City of Surrey PLANNING & DEVELOPMENT REPORT
File: 7918-0379-00
Planning Report Date: March 11, 2019
PROPOSAL:
• Development Permit • Development Variance Permit
to permit the development of a 27,585 square metre (296,922 sq. ft.) warehouse and distribution facility.
LOCATION: 19500 - 26 Avenue
ZONING: CD (By-law No. 19643)
OCP DESIGNATION: Mixed Employment
LAP DESIGNATION: Business Park
Staff Report to Council File: 7918-0379-00
Planning & Development Report
Page 2 RECOMMENDATION SUMMARY • Approval to draft Development Permit. • Approval for Development Variance Permit to proceed to Public Notification. DEVIATION FROM PLANS, POLICIES OR REGULATIONS • The applicant is proposing a Development Variance Permit to:
o Increase the maximum building height;
o Reduce the number of required parking spaces; and
o Increase the number of parking spaces for trucks and trailers within the
Loading/Unloading area. RATIONALE OF RECOMMENDATION • The proposal complies with the site’s Mixed Employment designation in the Official
Community Plan (OCP) and with the site’s Business Park designation in the Campbell Heights Local Area Plan (LAP).
• The proposed variance to increase the building height is required to operate the automated
system that has been designed for the proposed distribution warehouse. Increased building setbacks will help mitigate the impact of the proposed height from fronting roadways, as well as from the closest residential area located to the east within the Township of Langley.
• The proposed vehicle parking variance is supportable as the applicant has demonstrated that
the number of parking spaces provided is sufficient to meet the peak parking demand based on the maximum employee shift requirements.
• The proposed variance to allow increased truck loading/unloading bays is necessary to
accommodate a truck/trailer staging area and fleet parking on-site. All parking and loading areas are well-screened from public view through a combination of decorative fencing, landscaping, berms and natural plantings and vegetation located within the riparian lands owned by the City.
Staff Report to Council File: 7918-0379-00
Planning & Development Report
Page 3 RECOMMENDATION The Planning & Development Department recommends that: 1. Council authorize staff to draft Development Permit No. 7918-0379-00 generally in
accordance with the attached drawings (Appendix II). 2. Council approve Development Variance Permit No. 7918-0379-00 (Appendix III) varying
the following, to proceed to Public Notification:
(a) to increase the maximum height of a building in the CD Zone (By-law No. 19643) from 14 metres (45 ft.) to 25.5 metres (82 ft.);
(b) to reduce the minimum number of required on-site parking spaces in the CD Zone
(By-law No. 19643) from 299 spaces to 266 spaces; (c) to increase the maximum number of parking spaces for trucks and trailers within
the Loading/Unloading area in the CD Zone (By-law No. 19643) from 78 to 268; (d) to permit parking of trucks and trailers within 80 metres of an Arterial Road in the
CD Zone (By-law No. 19643); and (e) to permit the total area of truck and trailer parking to be greater than the lot area
covered by the principal building in the CD Zone (By-law No. 19643). 3. Council instruct staff to resolve the following issues prior to final approval:
(a) ensure that all engineering requirements and issues including restrictive covenants, dedications, and rights-of-way where necessary, are addressed to the satisfaction of the General Manager, Engineering;
(b) submission of a landscaping plan and landscaping cost estimate to the
specifications and satisfaction of the Planning and Development Department; and
(c) registration of a Section 219 Restrictive Covenant to require full parking requirements should the use change in the future.
(d) completion of subdivision under Development Application No. 7917-0009-00 is
required prior to final approval of the subject Development Permit. REFERRALS Engineering: The Engineering Department has no objection to the project.
However, the short form servicing agreement under project 7917-0009-00 must be amended and the final drawings must be accepted prior to the issuance of the Development Permit No. 7918-0379-00 or Development Variance Permit No. 7918-0379-00.
Staff Report to Council File: 7918-0379-00
Planning & Development Report
Page 4 Parks, Recreation & Culture:
No concerns.
Surrey Fire Department: No concerns.
SITE CHARACTERISTICS Existing Land Use: Vacant industrial land. Adjacent Area:
Direction Existing Use LAP Designation Existing Zone
North (Across 26 Avenue):
Vacant industrial land.
City Park and Business Park
CD (By-law No. 19643)
West:
City parkland. Open Space Corridors/Buffers
IB-1
South (Across 24 Avenue):
Gravel pit for City Operations.
Landscaping Strips and Business Park
A-1
East:
Township of Langley
N/A N/A
DEVELOPMENT CONSIDERATIONS Background • The site is designated "Mixed Employment" in the Official Community Plan (OCP), "Business
Park" in the Campbell heights Local Area Plan (LAP) and is zoned "Comprehensive Development Zone (CD)" (By-law No. 19643) which is based on the "Business Park 2 Zone (IB-2)".
• The subject site is located at 19500 – 26 Avenue and is approximately 10.8 hectares (27 acres) in size. The subject property is one of four lots to be developed within the Campbell Heights East Business Park under Development Application No. 7917-0009-00. Phase 1 of the Campbell Heights Business Park was recently Approved by Council on February 11, 2019 and consists of two development lots; including the subject property, together with environmentally sensitive lands which are being conveyed to the City for conservation purposes.
• Under Development Application No. 7917-0009-00, the subject site was rezoned from
"General Agriculture Zone (A-1)" to "Comprehensive Development Zone (CD)" and a General Development Permit No. 7917-0009-00 was issued for the property. As part of this Development Application, the natural areas to the east of the site are being subdivided from the parent parcel to be established as a natural riparian area. As such, all requirements associated with the City’s Sensitive Ecosystem Development Permit Areas for the subject site have been addressed and approved through Development Permit No. 7917-0009-00.
Staff Report to Council File: 7918-0379-00
Planning & Development Report
Page 5 Current Proposal • The applicant is proposing a detailed Development Permit for Form and Character to facilitate
the development of a 27,585 square metre (296,922 sq. ft.) automated warehouse and distribution facility. The property will contain two accessory buildings, a 106 square metre (1,141 sq. ft.) satellite electrical room and a 25 square metre (269 sq. ft.) guard house.
• The applicant is also proposing a Development Variance Permit (DVP) to: o increase the maximum height; o reduce the minimum number of on-site parking spaces; o increase the maximum number of parking spaces for trucks and trailers within the
Loading/Unloading; o permit parking of trucks and trailers within 80 metres of an Arterial Road; and o permit the total area of truck and trailer parking to be greater than the lot area
covered by the principal building. • The facility is proposed as a state-of-the-art automated refrigeration warehouse which will
distribute fresh produce to more than 60 markets throughout British Columbia.
• The applicant advises that approximately 120 high skilled workers will be employed for the ongoing operation and maintenance of the automated systems within the facility.
• Through automation, the goods being stored and transported from the facility are precisely
measured so that a computer-generated algorithm can optimize the placement of items on shipping pallets and within trailers. This process maximizes the available space in each shipment and helps create more secure and stable pallets. Consequently, with more efficient loading, the number of unnecessary transportation trips from the facility to consumer markets is reduced and the amount of food waste resulting from goods being damaged during the shipping process is minimized.
• The applicant has advised that approximately 20 electric semi-trucks will be operated from
this facility starting in 2022. • The total floor area for all proposed structures on site amounts to 27,716 square metres
(298,332 sq. ft.) and represents a Floor Area Ratio (FAR) of 0.26, which is below the maximum of 1.0 FAR permitted under the CD Zone.
• The total site coverage on the site amounts to 27,170 square metres (292,455 sq. ft.), which
represents 25% lot coverage. The proposed lot coverage is below the 60% permitted under the CD Zone.
• Under the Zoning By-law, 299 parking spaces for employees and visitors are required on site
based on the size of the proposed building. Through a DVP, the applicant is proposing to reduce the number of required parking stalls to 266 space based on their operational needs. To mitigate future parking concerns, the applicant has proposed to register a covenant on title of the property that would require full parking requirements should the use of the property change in the future.
Staff Report to Council File: 7918-0379-00
Planning & Development Report
Page 6 • Under the CD Zone, a maximum of 78 truck and trailer parking spaces are permitted based on
the number of loading spaces and shipping/receiving doors for the building. The applicant is proposing to increase the maximum number of truck and trailer parking spaces to 268 through a DVP.
DESIGN PROPOSAL AND REVIEW Building and Site Design • The proposed building is generally consistent with the design guidelines outlined in the
Campbell heights Local Area Plan and the OCP, as well as the site-specific Campbell Heights East Design Guidelines.
• The building is primarily oriented towards 24 Avenue. Along this frontage is an administrative office situated in the south-west corner of the building, an employee vehicle entrance and parking lot, and the building’s primary signage.
• A landscaped plaza feature, along with the office space, anchors the site to the north-east
corner of 24 Avenue and 194 Street. Pathways in the corner plaza feature and employee parking lot provide a clear route to the building’s main entrance.
• The building is setback 51.5 metres (169 ft.) from 24 Street and 58.3 metres (191 ft.) from
194 Street to address the scale of the building in relation to the adjoining streets.
• The building façade along 24 Avenue utilizes a treatment of horizontal and vertical insulated metal panels. The primary treatment along this façade are horizontal panels arranged in an alternating colour-scheme of zinc grey and dove grey panels, with the zinc grey panels being the dominant colour. To right-of-centre on the building façade are vertical panels in a sandstone colour, which aid in creating visual articulation over the span of the building face. The façade for the administrative office, located along the ground floor on the left side of the elevation, is comprised of an aluminum and glass curtain wall. The change in building materials clearly defines and highlights this area as the main entrance of the building.
• The 194 Street façade utilizes the same panels types and colour scheme as the 24 Avenue
façade. However, the vertical sandstone metal panels are the predominant façade treatment with the horizontal grey panels being used to create visual articulation along the elevation.
• The roof top mechanical units, required for the refrigeration of the building, are set far
enough away from the edge of the building that they are effectively screened by the building’s parapet.
• A second entrance for tractor-trailer traffic is provided from 194 Street at the north-west
corner of the site. This entrance has a guard house that is substantially setback from 194 Street.
• Through an increased building height of 25.5 metres (84 ft.), the operations within the
warehouse utilize a vertical storage system, which results in a more compact building footprint given the size of the property and the permitted FAR and lot coverage under the CD Zone. The rest of the site is used for trucking aisles, parking, and landscaping.
Staff Report to Council File: 7918-0379-00
Planning & Development Report
Page 7
• The loading, truck parking, and storage areas around the west, north, and east side of the
building are screened from public view by a decorative fence. The fence predominately comprises of 3 metre (10 ft.) high black corrugated metal fencing set behind high vegetation. Large accent segments, which are approximately 10.3 metre (34 ft.) wide by 4.5 metre (15 ft.) high and use the same horizontal dove grey and zinc grey panels from the building façade, provide visual interest along the extent of the fence. These accent segments are intended to create an interface that is more at the human scale when the site is viewed at ground level from the public realm.
