11 Greenway Plaza, 22 nd Floor Houston, Texas 77046 USA Phone: 713.965.0608 Fax: 713.961.4571 ADDENDUM NO. 02 September 25, 2018 To Drawings and Specifications dated August 27, 2018: Learner Support Center Clear Creek Independent School District Prepared by: PBK Architects, Inc. 11 Greenway Plaza, 22 nd Floor Houston, TX 77046 9/25/18 PBK Project No.: 17366 Notice to Proposers A. Receipt of this Addendum shall be acknowledged on the Proposal Form. B. This Addendum forms part of the Contract documents for the above referenced project and shall be incorporated integrally therewith. C. Each proposer shall make necessary adjustments and submit his proposal with full knowledge of all modifications, clarifications, and supplemental data included therein. Where provisions of the following supplemental data differ from those of the original Contract Documents, this Addendum shall govern. Proposal Date Has Changed: Thursday, October 4, 2018 2:00 PM Base Proposals 3:00 PM Alternate Proposals General Item No. 01 General - Please note the attached Pre-Proposal Sign-In Sheet. Item No. 02 General - Please note the attached Pre-Proposal Agenda Item No. 03 General - Please see attached responses to bidding RFI’s received to date Specifications Item No. 04 Spec Section 00 10 AA Request for Competitive Sealed Proposals – Proposal Date changed as follows: PROPOSAL DATE Tuesday, October 2, 2018 at 2:00 PM – Base Proposals AND TIME: Thursday, October 4, 2018 at 2:00 PM Base Proposals Thursday, October 4, 2018 at 3:00 PM Alternate Proposals Drawings Item No. 05 Please see attached structural sketch SK-1. This typical detail shall be referenced for all locations where CMU infill is called for on the plans END OF ADDENDUM NO. 2

Proposal Date Has Changed: Thursday, October 4, 2018 2:00 ...€¦ · 17366 – Pre-Proposal Conference – Page 1 of 2 11 Greenway Plaza, 22nd Floor \\ Houston, Texas 77046 \\ P

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Proposal Date Has Changed: Thursday, October 4, 2018 2:00 ...€¦ · 17366 – Pre-Proposal Conference – Page 1 of 2 11 Greenway Plaza, 22nd Floor \\ Houston, Texas 77046 \\ P

11 Greenway Plaza, 22nd Floor Houston, Texas 77046 USA Phone: 713.965.0608 Fax: 713.961.4571

ADDENDUM NO. 02 September 25, 2018

To Drawings and Specifications dated August 27, 2018:

Learner Support Center Clear Creek Independent School District

Prepared by: PBK Architects, Inc. 11 Greenway Plaza, 22nd Floor

Houston, TX 77046 9/25/18

PBK Project No.: 17366 Notice to Proposers A. Receipt of this Addendum shall be acknowledged on the Proposal Form. B. This Addendum forms part of the Contract documents for the above referenced project and shall be

incorporated integrally therewith. C. Each proposer shall make necessary adjustments and submit his proposal with full knowledge of all

modifications, clarifications, and supplemental data included therein. Where provisions of the following supplemental data differ from those of the original Contract Documents, this Addendum shall govern.

Proposal Date Has Changed: Thursday, October 4, 2018 2:00 PM – Base Proposals

3:00 PM – Alternate Proposals

General Item No. 01 General - Please note the attached Pre-Proposal Sign-In Sheet. Item No. 02 General - Please note the attached Pre-Proposal Agenda Item No. 03 General - Please see attached responses to bidding RFI’s received to date Specifications Item No. 04 Spec Section 00 10 AA Request for Competitive Sealed Proposals – Proposal Date changed as

follows: PROPOSAL DATE Tuesday, October 2, 2018 at 2:00 PM – Base Proposals AND TIME: Thursday, October 4, 2018 at 2:00 PM – Base Proposals

