13 K.HIGGINS NAD83(2011) NAVD88 R.GILMAN 2 LONDONDERRY BF 016-1(33) 2-11-2014 VT STATE PLANE GRID N T O L ANDG R OV E V T R OU TE 11 T O W I N D HA M V T R O U TE 1 1 F L OW UNNAME D BROOK 11 + 50 12 + 00 13 + 00 14 + 00 1 5 + 0 0 16 + 0 0 1 7 + 00 17 + 50 SCALE 1" = 40’-0" 40 0 40 REMOVAL OF EXISTING BRIDGE, AND REPLACEMENT WITH A NEW STRUCTURE. ROUTE NO : VT ROUTE 11, RURAL MINOR COLLECTOR 150.00 FEET 142.00 FEET 8.00 FEET BRIDGE NO : 24 LENGTH OF PROJECT: LENGTH OF ROADWAY: LENGTH OF STRUCTURE: PROJECT DESCRIPTION: PROJECT LOCATION: STA 14+00.00 BEGIN PROJECT STA 15+50.00 END PROJECT APPROXIMATELY 1.6 MILES WEST OF THE JUNCTION OF VT ROUTES 11 AND 100 STA 14+62.00 END BRIDGE STA 14+54.00 BEGIN BRIDGE COUNTY OF WINDHAM TOWN OF LONDONDERRY LOCATION PROJECT 30-SEP-2015 CONCEPTUAL PLANS THIS PROJECT. A SIMPLIFIED PAVEMENT DESIGN HAS BEEN DONE FOR 4. BY OTHERS. THE PROJECT AREA WHICH WILL REQUIRE RELOCATION THERE ARE EXISTING OVERHEAD UTILITIES WITHIN 3. PRELIMINARY DESIGN. RIGHTS REQUIRED WILL NOT BE KNOWN UNTIL NECESSARY FOR THIS PROJECT.THE EXTENT OF IT IS ANTICIPATED THAT CHANNEL RIGHTS WILL BE 2. MAINTAINED VIA A SIGNED STATE DETOUR. (FRIDAY 6PM-MONDAY 6AM). TRAFFIC WILL BE THE BRIDGE WILL BE CLOSED FOR ONE WEEKEND 1. REVIEWER NOTES V E R M O N T F R E E D O M A N D U N I T Y CANADA ORLEANS ESSEX WA S H I NG T ON L A M O I LL E FRANKLIN GRAND I SLE ADDISON CHI TTENDEN ORANGE CALEDONI A WI NDSOR RUTLAND BENNI NGTON WINDHAM N VT STATE PL ANE GRI D APPROVED DATE SHEET 1 OF SHEETS DATUM VERTICAL HORIZONTAL SURVEYED DATE : SURVEYED BY : PROJECT MANAGER : PROJECT NAME : PROJECT NUMBER : NEW YORK State of MASSACHUSETTS Commonwealth of NEW HAMPSHIRE State of BRIDGE PROJECT PROPOSED IMPROVEMENT AGENCY OF TRANSPORTATION STATE OF VERMONT QUALITY ASSURANCE PROGRAM : LEVEL PLANS. SPECIAL PROVISIONS AS ARE INCORPORATED IN THESE REVISIONS AND SUCH REVISED SPECIFICATIONS AND FOR USE ON THIS PROJECT, INCLUDING ALL SUBSEQUENT FEDERAL HIGHWAY ADMINISTRATION ON JULY 20, 201 1 FOR CONSTRUCTION DATED 201 1, AS APPROVED BY THE WITH THESE PLANS AND THE STANDARD SPECIFICATIONS CONSTRUCTION IS TO BE CARRIED ON IN ACCORDANCE DIRECTOR OF PROJECT DELIVERY . . .

PROPOSED IMPROVEMENT BRIDGE PROJECT - Vermont · a a a a a a a a a a a a 1’-0" high water ordinary ground existing * 1 1.5 (typ) channel excavation unclassified stone fill (typ)

  • Upload
    ngodan

  • View
    213

  • Download
    0

Embed Size (px)

Citation preview

13

K.HIGGINS

NAD83(2011)

NAVD88

R.GILMAN

2

LONDONDERRY

BF 016-1(33)

2-11-2014

VT

ST

AT

E

PL

AN

E

GRI

D

N

TO LANDGROVE

VT ROUTE 11

TO WI

NDHAMVT

ROUTE 11

FL

OW

UN

NA

ME

D

BR

OO

K

11+50 12+0013+00 14+00

15+00

16+00

17+0

0

17+5

0

SCALE 1" = 40’-0"

40 0 40

REMOVAL OF EXISTING BRIDGE, AND REPLACEMENT WITH A NEW STRUCTURE.

