Joannou & Paraskevaides (Overseas) Ltd.

International Contractors

OIL & GASAND ENERGY

PROJECTS

Page 3: PROJECTS - iDrainTheSwamp · PDF filesecuring of projects and corporate finance, ... some of which were on a “design and build” basis. ... Pig Launcher / Pig Receiver Skids,

BRIEF COMPANY PROFILE

J&P (O) Ltd. is a major international Civil, Building, M&E, Oil and Gas and Industrial con-tractor, registered in Guernsey, the Channel Islands, in 1961. The Company has a strong presence in most countries in the Middle and Near East, North and East Africa and Europe.

With an annual turnover in the region of US$ 1,2 billion and a current multi-task, multina-tional manpower in excess of 13,000 people, as well as a fleet of continuously renewed construction equipment, J&P is constantly featuring amongst the top 40 international contractors worldwide, (ENR-Engineering News Record survey of the top 225 interna-tional contractors in the world, ranked 37th in 2010).

The company’s worldwide operations are controlled by head offices in Nicosia (Cyprus), Athens (Greece) and London (UK). The highly qualified professionals in those offices are responsible for the formulation of strategy, securing of projects and corporate finance, R&D, world market research, coordination of resources, logistics and support of J&P’s worldwide operations. Currently J&P is mobi-lized in Greece, Cyprus, Libya, Egypt, Jordan, Ethiopia, Qatar, UAE, Saudi Arabia, Oman, Pa-kistan, Romania and Poland.

J&P’s activities cover almost all the construc-tion disciplines such as Highways, Airports, high/low cost Buildings and housing, heavy civil and steel structures, Tank farms, GOSPs, Oil and Gas gathering stations, Pipelines, trunklines, flowlines, piping and instrumen-tation, etc. J&P is currently involved with in-ternational consortia for major BOT projects.

J&P and all its branches and subsidiaries are ISO certified (ISO 9001, 14001 and OHSAS 18001).

TYPES OF PROJECTS

OIL & GAS RELATED INDUSTRY

GOSPs, Oil Gathering Stations and Gas Plants: Design, supply, fabrication and erection of separators, manifolds, oil produc-tion trains, various pumps, fire fighting sys-tems, instrumentation, infrastructure works, piperacks, civil works, and various RC build-ings.

Pipelines: Gas, Oil, Multiproducts, 4” to 36”. - Supply and installation of new pipe-lines, in all terrains (mountainous, desert, sand dunes, built areas) varying from 4” to 36”. - Repair works to oil and gas pipe-lines up to 36” in diameter.

Field Developments: Flowlines, Wa-ter injection systems, Manifolds, Overhead transmission lines, Gantries, Transformers, Substations, etc.

Tank farms: Design, supply, erect / repair, commissioning. New tank farms, on turnkey basis. Fixed and floating-roof steel tanks, varying from 5,000 to 300,000 bbl, for crude oil as well as oil products.Repairs of more than 50 existing steel tanks up to 560,000 bbl.

Refineries and Petrochemical plants: Polypropelene plant, PET Resin Pro-duction Unit, Crude and Vacuum Distillation Units, Revamping of Mild Hydrocracker Unit, Revamping of Naphtha Isomerization Unit.

Fire fighting systems: Design sup-ply, erection and commissioning of foam and / or water fire fighting systems, in tank farms, as well as in terminals and refineries.

Heavy civil works: In refineries, ter-minals and concessions in desert locations.

Page 4: PROJECTS - iDrainTheSwamp · PDF filesecuring of projects and corporate finance, ... some of which were on a “design and build” basis. ... Pig Launcher / Pig Receiver Skids,

Steel structures (design and build) for stores, workshops, airline hangars, ga-rages. More than 500,000 m2 of such struc-tures, up to the height of 50 m, complete with HVAC, smoke detection and fire fighting systems, compressed air networks and other utilities, depending on their use.