Access and Parking • The site has one access from 24 Avenue which provides access and egress for employees and
visitors to the parking lot along the south side of the building. A second access is provided from 194 Street to provide access and egress to the Loading/Unloading areas and truck/trailer parking on the site.
• The 194 Street truck access has a 25 square metre (269 sq. ft.) guard house, which is substantially set back from the street.
• The applicant is proposing 266 car parking spaces on-site, 30 tractor parking spaces, and
238 trailer parking spaces. This proposal requires a Development Variance Permit that is discussed in further detail in the By-law Variance section below.
Landscaping • Landscaping employs an urban design-oriented approach by softening the street frontage with
green space and a plaza.
• The proposed landscaping includes a 6 metre (20 ft.) landscape buffer, including a bio-swale, along 24 Avenue, a 7.5 metre (25 ft.) buffer along 194 Street, a 6 metre buffer along the northern portion of the site, and 4.5 metre buffer along the east portion of the site.
• Additional landscaping is provided in the interior of the site in parking islands within the employee parking areas, along the perimeter of the Loading/Unloading areas, and in a large plaza feature, occupying approximately 4,150 square metres (1.03 acres), at the corner of 194 Street and 24 Avenue. The plaza includes benches along walkways, picnic tables on scored concrete, pathways of stamped concrete, and landscape beds within the mass plantings and trees with the plaza and along 24 Avenue and 194 Street. The plaza feature is lit with pedestrian mounted lights and illuminated bollards along the walkways and landscape lighting within the planting beds.
• The proposed landscaping will consist of a variety trees, shrubs, and perennials. Trees to be
planted on site include vine maple, hornbeam, fern leaf beech, princess tree, Austrian pine, scarlet oak, black locust, and bald cypress.
• A decorative fence, noted in the above section, is provided around the perimeter of the site to
screen the truck loading/unloading and parking areas. A 2.4 metre (8 ft.) chain-link fence with a black vinyl coating finish is provided along the east property line, which interfaces with a City riparian lot.
Staff Report to Council File: 7918-0379-00
Planning & Development Report
Page 8 Signage • The applicant is proposing one facia sign to be located on the south elevation in the top-left
corner of the building.
• The sign displays the operator’s company name and logo in channel lettering.
• In accordance with the Design Guidelines in General Development Permit No. 7917-0009-00, the applicants have provided a location on the site plan for a future free-standing wayfinding sign for the broader Campbell Heights East development area. However, should the property owner wish to pursue this type of signage, the design of the sign would need to be reviewed and approved under a separate Development Permit application.
Sustainability Features Below is a summary of the sustainability features incorporated in specific aspects of the development project: • In accordance with the Conceptual Stormwater Management Plan for Campbell heights East
the following source controls will be provided onsite:
o A series of vegetated bioswales with underground rock reservoirs will be installed over approximately 4% of the parcel area. The bioswales will receive runoff from all parking areas providing natural filtration of pollutants collected from the parking lots before allowing the water to infiltrate in the underlying rock reservoir.
o Roof rain water will be directed to infiltration trenches covering approximately 1% of the parcel area.
o An Oil Grit Separator unit is to be installed in the internal stormwater sewer system
just before the connection to the City’s stormwater system. • The planting plan utilizes native and drought tolerant species. The tree canopy provided in
the planting plan provides additional shade to lower-lying shrubs and ground cover lowering the requirements for watering on the site.
• Heat island effect, which is the build-up and retention of heat in a specific location resulting
in the given area be significantly warmer than surrounding areas, is mitigated on the site by:
o a white Thermoplastic Poly Olefin roof membrane to reflect radiant energy;
o landscaping within the parking areas and the perimeter of the site will provide shade over asphalt surfaces;
o utilizing energy efficient equipment and mechanical rooftop units in the building; and
o the reflective effect of the white trailers parked in the loading/unloading areas.
Staff Report to Council File: 7918-0379-00
Planning & Development Report
Page 9 • Sustainable features in the building design include orienting offices to the south to take
advantage of solar heat and utilizing glazed interior partitions to promote the transfer of natural light within the building. Both measures will reduce energy requirements associated with heating and lighting the interior of the building.
• Low flow plumbing fixtures will be used throughout the building to reduce water consumption for the life of the building.
• LED lighting will be utilized within the building and around the site which will use
approximately 50% less electricity than traditional lighting options. Solar powered light bollards will be installed in the south-west corner plaza.
• The refrigeration process in the building uses a CO2 system which uses less than an evaporative condenser. This method of cooling allows the facility to balance water consumption with energy consumption depending on the outdoor ambient conditions. Heat emitted from the refrigeration system will be reused in the in-floor heating systems. The main source of CO2 in the system is atmospheric reclaim, meaning the CO2 that goes into the system is pulled from the atmosphere.
• Automating the distribution facility allows the building to be built vertically rather than
horizontally, resulting in a more efficient use of the land.
• The applicant has advised that approximately 20 electric semi-trucks will be operated from this facility starting in 2022. Infrastructure for electrical transportation charging will be provided onsite.
• The applicants have advised that they will be striving to achieve a waste free facility through
improved material handling and other operational efficiencies to reduce the amount of waste generate don the site. Further, they will be partnering with local food banks and donation partners to repurpose food and goods to both help serve the community and reduce waste.
PRE-NOTIFICATION A development proposal sign was installed on the site on February 24, 2019. To date, staff has not received correspondence from the public regarding the subject application.
Staff Report to Council File: 7918-0379-00
Planning & Development Report
Page 10 SUSTAINABLE DEVELOPMENT CHECKLIST The applicant prepared and submitted a sustainable development checklist for the subject site on September 21, 2018. The table below summarizes the applicable development features of the proposal based on the seven (7) criteria listed in the Surrey Sustainable Development Checklist.
Sustainability Criteria
Sustainable Development Features Summary
1. Site Context & Location
(A1-A2)
• The site is located in the Campbell Height LAP area. The proposed development is reflective of the land use designation.
2. Density & Diversity
(B1-B7)
• The proposed density of 0.26 FAR complies with the maximum of 1.0 FAR allowed under the CD Zone.
3. Ecology & Stewardship
(C1-C4)
• Rainwater management designs include: o Bioswales o Infiltration trenches o Natural landscaping o Sediment control devices
• Recycling and organic waste facilities will be provided. 4. Sustainable
Transport & Mobility
(D1-D2)
• Electric vehicle charging stations will be installed on site. • Covered outdoor waiting areas, direct linkages to transit stops, and
bike racks will available to employees and visitors of the site.
5. Accessibility & Safety
(E1-E3)
• Crime Prevention Through Environmental Design (CPTED) principles have been incorporated through site design to o Maximize sight lines from public areas; o Ensure there are no dark corners; and o Provision of lighting throughout the site.
6. Green Certification (F1)
• None proposed.
7. Education & Awareness
(G1-G4)
• Highlighted in the Sustainable Features section of this report.
ADVISORY DESIGN PANEL • The application was not referred to the Advisory Design Panel (ADP), but was reviewed by
City staff and found to be acceptable. The proposed development was evaluated based on compliance with the design guidelines within the Campbell Heights Local Area Plan, the Official Community Plan (OCP), and the site-specific Campbell Heights East Design Guidelines.
Staff Report to Council File: 7918-0379-00
Planning & Development Report
Page 11 BY-LAW VARIANCE AND JUSTIFICATION (a) Requested Variance:
• Increase the maximum height of a building in the CD Zone from 14 metres (45 ft.) to 25.5 metres (82 ft.).
Applicant's Reasons:
• The proposed distribution centre’s automation system which requires more vertical
and less horizontal space than a traditional warehouse distribution centre.
• Utilizing the vertical space above the property creates a more efficient building footprint.
Staff Comments:
• The building is set well back from the fronting roads (51.5 metres (169 ft.) from
24 Avenue and 58.3 metres (191 ft.) from 194 Street) to address the scale of the building in relation to the adjoining streets.
• Furthermore, the building is setback at a substantial horizontal distance from the closest residential area located to the east within the Township of Langley, with the City’s riparian lot lying in-between the building and Langley residents.
• The applicant is providing landscaping and a type of fencing along the perimeter of the property that creates an interface which is more human scale when the site is viewed at ground level from the public realm.
(b) Requested Variance:
• Reduce the minimum number of on-site parking spaces from 299 spaces to 266 spaces.
Applicant's Reasons:
• The proposed parking meets the Zoning Bylaw required for the related office use area. However, due to the automated nature of the facility, the warehouse component of the building requires less staff than what is needed for a typical distribution warehouse.
• The proposed 266 spaces are nearly double the number spaces that will actually be
needed onsite.
Staff Comments: • The applicant has advised that the facility will operate in three (3) shifts around the
clock, employing a total of 120 workers. There will be two (2) day shifts comprising of 45 to 50 employees each and a small maintenance crew of 15 to 20 employees during the overnight shift. The expected overlap in the employee parking area is approximately 60 minutes per shift change.
Staff Report to Council File: 7918-0379-00
Planning & Development Report
Page 12
• Should the proposed use for the subject site change in the future, the proposed staging
and parking area for trucks and trailers could be converted to additional passenger vehicle parking spaces to meet the Zoning By-law parking requirements.
• The applicant has agreed to register a Restrictive Covenant on title to require full parking requirements should the use of the site change in the future.
(c) Requested Variances:
• Increase the maximum number of parking spaces for trucks and trailers within the Loading/Unloading area from 78 to 268;
• Permit parking of trucks and trailers within 80 metres of an Arterial Road; and
• Permit the total area of truck and trailer parking to be greater than the lot area covered by the principal building.
Applicant's Reasons:
• The proposed facility will be the regional distribution centre for 60 markets
throughout British Columbia, it is important that the centre has adequate trailer storage and bays to avoid off-site queuing.
Staff’s Comments: • The CD Zone allows for additional areas for loading and unloading of trucks and
trailers, provided the number of additional parking spaces does not exceed the number of loading docks on the building and that these areas are screened from the street.
• The additional truck and trailer parking spaces are required to meet the operational
requirements of the operator.
• The building is designed to provide efficient loading and unloading areas by placing these respective areas on the opposite sides of the building from each other. As such, it would be difficult to completely orient the trailer parking away from 194 Street while still meeting the operational needs of the distribution centre.
• All proposed truck and trailer parking and loading and unloading areas are well-screened from public view with a combination of decorative fencing and landscape plantings, berms, and vegetation located within the riparian lands owned by the City.