ROUTE NO : VT ROUTE 11, RURAL MINOR COLLECTOR

150.00 FEET

142.00 FEET

8.00 FEET

BRIDGE NO : 24

LENGTH OF PROJECT:

LENGTH OF ROADWAY:

LENGTH OF STRUCTURE:

PROJECT DESCRIPTION:

PROJECT LOCATION:

STA 14+00.00

BEGIN PROJECTSTA 15+50.00

END PROJECT

APPROXIMATELY 1.6 MILES WEST OF THE JUNCTION OF VT ROUTES 11 AND 100

STA 14+62.00

END BRIDGE

STA 14+54.00

BEGIN BRIDGE

COUNTY OF WINDHAM

TOWN OF LONDONDERRY

LOCATION

PROJECT

30-SEP-2015

CONCEPTUAL PLANS

THIS PROJECT.

A SIMPLIFIED PAVEMENT DESIGN HAS BEEN DONE FOR 4.

BY OTHERS.

THE PROJECT AREA WHICH WILL REQUIRE RELOCATION

THERE ARE EXISTING OVERHEAD UTILITIES WITHIN3.

PRELIMINARY DESIGN.

RIGHTS REQUIRED WILL NOT BE KNOWN UNTIL

NECESSARY FOR THIS PROJECT.THE EXTENT OF

IT IS ANTICIPATED THAT CHANNEL RIGHTS WILL BE2.

MAINTAINED VIA A SIGNED STATE DETOUR.

(FRIDAY 6PM-MONDAY 6AM). TRAFFIC WILL BE

THE BRIDGE WILL BE CLOSED FOR ONE WEEKEND1.

REVIEWER NOTES

VERM ONTFREEDOM ANDUNITY

CANADA

ORLEANSESSEX

WASHI

NGTON

LAMOILLE

FRANKLIN

GR

AN

D IS

LE

ADDISON

CHIT

TENDEN

ORANGE

CA

LE

DO

NIA

WIN

DS

OR

RUTLAND

BE

NNIN

GT

ON

WINDHAM

N

VT

ST

AT

E P

LA

NE

GRID

APPROVED DATE

SHEET 1 OF SHEETS

DATUM

VERTICAL

HORIZONTAL

SURVEYED DATE :

SURVEYED BY :

PROJECT MANAGER :

PROJECT NAME :

PROJECT NUMBER :

NEW YORK

State of

MASSACHUSETTS

Commonwealth of

NEW HAMPSHIRE

State of

BRIDGE PROJECT

PROPOSED IMPROVEMENT

AGENCY OF TRANSPORTATION

STATE OF VERMONT

QUALITY ASSURANCE PROGRAM : LEVEL

PLANS.

SPECIAL PROVISIONS AS ARE INCORPORATED IN THESE

REVISIONS AND SUCH REVISED SPECIFICATIONS AND

FOR USE ON THIS PROJECT, INCLUDING ALL SUBSEQUENT

FEDERAL HIGHWAY ADMINISTRATION ON JULY 20, 201 1

FOR CONSTRUCTION DATED 201 1, AS APPROVED BY THE

WITH THESE PLANS AND THE STANDARD SPECIFICATIONS

CONSTRUCTION IS TO BE CARRIED ON IN ACCORDANCE

DIRECTOR OF PROJECT DELIVERY

.

.

.

A

A

AA

A

A

A

A

A

A

A

A

1’-0"

HIGH WATER

ORDINARYGROUND

EXISTING *

1

1.5

(TYP)

CHANNEL EXCAVATION

UNCLASSIFIED

STONE FILL (TYP)

GEOTEXTILE UNDER

(TYP)

MATERIAL

GRUBBING

(TYP)

STONE FILL

A

AA

MATERIAL

STREAM BED

MATERIAL INFORMATION

THICKNESS TYPE

WEARING COURSE

BINDER COURSE

BASE COURSE #2

BASE COURSE #1

SUBBASE

ROAD TYPICAL INFORMATION

24"

12"

BITUMINOUS CONCRETE PAVEMENT TYPE IV

SUBBASE OF DENSE GRADED CRUSHED STONE

BITUMINOUS CONCRETE PAVEMENT TYPE IV

BITUMINOUS CONCRETE PAVEMENT TYPE II

"�1

"�1

SAND SAND BORROW

STREAM BED MATERIAL

TOPSOIL 4" TOPSOIL

2�"

STONE FILL

BITUMINOUS CONCRETE PAVEMENT TYPE II

2�"

3 13

LONDONDERRY

30-SEP-2015

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

K.HIGGINS

3’-0"

(TYP)

FILL DEPTH

2 x STONE

(TYP)

DEPTH

STONE FILL

s13b262typ.dgn

J.SALVATORI

J.SALVATORI

TYPICAL SECTIONS

BF 016-1(33)

TRAVEL LANESHOULDER

CL

MAINLINE

(TYP)(TYP) (TYP)

PAVEMENT

NOT TO SCALE

BUFFERSUBBASE

CLEAR ZONE

SAND

WITH GUARDRAILWITHOUT GUARDRAIL

IN PLACE

AGGREGATE SHOULDERS

ROADWAY TYPICAL SECTION

5’-0"

6’-0"SPAN

RISE

*

CHANNEL TYPICAL SECTION

MATERIAL SHALL BEGIN AT THE BOTTOM OF SUBBASE.