Thursday, October 4, 2018 at 3:00 PM – Alternate Proposals Drawings Item No. 05 Please see attached structural sketch SK-1. This typical detail shall be referenced for all locations

where CMU infill is called for on the plans

END OF ADDENDUM NO. 2

Page 2: Proposal Date Has Changed: Thursday, October 4, 2018 2:00 ...€¦ · 17366 – Pre-Proposal Conference – Page 1 of 2 11 Greenway Plaza, 22nd Floor \\ Houston, Texas 77046 \\ P
Page 3: Proposal Date Has Changed: Thursday, October 4, 2018 2:00 ...€¦ · 17366 – Pre-Proposal Conference – Page 1 of 2 11 Greenway Plaza, 22nd Floor \\ Houston, Texas 77046 \\ P

17366 – Pre-Proposal Conference – Page 1 of 2 11 Greenway Plaza, 22nd Floor \\ Houston, Texas 77046 \\ P 713-965-0608 \\ F 13-961-4571 \\ PBK.com

LEARNER SUPPORT CENTER CLEAR CREEK INDEPENDENT SCHOOL DISTRICT

PBK Project No. 17366

PRE-PROPOSAL CONFERENCE

AGENDA

Monday, September 17, 2018 @ 10:00 A.M.

I. Introduction of Representatives:

A. OWNER: Clear Creek Independent School District Phone: 281.284.0048 01 Mr. Paul Miller ............................................. Director of Facilities and Planning 02 Ms. Lisa Lake ............................................. Construction Project Manager B. ARCHITECT: PBK .............................................. Phone: 713.965.0608 Fax: 713.961.4571 01 Rick Blan, AIA ............................................. Partner-In-Charge

02 Greg Prince ................................................ Associate C. MEPT: LEAF Engineers ...................................... Phone: 713.965.0608 Fax: 713.961.4571 01 Matt Sickorez .............................................. Project Manager

II. Proposal Date: Tuesday, October 2, 2018 Thursday, October 4, 2018 (Addendum No. 02)

Proposal Time: 2:00PM - Base Proposals 3:00PM – Alternates Proposals

Proposal Location: Clear Creek Independent School District – Central Support Facility 2145 W. NASA Blvd Webster, Texas 77573

III. Addendums:

Any changes arising out of questions requiring interpretation, clarification or correction to the Proposal Documents will be made by Addendum.

A. Addendum 01 - Issued 9/14/18.

IV. Base Proposal and Contract Time

A. Work performed under this Contract shall be done in accordance with the following paragraphs:

A. The Owner has a critical need for the work to begin immediately upon Notice to Proceed and be Substantially Complete by May 31, 2019.

V. Alternates: As indicated in Section 01 23 00 Alternates.

VI. Allowances: As indicated in Section 01 22 00 Allowances.

VII. Proposal Submission: A. Qualifications Statements Due – Tuesday, September 25, 2018 by 3:00 pm.

1. Mail or Deliver- to Greg Prince at PBK Architects (11 Greenway Plaza, 22nd Floor, Houston, Texas,

713-965-0608); Two (2) Qualification Statements submitted by fax transmission will not be

accepted.

Page 4: Proposal Date Has Changed: Thursday, October 4, 2018 2:00 ...€¦ · 17366 – Pre-Proposal Conference – Page 1 of 2 11 Greenway Plaza, 22nd Floor \\ Houston, Texas 77046 \\ P

17366 – Pre-Proposal Conference – Page 2 of 2 11 Greenway Plaza, 22nd Floor \\ Houston, Texas 77046 \\ P 713-965-0608 \\ F 13-961-4571 \\ PBK.com

a. Include contact name, phone number, fax, email address and project name and

Owner/District. C. Proposals must be submitted in duplicate.

D. The Proposal Form must be accompanied by Proposal Bond or Certified Check in the amount of 10% of the

proposal.