Staff Report to Council File: 7918-0379-00
Planning & Development Report
Page 13
INFORMATION ATTACHED TO THIS REPORT The following information is attached to this Report: Appendix I. Lot Owners and Action Summary (Confidential) and Project Data Sheets Appendix II. Site Plan, Building Elevations, Landscape Plans and Perspective Appendix III. Development Variance Permit No. 7918-0379-00 • Complete Set of Architectural and Landscape Plans prepared by Jerry Coviensky Architect and
M2 Landscape Architecture, respectively, dated February 26, 2019 and February 20, 2019.
original signed by Ron Hintsche Jean Lamontagne General Manager Planning and Development ARR/cm
APPENDIX I HAS BEEN
REMOVED AS IT CONTAINS
CONFIDENTIAL INFORMATION
DEVELOPMENT DATA SHEET
Existing Zoning: CD
Required Development Data Minimum Required / Maximum Allowed
Proposed
LOT AREA* (in square metres) Gross Total 10.8 ha (27 ac.) Road Widening area Undevelopable area Net Total 10.8 ha (27 ac.) LOT COVERAGE (in % of net lot area) Buildings & Structures Paved & Hard Surfaced Areas Total Site Coverage 60% 25% SETBACKS ( in metres) Front 16 m (52 ft.) 51.5 m
(169 ft.) Rear 7.5 m (25 ft.) 125.5 m
(411 ft.) Side #1 (W) 9 m (30 ft.) 58.3 m
(191 ft.) Side #2 (E) 7.5 m (25 ft.) 62.3 m
(204 ft.) BUILDING HEIGHT (in metres/storeys) Principal 14 m (45 ft.) 25.5 m
(84 ft.) Accessory FLOOR AREA: Industrial 26,153 m2 Office 886 m2 PARKING (number of stalls) Office 35 Warehouse 261 Total Number of Parking Spaces 299 266
* If the development site consists of more than one lot, lot dimensions pertain to the entire site.
Distribution Center19526 24 AVENUE, SURREY, BC. FOLIO 170672019.01.31
P206109Text Box
Appendix II
56.423
26 A
VE
NU
E
359° 18' 38" 378.138
90° 00' 00"
15.211
359° 48' 46"
143.953
89° 55' 28"
8.182
89
° 4
6' 2
9"
2
5
63
.9
91
194 STREET
24 A
VE
NU
E
20.117
25
.6
83
22.000
89° 44' 21"
62.350
1
0
1
°
4
6
' 2
3
"
1
2
0
°
5
0
'
1
4
"
a
=
2
4
.
9
8
0
r
=
1
2
7
.
1
0
4
a
=
8
1
.
8
0
8
r
=
1
5
2
.0
0
0
90° 00' 00"
1
5
6
°
3
4
'
4
7
"
1
7
.
9
1
8
28° 20' 18"
3.388
89
° 4
4' 2
1"
40
2.0
35
4
4
°
4
8
'
4
2
"
8
.
4
9
6
89° 44' 21"
12.501
388.043
SE
CT
IO
N L
IN
E
1.500
13.500
24.900
22.000
SECTION LINE
89° 44' 21" 400.544
10
.0
58
235.493
00° 00' 00"
166.514
89° 44' 21"
402.035
286.678
70.655
378.138
PART 4
106° 06' 19"
2.644
0° 00' 00"
65.915
134° 48' 42"
8.475
a
=
4
9
.
9
1
0r
=
1
5
0
.
0
0
0
a
=
4
2
.
5
9
0
r
=
1
2
8
.
0
0
0
30° 50' 14"
27.145
30° 50' 14"
13.894
a
=
4
3
.
8
4
8
r=
2
1
5
.3
9
6
30° 50' 13"
28.202
26° 21' 25"
37.118
3
0
°
5
0
'
1
4
"
5
1
.
9
5
5
359° 53' 03"
249.780
359° 53' 03"
248.210
1
2
0
°
5
0
'
1
3
"
1
2
0
°
5
0
'
1
4
"
97° 42' 23"
1
0
9
°
2
2
'
1
3
"
1
0
9
°
3
4
'
3
4
"
70.310
233.887
70.655
25.683
H
DENOTES PROPERTY LINE
DENOTES PROPERTY LINE
DENOTES PROPERTY LINE
DENOTES PROPERTY LINE
DENOTES PROPERTY LINE
DENOTES PROPERTY LINE
DENOTES PROPERTY LINE
OLD PROPERTY LINE OLD PROPERTY LINE
RED LINE DENOTES 0.50m
(1.64') SETBACK TO BE KEPT FREE
OF ANY FENCES, POSTS, STEPS,
OR U/G STRUCTURES.
DENOTES SETBACK LINE (TYP.)
DENOTES SETBACK LINE (TYP.)
DENOTES SETBACK LINE (TYP.)
DENOTES SETBACK LINE (TYP.)
30.00' (9.0m) SETBACK
30.00' (9.0m) SETBACK
3
0
.
0
0
'
(
9
.
0
m
)
S
E
T
B
A
C
K
25.00' (7.5m) SETBACK
25.00' (7.5m) SETBACK
25.00' (7.5m) SETBACK
25.00' (7.5m
) S
ET
BA
CK
25.00' (7.5m
) S
ET
BA
CK
52.00' (16.0m
) S
ET
BA
CK
52.00' (16.0m
) S
ET
BA
CK
52.00' (16.0m
) S
ET
BA
CK
RED LINE DENOTES 0.50m
(1.64') SETBACK TO BE KEPT FREE
OF ANY FENCES, POSTS, STEPS,
OR U/G STRUCTURES.
RED LINE DENOTES 0.25m
(0.82') SETBACK TO BE KEPT FREE
OF ANY FENCES, POSTS, STEPS,
OR U/G STRUCTURES.
RED LINE DENOTES 0.25m
(0.82') SETBACK TO BE KEPT FREE
OF ANY FENCES, POSTS, STEPS,
OR U/G STRUCTURES.
RED LINE DENOTES 0.25m
(0.82') SETBACK TO BE KEPT FREE
OF ANY FENCES, POSTS, STEPS,
OR U/G STRUCTURES.
RED LINE DENOTES 0.50m
(1.64') SETBACK TO BE KEPT FREE
OF ANY FENCES, POSTS, STEPS,
OR U/G STRUCTURES.
DP1
DA
TE
: 2
019/02/0
6
KW
A S
IT
E D
EV
ELO
PM
EN
T
CO
NS
ULT
IN
G IN
C.
2453 A
uckland D
rive
Burlington, O
N L7L 7A
9
Burlington W
oodstock V
ancouver
SIT
E B
AS
E P
LA
N
DP1
CH
EC
KE
D B
Y:A
KD
RA
WN
B
Y: B
HP
RO
JE
CT
N
o: 1
73
01
DIS
TR
IB
UT
IO
N C
EN
TE
R
WA
LM
AR
T
SU
RR
EY
- B
RIT
IS
H C
OLU
MB
IA
GRAPHIC SCALE
1:1500
0m10m
20m30m
AutoCAD SHX TextLOT 3
AutoCAD SHX TextPLAN BCP19916
AutoCAD SHX Text0.980 ha
AutoCAD SHX Text0.947ha
AutoCAD SHX Text10.755 ha
AutoCAD SHX Text2.459 ha
AutoCAD SHX TextTOTAL AREA= 4.996 ha
SITE STATISTICSBUILDING TYPE INDUSTRIAL
REQUIRED PROVIDED
MAIN WAREHOUSEAREAS:NET LOT AREA (SQ. M.) min. 2,000 m² ±107,549 m²
- GROUND FLOOR ±27,039 m²- MEZZANINE ±546 m²GROSS FLOOR AREA ±27,585 m²- SATELLITE ELECTRICAL ROOM ±106 m²- GUARD HOUSE ±25 m²TOTAL GROSS FLOOR AREA ±27,716 m²TOTAL FOOTPRINT AREA ±27,170 m²LOT COVERAGE max. 0.60 .25
BUILDING SETBACKSFRONT YARD (24th AVE.) SOUTH 16 m 51.5 mSIDE YARD (194th ST.) WEST 7.5 m 58.3 mINT. SIDE YARD - EAST 7 m 62.3 mREAR YARD - NORTH 7.5 m 125.5 m
TOTAL PAVED AND HARD SURFACE AREA ±61,014 m²- COVERAGE 56.7 %TOTAL LANDSCAPED AREA ±19,324 m²- COVERAGE __ % 18.0 %FLOOR AREA RATIO 1.0 .25
LANDSCAPE SETBACKSFRONT YARD (24th AVE.) 6 m 6 mSIDE YARD (194th ST.) 7.5 m 7.5 mINT. SIDE YARD 5 m 5 mREAR YARD 6 m 6 m
PARKING
- WAREHOUSE 1/100 m² 261 STALLS 227 STALLS- OFFICES 1/ 2.5 m² 35 STALLS 35 STALLS- HANDICAP (201 - 300 CARS) 3 STALLS 4 STALLSTOTAL 299 STALLS 266 STALLSPARKING STALL SIZE 5.5m x 2.75m 5.5m x 2.75 mHC STALL SIZE 5.5M x 4.1m 5.5m X 4.1mAISLE SIZE 6.7 m 6.7 m
TRUCKING- DOCK DOORS 78- TRAILER PARKING 238- TRACTOR PARKING 30
BUILDING HEIGHTS(ABOVE GROUND FLOOR)MAIN WAREHOUSE ±25.5 mSATELLITE ELECTRICAL ROOM ±4.3 mGUARD HOUSE ±4.3 m
WAREHOUSE AREA 26,100 m²OFFICE AREA 1,400 m²G.F.A. LESS MECH. RMS, ETC. 27,500 m²
SLO
PE
SLO
PE
SLO
PE
HIGH POINT
WEIGH SCALE
MAIN ENTRANCE
CITY PROPOSED SIDEWALK
CITY PROPOSED CURB
CONCRETE DOLLYPAD TYP.
CONCRETE APRON
CONCRETE APRON
41 DOCK DOORS
20 DOCK DOORS17 DOCK DOORS
30 TRAILERS @ 3.7m c/c
GENERATORCOURT
261 CARS
4.5m LANDSCAPE SETBACK
6m L
ANDS
CAPE
SET
BACK
7.5m LANDSCAPE SETBACK
4.5m LANDSCAPE SETBACK
6m LA
NDS
CAPE
SETB
ACK
GUAR
D HO
USE
±28
m²
17 TRAILERS @ 3.7m c/c
43 T
RAIL
ERS
@ 3
.7m
c/c
51 T
RAIL
ERS
@ 3
.7m
c/c
51 T
RAIL
ERS
@3.
7m c/
c
46 TRAILERS @ 3.7m c/c
RAM
P
ADM
INIS
TRAT
ION
OFF
ICES
1 ST
ORE
Y±8
86 m
²
WAREHOUSE±25,907m²
DOCK OFFFICES(2 STOREYS @ ±200m²)
±400 m²
2,000
34,28
416
,150
7,500
CONCRETE DOLLYPAD TYP.
SATELLITEELECTRICALROOM
30 TRACTORS @ 3350mm c/c
999
13,40
01,0
00
UNDEVELOPABLE GREEN AREA
194TH STREET
24TH
AVE
NU
E
7,500
6,000
10,950 8,305 180,595600
19,730 16,150 1,705 16,150 19,730 16,150
GUAR
D RA
IL
16,15
415
,296
50,43
522
,645
143,7
1522
,540
25,71
016
,150
40,51
5
SLO
PE
4,998
4,500
PUMPROOM
TYP.