WHENEVER CHANNEL SLOPE INTERSECTS ROADWAY SUBBASE, GRUBBING

LENGTHBAFFLE

NOT TO SCALE

(SEE RAIL LAYOUT SHEET)

GUARDRAIL

WIDTH SLOPE SLOPEWIDTH

RIGHTLEFT

SHOULDER

BUFFER

VARIES

VARIES

1:2.0

TRAVEL LANE

CLEAR ZONE (CUT) 12’-0"

FILL SLOPE

CLEAR ZONE (FILL)

CLEAR ZONE (GUARDRAIL)

20’-0"

4’-0"

STONE FILL, TYPE III

3’-7" -0.060

11’-0"

5’-0"

3’-7"

VARIES

VARIES

-0.060

1:2.0

70’-0"

12’-0"

4’-0"

11’-0"

5’-0"

20’-0"

SAND BORROWS

SUBBASE

- AGGREGATE SURFACE COURSE

- PAVEMENT (TOTAL THICKNESS)

SURFACE

+/- 1"

+/- 1"

+/- �"

+/- �"

MATERIAL TOLERANCES(IF USED ON PROJECT)

CL

CULVERT

(TYP)

(T

YP)

PAVEMENT

SUBBASE

BOX CULVERT

PRECAST CONCRETE

STRUCTURE EXCAVATION

LIMITS OF

REMOVED UNDER ITEM 529.15

EXISTING STRUCTURE TO BE

1’-0"

1’-6"

(TYP)

FILL SLOPE

GRADE

FINISHED

SAND

SPAN

RI

SE

MATERIAL

STREAM BED

SLOPE

CLEAR ZONE

STREAM BED MATERIAL)(TYPE II)

SPECIAL PROVISION (STONE FILL,

CULVERT TYPICAL SECTION

STRUCTURES (TYP)

BACKFILL FOR

LIMITS OF GRANULAR

NOT TO SCALE

(SEE DETAIL)

SAFETY EDGE

TOPSOIL

30-SEP-2015

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

------ ------

4 13

K.HIGGINS M.LONGSTREET

SYMBOLOGY LEGEND

s13b262leg.dgn

LONDONDERRY

BF 016-1(33)

DITCH

FOUNDATION

GARDEN

HEDGE

E

L

T

R

D

BK

AH

STA

POE

POB

PRC

PCC

PT

CC

PI

PC

CURVE EXTERNAL DISTANCE

CURVE LENGTH OF

CURVE TANGENT LENGTH

CURVE RADUIS OF

CURVE DEGREE OF (100FT)

BACK STATION SUFFIX

AHEAD STATION SUFFIX

STATION PREFIX

POINT OF ENDING

POINT OF BEGINNING

POINT OF REVERSE CURVE

POINT OF COMPOUND CURVE

POINT OF TANGENCY

CENTER OF CURVE

POINT OF INTERSECTION

POINT OF CURVATURE

WITH PROPOSED ANNOTATION.

FEATURES WITH HEAVIER LINEWEIGHT, IN COMBINATION

FOR EXISTING FEATURES, ALSO USED FOR PROPOSED

THESE ARE COMMON VAOT SURVEY POINT SYMBOLS

BODY OF WATER EDGE

WOOD LINE

STONE WALL

ROAD EDGE PAVEMENT

ROAD EDGE GRAVEL

DRIVEWAY EDGE

RAILROAD TRACKS

LEDGE EXPOSED

BRUSH LINE

WALL

SLOPE RIGHTS

SURVEY LINE

6F PROPERTY BOUNDARY

4F PROPERTY BOUNDARY

PROPERTY LINE (P/L)

TOWN BOUNDARY LINE

COUNTY BOUNDARY LINE

STATE BOUNDARY LINE

FENCE STEEL POST

FENCE (EXISTING)

FENCE WOOD POST

CULVERT (EXISTING)

ELECTRIC+CABLE

CABLE (TV)

ELECTRIC+TELEPHONE

UTILITY POLE GUY WIRE

ELECTRIC+TELEPHONE

PLAN LAYOUT MATCHLINE

CLEAR ZONE

TELEPHONE

ELECTRIC

CABLE+TELEPHONE

ELECTRIC+CABLE+TELEP.

ELECTRIC+TELEPHONE

ELECTRIC+CABLE

CABLE+TELEPHONE

SANITARY SEWER (SEPTIC)

ELECTRIC+CABLE+TELEP.

WATER LINE

GAS LINE

TELEPHONE

CABLE (TV)

ELECTRIC

CULVERT PROPOSED

BOTTOM OF DITCH L

STRUCTURE SUBSURFACE

.

