maintenance;
P1
Water Water
60% H3PO4
CH
CH CH
CH
Gas from reactor
Pump
S1
Vent
Blower
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 2 36
Concrete road will be developed within plant premises to avoid fugitive dust due to
vehicle movement.
Regular checking and maintenance of the same will be carried out to avoid any
leakages.
Manufacturing activity will be carried out in closed reactors/vessels.
All the raw materials will be stored in closed containers and sealed bags and will be
handled through closed system to avoid the handling losses.
All pumps handling hazardous chemicals shall be provided with mechanical seals to
prevent fugitive emission.
Manual Handling of various chemicals will be avoided and will be designed by
implementing latest automation technology.
2.7.7 Odour Control Measures
Odor shall be controlled by taking following steps:
All raw materials shall be charged into Reactors under gravity through closed pipes.
All vents of holding tanks and dosing vessels shall be connected to a Vent Scrubber
system comprising of a suction Blower, Two stage water Scrubber, before venting
through a tall stack.
Suction Hoods shall be placed near the Man-holes & Charging funnels of Reactors &
Filters so that chemical vapors and dust do not escape into the Plant & surroundings,
when the man-hole covers are opened for inspection or charging of RM.
Vent lines of Dosing vessels of red phosphorus, yellow phosphorus, Zink oxide,
magnesium oxide, etc. shall be connected to the vents to prevent contaminated air
release during material transfer.
All pumps handling hazardous chemicals shall be provided with mechanical seals to
prevent fugitive emission. Wherever possible magnetic coupled pumps will be used.
Any spillage from drums etc. will be absorbed with saw dust / soda ash and moped
clean. The contaminated absorbent will be safely disposed off along with hazardous
waste.
Measuring Instruments with sound alarm and having strategically placed sensing
elements will be provided for alerting the personnel in case of any escape of gases like
phosphine.
All liquid raw materials will be charged into reactors with pumps or under gravity
through closed pipes
Vents of storage tanks are/ will be provided with a water filled trap to prevent escape
of acid fumes.
Boundary wall as Wind breaker is provided to restrict the dispersion of odor & dust
from the site.
Personal protective equipment like dust mast will be provided.
2.7.8 Noise pollution
Sources of Noise at Site
Noise from Machinery/ Equipment during construction phase
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 2 37
In addition to the plant activity, during construction phase, site preparation / closure related
activities will also involve the operation of heavy equipment like pile drivers, loaders, etc. The
equipment‟s will be used during daytime and will emit noise within permissible limits. Thus,
there will not be any adverse impact on nearby habitation due to proposed activity.
Noise from Operation of Plant
The pumps and associated machinery, including the DG set is likely to emit noise in the
range of 80 to 90 dbA. The high noise levels within the workshop, during maintenance and
shutdown also have the potential to affect the workers on site. Continuous exposure to high
noise level in workplace environment may cause Noise Induced Hearing Loss (NIHL) and
other discomforts like headaches and increase in stress levels in workers.
The sources considered at the project site are given in Table 2-19.
Table 2-19: Sources of Noise with their Sound Pressure Levels
S.
No. Sources
Levels dB(A)
Day Night
1 DG sets 100 100
2 Compressor 85 85
3 Pumps 85 85
4 FD-ID Fan 85 85
Noise from Vehicle / Traffic
Vehicle movement for transportation of materials and work force to the site will cause minor
noise emission as the frequency of vehicular movement will be few times in a week.
Noise from DG sets, Pumps
Noise generated from DG set, Pumps, etc. will have a continuous effect, as they will work for
more hours in a day continuously.
2.7.9 Water Consumption, Waste Water Generation & Disposal Details
Details of Water Consumption and Waste water generation
Total water consumption will be 9.3 KLD, out of which 6.5 KLD will be fresh water and 2.8
KLD will be recycled water. Fresh water will be sourced from Sarigam GIDC. Letter of water
permission is enclosed as Annexure 4. Details of Water consumption is given in Table 2-20.
Table 2-20: Water Consumption & Wastewater Generation
S. No. Particulars Water Consumption (KLD) Wastewater generation (KLD)
1 Domestic 1 0.8
2 Processing 0 0
3 Boiler 0.5 0.1
4 Cooling 3 1.7
5 Floor / container / equipment washing
1 1
6 Scrubber 2.8 0
7 Gardening 1 0
Grand Total 9.3 3.6
Total Industrial 7.3 2.8
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 2 38
Wastewater Generation and disposal method:
Domestic effluent will be disposed through septic tank of adequate capacity. Total Industrial
wastewater generation will be 2.8 KLD mainly from boiler blow down; cooling tower blow
down and floor washing. The effluent will be treated into ETP. First waste water will be
collected, pH will be balanced and then the wastewater will be filtered and utilized for
scrubber. Thus there will be no discharge of any industrial effluent. The proposed unit will be
a Zero Liquid Discharge (ZLD) Unit. Details of wastewater generation is given in Table 2-21.
Table 2-21: Wastewater generation, treatment and disposal details
Type/Source Quantity of Waste Water
Generated (KLD) Treatment
Capacity (KLD) Treatment
Method Mode of Disposal
Industrial 2.8 5 ETP Recycle
Domestic 0.8 NA NA Sepctic Tank
Figure 2-5: Water Banlance Diagram
Design of ETP:
The effluent treatment plant will be designed based on following design paramters
Average hydraulic load, m3/day : 2.8 KLD
Design hydraulic load, m3/day : 5 m3/day
Average Inlet BOD, mg/L : <20 mg/L
Average Inlet COD, mg/L : <100 mg/L
Water Balance Diagram
Total water consumption, 9.3 M3/day (Fresh: 6.5 + Recycled: 2.8 ) Source from GIDC Sarigam
Domestic: 1.0Scrubber: 2.8 Boiler: 0.5Cooling: 3.0Floor/ container/equipmentWashing: 1.0
Gardening: 1.0
0Blow Down: 0.1Blow Down: 1.7 Septic tank: 0.8
ETP: 0.1ETP: 1.7
1.0
ETP: 1.0
Total effluent: 2.8
pH Correction and Filteration
Utilize for Scrubber: 2.8 M3/day
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 2 39
Table 2-22: Design paramters of Effluent Treatment Plant
S. No. Parameter Unit Untreated Treated
1 pH -- 7.5 to 9.0 6.5 to 8.5
2 Colour Pt-Co Scale 200 (max) <100
3 Suspended Solids mg/lit 250 (max) <100
4 Biochemical Oxygen Demand mg/lit 20 (max) <10
5 Chemical Oxygen Demand mg/lit 100 (max) <50
6 Oil and Grease mg/lit 2 (max) <1
7 Total Dissolved Solids mg/lit 1800 (max) <1800
Effluent Treatment Plant having specification mentioned in Table 2-23 will be installed.
Table 2-23: Effluent Treatment Scheme
S. No Name of the unit Size (m) Capacity (m3)
MOC No.
1 Collection cum pH correction
tank with air sparger 2 x 2 x 2 6 RCC 1
2 Dilute acid dosing tank - 0.2 HDPE 1
3 Filter nutsch 1 x 1 x1 1 MSRL with PP
filter cloth 1
4 Final holding tank 2 x 2 x 2 6 RCC 1
Figure 2-6: Flow Diagram of Proposed Effluent Treatment Plant
1 - Collection cum pH correction tank with air sparger
2 - Dilute acid dosing tank
3 - Filter nutsch
2
4
FLOW DIAGRAM OF PROPOSED EFFLUENT TREATMENT PLANT
1
3
Inlet
To Scrubbing System
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 2 40
4 - Final holding tank
2.7.10 Solid and Hazardous Waste Identification, Quantification, Storage and
Disposal
Solid and Hazardous Waste Identification, Quantification, Storage and Disposal details are provided below in Table 2-24.
Table 2-24: Solid and hazardous Waste details
Name of
Waste Item
Category
Quantity per
Annum Unit
Distance from Site (Km)
Mode of Transport
Treatment Mode of Disposal
ETP waste
Hazardous
Waste
35.3 (Sch.I)
1.0 Tonn
es 10 truck
Dried, packed in
bags
Will be disposed off into TSDF,
Vapi through SIA, Sarigam
Used Oil
Hazardous
Waste
5.1
(Sch.I) 0.05
Tonnes
10 truck Packed in carboys
Will be sold to Registered
re-processers
Discarded
containers
Hazardous
Waste
33.1
(Sch.I) 1.0
Tonnes
10 truck De-
contaminated stored
Will be sold to authorized
recycler
Phosphric acid (60%)
Hazardous
Waste
29.6
(Sch.I) 1440 TPA 10 Tanker
Packing
Sell to authorized
users having permission
under Rule 9 of the H/W rules 2016
2.7.11 Project Layout and Components
The proposed project is located in notified industrial estate and letter of allotment is enclosed
as Annexure 2.
The total area of the plot is 2351.25 m2. Greenbelt will be developed in 21% of the total area.
The site layout map is provided in Map 2-4. The area breakup of plant layout is provided
below in Table 2-25.
Table 2-25: Area breakup
S. No. Particulars Area (m2)
1. Production area/ Main Plant 550
2. Raw material storage area 75
3. Finished product storage 75
4. Office and laboratory area 100
5. Toilet block and others 20
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 2 41
6. Utility and boiler 50
7. Solid and hazardous waste storage 15
8. ETP 15
9. Greenbelt 500
10. Parking area 150
11. Open space 801.25
Total 2351.25
24%
7%
4%
4%
21%
6%
34%
Area Breakup
Production area
Storage area
Office and laboratory area
Utility and other
Gardening and plantation
Parking area
Open space
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 2 42
Map 2-4:Site map with Green Belt Development Planning
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 3 43
2.7.12 Mitigation Measures at Design Stage
Details of mitigation measures adopted at design stage are provided in Table 2-26.
Table 2-26: Details of Mitigation Measures at Design Stage
Name of Plant Environmental
Attributes
Operational Controls at Design Stage
Air Noise Water SHW
Air (Prevention & Control of Pollution) Act – 1981 and
Rules, 1982 as amended to date
The Noise Pollution (Regulation and Control) Rules, 2000 as amended
to date
Water (Prevention & Control of Pollution) Act – 1974 and Rules 1975
as amended to date
Hazardous and Other Wastes (Management and
Trans boundary Movement) Rules, 2016 as amended to
date
Proposed Project for the
Manufacture of Pesticides
(Aluminium Phosphide, Zinc
Phosphide, Magnesium Phosphide Technical)
Energy Energy efficiency will be considered during technology selection
Air --
Acoustic Enclosures will be provided to D.G sets
Adequate green belt surrounding the premises will be
provided to cut the noise going out of plant area
Ear plugs will be provided to workers.
-- --
PM,NOx, SO2 Chimney attached with
steam boiler and D, G set -- -- --
P2O5 Two stage water scrubber -- -- --
Waste Water -- --
Industrial Effluent : ETP
Sewage Water: Septic tank
--
Solid and Hazardous Waste
-- -- --
ETP waste: Sent to TSDF
Used Oil: Will be sold to Registered re-processers.
Discarded containers: Will be sold to authorized recycler
Psophoric acid (60%) will be
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 3 44
Name of Plant Environmental
Attributes
Operational Controls at Design Stage
Air Noise Water SHW
Air (Prevention & Control of Pollution) Act – 1981 and
Rules, 1982 as amended to date
The Noise Pollution (Regulation and Control) Rules, 2000 as amended
to date
Water (Prevention & Control of Pollution) Act – 1974 and Rules 1975
as amended to date
Hazardous and Other Wastes (Management and
Trans boundary Movement) Rules, 2016 as amended to
date
Sell to authorized users having permission under
Rule 9 of the H/W rules 2016
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 3 45
2.7.13 Assessment of New and Untested Technology
The manufacturing will be carried out using established manufacturing process. It is basic
technique which create least environmental impact. Hence there will be no use of any new
and untested technology for the proposed project.
2.7.14 Condensed Description
The condensed description of those aspects of the project likely to cause environmental
effects is given in Table 2-27.
Table 2-27: Details of Condensed Description
S. No.
Activity Aspects
Project Pre- Construction/ Construction
1 Site clearance Removal of top soil & Land clearance
2 Excavation and paving of
site
Generation of debris
Dust generation
Fall in pit, land sliding from sidewalls
3 Fabrication work for plant equipment land preventive
maintenance work
Generation of scraps
Noise generation
4
Vehicular movement for transportation of
construction material and waste
Emission of HC & CO
Noise generation
5 Influx of workers during
construction phase
Sewage generation
Employment generation
Commissioning/ Project Operation
1 Reactions, Processes
Emission of PM, SO2and NOx from D.G & Boiler
Generation of waste water from Cooling and Boiler Blow Down
Noise generation from D.G Set
2 Export of Product Increase in market scenario
General & Utilities
1 Operation of D.G Set,
Cooling tower, Boiler, etc.
Emission of PM, SO2 and NOx from D.G & Boiler Generation of waste water from Cooling and Boiler Blow Down
Noise generation from D.G Set
2 Equipment and Floor
Washing Generation of waste water
3 Operation of ETP Generation of waste water
Generation of ETP waste
4 Influx of workers
operational phase
Sewage generation
Employment Generation
5 Green belt developement Reduce air pollution, Noise
6 Loading and Unloading of chemicals, products etc.
Generation of Waste Drums/Barrels/bags and containers
7
Vehicular movement for transportation of raw
materials, finished goods and Industrial Waste
Increase in traffic load
Emission of HC & CO
Noise generation
8 Raw water intake for Plant Consumption of water
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 3 46
S. No.
Activity Aspects
Operation and Domestic Uses
9 Equipment maintenance Generation of used oil and lubricants
Generation of scraps and used spares etc.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 3 47
3 DESCRIPTION OF THE ENVIRONMENT
The baseline environmental quality is assessed through field studies within the probable
impact zone for various components of the environment viz. Air, Noise, Water, Soil, Ecology
& Bio diversity and Socio-economy. The baseline environmental study has been conducted
for the study region within 10 km radius. An exhaustive attempt has been made in the
current chapter to disclose all possible baseline status of environmental quality in the study
area, which further serves as the basis for identification, prediction and evaluation of
impacts. Villages covered within study region are shown in the Map 3-1.
Map 3-1: Study Area Map
3.1 BASELINE STUDY AREA AND PERIOD
The baseline environmental study has been conducted for the study region within 10 km
radius of the project site for the period 1st Oct 2018 to 31st Dec 2018. An exhaustive attempt
has been made in the current chapter to disclose all possible base line status of
environmental quality in the vicinity of the project, which further serves as the basis for
identification, prediction and evaluation of impacts. Study area map covering all the villages
are shown in the Map 3-1.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 3 48
3.2 METHODOLOGY
The baseline environmental study was carried out for the various environmental components
viz, Air, Water, Soil, Ecology and Biodiversity, Socio Economy and Noise. A desktop study
was carried out to select the sampling locations and site visit was done by our field area
experts. After the site visit, locations were finalized. During the submission of field area
expert report and discussion looking to the extent of impact, 5 km radius was considered as
core zone and rest 5 km radius was considered as buffer zone. All the locations have been
selected within 10 km radius from the project site as per the requirement of TOR and
environmental samples were collected from the selected locations of the study area. Before
starting the survey activity for ecology and bio diversity, secondary data were used as
reference during the desktop survey for listing the species of study zone and planning the
survey. In case of socio economy, secondary data have also been used for deciding the
parameters to be surveyed during socio economic data collection. As a secondary source of
data, for Ecology and Biodiversity survey various publications by the government of India
and literature available on internet site were used. Some photograph showing the monitoring
and survey activities are presented in Photograph 3-1.
3.2.1 Frequency of Sampling
Details of frequency of environmental sampling considered for the study are illustrated in
Table 3-1.
Table 3-1: Frequency of Environmental Monitoring
Attributes
Sampling
Locations Parameters Frequency
A. Air Environment
Micro-meteorological Data
Nr. Project Site Temperature, Relative Humidity, Precipitation Wind direction, Wind
Speed.
Hourly data for the period 1
st Oct 2018 to
31st Dec 2018.
Ambient Air Quality 8 numbers of locations in the study area of 10 km
radius.
PM2.5, PM10, SO2, NOx and CO
24 hour basis, twice a week during study
period
B. Noise 8 numbers of locations in the study area of 10 km
radius.
Noise Levels in dB (A). Once in Study Period.
C. Water
Ground Water Samples from 7 numbers of locations within 10 km radius from the project
site.
Physical, Chemical, Microbiological and
Heavy Metal.
Once in Study Period.
Surface Water Samples from 6 numbers of locations within 10 km radius from the project
site.
Physical, Chemical, Microbiological and
Heavy Metal.
Once in Study Period.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 3 49
Marine Water Samples from 1 number of location during high tide and low tide within 10 km radius from the
project site.
Physical, Chemical, Microbiological, Zooplankton,
Phytoplankton, Benthos, Sediment and
Heavy Metal.
Once in Study Period.
D. Soil Quality Samples from 4 numbers of locations within 10 km radius from the project
site.
Physical, Chemical Characteristics, Soil
Texture.
Once in Study Period.
3.2.2 Method of Environmental Sampling and Analysis
The methods adopted for environmental sampling and analysis are illustrated in following Table 3-2.
Table 3-2: Method of Environmental Sampling and Analysis
Attributes
Methods
Sampling/Preservation Analysis/data analysis
A. Air Environment
Micro-meteorological
Data Data collected on hourly basis using wind
monitor as per CPCB Guideline. NA
Ambient air quality As per IS: 5182, CPCB & AWMA. As per IS:5182,CPCB & AWMA
B. Noise Instrument : Sound level meter Survey carried out as per CPCB guideline.
C. Water
Ground Water, Surface Water and Marine Water
Standard Methods for Examination of Water and Wastewater, 23
rd edition, APHA
2017.
IS 3025 & Standard Methods for Examination of Water and Wastewater,
23rd
edition, APHA 2017.
D. Soil Quality
IS 2720, Soil Testing in India (Department of Agriculture & Cooperation).
IS 2720, Laboratory developed Method as per NABL requirement and Book - Soil
Testing in India (Department of Agriculture & Cooperation).
Photograph 3-1: Photograph Showing The Sampling Activity
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 3 50
EB Survey Ambient air – Sarigam
Punat – Noise Project Site – Ambient air
Ground water - Sarigam village Surface water – Daman ganga River
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 3 51
Surface River – Darotha River SE Survey
3.3 MICROMETEOROLOGY
The study of micro meteorological data helps to understand the variations in the ambient air
quality status in that region. The prevailing micrometeorological condition at project site
plays a crucial role in transport and dispersion of air pollutants. The persistence of the
predominant wind direction and wind speed at the project site decide the direction and extent
of the air pollution impact zone. The principal variables which affect the micrometeorology
are horizontal transport and dispersion, convective transport and vertical mixing and
topography of the area towards local influences. Micrometeorological data were collected by
using the wind monitor as per CPCB guideline which was installed near project site. All the
micrometeorological data were collected on hourly basis. Meteorological conditions of the
study area are presented in Table 3-3.
Table 3-3: Meteorological Condition of Study Area
Month Temperature (
oC) Relative Humidity (%) Wind Speed (km/hr)
Min. Max. Min. Max. Min. Max.
Oct'18 21.7 38.1 22.0 93.0 0.1 8.0
Nov'18 18.0 37.0 24.0 90.0 0.1 7.0
Dec'18 13.2 33.2 22.0 95.0 0.1 10.0
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 3 52
3.3.1 Temperature
During the study period minimum temperature was recorded 13.2oC on 29th Dec 2018 and maximum temperature was recorded as 38.1oC on 02nd
Oct 2018. Temperature data were collected on hourly basis during the study period. Variation of temperature is graphically presented in Figure 3-1.
Figure 3-1: Graphical Presentation for the month wise Temperature Variation
3.3.2 Humidity
Humidity affects the nature and characteristics of pollutants in the atmosphere as it is the measure of amount of moisture in the atmosphere.
Humidity helps suspended particulate matter to coalesce and grow in size to settle under the gaseous pollutants by providing them aqueous
medium. During the study period minimum Humidity was recorded 22% on 22th Oct 2018 and 19th Dec 2018 and maximum Humidity was recorded
as 95% on 11h Dec 2018. The variation in humidity is represented graphically in Figure 3-2.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Max. 36 38 36 37 36 37 37 37 35 37 35 37 37 37 35 37 36 34 36 37 35 37 37 36 36 36 36 35 36 34 34 35 35 37 36 34 36 34 34 34 34 36 35 36 32 35 35 34 35 35 35 34 36 35 35 33 33 34 34 33 33 31 32 33 31 31 32 32 30 31 30 30 30 29 28 28 30 28 29 28 29 30 31 32 30 30 26 27 26 29 30 28
Min. 24 25 27 27 27 28 27 27 26 26 27 26 25 24 24 25 24 26 26 26 23 22 21 22 21 23 22 21 22 24 23 23 23 24 25 25 24 22 21 19 19 19 19 21 20 20 20 19 19 20 21 21 23 25 24 23 21 21 20 19 18 17 16 20 21 19 20 17 16 18 17 17 19 18 19 18 18 18 14 13 15 15 15 16 17 17 15 13 13 13 17 17
0.0
5.0
10.0
15.0
20.0
25.0
30.0
35.0
40.0
45.0
Tem
per
atu
re (
oC
)
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 3 53
Figure 3-2: Graphical Presentation for the month wise Humidity Variation
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
Max. 82 83 87 92 83 79 71 88 92 88 92 87 82 82 80 80 93 90 85 80 73 74 84 76 71 86 78 66 60 51 60 71 70 80 75 80 69 60 68 78 78 82 76 83 90 85 68 81 83 81 76 78 76 72 67 69 65 68 80 74 81 86 84 75 86 77 70 84 84 89 85 95 91 81 76 86 81 69 59 57 65 65 68 82 70 60 78 80 79 84 80 75
Min. 44 53 62 56 38 43 36 39 63 49 71 34 38 35 45 26 50 62 42 40 45 22 26 38 25 42 40 38 23 27 26 38 42 40 34 58 34 38 36 38 35 38 26 25 58 30 24 32 38 42 33 45 42 41 34 44 36 38 38 36 40 39 42 43 44 41 36 36 34 52 56 54 45 38 48 58 50 32 40 22 30 40 24 43 34 32 32 33 36 35 42 38
0
10
20
30
40
50
60
70
80
90
100
Hu
mid
ity
(%)
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 54
3.3.3 Wind Speed and Wind Direction
Hourly wind speed data were collected for the period 1st Oct 2018 to 31st Dec 2018 with the
help of wind monitor. The rate of dispersion, diffusion and transportation of pollutants in the
atmosphere mainly depend on wind speed and its direction. Wind direction and velocity data
have been collected during the study period. Dominant wind direction in the study period
was from NE –SW during the study period. Wind speed was observed from 0.1 to 8.0 km/hr
in the month of Oct 2018, from 0.1 to 7.0 km/hr in the month of Nov 2018 and from 0.1 to
10.0 km/hr in the Month of Dec 2018. Month-wise maximum and minimum wind speed data
are tabulated in Table 3-3.
3.3.4 Wind Rose
Wind rose diagram is a graphical representation of the magnitude and direction of wind
speed considering all the directions. From the knowledge of wind rose one can easily predict
the direction and extent of spreading of the gaseous and particulate matter from the source.
Wind rose diagram has been prepared by using hourly wind velocity and dominant wind
direction data and is presented in Figure 3-3.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 55
Figure 3-3:Wind Rose Diagram
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 56
3.3.5 Interpretation of Micrometeorological Data
During the study, wind blow was in the direction of NE-SW and wind speed range 0.1 to 10.0
km/hr. Based on the wind direction and wind speed it is interpreted that maximum dispersion
of air pollutant will be in SW direction during the period of Oct to Dec.
3.4 AIR ENVIRONMENT
Air is the Earth‟s atmosphere having the gases in which living organisms live and breathe
but air is being deteriorated day by day due to the anthropogenic and natural sources. In
present scenario Industrialization, Energy production and the burning of fossil fuels has
polluted the air environment. Ambient air quality monitoring was carried out for the
assessment of the existing status of background air quality in the study area. This will be
useful for assessing the conformity of the ambient air quality to the standards even after
commencement of the proposed project.
3.4.1 Selection of Sampling Locations
Following points were considered during the selection of Ambient Air Quality Monitoring
locations.
Topography/terrain of the study area,
Regional synoptic scale climatologically norm‟s,
Densely populated areas within the region,
Location of surrounding Industries,
Representation of regional background,
Facility for Ambient Air Monitoring,
Representation of valid cross – sectional distribution in downwind direction,
Avoidance of proximity of roads, construction activity or any other perturbing activity
which may be temporary in nature, which may lead to some erroneous conclusions.
Availability of manpower, electricity, approach, sturdy structure and protection of
samplers.
Dominant Wind Direction.
To establish the baseline status around the project site of the study region, monitoring was
conducted for 8 numbers of locations during 1st Oct 2018 to 31st Dec 2018. At the time of
location selection previous micrometeorological data was referred and general wind pattern
in the study region was considered for the selection of minimum one location in the
downwind direction. However, ambient air monitoring locations were selected in all the
directions looking towards the possibility of change in wind pattern during the study period.
Ambient Air Quality monitoring locations are presented in Map 3-2 and Table 3-4.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 57
Map 3-2: Map showing the Study Region location of Ambient Air
Table 3-4:Ambient Air Quality Monitoring Locations in the Study Region
Code Location Distance/Direction Latitude and Longitude
Selection Criteria
A1 Project Site - 20°17'12.29"N 72°50'46.23"E
-
A2 Punat 5.6 km/ NEE 20°19'33.35"N
72°52'04.72"E Upwind
A3 Sarigam 2.0 km/ E 20°17'16.49"N
72°51'47.90"E Crosswind
A4 Sarai 4.6 km/ WSW 20°16'21.85"N
72°48'28.72"E Downwind
A5 Malav 6.34 km/ SSE 20°13'52.51"N
72°51'45.51"E Crosswind
A6 Fansa 7.94 km/ NW 20°20'08.23"N
72°47'22.69"E Crosswind
A7 Pali Karambeli 8.96 km/ N 20°21'43.46"N
72°50'30.03"E Crosswind
A8 Chandor 9.58 km/ NE 20°21'28.42"N
72°53'53.75"E Upwind
3.4.2 Frequency and Parameters for Sampling
Sampling team was appointed with one FAE and Technical Assistant to carry out Ambient
Air Quality Monitoring for 8 numbers of locations within 10 km radius from the project site.
Sampling and analysis was carried out as per CPCB, IS 5182 & EPA and instrument
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 58
operation manual for the parameters PM2.5, PM10, SO2, NOx and CO. After the completion of
sampling, samples were brought to the laboratory in Ice box and filter box for analysis.
Frequency of sampling was twice a week during study period.
3.4.3 Methodology for Sampling and Analysis
Samples were collected by using the PM10 and PM2.5 micron dust samplers at suitable height
from obstruction free area as per the availability of the facility. Sampling and Analysis was
carried out as per CPCB Guideline, instrument operational manual and National
Environmental Engineering Research Institute. Detail of reference method is presented in
Table 3-5.
Table 3-5:Details of Analysis Method
Sr. No. Parameters Test Method
i. Particular matter (PM 2.5) SOP No. WI/5.4/02-B/03,Issue No.1
Date:01/01/2010, CPCB Guideline
ii. Particulate Matter (PM10) IS 5182 (Part 13):2006/Reaffirmed 2012
iii. Sulphur Dioxide (SO2) IS 5182 (Part 2):2001/Reaffirmed 2012
iv. Oxide of Nitrogen (NOx) IS 5182 (Part 6):2006
v. Carbon monoxide (CO) Methods of Air sampling and Analysis 3rd
Edition by James P. Lodge JR. Editor AWMA. (CO Analyzer)
3.4.4 Quality of Ambient Air
Minimum, maximum, average and 98th percentile values for the parameters PM2.5, PM10,
SO2, NOx and CO are tabulated in Table 3-6 to Table 3-8 to describe the quality of Ambient
Air.
Table 3-6: Min, Max, 98th Percentile and Average Value of PM10 and PM2.5
Code
PM10 (µg/m3) PM2.5 (µg/m
3)
Min. Percentile
98th
Max. Avg. Min.
Percentile
98th
Max. Avg.
A1 67.4 83.2 85.5 75.1 37.4 46.3 47.1 41.4
A2 65.3 79.8 80.1 72.6 34.5 41.9 42.6 37.6
A3 68.2 80.2 80.3 74.2 33.1 42.8 43.1 37.7
A4 71.1 85.7 86.1 77.2 37.2 46.2 46.7 41.3
A5 64.3 79.5 79.8 72.6 34.2 44.7 44.3 38.2
A6 66.7 82.4 83.1 73.6 35.4 43.4 43.6 39
A7 69.8 84.4 85.2 77.8 36.2 44.4 45.3 40.1
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 59
A8 61.9 77.3 78.2 70.9 32.0 41.8 42.2 37.5
NAAQ Standard limit as per new notification of
MoEF & CC on 24 hrs. basis
100 60
Table 3-7: Min, Max, 98th Percentile and Average Value of SO2 and NOx
Code
SO2 (µg/m3) NOX (µg/m
3)
Min. Percentile
98th
Max. Avg. Min.
Percentile
98th
Max. Avg.
A1 12.7 17.5 17.6 15.3 18.2 23 23.0 20.8
A2 9.7 14.3 14.4 11.8 16.3 20.6 20.6 18.3
A3 10.1 14.3 14.4 12.2 16.7 22.7 22.8 19.7
A4 10.2 14.8 15.3 12.5 17.3 22.7 23.1 19.9
A5 10.5 14.8 15 13.3 16.2 20.8 20.8 19.5
A6 9.6 14.3 14.4 11.9 16.3 20.3 20.4 18.5
A7 10.5 15.3 15.4 13.7 17.1 21.4 21.4 20.0
A8 9.4 13.7 13.8 11.7 16.3 20.3 20.5 18.4
NAAQ Standard limit as per new notification of
MoEF & CC on 24 hrs. basis
80 80
Table 3-8: Min, Max, 98th Percentile and Average Value of CO
Code
CO (µg/m3)
Min. Percentile 98th
Max. Avg.
A1 573 688 688 631
A2 344 459 459 402
A3 344 459 459 402
A4 459 573 573 516
A5 459 573 573 516
A6 459 573 573 516
A7 344 459 459 402
A8 459 573 573 516
NAAQ Standard limit as per new notification of MoEF & CC on 8
hrs. basis 2000
3.4.5 Summary of Ambient Air Quality
Results were compared with the standard for ambient air quality monitoring as per
the Ministry of Environment, Forest and Climate Change (MoEF & CC).
During the study PM10 was observed in the range of 61.9 – 86.1 µg/m3. Maximum
concentration of PM10 was found at sarai village.