Interconnecting services between plants, including pipeway bridges and sleep-ers, piperacks and other foundations, man-holes, roads and pavements.

Administration, recreation, and other RC buildings in various locations.

Infrastructure works, such as water and sewage treatment plants, road works, port facilities. Airstrips, more than eleven airstrips, 45 - 60 m width, 2,2 km length, including lighting, refueling stations, and other build-ings, in various desert locations (concession camps, loading terminals etc).

ENERGY & INDUSTRIAL

J&P’s multidiscipline background enables the company to act not merely as a general contractor, but should the Client wish, as a partner as well.

Because of J&P’s diversity, access to inter-national markets and resourcefulness of its staff it has been able to provide not only the normal contracting services, in the form of lumpsum / turnkey projects, but to go further and assist the Client during the conceptual phase, training, and even the running of cer-tain facilities. Such services can be extended to most of the types of contracts summarized below: Power stations: 130 - 2x220 MW

Industrial complexes: Truck and bus factories / assembly lines, Cement Factories , Plastic factories, etc. Sewage and Water treatment plants

Workshops and industrial stores

craft hangars for 747 Boeing and Airbus A380 jets.

Marine works: Marinas, fishing ports, construction of quay walls, concrete or sheet piles, repairs of damaged walls, dredg-ing, land reclamation, including all on-shore infrastructure.

Heavy foundations: For high-rise buildings, including piling, dewatering, wa-ter proofing, and concrete works.

Infrastructure projects: Includ-ing sewerage networks and water supply, stormwater drainage networks, access paved roads, water towers, soft and hard landscap-ing. Water and sewage treatment plants: For residential areas.

BUILDINGS & BUILDING SERVICES

J&P (O) Ltd. has successfully completed nu-merous and diverse buildings, and/or resi-dential schemes, some of which have be-come landmarks in the countries in which they were built. They have gained interna-tional fame for their high quality finishes, as well as for the speed and efficiency of con-struction; Al Bustan Palace hotel in Oman, voted the best hotel of the year, built in 22 months and Onassis Cardiac Surgery Centre in Athens are such examples.

Hotels: Palaces, luxurious hotels etc., the Doha Intercontinental Hotel in Qatar, the Four Seasons in Sharm El Sheikh in Egypt, etc, are examples of five stars hotels completed in the past years.

Hospitals: High-tech buildings, such as Onassis Cardiac Surgery Centre in Athens (one of the most advanced in Southern Eu-rope), Sohar General Hospital in Oman, and many others in Greece and the Middle East, are living proof of J&P’s ability to successfully complete similar buildings.

High quality buildings of vari-ous sizes designed and supervised by well-

HEAVY CIVIL

All types of civil contracts, ranging from in-frastructure, transportation, dams, marine works, some of which were on a “design and build” basis.

Transportation projects: Thou-sands of kilometers of asphalt / concrete paved motorways and other secondary types of highways, in all types of terrain, including all technical works, such as interchanges, flyovers, bridges, drainage systems, culverts, street lighting.

Tunnels: For roads and highways, as well as water conveyance, using various bor-ing techniques

Reinforced concrete bridges: All types of bridges, using construction meth-ods such as precast, post tensioned, cantile-ver, box girder, concrete slipform

Earth and rockfill dams: Eight dams in various countries.

Airports - airstrips & terminals: J&P (O) Ltd. has successfully designed and built numerous international airports and airport facilities worldwide. These have been pro-jects of various types and sizes: King Fahd International Airport in 1993 (US$ 300m supervised by Bechtel), the infrastructure for Abu-Dhabi Airport in UAE (US$ 100m in 1980 prices), Seeb Internation-al Airport in Muscat Oman, Queen Alia Inter-national Airport in Amman Jordan, Emirates new engineering centre in UAE, reinforced concrete or asphalt landing pavements, aprons, infrastructure works, lighting and landing systems are some typical examples from a long string of successfully completed projects.