E. All proposals must be delivered sealed to the above address on or before the date and time set. Proposals will be received at no other place. If Proposal is sent by U.S. Mail, it must be sent via Registered Mail.

F. Selection Criteria: The Offeror shall be selected in accordance with selection criteria provided as part of

Section AB in the project manual. G. Post Proposal Information (Refer to Section AB in the project manual)

VIII. Miscellaneous Job Conditions (Refer to Sections CA, CB and 01 50 00): A. Conduct at Job Site/occupied campuses B. Utilities C. Temporary Facilities D. Signs E. Barriers F. Security G. CCISD Badging H. Superintendent I. Construction Fencing J. Cleaning K. First Aid L. Fire Protection M. Construction Aids (scaffolds, ladders, etc.) N. Parking Facilities

IX. Additional Items: A. Substitutions B. Schedule of Values C. Applications for Payment D. Performance and Payment Bonds – 100% E. Bid Bond F. Addenda items to be issued G. Sub-contractor information to be submitted, with proposal. The following categories are required:

Mechanical Electrical Fire Alarm Technology Plumbing Masonry Concrete Casework Aluminum Windows Door & Hardware Flooring Painting

H. Special Owner Requirements I. OCIP

X. Questions

Page 5: Proposal Date Has Changed: Thursday, October 4, 2018 2:00 ...€¦ · 17366 – Pre-Proposal Conference – Page 1 of 2 11 Greenway Plaza, 22nd Floor \\ Houston, Texas 77046 \\ P

11 Greenway Plaza, 22nd Floor Houston, Texas 77046 USA Phone: 713.965.0608 Fax: 713.961.4571

Bidding RFI Responses September 25, 2018

See RFI responses below received from bidders regarding the Drawings and Specifications dated August 27, 2018:

Learner Support Center Clear Creek Independent School District

Prepared by: PBK Architects, Inc. 11 Greenway Plaza, 22nd Floor Houston, TX 77046 PBK Project No.: 17366 ELECTRICAL DRAWINGS

1. DWG E6.02 – How many student work stations are there, how many teacher work stations are there. What room numbers are involved? 6 teacher work stations (teacher demonstration tables). Rooms 214, 213, 211,209,207,205. Refer to electrical drawings for number of student workstations. Assume each floor receptacle or above counter (AC) receptacle shown on the power plans in these 6 rooms to be a student workstation. Refer to plumbing drawings (base bid and alternate) for location of gas and water supply.

2. DWG E6.01- Notes mention fire rated ceiling assemblies, which would require fire barriers over

fixtures. Please identify what areas of this facility have fire rated ceilings. No fire rated ceiling in the facility. Fire barriers over fixtures not required.

3. DWG E5.02- New panel L2B shows 2 pole 20 amp cbs for cord reels. Should this be 1 pole breakers for

120 volt application? Provide 1 pole breaker for each cord reel circuit.

4. DWG E5.01- Note 2 says refer to riser diagram and there is a note 2 on panel S. Panel S1 is existing to remain and will have new work inside it. Are we still only raising transformer TS1 in the room or moving all components? Transformer TS1 to raise up to two feet from existing height as mentioned on E1.03.

5. Panels LL and (2) section L2B are new. Specs call out for non linear loads to have 173% neutrals. Panel

schedules show 100% neutrals, yet PNL L2B indicates the new transformer to be K13 rated. Please clarify. Provide 173% - 200% neutral for all new panels. Also specs indicate minimum 14 KAIC rating on branch ckt panelboards, and panel schedule has 10 K for new panel LL. Is 10 KAIC correct for this panel? Use 14KAIC minimum for panel LL per specs. Panel L2B is mentioned as 14KAIC already.

6. DWG E4.01- key notes 5,6,and 7 are missing from the drawings. Note 5. Replace (1) 2X4 prismatic lens in

this room with new type ‘B’ fixture. Note 6. Replace (2) 2X4 prismatic lens in this room with new type ‘B’ fixture. Note 7. Provide control switch in this area. New switch shall control lighting fixtures on its respective space as shown.