PM2.5 was observed in the range of 32.0 – 47.1 µg/m3. Maximum concentration of
PM2.5 was found at project site.
SO2 concentration was observed in the range of 9.4 -17.6 µg/m3, which is well within
the standard limit.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 60
NOx concentration in was observed in the range of 16.2- 23.0 µg/m3, which is well
within the standard limit.
P2O5 concentration in was observed <9.03 (Below Detective Limit).
Monitoring and analysis was also carried out for CO. Result for the CO was found
well within the norms.
3.4.6 Interpretation of Ambient Air Quality Data
Based on comparison study of results with NAAQS for tested parameters, ambient air quality
of studied locations can be considered good as all the results of tested parameters are well
within the limit. Looking towards the increasing pattern of PM10 and PM2.5 concentration in
ambient air, it is suggested that proper air pollution control measures must be adopted by
the industry. This interpretation relate to the results found during the monitoring for particular
location and date of monitoring.
3.5 NOISE ENVIRONMENT
The objective of the baseline noise survey was to identify existing noise sources and to
measure background noise levels at the sensitive receptors within the study area. Peoples‟
perception of noise varies depending on number of factors including their natural sensitivity
and hearing ability, past experience of sound, cultural factors and the time of day at which
sound is experienced. Continuous sound is perceived quite differently from intermittent
sound at the same level. High or continuous noise levels may cause permanent loss of
hearing ranging from reduced perception at certain frequencies to total deafness. At
comparatively lower levels noise may have psychological effects including disturbance of
sleep, annoyance and irritation.
3.5.1 Sources of Noise Pollution
The sources of noise pollution in the study area are industrial noise, noise due to commercial
activities, noise generated by Community, Vehicular traffic etc.
3.5.2 Noise Level in the Study Area
Noise level monitoring was carried out with the help of sound level meter at 8 different
locations fall under residential, industrial and high noise generating source. Noise sampling
locations are presented in Map 3-3 and Table 3-9. Analysis results are presented in Table
3-10 and Table 3-11.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 61
Map 3-3: Map showing the study region location of Noise
Table 3-9:Noise Monitoring Locations in the Study Region
Code Location Distance from
project site/Direction
Latitude and Longitude
Selection Criteria
N1 Project Site - 20°17'12.01"N 72°50'46.28"E
Industrial Area
N2 Punat 5.6 km/ NEE 20°19‟33.21”N
72°51‟46.46”E Residential Area
N3 Sarigam 2.0 km/ E 20°17‟15.52”N
72°51‟44.18”E Residential Area
N4 Sarai
4.6 km/ SWW 20°16‟22.69”N
72°48‟29.05”E Residential Area
N5 Malav 6.34 km/ SSE 20°13‟53.65”N
72°51‟46.23”E Residential Area
N6 Chandore 9.78 km/ NE 20°21‟32.13”N
72°53‟58.01”E Residential Area
N7 Bhilad-Sarigam-
Fansa Road 4.75 km/ SSE
20°18‟04.55”N
72°51‟01.93”E Road
N8 NH-8 near Dhanoli
village 1.84 km/ N
20°16‟06.02”N
72°53‟09.03”E Road
Table 3-10: Noise Monitoring report during day time
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 62
Code Lmin
dB
Ld dB(A)
Lmax
dB Zone
Limit dB(A) as per Noise Pollution (Regulation and
Control) Rules, 2000
N1 52.1 56.8 60.4 Industrial
75
N2 46.5 50.2 54.3 Residential 55
N3 46.8 50.8 54.5 Residential 55
N4 45.6 50.4 54.2 Residential 55
N5 47.2 51.1 54.7 Residential 55
N6 45.5 49.8 54.2 Residential 55
N7 73.4 77.1 83.4 Road -
N8 70.8 75.4 80.6 Road -
Table 3-11: Noise Monitoring report during night time
Code Lmin
dB
Ln
dB(A)
Lmax
dB Zone
Limit dB(A) as per Noise Pollution (Regulation and
Control) Rules, 2000
N1
48.5 51.6 55.2 Industrial 70
N2
40.1 42.4 44.8 Residential 45
N3
39.6 42.1 44.5 Residential 45
N4
39.8 42.6 44.2 Residential 45
N5
40.4 43.1 45.0 Residential 45
N6
39.5 43.0 44.7 Residential 45
N7
68.7 73.5 78.1 Road -
N8
65.5 68.8 73.4 Road -
Note: Day time –6.00 AM to 10.00 PM, Night time – 10.00 PM to 6.00 AM
Noise standards have been designated for different types of land use i.e. residential,
commercial, industrial areas and silence zones, as per „The Noise Pollution (Regulation and
Control) Rules, 2000, Notified by Ministry of Environment and Forests, New Delhi, February
14, 2000. Different standards have been stipulated for day (6 AM to 10 PM) and night (10
PM to 6 AM). The noise level study shows that the noise levels are meeting the acceptable
norms.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 63
3.5.3 Summary of Noise Data
Equivalent noise level was recorded 56.8 dB (A) at Project Site and it is varies from
49.8 to 51.1 dB (A) in residential area during day time.
Equivalent noise level was recorded 51.6 dB (A) at Project Site and it is 42.1 to 43.1
dB (A) in residential area during night time.
Noise level monitoring was carried out 1 meter away from Bhilad-Sarigam-Fansa
Road near project site and equivalent noise level was recorded 77.1 dB (A) during
day time and 73.5 dB (A) during night time.
Noise level monitoring was carried out 1 meter away from NH-8 near Dhanoli village
and equivalent noise level was recorded 75.4 dB (A) during day time and 68.8 dB
(A) during night time.
3.5.4 Interpretation of Noise Data
Based on noise level data obtained during the survey for residential area and industrial area,
it is interpreted that noise levels are within the standard norms prescribed by MoEF & CC.
Looking towards the increase in noise generating sources it is suggested that there is need
to apply noise reducing devices at noise generating sources and generate public awareness.
3.6 LAND ENVIRONMENT
3.6.1 Land Use Pattern of the Study area
Studies on land use aspects of eco system play an important role to identify sensitive issues
and to take appropriate action for maintaining ecological homeostasis in the region. The
main objective of this section is to provide a baseline status of the area, so that temporal
changes due to the proposed project on the surroundings can be assessed in future.
Data Used: United States Geological Survey (USGS) Satellite Data: Land sat 8 cloud free
data has been used for Land use /Land cover analysis, Satellite Sensor–OLITIRS multi-
spectral digital data has been used for the preparation of land use/ land cover map of
present study. Survey of India reference map on 1:50,000 scales have been used for the
preparation of base map and geometric correction of satellite data. Ground truthing has been
carried out to validate the interpretation accuracy and reliability of remotely sensed data, by
enabling verification of the interpreted details and by supplementing with the information,
which cannot be obtained directly on satellite imagery.
Methodology: The methodology used for the study consists of following components.
Methodology Adopted for Thematic Data Extraction from the Satellite Imageries
ERDAS image processing 10.0 software and ARC/GIS 10.0 software were used for the
project. ERDAS 10.0 image processing software was used for digital processing of the
spatial data. Digital image processing techniques were applied for the mapping of the land
use land cover classes of the provided area from the satellite data. Methodology used for
land use classification and mapping is presented in Figure 3-4. Land use map is presented
in Map 3-4. Land Use Statistic (10 km) is presented in Figure 3-5 and Table 3-12
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 64
Figure 3-4:Methodology used for Land use Classification
Map 3-4:Land Use Map
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 65
Table 3-12: Land use Statistics (10 km)
(Source: Land use mapping and primary survey of the area)
Percentage (%) Area
(Sq.km) Land cover Land Use
Area (Sq.km)
Percentage (%)
8.86 27.87 Water body Water body 27.87 8.86
5.31 16.69
Settlement Settlement
16.69 5.31
51.61
162.30
Agriculture Land
Orchard 111.25 35.38
Crop Land 19.13 6.08
Fallow Land 31.93 10.15
14.23
44.73
Range Land
Grass Land 36.34 11.56
Scrub Land 8.39 2.67
7.06
22.19
Forest Area
PF 1.40 0.45
RF 20.79 6.61
12.93 40.97 Barren Land Waste Land 36.97 11.76
Muddy 3.70 1.18
100 314.45 Total 314.45 100
Figure 3-5: Land use Statistics (10 Km)
8.86 5.31
35.38
6.08
10.15
11.56
2.67
0.45 6.61
11.76
1.18 Water body
Settlement
Orchard
Crop Land
Fallow Land
Grass Land
Scrub Land
PF
RF
Waste land
Muddy
Land Use Statistic (10 km)
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 66
3.6.2 Summary and Interpretation of Land Use Map
The area surrounding the project site is largely an agriculture land area like Orchad, Crop
Land and Fallow Land are covering around 35.38%, 6.08% and 10.15% respectively of the
total study area. Water body is covering around 8.86 % of the total study area. Range Land
like Grass Land and Scrub Land are covering around 11.56% and 2.67% respectively of the
total study area. Forest area like PF and RF are covering around 0.45% & 6.41%
respectively of the total study area. Barren land like waste land and Muddy are covering
around 11.76% & 1.18% respectively of the total study area. Settlement is covering around
5.31% of the total study area.
3.7 GEOLOGY
The Proposed site is located in Valsad District, Gujarat. Valsad district can be divided to
three geographic units: hilly area (in the east), alluvial plain and coastal zone. Prominent
rivers of the district are the River Damanganga and the Kolak nadi, debauching into the
Arabian Sea. The average annual rainfall is 208 cm. The area consists predominantly of
basaltic flows intruded, profusely by the basic rocks. Basaltic lavas with „pahohoe‟ and „Aa;
volcanic characters form „compound‟ and „simple‟ flows. Some of the flows carry giant
phenocrysts of plagioclase. The basic dykes are basaltic to dolertic in nature and trend in N-
S to NNW-SSE, NW-SE, ENE-WSW and WNW-ESE directions. Compositionally, these are
similar to the lava types viz. normal tholeilite, olivine tholelite, pictrite basalt and giant
phenocryst basalt. The soils in the district are fine, loamy, clayey, mixed, montmorillonitic
and calcareous in nature. They are isohyperthermic, vertic ustropepts and typic chromusterts
and are moderately deep well drained, fine soils on very gently sloping foot-hills with
moderate erosion and slight stoniness. The bouger gravity anomaly varies between -70 to
+30 m Gal. The basement depth is about 1500 m in the western part which decreases
towards east. The area lies in the moderate risk zone (Zone – III) of seismic zonation.
3.8 HYDROGEOLOGY
The groundwater in Valsad district occurs in porous unconsolidated formations and fissure
formations both under water table conditions as well as under confined conditions. The
unconsolidated formations comprise gravel, sand, silt, clay and kankars while the fissure
formations mainly consist of basaltic rock. Generally the water table follows topographic
configuration. The depth to water is greater in upland areas whereas in valley portion and
shallow grounds, the levels are very close to surface. In hilly terrain of eastern, north-eastern
and southeastern part of the district, spring zones are seen in river section and also along
the section of the Daman Ganga, Kolak, Par & Auranga rivers of the district. In major part of
the district, basalt rock units form aquifers whereas alluvium deposits form aquifer system in
north western part and in central part along river courses and also all along narrow coastal
stripes of the district. The weathered basalts formations are covered by soil / muram, valley
fill and piedmont deposits forming potential aquifers in the vicinity of rivers and in the vast
undulating plains adjacent to hilly terrain. But their regional continuity and extension are
limited due to heterogeneous nature of deposits with limited thickness and lateral extension.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 67
As such they rarely exceed a few square kilometers. The alluvium formation of Northwest
along coastal area has major constraint of quality, which have high TDS in ground water.
The interior patches have limited thickness and they form unique contiguous unconfined
system of alluvium portion and underlying weathered basalt rock units.
Range of water table Pre monsoon season 15-20 mbgl
Range of water table Post monsoon season 5-10 mbgl
3.9 TRAFFIC STUDY
Proposed project connects to National Highway No. 8 and State Highway No. 185. Proposed
project will attract to commercial vehicles as a result traffic load will also increase on
highways. Traffic load play a major role in polluting the air. To assess the traffic load, 4 no. of
surveyors were appointed to survey for National Highway No. 8 and State Highway No. 185.
Traffic data collected continuously for 24 hours by visual observation and counting of
vehicles under three categories, viz., heavy motor vehicles, light motor vehicles and
two/three wheelers. As traffic densities on the roads are high, two persons were deployed
simultaneously at each station during each shift- one person on each of the two directions
for counting the traffic. At the end of each hour, fresh counting and recording was
undertaken. Total numbers of vehicles per hour under the three categories were determined.
Traffic study is conducted on National Highway No. 8 and State Highway 185 from 10nd and
11th Dec 2018.
Table 3-13:Traffic Study Report
S.
No.
Vehicles
Distribution
No. of Vehicles/Day
Passenger Car Unit (PCU)
Total No. of Vehicle in PCU
Total No. of Vehicle
(PCU)/Hour
NH-8 SH-185
NH-8 SH-185
NH-8 SH-185
1. Cars 17562 8814 1.0 17562 8814 732 367
2. Buses 3024 714 3.0 9072 2142 378 89
3. Trucks 3328 802 3.0 9984 2406 416 100
4. Two wheelers 6914 4521 0.5 3457 2261 144 94
5. Three
wheelers 2538
1041 0.75 1904
781 79
33
Total 33366 15892 41979 16404 1749 683
Table 3-14: Existing Traffic Scenario with respect to LOS
V/C LOS Performance
Road V (Volume in
PCU/hr) C (Capacity in
PCU/hr) Existing V/C
Ratio LOS
NH-8 1749 3000 0.58 C
SH-5 683 1250 0.55 C
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 68
0.0-0.2 A Excellent
0.2-0.4 B Very Good
0.4-0.6 C Good/Average/Fair
0.6-0.8 D Poor
0.8-1.0 E Very Poor
3.9.1 Interpretation of Traffic Study
LOS values have been calculated based on traffic data on NH-8 and SH-5 and it has been
found 0.58 and 0.55 respectively. LOS value indicates that the performance of NH-8 and
SH-5 is good and Very good respectively.
3.10 SOIL QUALITY
4 numbers of samples were collected from different locations within 10 km radius to assess
the base line status of soil. Analysis was also carried out for physico-chemical parameters as
well as the parameters to define the texture class. Soil samples were collected by using core
cutter and brought to the laboratory in polythene bags. Standard procedures have been
followed for soil sampling and analysis. Soil sampling locations are presented in Map 3-5
and tabulated in Table 3.15. Results are presented in Table 3.16.
Map 3-5:Map showing the study region location of Soil
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 69
Table 3-15: Details of Soil sampling location
Code Location Distance from the
project site/Direction Latitude and Longitude
Selection Criteria
S1 Project Site - 20°17'12.27"N 72°50'46.61"E
Non Agriculture Land
S2 Chandor 9.78 km/ NE 20°21‟27.76”N
72°53‟51.65”E Non Agriculture Land
S3 Punat 5.6 km/ NEE 20°19‟32.78”N
72°52‟06.25”E Agriculture Land
S4 Sarigam 2.0 km/ E 20°17‟18.34”N
72°51‟54.73”E Agriculture Land
Table 3-16:Soil Sample Analysis Result
S. No Parameters Unit S1 S2 S3 S4
1 Water Holding Capacity % 29.4 28.8 34.8 35.4
2 Porosity % 20.2 18.8 22.4 24.2
2 Particle Size Distribution
a. Sand % 26.2 30.4 34.6 33.2
b. Silt % 25.4 21.8 27.4 28.4
c. Clay % 48.4 47.8 38.0 38.4
3 Texture - Clay Clay Clay Loam Clay
Loam
4 Cation Exchange Capacity meq/100 g 38.6 38.9 43.9 45.4
5 pH - 7.56 7.72 7.82 7.71
6 Electrical Conductivity dS/m 0.95 0.86 1.18 1.04
7 Exchangeable Sodium % 12.4 11.6 14.1 15.1
8 Exchangeable Calcium meq/100g 25.4 26.2 27.4 27.1
9 Exchangeable Magnesium meq/100g 7.2 6.8 8.6 8.0
10 Exchangeable Sodium meq/100g 4.8 4.5 6.2 6.6
11 Exchangeable Potassium meq/100g 1.2 1.4 1.7 2.0
12 Organic Carbon(OC) % 0.34 0.38 0.56 0.64
13 Total Nitrogen % 0.030 0.033 0.049 0.056
14 Nitrate N mg/100gm 6.8 6.2 10.7 11.2
15 Total Phosphorus mg/100gm 10.6 9.8 18.4 19.0
16 Total Iron mg/100gm 102.4 106.8 92.2 96.3
17 Total Zinc mg/100gm 2.4 2.6 3.6 3.1
18 Total Copper mg/100gm 0.5 0.7 1.2 1.4
19 Total Boron mg/100gm 1.56 1.66 2.32 2.16
20 Total Chromium mg/100gm 1.6 1.9 2.5 2.3
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 70
3.10.1 Summary of Soil Data
The soils are categorized as clay loam to clay based on different soil separates
(sand, silt and clay). They have moderate water holding capacity (28.8 to 35.6 %),
but poor drainage capacity as texture is clay loam to clay as nearly 77 % is silt + clay.
The soil is categorized as deep black having > 1m depth and lower layers are having
calcium nodules.
The pH of the soil samples narrowly ranged from 7.48 to 7.76 during the study
period. The soil EC also varied from 0.86 to1.18 dS/m and ESP ranged from 11.6 to
15.1. These parameters indicate that soils are neutral to alkaline in reaction, saline
(EC > 0.8 dS/m), but normal to sodic as ESP is exceeding 15 in one out of four
samples.
Among exchangeable basic cations predominance of calcium (25.4 to 27.4 meq/100
g soil) was seen followed by Mg (6.8 –8.6 meq/100 g soil), Na (4.5 to 6.6 meq/100 g
soil) and K (1.2 to 2.0 meq/100 g soil). The loss on ignition (0.2 to 0.6 % OC) indicate
that soils are low (<0.5 % OC) to medium (> 0.5 – 0.75 % OC) in organic carbon
status. This shows that soils are low to medium in nitrogen status.
Considering only 2% available phosphorus based on total P, soils are classified as
poor (>28 kg P2O5/ha) in available P. The based on exchangeable potassium values
soils are categorized as high (>280 kg K2O/ha. The results relating to total Fe, Cu,
Cr, B and Zn do not show alarming concentrations in different soil samples.
3.10.2 Interpretation of Soil Data
Based on soil analysis data it is concluded that soils are normal to saline from salinity view
point and non-sodic as ESP is < 15 at the site. The soils are low to medium in nitrogen, low
in phosphorus and high in potassium. The levels of total Fe, Cu, Cr, B and Zn are within the
safe limits. However, for successful greenbelt development liberal quantity of organic
manure (50 tons/ha) and double the quantity of recommended doses of N, and P and half
the dose of K fertilizers should be applied. The soil at the project site requires amelioration.
Apply acid forming amendments like sulphur/iron pyrite for removal of excess sodium from
the exchange complex with provision of adequate drainage. The soil should be periodically
monitored for EC, pH and ESP.
3.11 WATER ENVIRONMENT
Physical, Chemical and Microbiological factors influencing water quality are so interrelated
that a change in any water quality parameter may trigger other changes in a complete
network of interrelated variables. Selected water quality parameters for surface and ground
water resources along with biological indicators within study region have been used for water
environment and assessing the impact on it by proposed project. A study on water
environment aspects of ecosystem plays an important role in environmental assessment to
identify water related sensitive issues.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 71
3.11.1 Reconnaissance
As a significant part of predefined framework of the present study water samples were
collected from selected locations. The Reconnaissance survey was undertaken and
monitoring locations were finalized based on:
Presence, Location and uses of major water bodies in the region,
Type and Location of Industrial/residential areas, their intake and effluent disposal
locations,
Likely areas that can represent baseline conditions.
3.11.2 Water Quality
With the start of water quality study, the water resources in the study area were divided into
three categories for getting ideal upshot of baseline status of water quality of the region.
These three categories as determined are:
Ground water resources (tube well, open well, springs etc.)
Surface water resources including ponds, river, canals.
Marine water
3.11.3 Sampling and Analysis
All the water samples were collected and analyzed as per “Standard Methods for
Examination of Water & Wastewater”, APHA 23rd edition, 2017. Water Samples for the
analysis of physico-chemical parameters were collected in plastic carboy and parameter
wise preserved onsite as per the technique defined in the book of APHA 23rd edition, 2017.
Temperature, pH and DO were analyzed onsite and samples were brought to the laboratory
for the analysis of remaining parameters.
3.11.4 Ground Water
To assess the quality of ground water, samples were collected from 7 numbers of locations
for the analysis of physico-chemical and microbiological parameters. Ground water sampling
locations are presented in Table 3-17 and Map 3-6. Analysis results are presented Table
3-18.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 72
Map 3-6: Map showing the study region with locations for Ground Water
Table 3-17: Details of Ground Water sampling locations
Code Location Distance from the
project site/Direction
Latitude and Longitude
Source
GW1 Punat 5.6 km/ NEE 20°19‟34.53”N
72°52‟04.06”E Bore well
GW2 Sarai 4.6 km/ SWW 20°16‟24.72”N
72°48‟28.34”E Bore well
GW3 Sarigam 2.0 km/ E 20°17‟14.41”N
72°51‟48.48”E Bore well
GW4 Malav 6.34 km/ SSE 20°13‟51.96”N
72°51‟45.08”E Bore well
GW5 Fansa 7.94 km/ NW 20°20‟07.71”N
72°47‟24.90”E Bore well
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 73
GW6 Pali karambeli 8.46 km/ N 20°21‟42.36”N
72°50‟28.72”E Bore well
GW7 Chandor 9.78 km/ NE 20°21‟27.94”N
72°53‟54.65”E Bore well
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 74
Table 3-18: Ground water Analysis Results
S. No.
Parameters Unit GW1 GW2 GW3 GW4 GW5
GW6
GW7
Drinking Water Specification IS 10500: 1992 (Reaffirmed 2012)
Desirable
Limit Permissible Limit
1. Temperature 0C 25.5 25.0 25.5 25.0 25.5 25.0 25.5 -- --
2. pH @ 250C pH Unit 7.14 7.28 7.26 7.32 7.22 7.15 7.18 6.5 – 8.5 No Relaxation
3. Colour Hazen <5 <5 <5 <5 <5 <5 <5 5 15
4. Odour -- Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable --
5. TDS @ 1800C mg/L 602 745 804 744 854 826 924 500 2000
6. Conductivity µmho/cm 932 1138 1242 1148 1356 1298 1418 -- --
7. TSS mg/L <2 <2 <2 <2 <2 <2 <2 -- --
8. Turbidity NTU 1.4 2.2 1.9 1.5 2.1 2.1 2.3 -- --
9. Total Hardness
as CaCO3 mg/L 384 442 544 462 542 528 584 200 600
10. Calcium mg/L 105 102 98 78 108 102 102 75 200
11. Total Alkalinity
as CaCO3 mg/L 292 342 480 416 488 462 502 200 600
12. Chloride mg/L 148 198 184 178 192 186 202 250 1000
13. Magnesium mg/L 29 42 73 65 66 66 80 30 100
14. Sulphate mg/L 32 24 20 18.4 15.6 20.1 20.2 200 400
15. Total
Phosphorus (PO4-P)
mg/L 1.4 1.7 1.8 1.3 2.1 1.9 2.1 -- --
16. Sodium mg/L 70 102 105 100 114 98 120 -- --
17. Potassium mg/L 12 7 8 12 14 10 18 -- --
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 75
18. Fluoride mg/L 0.5 0.5 0.5 0.4 0.5 0.6 0.5 1.0 1.5
19. Phenolic
Compound mg/L <0.1 <0.1 <0.1 <0.1 <0.1 <1.0 <1.0 0.001 0.002
20. Oil and Grease mg/L <1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 -- --
21. Dissolved Oxygen
mg/L 5.3 5.2 5.0 5.2 5.1 5.3 5.4 -- --
22. Nitrate mg/L 0.6 0.6 0.5 0.5 0.6 0.6 0.6 45 No Relaxation
23. Total Nitrogen mg/L 1.2 1.1 1.2 1.2 1.5 1.5 1.5 - -
24. Iron mg/L 0.28 0.19 0.24 0.14 0.26 0.25 0.26 0.3 No Relaxation
25. Copper mg/L <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 0.05 1.5
26. Boron mg/L 0.08 <0.01 0.05 0.08 0.07 0.08 0.07 0.5 1.0
27. Chromium mg/L <0.03 <0.03 <0.03 <0.03 <0.03 <0.03 <0.03 0.05 No Relaxation
28. Zinc mg/L 0.12 <0.1 0.16 0.14 0.11 0.14 0.11 5 15
29. Total Coliform Present/Absent Absent Absent Absent Absent Absent Absent Absent Shall not be detectable in any100
ml of sample
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 76
3.11.5 Summary of Ground Water Quality
The test results were compared with the Drinking Water Specification: IS: 10500, 1992
(Reaffirmed 2012) and it is summarized as under.
pH was observed in the range of 7.14 – 7.32 which meets with desirable norms.
Total dissolved solid were recorded in the range of 602 to 924 mg/L with minimum at
Punat village and maximum at Chandor village.
Total hardness was in the range of 384-584 mg/L with minimum at Punat village &
maximum at Chandor village.
Total Alkalinity was found in the range of 292-502 mg/L with minimum at Punat village &
maximum at Chandor village.
Iron was found in the range of 0.14-0.28 mg/L with minimum at malav village and
maximum at Punat village.
As microbiological parameters MPN analysis was also carried out and it was found Nil.
3.11.6 Interpretation of Ground Water Quality Data
On the basis of test results obtained it is interpreted that results of all village meet with the
drinking water standard IS 10500:2012. These water sources can be used in drinking as well
as all domestic purposes. To save the ground water from contamination and improving the
quality, rainwater harvesting and ground water recharging may be helpful.
3.11.7 Surface Water
To assess the quality of Surface water, samples were collected from 2 numbers of locations
for the analysis of physico-chemical and microbiological parameters. Frequency of sampling
was once during the study period. Sampling and analysis was carried out as per “Standard
Methods for Examination of Water and Wastewater APHA 23rd edition, 2017. Surface water
sampling locations are presented in the Table 3-19 and Map 3-7. Analysis results are
presented in Table 3-20 & Table 3-21.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 77
Map 3-7: Map showing the locations for Surface water
Table 3-19:Details of Surface Water Sampling Locations
Code Location Distance from the
project Site/Direction
Latitude and Longitude Source
SW1. Darotha River 5.9 km/NE 20°19'47.02"N
72°52'38.75"E River
SW2. Damanganga River 9.1 km/NE 20°20'22.38"N
72°54'39.06"E River
Table 3-20: Surface water Analysis Results
S.
No. Parameters Unit SW1 SW2
Drinking Water Specification
IS 10500: 1992/(Reaffirmed 2012)
Desirable
Limit
Permissible
Limit
1. Temperature 0C 24.5 24.0 - -
2. pH @ 250C pH Unit 7.96 8.02 6.5 – 8.5 No Relaxation
3. Colour Hazen 10 8.04 5 15
4. Odour - Unobjectionable Unobjectionable Agreeable -
5. TDS @ 1800C mg/L 354 186 500 2000
6. Conductivity µmho/cm 556 290 - -
7. TSS mg/L 10 8 - -
8. Total
Hardness as CaCO3
mg/L 208 114
200 600
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 78
S.
No. Parameters Unit SW1 SW2
Drinking Water Specification
IS 10500: 1992/(Reaffirmed 2012)
Desirable
Limit
Permissible
Limit
9. Calcium mg/L 52 27 75 200
10. Total Alkalinity
as CaCO3 mg/L
182 84 200 600
11. Chloride mg/L 96 44 250 1000
12. Magnesium mg/L 19 11 30 100
13. Sulphate mg/L 12 16 200 400
14. Total
Phosphorus mg/L
1.4 1.8 - -
15. Sodium mg/L 55 24 - -
16. Potassium mg/L 6 3 - -
17. Fluoride mg/L 0.8 0.6 1.0 1.5
18. Phenolic Comp.
mg/L <0.1 <0.1
0.001 0.002
19. Oil and Grease mg/L <1.0 <1.0 - -
20. Dissolved Oxygen
mg/L 4.7 4.9
- -
21. COD mg/L 20 10 - -
22. BOD(3 days at
27 0C)
mg/L 6 4
- -
23. Nitrate mg/L 0.8 0.6 45 No Relaxation
24. Total Nitrogen mg/L 1.4 1.1 - -
25. Iron mg/L 0.38 0.30 0.3 No Relaxation
26. Copper mg/L <0.05 <0.05 0.05 1.5
27. Boron mg/L 0.1 0.08 0.5 1.0
28. Chromium mg/L <0.03 <0.03 0.05 No Relaxation
29. Zinc mg/L 0.14 0.12 Nil 15
Table 3-21:Bacteriological Analysis of surface Water
Code
Total coliform
Fecal coliform
Escherichia coli
Fecal Streptococci
Most Probable No (MPN): No/100 mL
SW1 20 18 <1.8 <1.8
SW2 16 14 <1.8 <1.8
Table 3-22:Standard limit as per IS 10500:2012 for Microbiological parameters
S.No. Organisams Requirements
1.
All water intended for drinking:
a) E. coli or thermo tolerant coliform
bacteria
Shall not be detectable in 100 ml sample
2.
Treated water entering the distribution system:
a) E. coli or thermo tolerant coliform
bacteria
b) Total coliform bacteria
Shall not be detectable in 100 ml sample
Shall not be detectable in 100 ml sample
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 79
3.
Treated water in the distribution system:
a) E. coli or thermo tolerant coliform
bacteria
b) Total coliform bacteria
Shall not be detectable in 100 ml sample
Shall not be detectable in 100 ml sample
1) Immediate investigative action shall be taken if either E.coli or total coliform bacteria are
detected. The minimum action in the case of total coliform bacteria is repeat sampling; if
these bacteria are detected in the repeat sample, the cause shall be determined by
immediate further investigation.
2) Although, E. coli is the more precise indicator of fecal pollution, the count of thermo
tolerant coli form bacteria is an acceptable alternative. If necessary, proper confirmatory
tests shall be carried out. Total coliform bacteria are not acceptable indicators of the sanitary
quality of rural water supplies, particularly in tropical areas where many bacteria of no
sanitary significance occur in almost all untreated supplies.
3) It is recognized that, in the great majority of rural water supplies in developing countries,
fecal contamination is widespread. Under these conditions, the national surveillance agency
should set medium-term targets for progressive improvement of water supplies.
3.11.8 Summary of Surface Water Quality
The following description is based on the analysis of the samples:
During the analysis pH of the samples was found in the range of 7.96-8.02.