Irrigation schemes: Concrete ca-nals, secondary buried pipe networks, pump-ing stations, drainage.

Steel structures: Millions of m2 ranging from stores, to workshops and air-

known International Consultants, finished to the highest quality with materials from all over the world, such as palaces, hotels high quality developments and embassies.

Public and private Commercial Buildings of various sizes, shopping centers, blocks of offices and accommodation, HQs of Companies, Banks, etc.

Residential settlements (low or high cost)

Special structures, such as Stadi-ums, closed Sport Facilities, etc.

Building services, AC, plant rooms

Renovations and refurbishments of buildings, such as hotels, offices and ac-commodation blocks.

Special use buildings, such as cold stores

High rise buildings

Page 5: PROJECTS - iDrainTheSwamp · PDF filesecuring of projects and corporate finance, ... some of which were on a “design and build” basis. ... Pig Launcher / Pig Receiver Skids,

Project Name: Nuayyim ASL Crude Increment Facilities & Hawtah Stabilizer Upgrades

Country: Saudi Arabia

Name of employer: Saudi Arabian Oil Company (Saudi Aramco)

Value: 320,000,000 US$

Contract Role: Main Contractor

Start Date: 2006

Completion Date: 2009

Nuayyim GOSPThe scope of the Nuayyim ASL Crude Increment Facilities - 100 MBCD project, is to install a grassroots facility to process an additional 100 MBCD crude oil from the Nuayyim field. The project includes Wet Crude Handling (WCH), Gas Compression, Oily Water Separator, Produced Water Disposal, Water Supply Systems, Centralized Water Injection, SEC power supply and associated mechanical, electrical, instrumen-tation, and utility systems.

Hawtah StabilizerThe scope of the Nuayyim Downstream Facilities, Part A: Hawtah Stabilizer Upgrades provides for addi-tional crude degassing facilities required at Stabilizer area (PS # 3) to process Arab Super Light (ASL) crude from both the Hawtah and Nuayyim fields. This project supports the Nuayyim ASL Crude Increment 100 MBCD.

Page 6: PROJECTS - iDrainTheSwamp · PDF filesecuring of projects and corporate finance, ... some of which were on a “design and build” basis. ... Pig Launcher / Pig Receiver Skids,

Project Name: Faregh Phase 2 Gas Processing Facilities, Structures Development & Well Tie-ins

Country: Libya

Name of employer: Waha Oil Company

Value: 254,173,000 US$

Contract Role: Main Contractor

Start Date: 2006

Completion Date: 2011

Engineering, procurement, construction, installation and commissioning and start up of Faregh Phase 2, including gas gathering and oil flowlines and a new gas processing plant, and all tie-in and associated works to the existing Faregh Phase 1 Facility.

Installation of oil flow lines and all site construction in order to provide complete, reliable, safe and work-ing tie-ins of nine (9) oil wells to Faregh Station and Heating Station, including the installation of 54km of 6” oil flow lines externally insulated.

Engineering, procurement, construction, commissioning and start-up of flowlines, trunklines, manifold, Pig Launcher / Pig Receiver Skids, C.I. Injection Skids, OH Lines, etc.

Page 7: PROJECTS - iDrainTheSwamp · PDF filesecuring of projects and corporate finance, ... some of which were on a “design and build” basis. ... Pig Launcher / Pig Receiver Skids,

Project Name: El-Sharara Development Project GOSPs, Gas Compression Facilities and PWT Plants

Country: Libya

Name of Employer: Akakus Oil Operations (Former Repsol Oil Operations)

Value: 162,666,000 US$

Contract Role: Main Contractor

Start Date: 1996

Completion Date: 2010

Over the last 15 years, J&P has been awarded by Repsol Oil Operations a number of Gas & Oil Separation Plants (GOSPs). The scope of work included the project management services, geotechnical services, en-gineering, procurement of equipment and materials (except separators, gas turbine generators, shipping pumps), fabrication and construction, installation, testing and commissioning, as well as storage tanks for:

· GOSP “A” at NC-115 of a capacity of 200,000 BOPD · GOSP “B” at NC-115 of a capacity of 80,000 BOPD · GOSP “H” at NC-115 of a capacity of 45,000 BOPD · GOSP “A” at NC-186 of a capacity of 100,000 BOPD

Each GOSP includes: · Production manifold · Oil production train (production and test separators, degassers, dehydrators, surge and stock tanks, crude pumps, etc.) · Booster and shipping pumps · Gas turbine generators · Crude fuel system · Process control, UPS, fire detection · 33kV power supply and distribution · Building and related civil works

Other types of plant awarded to J&P during the same period are:

· Gas Compression Facilities (3 Nos train) at GOSP A / NC-115 and (2 Nos train) at GOSP A / NC-186, each one including: multistage Gas Compressor Train, Process Facilities, Controls, etc.

Also, Produced Water Treatment Plants:

· At GOSP A / NC-115 of 100,000 BOPD Pump Station of 5 Nos injection pumps of 25,000 BOPD each at 1000 psig and two (2 Nos) settlement tank of 25,000 barrels each · At GOSP A / NC-186 of 100,000 BOPD Pump station of 4 Nos. injection pumps 25,000 BOPD each at 1680 psig and two (2 Nos) settlement tanks of 25,000 barrels each.

Page 8: PROJECTS - iDrainTheSwamp · PDF filesecuring of projects and corporate finance, ... some of which were on a “design and build” basis. ... Pig Launcher / Pig Receiver Skids,

Project Name: Gathering Stations, Oil Gathering Manifolds, Water Injection Manifolds

Country: Libya

Name of employer: Akakus Oil Operations (Former Repsol Oil Operations)

Value: 156,300,000 US$

Contract Role: Main Contractor

Start Date: 2004

Completion Date: 2011

During the last seven years, Akakus Oil Operations has entrusted J&P with the execution of the following field facilities at the El-Sharara Development Project’s NC-115, NC-186 and IR fields:

· Gathering Stations: 13 Nos. · Oil Gathering Manifolds: 45 Nos. 235-slots total. · Water Injection Manifolds: 17 Nos. 141-slots total.

The project included all associated electrical, instrumentation, building and civil works.

Page 9: PROJECTS - iDrainTheSwamp · PDF filesecuring of projects and corporate finance, ... some of which were on a “design and build” basis. ... Pig Launcher / Pig Receiver Skids,

Project Name: Mabruk Phase 4 Project Process Plant and Field Facilities

Country: Libya

Name of employer: TOTAL - Compagnie des Petroles Total Libye

Value: 96,600,000 US$

Contract Role: Main Contractor

Start Date: 2004

Completion Date: 2007

The scope of work consisted of the detailed engineering, procurement and construction of Great Mabruk Field Development Gas & Oil Separation Plant (GOSP) of ultimate capacity 53,000 BOPD for East and Cen-tral Mabruk Fields. GOSP, PWT Plant and downstream facilities upgrade, plus associated offsites, utilities and satellites.

The new process plant includes;

· Two process trains · Three oil storage tanks · Three new gathering satellites · Oil metering · Export pumps station · Oily water treatment · Flare system · Fire water system including fire water storage tanks and fire water pumps · Power generation 2.9 MW and all associated mechanical, electrical, instrumentation and civil works.