SR SR SR

FILTER CURTAIN

SILT FENCE

SILT FENCE WOVEN WIRE

EPSC MEASURES

WETLAND BOUNDARY

RIPARIAN BUFFER ZONE

SOIL TYPE BOUNDARY

HISTORIC STRUCTURE

HISTORIC DISTRICT BOUNDARY

HISTORIC AREA

AGRICULTURAL LAND

HAZARDOUS WASTE AREA

ENVIRONMENTAL RESOURCES

FISH & WILDLIFE HABITAT

FLOOD PLAIN

STORM WATER

USDA FOREST SERVICE LANDS

WILDLIFE HABITAT SUIT/CONN

CHECK DAM

ARCHEOLOGICAL BOUNDARY

ARCHEOLOGICAL & HISTORIC

UTILITY SYMBOLOGY

UNDERGROUND UTILITIES

ABOVE GROUND UTILITIES (AERIAL)

PROJECT DESIGN & LAYOUT SYMBOLOGY

CODE DESCRIPTIONPOINT

COMMON TOPOGRAPHIC POINT SYMBOLS

DESCRIPTION

PROPOSED GEOMETRY CODES

CODE

BARRIER FENCE

EPSC LAYOUT PLAN SYMBOLOGY

PROJECT CONSTRUCTION SYMBOLOGY

EROSION MATTING

PROJECT CONSTRUCTION FEATURES

STONE FILL

TOE OF FILL SLOPE

TOP OF CUT SLOPE

CONVENTIONAL TOPOGRAPHIC SYMBOLOGY

EXISTING FEATURES

CONVENTIONAL BOUNDARY SYMBOLOGY

STRIPING LINE REMOVAL

REQUIRING RE-VEGETATION

DISTURBED AREAS

THREATENED & ENDANGERED SPECIES

SHEET PILES

HAZARDOUS WASTE

WSO

WELL

VCTRL

TSIGN

TIE

TEL

STUMP

SIGN

SHRUB

SAT

S

RRSL

RRSIG

POST

PMK

PM

MM

MH

MB

LI

IPIPE

IP

HYD

HVCTRL

HCTRL

H

GV

GUYW

GUY

GSO

GP

GASFIL

FPOLE

EL

DITHR

COMB

CB

BND

BM

APL

PERMANENT EASEMENT LINE (P)

TEMPORARY EASEMENT LINE (T)

BOUNDARY LINES

DESCRIPTIONCODE

IRON PIN TO BE SET

BNDNS

IPNS

CALC

POINT

STATE ROW

TOWN ROW

STATE ROW (LIMITED ACCESS)

PROJECT DEMARCATION FENCE

TREE PROTECTION ZONE (TPZ)

PROPOSED STATE R.O.W.

PROPOSED STATE R.O.W. (LIMITED ACCESS)

BOUND TO BE SETBNDNS

IPNS

BOUND SET

IRON PIN SET

R.O.W. ABBREVIATIONS (CODES) & SYMBOLS

USED TO CLARIFY AS NEEDED.

VARY, PLAN ANNOTATIONS AND NOTES SHOULD BE

SHEET COVERS THE BASICS. SYMBOLOGY ON PLANS MAY

AS NOTED ON PROJECT PLAN SHEETS. THIS LEGEND

LINEWEIGHT, IN COMBINATION WITH PROJECT ANNOTATION,

USED FOR EXISTING & PROPOSED FEATURES WITH HEAVIER

STANDARD CONVENTIONAL SYMBOLOGY. THE SYMBOLOGY IS

THE SYMBOLOGY ON THIS SHEET IS INTENDED TO COVER

SYMBOLOGY LEGEND NOTE

GENERAL INFORMATION

ROAD GUARDRAIL

PROW PROPOSED ROW POINT

LENGTH LENGTH CARRIED ON NEXT SHEET

EXISTING ROW POINT

(T)

(P)

UE

SR

R&REP

R&RES

LAND

I&M

HWY

EC

DRIVE

DR

DIT

D&C

CUL

CONST

CH

TEMPORARY EASEMENT

PERMANENT EASEMENT

UTILITY EASEMENT

SLOPE RIGHT

REMOVE & REPLACE

REMOVE & RESET

LANDSCAPE EASEMENT

INSTALL & MAINTAIN EASEMENT

HIGHWAY EASEMENT

EROSION CONTROL

DRIVEWAY EASEMENT

DRAINAGE EASEMENT

DITCH EASEMENT

DISCONNECT & CONNECT

CULVERT EASEMENT

CONSTRUCTION EASEMENT

CHANNEL EASEMENT

UTILITY (GENERIC-UNKNOWN)

UTILITY (GENERIC-UNKNOWN)