4,200
24,600
5 CARS2.75m
TYP.
5,500 6,700 5,500
17,700
5,500
6,700
9,000
7,500
13,45
1
11,000
600
600
600
3,000
2,717
1,289
ROOF TOP UNITS
125,415
65,86
076
,075
125,570
80,55
5
70,710
STAIR EXIT5,001 11,804
PAINTEDISLAND
PAINTEDWALKWAY
REGULARCONCRETE
2.75m
TYP.
5,500 6,700 5,500
17,700
WAL
MAR
T
ARCH
R2
SITE
PLA
N -S
TATI
STIC
S
Dis
tribu
tion
Cen
ter
1952
6 24
AVE
NUE,
SUR
REY,
BC.
PRO
JECT
No:
170
67D R
AWN
BY: O
CCH
ECKE
D B
Y: J
C
P100
DATE
: 201
9.02
.14
Scale: 1 : 1500 P1001SITE PLAN
PROJECTNORTHNORTH
Scale: 1 : 750 P1002PARKING DETAIL TYPICAL
WB-67-InterstateSemi-Trailer
WB- 67 - I nt er st at e Se mi -T ra il er
WB- 67 - I nt er st at e Se mi -T ra il er
E-ONEHP
100Aerial
WB -6 7 - I nte rs ta t e S e mi -T ra i l er
WB -6 7 - I nte rs ta t e S e mi -T ra i l er
WB-67-InterstateSemi-Trailer
WB-67-Inte
rstateSemi-
Trailer
WB-67-InterstateSemi-Trailer
WB- 67 - I nt er st at e Se mi -T ra il er
WB-67-InterstateSemi-Trailer
WB-67-InterstateSemi-Trailer
WB-67-Inte
rstateSemi-
Trailer
WB-67-Inte
rstateSemi-
Trailer
WB-67-InterstateSemi-Trailer
WB-67-InterstateSemi-Trailer
WB-67-Inte
rstateSemi-
Trailer
WB-67-Inte
rstateSemi-
Trailer
LEGEND
PROPERTY LINE1
CONCRETE SIDEWALK2
CONCRETE CURB 150mm WIDE3
CONCRETE APRON / DOLLY PAD4
DECORATIVE PAVING5
DECORATIVE FENCE - METAL PANEL6A
DECORATIVE FENCE - IRON EAGLE6B
LIGHT DUTY PAVING7
HEAVY DUTY PAVING (TRUCKING AREA)8
WEIGH SCALE9
MAIN SPRINKLER ROOM10
MAIN ELECTRICAL ROOM11
FIRE ACCESS ROUTE12
RETAINING WALL13
ROOF DRAIN14
ROOF DOWNSPOUT15
ROOF TOP MECHANICAL UNIT16
ARMCO TYPE METAL GUARD RAIL ALONGBUILDING SIDE
17
TRUCK TURNING BASED ON WB-67 INTERSTATESEMI-TRAILERFIRE TRUCK BASED ON E-ONE HP100 AERIAL
NOTE ON TURNING SIMULATIONS:
PARKING LOT LIGHTS, REFER TO ELECTRICALDRAWINGS
18
WALL MOUNTED LIGHTS, REFER TOELECTRICAL DRAWINGS
19
CORRUGATED METAL FENCE6C
SLOP
E
SLOP
E
SLOP
E
HIGH POINT
MAIN ENTRANCE
CITY PROPOSEDSIDEWALK
CITY PROPOSEDCURB
19 DOCK DOORS19 DOCK DOORS
30 TRAILERS @ 3.7m c/c
GENERATORCOURT
261
CARS
4.5m LANDSCAPE SETBACK
6mLA
NDSC
APE
SETB
ACK
6m LANDSCAPE SETBACK
4.5m LANDSCAPE SETBACK
6mLA
NDSC
APE
SETB
ACK
GUAR
DHO
USE
±28
m²
17 TRAILERS @ 3.7m c/c
43TR
AILE
RS@
3.7m
c/c
51TR
AILE
RS@
3.7m
c/c
51TR
AILE
RS@
3.7m
c/c
RAM
P
ADM
INIS
TRAT
ION
OFFI
CES
1ST
ORE
Y
±886
m²
WAREHOUSE±25,907m²
DOCK OFFFICES(2 STOREYS @ ±200m²)
±400 m²
6 66
30 TRACTORS @ 3350mm c/c
15
UNDEVELOPABLE GREEN AREA
194TH STREET24
THAV
ENU
E
15 15 15 15 15 15
2 2 2 2 2 2 2
SLOP
E
3
3
14
4
4
4
4
17
44
8
8
8
413
4
8
33
232
2
5
2
3
3
3
3
6A
1
6B6A
6A
6A
1
6B 1
6B
1
4
6B 1
1
6B
2
9
3
3
6A 6A 6B
6C
12
12
7
7
8
PUMPROOM
STAIR EXIT
ROOF TOP UNITS
5
6C
18
18
18
41 DOCK DOORS
46 TRAILERS @ 3.7m c/c
18
19
19
19
7 ,50 0
WAL
MAR
T
ARCH
R0
SITE
PLAN
-DES
CRIP
TIO
N
Dis
tribu
tion
Cen
ter
1952
624
AVEN
UE,
SURR
EY,B
C.PR
OJE
CTNo
:170
67DR
AWN
BY:O
CCH
ECKE
DBY
:JC
P101
DAT
E:20
18.0
9.20
PROJECTNORTHNORTH
SCALE 1:1500
WAL
MAR
T
ARCH
R1
VIEW
FRO
M S
W C
ORN
ER
Dis
tribu
tion
Cen
ter
1952
6 24
AVE
NUE,
SUR
REY,
BC.
PRO
JECT
No:
170
67D R
AWN
BY: A
utho
rCH
ECKE
D B
Y: C
heck
er
P300
DATE
: 201
9.01
.31
WAL
MAR
T
ARCH
R1
VIEW
FRO
M 2
4TH
AVEN
UE
Dis
tribu
tion
Cen
ter
1952
6 24
AVE
NUE,
SUR
REY,
BC.
PRO
JECT
No:
170
67D R
AWN
BY: A
utho
rCH
ECKE
D B
Y: C
heck
er
P301
DATE
: 201
9.01
.31
WAL
MAR
T
ARCH
R1
VIEW
FRO
M 1
94TH
STR
EET
Dis
tribu
tion
Cen
ter
1952
6 24
AVE
NUE,
SUR
REY,
BC.
PRO
JECT
No:
170
67D R
AWN
BY: A
utho
rCH
ECKE
D B
Y: C
heck
er
P302
DATE
: 201
9.01
.31
WAL
MAR
T
ARCH
R1
VIEW
FRO
M S
E CO
RNER
Dis
tribu
tion
Cen
ter
1952
6 24
AVE
NUE,
SUR
REY,
BC.
PRO
JECT
No:
170
67D R
AWN
BY: A
utho
rCH
ECKE
D B
Y: C
heck
er
P303
DATE
: 201
9.01
.31
WAL
MAR
T
ARCH
R1
VIEW
FRO
M 1
94TH
STR
EET
Dis
tribu
tion
Cen
ter
1952
6 24
AVE
NUE,
SUR
REY,
BC.
PRO
JECT
No:
170
67D R
AWN
BY: A
utho
rCH
ECKE
D B
Y: C
heck
er
P304
DATE
: 201
9.01
.31
0.00GROUND FLOOR
7.01 TOP OF PARAPET #1
12.65TOP OF PARAPET #2
P3201
P3202
P3203
123 6 4 2
9.14T.O.P SHIPPING OFFICE
7 7910 10
0.00GROUND FLOOR
7.01TOP OF PARAPET #1
12.65TOP OF PARAPET #2
P3204
xx
5 HORIZONTAL METALMOULDING APPLIED,COLOR 6, TYPICAL
5 1 6 7 8
WAL
MAR
T
ARCH
R2
ELEV
ATIO
NS
Dis
tribu
tion
Cen
ter
1952
624
AVEN
UE,
SURR
EY,B
C.PR
OJE
CTNo
:170
67DR
AWN
BY:O
CCH
ECKE
DBY
:JC
P310
DAT
E:20
19.0
2.21
Scale: 1 : 600 P3101SOUTH ELEVATION - 24TH AVENUE
Scale: 1 : 600 P3102WEST ELEVATION - 194TH STREET
EXTERIOR ELEVATION FINISH LEGEND6 METAL PANEL, COLOR DOVE GREY7 INSULATED METAL PANEL, MICRORIB, COLOR CHARCOAL8 METAL SIDING CANOPY9 ALUMINUM & GLASS CURTAIN WALL
10 SPANDREL GLASS
EXTERIOR ELEVATION FINISH LEGEND1 INSULATED METAL PANEL, MICRORIB, COLOR SANDSTONE2 INSULATED METAL PANEL, GRANITSONE, COLOR DOVE GREY3 INSULATED METAL PANEL, SMOOTH, COLOR DOVE GREY4 INSULATED METAL PANEL, SMOOTH, COLOR ZINC GREY5 INSULATED METAL PANEL, MICRORIB, COLOR ZINC GREY
TOP OF PARAPET #3 25.50
TOP OF PARAPET #3 25.50
0.00 GROUND FLOOR
7.01 TOP OF PARAPET #1
12.65 TOP OF PARAPET #2
9.14T.O.P SHIPPING OFFICE
6 1 55 7810
0.00 GROUND FLOOR
12.65 TOP OF PARAPET #2
9.14 T.O.P SHIPPING OFFICE
3 2 5 17
WAL
MAR
T
ARCH
R2
ELEV
ATIO
NS
Dis
tribu
tion
Cen
ter
1952
624
AVEN
UE,
SURR
EY,B
C.PR
OJE
CTNo
:170
67DR
AWN
BY:O
CCH
ECKE
DBY
:JC
P311
DAT
E:20
19.0
2.21
Scale: 1 : 600 P3112ELEVATION EAST
Scale: 1 : 600 P3111NORTH ELEVATION
EXTERIOR ELEVATION FINISH LEGEND6 METAL PANEL, COLOR DOVE GREY7 INSULATED METAL PANEL, MICRORIB, COLOR CHARCOAL8 METAL SIDING CANOPY9 ALUMINUM & GLASS CURTAIN WALL
10 SPANDREL GLASS
EXTERIOR ELEVATION FINISH LEGEND1 INSULATED METAL PANEL, MICRORIB, COLOR SANDSTONE2 INSULATED METAL PANEL, GRANITSONE, COLOR DOVE GREY3 INSULATED METAL PANEL, SMOOTH, COLOR DOVE GREY4 INSULATED METAL PANEL, SMOOTH, COLOR ZINC GREY5 INSULATED METAL PANEL, MICRORIB, COLOR ZINC GREY
0.00GROUND FLOOR
7.01TOP OF PARAPET #1
12.65TOP OF PARAPET #2
WAL
MAR
T
ARCH
R2
ELEV
ATIO
NS&
FENC
ES
Dis
tribu
tion
Cen
ter
1952
624
AVEN
UE,
SURR
EY,B
C.PR
OJE
CTNo
:170
67DR
AWN
BY:O
CCH
ECKE
DBY
:JC
P312
DAT
E:20
19.0