7. DWG- E2.01- Will all 60 plus existing brass floor plates be replaced with like floor box plates with flip up

covers? Replace existing brass floor plates to match existing with flip up covers.

Page 6: Proposal Date Has Changed: Thursday, October 4, 2018 2:00 ...€¦ · 17366 – Pre-Proposal Conference – Page 1 of 2 11 Greenway Plaza, 22nd Floor \\ Houston, Texas 77046 \\ P

8. DWG E1.04- During the walkthrough, it was discussed to route charging station circuits in CMU wall. This is not possible due to quantity of circuits. Dwg notes indicate wiremold under shelf. Is wiremold 4000 acceptable? All ckts will be 10 ga. Use wiremold 4000 series. Increase wiremold drop from the ceiling to accommodate the charging station circuits.

9. DWG E1.02- Ceiling area of theater appears to be plaster with no access above. Access panels will be

required to be cut into ceiling to route wiring. Will type MC fished above ceiling be acceptable? We will have access panel next to the projector per my phone conversation with the architect. Refer to architect for more information. The added receptacles as shown on theater walls call for wiremold 4000 (from high ceiling). Will it be acceptable to run one run of wiremold up to ceiling and bore through brick to install surface mount receptacle on opposite wall? Provide one wiremold up to ceiling inside theater and bore through brick on opposite wall to install the surface mount receptacle.

10. DWG E1.01- Note 5 calls for use of an existing circuit and addition of 3 additional circuits for flex lab and

computer lab- There are (10) locations for note 5. There are roughly (58) receptacles. If following note 5 as shown on each receptacle group, there would be (30) new circuits added. The circuit numbers are not shown on this dwg and can’t be readily identified on the panel schedule. Please clarify how many circuits you intend for these two rooms. There are existing circuits in this area to be re-used. Contractor to re-use existing circuits and add new as required to accomplish the circuit distribution shown.

11. DWG DE1.01 Indicates “RR” on many receptacles. Many of these appear to be fed from under

slab. Removal / relocation will require reconnection from above. Many are in CMU walls where block may have to be cut from ceiling to device. Can MC cable be used where possible to refeed these if we are able to fish down in block voids, as this can be labor intensive and in many cases may require new circuits from panels as well? MC cable is not acceptable for base bid.

ELECTRICAL SPECIFICATIONS

1. There is a specification section for MC cable. Realizing you require a separate neutral for each phase and limiting 6 conductors per raceway, we request use of type MC for fishing down existing walls where outlets will be added, otherwise GC will have to cut and patch sheetrock in the existing walls. Will MC be acceptable for fishing new circuits in existing walls? MC cable is not acceptable for base bid.

2. Specifications call for independent test lab for testing conductors larger than #2. We have (2) new panel

boards and feeders. Will independent Certified Test Lab be required to Meg Test these feeders? Yes

3. Grounding specifications call for copper ground buss at all IDF MDF rooms, telephone rooms etc. This is only for new installation, correct? There are other grounding items such as water / gas piping etc. Are we only dealing with newly installed panelboards for this section? Yes we are only dealing with panel boards and transformer.

4. You also have provisions for written ground test reports and certification of ground system. Please clarify

to what extent this will apply and will you want independent test lab reports for anything on this project, pertaining to electric work? We will only do the megger report for new panels and transformer. We will not do the testing of the grounding system. There is also provisions for testing Theater isolation system, all sub panels, audio system, etc. Will we be required to test any existing systems? No because they are all existing.

5. Specifications for Lutron lighting control calls for training and on site factory certified rep to set up and

test. Will this be required for this facility where we are installing lighting controls like occupancy sensors and switches to existing rooms? This will apply to alternate bid only.