C

L L

PP

CZ

T&E

AG

HABITAT

FLOOD PLAIN

OHW

HISTORIC

HISTORIC DIST

ARCH

WATER SHUT OFF

WELL

CONTROL VERTICAL

SIGN W/DOUBLE POST

TIE

TELEPHONE POLE

STUMP

SIGN

SHRUB

SATELLITE DISH

TREE SOFTWOOD

RAILROAD SWITCH LEVER

RAILROAD SIGNAL

POST STONE/WOOD

PROJECT MARKER

PARKING METER

MILE MARKER

MANHOLE (MH)

MAILBOX

LIGHT - STREET OR YARD

IRON PIPE

IRON PIN

HYDRANT

CONTROL HORIZ. & VERTICAL

CONTROL HORIZONTAL

TREE HARDWOOD

GATE VALUE

GUY WIRE

GUY POLE

GAS SHUT OFF

GUIDE POST

GAS FILLER

FLAGPOLE

ELECTRIC POWER POLE

DROP INLET THROATED DNC

COMBINATION POLE

CATCH BASIN

BOUND

BENCHMARK

BOUND APPARENT LOCATION

SEE EPSC DETAIL SHEETS FOR ADDITIONAL SYMBOLOGY

ORDINARY HIGH WATER (OHW)

WETLAND BUFFER ZONE

FL

OW

UN

NA

ME

D

BR

OO

K

30-SEP-2015

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF5 13

LONDONDERRY

SCALE 1" = 20’-0"

20 0 20K.HIGGINS

s13b262bdr.dgn

J.SALVATORI

J. SALVATORI

LAYOUT SHEET

TO WI

NDHAMVT

ROUTE 11

VT

ST

AT

E

PL

AN

E

GRI

D

N

BF 016-1(33)EXISTING CONDITIONS

19 SQ FEET WATERWAY OPENING

15’ AVERAGE COVER

BUILT 1948, CATTLE PASS

72" ACCGMP, 66’ LONG

EXISTING CULVERT DATA

TO LANDGROVE

VT ROUTE 11

2

HVCTRL

100

HVCTRL

ELEV. =1337.67

SPIKE IN POLE

RAIL ROAD

BENCHMARK

FL

OW

18"

RC

P

FLOW18"

CGMP

FL

OW

72"

CG

MP

DI

STONE

RETAINING

WALL

STONE

RETAINI

NG

WALL

PAVEDDRIVE

GR

AVEL

DRI

VE

GR

AV

EL

DRI

VE

160

319

COMB

56-1

159

5-3

COMB

56X

52

COMB

56

52

COMB

GUY GUY

GUY

GUY

GUY

LIGHT

LIGHTLIGHT

LIGHT

PROPANE TANK

BURIED

WELL

ARTESIAN

VT 11

BRIDGE 24

VD-701

VT 11

BRIDGE 24

VD-701

COMMERCIAL

SIGN

S4-3P

S1-1

SIGN

MEASUREMENTS

FROM

COMB

11+5011+5012+00

13+00 14+00

15+00

16+00

17+0

0

17+5

0

50+00

51

+00

52+00

1320

1330 1330

1330

1330

.

1340

1340

1340

1340

1340

1340

1340

1340

1340

.

.

30-SEP-2015

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF6 13

LONDONDERRY

SCALE 1" = 20’-0"

20 0 20K.HIGGINS

s13b262bdr.dgn

J.SALVATORI

J. SALVATORI

LAYOUT SHEET

LAYOUT SHEET

FL

OW

UN

NA

ME

D

BR

OO

K

TO WI

NDHAMVT

ROUTE 11

TO LANDGROVE

VT ROUTE 11

VT

ST

AT

E

PL

AN

E

GRI

D

N

BF 016-1(33)

HVCTRL

2

HVCTRL

100

BENCHMARK

RAIL ROAD

SPIKE IN POLE

ELEV. =1337.67

18"

RC

P

FL

OW

18" CGMP

FLOW

72"

CG

MP

FL

OW

DI

STONE

RETAINING

WALL

STONE

RETAINI

NG

WALL

PAVEDDRIVE

GR

AVEL

DRI

VE

GR

AV

EL

DRI

VE

COMB

319

160

COMB

5-3

159

56-1

COMB

52

56X

COMB

52

56

GUY GUY

GUY

GUY

GUY

LIGHT

LIGHTLIGHT

LIGHT

BURIED

PROPANE TANK

ARTESIAN

WELL

VD-701

BRIDGE 24

VT 11

VD-701

BRIDGE 24

VT 11

SIGN

COMMERCIAL

SIGN

S1-1

S4-3P

COMB

FROM

MEASUREMENTS

STA 13+50.00

BEGIN APPROACH

STA 14+00.00

BEGIN PROJECT

STA 14+54.00

BEGIN BRIDGE

STA 14+62.00

END BRIDGE STA 15+50.00

END PROJECT

STA 16+00.00

END APPROACH

11+5011+5012+00

13+00 14+00

15+00

16+00

17+0

0

17+5

0

50+00

51

+00

52+00

STA 50+65.00

CHANNEL PI#1

STA 50+00.00

CHANNEL POB

STA 51+40.00

CHANNEL PI#2

STA 11+50.00

MAINLINE POB

STA 12+62.07

MAINLINE PC#1

STA 52+00.00

CHANNEL POE

STA 17+31.74

MAINLINE PT#1

STA 17+50.00

MAINLINE POE

E = 24.40’

L = 469.67’

T = 238.15’

R = 1150.00’

MAINLINE CURVE (1)

STA 14+93.59 AHD

STA 15+00.22 BK =

MAINLINE PI#1

.