2.21
Scale: 1 : 600 P3121WEST FENCE ELEVATION - 194TH STREET
TOP OF PARAPET #3 25.50
0.00 GROUND FLOOR
12.65 TOP OF PARAPET #2
9.14 T.O.P SHIPPING OFFICE
0.00 GROUND FLOOR
7.01 TOP OF PARAPET #1
12.65 TOP OF PARAPET #2
WAL
MAR
T
ARCH
R2
ELEV
ATIO
NS&
FENC
ES
Dis
tribu
tion
Cen
ter
1952
624
AVEN
UE,
SURR
EY,B
C.PR
OJE
CTNo
:170
67DR
AWN
BY:O
CCH
ECKE
DBY
:JC
P313
DAT
E:20
19.0
2.21
Scale: 1 : 600 P3131NORTH FENCE ELEVATION
Scale: 1 : 600 P3132EAST FENCE ELEVATION
xx
x
xx
x
WAREHOUSE
UNDEVELOPABLE GREEN AREA
194TH STREET
24TH
AVEN
UE
NORTH
1P400
3P400
2P400
±24.8m to closest Roof Top Unit
LANDSCAPING6,960
TRUCK YARD73,450
FROST FENCE
70.55
54.20
TOP OF PARAPET
TOP OF SHIPPING OFFICE PARAPET
45.05TOP OF SLAB
8,997
43.1543.85
2,952
TRUCK YARD64,290
LANDSCAPING & SIDEWALK15,420
194th STREET12,200
FROST FENCE
70.55
45.05
TOP OF PARAPET
TOP OF SLAB43.0
43.85
43.1543.30
±42.5m to closest Roof Top Unit3,1
32
2,862
11,153
24th AVENUE19.98
SIDEWALK & LANDSCAPING11.30
PARKING17.70
LANDSCAPING5.72
PARKING17.69
SIDEWALK4.01
PARKING12.17 6.74
70.55
53.28
45.05
TOP OF PARAPET
TOP OF OFFICE PARAPET
TOP OF SLAB42.32
44.9044.0043.30
RTU UNIT
11,640
MUA UNIT
ROOF EXITSTAIR
WAL
MAR
T
ARCH
R1
ROO
FSC
REEN
ING
SECT
IONS
Dis
tribu
tion
Cen
ter
1952
624
AVEN
UE,
SURR
EY,B
C.PR
OJE
CTNo
:170
67DR
AWN
BY:M
SCH
ECKE
DBY
:JC
P400
DAT
E:20
19.0
2.21
Scale: 1 : 500 ,Ref:A210 P4002P400 Section Through East Truck Yard
Scale: 1 : 500 ,Ref:A210 P4003P400 Section Through West Truck Yard
Scale: 1 : 500 ,Ref:A210 P4001P400 Section Through Employee Parking
SLO
PE
SLO
PE
SLO
PE
HIGH POINT
MAIN ENTRANCE
RAM
P
ADM
INIS
TRAT
ION
OFFI
CES
1ST
ORE
Y±8
84m
²
WAREHOUSE±25,893m²
180,595
600
GUAR
DRA
IL
SLO
PE
ROOF TOP UNITS
PROJECTNORTHNORTH
143,9
10
52,32
0
NO EQUIPMENT IN THIS ZONE
NO EQUIPMENT IN THIS ZONE
NO EQUIPMENT IN THIS ZONE
NO EQUIPMENT IN THIS ZONE
WHITE TPO ROOF MEMBRANE
8,127
11,10
0
11,150
15,399
9,000
WAL
MAR
T
ARCH
R5
ROO
FPL
AN
Dis
tribu
tion
Cen
ter
1952
624
AVEN
UE,
SURR
EY,B
C.PR
OJE
CTNo
:170
67DR
AWN
BY:A
utho
rCH
ECKE
DBY
:Che
cker
P402
DAT
E:20
19.0
2.26
± ²
DIS
TRIB
UTI
ON
CEN
TER
1952
6 24
AVE
NU
E, S
UR
REY
, BC
.
WAL
MAR
T
LANDSC.
DAT
E:
CH
ECKE
D B
Y:D
RAW
N B
Y:PR
OJE
CT
No:
MM
TB00
000
2019
.FEB
.20
R3
L1
.0
1:15
00SI
TE P
LAN
- W
HO
LE S
ITE
REVI
SIO
N D
ESCR
IPTI
ON
NO
.DA
TEDR
.
SEAL
:
AutoCAD SHX TextPL
AutoCAD SHX TextPL
AutoCAD SHX Text24TH AVE
AutoCAD SHX Text194TH STREET
AutoCAD SHX TextENVIRONMENTAL AREA
AutoCAD SHX Text+42.34
AutoCAD SHX Text+45.72
AutoCAD SHX Text+43.33
AutoCAD SHX Text+42.79
AutoCAD SHX Text+43.00
AutoCAD SHX Text+43.71
AutoCAD SHX Text+43.32
AutoCAD SHX Text+43.70
AutoCAD SHX Text+44.29
AutoCAD SHX Text+43.67
AutoCAD SHX Text+44.11
AutoCAD SHX Text2%
AutoCAD SHX Text+43.79
AutoCAD SHX Text+42.68
AutoCAD SHX Text+42.10
AutoCAD SHX Text+43.44
AutoCAD SHX Text+42.85
AutoCAD SHX Text+41.80
AutoCAD SHX Text+42.75
AutoCAD SHX Text+43.06
AutoCAD SHX Text+42.76
AutoCAD SHX Text+43.59
AutoCAD SHX Text+43.30
AutoCAD SHX Text+43.00
AutoCAD SHX Text+43.44
AutoCAD SHX Text+43.35
AutoCAD SHX Text+43.35
AutoCAD SHX Text+43.35
AutoCAD SHX Text+43.35
AutoCAD SHX Text+43.35
AutoCAD SHX Text+42.15
AutoCAD SHX Text+45.05
AutoCAD SHX Text+45.31
AutoCAD SHX Text+43.36
AutoCAD SHX Text+43.30
AutoCAD SHX Text+43.47
AutoCAD SHX Text+43.34
AutoCAD SHX Text+43.00
AutoCAD SHX Text+43.00
AutoCAD SHX Text+43.56
AutoCAD SHX Text+43.35
AutoCAD SHX Text+43.35
AutoCAD SHX Text+43.00
AutoCAD SHX Text+43.00
AutoCAD SHX Text2%
AutoCAD SHX Text2%
AutoCAD SHX Text2%
AutoCAD SHX Text+43.35
AutoCAD SHX TextBERMS 1-1.5HT
AutoCAD SHX TextWAY FINDING R.OW.
AutoCAD SHX TextSTAMPED CONCRETE FM-8420 MAT FROM BRICKFORM.COM
AutoCAD SHX TextBLACK LOCUST TREE
AutoCAD SHX TextSCORED CONCRETE
AutoCAD SHX TextCITY SIDEWALK
AutoCAD SHX TextHORNBEAM BOSQUE
AutoCAD SHX TextBENCH BY SANDERSON CONCRETE
AutoCAD SHX TextSCORED CONCRETE PROMENADE
AutoCAD SHX TextBIOSWALE WITH ROUND RIVER ROCK AT LOWPOINT
AutoCAD SHX TextSTAMPED CONCRETE FM-5100 MAT FROM BRICKFORM.COM
AutoCAD SHX TextSCARLET OAK
AutoCAD SHX TextSTAMPED CONCRETE FM-5100 MAT FROM BRICKFORM.COM
AutoCAD SHX TextBIOSWALE WITH ROUND RIVER ROCK AT LOWPOINT
AutoCAD SHX TextHORNBEAM TREE
AutoCAD SHX TextHORNBEAM TREE
AutoCAD SHX TextSCARLET OAK
AutoCAD SHX Text30" GRAVEL ACCESS PATHWAY
AutoCAD SHX TextSTAMPED CONCRETE FM-8420 MAT FROM BRICKFORM.COM
AutoCAD SHX TextSTAMPED CONCRETE FM-5100 MAT FROM BRICKFORM.COM
AutoCAD SHX TextPICNIC TABLE BY SANDERSON CONCRETE
AutoCAD SHX TextSTAMPED CONCRETE FM-8420 MAT FROM BRICKFORM.COM
AutoCAD SHX TextDRIFTS OF MASS PLANTING
AutoCAD SHX TextGATED ELECTRICAL AREA
AutoCAD SHX TextSTAMPED CONCRETE FM-5100 MAT FROM BRICKFORM.COM
AutoCAD SHX TextBIOSWALE WITH ROUND RIVER ROCK AT LOWPOINT
AutoCAD SHX TextSTAMPED CONCRETE FM-5100 MAT FROM BRICKFORM.COM
AutoCAD SHX TextBIOSWALE WITH ROUND RIVER ROCK AT LOWPOINT
AutoCAD SHX TextRIP RAP: ROUND RIVER STONE
AutoCAD SHX TextSOLID FENCE TYPE 01 REFER TO DETAIL
AutoCAD SHX TextCHAINLINK FENCE TYPE 02 REFER TO DETAIL
AutoCAD SHX TextGATE
AutoCAD SHX TextDRIFTS OF MASS PLANTING
AutoCAD SHX TextPEDESTRAIN CONNECTION
AutoCAD SHX TextIN CONCRETE BROOM FINISHING
AutoCAD SHX TextPAINTED ISLAND
AutoCAD SHX TextPAINTED WALK (REFER TO P101)
AutoCAD SHX TextLETDOWN (TYP)
AutoCAD SHX TextLETDOWN (TYP)
AutoCAD SHX TextSCORED CONCRETE
AutoCAD SHX TextLETDOWN (TYP)
AutoCAD SHX TextGENERATOR
AutoCAD SHX TextCOURT
AutoCAD SHX Text6m LANDSCAPE SETBACK
AutoCAD SHX Text7.5m LANDSCAPE SETBACK
AutoCAD SHX Text6m LAND. SETBACK
AutoCAD SHX TextADM. OFFICES
AutoCAD SHX TextWAREHOUSE
AutoCAD SHX Text25,893m²
AutoCAD SHX TextDOCK OFFICES
AutoCAD SHX TextSATELLITE
AutoCAD SHX TextELECTRICAL
AutoCAD SHX TextROOM
AutoCAD SHX TextMAIN ENTRANCE
AutoCAD SHX TextCITY SIDEWALK
AutoCAD SHX TextFAGUS SYLVATICA
AutoCAD SHX TextISLANDS WITH 0.75M GROWING MEDIUM DEPH
AutoCAD SHX TextISLAND WITH 0.75M GROWING MEDIUM DEPH
AutoCAD SHX TextACCESS GATES
AutoCAD SHX Text GATE
AutoCAD SHX TextP.L.