Page 10: PROJECTS - iDrainTheSwamp · PDF filesecuring of projects and corporate finance, ... some of which were on a “design and build” basis. ... Pig Launcher / Pig Receiver Skids,

Project Name: Faregh Production and Heating Stations & Faregh Field Development Pipelines

Country: Libya

Name of employer: Waha Oil Company

Value: 57,464,000 US$

Contract Role: Main Contractor

Start Date: 1999

Completion Date: 2002

All civil, mechanical, piping, electrical and instrumentation works to install the Faregh main station in-cluding process facilities for oil and gas plants, pre-commissioning and assistance to commissioning of the GOSP and heating station “A” installations. The works comprised the construction of an oil produc-tion facility and gas plant at Faregh oil field and all associated utilities including on-plot and off-plot piping up-to the flare stack, fire water and cooling water system, distribution control system, emergency shut-down system, instrumentation, electrical distribution and emergency power, flare, burn pit, tank-age, buildings, fence, manifold, slug catcher pipe racks, pig launchers and receivers, metering compres-sors, separators, dehydration vessels, K.O. drums, pumps, liquid recovery plant, depropaniser water bath heater, boilers, etc. Also included were the facilities at the heating station “A” comprising test separators, water bath heaters, associated utilities, on-plot piping, pipe racks, pig launcher, fencing, water tanks and control buildings. All above equipment was supplied by the Client.

Project management and installation of 262.3 km of buried insulated pipeline from 4” to 16” outside di-ameter, including erection and operation of insulation plant for insulating the line pipes with 75mm PU foam and external lining with PE, stacking, stringing, ditching, welding, field joint insulating and coat-ing, lowering into ditch, backfilling, cathodic protection, hydrotesting and commissioning complete with wellhead connection at 26 No. oil wells and manifold connections.

Page 11: PROJECTS - iDrainTheSwamp · PDF filesecuring of projects and corporate finance, ... some of which were on a “design and build” basis. ... Pig Launcher / Pig Receiver Skids,

Project Name: Nafoora Gas Lift Expansion & Water Disposal at GOSP 4 & 102D

Country: Libya

Name of employer: Arabian Gulf Oil Company (AGOCO)

Value: 50,825,000 US$

Contract Role: Main Contractor

Start Date: 2000

Completion Date: 2004

Project management, engineering, procurement, construction, installation, precommissioning, commis-sioning and start-up of gas compressors, fuel gas treatment equipment, dehydration units, gas separa-tors (slug catchers), pumps, interconnecting piping, control rooms, electrical equipment, power & control cables, 34.5 kV power supply and distribution (receiving station and distribution), instrumentation, export gas sweetening (mole sieve) unit, flow meters, underground pipelines (8” and 16”), cathodic protection, fire fighting systems, civil works (foundations, piperacks, shelters), etc.

Engineering, procurement, construction and commissioning of separate systems at GOSP 4, GOSP 102D, comprising of lines and tie-ins to direct the produced water from separators, desalters, surge tanks and boots to new PWT Plant with Skimmer / Tanks (25,000 BBL and 10,000 BBL for GOSP 4 and GOSP 102D respectively).

Page 12: PROJECTS - iDrainTheSwamp · PDF filesecuring of projects and corporate finance, ... some of which were on a “design and build” basis. ... Pig Launcher / Pig Receiver Skids,

Project Name: Haradh GOSP Arabian Light Crude Increment II

Country: Saudi Arabia

Name of employer: Saudi Arabian Oil Company (Saudi Aramco)

Value: 34,138,000 US$

Contract Role: Sub-Contractor

Start Date: 2001

Completion Date: 2003

The project consisted of the construction of a new 300,000 BCD Crude Oil and 140 MMSCFD of associated gas, Oil & Gas Separation Plant (GOSP), water injection plant and modification to an existing water injec-tion plant.

The works included substantial quantities of earthworks, civil works, large-pour concrete foundations, construction of industrial support buildings, structural steel works in excess of 1,000 tons inclusive of erec-tion of pipe racks, underground utility systems including RTR pipeline networks, plant infrastructure and civil related works supporting the mechanical, electrical and instrumentation works.

The electrical works included the installation of a 36KV substation, power distribution system inclusive of high and low voltage network, plant earthing system, cathodic protection system, electrical installation to the buildings and public address and telephone system.

The instrumentation works included the installation of air system, installation of processing system in-struments, analysing, tracing and sampling systems, control building instrumentation and monitoring systems.