.

.

30-SEP-2015

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF7 13

LONDONDERRY

BF 016-1(33)

s13b262pro.dgn

K.HIGGINS

J.SALVATORI

J.SALVATORI

MAINLINE PROFILE

GRADES ALONG THE PROPOSED ALIGNMENT.

THE GRADES SHOWN TO THE NEAREST HUNDREDTH ARE THE FINISH

GROUND ELEVATIONS ALONG THE PROPOSED ALIGNMENT.

THE GRADES SHOWN TO THE NEAREST TENTH ARE THE ORIGINAL

MAINLINE PROFILE

BANKING DIAGRAM

1300

1310

1320

1330

1340

13501350

1300

1310

1320

1330

1340

13501350

12

+50

12

+75

13

+00

13

+25

13

+50

13

+75

14

+00

14

+25

14

+50

14

+75

15

+00

15

+25

15

+50

15

+75

16

+00

16

+25

16

+50

16

+75

17

+00

1337.30

1337.11

1337.01

1337.01

1337.11

1337.31

1337.60

1338.00

1338.50

1339.6

1339.0

1338.5

1338.0

1337.6

1337.4

1337.1

1337.0

1336.9

1337.0

1337.2

1337.5

1337.9

1338.4

1339.1

1339.7

1340.5

1341.3

1342.3

PVI 13+00.00

ELEV 1338.46

PV

C 13

+20.01

EL

EV 1338.09

PVI 14+65.86

ELEV 1335.37

PV

T 16

+11.72

EL

EV 1339.41

PVI 16+50.00

ELEV 1340.47

-1.8620% 2.7682%

L =291.71 FT

HSD =304 FT

K =63

12+75 13+00 13+25 13+50 13+75 14+00 14+25 14+50 14+75 15+00 15+25 15+50 15+75 16+00 16+25 16+50 16+75

0.000

0.020

0.040

0.060

-0.020

-0.040

-0.060

-0.080

-0.100

0.000

0.020

0.040

0.060

-0.020

-0.040

-0.060

-0.080

-0.100

MA

TC

H

EXI

STI

NG

MA

TC

H

EXI

STI

NG

STA 13+50.00

BEGIN APPROACH

STA 14+00.00

BEGIN PROJECT

STA 15+50.00

END PROJECT

STA 16+00.00

END APPROACH

-0.053 LT

-0.080 LT

-0.085 LT

-0.080 LT

0.050 RT 0.050 RT0.046 RT

0.051 RT

STA 13+50.00

BEGIN APPROACH

STA 14+00.00

BEGIN PROJECT

STA 15+50.00

END PROJECT

STA 16+00.00

END APPROACH

VER. SCALE 1" = 10’-0"

HOR. SCALE 1" = 20’-0"

NO VER. SCALE

HOR. SCALE 1" = 20’-0"

SCALE 1" = 20’-0"

20 0 20

FL

OW

UN

NA

ME

D

BR

OO

K

TO WI

NDHAMVT

ROUTE 11

VT

ST

AT

E

PL

AN

E

GRI

D

N

TO LANDGROVE

VT ROUTE 11

ROCK QUALITY DESIGNATION

SHEAR STRENGTH

N TERM

DESCRIPTIVE

(GRANULAR SOILS)

DENSITY

(COHESIVE SOILS)

CONSISTENCY

N TERM

DESCRIPTIVE

A7

A6

A5

A4

A2

A3

A1

AASHTO

Very Loose

Loose

Med. Dense

Dense

Very Dense

Very Soft

Soft

Med. Stiff

Stiff

Very Stiff

Hard

Very Hard

COLOR

Orange

Light

Green

Gray

Dark

Brown

Blue

Black

Multicolored

Yellow

White

Tan

Red

Purple

Pink

SOIL CLASSIFICATION

DEFINITIONS

COBBLE

BOULDER

GRAVEL

BEDROCK (LEDGE)

SILT

CLAY

SAND

VARVED

HARDPAN

MUCK

MOISTURE CONTENT

FLOWING SAND

STRIKE

DIP

TO DENSITY/CONSISTENCYCORRELATION GUIDE OF "N"

mltc

yel

wh

tn

rd

pu

pnk

12 inches.