TDS analysis was also carried out for surface water sample and it was found in the
range of 186-354 mg/L.
DO measured during analysis was found in the range of 4.7-4.9 mg/L.
COD & BOD analysis was also carried out during the study period and it was found
more than desirable value for drinking water.
MPN test was also carried out for this surface water sample and it was found positive.
It indicates towards the fecal contamination in surface water body.
3.11.9 Interpretation of Surface Water Quality Data
Based on test result data comparison study, it is interpreted that River water quality does not
meet with drinking water norms as per IS 10500:2012. Results of COD, BOD and Iron have
been found more than expected value which indicates that water has been contaminated
with organic matter and Iron. It may be due to directly or indirectly contamination of sewage
and effluent. These waters should not be directly used in drinking purpose but it can be used
in drinking after conventional treatment followed by disinfection. These waters can be used
in irrigation and other domestic purposes. Water qualities of pond waters are comparatively
better than river water.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 80
3.11.10 Marine water
To assess the quality of Marine water, total 10 km radial distance was considered in up and
down stream of Arabian Sea. Benthos samples were collected with the help of Ekmann
Benthos sampler during high tide only. Frequency of sampling was once in a season except
monsoon season and samples were collected as per standard method for the examination of
water & wastewater APHA 23rd Edition, 2017 to analyze the physico chemical, metal,
biological & microbiological parameters. Sediment sample was also collected from Arabian
Sea for the analysis of nutrient and heavy metal parameter. Sampling location is showing in
the Map 3-8 and Table 3-23 Test results are presented in Table 3-24 to Table 3-29.
Table 3-23:Details of Surface Water Sampling Locations
Code Location Distance from the
project Site/Direction
Latitude and Longitude Source
M1 Arabian Sea (High Tide)
9.5 km/ NW
20°20‟54.05”N
72°46‟55.70”E Marine
M2 Arabian Sea (Low Tide) 20°20‟30.61”N
72°46‟39.94”E Marine
Map 3-8: Map showing the locations for Marine water
Table 3-24: Marine Water Analysis Result
S. No. Parameters Unit Low Tide High Tide
1. pH pH -unit 7.84 7.76
2. Temperature oC 25.0 24.0
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 81
3. Salinity as Nacl mg/L 35650 34510
4. TSS mg/L 526 476
5. Oil & Grease mg/L <1.0 <1.0
6. Total Nitrogen mg/L 1.5 1.3
8. Total Phosphorous mg/L 3.4 2.8
9. Phenolic Compound mg/L <0.1 <0.1
10. DO mg/L 5.1 5.4
11. BOD mg/L <4 <4
12. Iron mg/L 0.28 0.20
13. Copper mg/L <0.05 <0.05
14. Zinc mg/L 0.5 0.3
15. Boron mg/L <0.01 <0.01
16. Chromium mg/L <0.03 <0.03
Table 3-25:Microbiological Analysis Report for Marine Water Sample
S. No.
Sampling during
Total coliform
F. coliform E.Coli Streptococci
No./100ml
01. High Tide 104 84 3 <1.8
02. Low Tide 88 72 7 <1.8
Table 3-26: Zooplankton Analysis Report for Marine Water Sample
S. No. Sampling during Total Count
per m3
Percentage of Organism in each group
Protozoa Rotifera Copepoda
01. High Tide 6200 62 18 20
02. Low Tide 5800 70 14 16
Table 3-27:Pigment Analysis and Phytoplankton cell count for Marine Water
S.
No Sampling during
Chlorophyll – a
mg/m3
Pheophytin
mg/m3
Cell Count
Unit/L
01. High Tide 0.53 0.18 228
02. Low Tide 0.72 0.22 276
Table 3-28: Benthos Details
Systematic Group Results
Polychaetes +
Mysides _
Ostracodes -
Isopodes +
Amphipodes +
Brachyurans +
Insects +
Gastropodes -
Pelecypodes -
Copepode +
Fishlarvae +
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 82
Systematic Group Results
Fisheggs +
Note: + denotes present and – denotes absent
Dominant groups are Polychaetes, Fishlarvae fishes and Brachyurans.
Table 3-29: Sediment Quality Analysis
S. No.
Sampling Point
Total Phosphorous
mg/kg
Cr
mg/kg
Mn
mg/kg
Fe
mg/kg
Zn
mg/kg
Cu
mg/kg
Loss on ignition%
01. Arabian Sea 142 8.8 8.0 670 12.1 10.0 0.4
3.11.11 SUMMARY OF MARINE WATER QUALITY
Temperature is an important parameter, which affects the living organisms. The
temperature of the water was less than ambient air temperature.
The pH variation was observed in a narrow range of 7.56 to 7.62. pH range is
maintained due to buffering action of CO2,CO3-2 and HCO3
-2.
Salinity was observed in the range of 34520 to 35610 mg/L which is near to the
expected value.
DO is an essential parameter which affects the biotic component of the water. Fish
and other aquatic life take oxygen through the gill. DO levels affect the aerobic
bacterial population as well as Chlorophyllous Phytoplankton. During study period
maximum DO level was recorded in the range of 5.2 to 5.4 mg/L.
BOD is also an important parameter to define the environmental scenario of marine
ecosystem as it affects the DO level. BOD was found <4 mg/L.
Iron varies from 0.18 to 0.24 mg/L. Minimum value for Iron was recorded during high
tide. Other Heavy metals were found well within the range.
Microbiological and biological analysis was also carried out for marine water sample.
Results for microbiological parameters show that marine water is contaminated with
animal as well as human fecal matter.
3.11.12 INTERPRETATION OF MARINE WATER QUALITY DATA
On the basis of test results it is interpreted that water quality of marine is as per expectation
and suitable for sustaining the aquatic life. Presence of certain bio indicators indicate that
water is being contaminated with sewage or industrial discharge. Organic load is not more
than the self-purification capacity.
3.12 ECOLOGY AND BIODIVERSITY
Mainly two types of Vegetation cover are on the earth surface. One is self-growing and
another is cultivated. Plants are renewable resource and useful to living organism in many
ways. It is therefore the role of man in manipulating and changing vegetation population.
Due to lack of awareness deforestation is occurring which in turn is responsible for
imbalance of ecosystem. The main objective of the ecological survey is aimed to find out
baseline status of flora and fauna of the study region. An ecological survey of the study area
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 83
was conducted particularly with reference to listing of species and assessment of the
existing baseline ecological (terrestrial and marine ecosystem) conditions in the study area.
3.12.1 Methodology Adopted for the Study of Flora and Fauna
The EB surveys have been conducted as per our QMS Quality Procedure for
Ecology and Biodiversity for conducting ecology and biodiversity study.
Study Area: 314.45 sq.km
Core Zone: Projects site and 5 km radii w.r.t. project site.
Buffer Zone: 10 km radii w.r.t. project site.
Study Period: 1st Oct 2018 to 31st Dec 2018
List of Villages: Punat, Sarigam, Sarai, Malav, Fansa, Pali Karambeli and chandor
3.12.2 Floral Diversity of the Study Area
The objective of this floral inventory of the study area is to provide necessary information on
floristic structure in the study area for formulating effective management and conservation
measures. The climatic, edaphic and biotic variations with their complex interrelationship and
composition of species, which are adapted to these variations, have resulted in different
vegetation cover, characteristic of each region (Ohasi, 1975).
Trees: The dominant trees in the study area are Manikara zapota (Chickoo) and Mangifera
indica (Aam). Total 32 species of trees belong to 15 families are enumerated from the study
area.
Table 3-30: Trees in the Study area
S. No. Family and Scientific Name Vernacular Name
1 Fabaceae
1/1 Acacia auriculiformis Bengali Baval
2/2 Acacia nilotica Desi Baval
3/3 Albizzia odoratissima Kalo Siras
4/4 Albizzia procera Killai (kelvo)
5/5 Butea monosperma Palas
6/6 Cassia fistula Bahwa garmalo
7/7 Dalbergia sissoo Sissoo
8/8 Pithecellobium dulce Mithi Amli (Goras Amli)
9/9 Millettia pinnata Karanj
10/10 Prosopis juliflora Gando Baval
11/11 Tamarindus indica Amli
2 Rutaceae
12/1 Aegle marmelos Bili
3 Simaroubaceae
13/1 Ailanthus excelesa Arduso
4 Cornaceae
14/1 Alangium salvifolium Ankol
5 Meliaceae
15/1 Azadirachta indica Limbado
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 84
Shrubs: Total 18 species of Shrubs belong to 12 families are enumerated from the study
area.
Table 3-31:List of Shrubs in the study area
S.No. Family name & Scientific Name Vernacular Name
1 Malvaceae
1/1 Abutilon indicum Khapat
2/2 Gossypium herbaceum Kapas
2 Rosaceae
3/1 Rosa Damascena Rose
3 Apocynaceae
4/1 Calotropis procera Akado
6 Leguminosae
16/1 Bauhinia purpurea Kachnar
7 Casuarinaceae
17/1 Casuarina equisetifolia Sharu
8 Boraginaceae
18/1 Cordia gharaf Gundi
9 Myrtaceae
19/1 Eucalyptus species Nilgiri
20/2 Syzygium cumunii Jambu
10 Moraceae
21/1 Ficus bengalensis Vad
22/2 Ficus glomerata Umero
23/3 Ficus religiosa Pipdo
24/4 Morus alba Shetur
11 Arecaceae
25/1 Phoenix sylvestris Khajuri
12 Combretaceae
26/1 Terminalia belleric Bahedo
27/2 Terminalia tomentosa Sadad
13 Rhamnaceae
28/1 Zizyphus mauritiana Bor
29/2 Zizyphus xylopyrus Ghat Bor
14 Sapotaceae
30/1 Manikara zapota Chickoo
15 Anacardiaceae
31/1 Mangifera indica Aam
32/2 Anacardium occidentale Kaju
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 85
S.No. Family name & Scientific Name Vernacular Name
5/2 Carissa conjesta Karmada
6/3 Nerium indicum Karen
4 Rutaceae
7/1 Cirtus species Limbu
5 Fabaceae
8/1 Prosopis juliflora Vilayati Mendi
9/2 Tephrosia purpurea Sartankho
6 Solanaceae
10/1 Datura stramonium Dhaturo
7 Mallows
11/1 Hibiscus rosa-sinensis Jasud
12/2 Thespesia lampas Paras Piplo
8 Verbenaceae
13/1 Lantana camara Lantana
9 Lythraceae
14/1 Lawsonia inermis Mendi
10 Oleaceae
15/1 Nyctanthus arbortristis Parijatak
11 Euphorbiaceae
16/1 Riccinus communis Divelo (Erandi)
12 Rhamnaceae
17/1 Zizyphus nummularia Chanibor
18/1 Zizyphus oenoplia Boydinovelo
Herbs: Total 14 species of Herbs belong to 11 families are enumerated from the study area
Table 3-32:List of Herbs in the study area
S. No. Family name & Scientific Name Vernacular Name
1 Papaveraceae
1/1 Argemone mexicana Darudi
2 Amaranthaceae
2/1 Aerva sanguinolenta Karadia
3/2 Achyranthes aspera Anghedi
3 Fabaceae
4/1 Arachis hypogea Mungfali F
5/2 Cassia tora Kunvandio
4 Apocynaceae
6/1 Catharanthus roseus Barmasi
5 Solanaceae
7/1 Capsicum annum Marchi
8/2 Datura metel Ganthovalo Dhaturo
6 Apiaceae
9/1 Centella asiatica Bhrami
7 Malvaceae
10/1 Hibiscus lobatus Tali
8 Convolvulaceae
11/1 Ipomoea aquaticaforsk Mali Ni Bhaji
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 86
S. No. Family name & Scientific Name Vernacular Name
9 Musaceae
12/1 Musa paradisiacal Kela
10 Lamiaceae
13/1 Ocimum sanctum Tulsi
11 Phyllanthaceae
14/1 Phyllanthus fraternus Bhonya Amli
Climbers: Total 4 species of Herbs belong to 4 families are enumerated from the study
area.
Table 3-33: List of Climbers in the study area
S.No. Family Name & Scientific Name Vernacular Name
1 Vitaceae
1/1 Ampelocissus latfolia Jungli
2 Nyctaginaceae
2/1 Bougainvillea spectabilis Bougain velia
3 Cucurbitaceae
3/1 Cucurbita maxima Kolu
4 Menispermaceae
4/1 Tinosporacordifolia Gulvel
Fauna:
There was no endangered species observed during faunal survey, list of fauna detail
summarized in Table 3-34 to Table 3-39.
Table 3-34: List of Mammals in the Study area
S. No. Scientific Name Common
Name Local Name
Schedule as per WPA 1972
1. Herpestes edwardsi Nurulia, Noria
Common mongoose Schedule II
2. Funambulus penanti Khiskoli Three striped Schedule IV
3. Rattus rattus Rat - Schedule V
4. Mus musculus Mouse - Schedule V
5. Chiroptera Bat - Schedule V
Table 3-35:List of Domestic animal in the Study area
S.No. Scientific Name Common Name
1. Bubalus bubalis Buffalo
2. Bos taurus Cow
3. Capra aegagrushircus Goat
4. Canis lupus familiaris Dog
Table 3-36: List of Birds in the Study area
S. No. Scientific Name Common Name Local Name Schedule
and Status Mig.
Status
1. Ardeola grayii Indian pond heron - Schedule IV R
2. Bubulcus ibis Cattle egret Dhorbaglo Schedule IV R
3. Egretta garzetta Little egret Baglo Schedule IV R
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 87
4. Pseudibis papillosa Black ibis - Schedule IV R
5. Milvus migrans Black winged kite Govinda Samadi LC R
6. Pavo cristatus Indian Peafowl Mor Schedule I R
7. Vanellus indicus Red-watted lapwing Titodi Schedule IV R
8. Charadrius dubius Yellow-wattled lapwing - LC R
9. Tringa ochropus Little ringed plover Leelitutvari LC R
10. Himantopus himantopus Green sandpiper - LC R
11. Sterna aurantia Indian river tern - LC R
12. Columba livia Blue rock pigeon Parevun Schedule IV R
13. Streptopelia decaocto Indian ring dove Dhol LC R
14. Streptopelia chinensis Spotted dove Vanaholi LC R
15. Psittacula krameri Rose ringed parakeet Sudo, Popat LC R
16. Cuculus micropterus Indian cuckoo - Schedule IV R
17. Glaucidium radiatum Jungle owlet Ghubad Schedule I R
18. Alcedo atthis Common kingfisher Lagothi Schedule IV R
19. Merops orientalis Green bee-eater Nano patrangiyo - R
20. Coracias benghalensis Indian roller Nilkant Schedule IV R
21. Galerida malabarica Malabar crested lark - LC R
22. Hirundo rustica Common swallow - LC R
23. Hirundo daurica Red rumped swallow Kenchia babil LC R
24. Oriolus xanthornus Black headed oriole - Schedule IV R
25. Dicrurus adsimilis Fork Tailed Drongo Kalokoshi Schedule IV R
26. Sturnus pagodarum Brahminy myna - Schedule IV R
27. Acridotheres tristis Indian myna Kabar Schedule IV R
28. Acridotheres ginginianus Bank myna Kabar Schedule IV R
29. Pycnonotus cafer Red vented bulbul Bulbul Schedule IV R
30. Turdoides caudata Common babbler Sheradi Schedule IV R
31. Turdoides striata Jungle babbler Vanalaledo Schedule IV R
32. Orthotomus Tailor bird Darjido LC R
33. Megalurus palustris Striated marsh warbler - LC R
34. Copsychus saularis Magpie robin Daiyad LC R
35. Saxicoloides fulicata Indian robin Deoli LC R
36. Geokichla citrina Orange headed ground
thrush Malagirkasturo LC R
37. Parus spilonotus Yellow cheeked tit - Schedule IV R
38. Motacilla flava Yellow wagtail Matanopilakya LC R
39. Cinnyris asiaticus Purple sunbird Phulchakli LC R
40. Passer domesticus House sparrow Chakli LC R
41. Ploceus philippinus Baya Sughari Schedule IV R
Table 3-37: List of Reptiles in the Study area
S. No. Scientific Name Common Name Local Name
Schedule as per WPA,1972
1. Hemidactylus flaviviridis Northern house gecko Garoli Not Listed
2. Calotes versicolor Common garden lizard Kachindo Not Listed
3. Calotes rouxi Forest calotes Kachindo Not Listed
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 88
4. Sitana ponticeriana Fan-throated lizard - Not Listed
5. Chameleo zeylanicus Indian chameleon Sarado Not Listed
6. Ptyas mucosus Common rat snake Dhaman Not Listed
7. Naja naja Indian cobra Nag Schedule II
Table 3-38: List of Invertebrates in the Study area
S. No. Scientific Name Common Name Local Name
1. Anisoptera Dragonfly Dragonfly
2. Apis Honey bee Honey bee
3. Argiopeaurantia Garden Spinder The garden
Table 3-39:Details of Fishes
S. No. Species S. No. Species
Marine Fishes
1. White Pomfret 9. Mullet
2. BlachPomfret 10. Ribbon Fish
3. Bombay Duck 11. Silverbar
4. Thread Fin 12. Eel
5. Jew Fish 13. Smallscineldies
6. Clupeids 14. Cat Fish
7. Coilia 15. Crab
8. Levta 16. Leather Jacket
Fresh water Fishes
1. Catla 5. Mullet
2. Mrigal 6. Eel
3. Minor Carp 7. Shrimps
4. Vallagoattu
Source: Local Information from Villagers
3.12.3 Interpretation of Ecology and Biodiversity
Different species of flora were observed among which Mango and Chickoo species were
dominant, as the soil of the study region also support for the cultivation of same. Herbal
species were observed rarely. Looking to the density of plant it may also be suggested to
improve the quality of environment by planting more trees. Due to destruction of natural
habitat, less numbers of wild mammals were observed. Number of species and density of
wild mammals can be increased by promoting/ facilitating the growth of bush. There was no
endangered species observed during primary survey.
3.13 SOCIO-ECONOMIC ENVIRONMENT
Socioeconomics (also known as socio-economics or social-economics) is the social
science that studies how economic activity affects social processes. In general it analyzes
how societies progress, stagnate, or regress because of their local or regional economy, or
the global economy.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 89
In order to assess and evaluate the likely impacts arising out of any new or existing projects
in socio-economic environment, it is necessary to gauge the apprehension of the people in
the surrounding areas. Socio-economic survey serves as an effective tool for fulfilling this
requirement.
The rapid industrialization of the study region has greatly influenced the socio economic and
health environment in the villages. Increasing industrialization and population density has
increased pressure on resources, civic amenities and public infrastructure. Economic
conditions of the local people have improved with the increasing industrialization and greater
employment opportunities.
The socio-economic environment includes demography structure, population density, literacy
level, and employment levels. The data establish a baseline for the prediction of likely
impacts of the proposed activity on the socio-economic environment. Secondary information
pertaining to the study area villages was collected from Government Agencies, Census data
for the year 2011, and statistical abstracts to compile the socio-economic data.
3.13.1 Socio-Economic Survey Methodology
Socio-economic survey tools provide a means of improving understanding of local resource
management systems, resource use and the relative importance of resources for
households and villages. They can also be used to elicit insights on interaction with
government decision-making systems, community perceptions of trends and priority issues,
and community-based institutions and their role in the sustainable use and conservation of
natural resources.
Data Collection: Following steps were considered for the collection of primary data:
1. Identification of Study Area: The study area was identified before carrying out the
survey. All the related information which could affect the prosperity, development & literacy
were also collected.
2. Site Visit: Location wise survey plan & format for data collection were prepared for site
visit. Data regarding Land Characteristics, Population, Literacy, Workers and Amenities were
collected during the survey.
Analysis of Data: The data collected by primary survey were verified with secondary data
collected from sources like Government Agencies, Census data for the year 2011, and
statistical abstracts.
3.13.2 Demography
Almost all villages in the study area are experiencing a rapid growth of population due to
industrialization. The total population of study region is summarized in Table 3-40.
3.13.3 Population Density
Population density in the study area varies from 71–6156 person/sq.km. Details of the same
are tabulated in Table 3-40.
Table 3-40: Details of Population in Study Area
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 90
Villages No. of
Household
Total
Population
T006Ftal area
Sq.km
Population density
Person/sq.km
Fansa 2963 14459 15.63 925
Pali karambeli 475 2356 4.26 553
Pali 451 2241 5.84 384
Jamburi 392 1868 2.65 705
Mohan 1334 6225 9.34 666
Eklahare 345 1696 2.33 728
Nahuli 352 1644 3.16 520
Valwada 876 3922 6.03 650
Chanod (CT) 4738 18776 3.05 6156
Sarigam (INA) 290 925 13.12 71
Bhilad (CT) 1998 9022 7.47 1208
Daheli 2188 10475 9.61 1090
Dhanoli 544 2826 3.83 738
Talwada 229 1223 2.02 605
Zaroli 1093 5469 9.37 584
Nag was 333 1743 3.36 519
Manda 1165 6022 10.64 566
Sarai 429 2391 3.02 792
Maroli 3081 15678 18.70 838
Nanakwada (CT) 2407 10172 2.85 3569
Malav 535 2788 5.68 491
Vankas 462 2472 4.74 522
Manekpur 589 2919 4.64 629
Ahu 301 1490 3.19 467
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 91
Villages No. of
Household
Total
Population
T006Ftal area
Sq.km
Population density
Person/sq.km
Khattalwada 4048 21036 34.55 609
Tadgam 513 2514 4.60 546
Kachigam 755 3375 5.96 566
Kalgam 2182 10687 21.48 497
Punat 530 2621 5.78 453
Aangam 528 2477 4.02 616
Manda 1165 6022 10.64 566
Nandigam 372 1971 3.39 581
Achhari 404 2047 - -
Mamakwada 328 1515 23.3 65
Karambele 688 3308 54.2 61
Karamkhal 831 3525 38.0 93
Pardi (M) 6278 28495 13.1 2175
Chandor 538 2389 40.5 59
Namdha 456 1938 21.1 92
Total 47,186 2,22,722 435.12 30,955
3.13.4 Sex Ratio
The sex ratio i.e. the number of females per 1000 males is in range of 629-1080 with lowest
in Sarigam and highest in Punat. The Sex ratio i.e. the number of females per 1000 males
indirectly reveals certain sociological aspect in relation to female births, infant mortality
among female children. Details of the same are tabulated in
Table 3-41.
Table 3-41: Details of Sex Ratio in Study Area
Zone of Study Male
Population Female
Population Total
Population
Sex Ratio
(Female to 1000 Male)
Fansa 7324 7135 14459 974
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 92
Zone of Study Male
Population Female
Population Total
Population
Sex Ratio
(Female to 1000 Male)
Pali karambeli 1223 1133 2356 926
Pali 1130 1111 2241 983
Jamburi 936 932 1868 996
Mohan 3160 3065 6225 970
Eklahare 890 806 1696 906
Nahuli 838 806 1644 962
Valwada 2041 1881 3922 922
Chanod (CT) 10800 7976 2819 739
Sarigam (CT) 568 357 925 629
Bhilad (CT) 4803 4219 9022 878
Daheli 5398 5077 10475 941
Dhanoli 1424 1402 2826 985
Talwada 605 618 1223 1021
Zaroli 2744 2725 5469 993
Nagwas 869 874 1743 1006
Manda 3001 3021 6022 1007
Sarai 1220 1171 2391 960
Maroli 8029 7649 15678 953
Nanakwada (CT) 5140 5032 10172 979
Malav 1402 1386 2788 989
Vankas 1271 1201 2472 945
Manekpur 1465 1454 2919 992
Ahu 750 740 1490 987
Khattalwada 10538 10498 21036 996
Tadgam 1307 1207 2514 923
Kachigam 1799 1576 3375 876
Kalgam 5335 5352 10687 1003
Punat 1212 1309 2621 1080
Aangam 1254 1223 2477 975
Manda 3001 3021 6022 1006
Nandigam 960 1011 1971 1053
Achhari 1064 983 2047 923
Mamakwada 784 731 1515 932
Karambele 1702 1606 3308 943
Karamkhal 2093 1432 3525 684
Pardi (M) 14648 13847 28495 945
Chandor 1215 1174 2389 966
Namdha 1036 902 1938 871
Total 1,14,979 1,07,643 2,06,765 -
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 93
3.13.5 Literacy Rate
The literacy level of the study area is summarized in Table 3-42 and graphically presented in
Figure 3-6.
Table 3-42: Details of Literacy Rate in Study Area
Village Literate Literacy (%)
Male Female Total Male Female Total
Fansa 5830 5169 10999 79.60 72.45 76.07
Pali karambeli 994 938 1932 81.28 82.79 82.00
Pali 830 637 1467 73.45 57.34 65.46
Jamburi 709 607 1316 75.75 65.13 70.45
Mohan 2554 2202 4756 80.82 71.84 76.40
Eklahare 767 625 1392 86.18 77.54 82.08
Nahuli 667 558 1225 79.59 69.23 74.51
Valwada 1614 1305 2919 79.08 69.38 74.43
Chanod (CT) 8820 5845 14665 81.67 73.28 78.11
Sarigam (CT) 461 243 704 81.16 68.07 76.11
Bhilad (CT) 3713 2681 6394 77.31 63.55 70.87
Daheli 3838 3063 6901 71.10 60.33 65.88
Dhanoli 940 717 1657 66.01 51.14 58.63
Talwada 398 268 666 65.79 43.37 54.46
Zaroli 1974 1489 3463 71.94 54.64 63.32
Nagwas 640 444 1084 73.65 50.80 62.19
Manda 1998 1507 3505 66.58 49.88 58.20
Sarai 873 599 1472 71.56 51.15 61.56
Maroli 6293 5085 11378 78.38 66.48 72.57
Nanakwada (CT) 4536 4312 8848 88.25 85.69 86.98
Malav 928 645 1573 66.19 46.54 56.42
Vankas 976 669 1645 76.79 55.70 66.55
Manekpur 915 663 1578 62.46 45.60 54.06
Ahu 523 429 952 69.73 57.97 63.89
Khattalwada 7531 5805 13336 71.47 55.30 63.40
Tadgam 1069 853 1922 81.79 70.67 76.45
Kachigam 1459 1025 2484 81.10 65.04 73.60
Kalgam 4310 3824 8134 80.79 71.45 76.11
Punat 1040 841 1881 85.81 64.25 71.77
Aangam 839 639 1478 66.91 52.25 59.67
Manda 1998 1507 3505 66.58 49.88 58.20
Nandigam 617 479 1096 64.27 47.38 55.61
Achhari 813 608 1421 76.41 61.85 69.42
Mamakwada 627 470 1097 79.97 64.30 72.41
Karambele 1462 1297 2759 85.90 80.76 83.40
Karamkhal 1740 929 2669 83.13 64.87 75.72
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 94
Village Literate Literacy (%)
Male Female Total Male Female Total
Pardi (M) 12016 10447 22463 82.03 75.45 78.83
Chandor 945 790 1735 77.78 67.29 72.62
Namdha 879 616 1495 84.85 68.29 77.14
Total 89,136 70,830 1,48,967 - - -
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 95
Figure 3-6:Graph of Literacy Rate
Among all the villages of study area Nanakwada (CT) having high literacy rate i.e. 86.98 %. There is not much difference between female literacy
rate and male literacy rate in the study region. Female literacy rate is an important indicator for social change.
0
10
20
30
40
50
60
70
80
90
100
% L
iter
acy
Villages
Literacy (%) Male Literacy (%) Female Literacy (%) Total
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 96
3.13.6 Economic Aspects
Economic aspects of the study area include the economical structure of the people of the
surrounding area. It can be predicted that economic structure of the study area will be
improved with time, because it consists large industrial estate and hence there are more
employment opportunities.
According to working status, whole population of the study area is divided into
Marginal workers
Non workers
Main workers
Census department has defined 10 categories of workers in Main workers. It consists of
cultivators, agricultural, labourer those engaged in livestock, forestry, fishing, mining and
quarrying, manufacturing, processing and repairs in household industries and other services.
Workers engaged in the work for a period less than 6 month during the reference year falls
under marginal workers. Workers engaged in unpaid household duties e.g. students, retired
person, dependents etc. falls under non-workers. Detail of occupational structure is shown in
Table 3-43 and Figure 3-7.
Table 3-43:Details of Occupational Structure
Zone of Study Non-Workers (%) Total Workers
Main Workers (%) Marginal Workers (%)
Fansa 57.8 33.18 9.0
Pali karambeli 42.1 57.05 0.8
Pali 62.0 36.59 1.4
Jamburi 59.9 34.37 5.7
Mohan 51.0 39.57 9.5
Eklahare 56.0 36.20 7.8
Nahuli 59.9 38.93 1.2
Valwada 55.8 39.29 4.9
Chanod (CT) 60.7 37.03 2.3
Sarigam (CT) 53.3 45.62 1.1
Bhilad (CT) 63.8 33.15 3.0
Daheli 64.6 33.88 1.5
Dhanoli 65.7 29.02 5.2
Talwada 58.2 35.24 6.5
Zaroli 62.9 32.89 4.2
Nagwas 47.3 27.60 25.1
Manda 58.2 37.70 4.1
Sarai 58.2 34.38 7.4
Maroli 64.3 33.08 2.6
Nanakwada (CT) 60.5 35.68 3.9
Malav 53.7 38.31 8.0
Vankas 49.3 43.28 7.4
Manekpur 67.6 29.19 3.2
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 97
Zone of Study Non-Workers (%) Total Workers
Main Workers (%) Marginal Workers (%)
Ahu 51.4 46.71 1.9
Khattalwada 63.2 32.72 4.0
Tadgam 51.8 31.62 16.6
Kachigam 12.5 42.46 13.7
Kalgam 58.2 36.21 5.6
Punat 59.1 37.01 3.9
Aangam 53.7 38.88 7.4
Manda 58.2 37.70 4.1
Nandigam 58.4 29.78 11.8
Achhari 61.7 35.86 2.5
Mamakwada 56.9 38.88 4.2
Karambele 66.1 32.95 0.9
Karamkhal 50.4 43.15 6.4
Pardi (M) 57.4 35.20 7.4
Chandor 59.3 37.17 3.6
Namdha 53.0 38.08 8.9
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 98
Figure 3-7: Details of Occupational Structure
Pali Karambeli has significant employment i.e. 57.05 % as main workers, while the lowest employment as main workers in Nagwas i.e. 27.6%.
Almost all the villages have more than 50 % people as non-workers. Rapid industrialization in the last two decades has resulted in significant
changes in the occupational profile of the local people. There is an overall trend among the youth to opt for employment in service sector and move
away from traditional occupation.
