Proposed LBT Instrument Facility Enclosure
OSU
MODS
Proposed First Floor LBT Instrument Facility
• Minimizes handling, lifting, and moving
• Safe access to auxiliary bay crane
• Space for large, high ceiling cleanroom
• Utilities nearby
• Proximity to existing electronics lab
• Space for wet and dry bench lab
• Consider possibility of second floor use above facility • Architectural & structural consult and approval • Cost of installation of additional heating, cooling, and air handling capacity • Size, class, and cost of cleanroon• Requirements for mobile crane within enclosure• Feasibility of using level 3L for machine shop• Cost estimates for interior insulation, finishing, and furnishings