- Rock in its native

- A rock fragment with an

- Rock fragments with an

average dimension > 12 inches.

average dimension between 3 and

- Rounded particles of rock

able strength when air-dried.

no strength when air-dried.

or slightly plastic and exhibits

- Fine grained soil, exhibits

plasticity when moist and consider-

- Alternate layers of silt

- Granular soil so

and clay.

- Extremely dense soil,

cemented layer, not softened

when wet.

- Weight of water

- Inclination of bed with a

into drill casing during extraction

- Angle from magnetic north

of wash rod.

to line of intersection of bed

with a horizontal plane.

saturated (loose) that it flows

Clayey Soil - Highly Compressible

Clayey Soil - Low Compressibility

Silty Soil - Highly Compressible

Silty Soil - Low Compressibility

Silty or Clayey Gravel and Sand

Fine Sand

Gravel and Sand

>50

25-50

11-24

5-10

<5

>60

31-60

16-30

9-15

5-8

2-4

<2

<250

250-500

>4000

500-1000

1000-2000

2000-4000

IN P.S.F.

ROCK

DESCRIPTION

CONSISTENCY

UNDRAINED

SHEAR STRENGTH

Very Poor

Poor

Fair

Good

Excellent

Soft

Very Soft

Med. Stiff

Stiff

Hard

Very Stiff

- Particles of rock < 0.0787"

< 3" and > 0.0787" (#10 sieve).

(#10 sieve) and > 0.0029" (#200 sieve).

- Soil < 0.0029" (#200 sieve), non

(AASHTO)

horizontal plane.

divided by dry weight of soil.

COMMONLY USED SYMBOLS

- Soft organic soil (containing

> 10% organic material.

Water Elevation

Standard Penetration Boring

Auger Boring

Rod Sounding

Sample

Standard Penetration Test

Blow Count Per Foot For:

2" O. D. Sampler

1 �" I. D. Sampler

Hammer Weight Of 140 Lbs.

Hammer Fall Of 30"

Field Vane Shear Test

S

N

Can Not Penetrate Further

No Ledge To Depth

Ledge

No Recovery

Percent Recovery

Recovery

Rock Quality Designation

California Bearing Ratio

NP

PI

PL

LL

M

NX

BX

AX

HSA

WA

MD

DC

B

Wash Ahead

Mud Drill

Diamond Core

Blast

Core Size 1 �"

Hollow Stem Auger

Core Size 2 �"

Core Size 1 �"

Plastic Limit

Liquid Limit

Non Plastic

Plasticity Index

Sat

W

MTW

M

D

Saturated

Wet

Moist To Wet

Moist

Dry

Double Tube Core Barrel Used

US

VS

Undisturbed Soil Sample

Bo

Gr

Sa

Si

Cl

HP

Le

NLTD

CNPF

TLOB

Boulder

Gravel

Sand

Silt

Clay

Hardpan

NR

Rec.

%Rec.

RQD

CBR

< Less Than

> Greater Than

location of indefinite thickness.

R.Q.D. (%)

>90

76 to 90

51 to 75

25 to 50

<25

R Refusal (N 100)>

or

lt

gn

gry

dk

brn

bl

blk

1.

2.

3.

Moisture Content (Dry Wgt. Basis)

VTSPG NAD83 - See Note 7

Top of Ledge Or Boulder

30-SEP-2015

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

GENERAL NOTES

and other factors.

ing rainfall, methods of exploration

may vary according to the prevail-

ed at the time of exploration and

conditions indicated are as record-

Observed water levels and/or

boring or sample locations.

encountered between individual

surface conditions that may be

reflect actual variations in sub-

the Agency and may not necessarily

available subsurface information by

engineering interpretation from

ties and descriptions are based on

Soil and rock classifications, proper-

and __________ by the Agency.

herein were made between ________

The subsurface explorations shown

or judgment by the Contractor.

interpretation, independent analysis

personal investigation, independent

is not intended as a substitute for

tion is presented in good faith and

the Agency. The subsurface informa-

access to the same data available to

intended to provide the Contractor

the information in the Contract is

estimating purposes. Presentation of

interpreted for Agency design and

surface data was performed and

Analysis and interpretation of sub-

face information presented herein.

exercised in preparing the subsur-

Engineering judgment was4.

5.

6.

7.

meters and survey feet.

Grid North American Datum 1983 in

are shown in Vermont State Plane

Northing and Easting coordinates

Subsurface Investigations, 1988.

defined in the AASHTO Manual on

discontinuities in the bedrock is

fractures, joints and other

weathering, and spacing of

describe the hardness, degree of

Terminology used on boring logs to

portray final contract details.

only and may not accurately

profile are for illustrative purposes

the boring plan layout or soils

Pictorial structure details shown on

------

8 13BORING INFORMATION SHEET

LONDONDERRY

BF 016-1(33)

s13b262bor.dgn

K. HIGGINS

J. SALVATORI

J. SALVATORI

BORING LAYOUT

Off L 30.00 FT

STA 14+50.00

E 1548568.90 FT

N 268146.87 FT

B-101

Off R 15.00 FT

STA 14+65.00

E 1548570.33 FT

N 268099.49 FT

B-102

13+00 14+00

15+00

16+00

17+0

0

P

L

P

L

.