0
10
20
30
40
50
60
70
80%
of
Work
ers
Villages
Non Workers (%) Total Workers Main Workers(%) Total Workers Marginal Workers (%)
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 99
3.13.7 Amenities
Village-wise status of infrastructural facilities available in the study area with respect to
education, medical facility, water supply, communication and transportation facility and
power supply, banking facilities etc. are presented in analysis of data indicates that
infrastructural facilities/ basis amenities are available in most of the villages.
Table 3-44:Education Facilities
Go
vt.
P
re -
Pri
mary
Sch
oo
l
Pri
vate
Pre
-
Pri
mary
Sch
oo
l
Go
vt.
Pri
mary
Sch
oo
l
Pri
vate
Pri
mary
Sch
oo
l
Go
vt
Mid
dle
Sch
oo
l
Pri
vate
Mid
dle
Sch
oo
l
Go
vt
Seco
nd
ary
Sch
oo
l
Pri
vate
Seco
nd
ary
Sch
oo
l
Go
vt.
Sen
ior
Seco
nd
ary
Sch
oo
l
Pri
vate
Sen
ior
Seco
nd
ary
Sch
oo
l
Go
vt.
Po
lyte
ch
nic
Go
vt.
Vo
cati
on
al
Tra
inin
g
Sch
oo
l
16 1 81 8 5 1 13 2 7 5 1 1
Table 3-45: Health Care Facilities
Primary Health Centre Primary Health Sub Center
Maternity And Child Welfare Centre
Mobile Health Clinic
6 33 7 1
Table 3-46:Drinking Water Facilities
Tap Water-Treated
Tap Water
Untreated
Covered Well
Uncovered Well
Hand Pum
p
Tube Wells/Borehol
e River/Canal Tank/Pond/Lake
1 28 5 26
29
18 22 13
Table 3-47: Sanitation Facilities
Closed Drainage
Open Drainage
No Drainage Open Pucca Drainage Covered with Tiles Slab
Open Pucca Drainage
Uncovered
Open Kuccha Drainage
1 25 8 8 23 17
Table 3-48:Communication Facilities
Post Office Sub Post
Office Telephone (landlines)
Public Call Office /Mobile
Internet Cafes / Common
service Centre
3 23 29 22 29
Table 3-49:Transportation Facilities
Public Bus
Service
Private Bus
Service
Railway Station
Auto/Modified Autos
Taxi Vans Tractors Sea/River/Ferr
y Service
29 4 4 17 0 4 19 1
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 100
Table 3-50: Road Facilities
Black Topped (pucca) Road
Gravel (kuchha) Roads
Water Bounded Macadam
All Weather Road
Foothpath
29 26 5 21 29
Table 3-51: Bank Facilities
Commercial Bank Cooperative Bank Agricultural Credit Societies
5 1 6
Table 3-52: Power Supply Facilities
Power Supply For Domestic Use
Power Supply For Agriculture Use
Power Supply For Commercial Use
Power Supply For All Users
29 29 29 29
Source: District Census Handbook 2011, District Valsad, Gujarat and Daman & Diu.
3.13.8 Interpretation of Socio Economic Data
During the primary survey it was observed that almost pakka road facility is available in all
villages within 10 km radius. Literacy rate of the study region is from 54.06 to 86.98%. On
the basis of survey for literacy rate data it is interpreted that there is need to promote
educate more and more people. Almost all the villages have more than 50 % people as non-
workers. It indicates that the problem of unemployment can be solved by providing proper
training and education. There is also need to establish more industries so that maximum
number of employment can be generated. Basic amenities like Education facilities Health
care facilities, water supply, electric power supply, mode of transportation etc. are available
in all villages.
Socio Gap Analysis
During the survey and interaction with villagers, following issues were identified.
Issues Village name
Insufficient furniture in primary school Sarigam Village
Not proper school uniform Punat Village
insufficient availability of Drinking water
Not proper sanitary facility Sarai Village
Awareness program to farmers
Improper Community plantation Chandor Village
Health issues in villagers
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 101
Insufficient knowledge for farming Malav Village
Depends upon above issues company will proposes to carry out social welfare activities for
the welfare of local community is provide in section 6.2.1.
3.14 SUMMARY
Ambient Air Quality Monitoring
Sr. No.
Criteria Pollutants
Unit Maximum Value
Minimum Value
98th
percentile
value
Prescribed standard
1. PM10 µg/m3 86.1 61.9 85.7 100
2. PM2.5 µg/m3 47.1 32.0 46.3 60
3. SO2 µg/m3 17.6 9.4 17.5 80
4. NOX µg/m3 23.0 16.2 23.0 80
Based on comparison study of results with NAAQS for tested parameters, ambient air quality of studied locations can be considered good as all the results of tested parameters are well within the limit. Looking towards the increasing pattern of PM10 and PM2.5 concentration in ambient air, it is
suggested that proper air pollution control measures must be adopted by the industry. This interpretation relate to the results found during the monitoring for particular location and date of
monitoring.
Noise Monitoring
Sr. No.
Parameter Unit Maximum Value Minimum Value Prescribed standard
1. Leq (Day) dB(A) 77.1 50.2 -
2. Leq(Night) dB(A) 73.5 42.1 -
Based on noise level data obtained during the survey for residential area and industrial area, it is interpreted that noise levels are within the standard norms prescribed by MoEF & CC. Looking
towards the increase in noise generating sources it is suggested that there is need to apply noise
reducing devices at noise generating sources and generate public awareness.
Soil Quality and Characteristics
Sr. No.
Parameter Unit Maximum Value Minimum Value
1. pH - 7.82 7.56
2. electrical
Conductivity dS/m 1.18 0.86
3. Sodium meq/100gm 6.6 4.5
4. Potassium meq/100gm 2.0 1.2
5. Phosphorous mg/100gm 19.0 9.8
6. Total Nitrogen % 0.056 0.030
Based on soil analysis data it is concluded that soils are normal to saline from salinity view point and non-sodic as ESP is < 15 at the site. The soils are low to medium in nitrogen, low in phosphorus and
high in potassium. The levels of total Fe, Cu, Cr, B and Zn are within the safe limits. However, for successful greenbelt development liberal quantity of organic manure (50 tons/ha) and double the
quantity of recommended doses of N, and P and half the dose of K fertilizers should be applied. The soil at the project site requires amelioration. Apply acid forming amendments like sulphur/iron pyrite for removal of excess sodium from the exchange complex with provision of adequate drainage. The
soil should be periodically monitored for EC, pH and ESP.
Ground Water
Sr. No.
Parameter Unit Maximum Value
Minimum Value
Desirable Limit
Permissible Limit
1. pH - 7.28 7.14 6.5-8.5 No Relaxation
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 102
2. TDS mg/L 924 602 500 2000
3. TSS mg/L <2 <2 - -
4. Total hardness mg/L 584 384 200 600
5. Chloride mg/L 202 148 250 1000
6. Total Alkalinity mg/L 502 292 200 600
7. Fluoride mg/L 0.6 0.4 1.0 1.5
8. Iron mg/L 0.28 0.14 0.3 No Relaxation
On the basis of test results obtained it is interpreted that results of all village meet with the drinking water standard IS 10500:2012. These water sources can be used in drinking as well as all domestic
purposes. To save the ground water from contamination and improving the quality, rainwater harvesting and ground water recharging may be helpful.
Surface Water
Sr. No.
Parameter Unit Maximum Value
Minimum Value
Desirable Limit
Permissible Limit
1. ph - 8.02 7.96 6.5-8.5 No Relaxation
2. TDS mg/L 354 186 500 2000
3. DO mg/L 4.9 4.7 - -
4. COD mg/L 20 10 - -
5. BOD mg/L 6 4 - -
Based on test result data comparison study, it is interpreted that River water quality does not meet with drinking water norms as per IS 10500:2012. Results of COD, BOD and Iron have been found
more than expected value which indicates that water has been contaminated with organic matter and Iron. It may be due to directly or indirectly contamination of sewage and effluent. These waters should
not be directly used in drinking purpose but it can be used in drinking after conventional treatment followed by disinfection. These waters can be used in irrigation and other domestic purposes. Water
qualities of pond waters are comparatively better than river water.
Marine Water
On the basis of test results it is interpreted that water quality of marine is as per expectation and suitable for sustaining the aquatic life. Presence of certain bio indicators indicate that water is being contaminated with sewage or industrial discharge. Organic load is not more than the self-purification
capacity.
Ecology and Biodiversity
Different species of flora were observed among which Mango and Chickoo species were dominant, as the soil of the study region also support for the cultivation of same. Herbal species were observed
rarely. Looking to the density of plant it may also be suggested to improve the quality of environment by planting more trees. Due to destruction of natural habitat, less numbers of wild mammals were
observed. Number of species and density of wild mammals can be increased by promoting/ facilitating the growth of bush. There was no endangered species observed during primary survey.
Socio Economic
During the primary survey it was observed that almost pakka road facility is available in all villages within 10 km radius. Literacy rate of the study region is from 54.06 to 86.98%. On the basis of survey
for literacy rate data it is interpreted that there is need to promote educate more and more people. Almost all the villages have more than 50 % people as non-workers. It indicates that the problem of
unemployment can be solved by providing proper training and education. There is also need to establish more industries so that maximum number of employment can be generated. Basic
amenities like Education facilities Health care facilities, water supply, electric power supply, mode of transportation etc. are available in all villages.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 103
4 ANTICIPATED ENVIRONMENTAL IMPACTS AND
MITIGATION MEASURES
4.1 INVESTIGATED ENVIRONMENTAL IMPACTS DUE TO THE
PROPOSED PROJECT
This chapter comprises the information regarding the identified beneficially or adversely
environmental impacts due to possible aspects predicted because of location of the plant,
expected / predicted accidents scenario, conceptualization of project, preconstruction &
construction activities and due to operation of machineries/equipment. Environmental
aspect-impact relationship will be identified and quantified with its scale of magnitude and
scale of importance, accordingly significance of impact will be determined along with
mitigation measures.
The impact assessment essentially consists of three steps:
1. Impact Identification
2. Impact Predictions
3. Impact Analysis for determination of significance of impacts
Here, impact assessment has been done based on Leopold Matrix in which each action and
its potential in creating impact is expressed in terms of its magnitude and importance. For
quantitative representation, both magnitude & importance are represented by values as
described below:
Scale of Importance: Importance of an interaction is related to its significance, or an
assessment of probable consequences of anticipated impact. It ranges from 1 to 9; with 9
representing a very important interaction and 1 of relatively low.
Scale of Magnitude: Impact score or magnitude ranges from 0-5 with positive and negative
values, depending upon the impact rising out of the project activity. Refer Table 4-1 for
Severity Criteria for Magnitude of Impacts.
Table 4-1: Severity Criteria for Magnitude of Impacts
S. No Category Description of category Impact
Adverse Beneficial
1. No impact - 0 0
2. No appreciable impact Short term reversible -1 1
3. Significant impact Long term reversible -2 2
4. Major impact Irreversible but of lesser extent -3 3
5. High impact Irreversible but of medium extent -4 4
6. Permanent impact Severe irreversible impact -5 5
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 104
Score of each of the component is to be multiplied by „‟Importance factor” and totals core is
to be obtained by summation of products. Score ranges of impact evaluation based on
matrix score is given in Table 4-2.
Table 4-2: Score ranges for Beneficial and Adverse Impacts
S. No Total score Outcome
1. +ve / -ve Beneficial impact / adverse impact
2. 0-300 No appreciable Beneficial impact / adverse impact
3. 300-600 Appreciable but reversible adverse impact-mitigation measures are needed
4. 600-900 Significant adverse impacts: most of the impacts are reversible. Mitigation measure are crucial.
5. 900-1200 Major adverse impacts; most of the impacts are reversible. Alternative site selection to be considered.
6. >1200 Permanent irreversible impact; alternatives to the project need to be explored
4.1.1 Investigated Environmental Impacts Due to the Proposed Project
Assessment of Significance of Impacts
Assessment of aspect and impact from the proposed activity is described in Table 4-3.
Table 4-3: Aspect-Impact Identification from Proposed Project
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 105
S. No.
Project Activity
N/ A
N/
E
sit
uati
on
s
Identified Aspect
Scale of Magnitude
(+ve) or Air Water
Waste Water
Land Resource Depletion
SHW Ecology &
Biodiversity Social
Health &
Safety Total
(-ve) AP/AQ NV SW GW Effluent/ Sewage
LU/ LC
Soil RD HW C&D SW Ter. Aqu. Infrastructures Economic /
Employment
Scale of Importance 7 5 4 4 5 1 3 8 8 4 4 2 3 6 9 6 79
1 Project Pre- Construction/ Construction
1.1 Site clearance N Removal of top soil & Land clearence
1,2,3,4,5 -1 -1
1.2 Excavation and paving
of site
N Generation of debris 1,2,3,4,5 -1 -1
N Dust generation 1,2,3,4,5 -1 -1 -1
AN Fall in pit, land sliding
from sidewalls 1,2,3,4,5 -2 -2
1.3
Fabrication work for erecting major plant equipment including
operation of equipment like crane, concrete
mixtures, vibrators etc. and preventive
maintenance work
N Generation of scraps 1,2,3,4,5 -1 -1
N Noise generation 1,2,3,4,5 -1 -1
1.4
Vehicular movement for transportation of construction material
and waste
N Increase in traffic
load 1,2,3,4,5 -1 -1 -2
N Emission of HC & CO 1,2,3,4,5 -1 -1 -2
N Noise generation 1,2,3,4,5 -1 -1 -2
1.5 Influx of workers
during construction phase
N Employment generation
1,2,3,4,5 2 2
N Sewage generation 1,2,3,4,5 -1 -1
2 Commissioning/ Project Operation
2.1 Reactions Processes
N Emission of P2O5 1,2,3,4,5 -3 -2 -3 -8
N Waste Water Generation
1,2,3,4,5 -3 -3 -6
N genration of
Phosphine gas reacts with Acid & water
1,2,3,4,5 -3 -3 -6
N Spillage and Leakage
of Raw Material/ Prduct
1,2,3,4,5 -1 -1 -1 -3
2.2 Export of Product N Increase in market
scenario 1,2,3,4,5 5 5
3 General & Utilities
3.1 Operation of D.G Set, Cooling tower, Boiler,
etc.
AN Emission of PM, SO2 and NOx from D.G &
Boiler 1,2,3,4,5 -3 -3
N Generation of waste water from Cooling
and Boiler Blow
1,2,3,4,5 -3 -3 -6
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 106
S. No.
Project Activity
N/ A
N/
E
sit
uati
on
s
Identified Aspect
Scale of Magnitude
(+ve) or Air Water
Waste Water
Land Resource Depletion
SHW Ecology &
Biodiversity Social
Health &
Safety Total
(-ve) AP/AQ NV SW GW Effluent/ Sewage
LU/ LC
Soil RD HW C&D SW Ter. Aqu. Infrastructures Economic /
Employment
Down
N Noise generation
from D.G Set 1,2,3,4,5 -1 -1
3.2 Equipment and Floor
Washing N
Generation of waste water
1,2,3,4,5 -3 -3
3.3 Operation of ETP
N Generation of waste
water 1,2,3,4,5 -3 -3 -6
N Generation of ETP
waste 1,2,3,4,5 -3 -3
3.4 Influx of workers
operational phase
N Employment Generation
1,2,3,4,5 5 5
N Sewage generation 1,2,3,4,5 -3 -3 -6
3.5 Green belt
developement N
Reduce air pollution, Noise
1,2,3,4,5 5 5 10
3.6 Socio Economic
improvement N CER Activity 1,2,3,4,5 5 5
3.7
Loading and Unloading of
chemicals, products etc.
N Generation of Waste Drums/Barrels/bags
and containers 1,2,3,4,5 -3 -3
3.8
Vehicular movement for transportation of
raw materials, finished goods and Industrial
Waste
N Increase in traffic
load 1,2,3,4,5
-3 -3
N Emission of HC & CO 1,2,3,4,5 -3 -2 -3 -8
N Noise generation 1,2,3,4,5 -3 -3
3.9 Raw water intake for Plant Operation and
Domestic Uses N
Consumption of water
1,2,3,4,5 -4 -4 -8
3.10 Storm water management
AN Mixing of process
drains with rainwater 1,2,3,4,5 -3 -2 -2 -3 -10
3.11 Equipment
maintenance
N Generation of used oil and lubricants
1,2,3,4,5 -2 -2
N Generation of scraps and used spares etc.
1,2,3,4,5 -1 -1
Total of Individual VEC's -9 -1 -19 -2 -16 0 -2 -4 -9 -3 0 -6 -3 -4 17 -15 -76
TOTAL -63 -5 -76 -8 -80 0 -6 -32 -72 -12 0 -12 -9 -24 153 -90 -336
Interpretation:
The final score is -336 which concludes “Appreciable but reversible adverse impact-mitigation measures are needed”. Mitigation measures for respective valued environment component are described in following sections.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 107
Signifecance:
The mitigation measures are suggested based on the criteria of significance / consequence
as per the Table 4-4 for individual Valued Environmental Components (VECs) in following
sections.
Table 4-4: Criteria of Significance / Consequence
Score Significance/Consequence
-/+ 1 to -/+ 9 Low
-/+ 10 to -/+ 30 Medium
-/+ 31 to -/+ 45 High
4.1.2 Air Environment
Construction Phase
Impact
During the construction phase of the project, the major activities will involve earth work
excavation, transport of construction materials, building of structures etc. These activities
would cause a general increase in levels of dust and suspended particulate matter in the
ambient air. During construction phase, for equipment/ material movement trucks and trailers
shall be deployed from manufacturer‟s locations. Due to the movement of vehicles for
transportation of construction material required during construction phase, marginal increase
in the levels of particulate matter (PM), carbon monoxide (CO) and hydrocarbons (HC) are
envisaged. However, this increase in concentration of pollutants would be of temporary in
nature and localized.
Mitigation Measures
Mitigation measures for air quality impacts are:
All vehicles delivering construction materials to the site shall be covered to avoid
spillage of materials and maintain cleanliness of the roads;
Regular water sprinkling will be done at least twice a day (i.e. morning and evening)
for dust suppression of the construction site and unpaved roads used by construction
vehicles;
Dust screens will be used and water will be sprinkled around the construction site to
arrest spreading of dust in the air and surrounding areas;
The engines and exhaust systems of all vehicles and equipment used will be
maintained as such, that exhaust emissions are low and do not reach statutory limits
set for the concerned vehicle/equipment type;
Ensuring the availability of valid Pollution Under Control Certificates (PUCC) for all
vehicles used on site.
Operational Phase
Impacts on ambient air, during operation phase, would be;
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 108
1. Flue gases emission due to operation of boiler using natural gas as fuel & use of DG
set of 100 KVA capacity using HSD as fuel.
2. Emission of P2O5 from the reactor.
The purpose of impact predictions on air environment, emission sources can be classified as
point source. Emissions from the above mentioned point sources will be predicted for its
impacts on the Ground Level Concentration (GLC) at various distances using the dispersion
modeling guidelines given by the Central Pollution Control Board, New Delhi and i.e. by
using AERMOD view software.
About the Software
The American Meteorological Society/Environmental Protection Agency Regulatory Model
Improvement Committee (AERMIC) was formed to introduce state-of-the-art modeling
concepts into the EPA's air quality models. Through AERMIC, a modeling system,
AERMOD, was introduced that incorporated air dispersion based on planetary boundary
layer turbulence structure and scaling concepts, including treatment of both surface and
elevated sources, and both simple and complex terrain.
AMS/EPA Regulatory Model (AERMOD) is a steady-state plume model. It is designed to
apply to source releases and meteorological conditions that can be assumed to be steady
over individual modeling periods (typically one hour or less). AERMOD has been designed to
handle the computation of pollutant impacts in both flat and complex terrain within the same
modeling framework. In fact, with the AERMOD structure, there is no need for the
specification of terrain type (flat, simple, or complex) relative to stack height since receptors
at all elevations are handled with the same general methodology. To define the form of the
AERMOD concentration equations, it is necessary to simultaneously discuss the handling of
terrain.
AERMET is an input data processor that is one of the regulatory components of the
AERMOD modeling system. It incorporates air dispersion based on planetary boundary layer
turbulence structure and scaling concepts.
Meteorological Parameters
Surface meteorological data at project site was collected for one year (Oct-Dec, 2018). The
hourly meteorological data considered during this period were:
Wind speed;
Wind Direction;
Ambient atmospheric temperature;
Cloud cover;
Solar insolation;
Relative Humidity
Following parameters were considered for dispersion modeling – Point source:
Quantity of fuel;
Emission rate of pollutants
Stack:
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 109
Internal diameter at top of stack;
Height of stack;
Exit gas velocity;
Exit gas temperature.
Source of Emission
Impacts on ambient air, during operation phase, would be due to emissions from operation
of boiler also during power failure, the set of 100 KVA capacity will be used as power
backup. The fuel will be HSD in DG sets and Natural Gas in Steam boiler. The flue gas
stacks will be considered as point of pollutants‟ emission source.
Further, the P2O5 & NH3 will be emitted from the Reactor. These stacks/Vents emission
source will be considered as point source.
Also, the raeactor vent is attached to two Stage water scrubber. These stacks/vents will be
considered and done air dispersion modeling separately.
The stack details alongwith emission rate of Pollutants are given in Table 4-5 & Table 4-6.
Sta
ck
No.
Stack Attached to
Capacity
Height
(m)
Diameter(m)
Gas Exit
Velocity,
(m/s)
Gas Exit Temp,
oC
Fuel
Natural Gas
Consumption
(SCM/hr)
SO2 Emitte
d (gm/s
ec)
NOx Emitte
d (gm/s
ec)
1 Steam Boiler
0.2 TPH
11 0.30 5 80 Natural
Gas 15
0.00004
0.06
Assumptions
The dispersion modeling assumptions considered are as follows:
The emission rate for PM, SO2 was calculated based on the Specification of Natural
gas as well as the NOx was calculated based on GPCB emission standards.
The emission rate for P2O5 & PM was calculated based on the Natioanl Emission
Standards for Pesticide Manufacturing and Formulation Industry.
The terrain of the study area was considered as FLAT.
Stability class was evaluated based on solar insulation and cloud cover.
The mathematical equations used for the dispersion modeling assumes that the earth
surface acts as a perfect reflector of plume and physic-chemical processes such as
dry and wet deposition and chemical transformation of pollutants are negligible.
Study has been conducted for summer season 1st October – 31st December, 2018. The stack
emission concentrations used for dispersion modeling were taken as per CPCB guidelines.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 110
Table 4-5: Proposed Stack Emission
Stack No.
Stack Attached to
Capacity
Height
(m)
Diameter(m)
Gas Exit
Velocity,
(m/s)
Gas Exit Temp,
oC
Fuel
Natural Gas
Consumption
(SCM/hr)
SO2 Emitte
d (gm/s
ec)
NOx Emitte
d (gm/s
ec)
1 Steam Boiler
0.2 TPH
11 0.30 5 80 Natur
al Gas
15 0.0000
4 0.06
Table 4-6: Proposed Vent Emission & APCM
Vent
No.
Vent Attache
d to
Height
(m)
Diameter(m)
Gas Exit
Velocity, (m/s)
Gas Exit Temp,
oC
Pollutant
Permissible limit
(mg/Nm3)
APCM
Emissoin
(gm/sec)
1 Reactor 11 0.5 3.0 50 P2O5 10
Two Stage Water Scrubb
er
0.00007 (P2O5)
Air Quality Dispersion Modeling
Emission from Flue Gas Stacks
Sulfur Oxide (SO2)
The results of incremental GLC for SO2 for the above mentioned emissions Table 4-5 from
flue gas stacks are provided in Annexure 5. The Isopleth for the same is given as Figure
4-1.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 111
Figure 4-1: Isopleth for Incremental GLC of Oxides of Sulphur (SO2) from Flue Gas Stack
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 112
Oxides of Nitrogen (NOX)
The results of incremental GLC for Oxides of Nitrogen (NOX) for the above mentioned
emissions Table 4-5 from flue gas stacks are provided in Annexure 5. The Isopleth for the
same is given as Figure 4-2.
Figure 4-2: Isopleth for Incremental GLC of Oxides of Nitrogen (NOX) from Flue Gas Stack
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 113
Emission from Vents
Phosphorous Pentoxide (P2O5)
The results of incremental GLC for P2O5 for the above mentioned emissions Table 4-5 from
flue gas stacks are provided in Annexure 5. The Isopleth for the same is given as Figure
4-3.
Figure 4-3: Isopleth for Incremental GLC of P2O5 from Reactor Vent
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 114
Prediction of Incremental GLC of Pollutants on Air Environment
Results
The incremental increase in GLC of SO2, PM , NOx and P2O5 due to consumption of natural
gas for proposed steam boiler and vent attached to Reactor is presented in Table 4-7.
The worst combined environmental situation is predicted as the sum of Maximum monitored
value of a parameter and the incremental GLC at the monitoring location.
Table 4-7: 24 hourly average incremental increase in GLC – Flue gas stacks & vents
S.No.
Name of Village/ Industry
(Distance in km/
Direction)
Pollutant
Maximum Monitored Baseline
Concentration
(µg/m3)
Incremental GLC
(µg/m3) Total Predictive GLC
(µg/m3)
Flue gas
stacks
Process Vents
C1 C2 C3 C4 C5 C6 C7=C4+C5+C6
1 At Prject Site
[-, -]
SO2 17.6 0.003 - 17.603
NOX 23.0 3.42 - 26.42
P2O5 - - 0.007 0.007
2
At Punat
[5.6 Km, ENE direction]
SO2 14.4 0.0001 - 14.4001
NOX 20.6 0.08 - 20.68
P2O5 - - 0.00003 0.00003
3
At Sarigam
[2.0 Km, E direction]
SO2 14.4 0.0002 - 14.4002
NOX 22.8 0.21 - 23.01
P2O5 - - 0.0003 0.0003
4
At Sarai
[4.6 Km, WSW direction]
SO2 15.3 0.0001 - 15.3001
NOX 23.1 0.16 - 23.26
P2O5 - - 0.00031 0.00031
5
At Malav
[6.34 Km, SSE direction]
SO2 14.4 0.0002 - 14.4002
NOX 20.8 0.20 - 21
P2O5 - - 0.00049 0.00049
6
At Fansa
[7.94 Km, NW direction]
SO2 14.4 0.00001 - 14.40001
NOX 20.4 0.02 - 20.42
P2O5 - - 0.00002 0.00002
7
At Pali Karambeli
[8.96 Km, N direction]
SO2 15.4 0.00001 - 15.40001
NOX 21.4 0.01 - 21.41
P2O5 - - 0.00002 0.00002
8
At Chandor
[9.58 Km, NE direction]
SO2 13.8 0.00002 - 13.80002
NOX 20.5 0.02 - 20.52
P2O5 - - 0.00002 0.00002
BDL: Below Detectable Limit
It is observed as follows:
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 115
The maximum 24 hourly average GLC‟s for NOx is observed to be 3.91 µg/m3.
These GLC‟s are expected to occur at a distance of 50 m from the source towards
the SW direction.
The maximum 24 hourly average GLC‟s for P2O5 is observed to be 0.0088 µg/m3.
These GLC‟s are expected to occur at a distance of 10 m from the source towards
the West direction.
The maximum 24 hourly average GLC‟s SO2 for is observed to be 0.0046 µg/m3.
These GLC‟s are expected to occur at a distance of 50 m from the source towards
the SW direction.
The concentration limit for SO2 and NOx in the ambient air, as specified by CPCB is 80
µg/m3, Hence, the predicted impact level due to the operation of Steam Boiler & Vents
attached to Reactor are within the prescribed limits of CPCB for the ambient air quality.
Consequently, ambient air quality due to proposed activities is not expected to cause an
effect on vegetation and human settlements in the vicinity of the operational sites.
Operational & design considerations of the diesel engines with respect to parameters such
as air-fuel ratio, fuel quality and rate of combustion would contribute to reduction / increase
in emission load to the air environment. The level of maintenance of the engines as well as
their make and age will also influence the air emissions. Ensuring that operating conditions
are managed as per standard operating procedures is therefore, of importance.
Mitigation Measures
General Mitigation Measures for Air Quality Control during Operation Phase:
Greenbelt will be developed at the facility.
Attenuation of pollution/protection of receptor through greenbelt/green cover.
Regular monitoring of air pollutant concentrations.
All trucks shall be PUC Certified from time to time.
DG Set will be operated during power failure only.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 116
Potential impacts on Air Environment /Nearby Ambient Air Quality are tabulated in Table 4-8.
Table 4-8: Impact Scoring and Mitigation Measures for Air Environment
S. No.
Project Activity
N/ A
N/
E
sit
uati
on
s
Identified Aspect
Scale of Magnitude (+ve)
& (-ve)
Air
Total Score
Significance / Consequence
Mitigation Measures
AP/AQ
Scale of Importance 7
1 Project Pre- Construction/ Construction
1.2 Excavation and paving of site
N Dust generation 1,2,3,4,5 -1 -7 Low
Regular water sprinkling will be done and Dust mask will be
provided
1.4
Vehicular movement for transportation of construction material
and waste
N Emission of HC
& CO 1,2,3,4,5 -1 -7 Low
Maintaining the speed limit of
vehicle transporting construction
materials. Entry only PUC certified
vehicles
2 Commissioning/ Project Operation
2.1 Reactions Processes
N Emission of
P2O5 1,2,3,4,5 -3 -21 Medium
Two stage water scrubber will be
provided
N
Generation of Phosphine gas reacts with Acid
& water
1,2,3,4,5 -3 -21 Medium Two stage water scrubber will be
provided
3 General & Utilities
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 117
3.1 Operation of D.G Set, Cooling tower, Boiler,
etc. N
Emission of PM, SO2 and NOx from D.G &
Boiler
1,2,3,4,5 -3 -21 Medium Boiler with chimney of adequate height
will be provided
3.5 Green belt
developement N
Reduce air pollution, Noise
1,2,3,4,5 5 35 High Not Applicable
3.8
Vehicular movement for transportation of
raw materials, finished goods and
Industrial Waste
N Emission of HC
& CO 1,2,3,4,5 -3 -21 Medium
PUC Certified vehicles shall be
used
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 118
Environmental Impacts on Construction Phase:
Dust generation during excavation and paving at site.
Emission of HC and CO during Vehicular movement for transportation of construction
material and waste.
Mitigation Measures
Regular monitoring of air pollutant concentrations.
Mainain speed limits of vehicals for transportation of construction works.
All trucks shall be PUC Certified from time to time.
Operational Phase
Environmental Impacts:
Emission of P2O5 during process.
Generation of Phosphine gas reacts with Acid & water during reaction and process.
Emission of PM, SO2 and NOx from operaton of D.G & Boiler
Emission of HC and CO during Vehicular movement for transportation of construction
material and waste.