6. Specifications are calling for short circuit coordination study and arc fault study. Will this study be

required for the installation of ONLY new equipment (2 panelboards) provided by us? YES

7. Specifications detail SPD’s for panelboards, with 10 yr warranty etc. You do not show these on the (2) new panelboards on one-line or schedule. Will these be required for either of these new panelboards? Panel LL is fed from panel L with existing SPD. Provide SPD for panel L2B as mentioned on the plan.

Page 7: Proposal Date Has Changed: Thursday, October 4, 2018 2:00 ...€¦ · 17366 – Pre-Proposal Conference – Page 1 of 2 11 Greenway Plaza, 22nd Floor \\ Houston, Texas 77046 \\ P

8. What testing / training will be required for the Electrical Installation on this project? Megger testing for new

feeders.

9. You are requesting alternate (dwg notes) to add Lutron Lighting Control, per spec, throughout the facility. Are all areas of this facility shown on the plans you have provided? We did not provide the plans for upgrading the lighting control for the entire facility. Contractor to field verify and price it for alternate.

Page 8: Proposal Date Has Changed: Thursday, October 4, 2018 2:00 ...€¦ · 17366 – Pre-Proposal Conference – Page 1 of 2 11 Greenway Plaza, 22nd Floor \\ Houston, Texas 77046 \\ P

3' - 4" MAX

(2) #4 HORIZ BARSIN 2ND FROM TOP COURSE

(1) #4 DOWEL DRILLED & EPOXIED INTO CMU JAMB 6" W/ HILTI HY-70 ADHESIVE

24: L

AP

(TY

P.)

#4 DOWEL DRILL & EPOXY 6" INTO EXISTING W/ HILTI HY-70 ADHESIVE

#4 DOWEL DRILLED & EPOXIED 3" INTO FOUNDATION W/ HILTI HY-200 ADHESIVE

S

TATE OF TEXAS

LI C E N S E

D

PR

OF

ES

S IO A L ENGI N

EE

R

N

JOHN R. KUBALA

106120

AG&E Structural EngenuityF-8435

13118

CLEAR LAKE HIGH SCHOOL REBUILD

Drawing:

Date:

22nd Floor

Phone: 713.965.0608Houston, Texas 77046

Fax: 713.961.4571

11 Greenway Plaza Project:

Project No.:

SK-1

JANUARY 25, 2018

6"=1'-0"

01/25/2018

- CMU INFILL AT 9TH GRADE CENTER

LEARNER SUPPORT CENTER17366

09/25/2018SK-1 TYPICAL INFILL AT EXISTING CMU WALL

S

TATE OF TEXAS

LI C E N S E

D

PR

OF

ES

S IO A L ENGI N

EE

R

N

JOHN R. KUBALA

106120

AG&E Structural EngenuityF-8435

01/25/2018

RE

F A

RC

H

8'-0"

MA

X

REF ARCH

8'-0" MAX

DRILL 0'-6" INTO EXISTINGCMU WALL, NEW CMU REINF. TO BE PLACED INTO EXISTINGWALL W/ HILTI-HY 70 ADHESIVE

30"

MIN

LA

P30"

MIN

LA

P

#5 VERTICALS @ 16" OC

THE CONDITION OF THE EXISTING GROUTED CELLTO BE VERIFIED ON THE FAND REPORT TO THE STRUCTURAL ENGINEER IIS NOT SOLID GROUTED.

3/4" = 1'-0"9 TYPICAL FILL IN EXISTING CMU WALL OPENING1 1/2" = 1'-0"

THE CONDITION OF THE EXISTING GROUTED CELLS NEED TO BE VERIFIED ON THE FIELD AND REPORT TO THE STRUCTURAL ENGINEER IF WALL IS NOT SOLID GROUTED.

09/25/2018Structural Engenuity

9 Greenway Plaza, Suite 2025Houston, Texas 77046Ph: 713.595.9935www.age-se.com

Firm Reg No. F-8435PROJECT#16-17918xxx.00000