.

.

1300

1310

1320

1330

1340

1350

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

1300

1310

1320

1330

1340

1350

1300

1310

1320

1330

1340

1350

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

13+75

1300

1310

1320

1330

1340

1350

1300

1310

1320

1330

1340

1350

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

1300

1310

1320

1330

1340

1350

1300

1310

1320

1330

1340

1350

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

14+25

1300

1310

1320

1330

1340

1350

STA.13+50 TO STA.14+25

MATCH EXISTING

F.G. = 1337.30

F.G. = 1337.11

F.G. = 1337.01

-0.0530.046

-0.0530.048

-0.0530.050

-0.0660.050

BEGIN APPROACH

13+50

BEGIN PROJECT

14+00

(TYP)

1:1.5

(TYP)

0.060

30-SEP-2015

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

------

9 13

LONDONDERRY

BF 016-1(33)

s13b262xs.dgn

K.HIGGINS

J.SALVATORI

J.SALVATORI

MAINLINE SECTIONS

1300

1310

1320

1330

1340

1350

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

14+50

1300

1310

1320

1330

1340

1350

1300

1310

1320

1330

1340

1350

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

1300

1310

1320

1330

1340

1350

1300

1310

1320

1330

1340

1350

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

14+75

1300

1310

1320

1330

1340

1350

1300

1310

1320

1330

1340

1350

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

15+00

1300

1310

1320

1330

1340

1350

STA.14+50 TO STA.15+00

F.G. = 1337.01 F.G. = 1337.11

F.G. = 1337.31

-0.0800.050

-0.0800.050

-0.0800.050

14+58

(TYP)

1:1.5

(TYP)

0.060

(TYP)

1:2.0

30-SEP-2015

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

------

10 13

LONDONDERRY

BF 016-1(33)

s13b262xs.dgn

K.HIGGINS

J.SALVATORI

J.SALVATORI

MAINLINE SECTIONS

F.G. = 1337.60

F.G. = 1338.00

F.G. = 1338.50

MATCH EXISTING

1300

1310

1320

1330

1340

1350

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

15+25

1300

1310

1320

1330

1340

1350

1300

1310

1320

1330

1340

1350

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

1300

1310

1320

1330

1340

1350

1300

1310

1320

1330

1340

1350

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

15+75

1300

1310

1320

1330

1340

1350

1300

1310

1320

1330

1340

1350

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

1300

1310

1320

1330

1340

1350

STA.15+25 TO STA.16+00

-0.0800.050

-0.0800.050

-0.0820.051

-0.0850.051

END PROJECT

15+50

END APPROACH

16+00

1:2.0

(TYP)

1:3.0

30-SEP-2015

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

------

11 13

LONDONDERRY

BF 016-1(33)

s13b262xs.dgn

K.HIGGINS

J.SALVATORI

J.SALVATORI

MAINLINE SECTIONS

1300

1310

1320

1330

1340

1350

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

50+50

1300

1310

1320

1330

1340

1350

1300

1310

1320

1330

1340

1350

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

50+60

1300

1310

1320

1330

1340

1350

1300

1310

1320

1330

1340

1350

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

50+70

1300

1310

1320

1330

1340

1350

1300

1310

1320

1330

1340

1350

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

51+00

1300

1310

1320

1330

1340

1350

STA.50+50 TO STA.51+00

30-SEP-2015

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

------

12 13

LONDONDERRY

BF 016-1(33)

s13b262xs.dgn

K.HIGGINS

J.SALVATORI

J.SALVATORI

CHANNEL SECTIONS

1300

1310

1320

1330

1340

1350

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

51+50

1300

1310

1320

1330

1340

1350

1300

1310

1320

1330

1340

1350

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

51+60

1300

1310

1320

1330

1340

1350

1300

1310

1320

1330

1340

1350

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

51+30

1300

1310

1320

1330

1340

1350

1300

1310

1320

1330

1340

1350

0 10 20 30 40 50 60 70-10-20-30-40-50-60-70

51+40

1300

1310

1320

1330

1340

1350

STA.51+30 TO STA.51+60

30-SEP-2015

DESIGNED BY:

PROJECT LEADER: DRAWN BY:

PLOT DATE:

CHECKED BY:

PROJECT NAME:

PROJECT NUMBER:

FILE NAME:

SHEET OF

------

13 13

LONDONDERRY

BF 016-1(33)

s13b262xs.dgn

K.HIGGINS

J.SALVATORI

J.SALVATORI

CHANNEL SECTIONS