Mitigation Measures:
Water sprinkling shall be done on the paved/road prior and during unloading. All
transfer point locations would be fully enclosed.
Transportation vehicles will be covered with tarpaulin sheet while transporting
materials.
Use of DG set during emergency only.
Adequate stack height of the chimney will be provided.
Two stage water scrubber will be provided.
Thick Greenbelt development
Dust masks have been/will be provided to workers.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 119
4.1.3 Noise Environment
Operational controls and mitigation measures are provided against noise generating activities is given in Table 4-9.
Table 4-9: Impact Scoring and Mitigation Measures for Noise Environment
S. No.
Project Activity
N/ A
N/
E
sit
uati
on
s
Identified Aspect
Scale of Magnitude (+ve)
& (-ve)
NV
Total Score
Significance / Consequence
Mitigation Measures
Scale of Importance 5
1 Project Pre- Construction/ Construction
1.3
Fabrication work for erecting major plant equipment including
operation of equipment like crane, concrete
mixtures, vibrators etc. and preventive
maintenance work
N Noise generation 1,2,3,4,5 -1 -5 Low
Use of properly certified, tested and
calibrated equipment‟s
1.4
Vehicular movement for transportation of
construction material and waste
N Noise generation 1,2,3,4,5 -1 -5 Low
Well maintained vehicles and properly designed equipment
will be used
3 General & Utilities
3.1 Operation of D.G Set, Cooling tower, Boiler,
etc. N
Noise generation from D.G Set
1,2,3,4,5 -1 -5 Low Accoustic enclosures
would be provided
3.5 Green belt
developement N
Reduce air pollution, Noise
1,2,3,4,5 5 25 Medium Not Applicable
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 120
S. No.
Project Activity
N/ A
N/
E
sit
uati
on
s
Identified Aspect
Scale of Magnitude (+ve)
& (-ve)
NV
Total Score
Significance / Consequence
Mitigation Measures
Scale of Importance 5
3.8
Vehicular movement for transportation of raw
materials, finished goods and Industrial Waste
N Noise generation 1,2,3,4,5 -3 -15 Medium
Well maintained vehicles and properly designed equipment
will be used
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 121
The potential impacts on noise level may arise out of the following:
Construction Phase
Impacts:
Noise generation due to construction activities, Fabrication work, operation of plant
machineries
Impact on environment due to vehicle movement for transportation of materials.
Mitigation Measures:
Provision of ear muffs and ear plugs to prevent noise exposure risk to labourers
working on site.
Avoid high noise generating activity during night-time and their frequency to be
minimized to avoid continuous noise exposure.
Vehicles having PUC certificates will only be allowed to transport materials and
equipment‟s at project site.
Unnecessary horn honking will be avoided and strictly prevented.
Operation Phase
Impacts:
Noise generation form operation of D.G set (in case of emergency only).
Noise generation from Vehicular movement for transportation of raw materials,
finished goods and Industrial Waste.
Mitigation Measures:
D.G set will be used in case of power failure.
PUC Certified vehicles will be used.
Regular maintenance & lubrication of utilities, equipments and vehicles will be carried
out.
Adequate protective measures in the form of ear muffs/ear plugs will be provided to
the workers working in high noise areas.
Tree plantation beside the road area will be carried out.
Development of greenbelt on periphery of plant premises will increase aesthetic view
as well as act as a barrier for noise.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 122
4.1.4 Water Environment
Based on the identified project activities impact on water environment is accessed. Scoring of the same is done and mitigation measures are
prepared based on these scores which are given inTable 4-10.
Table 4-10:Impact Scoring and Mitigation Measures for Water Environment
S. No.
Project Activity
N/ A
N/
E
sit
uati
on
s
Identified Aspect
Scale of Magnitude (+ve) & (-
ve)
Water & Wastewater
Total Score
(Scale of Importance × Scale of
Magnitude)
Significance / Consequence
Mitigation Measures
SW(4)
GW(4)
Effluent (5)
1 Project Pre- Construction/ Construction
1.5
Influx of workers during
construction phase
N Sewage
generation 1,2,3,4,5 -1 -5 Low
Sewage would be disposed in septic tank
2 Commissioning/ Project Operation
2.1 Reactions Processes
N Waste Water
Generation 1,2,3,4,5 -3 -3 -27 Medium
Effluent will be treated in proposed ETP
3 General & Utilities
3.1
Operation of D.G Set, Cooling tower, Boiler,
etc.
N
Generation of waste
water from Cooling and Boiler Blow
Down
1,2,3,4,5 -3 -3 -27 Medium Effluent will be treated in
proposed ETP
3.2 Equipment and Floor Washing
N Generation
of waste water
1,2,3,4,5 -3 -15 Medium Effluent will be treated in
proposed ETP
3.3 Operation of ETP N Waste Water
1,2,3,4,5 -3 -3 -27 Medium Treated water from ETP
will be utilized for
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 123
Generation scrubbing
3.4 Influx of workers
operational phase
N Sewage
generation 1,2,3,4,5 -3 -3 -27 Medium
Sewage would be disposed in septic tank
3.9
Raw water intake for Plant
Operation and Domestic Uses
N Consumption of water
1,2,3,4,5 -4 -16 Medium
RWH practices to reduce fresh water
consumption. Check water consumption through flow meters
3.10 Storm water management
AN
Mixing of process
drains with rainwater
1,2,3,4,5 -3 -2 -20 Medium
Separate drain for storm water with parapet wall and bumps. First rain
water will be reuse in the process
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 124
A number of sources from proposed project can cause potential impacts on water
environment which includes groundwater, surface water and effluent generation:
Construction Phase:
Impacts:
Sewage and domestic waste generation due to Influx of workers which will be is/ will
be disposed in STP.
Untreated sewage from construction area may have negative impact.
Mitigation Measures suggested:
Generated sewage is/ will be disposed of into Septic tank via soak pit
Proper Sanitation facility will be developed for construction workers.
Operational Phase
Impacts:
Waste water generation from manufacturing activities.
Generation of waste water from Cooling and Boiler Blow Down.
Generation of waste water from operation of ETP and floor washing.
Sewage generation from influx of workers.
Consumption of water for process and domestic uses.
Mixing of plant drain with rainwater during rainfall.
Mitigation Measures suggested:
Waste water will be treated into ETP and treated water from ETP will be utilized for
scrubbing.
Generated sewage is/ will be disposed of into Septic tank via soak pit.
Reuse of waste water and RWH practices to reduce fresh water consumption. Check
water consumption through flow meters
Separate drain for storm water, Management will be proposed to avoid run off
contamination.
.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 125
4.1.5 Solid and Hazardous Waste Management
Based on the identified project activities impact due to Waste generation is access. Scoring of the same is done and mitigation measures are
prepared based on these scores which are given in Table 4-11.
Table 4-11: Impact Scoring and Mitigation Measures for Solid and Hazardous Waste Management
S. No.
Project Activity
N/ A
N/
E
sit
uati
on
s
Identified Aspect
Scale of Magnitude
(+ve) & (-ve)
Waste Generation
Total Score
Significance / Consequence
Mitigation Measures
HW
(8)
C&D
(4)
SW
(4)
(Scale of Importance × Scale of
Magnitude)
1 Project Pre- Construction/ Construction
1.2 Excavation and paving of site N Generation of
debris 1,2,3,4,5 -1
-4 Low
Debris will be reused in filling low lying
area
1.3
Fabrication work for erecting major plant equipment including operation of
equipment like crane, concrete mixtures, vibrators etc. and
preventive maintenance work
N Generation of
scraps 1,2,3,4,5 -1 -4 Low
Scraps will be handled as per rules
and sold to authorized
vendors
2 Commissioning/ Project Operation
2.1 Reactions Processes N Spillage and
Leakage of Raw Material/ Prduct
1,2,3,4,5 -1 -8 Low Paved area will be
provided
3 General & Utilities
3.3 Operation of ETP N Generation of ETP
waste 1,2,3,4,5 -3 -24 Medium
ETP sludge will be disposed at TSDF
Site
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 126
S. No.
Project Activity
N/ A
N/
E
sit
uati
on
s
Identified Aspect
Scale of Magnitude
(+ve) & (-ve)
Waste Generation
Total Score
Significance / Consequence
Mitigation Measures
HW
(8)
C&D
(4)
SW
(4)
(Scale of Importance × Scale of
Magnitude)
3.7 Loading and Unloading of chemicals, products etc.
N
Generation of Waste
Drums/Barrels/bags and containers
1,2,3,4,5 -3 -24 Medium
Waste Drums/Barrels/bags and containers will be handed over to authorized recycler
3.8 Equipment maintenance N Generation of used oil and lubricants
1,2,3,4,5 -2 -16 Medium
Used oil and lubricants will be handed over to
authorized recycler
3.9 Equipment maintenance N Generation of
scraps and used spares etc.
1,2,3,4,5
-1 -4 Low
Scraps will be handled as per rules
and sold to authorized
vendors
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 127
A number of sources in production of proposed product can cause generation of Solid and
Hazardous waste:
Construction Phase:
Impact:
Generation of scrap during febrication activities.
Generation of debris during construction activities
Mitigation measure:
Generated scraps will be handled as per rules and sold to authorized vendors
Daily collection of waste will be carried out and composting of this waste will used as
manure for greenbelt and vegetable farms development.
Operation Phase:
Impact:
Generation of Waste Drums/Barrels/bags and containers from loadinhg and
unloading of chemicals.
Spillage and leakages of raw materials and products from manufacturing process.
Generation of ETP waste from operation of ETP.
Sewage generation from influx of workers.
Generation of used oil, lubricants, scraps and used spares etc. from equipment
maintenance.
Mitigation measure:
Waste Drums/Barrels/bags and containers will be handed over to authorized recycler
Used oil and lubricants will be handed over to authorized recycler
Scraps will be handled as per rules and sold to authorized vendors
Proper sanitation and disposal of sewage sludge will be carried out
Scraps will be handled as per rules and sold to authorized vendors
4.1.6 IMPACTS ON LAND ENVIRONMENT
Scoring of the same is done and mitigation measures are prepared based on these scores
which are given in Table 4-12.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 128
Table 4-12: Impact Scoring and Mitigation Measures for Land Environment
Environmental Components
S. No.
Project Activity
N/ A
N/
E
sit
uati
on
s
Identified Aspect
Scale of Magnitude
(+ve) & (-ve)
Land Environment and Natural Resource
Total Score(Scale of Importance ×
Scale of Magnitude)
Significance / Consequence
Mitigation Measures
LU/ LC
(1)
Soil
(3)
Resources
(8)
Land Environment and Natural Resource
1.1 Site clearance N
Removal of top soil &
Land clearence
1,2,3,4,5 0 -1 -3 Low
Top soil will be stacked seprately
and will be used for
plantation.
2.1 Reactions Processes
N
Spillage and Leakage of
Raw Material/ Prduct
1,2,3,4,5 0 -1 -3 Low Paved area
will be provided
3.9
Raw water intake for Plant Operation and Domestic Uses
N Consumption
of water 1,2,3,4,5 0 -4 -32 High
RWH practices to
reduce fresh water consumptio
n. Check water
consumption through
flow meters
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 129
A number of sources can cause potential impacts on Land: LU/LC, Soil and HG
environments. Based on the identified project activities, impact is accessed.
Construction Phase:
Impacts:
Removal of top soil and land clearance during site clearance.
Mitigation Measures Suggested:
Top soil will be stacked seprately and will be used for plantation.
Operation Phase:
Impacts:
Contamination of soil due to generation of used oil from utility and spillage and leakage of raw material/product from manufacturing process.
Consuptoin of water due to Raw water intake for Plant Operation and Domestic Uses
Mitigation Measures Suggested:
Raw material will be handled, stored and transported as per manufacture, storage and import as per Hazardous Waste (Management, Handling and Transboundary Movement) Rules, 2016.
Impervious flooring will be provided.
RWH practices to reduce fresh water consumption. Check water consumption through flow meters
4.1.7 Ecology & Biodiversity Environment
Operational controls and mitigation measures are provided against activities identified
having impacts on Ecology & Biodiversity Environment are given in Table 4-13.
Table 4-13: Impact Scoring and Mitigation Measures for Ecology& Biodiversity
S. No.
Project Activity
N/ A
N/
E s
itu
ati
on
s
Identified
Aspect
Scale of Magnitude (+ve) & (-ve)
Ecology & Biodiversit
y
Total Score
(Scale of Importan
ce × Scale of
Magnitude)
Significance /
Consequence
Mitigation
Measures
Ter.
(2)
Aqu.
(3)
2.1 Reactions Processes
N Emission
of P2O5 1,2,3,4,5 -2 -4 Low
Two stage water
scrubber will be
installed with 11m
high Stack
3.8
Vehicular movement
for transportation of raw
N Emission of HC &
CO 1,2,3,4,5 -2 -4 Low
Only Vehicles with valid PUC will
be
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 130
S. No.
Project Activity
N/ A
N/
E s
itu
ati
on
s
Identified
Aspect
Scale of Magnitude (+ve) & (-ve)
Ecology & Biodiversit
y
Total Score
(Scale of Importan
ce × Scale of
Magnitude)
Significance /
Consequence
Mitigation
Measures
Ter.
(2)
Aqu.
(3)
materials, finished
goods and Industrial
Waste
allowed
3.10
Storm water management
AN
Mixing of process drains with
rainwater
1,2,3,4,5 -2 -3 -13 Medium
Separate drain for
storm water with
parapet wall and bumps.
First rain water will be reuse
in the process
A number of sources in production of proposed product can cause impact on Ecology and
Biodiversity.
Operation Phase:
Impact:
Emission of P2O5 from manufacturing process.
Emission of HC and CO from Vehicular movement for transportation of raw materials,
finished goods and Industrial Waste
Mixing of process drains with rainwater
Mitigation Measure:
Scrubbing systems with adequate stack height will be provided for reduction of
process emission.
Only Vehicles with valid PUC will be allowed
Separate drain for storm water with parapet wall and bumps. First rain water will be
reuse in the process
Local species will be planed as per soil conditions; regular maintenance of greenbelt
is being/will be done.
4.1.8 Socio Economic
The manpower requirement for the proposed project activity will be expected to generate
some secondary jobs for the operation and maintenance. This will temporarily increase the
employment opportunity. Secondary jobs shall also bound to be generated to provide day-to-
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 131
day needs and services to the work force. This will also temporarily increase the demand for
essential daily utilities in the local market.
The proposed activities shall generate indirect employment in the region due to the
requirement of workers in trail making, supply of raw material, auxiliary and ancillary works,
which would marginally improve the economic status of the people. The activities would
result in an increase in local skill levels through exposure to activities.
Occupational Health
During construction period, periodic check-ups of all the employees shall be done regularly.
Workers will be provided with basic amenities like safe water supply, low cost sanitation
facilities, first aid, required personal protective equipment, etc.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 132
Table 4-14: Impact Scoring and Mitigation Measures for Socio Economic
S. No.
Project Activity
N/ A
N/
E
sit
uati
on
s
Identified Aspect
Scale of Magnitude
(+ve) & (-ve)
Social Total Score
(Scale of Importance ×
Scale of Magnitude)
Significance / Consequence
Mitigation Measures
Infra.
(6)
Economic
(9)
1.4
Vehicular movement for
transportation of construction
material and waste
N Increase in traffic load
1,2,3,4,5 -1 -6 Low
Transportation trips will be scheduled
appropriately
1.5 Influx of workers
during construction phase
N Employme
nt generation
1,2,3,4,5 2 18 Medium Not Applicable
2.2 Export of Product N Increase in
market scenario
1,2,3,4,5 5 45 High Not Applicable
3.4 Influx of workers
operational phase N
Employment
Generation 1,2,3,4,5 5 45 High Not Applicable
3.6 Socio Economic
improvement N
CER Activity
1,2,3,4,5 5 45 High Not Applicable
3.8
Vehicular movement for
transportation of raw materials,
finished goods and Industrial Waste
N Increase in traffic load
1,2,3,4,5 -3 -18 Medium
Transportation trips will be scheduled
appropriately
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 133
4.1.9 Health and safety (RH)
Identified having impacts on Health and safety are given in Table 4-15.
Table 4-15: Impact Scoring and Mitigation Measures for Health and safety
S. No.
Project Activity
N
/ A
N/
E
sit
uati
on
s
Identified Aspect
Scale of Magnitude
(+ve) & (-ve)
Health &
Safety
Total Score
(Scale of Importance × Scale of Magnitude)
Significance / Consequence
Mitigation Measures
6
1.2 Excavation and paving of site
N Dust
generation 1,2,3,4,5 -1 -6 Low
Regular water sprinkling will be done and Dust mask will be
provided
AN Fall in pit, land
sliding from sidewalls
1,2,3,4,5 -2 -12 Medium Appropriate benches will be
provided for safe movement and PPEs will be provided to workers
1.4
Vehicular movement for
transportation of construction
material and waste
N Increase in traffic load
1,2,3,4,5 -1 -6 Low Transportation trips will be scheduled appropriately
N Emission of HC & CO
1,2,3,4,5 -1 -6 Low
Maintaining the speed limit of vehicle transporting construction
materials. Entry only PUC certified vehicles
N Noise
generation 1,2,3,4,5 -1 -6 Low
Well maintained vehicles and properly designed equipment will
be used
2.1 Reactions Processes
N Emission of
P2O5 1,2,3,4,5 -2 -12 Medium
Two stage water scrubber will be provided
N
Spillage and Leakage of
Raw Material/ Prduct
1,2,3,4,5 -1 -6 Low Paved area will be provided
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 134
S. No.
Project Activity
N/ A
N/
E
sit
uati
on
s
Identified Aspect
Scale of Magnitude
(+ve) & (-ve)
Health &
Safety
Total Score
(Scale of Importance × Scale of Magnitude)
Significance / Consequence
Mitigation Measures
6
N
Generation of Phosphine gas
reacts with Acid & water
1,2,3,4,5 -3 -18 Medium
Keep away from heat, hot surfaces, sparks, open flames and
other ignition sources. No smoking. Use only non-sparking
tools.
Select eye protection in accordance with OSHA 29 CFR
1910.133.
3.8
Vehicular movement for
transportation of raw materials, finished goods and Industrial
Waste
N Emission of HC & CO
1,2,3,4,5 -3 -18 Medium Appropriate benches will be
provided for safe movement and PPEs will be provided to workers
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 135
A number of sources in production of proposed product can cause impact on Risk and
hazards.
Construction Phase:
Impact:
Generation of dust and impact on human health during site clearance
Chances of accident during vehicle movement.
Emission of HC and CO due to vehicular movement.
Generated noise during vehicular movement.
Mitigation Measure:
Well trained, licensed and certified motor vehicle driver is being/will be given job for transportation.
Maintaining the speed limit of vehicle transporting construction materials. Entry only PUC certified vehicles
All transportation within the main working will be carried out directly under the supervision and control of the management.
PPE„s are being/will be provided to workers.
Operation Phase:
Impact:
Emission of P2O5 due to manufacturing process.
Chances of accident to workers due to spillage, during handling of raw materials.
Generation of Phosphine gas reacts with Acid & water
Emission of HC & CO during vehicular movement for transportation of raw materials and finished goods.
Mitigation Measure:
Two stage water scrubber will be provided for the control of Emission of P2O5.
Paved area will be provided for Spillage and Leakage of Raw Material/ Prduct
Standard operating procedure is in place and is being/will be strictly followed by workers.
PPE„s are being/will be provided to workers.
Appropriate benches will be provided for safe movement and PPEs will be provided to workers
Preventive maintenance of mechanical equipments will be done periodically.
Safety training is being/will be provided to workers.
4.2 IMPACT ON TRAFFIC
From the proposed facility, approximately on daily basis 5 trucks per day carrying chemicals
other waste shall be using the state highway 185 and National Highway-8 Employees and
contract workers (~ 5 cars, 10 two wheelers & 15 cycles) shall use the same route during
peak hours (i.e. morning 0800 hours to 1030 hours and evening 1600 hours to 2000 hours).
As per the Traffic scenarios considered with respect to the LOS value, the Capacity of
existing roads indicates that the performance of NH-8 is very good and is sufficient to
support the additional traffic load. Hence there will be minimum impact on the existing
Traffic.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 4 136
Impacts
Increase in transportation will lead to increase in road traffic.
Dispersion of dust and particulate matters from open truck
Emission of pollutants like HC, SO2, CO, CO2.
Noise generation from vehicular movement.
Spillage or leak of materials during transportation.
Mitigation measures
The trucks transporting materials will be covered.
It will be assured that vehicles are PUC certified.
Adequate measures will be taken to avoid spillage or leak of raw material and drivers
will be instructed to control leakages and collection of spilled material.
Ensuring the availability of valid Pollution under Control Certificates (PUCC) for all
vehicles used on site.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 5 137
5 ANALYSIS OF ALTERNATIVES
5.1 SITE ALTERNATIVES
The Proposed unit will be located within GIDC Sarigam which has all the ancillary facilities
required for the project and is well connected through National Highways, State Highways
and Railway Networks
Following are additional benefits for site selection:
Availability of internal infrastructure
Connectivity for transportation of material
Availability of skilled manpower
Availability of utilities like water, power
Good hold on local market
Considering the above stated benefits, the site is considered as most suitable.
5.2 TECHNOLOGY ALTERNATIVES
The manufacturing process/ technology selected is simple, cost effective and has less
negative impact to environment and resources.
During EIA study some alternatives for technology and other parameters were considered
and are discussed below:
Alternative of site and technology are evaluated and provided in Table 5-1.
Table 5-1: Alternative for technology and other parameter
Sr. no Site Particular Option 1-
Existing
site
Option 2 –
Alternative
site
Option – 1
Suitable
Option – 2
Suitable
1 Land Available To purchase
new
Yes No
2 Cost No cost as
it is owned
Involve huge
cost
Yes No
3 Internal
infrastructure,
roads,
buildings and
Already well
developed
To be
developed
will have
cost and time
Yes No
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 5 138
utilities factors.
4 Other
information in
the area
Available Available Yes Yes
5 Availability of
labour
Available Available Yes Yes
6 Manufacturing
facility
Facilities
available
New
construction
&
development
Yes No
7 Finished
goods
customers
Developed
in vicinity
To be
develop
Yes No
With reference to above table for propesd project we are selecting option 1 forsite selection.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700035 Chapter 6 139
6 ENVIRONMENTAL MONITORING PROGRAM
In order to measure effectiveness of mitigation measures, technical aspects like
measurement methodologies, frequency, location, data analysis, reporting schedules,
emergency procedures & procurement schedules are covered in this chapter along with
detailed budget.
6.1 ENVIRONMENTAL MONITORING PROGRAM
Technical aspects of Environmental Monitoring for air, water, noise and land environment
are summarized in tabulated form as follows:
6.1.1 Air Environment
Detailed environmental monitoring program for air environment is given in Table 6-1.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 6 140
Table 6-1: Environmental Monitoring Program for Air Environment
Environmental Components
Project Activity
Identified Aspect Mitigation Measured
Implementation and Management
Data Analysis
Measurement Methodology
Frequency Location Reporting Schedule/
Responsibility
Air
Excavation and paving of
site Dust generation
Regular water sprinkling will be done and Dust mask will
be provided SPM
PM Gravimetric
IS:5182 (Part 23) 2006
Once a season
(Excluding rainy
season)
At site EHS Manager,
Safety Officer
Vehicular movement for transportation
of construction material and
waste
Emission of HC & CO
Maintaining the speed limit of vehicle transporting
construction materials. Entry only PUC certified vehicles
PM10 PM2.5,
Sox
PM10-Gravimetric
IS:5182 (Part 23) 2006 PM2.5-
Gravimetric IS:5182
Once a season
(Excluding rainy
season)
At site
EHS Manager,
Plant head
Reactions Processes
Emission of P2O5 Two srage water scrubber will
be provided
Principal parameters and methodology will be
followed as per IS method
Once a season
(Excluding rainy
season)
Process Stack
EHS Manager,
Utility supervisor
Operation of D.G Set,
Cooling tower, Boiler, etc.
Emission of PM, SO2 and NOx from
D.G & Boiler
Boiler with chimney of adequate height will be
provided
SO2 & NOx in stack of Boiler
Stack monitoring by
Isokinetic sampling IS:11255
During operation of Boiler
Flue gas stack
EHS Manager,
Utility
supervisor
PM10, PM2.5, SOx,
NOx in ambient air and within
PM10-Gravimetric
IS:5182 (Part 23) 2006
Once a season
(Excluding rainy
season)
At 2 locations (site and village in
downwind)
EHS Manager,
Utility
supervisor PM2.5-Gravimetric
IS:5182
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 6 141
Environmental Components
Project Activity
Identified Aspect Mitigation Measured
Implementation and Management
Data Analysis
Measurement Methodology
Frequency Location Reporting Schedule/
Responsibility
plant premise
SO2: Colorimetric IS:5182 (Part
II) 2001
NOx: Colorimetric IS:5182 (Part
VI) 2006
Vehicular movement for transportation
of raw materials, finished
goods and Industrial
Waste
Emission of HC & CO
PUC Certified vehicles shall be used
PM10 PM2.5,
Sox
PM10-Gravimetric
IS:5182 (Part 23) 2006 PM2.5-
Gravimetric IS:5182
Once a season
(Excluding rainy
season)
At site
Maintenance in-charge,
Purchase department,
Safety Officer
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 6 142
6.1.2 Noise Environment
Detailed environmental monitoring program for noise environment is given in Table 6-2.
Table 6-2: Environment Monitoring Program for Noise Environment
Environmental Components
Project Activity Identified Aspect
Mitigation Measured
Implementation and Management
Data Analysis
Measurement Methodology
Frequency Location
Reporting Schedule/
Responsibility
Noise
Fabrication work for erecting major plant equipment including operation of equipment like crane,
concrete mixtures, vibrators etc. and preventive maintenance work
Noise generation
Use of properly certified, tested and
calibrated equipment‟s
Leq Levels for Day and
night time
ISLM 100
Once a season
(Excluding rainy
season)
At site
Maintenance in-charge,
Purchase department
Vehicular movement for transportation of construction
material and waste
Noise generation
Well maintained vehicles and properly designed equipment
will be used
Leq Levels for Day and
night time
ISLM 100
Once a season
(Excluding rainy
season)
At site
EHS Manager,
Safety Officer
Operation of D.G Set, Cooling tower, Boiler, etc.
Noise generation from D.G
Set
Accoustic enclosures would be provided
Leq Levels for Day and
night time
ISLM 100
Once a season
(Excluding rainy
season)
At site
EHS Manager,
Maintenance in-charge,
Purchase department
Vehicular movement for transportation of raw
materials, finished goods and Industrial Waste
Noise generation
Well maintained vehicles and properly designed equipment
will be used
Leq Levels for Day and
night time
ISLM 100
Once a season
(Excluding rainy
season)
At site
EHS Manager,
Safety Officer
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 6 143
6.1.3 Water Environment
Detailed environmental monitoring program for water environment is given in Table 6-3.
Table 6-3: Environmental Monitoring Program for Water Environment
Environmental Components
Project Activity
Identified Aspect Mitigation Measured
Implementation and Management
Data Analysis
Measurement Methodology
Frequency Location Reporting Schedule/
Responsibility
Water and Wastewater
Reactions Processes
Waste Water Generation
Effluent will be treated in proposed ETP
Inlet and outlet characteristics as per consent condition and Methodology will be
followed as per IS method.
Once a season
(Excluding rainy
season)
At ETP
EHS Manager,
Design head
Operation of D.G Set,
Cooling tower, Boiler, etc.
Generation of waste water from Cooling
and Boiler Blow Down
Effluent will be treated in proposed ETP
Equipment and Floor Washing
Generation of waste water
Effluent will be treated in proposed ETP
Operation of ETP
Waste Water Generation
Treated water from ETP will be utilized for scrubbing
Storm water management
Mixing of process drains with rainwater
Separate drain for storm water with parapet wall and bumps. First rain water will be reuse in
the process
Principal parameters and methodology will be
followed as per IS method
Once a season
(Excluding rainy
season)
At site ETP In charge / Third Party
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 6 144
6.1.4 Land Environment and Solid and Hazardous Waste Management
Detailed environmental monitoring program for Land Environment and Solid Waste, Construction Waste and Hazardous waste is given in Table
6-4.
Table 6-4: Land Environment and Solid and Hazardous Waste Management
Environmental Components
Project Activity Identified Aspect Mitigation Measured
Implementation and Management
Data Analysis
Measurement Methodology
Frequency Location Reporting Schedule/
Responsibility
Land Environment
Excavation and paving of site
Generation of debris
Debris will be reused in filling low lying area
Quantity of debris
Approximation Daily At site
EHS Manager,
Civil supervisor
Fabrication work for erecting major plant equipment including
operation of equipment like crane, concrete
mixtures, vibrators etc. and preventive maintenance work
Generation of scraps
Scraps will be handled as per rules and sold to authorized vendors
Quantity of scraps
Record of quantity
generated Daily At site
EHS Manager,
Procurement
head
Reactions Processes
Spillage and Leakage of Raw Material/ Prduct
Paved area will be provided
Quantity of Waste
Approximation Daily At site
EHS Manager,
Procurement
head
Operation of ETP Generation of ETP
waste ETP sludge will be
disposed at TSDF Site Quantity of Waste
Record of quantity
generated Daily At site EHS Manager
Loading and Unloading of
chemicals, products etc.
Generation of Waste
Drums/Barrels/bags and containers
Waste Drums/Barrels/bags
and containers will be handed over to
authorized recycler
Quantity of Waste
Record of quantity
generated Daily At site
Procurement head
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 6 145
Environmental Components
Project Activity Identified Aspect Mitigation Measured
Implementation and Management
Data Analysis
Measurement Methodology
Frequency Location Reporting Schedule/
Responsibility
Equipment maintenance
Generation of used oil and lubricants
Used oil and lubricants will be handed over to
authorized recycler
Quantity of Waste
Record of quantity
generated Daily At site
EHS Manager,
Maintenance
in-charge
Equipment maintenance
Generation of scraps and used
spares etc.
Scraps will be handled as per rules and sold to authorized vendors
Quantity of Waste
Record of quantity
generated Daily At site EHS Manager
Site clearance Removal of top soil & Land clearence
Top soil will be stacked seprately and
will be used for plantation.
Quantity of Soil
Approximation Daily At site
EHS Manager,
Civil supervisor
Reactions Processes
Spillage and Leakage of Raw Material/ Prduct
Paved area will be provided
Quantity of Waste
Approximation Daily At site Civil supervisor
6.1.5 Ecology & Biodiversity Environment
Detailed environmental monitoring program for Ecology and Biodiversity is given in Table 6-5.