AutoCAD SHX TextP.L.
AutoCAD SHX TextP.L.
AutoCAD SHX TextP.L.
AutoCAD SHX TextP.L.
AutoCAD SHX TextP.L.
AutoCAD SHX Text+42.42
AutoCAD SHX TextGATEWAY R.O.W.
AutoCAD SHX TextSCORED CONCRETE
AutoCAD SHX TextFENCE TYPE 01
AutoCAD SHX TextFENCE TYPE 02
AutoCAD SHX TextCHAINLINK HT=2.43M (8')
AutoCAD SHX TextSOLID HT=2.43M (8'); TOTAL HT=3.0M
AutoCAD SHX TextFENCES LEGEND
AutoCAD SHX TextSHEET LIST
AutoCAD SHX TextNUMBER
AutoCAD SHX TextL1
AutoCAD SHX TextSITE PLAN - WHOLE SITE
AutoCAD SHX TextL2
AutoCAD SHX TextSITE PLAN - AMENITY AREA
AutoCAD SHX TextL3.0
AutoCAD SHX TextPLANTING PLAN - KEY MAP
AutoCAD SHX TextL3.1
AutoCAD SHX TextPLANTING PLAN 1
AutoCAD SHX TextL3.2
AutoCAD SHX TextPLANTING PLAN 2
AutoCAD SHX TextSHEET TITLE
AutoCAD SHX TextL3.3
AutoCAD SHX TextPLANTING PLAN 3
AutoCAD SHX TextL3.4
AutoCAD SHX TextPLANTING PLAN 4
AutoCAD SHX TextL3.5
AutoCAD SHX TextPLANTING PLAN 5
AutoCAD SHX TextL3.6
AutoCAD SHX TextPLANTING PLAN 6
AutoCAD SHX TextL3.7
AutoCAD SHX TextPLANTING PLAN 7
AutoCAD SHX Text1:1500
AutoCAD SHX Text1:400
AutoCAD SHX Text1:2000
AutoCAD SHX Text1:200
AutoCAD SHX Text1:200
AutoCAD SHX Text1:200
AutoCAD SHX Text1:200
AutoCAD SHX Text1:200
AutoCAD SHX Text1:200
AutoCAD SHX Text1:200
AutoCAD SHX TextSCALE
AutoCAD SHX TextL4.0
AutoCAD SHX TextHARDSCAPE DETAILS
AutoCAD SHX TextNOTED
AutoCAD SHX TextL4.1
AutoCAD SHX TextSOFTSCAPE DETAILS
AutoCAD SHX TextNOTED
AutoCAD SHX TextL5.0
AutoCAD SHX TextSECTIONS
AutoCAD SHX TextNOTED
AutoCAD SHX TextL3.8
AutoCAD SHX TextPLANTING PLAN 8 (A & B)
AutoCAD SHX TextL3.9
AutoCAD SHX TextPLANTING PLAN 9
AutoCAD SHX TextL3.10
AutoCAD SHX TextPLANTING PLAN 10
AutoCAD SHX TextL3.11
AutoCAD SHX TextPLANTING PLAN 11
AutoCAD SHX TextL3.12
AutoCAD SHX TextPLANTING PLAN 12
AutoCAD SHX TextL3.13
AutoCAD SHX TextPLANTING PLAN 13
AutoCAD SHX TextL3.14
AutoCAD SHX TextPLANTING PLAN 14
AutoCAD SHX Text1:200
AutoCAD SHX Text1:200
AutoCAD SHX Text1:200
AutoCAD SHX Text1:200
AutoCAD SHX Text1:200
AutoCAD SHX Text1:200
AutoCAD SHX Text1:200
AutoCAD SHX TextL3.15
AutoCAD SHX TextPLANTING PLAN 15 (A & B)
AutoCAD SHX TextL3.16
AutoCAD SHX TextPLANTING PLAN 16 (A & B)
AutoCAD SHX Text1:200
AutoCAD SHX Text1:200
AutoCAD SHX TextA
AutoCAD SHX TextL5.0
AutoCAD SHX TextA
AutoCAD SHX TextL5.0
AutoCAD SHX TextB
AutoCAD SHX TextL5.0
AutoCAD SHX TextB
AutoCAD SHX TextL5.0
AutoCAD SHX TextL6.0
AutoCAD SHX TextLIGHTING PLAN - WHOLE SITE
AutoCAD SHX Text1:1500
AutoCAD SHX TextL7.0
AutoCAD SHX TextIRRIGATION PLAN - WHOLE SITE
AutoCAD SHX Text1:1500
AutoCAD SHX TextL8.0
AutoCAD SHX TextSPECIFICATIONS
AutoCAD SHX Text-
AutoCAD SHX Text0
AutoCAD SHX Text2018.SEP.14
AutoCAD SHX TextISSUED FOR DP
AutoCAD SHX TextTB
AutoCAD SHX Text1
AutoCAD SHX Text2019.FEB.01
AutoCAD SHX TextISSUED FOR DP REZONING
AutoCAD SHX TextJG
AutoCAD SHX Text2
AutoCAD SHX Text2019.FEB.07
AutoCAD SHX TextREISSUED FOR DP REZONING
AutoCAD SHX TextJG
AutoCAD SHX Text3
AutoCAD SHX Text2019.FEB.20
AutoCAD SHX TextREVISION CITY'S COMMENTS
AutoCAD SHX TextJG
DIS
TRIB
UTI
ON
CEN
TER
1952
6 24
AVE
NU
E, S
UR
REY
, BC
.
WAL
MAR
T
LANDSC.
DAT
E:
CH
ECKE
D B
Y:D
RAW
N B
Y:PR
OJE
CT
No:
xxxx
0000
0
2019
.FEB
.20
R3
L2
.0
1:40
0SI
TE P
LAN
- AM
ENIT
Y AR
EA
REVI
SIO
N D
ESCR
IPTI
ON
NO
.DA
TEDR
.
SEAL
:
AutoCAD SHX TextPL
AutoCAD SHX TextPL
AutoCAD SHX TextLEGEND
AutoCAD SHX TextICON
AutoCAD SHX TextFENCES
AutoCAD SHX TextHARDSCAPE
AutoCAD SHX TextSTAMPED CONCRETE: FM-8420 MAT
AutoCAD SHX TextSCORED CONCRETE AT 950MM INTERVALS
AutoCAD SHX TextSCORED CONCRETE AT 600MM INTERVALS
AutoCAD SHX TextFURNITURE
AutoCAD SHX TextPICNIC TABLE BY MAGLIN #MLPT720
AutoCAD SHX TextROUND RIVER ROCK
AutoCAD SHX TextBENCH BY MAGLIN MLB700
AutoCAD SHX TextGRID PATTERN
AutoCAD SHX TextLINEAR PATTERN
AutoCAD SHX TextFROM BRICKFORM.COM
AutoCAD SHX TextSTAMPED CONCRETE: FM-5100 MAT
AutoCAD SHX TextFROM BRICKFORM.COM
AutoCAD SHX TextFENCE TYPE 01
AutoCAD SHX TextFENCE TYPE 02
AutoCAD SHX TextCHAINLINK HT=2.43M (8')
AutoCAD SHX TextSOLID HT=2.43M (8'); TOTAL HT=3.0M
AutoCAD SHX TextSTAMPED CONCRETE
AutoCAD SHX TextSCORED CONCRETE
AutoCAD SHX TextBIOSWALES
AutoCAD SHX TextBOSQUE
AutoCAD SHX TextSEASONAL INTEREST
AutoCAD SHX Text1
AutoCAD SHX Text2
AutoCAD SHX Text3
AutoCAD SHX Text4
AutoCAD SHX Text5
AutoCAD SHX Text6
AutoCAD SHX TextPICNIC AREA
AutoCAD SHX Textcontour interval: 0.5m
AutoCAD SHX TextBOSQUE
AutoCAD SHX TextPUBLIC PLAZA
AutoCAD SHX TextROUGH GRASS LAWN
AutoCAD SHX TextADMIN BUILDING
AutoCAD SHX TextPARKING / LOADING
AutoCAD SHX Text7
AutoCAD SHX TextPLANTED BERMS:
AutoCAD SHX Text0
AutoCAD SHX Text2018.SEP.14
AutoCAD SHX TextISSUED FOR DP
AutoCAD SHX TextTB
AutoCAD SHX Text1
AutoCAD SHX Text2019.FEB.01
AutoCAD SHX TextISSUED FOR DP REZONING
AutoCAD SHX TextJG
AutoCAD SHX Text2
AutoCAD SHX Text2019.FEB.07
AutoCAD SHX TextREISSUED FOR DP REZONING
AutoCAD SHX TextJG
AutoCAD SHX Text3
AutoCAD SHX Text2019.FEB.20
AutoCAD SHX TextREVISION CITY'S COMMENTS
AutoCAD SHX TextJG
AutoCAD SHX Text1
AutoCAD SHX Text2
AutoCAD SHX Text3
AutoCAD SHX Text4
AutoCAD SHX Text4
AutoCAD SHX Text5
AutoCAD SHX Text5
AutoCAD SHX Text5
AutoCAD SHX Text6
AutoCAD SHX Text7
AutoCAD SHX Text7
ALL PLANT MATERIAL MUST BE PROVIDED FROM CERTIFIED DISEASE FREE NURSERY. PROVIDE CERTIFICATION UPON REQUEST.
± ²
DIS
TRIB
UTI
ON
CEN
TER
1952
6 24
AVE
NU
E, S
UR
REY
, BC
.
WAL
MAR
T
LANDSC.
DAT
E:
CH
ECKE
D B
Y:D
RAW
N B
Y:PR
OJE
CT
No:
MM
TB18
046
2019
.FEB
.20
R03
L3.0
1:20
00PL
ANTI
NG
PLA
N -
KEY
MAP
REVI
SIO
N D
ESCR
IPTI
ON
NO
.DA
TEDR
.
