Island Waste Management Corporation is proposing to increase the approved height of the landfill located at East Prince Waste Management Facility in Wellington.
An evaluation has been conducted by CBCL which determined that the landfill could increase its height to 24 meters without impacting or creating any potential technical, operational, safety or visual concerns or issues.
Increasing the height to 24 meters allows the Corporation to fully utilize the space occupied by the landfill, extend its useful life for many years, and offer a financially-responsible solution for all ratepayers.
The following documents provide an overview of the existing site and demonstrate how an increase in height to 24 meters would appear visually. The artistic renderings reflect the proposed height at the worst time of year when foliage from trees is not present. During times when trees are in foliage it would be very difficult to see the landfill from any viewpoint.
PROPOSED LANDFILL HEIGHT INCREASE AT EAST PRINCE WASTE MANAGEMENT FACILITY
PROPOSED LANDFILL HEIGHT INCREASE AT EAST PRINCE WASTE MANAGEMENT FACILITY
La Société de gestion des déchets de Prince-Est propose d’augmenter la hauteur approuvée de son site d’enfouissement situé à l’Installation de gestion des déchets de Prince-Est à Wellington.
Selon une évaluation menée par la firme CBCL, la hauteur du site d’enfouissement pourrait être augmentée à 24 mètres sans créer de préoccupations ou de problèmes techniques, opérationnels, visuels ou de sécurité.
Cette augmentation de hauteur permettrait à la Société d’utiliser pleinement l’espace occupé par le site d’enfouissement, de prolonger sa vie utile d’un grand nombre années et d’offrir une solution viable aux contribuables.
Les documents suivants donneront un aperçu du site existant et montreront ce que ressemblera l’augmentation à 24 mètres. Les vues d’artiste reflètent la hauteur proposée au pire des temps lorsqu’il n’y a pas de feuilles sur les arbres. Lorsqu’il y aura des feuilles, il sera très difficile de voir le site d’enfouissement, peu importe le point de vue.
AUGMENTATION DE HAUTEUR PROPOSÉE POUR LE SITE D’ENFOUISSEMENT DE L’INSTALLATION DE GESTION DES DÉCHETS DE PRINCE-EST
AUGMENTATION DE HAUTEUR PROPOSÉE POUR LE SITE D’ENFOUISSEMENT DE L’INSTALLATION DE GESTION DES DÉCHETS DE PRINCE-EST
IWMCSOCIÉTÉ DE GESTION DES DÉCHETS DE L’ÎLE
East Prince Waste Management FacilityInstallation de gestion des déchets de Prince-Est
East Prince Waste Management FacilityInstallation de gestion des déchets de Prince-Est
Height DrawingDessin de la hauteur
HE
IGH
T A
BO
VE
EX
IST
ING
GR
AD
E
HA
UT
EU
R A
U-D
ES
SU
S
DE
LA
PE
NT
E E
XIS
TAN
TE
EXISTINGGRADE /
PENTEEXISTANTE
14
24
36
5H : 1V5H : 1V
CURRENT APPROVED TOP /PLAFOND ACTUEL APPROUVÉ
EXISTING GRADE /PENTE EXISTANTE
APPROMIXATE CURRENT LANDFILL TOP /NIVEAU APPROXIMATIF ACTUEL
DE LA DÉCHARGE
PROPOSED TOP /PLAFOND PROPOSÉ
View #1 / Vue #1
Artist Rendering / Vue d’artiste
EXISTING / EXISTANTE
AERIAL / AÉRIENNE PHOTO
PROPOSED / PROPOSÉE
View #2 / Vue #2
EXISTING / EXISTANTE
AERIAL / AÉRIENNE PHOTO
PROPOSED / PROPOSÉE
Artist Rendering / Vue d’artiste
View #3 / Vue #3
Artist Rendering / Vue d’artiste
EXISTING / EXISTANTE
AERIAL / AÉRIENNE PHOTO
PROPOSED / PROPOSÉE
East Prince Waste Management Facility LandfillConceptual Design Cross Section
East Prince Waste Management Facility LandfillConceptual Design Cross Section
Gas Ventilation Pipe
Top Soil & Grass
Protective Matting(Geotextile A)
Gravel Drainage Layer
Protective Matting(Geotextile B)40 mil Plastic HDPE Liner(Geomembrane)Sand Cushion Venting Layer
Waste
Waste
Gravel Drainage(Collection Layer)
Wastewater Collection Pipe(HDPE)
Protective Matting(Geotextile B)
80 mil Plastic HDPE Liner(Geomembrane)
Compacted Soil(Low Permeability Soil Liner)
Protective Matting(Geotextile A)
Soil Drainage Layer(Grading/Drainage Layer)
Soil Reinforcement(Geogrid)
Soil Base Layer(Grading Pad)
IWMCISLAND WASTE MANAGEMENT CORPORATION
DéchetsGravier de drainage
(couche collectrice)
Tuyau de collecte des eaux usées
(polyéthylène haute densité)
Tapis de protection(géotextile B)
Doublure de plastique en polyéthylène haute
densité de 80 mil(géomembrane)
Terre compactée(couche de sol à faible perméabilité)
Tapis de protection(géotextile A)
Drainage du sol(couche de terrassement/drainage)
Consolidation des sols(grille)
Couche de terre de base(terrassement)
Tuyau de ventilation des gaz
Terre arable et pelouse
Tapis de protection(géotextile A)
Couche de gravier de drainage
Tapis de protection(géotextile B)
Doublure de plastique en polyéthylène haute densité de 40 mil(géomembrane)
Coussin de sable (couche d’aération)
Déchets
Site d’enfouissement – Installation de gestion des déchets de Prince-EstSchéma théorique : coupe transversale
Site d’enfouissement – Installation de gestion des déchets de Prince-EstSchéma théorique : coupe transversale
IWMC