Table 6-5: Manamgeent of Ecology and biodiversity Envieoronment
Environmental Components
Project Activity
Identified Aspect Mitigation Measured
Implementation and Management
Data Analysis
Measurement Methodology
Frequency Location Reporting Schedule/
Responsibility
Ecology and Biodiversity
Reactions Processes
Emission of P2O5 Two stage water scrubber will
be installed with 11m high Stack
Principal parameters and methodology will be
followed as per IS method
Once a season
(Excluding rainy
season)
Process Stack
EHS Manager
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 6 146
Vehicular movement for transportation
of raw materials,
finished goods and Industrial
Waste
Emission of HC & CO
Only Vehicles with valid PUC will be allowed
PM10 PM2.5,
Sox
PM10-Gravimetric
IS:5182 (Part 23) 2006 PM2.5-
Gravimetric IS:5182
Once a season
(Excluding rainy
season)
At site EHS Manager
Storm water management
Mixing of process drains with rainwater
Separate drain for storm water with parapet wall and bumps. First rain water will be reuse in
the process
Principal parameters and methodology will be
followed as per IS method
Once a season
(Excluding rainy
season)
At site EHS Manager
6.1.6 Traffic Management Plan
An efficient traffic management program will be developed to ensure smooth and congestion free traffic movement on nearby state highway and
from Plant. This plan will be as shown in Table 6-6.
Table 6-6: Traffic Monitoring Program
Impacting Activity Mitigation Measures
Data Analysis Measurement Methodology
Frequency Location Reporting Schedule/
Responsibility
Emergency Procedure
Procurement Schedule
Vehicular movement for
transportation of material and waste during construction
phase
Controlled vehicular
movement clearly
demarcated entry/exit
with adequate supervision
Records number of
trucks/tanker entry/exit
Manual
Throughout construction
and operation phase
Entry and exit gates
Security In-charge
Route for safe exit will be in place
During construction
and operation phase
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 6 147
6.2 SOCIO ECONOMIC
6.2.1 Social Welfare & Upliftment Plan
The company also proposes to carry out social welfare activities for the welfare of local
community. The company has proposed a detailed Corporate Environment Responsibility
(CER) Plan. Under this plan, the proponent has allocated a budget of Rs. 12 lakhs to be
spent within a span of 5 years in nearby villages like Punat, Sarai, Malav, Chandor and
Sarigam villages etc. Activities under the following areas have been identified and shall be
carried out:
Education and Youth Development
Infrastructure Development
Miscellaneous activities
Social – Awareness
Health – Awareness
Corporate Environment Responsibility (CER)
As per latest OM No. F. No.22-65/2017-IA, dated 1st May, 2018, the fund allocation for the
CER is Rs. 12 lakhs (2% of Additional Capital Investment of Rs. 6 crore for undertaking the
Socio Economic development activities. Budget with break up for initial three years is
provided in Table 6-7.
Table 6-7: Budget Break-up for CER Activities of 5 years
S. No.
Planned activities under CER as
per specific needs at nearest
villages
Budget (Rs. Lakhs)
1st
year 2nd
year 3rd
year 4th
year 5th
Year
Total (19-20) (20-21) (21-22) (22-23) (23-24)
Sarigam Village at 2.0 km/ E
1
Augmentation of furniture,
blackboard, repair work, etc. in village
schools
70,000 70,000 50,000 50,000 50,000 290,000
Punat Village at 5.6 km/ NEE
2 School uniform and
scholarship to students
40,000 20,000 10,000 10,000 10,000 90,000
3 Drinking water 50,000 25,000 25,000 20,000 20,000 140,000
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 6 148
Sarai Village at 4.6 km/ WSW
4 Providing toilets in villages -Swatch Bharat Abhiyan
100,000 80,000 80,000 50,000 50,000 360,000
5
Desilting of village ponds & water
awareness program
20,000 15,000 15,000 10,000 10,000 70,000
Malav Village at 6.34 km/ SSE
6
Awareness camp for local farmers to increase yield and provide seedlings
20,000 20,000 20,000 20,000 20,000 100,000
Chandor Village 9.58 km/ NE
7 Community plantation
10,000 10,000 10,000 10,000 10,000 50,000
8 Provide medical health checkup
camp 20,000 20,000 20,000 20,000 20,000 100,000
Grand Total 330,000 260,000 230,000 190,000 190,000 1,200,000
6.2.2 Environmental Monitoring and Management Cost
Above mentioned monitoring program and cost can be summarized as tabulated in Table
6-8.
Table 6-8: Summary of Environmental Monitoring Program
S. No.
Particular Parameter for Monitoring Frequency of Monitoring
1 Ambient Air Quality Monitoring PM10, PM2.5. SO2, NOx Once a season (Excluding rainy
season)
2 Flue Stack Emission Monitoring SO2, NOx & PM in stack of Boiler Once a season (Excluding rainy
season)
3 Process Stack Emission Monitoring Principal parameters and
methodology will be followed as per IS method
Once a season (Excluding rainy
season)
4 Water Quality pH, TDS, SS, COD, BOD, Oil &
grease & Chlorides
Once a season (Excluding rainy
season)
5 Ambient Noise Monitoring Leq Levels for Day and night time Once a season (Excluding rainy
season)
6 Solid/Hazardous Waste generation
Records of quantity of generation, handling, storage and transportation
(disposal) of solid and hazardous waste will be maintained.
Daily
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 6 149
S. No.
Particular Parameter for Monitoring Frequency of Monitoring
7 Occupational Health Checkup
Pre-employment and periodical health checkup for eye test, lung
test, hearing capacity, skin test, step test and other test in respect of air borne concentration of hazardous
chemicals in ppm etc. of every employee.
Annually
8 Greenbelt Development Number of plantation (Units),
Number of Survived Plants/ Trees, Number of Poor plant/ Trees
Annually
9 Safety Audit Incedent/ Accident Record Annually
10 Compliance of EC conditions Submission of 6 monthly compliance
reports Half-Yearly
Monitoring of the above parameters will carried out to assess the performance of pollution
control equipment‟s installed to achieve the statutory norms. In case emissions/pollutant will
found to exceed the norms, the „on duty‟ personnel will check the relevant parameters and
take appropriate corrective actions. A record of corrective and preventive action will be
maintained as per requirement.
Expenditure to be incurred by Integrated chemisol on environmental management system is
tabulated in Table 6-9 and Table 6-10.
Table 6-9: Capital Cost for Environmental Management System
S. No. Component Capital Cost (INR)
1 Air Pollution Control 5,00,000
2 ETP 2,50,000
3 Solid / Hazardous Waste Management 75,000
4 Safety and Occupational Health Management 1,00,000
5 Greenbelt Development 75,000
Total 10,00,000
Table 6-10: Recurring/operating Cost Per Annum Environmental & Safety Management System
S. No.
Component Recurring Cost per
Annum (INR)
1 Air Pollution Control 1,00,000
2 ETP 1,00,000
3 Solid / Hazardous Waste Management 50,000
4 Safety and Occupational Health Management 75,000
Greenbelt Development 25,000
5 Environmental Monitoring 50,000
6 EC Complaince 1,00,000
Total 5,00,000
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 7 150
7 ADDITIONAL STUDIES
7.1 PUBLIC CONSULTATION
Since the proposed project is located in Notified Industrial Estate Public Consultation is not
applicable. Letter regarding location of unit in notified Industrial Estate of Sarigam is
attached as Annexure 3.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 7 151
7.2 RISK ASSESSMENT
This chapter includes a brief description of Risk & Hazard study.
Integrated Chemisol Pvt. Ltd. proposes to establishe green field Technical grade pesticides
manufacture plant for Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide
Technical locted at Plot No. 4924, Notified Industrial Area, GIDC Sarigam, District - Valsad,
Gujarat shall handle chemicals, some of which are hazardous in nature by virtue of their
intrinsic chemical properties or their operating temperatures or pressures or a combination of
them. Fire, toxic release or combinations of them are the hazards associated with industrial
plants using hazardous chemicals. More comprehensive, systematic and sophisticated
methods of Safety Engineering, such as, Hazard Analysis and Qualitative/Quantitative Risk
Assessment have been developed to improve upon the integrity, reliability and safety of
industrial plants, the same has been discussed in detail under their respective headings.
Scope of Study
Compliance of TOR
Hazard Identification
Risk Management
Disaster management Plan
Methodology:
The steps involved in risk assessement methodology are as follows:
1. Hazard identification by studing the information on plant location, layout of the
equipment & process condition;
2. Hazard assessment by qualitative risk analysis and quantitative risk analysis.
Quantification of Hazard involves selection of most credible scenario or wort case
scenario; Eastimate consequences scenarios in the plant such as fire, explosion and
toxic effect; Eastimate frequence of occurance of any incident is to be found out by
reliability analysis;
3. Prioritize and Reduce Risk by providing control / mitigation measures;
4. Preparing disaster management plan to face any accident and disaster caused by
the project operations.
7.3 Hazard identification
7.3.1 Storage Details & Layout
Total Plant area 2351.25 m2 having storage area is provided for storage of Raw material
and Finished Product. The storage condition of liquid acid tanks is given in Table 7-1.
Table 7-1: Chemical Storage Details
Sr.No. Products Storage Condition
Temperature Pressure
1 Phosphorus Ambient Atmospheric
2 Aluminium Powder Ambient Atmospheric
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 7 152
Sr.No. Products Storage Condition
Temperature Pressure
3 Graphite Powder Ambient Atmospheric
4 Paraffin Wax Ambient Atmospheric
5 Zinc Powder Ambient Atmospheric
6 Red Phosphorous Ambient Atmospheric
7 Magnesium Oxide Ambient Atmospheric
8 Magnesium Phosphide Ambient Atmospheric
7.3.2 Layout map
The storage facilities for the raw material and finshed goods have been shown in the layout
map as shown in Map 7-1.
Map 7-1: Layout Plan Showing Storage Facilities
7.3.3 Chemical Properies
The information on the hazardouse properties from MSDS of the chemicals handled at the
site has been reviewed to identify the associated hazards. The Physico-chemical properties
of various chemicals are listed along with relevant hazard as per given in Table 7-2.
Table 7-2: Physico-chemical properties of Chemicals
SN Name of Chemical Storage Facility / Packing
Storage of Chemical
(MT/M)
Flash Point 0C
Storage condition
1 Phosphorus MS Barrel 50 MT < 20℃ NTP
2 Aluminium Powder Plastic bag 20 MT N/A Pressure-200 kg/m2
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 7 153
SN Name of Chemical Storage Facility / Packing
Storage of Chemical
(MT/M)
Flash Point 0C
Storage condition
Room Temp
3 Graphite Powder Plastic bag 5 MT N/A Pressure-200 kg/m
2
Room Temp
4 Paraffin Wax Plastic bag 5 MT >193°C Pressure-200 kg/m
2
Room Temp
5 Zinc Powder Plastic bag
Sepaate room 20 MT N/A
Pressure-200 kg/m2
Room Temp
6 Red Phosphorous MS Barrel 100 MT N/A Atm Pressure
Around 30 Deg C
7 Magnesium Oxide Plastic bag 2 MT Not
Combustible NTP
8 Magnesium Phosphide
20 kg corrugated
boxes 100 MT N/A
Pressure-400 kg/m2
Room Temp
NA: Not Available
7.4 QUALITATIVE RISK ASSESSMENT
Many a times Risk involved in various processes / process equipment‟s cannot be
addressed completely by Consequence Analysis. As a conservative approach, these risks
have been considered separately under this topic.The approach is to identify hazards
associated in operation of equipment as well as in processes, assessing its impacts, ranking
the risk posed by it and finally to propose remedial actions/mitigation measures such that the
risk is minimized to tolerable level.
Qualitative Risk Assessment has been carried out for the following areas:
Hazard involving during Construction Phase;
Storage and Handling of Red Phophorus;
Storage and Handling of yellow Phosphorus;
Manufacturing of Zinc Phosphide;
Manufacturing of Magnesium Phosphide;
Storage and Handling of Phospine;
In Qualitative Risk Assessment, risk has been analyzed using methodology called HIRA-
Hazards Identification & Risk Assessment. In HIRA, major manual activities carried out by
plant personnel as well as contract labors have been considered. The Risk Matrix presented
in Table 7-3 is referred in evaluating the assessment. Risk acceptability criteria given in
Table 7-4.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 7 154
Table 7-3: Risk Matrix for Qualitative Risk Assessment
Table 7-4: Risk Acceptability Criteria
LIKE HOOD/ PROBABILITY
SEVERITY
Catastrophic (Death/ System Loss)
Major/ Critical
(Serious injury/ Illness)
Moderate (Less
Serious Injury/ Illness)
Minor/ Marginal
(Minor Injury/ Illness)
Insignificant/Negligible (No injury /illness)
5 4 3 2 1
Almost Certain
E H H H M M
Likely D H H M M L
Possible C H M M M L
Unlikely B M M M L L
Impossible A M M L L L
Risk Range
Risk Acceptability
Criteria Remarks
H Unacceptable/
High Management‟s Decision/Action Plan Required. Potential off-site
Impact.
M Medium Generally Minor Impact. Acceptable with Management‟s Review.
Specific monitoring or SOP to be followed.
L Low Acceptable without Review. Manage through Routine Procedure.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 7 155
Table 7-5: Hazard Identification and Risk Assesement
S. No. Process Or
Activity
Associated
Hazards
Health & Safety Impact (Risk)
Initial Risk
Control / Mitigation Measures
Residual Risk
Sev
eri
ty
Lik
elih
oo
d
Ris
k
Sev
eri
ty
Lik
elih
oo
d
Ris
k
A Hazard involving during Construction Phase
1 Site Clearence, excavation and paving of site
Dust generation & increase in
SPM/RSPM in air
Fall into pit due to caving the side
Health effect on workers and surrounding
People
Risk of injury to workers
2 C M
Water spray on the ground before excavation.
Work permit procedure to be followed.
Shoring of the sides while manual digging the ground.
Use of dust mask.
1 B L
Fabrication work for erecting major plant equipment
including operation of
equipment like crane, concrete
mixtures, vibrators etc. and
preventive maintenance
work
Noise generation
Health effect on workers and surrounding
People.
2 C M
Ear plugs will be provided / and use ensured. Grinding
will be carried out in a closed shed area to.Thick greenbelt will be developed to reduce the noise level going outside
factory premises
2 C M
2
Vehicular movement for transportation of construction
material
Emission of PM10, HC, NOx, & CO
Noise generation
Health effect
Risk of injury to workers due to
accidents
2 E M
P.U.C Certfied Vehicles
Regular Maitenance of Vehicles
Speed control of the vehicles.
1 C L
B Storage and Handling of Red Phophorus
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 7 156
S. No. Process Or
Activity
Associated
Hazards
Health & Safety Impact (Risk)
Initial Risk
Control / Mitigation Measures
Residual Risk
Sev
eri
ty
Lik
elih
oo
d
Ris
k
Sev
eri
ty
Lik
elih
oo
d
Ris
k
1 Loading & Unloading
Fire Explosion due to leakage /spillage in
pipe/container/ valves etc. if contct
with heat/sparks/open
flames/hot surfaces
Skin/Eye irritation.
Toxic Vapor inhalation etc.
2 C M
Safety glasses with side-shields conforming to EN166
for Eye Protection.
Use proper glove removal technique (without touching
glove's outer surface) to avoid skin contact with this product
for skin Protection.
Flame retardant antistatic protective clothing, for body
Protetion.
Store in cool place. Keep container tightly closed in a
dry and well-ventilated place.
2 B L
C Storage and Handling of yellow Phosphorus
1 Handling / Charging
Fire Explosion due to leakage /spillage in
pipe/container/ valves etc. if contact
with heat/sparks/open
flames/hot surfaces
Eye irritation and respiratory disorder.
2 C M
Inspection of Bags/Barrel.
Use of eye goggle & nose mask.
2 B L
D Manufacturing of Zinc Phosphide
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 7 157
S. No. Process Or
Activity
Associated
Hazards
Health & Safety Impact (Risk)
Initial Risk
Control / Mitigation Measures
Residual Risk
Sev
eri
ty
Lik
elih
oo
d
Ris
k
Sev
eri
ty
Lik
elih
oo
d
Ris
k
1
Mixing of Yellow
Phosphorus and zinc
Powder into closed reactor.
Generation of P2O5
Health effect on workers and surrounding
People.
Eye irritation and respiratory disorder
2 C M
Scrubber is installed to avoid releasing of P2O5 into the
environment and treated as Phosphoric Acid.
Appropriate PPEs like Safety Goggles, Butyl or Nitrile rubber gloves, gumboot,
plastic apron etc. will be used.
2 B M
E Manufacturing of Magnesium Phosphide
1
Mixing of Magnesium
Phosphate and Magnesium
ground nut Oil MgO into
reaction pot.
Generation of P2O5
Health effect on workers and surrounding
People.
Eye irritation and respiratory disorder
2 C M
Scrubber is installed to avoid releasing of P2O5 into the
environment and treated as Phosphoric Acid.
Appropriate PPEs like Safety Goggles, Butyl or Nitrile rubber gloves, gumboot,
plastic apron etc. will be used.
2 B M
F Storage and Handling of Phospine
Charging of Zinc Oxide,Red
phosphorus, Yellow
Phosphorus.
Releasing of Phospine gas.
Health effect on workers and surrounding
People.
Eye irritation and respiratory disorder
2 C M
Keep away from heat, hot surfaces, sparks, open flames and other ignition sources. No
smoking. Use only non-sparking tools.
Select eye protection in accordance with OSHA 29
CFR 1910.133.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 7 158
7.4.1 Conclusion
It can be seen from the above table that:
After providing mitigation measure in Vehicular movement for transportation of
construction material activity of construction phase, the risk probability will change
from alomost certain to possible as well as its residual risk will change from medium
to low.
In Other than all activity, the risk probability will change from possible to unlikely as
well as its residual risk will change from medium to low.
7.5 CONTROL / MITIGATION MEASURES
Based on the risk assessment analysis following precautionary mitigation measures are
recommended for the project.
Work permit procedure to be followed;
Use of P.U.C Certified Vehicles;
Periodic Inspection of flanges/ferrule joints is carried out;
Acid proof flooring will be done at storage and handling area;
Inspection of Bags;
Fire extinguishers are kept available;
Use of Suitable protective clothing, gloves, and gumboot.
For various activities the adequate mitigation mesures are provided in Table 7-5.
7.5.1 General Safety Measures for Construction Phase
The following will be implemented by the contractor while carrying out civil construction.
Required PPE will be provided to cover occupational foot, head, hearing, and eye protection.
Fall Protection/ Working at height: The Contractor is required to provide fall protection to
employees who are working at heights equal to or greater than 1.8 m. fall protection can be
in the form of perimeter protection such as guardrails and toe rails, personal protective
equipment (PPE), a safety monitoring system, or a fall protection plan. Activities that require
personal fall protection systems include steel erection bolting, riveting, fitting-up and
plumbing-up, work over water and some deep excavation work.
Foot Protection: If machines or operations present the potential for foot injury, the
contractor will provide foot protection with safe design and construction for the work to be
performed. Workers and visitors shall not be allowed on a construction site without safety
boots. The foot protection will be provided for workers working with concrete or cement.
Gum boot shall be provided to avoid contact with cement/RCC mixtures and mortar.
Head Protection: If head hazards remain after all steps have been taken to control them
(safety nets for work at heights, proper housekeeping), the Contractor will provide workers
with appropriate head protection. Safety helmet will be recommended. When the worker is
carrying load on the head a suitable head protection will be provided.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 7 159
Noise Protection: Workers shall wear hearing protection devices (ear plugs, ear muffs,
canal caps), whenever the diesel operated engines, DG set or other noisy machines are
operating in the area.
Eye Protection: When operations present potential eye injury from physical or chemical
elements, the Contractor will select, provide, maintain and required affected workers to use
appropriate eye protection. Eye protection is required while working on RCC dismantling,
steel fabrication, welding, rough plastering and painting work. Any work which involves
looking upside also requires the protection e.g. electrical cabling on walls and ceiling. The
various eye protecting devices like safety glasses and goggles, face shields and welding
helmets will be provided to workers.
Hand protection: Suitable hand gloves shall be provided for working with cement or mortar.
A suitable anti-allergic cream or protecting gel shall be applied on the hands for persons who
develop allergy with cement or lime.
Electrical Safety:
A licensed electrician shall be deployed to complete all temporary wiring and
electrical installations required for construction activities.
Fuses and circuit breakers (ELCB‟s) shall be used to protect motherboards,
conductors and equipment to avoid short circuiting and electric shock. MCB‟s and
fuses will also to be used to protect the electrical equipment from over current and
over voltage.
Extension cords for equipment or as part of a temporary wiring system shall not be
damaged or compromised in any way and insulation must be of the highest grade.
The joints of electrical wires shall be avoided or an extension cord can be used if
needed
Anytime electrical equipment will be deactivated for repair, or circuits will be shut off,
the equipment will be locked out and tagged at the point where it can be energized.
Proper earthling will be ensured for all equipment and electrical panels
Temporary lights shall not be suspended by their cords.
The employer shall provide the necessary safety equipment, supplies and monitoring
equipment to their personnel.
During the operation stage maintenance of transformer and manning of electrical
substation shall be by the competent persons only.
7.5.2 Safety Measures for Transportation, Storage and Handling of
Chemicals
A. General safety measures for Transportation, Storage & Handling
Layout and location of hazardous chemical storage area will be based on natural and
Mechanical ventilation.
Spare barrels of sufficient quantity will be kept ready for any emergency spillage or
leakage.
Regular inspection of all the storage tanks of hazardous chemicals will be carried out.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 7 160
Display Boards will be provided on all storage tanks which include the name of the
chemicals, Calibration of tanks and date of Painting.
All equipments related to hazardous chemical storage will be maintained and
calibrated regularly.
SOP for handling will be displayed in local language for safe operating procedure.
Standard procedure for unloading will be in place and will be implemented for safe
unloading of road tanker.
Muffler on the silencer of the tanker during entering in factory premises.
Water showering system (Automated sprinkling system) will be provided to the
flammable chemical storage area.
On site detectors for fire based on heat &/or smoke detection with alarm system will
be provided as required.
Adequate firefighting system will be provided as required. Details of the same are
elaborated in related section.
First aids boxes will also be provided at prominent places in the plant.
Area will be declared as “NO SMOKE ZONE”.
B. Safety measures for storage and handling of Phosphorus (Red, Yellow)
Storage
Ensure the container is tightly closed at all times.
Keep in a cool, dry, well-ventilated area away from incompatible materials and
conditions.
Containers which are opened must be carefully resealed and kept upright to prevent
leakage.
Avoid direct sunlight.
Avoid formation of dust and aerosols.
Provide appropriate exhaust ventilation at places where dust is formed.
Keep away from sources of ignition - No smoking.
Provide Labelling according Regulation (EC) No 1272/2008
Provide NFPA label.
Keep Away from water.
Handling
The lab where the material is being handled has an approved / certified emergency
eyewash and safety shower.
Ensure you are wearing the following minimum PPE: tightly fitting safety goggles
and face shield, fire/flame resistant lab coat, full length pants, close-toe rubber or
leather shoes, nitrile gloves.
Lab emergency contact information must be readily posted. Easy access to a
cellular phone or land line is readily available.
Avoid contact with skin, eyes, and clothing.
Avoid inhalation of vapor or mist.
Avoid Contact of water.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 7 161
Personal Precaution
Wear respiratory protection. Avoid breathing vapors, mist or gas. Ensure adequate
ventilation. Evacuate personnel to safe areas. Do not attempt clean-up without
minimum PPE.
Environmental Precautions
Prevent further leakage or spillage – if safe to do so. Do not allow product to enter
drains.
Hygiene Measures
Avoid contact with skin, eyes, and clothing. Wash hands before breaks and
immediately after handling the product.
Engineering Controls
All operations should be carried out in a ventilated enclosure chemical fume hood to
keep airborne concentrations below recommended exposure limits. Use explosion-
proof ventilation equipment.
C. Safety Measures for Flammable Chemicals
Storage for sealed drums will be out of direct sunlight and remote from sources of
heat to avoid generation of pressure.
Drums will be stored at ground level and measures taken to prevent corrosion of the
drum base.
Adequate ventilation will be available to ensure that in case of incidental release of
chemicals (vapour) the vapour concentration is as low as possible, and in any event
within the regulatory requirements.
D. Safety Measures for Transportation of Raw Material
Training will be provided to driver and cleaner regarding the safe driving, hazards of
Flammable chemicals, emergency handling and use of SCBA sets.
TREM card will be kept with Threshold Limit.
SCBA set will be kept with TL.
Fire extinguishers will be kept with TL.
Flame arrestor will be provided to TL exhaust.
Instructions will be given not to stop road tanker in populated area.
Hazard Identification symbol and emergency telephone number will be displayed as
per HAZCHEM CODE.
Appropriate PPEs will be kept with TL.
In case of leak or spill: 1. Area will be isolated.
2. Container shall be isolated.
3. Source of leakage will be checked.
4. Damaged containers or spilled material shall not be attended without wearing
appropriate protective clothing.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 7 162
5. Leakage will be stopped, if possible to do so without risk.
6. Water spray will be used to reduce vapors (but do not put water directly on leak, spill
area or inside container).
7. Combustibles (wood, paper, oil, etc.) will be kept away from spilled material.
E. Safety Measures for Unloading of Raw Material from Tanker
Priority will be given to Tanker to immediately enter the storage premises at site and
will not be kept waiting near the gate or the main road.
Security person will check License, TREM CARD, Fire extinguisher condition; SCBA
set condition, Antidote Kit, required PPEs as per SOP laid down.
Store officer will take sample as per sampling SOP from sampling point.
After approval of QC department unloading procedure will be allowed be started, as
per rules & guidelines.
F. Safety Measures for Drum Storage and Handling
Drums will be stored at designated location or secured in a safety storage cabinet.
Approved methods of equipping a drum and dispensing liquids from it will be
followed.
Drums, carboys and related accessories will be inspected on regular basis for
maintenance purpose.
All the vessels and equipments will be earthed properly and protected against static
electricity. Also, proper earthing facilities shall be provided for drums.
Materials will be transferred by pumping through pipeline or by vacuum, from drums.
Drums for flammable liquids will have proper closures that can withstand the
expected handling conditions without leaking.
G. Storage area Safety
Pipes and equipment shall be inspected at regular intervals.
Entry of unauthorized persons is prohibited.
Spark-resistant tools will be used.
Combustibles (wood, paper, oil, etc.) shall be kept away from spilled material.
SS storage tank will be provided as per IS code.
Dyke wall will be provided to storage tank.
Level transmitter will be provided with low level/high level auto cut-off provision.
Fire hydrant monitor with foam attachment facility will be provided.
Suitably eye-wash, showers and water showers to body is provided nearby acid and
Caustic Storage area.
FLP type pump & electrical fittings will be provided.
All storage areas shall be isolated from all sources of open flame and well posted
with' NO SMOKING' signs and will provided with adequate firefighting/extinguishing
system.
H. Ways to Minimize the Manual Handling of the Hazardous Chemicals
SOPs, work instructions will be prepared and followed.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 7 163
Fork lifts will be used for unloading chemical bags, bags movements within plant, etc.
Cranes, hoists, pallet trucks, conveyors, etc. shall be used as per the requirement, to
eliminate manual handling.
Lifting tools & tackles will be used, wherever required.
Trainings will be provided to relevant staff, operators, workers for the risk associated
with manual handling of hazardous chemicals, ways to overcome those risk, etc.
I. Process Safety Measures
For the safety in production area some important critical safety measures must be provided
within the process technology/equipment itself.
The details of the general safety measures for process unit are as below;
Process parameters control will be provided vide Standard Operating Procedures.
All reaction vents will be connected to either vapor condensers system or gaseous
scrubber system.
Trained person will be engaged for handling of hazardous materials.
Proper safety precautions will be taken during handling of hazardous materials.
Further all the vessels will be examined periodically by a recognized competent
person.
All the vessels and equipments will be well earthed appropriately and well protected
against Static Electricity. Also for draining in drums proper earthing facilities have
been provided.
Reaction column pressure and temperature data will be regularly monitored and
assessment of properties of flammable chemicals will be evaluated to avoid
fire/explosion scenarios.
Temperature indicators will be provided near all reactors.
Caution note, safety posters, stickers, periodic training & updation in safety and
emergency preparedness plan will be displayed and conducted.
Total reaction will be carried out in closed jacketed vessel having cooling water
supply to control temperature in case of run-away reaction.
Emergency reactor shutdown system will be implemented.
J. Preventive safety
The safety measures in form of the general Do's & Don'ts for safety in process & other plant
area are as below:
Check VOC content for flammable and make sure that no flammable vapour
contents.
Keep proper and adequate fire extinguisher near work area.
Check all motors are disconnected and fuse pulled out before maintenance.
Work in any equipment must be conducted in presence of supervisor.
Make sure all process lines are disconnected.
Do not work on equipments without permission from plant head and maintenance
head.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 7 164
Do not allow any employment without pre medical checkup or without checking
fitness.
Use proper PPE.
K. DO’s & DON’Ts
Management has listed some of the Do's & Don'ts activities to strengthen the
SAFETY AT WORK, which will be followed strictly:
For Preventive Maintenance
Do's:
Ensuring that operators/workers etc. follows the SOPs, Safety procedures &
standards, work permit system etc.
Inspection of Storage Area, Earthing & Bonding system.
Inspection of all Fire Fighting Facilities /Check Alarms operation.
Checking the availability of Spill Containment Kit.
Inspections of plant, machinery, tools, equipment, premises, work practices,
processes, procedures and general environment must be carried out for the health
and safety of plant, people and surrounding.
On-site and Offsite Emergency Plans shall be reviewed and updated, as per the
requirement.
Don’ts:
Don't allow anyone who hasn't received specific safety and operational training to get
indulge in any site activity.
Don't perform any activity without proper permit.
Don't perform your own maintenance.
Don‟t compromise on Design and Engineering part.
Don't panic if you are in a risky situation.
Don't allow spilled chemicals to drain to sewers/gutters etc.
7.5.3 Occupational Health and Safety
The main effects of chemicals especially VOCs are anticipated in proposed project. No other
source of adverse effects on occupation health & safety is likely to occur. However, MSDS of
hazardous chemicals will be prepared & made available with the management as well as
concern personnel working with the materials or area likely to be affected by the materials.
In general following are the key safety measure recommended for the proposed project.
Provision of drinking water supply for the employees as per standard of the drinking
water as per WHO guidelines.
Availability of proper sanitary facilities for the employees so that they do not suffer
from any health ailments.
Provision of all necessary equipment like portable detector, online detectors and
other laboratory equipments as proposed for regular monitoring of workplace air and
other conditions.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 7 165
Establish the safety policy.
Organize training program for information on accident prevention, proper control and
maintenance of equipment, first aid training and safe material handling practices.
Monitoring of occupational hazards like noise, ventilation, chemical exposure will be
carried out at frequent intervals.