SEAL
:
AutoCAD SHX TextPLANTED SIZE / REMARKS
AutoCAD SHX TextCOMMON NAME
AutoCAD SHX TextBOTANICAL NAME
AutoCAD SHX TextPLANT SCHEDULE
AutoCAD SHX TextKEY
AutoCAD SHX TextQTY
AutoCAD SHX TextTREE
AutoCAD SHX Text6
AutoCAD SHX TextACER CIRCINATUM
AutoCAD SHX TextVINE MAPLE
AutoCAD SHX Text46
AutoCAD SHX TextCARPINUS BETULUS
AutoCAD SHX TextHORNBEAM
AutoCAD SHX Text18
AutoCAD SHX TextFAGUS SYLVATICA 'ASPLENIFOLIA'
AutoCAD SHX TextFERN LEAF BEECH
AutoCAD SHX Text15
AutoCAD SHX TextPAULOWNIA TOMENTOSA
AutoCAD SHX TextPRINCESS TREE
AutoCAD SHX Text30
AutoCAD SHX TextPINUS NIGRA
AutoCAD SHX TextAUSTRIAN PINE
AutoCAD SHX Text23
AutoCAD SHX TextQUERCUS COCCINEA
AutoCAD SHX TextSCARLET OAK
AutoCAD SHX Text12
AutoCAD SHX TextROBINIA PSEUDOACACIA
AutoCAD SHX TextBLACK LOCUST
AutoCAD SHX Text14
AutoCAD SHX TextSHRUB
AutoCAD SHX TextA1
AutoCAD SHX Text293
AutoCAD SHX TextARONIA MELANOCARPA 'AUTUMN MAGIC'
AutoCAD SHX TextBLACK CHOKE CHERRY
AutoCAD SHX Text#2 POT
AutoCAD SHX TextC
AutoCAD SHX Text586
AutoCAD SHX TextCORNUS SERICEA
AutoCAD SHX TextRED TWIG DOGWOOD
AutoCAD SHX Text#2 POT
AutoCAD SHX TextP
AutoCAD SHX Text214
AutoCAD SHX TextPHILADELPHUS LEWISII
AutoCAD SHX TextMOCK ORANGE
AutoCAD SHX Text#3 POT
AutoCAD SHX TextR
AutoCAD SHX Text1429
AutoCAD SHX TextRIBES SANGUINEUM 'BROCKLEBANKII'
AutoCAD SHX TextFLOWERING CURRANT
AutoCAD SHX Text#2 POT
AutoCAD SHX TextRO1
AutoCAD SHX Text536
AutoCAD SHX TextROSA RUGOSA
AutoCAD SHX TextBEACH ROSE
AutoCAD SHX Text#2 POT
AutoCAD SHX TextSA
AutoCAD SHX Text2151
AutoCAD SHX TextSPIRAEA DENSIFLORA
AutoCAD SHX TextMOUNTAIN SPIRAEA
AutoCAD SHX Text#2 POT
AutoCAD SHX TextSY
AutoCAD SHX Text928
AutoCAD SHX TextSYMPHORICARPUS ALBUS
AutoCAD SHX TextSNOWBERRY
AutoCAD SHX Text#2 POT
AutoCAD SHX TextVA
AutoCAD SHX Text2725
AutoCAD SHX TextVACCINIUM OVATUM
AutoCAD SHX TextEVERGREEN HUCKLEBERRY
AutoCAD SHX Text#2 POT
AutoCAD SHX TextPERENNIAL
AutoCAD SHX TextCD
AutoCAD SHX Text4820
AutoCAD SHX TextCAREX DENSA
AutoCAD SHX TextDENSE SEDGE
AutoCAD SHX Text#2 POT
AutoCAD SHX TextL
AutoCAD SHX Text93
AutoCAD SHX TextLAVENDULA ANGUSTIFOLIA
AutoCAD SHX TextENGLISH LAVENDER
AutoCAD SHX Text#2 POT
AutoCAD SHX TextS
AutoCAD SHX Text255
AutoCAD SHX TextSALVIA NEMOROSA 'CARADONNA'
AutoCAD SHX TextWOODLAND SAGE
AutoCAD SHX Text#2 POT
AutoCAD SHX TextS1
AutoCAD SHX Text392
AutoCAD SHX TextSTIPA TENUISSIMA 'WIND WHISPERS'
AutoCAD SHX TextFEATHER GRASS
AutoCAD SHX Text#2 POT
AutoCAD SHX TextGC
AutoCAD SHX TextAR
AutoCAD SHX Text1393
AutoCAD SHX TextARCTOSTAPHYLOS UVA-URSI
AutoCAD SHX TextBEARBERRY
AutoCAD SHX Text#2 POT
AutoCAD SHX TextE
AutoCAD SHX Text1956
AutoCAD SHX TextERICA CARNEA
AutoCAD SHX TextWINTER HEATHER
AutoCAD SHX Text#1 POT
AutoCAD SHX TextM
AutoCAD SHX Text625
AutoCAD SHX TextMAHONIA REPENS
AutoCAD SHX TextCREEPING MAHONIA
AutoCAD SHX Text#1 POT
AutoCAD SHX TextNOTES: * PLANT SIZES IN THIS LIST ARE SPECIFIED ACCORDING TO THE BC LANDSCAPE STANDARD, LATEST EDITION. CONTAINER SIZES SPECIFIED AS PER CNTA STANDARDS. BOTH PLANT SIZE AND CONTAINER SIZE ARE THE MINIMUM ACCEPTABLE SIZES. * REFER TO SPECIFICATIONS FOR DEFINED CONTAINER MEASUREMENTS AND OTHER PLANT MATERIAL REQUIREMENTS. * SEARCH AND REVIEW: MAKE PLANT MATERIAL AVAILABLE FOR OPTIONAL REVIEW BY LANDSCAPE ARCHITECT AT SOURCE OF SUPPLY. AREA OF SEARCH TO INCLUDE LOWER MAINLAND AND FRASER VALLEY. * SUBSTITUTIONS: OBTAIN WRITTEN APPROVAL FROM THE LANDSCAPE ARCHITECT PRIOR TO MAKING ANY SUBSTITUTIONS TO THE SPECIFIED MATERIAL. UNAPPROVED SUBSTITUTIONS WILL BE REJECTED. ALLOW A MINIMUM OF FIVE DAYS PRIOR TO DELIVERY FOR REQUEST TO SUBSTITUTE. SUBSTITUTIONS ARE SUBJECT TO BC LANDSCAPE STANDARD - DEFINITION OF CONDITIONS OF AVAILABILITY.
AutoCAD SHX TextM2 JOB NUMBER:
AutoCAD SHX Text18-046
AutoCAD SHX TextTAXODIUM DISTICHUM VAR. DISTICHUM
AutoCAD SHX TextBALD CYPRESS
AutoCAD SHX Text6CM CAL
AutoCAD SHX Text2.5M HT; B&B
AutoCAD SHX Text2M HT
AutoCAD SHX Text1.8M HT; B&B; 3 STEM CLUMP
AutoCAD SHX Text6CM CAL
AutoCAD SHX Text6CM CAL
AutoCAD SHX Text6CM CAL
AutoCAD SHX Text6CM CAL
AutoCAD SHX TextPL
AutoCAD SHX TextPL
AutoCAD SHX Text24TH AVE
AutoCAD SHX Text194TH STREET
AutoCAD SHX TextENVIRONMENTAL AREA
AutoCAD SHX TextGENERATOR
AutoCAD SHX TextCOURT
AutoCAD SHX TextADM. OFFICES
AutoCAD SHX TextWAREHOUSE
AutoCAD SHX Text25,893m²
AutoCAD SHX TextDOCK OFFICES
AutoCAD SHX TextSATELLITE
AutoCAD SHX TextELECTRICAL
AutoCAD SHX TextROOM
AutoCAD SHX TextP.L.
AutoCAD SHX TextP.L.
AutoCAD SHX TextP.L.
AutoCAD SHX TextP.L.
AutoCAD SHX TextP.L.
AutoCAD SHX TextP.L.
AutoCAD SHX TextPAULOWNIA TOMENTOSA
AutoCAD SHX TextRIBES SANGUINEUM
AutoCAD SHX TextCORNUS SERICEA
AutoCAD SHX TextCAREX DENSA
AutoCAD SHX TextARCTOSTAPHYLOS
AutoCAD SHX TextUVA-URSI
AutoCAD SHX TextROBINIA PSEUDOACACIA
AutoCAD SHX TextPINUS NIGRA
AutoCAD SHX TextQUERCUS COCCINEA
AutoCAD SHX TextVACCINIUM OVATUM
AutoCAD SHX TextFRAGARIA CHILOENSIS
AutoCAD SHX TextL3.16(B)
AutoCAD SHX TextL3.16(A)
AutoCAD SHX TextL3.15(B)
AutoCAD SHX TextL3.15(A)
AutoCAD SHX TextL3.14
AutoCAD SHX TextL3.13
AutoCAD SHX TextL3.12
AutoCAD SHX TextL3.11
AutoCAD SHX TextL3.10
AutoCAD SHX TextL3.9
AutoCAD SHX TextL3.8(B)
AutoCAD SHX TextL3.8(A)
AutoCAD SHX TextL3.1
AutoCAD SHX TextL3.2
AutoCAD SHX TextL3.3
AutoCAD SHX TextL3.4
AutoCAD SHX TextL3.5
AutoCAD SHX TextL3.6
AutoCAD SHX TextL3.7
AutoCAD SHX Text0
AutoCAD SHX Text2018.SEP.14
AutoCAD SHX TextISSUED FOR DP
AutoCAD SHX TextTB
AutoCAD SHX Text1
AutoCAD SHX Text2019.FEB.01
AutoCAD SHX TextISSUED FOR DP REZONING
AutoCAD SHX TextJG
AutoCAD SHX Text2
AutoCAD SHX Text2019.FEB.07
AutoCAD SHX TextREISSUED FOR DP REZONING
AutoCAD SHX TextJG
AutoCAD SHX Text3
AutoCAD SHX Text2019.FEB.20
AutoCAD SHX TextREVISION CITY'S COMMENTS
AutoCAD SHX TextJG
31
DIS
TRIB
UTI
ON
CEN
TER
1952
6 24
AVE
NU
E, S
UR
REY
, BC
.
WAL
MAR
T
LANDSC.
DAT
E:
CH
ECKE
D B
Y:D
RAW
N B
Y:PR
OJE
CT
No:
MM
TB18
046
2019
.FEB
.20
R03
L5.0
SCAL
E N
OTE
DH
ARD
SCAP
E D
ETAI
LS
REVI
SIO
N D
ESCR
IPTI
ON
NO
.DA
TEDR
.
SEAL
:
AutoCAD SHX TextBIOSWALE INFILTRATION TRENCH
AutoCAD SHX TextA
AutoCAD SHX TextL5.0
AutoCAD SHX Text1:75
AutoCAD SHX TextBIOSWALE INFILTRATION TRENCH
AutoCAD SHX TextB
AutoCAD SHX TextL5.0
AutoCAD SHX Text1:25
AutoCAD SHX TextCURB OPENING
AutoCAD SHX TextTOPSOIL
AutoCAD SHX TextSAND LAYER WRAPPED IN NON-WOVEN GEOTEXTILE
AutoCAD SHX Text150MM PERFORATED UNDERDRAIN WRAPPED IN NON-WOVEN GEOTEXTILE
AutoCAD SHX Text50MM CLEAR STONE WRAPPED IN NON-WOVEN GEOTEXTILE
AutoCAD SHX TextNATIVE GROUND
AutoCAD SHX TextCAR PARKING
AutoCAD SHX TextCAR PARKING
AutoCAD SHX TextCATCH BASIN
AutoCAD SHX TextRIP RAP: ROUND RIVER ROCK
AutoCAD SHX Text0
AutoCAD SHX Text2018.SEP.14
AutoCAD SHX TextISSUED FOR DP
AutoCAD SHX TextTB
AutoCAD SHX Text1
AutoCAD SHX Text2019.FEB.01
AutoCAD SHX TextISSUED FOR DP REZONING
AutoCAD SHX TextJG
AutoCAD SHX Text2
AutoCAD SHX Text2019.FEB.07
AutoCAD SHX TextREISSUED FOR DP REZONING
AutoCAD SHX TextJG
AutoCAD SHX Text3
AutoCAD SHX Text2019.FEB.20
AutoCAD SHX TextREVISION CITY'S COMMENTS
AutoCAD SHX TextJG
CITY OF SURREY
(the "City")
DEVELOPMENT VARIANCE PERMIT
NO.: 7918-0379-00
Issued To: City of Surrey
(the "Owner")
Address of Owner: 13450 - 104 AvenueSurrey, BC V3T 1V8
1. This development variance permit is issued subject to compliance by the Owner with all statutes, by-laws, orders, regulations or agreements, except as specifically varied by this development variance permit.