Provision of ear muffs/ ear plugs to the workers exposed to higher noise level.
Provision of proximity suits and self-breathing apparatus.
Provision and compulsory use of necessary PPEs like helmet, safety goggles, face mask,
hand gloves and safety shoes etc. for all workers.
7.6 DISASTER MANAGEMENT PLAN (DMP)
The Disaster Management Plan (DMP) is a guide, giving detailed organizational
responsibilities, actions, reporting requirements and support resources available to ensure
effective and timely management of emergencies likely to arise from planned operations.
The DMP has been prepared for the Pesticides production plant on the basis of the Risk
Assessment and related findings covered in the foregoing topics in this report.
7.6.1 Structure
The DMP is supposed to be a dynamic, changing, document focusing on continual
improvement of emergency response planning and arrangements. A structure working on a
Plan, Do, Check and Review (PDCR) cycle has been therefore suggested. Another
advantage of doing this is to have a system that is in synchronicity with commonly used EHS
systems such as ISO: 14001 and OHSAS: 18000. The DMP is covered in further detail in the
remaining sections of this Chapter.
7.6.2 Policy
The Environment, Health and Safety (EHS) policies are to be made accessible to all
personnel at site and to other stakeholders. The policies must be framed considering
statutory compliance, stakeholder involvement, continual improvement, and management by
objectives. If required, the explanation for the EHS policies will be provided in simple
language which could be easily understood by the personnel.
7.6.3 Planning
Identification and Prevention of Possible Emergency Situations
Possible emergency situations in the fertilizer plant can broadly be classified into
unintended explosions, fire, electrical short-circuits and resultant fire, vehicle
collision, and inundation. Additional emergency situations can be developed on the
basis of audit or other procedures prior to commencement of operations.
Emergency Prevention
Some of the ways of preventing emergencies are as follows:
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 7 166
Preparation of a Preventive Maintenance Programme covering periodic maintenance
schedules for all the equipments, instruments and system as a whole as per
recommendations provided in the Operation and Maintenance manual supplied by
the respective manufacturers. The maintenance schedule may also incorporate
additional recommendations based on the hands-on experience of engineers gained
from working in similar plants.
Importantly, it is of great importance to collect and analyze information pertaining to
minor incidents and accidents at similar sites, as well as for recording near misses or
emergencies that were averted. This information gives an indication of how likely or
unlikely it is for the site to face actual emergencies and what should be further done
to prevent them from occurring.
Establishment of an ongoing training and evaluation programme, incorporating the
development of capabilities amongst employees about potential emergencies and
ways and means of identifying and averting the same. Most emergencies do not
occur without some incident or an abnormal situation. Hence, there is always
sometime of few seconds to few minutes to arrest an incident of abnormal situation
from turning into an emergency. This is the role of the shift in-charge who is generally
the incident controller (IC) along with his shift team.
Classification of Emergency
The Level of Emergency can be classified in three Categories, which is given in Table 7-6.
Table 7-6: Emergency Types
Classification Description Causes Applicability
Level – 1 The leakage or emergency, which is confinable within the
plant/area.
Small pipe/valve rupture or similar leakages that
do not affect outside premises.
Release of toxic chemicals for short
duration.
Small fire in the plant.
NA
Level – 2
The emergency, which is confinable within the
factory premises.
Leakage of toxic chemicals for long
duration.
Medium scale explosion confined to the factory
premises.
Medium scale fire inside the factory premises.
Phosphorus
Level – 3
The emergency, which is not confinable within the factory premises and general public in
the vicinity are likely to be affected.
Heavy / Profuse leakage of toxic / flammable
gases for a long duration.
Explosion of high magnitude affecting the
adjacent area.
NA
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 7 167
Major fire inside the factory premises
Emergency Plan Objectives
Specific objectives of the Emergency Response Plan are listed with regards to the
responses desired for successful management of the possible emergency situations.
Suggested Objectives would include:
To define and assess emergencies
To control and contain incidents.
To safeguard the employees.
To minimize damage to the property and/or the environment.
To inform the employees, the general public residing around the plant and the
authority on the hazards/risks assessed.
To safeguard provided residual risk, if any, and the role to be played by the
employees in the event of emergency.
To inform the state authorities like Police and Fire Departments, Mutual Aid Centers,
Medical Centers to come up for help.
To effectively rescue and to provide treatment of casualties and to count the injured.
To identify and list fatal accidents, if any.
To secure the safe rehabilitation of affected areas and to restore normally.
To provide authoritative information to the news media for the incident.
To preserve records, equipments, etc. and to organize investigation into the cause of
the emergency and to suggest preventive measures to stop its recurrence.
To ensure safety of staff and patients and resume work.
To work out a plan with all provisions to handle emergencies and to provide for
emergency.
On-Site Emergency
The On-site emergency plan: deals with, measures to prevent and control emergencies
within the factory and not affecting outside public or Environment.
Table 7-7: On-Site Emergency Planning
Sr.No. Code of Practice Objective Line of Action
1
In Case of Fire at
hazardous
chemicals
Storage area.
To deal with Fire
efficiently and quickly at
different locations in the
storage area and
electrical Panel
Any person notices any sign of fire shall
start shouting FIRE, FIRE (Aag, Aag) to
seek assistance and also immediately take
steps to give warning by blowing the siren
continuously and take steps to extinguish
the fire by using fire extinguishers available
near the site of fire.
After giving information reach the spot
remove Man & Machinery and take steps
to tackle the fire in accordance with the
firefighting instructions. Inform at security
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 7 168
office to get Ambulance if required.
2
In case of Heavy
Spillage, Leakage
of chemicals.
To deal with the
incidence of chemical
spillage or leakage
efficiently and
Quickly.
Any person who notices any leakage or
spillage of chemicals from storage tank,
pipe line or from any equipment should try
to warn the nearby persons and report to
the shift supervisor without any delay.
The Person should not go near the spill
unless he is wearing a proper PPE and has
been fully trained to handle the chemicals
leaks.
2 Preventive measures and plant safety
During construction
Safety precaution and preventive measures adopted in built in design, maintenance,
instrumentations, handling housekeeping, storage, loading, unloading, transportation etc.
During operation
Colour code system: Will be adopted
Work permit system: Will be adopted
Safety Audit: Internally and externally planned
Breakdown/Periodic maintenance and preventive maintenance schedule: Schedule will be
prepared and regular breakdown maintenance is carried out after getting written job order
from department where the equipment is used.
Other precautions: All other precautions will be taken (need based) from time to time.
Details of Safety Organization
1. Safety organization chart
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 7 169
Emergency Organization chart
Figure 7-1: Emergency Organization Chart
2. Constitution of Safety Committee
A safety committee will be constituted and it comprises equal number of members from
workmen as well as management side. Issues related to safety will be discussed in the
meeting and implemented accordingly. Plant manager acts as a chairman of the committee
and this meets as and when required.
3. Development of details inspection procedures for various equipment and system
4. Record keeping
All identified vital records of the factory will be kept in safeguard them in the event of an
emergency. Back up storage facility will be provided.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 7 170
Details of training and periodic retraining programs for the personnel of safety and
fire department
Security guards who act as firemen during fire emergency are trained, retrained and
refreshed on regular basis. Safety professional is sent for external training and some training
program also conducted at works site by external experts of the field.
Details of Training and retraining programs for the workers
Training programs on safety aspects with special attention to firefighting are regular feature
of company. Plant organizes 3-4 sessions every month on safety aspects and cover good
number of workmen in these programs.
All these training programs would at least include the following:
Lectures
Seminars and workshop
Practical Exercises
Distribution and practice safety instructions
Safety quiz contests/competitions for individual as also for groups
Display of safety posters and safety slogans at convenient and conspicuous places.
Explanation of instructions (in the language easily understood by workers) about the
possible hazards involved in handling of chemicals ad methods to deal with such
hazards failing which possible emergency situation are likely to arise.
Developing safety instructions for every job and ensuring practice to these instructions/
booklets or manuals by workers.
Educating workers about the
Physical and health hazards arising out from the exposure of handling substance
Measures taken to ensure safety and control physical and health hazards.
Measures to be taken by workers to ensure safe handling, loading and unloading.
Storage and transportation of hazardous substances
Meaning of various labels and marking used on containers of hazardous substances
and to whom to report
Measures to be taken in case of any spillage or leakage.
Off-Site Emergency
The Off-site emergency plan: deals with, measures to prevent and control emergencies
affecting public and the environment outside the premises.
Arrangement made for off- site emergency
Considering distance from district Head Quarters, other nearby external emergency control
organization. Following arrangements will be arranged in consultation with DY. DISH, district
collectorate, SDM, mamlatdar.
Disclosure of information to neighboring organization and population:
Integrated Chemisol Pvt. Ltd will prepare booklet and circulate among neighboring
organization and population containing hazardous operation and chemicals. First aid,
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 7 171
emergency treatment, probable types of emergencies that can arise. Preventive steps will be
taken to control emergency. Emergency warning siren code system, to make them aware in
advance. Integrated Chemisol Pvt. Ltd. will carry out group get together, acquaintance
round, meeting with neighboring public, population to train and make them aware about our
operation and preparedness.
The same groups along with external emergency control organization were invited during
mock drill, rehearsals for training and acquaintance.
Local crisis group
As per central government notification and DISH office for preparation of offsite emergency
plan and Integrated Chemisol Pvt. Ltd. will become member of local level crises group, will
set up disaster management center of industrial area using available facility of industries in
the area with facility and emergency contact phone numbers.
During emergency with in local group reach in and around industrial area any one can
contact DMC – control room situated in both the factories and manned round the clock will
initiate actions and arrange to organize resource mobilization and communication.
Communication and warning by Disaster Management Center
When a disaster occurs, the industry affected by the disaster will immediately inform the
disaster management center with all available information, the DPMC will act as per the
contingency plan and DPMC will also communicate immediately to district Collectorate. The
integration of on – site plan with district contingency plan and various functions to be carried
out are mentioned in chart OFF – SITE emergency plan as follow:
Emergency Organization Chart
Figure 7-2: Emergency Organizational Chart
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 7 172
Implementation
Allocation of Resources
Key Personnel are identified for carrying out specific and assigned duties in case of any kind
of emergency. All such key personnel shall be available on call even on holidays and off duty
as well.
Commander (Office Manager)
Deputy Commander (Personnel Officer)
Site Incident Controller (Shift-in-charge)
Deputy Incident Controller (Deputy to Shift-in-charge)
Other key personnel
Essential Workers
Responsibilities of Commander / Deputy Commander
To reach the identified Emergency Control Center as soon as information for incident
is provided and take charge of situation and send his deputy at the place of incident.
To activate the Emergency Preparedness Plan according to severity of situation.
To call Safety Officer and Fire Officer with all necessary resources at site of incident.
To call for outside help from State Fire Department, nearby industries, if required,
looking at magnitude of incident.
Call all key personnel and inform Doctor/Medical Center to be ready for treatment.
Commander shall deploy staff to carry out following functions.
To liaise with other departments and guide their personnel.
To supervise Assembly and Evacuation at all points.
To look after patients who are bed ridden and any casualties and give psychological
support.
To activate Assembly and Evacuation Plan, if required, as per situation by ordering
Site Incident Controller.
To inform and liaison with Chief Operating Officer, Police Department and District
Emergency Authority.
To inform all the employees and relatives of the affected employees.
Site Main Controller
(General Manager)
Incident Controller
(Shift Incharge)
Maintenance Incharge Safety Officer HR Personnel
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 7 173
To arrange for chronological records of emergency for future reference and
supplement the investigation of incident.
Issue authorized statements to News Media.
To ensure prompt action for preservation of evidence and arrange for video shooting/
photographs.
Deputy Commander to carry out the responsibilities of Commander in his absence
and assist him in his duties when present.
Assign Medicare and Emergency Management tasks to all persons of management
cadre
Responsibilities of Site Incident Controller / Deputy Incident Controller
To rush to the site of incident and take immediate charge.
To ensure that immediate steps as per Emergency Preparedness Plan are taken and
direct the worker staff accordingly.
To inform Commander, Deputy Commander and other key personnel for the situation
from time to time.
To blow the Siren as per situation to declare Emergency.
To supervise assembly and evacuation as per plan, if required, from the site of
incident.
To take decisions for controlling the emergency and incorporate advice given by
Commander after taking charge in Emergency Control Centre.
To ensure that casualties receive adequate attention and medical care.
To ensure accounting for the personnel present at site of incident and personnel
rescued and personnel missing.
To control traffic movement in the premises.
To arrange for relief of rescue workers and catering facilities, when emergency is
prolonged.
Deputy Incident Controller shall take charge at site of emergency in the absence of
Site Incident Controller.
When Site Incident Controller shall be present at the site of incident, Deputy Incident
Controller shall assist Site Incident Controller or take charge at another location, if
emergency exists at more than one place.
Responsibilities of Essential Workers
A task force of essential trained staff will be made available to get work done by Incident
Controllers. Such work would include:
Firefighting using portable extinguishers / hydrants (as feasible) and controlling the
spill, if any, till fire department people takes the charge.
To help the fire brigade, if required.
Emergency engineering work e.g. isolating equipment, shifting materials, urgent
repairing or replacement, electrical work etc.
Provision of emergency power, water, lighting, material etc.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 7 174
Direct movement of people, equipment, special vehicle and transport to or from the
scene of the incident and provide barricade to area of incident to prevent
unauthorized trespassing.
Search, evacuation, rescue and welfare, first-aid and medical help.
Manning of assembly points to record the arrival of evacuated personnel.
Manning of outside shelters and welfare of evacuated persons there.
Assistance at casualty‟s reception areas to record details of casualties.
Assistance at communication centre to handle outgoing and incoming calls and to act
as messengers, if necessary.
Control of traffic at the premises.
7.6.4 Setting up of Emergency Infrastructure
To enable the key persons to implement the DMP, the following infrastructure will be set up:
Assembly Points
In case of emergency, the site needs to be evacuated immediately. On evacuation, the
personnel working in the plant will go to pre-assigned assembly points. The charge will be
taken by Shift-in-charge, and in his absence, a person deployed by Commander will be in
charge of respective assembly points and will supervise Assembly and Head Count. The
sign boards indicating the Assembly Point with number having relevant information will be
placed at all such point for guidance. Each assembly point will be earmarked for the
personnel from specific plant areas for assembly in the event of emergency.
Task Force of Essential Staff
A task force of essential trained staff will be made available to get the work done by
Commander. Task Force personnel will be trained to perform various tasks as mentioned
above.
Emergency Control Centre
A small separate room (generally located near Security Office at Main Entry Gate) will be
provided to facilitate Emergency Control Centre. This room will be equipped with dedicated
and direct communication facilities. The Control Centre will be situated in this area, which is
of minimum risk with immediate availability of security personnel nearby. Moreover, the area
will be on the arterial road to allow easy access by a vehicle, if other systems fail or extra
communication facilities needed to be set up. The Emergency control centre will consist of
following items:
Internal and external telephone including STD facility;
Telephone directory/ Telephone nos. of mutual aid centers.
First Aid;
Muster roll of Workers;
Identity card register;
Layout plan of the factory showing the location of hazardous materials, assembly point, and first aid centers etc.;
Map of surrounding area with Fire Extinguishers location;
M.S.D.S.;
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 7 175
Copy of ON SITE OFF SITE PLAN;
Stationeries like- note book, pen, pencils etc.
S.B. Apparatus;
List of Government Agencies /Local press agencies with phone No;
Sand Buckets & Hydrant Network;
Adequate numbers of PPE's.
Fire Fighting
The personnel working in the plant, in case of noticing fire, will immediately raise an alarm
and ask the nearest personnel to inform Manager. He may make an attempt to extinguish
the fire depending on intensity using a portable fire extinguisher along with other personnel
working with him. The severity of fire will be assessed and if it is likely to be severe, will take
following steps:
Call his departmental head/Shift-in-charge to inform about the incident.
Call fire tenders and mobile trailer pump from nearby fire department.
Call nearby personnel to move away from the site of incident and go to assembly points.
Arrange for switching off electricity supply to that specific area of incident.
Manager shall review the steps taken by Shift-in-charge in his capacity as COMMANDER and will reach "Emergency Control Room".
Steps in Case of Spreading of fire
Commander, after taking charge of the situation, will continuously assess the situation and if
it is not being controlled then ensure:
Ensure evacuation, in orderly fashion and assembly of all persons at the assembly points.
Arrival of fire tenders and/or Mobile Trailer Pump from outside resources.
Ensure that any vehicle parked near the fire site is taken away to safe area.
Communication System
Communication System is a Crucial Factor while handling emergency. Company has quick & effective Communication System through which, any situation, which can lead to emergency, can be informed or known to.
1. All persons working inside the plant.
2. Key Personnel outside during normal working hours & during off-duty hours.
3. Outside emergency services, Statutory and Local Authorities &
4. Neighboring facilities and public leaving in vicinity.
Each and every section, Plant & Department of the Factory will be connected by internal telephones with SMC, Supervisor or IC‟s. External Phone at Office and Residence and Mobile shall also be made available with Key Personnel and top executive of the factory. The Communication System shall begin with raising the alarm declaring the emergency, Telephone messages and Procedure to communicate the emergency to other persons & General Public.
Treatment of affected persons
Injured / Affected persons will be provided suitable first-aid treatment and sent to the
Company's Doctor and/or designated local medical center nearby in town for further
treatment depending on injury.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 7 176
Patients requiring further treatment shall be sent in Ambulances to Hospitals in nearest area.
Patients suffering from minor problems will be discharged and sent home after preliminary
treatment by the Company‟s Doctor.
Post Emergency Activities
Medical check up
Medical checkup of affected persons in the incident, if any, will be carried out, and suitable
medical aid shall be provided to set right the problem.
Collection of Records
All possible evidences will be collected along with shift logs and personnel nearby or
connected with the incident will be called for narrating the details so as to facilitate finding of
the most probable and convincing cause of incident and emergency situation. The proposed
procedure will help in suggesting the remedial measures for preventing recurrence.
Inquiry
Detailed inquiry for the incident will be carried out to find out the cause, which will be in the
form of fact finding mission and recommendations made to the suitable authority.
Training
Regular training program for all the concerned personnel will be conducted to enable them to
face any type of emergency situation, be it natural disaster, fire in equipment, building or any
explosion in equipment.
Review of Emergency Performance
The site/head office management will review the findings of the audit and the non-
compliances. It will consider whether the DMP is providing adequate safety assurance to the
management, delivering performance as desired, and whether it continues to be in the spirit
of Environment, Health and Safety Policies and changing requirements. On the basis of
these, the management will record its decisions and consider modifying the DMP, as
deemed appropriate.
7.6.5 Occupational Health and Safety Programme
M/s. Integrated Chemisol Pvt. Ltd. has prepared the Occupational Health Surveillance
Programme which shall be followed right from the project construction & erection phase and
the same shall be updated for the upcoming new facility, if required.
The details of the same are described in the following sections.
1. First Aid
The First Aid kit as per Gujarat Factory Rules.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 7 177
2. Plan for Periodic Medical Checkup As Per Gujarat Factory Rules.
3. Safety Trainings & Mock Drills
Safety trainings (on Safe Material Handling, First Aid, & all Safety Aspects) shall be provided
by the Safety Officers.
4. Mock Drills
To evaluate the effectiveness of emergency preparedness and to spread the awareness among employees mock drill will be carried out at the interval of every six months.
After completion of the mock drill, summary report shall be made and corrections will be
done if any weakness has been observed.
7.7 Socio Economic
The social management plan proposes to improve the quality of life of inhabitants of nearby
villages.
Social – Awareness on project benefits, gender empowerment, increases livelihood
opportunities due to proposed project and generating community participation.
Health – Awareness on health, hygiene, environmental sanitation and generic issues related
to improving quality of life with specific emphasis on potable drinking water, HIV/AIDS/STI
mitigation.
Infrastructure – Developing prioritized infrastructure facilities which are related to the
continuum of project benefits to the local communities and area as a whole.
Details on Corporate Environment Responcibility are givne in Section 6.2, Chapter 6.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 8 178
8 PROJECT BENEFITS
8.1 IMPROVEMENTS IN THE PHYSICAL INFRASTRUCTURE
The proposed manufacturing unit will increase physical infrastructure in terms of new plant
and machineries, pollution control systems, basic amenities etc.
8.2 IMPROVEMENTS IN THE SOCIAL INFRASTRUCTURE
M/s Integrated Chemisol will carry out CER activities for betterment of the people living in
neighborhood of its units/ installation like providing sanitation facilities, improving
Anganwadi, upgrading school furniture‟s etc. to local people.
8.2.1 Education
Providing scholarships to female child/ girls in the school will encourage girls to develop
more skills and study further.
8.2.2 Water (Drinking Water Facilities)
Awareness program on conservation and safe drinking of water.
Support for water harvesting schemes.
Drinking water supply to nearby villages through tanker / tap water
8.2.3 Health
Health care center and ambulance facility is being/ will be promoted;
Awareness to improve health and hygiene standards;
Arranging medical camp and free medical check-up of villagers.
8.2.4 Employment Avenues
The company will generate direct and indirect employment. Preference will be given
to the local people for employment based on their educational qualifications and
experience.
Apprentice Training is being provided regularly.
8.3 EMPLOYMENT POTENTIAL SKILLED; SEMI-SKILLED AND
UNSKILLED
The unskilled employment potential will be used for site clearing during pre-construction
phase. The skilled and unskilled employees/workers will work during construction phase for
activities like excavation, site leveling, etc. Average 20-35 nos. of workers will be engaged in
installation of plant like heavy fabrication work, civil work, painting etc.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 8 179
During operational phase, approx. 15 employees unskilled/skilled will be appointed on
regular/contractual basis.
8.4 OTHER TANGIBLE BENEFITS
This manufacturing unit will increase inflow of Pesticides into local market which will be
directly beneficial to growing agriculture demand.
Local self-employment like will encouraged tea stalls, small food dhaba, tempo and
riksha walas, plumber, carpenters, wiremen etc.
Literacy level will be increased as school in the vicinity.
Medical facility will be increased and chances to save life.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 9 180
9 ENVIRONMENTAL COST BENEFIT ANALYSIS
9.1 PROJECT COST AND APPRAISAL
Environmental Cost Benefit Analysis (CBA) is an analytical way to make an educated
decision regarding the commencement of an industrial activity or similar
trade/commercial/infrastructure activity. This involves a comparison of the costs of an action
with considerations of the benefits associated with that action. CBA assists the regulators to
evaluate the benefits and challenges imposed by the upcoming activity in commercial terms
with respective to the impact on the environmental scenario such as human wellbeing,
quality of life and environmental wellbeing.
An important component of a CBA is a base situation which is a situation when no changes
take place. All decisions are then compared to the base situation. Once the base and a
relevant time period are established, benefits and costs can be calculated in terms of human
and environmental well-being. In this case, a benefit is defined as anything that increases
human well-being, and a cost is anything that decreases it. CBA aims to maximize economic
efficiency at a point where marginal benefits and marginal costs are equal.
9.2 APPLICABILITY OF CBA AND SUMMARY
During the scoping/ ToR stage, no recommendation of environmental cost benefit analysis
was suggested by the appraisal committee. propsed manufacturing of pesticides (Aluminium
Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) will be carried out Plot No.
4924, Notified Industrial Area, GIDC Sarigam, District - Valsad, Gujarat. specific
environmental Cost Benefit Analysis is not carried out in preparing if this EIA report.
Environmental monitoring and management cost is adequately described in chapter 6
(Environmental Management program) and Chapter 10 (Environmental Management Plan).
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 10 181
10 ENVIRONMENTAL MANAGEMENT PLAN
The Environmental Management Plan (EMP) constitutes an important part of the EIA report.
The main purpose of EMP is to minimize the identified potential environmental impacts to be
generated from the proposed project and to mitigate the consequences. Integrated
Chemisol, on basis of the impacts identified, sets targets to reduce the negative impacts,
plans and decides action plan to achieve the target effectively and efficiently. EMP ensures
an effective implementation methodology and alternatives for mitigation measures
planned/recommended to reduce or eliminate the adverse impacts to maximum possible
extent during the operation of the proposed project.
10.1 ENVIRONMENTAL MANAGEMENT PLAN (EMP)
As mentioned in earlier section, EMP is a system to address potential adverse impacts, to
instruct project proponent to introduce standards of good practice to be adopted for all
project activities.
10.1.1 Objectives of EMP
Following are long-term objectives of the Environmental Management Plan for all the
environmental attributes:
To comply with all the regulations stipulated by Central /State Pollution Control
Boards related to applicable laws.
To create good working conditions.
To encourage support and conduct developmental works for the purpose of
achieving environment standards and to improve methods of environment
management.
Streamline environmental activities to add value to efficiency and effectiveness.
To encourage and achieve highest performance and response from individual
employees and contractors.
To plan out the complete strategy to take care of stakeholder engagement.
To contribute significantly for sustainable development.
10.1.2 Environment Management Plan
Details of identified aspect due to proposed activities in the project and its management plan
are given inTable 10-1.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 10 182
Table 10-1: Environmental Management Plan
Sr.No. Identified Aspect Impact Zones Mitigation Measured Effectiveness Responsibilities
Air Environment
1 Dust generation from
excavation and paving of site
Near excavation and paving sites, Near
storage area,
Regular water sprinkling will be done and Dust mask will be provided
1. Monitoring records of water quantity used in sprinkling
during pre-construction phase 2. Ensuring wearing of dust
mask by workers
1. EHS Manager
2. Safety Officer
2
Emission of HC & CO from Vehicular movement for
transportation of construction material
and waste
Within 1 Km from internal roads and
during movement of vehicles
Maintaining the speed limit of vehicle transporting construction materials. Entry only
PUC certified vehicles
1. Regular inspection for efficient working of pollution
abatement system
2. Ensuring work order has a safety compliance condition
mentioning adhering to speed limit, having valid PUC
1. EHS Manager
2. Plant head
3 Emission of P2O5 from Reactions Processes
Within 1 km near Process Area
Two stage water scrubber will be provided Ensuring proper functioning of
Two stage water scrubber
1. EHS Manager
2.Utility supervisor
4
Emission of PM, SO2 and NOx from D.G & Boiler from Operation of D.G Set, Cooling tower, Boiler, etc.
Within 1 Km near Boiler Boiler with chimney of adequate height will be
provided
Ensuring stack height at design stage and inspecting before
installation
EHS Manager
2.Utility supervisor
5
Emission of HC & CO from Vehicular movement for
transportation of raw materials, finished
goods and Industrial Waste
Within 1 Km from chimneys, internal roads and during
movement of vehicles
Maintaining the speed limit of vehicle transporting construction materials. Entry only
PUC certified vehicles
1. Regular inspection for efficient working of pollution
abatement system
2. Ensuring work order has a safety compliance condition
mentioning adhering to speed limit, having valid PUC
Maintenance in-charge
Purchase department
Safety Officer
Noise Environment
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 10 183
Sr.No. Identified Aspect Impact Zones Mitigation Measured Effectiveness Responsibilities
1 Noise generation Near processing unit,
transportation route and D.G.Set
Use of properly certified, tested and calibrated equipment‟s, Well maintained vehicles and properly designed equipment will be used, Accoustic enclosures would be provided
1. Ensuring work order has a safety compliance condition for
acoustic enclosure 2. Regular inspection of required certificates for equipment and vehicles
3. Ensuring workers should wear ear muff and ear plugs
1. Maintenance in-charge
2.Purchase department
3. Safety Officer
Water and Wastewater
1
Sewage generation ue to Influx of workers during construction phase and Influx of
workers during operational phase
Toilets, Washrooms in the plant
Sewage would be disposed in septic tank Reviewing cleaning of tank/pit
as per schedule Design head
2 Waste Water
Generation due to Reactions Processes
Manufacturing Unit Effluent will be treated in proposed ETP
1. Monitoring of wastewater quantity and Quality
2. Ensure characteristics of treated effluent within
prescribed norms before disposal
ETP In charge / Third Party
3
Generation of waste water from Cooling and Boiler Blow Down due to Operation of D.G Set, Cooling tower,
Boiler, etc.
Utility area Effluent will be treated in proposed ETP
4
Generation of waste water due to
Equipment and Floor Washing
Process Area Effluent will be treated in proposed ETP
5 Waste Water
Generation from Operation of ETP
ETP Area Treated water from ETP will be utilized for
scrubbing
6 Consumption of water
for Plant Operation and Domestic Uses
SW reservoir RWH practices to reduce fresh water
consumption. Check water consumption through flow meters
1. Monitoring of wastewater quantity reused by way of
statistical records
2. Monitoring reduction in
EHS Manager
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 10 184
Sr.No. Identified Aspect Impact Zones Mitigation Measured Effectiveness Responsibilities
consumption of fresh water
7 Mixing of process
drains with rainwater Surrounding surface
water bodies
Separate drain for storm water with parapet wall and bumps. First rain water will be reuse
in the process
1. Ensuring SWDs are always dry except during monsoon.
2. During rainy season, daily check if there is any liquid
found it will be pumped back into the system of SW
3. Periodic inspection water quality in to storm water drain and non-mixing of water with
process drain
ETP In charge / Third Party
Hazardous and Solid waste Management
1 Generation of debris
due to Excavation and paving of site
Within site premises Debris will be reused in filling low lying area Inspection for full use of debris for leveling within site Ensuring
good housekeeping
1. EHS Manager 2.Civil supervisor
2
Generation of scraps Fabrication work for erecting major plant equipment including
operation of equipment like crane, concrete
mixtures, vibrators etc. and preventive
maintenance work
Within site premises Scraps will be handled as per rules and sold
to authorized vendors
To ensure scraps generated stored properly, maintain records and to dispose of
within stipulated time
1.EHS Manager
2.Procurement head
3
Spillage and Leakage of Raw Material/
Prduct due to Reactions Processes
Manufacturing Unit Paved area will be provided To ensure minimum spillage
and leakages and regular cleaning of the area
1.EHS Manager
2.Procurement head
4 Generation of ETP
waste due to Operation of ETP
ETP Area ETP sludge will be disposed at TSDF Site To ensure ETP sludge is disposed off at TSDF Site
EHS Manager
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 10 185
Sr.No. Identified Aspect Impact Zones Mitigation Measured Effectiveness Responsibilities
5
Generation of Waste Drums/Barrels/bags
and containers due to Loading and Unloading of chemicals, products
etc.
Within site premises Waste Drums/Barrels/bags and containers will
be handed over to authorized recycler To ensure waste generated stored properly, records
maintained and to be sold within stipulated time
Procurement head
6
Generation of used oil and lubricants due to
Equipment maintenance
Within site premises Used oil and lubricants will be handed over to
authorized recycler
7
Generation of scraps and used spares etc.
due to Equipment maintenance
Within site premises Scraps will be handled as per rules and sold
to authorized vendors
To ensure scraps generated stored properly, maintain records and to dispose of
within stipulated time
1.EHS Manager
2.Maintenance in-charge
Land Environment
1 Removal of top soil & Land clearence due to
Site clearance Within site premises
Top soil will be stacked seprately and will be used for plantation.
To ensure separate stacking of top soil and utilizing ti for
plantation
Procurement head
2
Spillage and Leakage of Raw Material/
Prduct due to Reactions Processes
Near storage area Paved area will be provided To ensure minimum spillage
and leakages and regular cleaning of the area
1.EHS Manager
2. Civil supervisor
Social Environment (Infrastructure / Economy)
1 Increase in traffic load
during construction and operation phase
On connecting roads Controlled vehicular movement (preferably
with clearly demarcated entry/exit) with adequate supervision
Regular checkup for vehicles, their certifications, record
maintenance
Administration head
2
Employment generation during construction and operation phase
Nearby villages Positive impact Records of employment
generated Administration
head
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 11 186
10.2 ENVIRONMENT AMELIORATION
10.2.1 Green Belt Development
Proposed Greenbelt within Site Boundary
Project Proponent will develop green belt at suitable locations within site premises.
Consultation of Horticulture expert will be sought to make sure adequate development of
green belt. The total greenbelt area will be 500 m2. Plantation will be carried out around
periphery of the project site. Plant species suggested are provided in detail in Table 10-2
and five year greenbelt plan is provided in Table 10-3.
Table 10-2: List of plant species for Plantation in LIZ Area
S. No Scientific Name Common Name Ecological performance Locations
1 Aegle marmelos Bel CN, DC
Agriculture Hedges
2 Azardirachta indica Neem CN, OGE, DC
3 Delbergia sissoo Shisham DC, DR, FR
4 Delonix regia Gulmohar DC
5 Syzygium cumini Jamun, Jambu CN, DC
6 Terminalia catappa Desi Badam CN, OGE, DC
Ecological performance: CN –Control Noise level, OGE – Absorb Gas emission (Sexena 1991)1 and (Abbasi & Khan 2000)2, DC - Dust Controller (CPCB 2007)3.
Table 10-3: Greenbelt Development Plan
Sr. No. Description Tree Shrub
1 1st Year 25 2
2 2nd
Year 25 5
3 3rd
Year 25 5
4 4th Year 25 5
5 5th Year 25 3
Total 125 20
Budget Allocation for Greenbelt within Project Site
Considering approx. Cost @ Rs. 100 per sapling / plant, the budget for proposed Greenbelt
Development will be ~Rs. 12500 INR and cost @ Rs. 10 per sapling and 20 for Shrubs.
Recurring cost per Annum is Rs. 200 for greenbelt development.
Plantation Technique and Care
Plantation Technique
Following basic procedures need to be followed for greening the area.
1 Saxena, V.S. 1991. Afforestation as a tool for environmental improvement. In: Executive development program on greening the townships. Vaniki Prashikshan Sansthan, Jaipur. Pp 13-44.
2 Greenbelts for Pollution Control: Concepts, Design, Applications. 2000. Abbasi, S.A. and F.I. Khan. Discovery Publishing House, New Delhi.
3 Phytoremediation of particulate matter from ambient environment through dust capturing plant species. Published 2007 by Central Pollution Control Board, Ministry of Environment & Forests, Govt. of
India in Delhi.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 11 187
Since the project area having poor / slightly saline soil quality, plantation of tree species
required approx. 1m3 pit for soil enrichment
Pit should be filled with imported soil with 3:1:1 the ratio of sand, silt and form yard manure
Procure well grown saplings of recommended species from the nearby Forest Department
nursery
Make 1m diameter ring bund around the planted saplings for water retention
Watering of sapling is species specific, therefore watering need to be done daily in monsoon
and once in 2 days in other seasons for a period of two years.
Monitoring Protocol
The plantations need to be managed by regular watering, soil enrichment work, applying
manure, weeding and provide proper protection.
Replacement of sapling (replanting) required whenever mortality occurs in the plantation
during the growth stage.
Plantation requires after care for a period of minimum five years till the saplings attain
matured tree stage.
Any damage to the developed greenbelt due to any natural or cattle activity should be
redeveloped and maintained by the agency.
Conservation Plan for Schedule-I Species
Conservation plan has been prepared to enhance the population status of this Schedule
species as well as overall improvement of biodiversity which will be implemented in
consultation of “Local Farmers and State Forest Department”.
Plan for Schedule-I Species
Conservation plan has been prepared to enhance the population status of this
Schedule species as well as overall improvement of biodiversity which will be
implemented in consultation of “Local Farmers and State Forest Department”.
Likely Impact Zone (LIZ) Description
Selection of Plant Species
All the facts considered for species selection are same as facts considered for
greenbelt development within project site premises.
Habitat Improvement through Plantation in LIZ
In identified LIZ area, plantation will be carried out on the agriculture hedges.
Following budget is allocated for additional greenbelt, habitat improvement and
conservation of threatened species of the study area.
Multi-layered plantation comprising of medium height trees (6-8 m height) and shrubs (3-5m
height) will be proposed for the green belt. The plan comprises of a five year program from
1st year to 5th year for greenbelt development.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 11 188
(i) Plan for 1st year (Trees/Saplings Plantation)
The work plan for the first year, digging of pits and soil conditioning
Planting of saplings
Surveillance maintenance and irrigation of the saplings to achieve maximum survival
(ii) Plan for 2nd year (Additional Trees/Saplings Plantation + Replacing Dead Trees)
The work plan for the second and third year
Maintenance and irrigation of species planted earlier.
Survey of the area to identify the locations for replantation and causality replacement
Removal of dead trees and replantation based on specific location requirements
(iii) Plan for 3rd and 4th year (Replacing Dead Trees + Maintaining the Greenbelt)
The work plan for the fourth year
Maintenance and irrigation of species planted earlier.
Survey of the area to identify the locations for replantation and causality replacement
Maintenance and irrigation of plants to achieve the targeted rate at 100%.
(iv) The work plan for subsequent years comprises (Maintenance)
Maintenance of plantation.
Clearing of afforested areas to remove undesirable species
Replacement of dead and diseased/malformed species with new ones
Table 10-4: Budget for Additional Greenbelt outside premises / Habitat Improvement Programme
S. No
Work or Activity
1st year 2nd year 3rd year 4th year 5th year Budget (INR)
1 Plantation on agriculture hedges will be carried out up to five years (Approx. Cost @ Rs. 100 per
plant).
Saplings Required 25 25 25 25 25 12500/-
Amount 2500 2500 2500 2500 2500
Total Budget 12500/-
(Twelve Thousand Five Hundred Rupees Only)
10.2.2 Concept of Waste Minimization, Recycle, Reuse / Recover, Energy
Conservation and Natural Resource Conservation
Waste Minimization
Cleaner Production (CP) activities & techniques which can be implemented by minor
change in process, handling practice of raw material as well as wastes to be
generated, elimination of pollutants at or near the source etc.
A designated raw material storage area shall be provided for better handling.
Proper handling, loading and unloading practices shall be followed for reducing
material wastage.
Energy Conservation
Regular energy conservation initiatives will be taken to reduce energy consumption
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 11 189
Energy efficient machineries, fixtures and equipment will be used during the
construction and operation phase as far as possible.
Periodic monitoring of unit/plant/department wise for energy consumption
10.2.3 RAIN WATER HARVESTING SCHEME
Rainwater harvesting is a mechanism involved in collecting, storing and using rainwater
when it is most needed. A rainwater harvesting system comprises of various stages i.e.
transporting rainwater through pipes or drains, filtration, and storage in tanks for reuse or
recharge.
Based on the long term IMD Data for Valsad District, calculations are done accordingly and
shown in Table below:
Annual Rainfall intensity = 1500 mm (0.15 m)
Table 10-5: Rainwater harvesting calculations
Final Catchment Area Run-off
Coefficient
Avg. Rainfall
Intensity
(per annum)
Rainwater Available
(per annum)
Type m2 m
3
Roof Top 815 0.85 0.15 104.03
Open Area 951.25 0.3 0.15 42.8
Greenbelt Area 500 0.3 0.15 22.5
Total 2266.25 - - 169.33
Calculations are based on methodology given in “Concepts and Practices for Rainwater
Harvesting by CPCB-2001”.
Total Run-off Generated: 169.33 m3/ annum
Hence, 169.33 m3/ annum much amount of rainwater will be available for harvesting.
Company will be self-sufficient in water requirement.
10.3 OCCUPATIONAL HEALTH OF WORKERS
10.3.1 Noise
Noise will be regularly monitored at plant boundary and near high noise generating
equipment against workplace monitoring requirement as per Factory Act.
All Workmen working in high noise areas are/ will be provided with ear plug, ear muff etc.
where noise levels excess of 80 dbA.
10.3.2 Heat
The project does not envisage conditions that could lead to excess heating. Consequently,
special requirements for protection against heat stress are not anticipated. However, the
following shall be carried out:
Ventilation shall be provided to take care of heat evacuation. An air-exchange ratio of at
least 6 will be maintained at all times
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 11 190
Drinking water availability shall be ensured at several locations within the plant to ensure
workers have easy access to the same
In case of occasional handling of heated equipment or materials, suitable PPEs such as
heat resistant gloves will be used.
10.3.3 Dust, other Chemicals and Metals being suspended in the Environment
Workmen are/ will be provided with appropriate PPEs, like nose musk / nose respirator,
gloves, helmets, protective uniform and clothing, eye protections etc.
10.3.4 Occupational Hazards specific Pre-Placement and Periodical Health
Checkup
As per policy and norms all of the workmen will be put to medical examination periodically as
per Factory Act and based on the medical report actions is/ shall be taken.
10.4 ENVIRONMENTAL MANAGEMENT CELL
The company will have a system of reporting of non-compliances / violations of
environmental norms to the Board of Directors of the company and / or stakeholders at
large. The reporting mechanism is detailed in this section.
Organogram of environment management cell is as shown in Figure 10-1.
Description of the administrative aspects of ensuring that mitigative measures are
implemented and their effectiveness monitored, after approval of the EIA.
Figure 10-1: Organogram of Environmental Management Cell
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 11 191
11 SUMMARY AND CONCLUSION
11.1 INTRODUCTION
Integrated Chemisol Pvt. Ltd. proposes to manufacture pesticides (Aluminium Phosphide,
Zinc Phosphide, Magnesium Phosphide Technical Plot No. 4924, Notified Industrial Area,
GIDC Sarigam, District - Vaalsad, Gujarat
The proposed project falls under 5 (b), category A “Pesticides industry and pesticide specific
intermediates (excluding formulations) as per Schedule in EIA Notification 2006, as
amended till date.
11.1.1 Proposed Project
S. No.
Product/s Quantity Unit Mode of
transportaion
1 Aluminium Phosphide / Zinc Phosphide /
Magnesium Phosphide Technical 500 TPM Road
Project description
Propose project is located Notified Industrial Area, GIDC Sarigam. The proposed project site
lies on 20°17'12.71"N Latitude and 72°50'45.82"E Longitude, cost of the project is ~INR 6
Cr. Power demand will be 125 KVA, sourced from DGVCL, fresh water requirement will be
6.5 KLD, sourced from GIDC, Vapi and manpower will be 75 numbers.
Process Description
The Company is manufacturing Pesticides a state of the art technology. Project Proponent
proposes to adopt successful best process technology for process. The company will be
using modern machine and equipment‟s with emphasis on waste minimization techniques.
Details description of process is provided in Chapter 2.
11.1.2 Air Emissions & Control
Point Source emissions from flue gas stacks attached to steam Boiler are PM, SO2 & NOx.
Adequate height of chimney will be provided. Process gas stacks attached with two stage
water scrubber.
Noise: Noise generation sources are: Compressors, Pumps and vehicular movement for
transportation of raw material and product.
11.1.3 Wastewater Treatment &Disposal
Total Industrial wastewater generation will be 2.8 KLD mainly from boiler blow down;
cooling tower blow down and floor washing. The effluent will be treated into ETP. First
waste water will be collected, pH will be balanced and then the wastewater will be filtered
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 11 192
and utilized for scrubber. Thus there will be no discharge of any industrial effluent. The
proposed unit will be a Zero Liquid Discharge (ZLD) Unit.
Domestic waste water (2 KL/day) will be passed through Septic Tank/Soak Pit.
11.1.4 Hazardous& Other Solid Waste
Hazardous Waste includes Used Oil, Discarded Containers, ETP Waste. This waste will
be disposed of as per Hazardous and Other Wastes (Management and Transboundary
Movement) Rules, 2016.
Domestic Waste: Paper waste will be handed over to scrap dealers and municipal waste
will be sent to nearest municipal waste collection site.
Small amount of e-waste and scrap will be handed over to authorized scrap dealers.
11.2 DESCRIPTION OF THE ENVIRONMENT
11.2.1 Study Period, Area & Monitoring/Sampling Locations
Period of the baseline study was October 2018 to December 2018 and study was conducted
within 10 km radius from the project site.
Total eight ambient air samples, seven ground water samples, four soil samples and six
surface water samples were collected. Noise monitoring was carried out at eight different
locations.
Summary of results is as under:
11.2.2 Land Use and Land Cover
The area surrounding the project site is largely an agriculture land area like Orchad, Crop
Land and Fallow Land are covering around 35.38%, 6.08% and 10.15% respectively of the
total study area. Water body is covering around 8.86 % of the total study area. Range Land
like Grass Land and Scrub Land are covering around 11.56% and 2.67% respectively of the
total study area. Forest area like PF and RF are covering around 0.45% & 6.41%
respectively of the total study area. Barren land like waste land and Muddy are covering
around 11.76% & 1.18% respectively of the total study area. Settlement is covering around
5.31% of the total study area
11.2.3 Micro Meteorology
Micrometeorological data were collected by using the weather station as per CPCB guideline
which was installed near project site. Following are the observations:
Minimum temperature was recorded 13.2oC on 29th Dec 2018 and maximum temperature
was recorded as 38.1oC on 02nd Oct 2018.
During the study period minimum Humidity was recorded 22% on 22th Oct 2018 and 19th
Dec 2018 and maximum Humidity was recorded as 95% on 11h Dec 2018.
Wind speed was observed from 0.1 to 8.0 km/hr in the month of Oct 2018, from 0.1 to
7.0 km/hr in the month of Nov 2018 and from 0.1 to 10.0 km/hr in the Month of Dec 2018.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 11 193
11.2.4 Ambient Air Quality
The broad findings of the ambient air quality monitoring are:
Results were compared with the standard for ambient air quality monitoring as per
the Ministry of Environment, Forest and Climate Change (MoEF & CC).
During the study PM10 was observed in the range of 61.9 – 86.1 µg/m3. Maximum
concentration of PM10 was found at sarai village.
PM2.5 was observed in the range of 32.0 – 47.1 µg/m3. Maximum concentration of
PM2.5 was found at project site.
SO2 concentration was observed in the range of 9.4 -17.6 µg/m3, which is well within
the standard limit.
NOx concentration in was observed in the range of 16.2- 23.0 µg/m3, which is well
within the standard limit.
Monitoring and analysis was also carried out for CO. Result for the CO was found
well within the norms.
11.2.5 Noise Level
The broad findings of the noise level monitoring are:
Equivalent noise level was recorded 56.8 dB (A) at Project Site and it is varies from
49.8 to 51.1 dB (A) in residential area during day time.
Equivalent noise level was recorded 51.6 dB (A) at Project Site and it is 42.1 to 43.1
dB (A) in residential area during night time.
Noise level monitoring was carried out 1 meter away from Bhilad-Sarigam-Fansa
Road near project site and equivalent noise level was recorded 77.1 dB (A) during
day time and 73.5 dB (A) during night time.
Noise level monitoring was carried out 1 meter away from NH-8 near Dhanoli village
and equivalent noise level was recorded 75.4 dB (A) during day time and 68.8 dB
(A) during night time.
11.2.6 Soil Quality
Based on the soil analysis for its physical and chemical properties, it is observed that:
The soils are categorized as clay loam to clay based on different soil separates
(sand, silt and clay). They have moderate water holding capacity (28.8 to 35.6 %),
but poor drainage capacity as texture is clay loam to clay as nearly 77 % is silt + clay.
The soil is categorized as deep black having > 1m depth and lower layers are having
calcium nodules.
The pH of the soil samples narrowly ranged from 7.48 to 7.76 during the study
period. The soil EC also varied from 0.86 to1.18 dS/m and ESP ranged from 11.6 to
15.1. These parameters indicate that soils are neutral to alkaline in reaction, saline
(EC > 0.8 dS/m), but normal to sodic as ESP is exceeding 15 in one out of four
samples.
Among exchangeable basic cations predominance of calcium (25.4 to 27.4 meq/100
g soil) was seen followed by Mg (6.8 –8.6 meq/100 g soil), Na (4.5 to 6.6 meq/100 g
soil) and K (1.2 to 2.0 meq/100 g soil). The loss on ignition (0.2 to 0.6 % OC) indicate
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 11 194
that soils are low (<0.5 % OC) to medium (> 0.5 – 0.75 % OC) in organic carbon
status. This shows that soils are low to medium in nitrogen status.
11.2.7 Groundwater Quality
The test results were compared with the Drinking Water Specification: IS: 10500, 1992
(Reaffirmed 2012) and it is summarized as under:
pH was observed in the range of 7.14 – 7.32 which meets with desirable norms.
Total dissolved solid were recorded in the range of 602 to 924 mg/L with minimum at
Punat village and maximum at Chandor village.
Total hardness was in the range of 384-584 mg/L with minimum at Punat village &
maximum at Chandor village.
Total Alkalinity was found in the range of 292-502 mg/L with minimum at Punat village &
maximum at Chandor village.
Iron was found in the range of 0.14-0.28 mg/L with minimum at Malav village and
maximum at Punat village.
As microbiological parameters MPN analysis was also carried out and it was found Nil.
11.2.8 Surface water Quality
Samples were collected from 3 locations as most of the ponds were dried up. Following are
the findings:
During the analysis pH of the samples was found in the range of 7.96-8.02.
TDS analysis was also carried out for surface water sample and it was found in the
range of 186-354 mg/L.
DO measured during analysis was found in the range of 4.7-4.9 mg/L.
COD & BOD analysis was also carried out during the study period and it was found
more than desirable value for drinking water.
MPN test was also carried out for this surface water sample and it was found positive.
It indicates towards the fecal contamination in surface water body.
11.2.9 Marine water Quality
On the basis of test results it is interpreted that water quality of marine is as per expectation
and suitable for sustaining the aquatic life. Presence of certain bio indicators indicate that
water is being contaminated with sewage or industrial discharge. Organic load is not more
than the self-purification capacity.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 11 195
11.2.10 Ecology and Biodiversity
Project Site / Core Zone:
The project site is having thick trees plantation covering area of 500 m2 comprising of various
local trees and shrubs.
Buffer Zone/Study area:
All the common species of flora and fauna were observed for flat terrain during the survey.
Different species of flora were observed among which Mango and Chickoo species were
dominant, as the soil of the study region also support for the cultivation of same. Herbal
species were observed rarely. Looking to the density of plant it may also be suggested to
improve the quality of environment by planting more trees. Due to destruction of natural
habitat, less numbers of wild mammals were observed. Number of species and density of
wild mammals can be increased by promoting/ facilitating the growth of bush. There was no
endangered species observed during primary survey.
11.2.11 Socio Economic
The summary of the social survey for the study area is provided as below:
Population and its distribution: There are 41 villages, with a total population of 2,22,722
persons.
Sex ratio: It is in the range of 629-1080 (number of females per 1000 males) with lowest
in Sarigam and highest in Punat.
Literacy Rate: Among all the villages of study area Nanakwada (CT) having high literacy
rate i.e. 86.98 %. There is not much difference between female literacy rate and male
literacy rate in the study region. Female literacy rate is an important indicator for social
change.
Economic Aspects: Pali Karambeli has significant employment i.e. 57.05 % as main
workers, while the lowest employment as main workers in Nagwas i.e. 27.6%. Almost all
the villages have more than 50 % people as non-workers
11.3 IMPACT AND MITIGATION MEASURES
11.3.1 Air Environment
Dispersion modeling (using “AERMOD” modeling software) was carried out:
The maximum 24 hourly average GLC‟s for NOx is observed to be 3.91 µg/m3.
These GLC‟s are expected to occur at a distance of 50 m from the source towards
the SW direction.
The maximum 24 hourly average GLC‟s for P2O5 is observed to be 0.0088 µg/m3.
These GLC‟s are expected to occur at a distance of 10 m from the source towards
the West direction.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 11 196
The maximum 24 hourly average GLC‟s SO2 for is observed to be 0.0046 µg/m3.
These GLC‟s are expected to occur at a distance of 50 m from the source towards
the SW direction.
11.3.2 Noise Environment
Due to the proposed activities the noise will be generated from Vehicular movement and
heavy fabrication work during construction phase and from Compressors, Pumps and
vehicular movement for products transportation during operation phase for raw material and
products transportation during operation phase. This noise will be very negligible.
Control measures will be provided. These include passive and active controls such as noise
barriers (hollow blocks) or acoustic enclosure. Where this is not possible, control measures
in the form of use of suitable PPE (ear muffs or ear plugs) will be provided.
11.3.3 Water Environment
Surface Water: The proposed unit does not involve disposal of effluent on CETP and Land
directly. The effluent will be treated into ETP and then utilized for scrubber. The domestic
wastewater generated will be disposed off into soak pits / septic tank.
Ground Water: Impact on groundwater environment is envisaged due to project activities
due to mixing of process water with storm water drains.
Mitigation measures suggested are:
Separate drain for storm water with parapet wall and bumps. First rain water will be
reuse in the process.
11.3.4 Land Environment
Land clearance will be done leading to removal of top soil which will be used for greenbelt
management.
11.3.5 Solid and Hazardous Waste Management
Excavation and paving activity involve for proposed project will be utilized for leveling of low
lying area. The scraps generated during fabrication will be given to scrap vendors.
During operation phase the ETP waste Will be disposed off into TSDF, Vapi through SIA,
Sarigam, Used oil Will be sold to Registered re-processers and Discarded containers Will be
sold to authorized recycler and Phosporic acid will be Sell to authorized users having
permission under Rule 9 of the H/W rules 2016.
11.3.6 Biological Environment
Removal of common site specific floral species from project site will not have significant or
permanent impact on the habitat structure of associated faunal diversity.
As the emissions from the plant are regulated and minimal with respect to the specified
norms, and with a very healthy greenbelt proposed at the site in the form of several species,
it then follows that the biological environment will be protected.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 11 197
11.3.7 Green Belt Development
The total greenbelt area will be 500 m2. Plantation will be carried out around periphery of the
project site. Considering, greenbelt area, project site will have plantation of around 125 trees
and 20 shrub of local species like Bel, Neem, Shesham, Peepal etc. Plantation will be
carried out in around periphery and within the project site.
11.3.8 Socio-Economic Environment
Assessment of socio-economic and sociological impact including health impacts to
surrounding population. The proposed activities shall generate indirect employment in the
region due to the requirement of workers in trail making, supply of raw material, auxiliary and
ancillary works, which would marginally improve the economic status of the people.
11.4 ENVIRONMENTAL MONITORING PLAN
The following will be monitored on a regular basis during operation phase to ensure that a
high level of environmental performance is maintained:
Ambient air monitoring of PM10, PM2.5,, SO2 and NOx will be carried out during the
operational phase within site premises and nearby villages, location of downwind
direction, once every season
Groundwater sample from site or nearby location once every season
Post project sampling and effect on baseline data generated during construction and
operation;
The general effectiveness of pollution control measures shall also be monitored
11.5 ADDITIONAL STUDIES
11.5.1 Socio Economic Development Activities
Socio-economic development activities towards community welfare in the field of education,
health care services, sanitation, & infrastructure development programs in the study area will
be based on the need of the community.
11.5.2 Risk Assessment
Risk Assessment has been analyzed using methodology called HIRA-Hazards Identification
& Risk Assessment for Construction phase and Storage and Handling of various Chemicals
during operation phase. Major hazards identified and related risk involved (impact) during
construction phase are mainly related to health issues, injuries, fall, accidents etc. of
workers. Mitigation measures suggested are by providing proper PPEs and adequate safety
measures.
Hazard identified for operation phase is mainly related to storage and handling of toxic
chemicals and solid chemicals. Proper handling and storage procedures will be followed to
avoid any kind of accidents.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 11 198
Occupational health and safety
It will be ensured that all workers will wear ear plugs, muffs etc. The project does not
envisage conditions that could lead to excess heating. However, it will be ensured that
proper ventilation of air will be provided for heat evacuation, drinking water availability at
several locations and providing suitable PPEs for handing of heated equipment.
11.6 PROJECT BENEFITS
Due to establishment of the proposed project following benefits are envisaged for the locals
and country:
The proposed project will provide potential growth opportunity for the on-going
business of the company.
Local market is also showing strong growth potential.
It will increase the demand of local employment.
The company will employ about 75 people to fulfill its need to handle the plant.
Local people will get some contracts of supply and services to get indirect income.
Company will contribute in improving education and health facilities in nearby area.
11.7 ENVIRONMENTAL MANAGEMENT PLAN
Environmental Management Plan for suggested mitigation measures and monitoring plan
will include:
Review of Compliance of EMP, EC & statutory conditions in the management
meeting
Preparation and timely submission of required statutory reports & Cess
Proper hazardous waste inventory accounting by HSE department
Monitoring for reduction in air emissions generation of hazardous waste quantity by
concerned department heads as per QMS developed by integrated chemisol Pvt. Ltd.
Reviewing time bound action plan for imparting training to drivers and availability of
TREM cards
Reviewing annual performance of EHS in board meeting
An Environmental Management Cell with adequate professional expertise and resources
shall be established to discharge responsibilities related to environmental management
including statutory compliance, pollution prevention, environmental monitoring, etc.
11.8 CONCLUSION
Based on the EIA study conducted in Post Monson Season of 2018 as per terms of
reference given by EAC dated 22th July, 2018 the following highlights emerge:
Proposed project is located in Notified Industrial Area and would not have any
considerable impact on environment.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 11 199
There will be negligible pollution potential on air, water and noise environment,
which, with the implementation of the mitigation measures and EMP, can be reduced
considerably.
The proposed project activities will have positive beneficial effect on the local
population, economic output and other related facilities viz. employment,
development of business, transportation etc.
Rapid risk assessment including emergency response plan and DMP has been
prepared to handle any sort of emergencies.
Looking to the overall project justification, process, pollution potential and pollution
prevention measures /technologies installed by proponent, environmental management
activities of proponent; the proposed project would be environmentally acceptable, in
compliance with environmental legislation and standards.
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 12 200
12 DISCLOSURE OF CONSULTANTS
12.1 GENERAL
Integrated Chemisol has appointed Eco Chem Sales & Services (ECSS) for carrying out this
Environmental Impact Assessment Study as per the EIA notification, 2006 as amended till
date. ECSS has approved EIA coordinators and Field Area Experts for undertaking
Environmental and related studies in twenty two (22) approved sectors by NABET, Quality
Council of India, New Delhi.
12.2 BRIEF RESUME AND NATURE OF CONSULTANCY
ECO CHEM SALES & SERVICES (ECSS) is one of the leading companies in the field of
Environmental Consultancy Service providers in India. We are NABET Accredited consultant
for conducting Environmental Impact Assessment Studies (EIA) and obtaining
Environmental Clearances. We also take up services which include and are not limited to
Environment Monitoring and Testing, Environment Audit, Risk Assessment Studies, Turnkey
solutions, Operation and Maintenance contracts and obtaining various statutory clearances
from Ministry of Environment, Forest and Climate Change (MoEF&CC) and State Pollution
Control Boards. ECSS also has branch offices in Vapi, Dahej and Vadodara, Gujarat.
The accreditation certificate number NABET/EIA/1720/RA 051 is valid up to 3rd Feb. 2020.
Copy of NABET certificate is attached with EIA report.
12.3 TEAM MEMBER FOR EIA REPORT
Table 12-1: EIA Team Member
Name of Internal Team
Member Activity / Area
Involvement
Actual Work Performed
Under Approved Expert
Jagdish Rathi Quality Check
Project planning; Understanding of project; Site visit; Discussion with client; Guidance in writing and modification in Contents; Impact
Assessment; Review of EIA/EMP report.
EC
Disha Patel EIA Report writing (TM)
Team Member- Coordination for data collection, data analysis, coordination with
FAEs, various chapter preparations, compiling the primary & secondary data into
EIA report.
EIA
Jeet Shah Land use (LU) Team Member- Assisting in coordination for
data collection and data analysis, Assisting in map preparation & report writing
FAE-LU
Disha Patel Water
Pollution, Prevention and
Team Member- Identification of surface water sampling stations; water requirement /
demand calculation; identification of impacts and relevant mitigation measures; assisting
FAE-WP
EIA-EMP Report for Proposed Project for the Manufacture of Pesticides (Aluminium Phosphide, Zinc Phosphide, Magnesium Phosphide Technical) at Sarigam GIDC, Valsad
Eco Chem Sales & Services, Surat Doc. No: 2017_ECSS_EIAI2_1700034 Chapter 12 201
Name of Internal Team
Member Activity / Area
Involvement
Actual Work Performed
Under Approved Expert
Control (WP) in preparation of management plan and report writing
Air Pollution (AP)
Team Member- Identification of sampling location, - Assistance in Identification of
impacts & mitigation measures,
FAE-AP
Nazneen Mansuri
Solid & Hazardous
Waste Management
(SHW)
Team Member- Assisting in solid waste generation calculation, preparing solid waste
disposal plan, assistance in FAE
Report writing, assisting in identifying hazardous waste generation sources and
preparing environmental management plan.
FAE-SHW
Mr. Vaibhav Rana
Meteorology, Air Quality Modeling
&prediction (AQ)
Team Member- Data collection, assistance in report preparation to FAE
FAE-AQ
Ms. Priyanka Verma
Noise & Vibration (NV)
Team Member-Assistance in noise monitoring and report writing
FAE-NV
Ms. Kanchan Prabha
Rathoure
Socio-economic (SE)
Team Member-Assisting in survey, data interpretation and report writing
FAE-SE
Mr. Deep Kumar
Risk Assessment &
Hazard Management
(RH)
Team Member- Assistance in Identification of impacts & mitigation measures, safety during
construction and operational phase and report writing
FAE-RH
12.4 LABORATORY INVOLVED FOR BASELINE MONITORING AND
OTHER ANALYSIS
ECSS has NABL accredited Laboratory with Certificate No. T – 6603, dated 26/10/2017 valid
up to 25/10/2019 for testing of Water, Wastewater, Sewage, Air, Noise and Soil.