2. This development variance permit applies to that real property including land with or without improvements located within the City of Surrey, with the legal description and civic address as follows:
Parcel Identifier: 026-447-614Lot 3 Section 22 Township 7 New Westminster District Plan BCP19916
19500 - 26 Avenue
(the "Land")
3. (a) As the legal description of the Land is to change, the City Clerk is directed to insert the new legal description for the Land once title(s) has/have been issued, as follows:
Parcel Identifier: ____________________________________________________________
(b) If the civic address(es) change(s), the City Clerk is directed to insert the new civic address(es) for the Land, as follows:
_____________________________________________________________
P206109Text BoxAppendix III
- 2 -
4. Surrey Zoning By-law, 1993, No. 12000, as amended is varied as follows:
(a) In Section G.1. of "Comprehensive Development Zone (CD)" (By-law No. 19643) the maximum height of a building is increased from 14 metres (45 ft.) to 25.5 metres (82 ft.);
(b) In Section C.1. of Part 5 "Off-Street Parking and Loading/Unloading" the minimum required on-site parking spaces is reduced from 299 spaces to 266 spaces;
(c) In Section H.2.(a) of "Comprehensive Development Zone (CD)" (By-law No. 19643) the maximum number of truck and trailer parking spaces is permitted to exceed the number of loading spaces and/or shipping doors to allow a total of 268 spaces;
(d) Section J.2.(a) of "Comprehensive Development Zone (CD)" (By-law No. 19643) is varied to permit the parking of trucks and trailers within 80 metres [256 ft.] of an Arterial Road; and
(e) Section J.2.(b) of "Comprehensive Development Zone (CD)" (By-law No. 19643) is varied to permit the area for parking of trucks and trailers to exceed the total area of the lot covered by the principal building.
5. This development variance permit applies to only the that portion of the buildings and structures on the Land shown on Schedule A which is attached hereto and forms part of this development variance permit.
6. The Land shall be developed strictly in accordance with the terms and conditions and provisions of this development variance permit.
7. This development variance permit shall lapse if the Owner does not substantially start any construction with respect to which this development variance permit is issued, within two (2) years after the date this development variance permit is issued.
8. The terms of this development variance permit or any amendment to it, are binding on all persons who acquire an interest in the Land.
- 3 -
9. This development variance permit is not a building permit.
AUTHORIZING RESOLUTION PASSED BY THE COUNCIL, THE DAY OF , 20 .ISSUED THIS DAY OF , 20 .
______________________________________Mayor – Doug McCallum
______________________________________City Clerk
0.00GROUND FLOOR
7.01 TOP OF PARAPET #1
12.65TOP OF PARAPET #2
P3201
P3202
P3203
123 6 4 2
9.14T.O.P SHIPPING OFFICE
7 7910 10
0.00GROUND FLOOR
7.01TOP OF PARAPET #1
12.65TOP OF PARAPET #2
P3204
xx
5 HORIZONTAL METALMOULDING APPLIED,COLOR 6, TYPICAL
5 1 6 7 8
WAL
MAR
T
ARCH
R2
ELEV
ATIO
NS
Dis
tribu
tion
Cen
ter
1952
624
AVEN
UE,
SURR
EY,B
C.PR
OJE
CTNo
:170
67DR
AWN
BY:O
CCH
ECKE
DBY
:JC
P310
DAT
E:20
19.0
2.21
Scale: 1 : 600 P3101SOUTH ELEVATION - 24TH AVENUE
Scale: 1 : 600 P3102WEST ELEVATION - 194TH STREET
EXTERIOR ELEVATION FINISH LEGEND6 METAL PANEL, COLOR DOVE GREY7 INSULATED METAL PANEL, MICRORIB, COLOR CHARCOAL8 METAL SIDING CANOPY9 ALUMINUM & GLASS CURTAIN WALL
10 SPANDREL GLASS
EXTERIOR ELEVATION FINISH LEGEND1 INSULATED METAL PANEL, MICRORIB, COLOR SANDSTONE2 INSULATED METAL PANEL, GRANITSONE, COLOR DOVE GREY3 INSULATED METAL PANEL, SMOOTH, COLOR DOVE GREY4 INSULATED METAL PANEL, SMOOTH, COLOR ZINC GREY5 INSULATED METAL PANEL, MICRORIB, COLOR ZINC GREY
TOP OF PARAPET #3 25.50
TOP OF PARAPET #3 25.50
P206109Text Box
P206109CalloutMaximum building height is varied to 25.5 metres
P206109Text BoxSchedule A
SITE STATISTICSBUILDING TYPE INDUSTRIAL
REQUIRED PROVIDED
MAIN WAREHOUSEAREAS:NET LOT AREA (SQ. M.) min. 2,000 m² ±107,549 m²
- GROUND FLOOR ±27,039 m²- MEZZANINE ±546 m²GROSS FLOOR AREA ±27,585 m²- SATELLITE ELECTRICAL ROOM ±106 m²- GUARD HOUSE ±25 m²TOTAL GROSS FLOOR AREA ±27,716 m²TOTAL FOOTPRINT AREA ±27,170 m²LOT COVERAGE max. 0.60 .25
BUILDING SETBACKSFRONT YARD (24th AVE.) SOUTH 16 m 51.5 mSIDE YARD (194th ST.) WEST 7.5 m 58.3 mINT. SIDE YARD - EAST 7 m 62.3 mREAR YARD - NORTH 7.5 m 125.5 m
TOTAL PAVED AND HARD SURFACE AREA ±61,014 m²- COVERAGE 56.7 %TOTAL LANDSCAPED AREA ±19,324 m²- COVERAGE __ % 18.0 %FLOOR AREA RATIO 1.0 .25
LANDSCAPE SETBACKSFRONT YARD (24th AVE.) 6 m 6 mSIDE YARD (194th ST.) 7.5 m 7.5 mINT. SIDE YARD 5 m 5 mREAR YARD 6 m 6 m
PARKING
- WAREHOUSE 1/100 m² 261 STALLS 227 STALLS- OFFICES 1/ 2.5 m² 35 STALLS 35 STALLS- HANDICAP (201 - 300 CARS) 3 STALLS 4 STALLSTOTAL 299 STALLS 266 STALLSPARKING STALL SIZE 5.5m x 2.75m 5.5m x 2.75 mHC STALL SIZE 5.5M x 4.1m 5.5m X 4.1mAISLE SIZE 6.7 m 6.7 m
TRUCKING- DOCK DOORS 78- TRAILER PARKING 238- TRACTOR PARKING 30
BUILDING HEIGHTS(ABOVE GROUND FLOOR)MAIN WAREHOUSE ±25.5 mSATELLITE ELECTRICAL ROOM ±4.3 mGUARD HOUSE ±4.3 m
WAREHOUSE AREA 26,100 m²OFFICE AREA 1,400 m²G.F.A. LESS MECH. RMS, ETC. 27,500 m²
SLO
PE
SLO
PE
SLO
PE
HIGH POINT
WEIGH SCALE
MAIN ENTRANCE
CITY PROPOSED SIDEWALK
CITY PROPOSED CURB
CONCRETE DOLLYPAD TYP.
CONCRETE APRON
CONCRETE APRON
41 DOCK DOORS
20 DOCK DOORS17 DOCK DOORS
30 TRAILERS @ 3.7m c/c
GENERATORCOURT
261 CARS
4.5m LANDSCAPE SETBACK
6m L
ANDS
CAPE
SET
BACK
7.5m LANDSCAPE SETBACK
4.5m LANDSCAPE SETBACK
6m LA
NDS
CAPE
SETB
ACK
GUAR
D HO
USE
±28
m²
17 TRAILERS @ 3.7m c/c
43 T
RAIL
ERS
@ 3
.7m
c/c
51 T
RAIL
ERS
@ 3
.7m
c/c
51 T
RAIL
ERS
@3.
7m c/
c
46 TRAILERS @ 3.7m c/c
RAM
P
ADM
INIS
TRAT
ION
OFF
ICES
1 ST
ORE
Y±8
86 m
²
WAREHOUSE±25,907m²
DOCK OFFFICES(2 STOREYS @ ±200m²)
±400 m²
2,000
34,28
416
,150
7,500
CONCRETE DOLLYPAD TYP.
SATELLITEELECTRICALROOM
30 TRACTORS @ 3350mm c/c
999
13,40
01,0
00
UNDEVELOPABLE GREEN AREA
194TH STREET
24TH
AVE
NU
E
7,500
6,000
10,950 8,305 180,595600
19,730 16,150 1,705 16,150 19,730 16,150
GUAR
D RA
IL
16,15
415
,296
50,43
522
,645
143,7
1522
,540
25,71
016
,150
40,51
5
SLO
PE
4,998
4,500
PUMPROOM
TYP.
4,200
24,600
5 CARS2.75m
TYP.
5,500 6,700 5,500
17,700
5,500
6,700
9,000
7,500
13,45
1
11,000
600
600
600
3,000
2,717
1,289
ROOF TOP UNITS
125,415
65,86
076
,075
125,570
80,55
5
70,710
STAIR EXIT5,001 11,804
PAINTEDISLAND
PAINTEDWALKWAY
REGULARCONCRETE
2.75m
TYP.
5,500 6,700 5,500
17,700
WAL
MAR
T
ARCH
R2
SITE
PLA
N -S
TATI
STIC
S
Dis
tribu
tion
Cen
ter
1952
6 24
AVE
NUE,
SUR
REY,
BC.
PRO
JECT
No:
170
67D R
AWN
BY: O
CCH
ECKE
D B
Y: J
C
P100
DATE
: 201
9.02
.14
Scale: 1 : 1500 P1001SITE PLAN
PROJECTNORTHNORTH
Scale: 1 : 750 P1002PARKING DETAIL TYPICAL
P206109Text BoxMinimum passenger vehicle parking is reduced to 266 spaces.
Maximum truck and trailer parking is increased to 268 spaces.
Truck and trailer parking is permitted within 80 metres of an arterial road.
Area for truck and trailer parking is permitted to exceed the total area of the lot covered by the principal building.