Page 13: PROJECTS - iDrainTheSwamp · PDF filesecuring of projects and corporate finance, ... some of which were on a “design and build” basis. ... Pig Launcher / Pig Receiver Skids,

Project Name: El Sharara (NC-115) Development Project - NC-115 to Azzawiya 30” 730 Km Main Transmission Pipeline and Pump Station

Country: Libya

Name of employer: Akakus Oil Operations (Former Repsol Oil Operations)

Value: 379,740,000 US$

Contract Role: Main Contractor

Start Date: 1995

Completion Date: 1998

Design, supply and construction of the 30” 730 Km buried Crude Oil Pipeline from NC-115 to Azzawiya Terminal:

· 12 Valve stations, cathodic protection, fiber optic cable communication system · Terrain : 200 Km in sand dunes, 420 Km in rocky ground and 110 Km in cultivated/urban areas · Welding of the pipeline with Automatic Welding Machines type SATURNAX by SERIMER at an average rate of 140 welds per day · Highway road crossing (HDD) 700 m long. Dual crossing for 30’’ pipeline and 8” sleeve for F.O. cables.

The El Sharara NC-115 Development Project (Hamada Booster Pump Station), included the engineering design, procurement, construction/installation of all civil facilities, fabrication/erection of equipment, the testing and commissioning of all systems.

Page 14: PROJECTS - iDrainTheSwamp · PDF filesecuring of projects and corporate finance, ... some of which were on a “design and build” basis. ... Pig Launcher / Pig Receiver Skids,

Project Name: F-NC 174 Elephant Field Development Pipeline, Electrical Supply & Main Civil Projects

Country: Libya

Name of employer: ENI OIL B.V.

Value: 108,700,000 US$

Contract Role: Main Contractor

Start Date: 2002

Completion Date: 2004

This project consisted of the engineering, procurement, installation/construction, pre-commissioning and commissioning of the following:

Pipeline 75 km of a 24” export pipeline from the Elephant field FNC 174 GOSP to the existing NC-115 facilities and 12 km of Trunk lines from well sites to GOSP, 40 km of a water injection line and

Electrical 80 km OHTL from Elephant Field FNC 174 GOSP facilities to existing NC-115 locations and various wellpad areas, switchyards, transformers, etc.

Main Civil All building & civil construction works regarding the accommodation, maintenance and utility facilities complete with electrical, mechanical, H.V.A.C systems. Also road works, pavements and landscaping, for the operation of LASMO’S GOSP Project NC-174 at Elephant Field.

· Since the NC-174 Field lies in an archeologically sensitive area, it was essential to minimize the devel-opment footprints where possible and where safety was not jeopardized, in a way that only previously disturbed areas were utilized.

Page 15: PROJECTS - iDrainTheSwamp · PDF filesecuring of projects and corporate finance, ... some of which were on a “design and build” basis. ... Pig Launcher / Pig Receiver Skids,

Project Name: Trunklines, Flowlines and OHTL

Country: Libya

Name of employer: Akakus Oil Operations (Former Repsol Oil Operations)

Value: 356,992,000 US$

Contract Role: Main Contractor

Start Date: 1996

Completion Date: 2011

Akakus Oil Operations has awarded J&P over the past 15 years, within the framework of the El-Sharara Development Project at fields NC-115, NC-186 and IR, a certain number of contracts concerning the engi-neering, procurement and installation/construction of the following:

Trunklines - Total: 290 km · 8” - 40 km · 12” - 110 km · 16” - 30 km · 18” - 90 km · 24” - 20 km

Wellhead arrangements (oil, water injection and water source) : 223 Nos.

Flowlines - Total: 975 km · 6” - 915 km · 8” - 60 km

OHTL approximately 170 km 33kV, 70km u/g cables 6.6kV

Page 16: PROJECTS - iDrainTheSwamp · PDF filesecuring of projects and corporate finance, ... some of which were on a “design and build” basis. ... Pig Launcher / Pig Receiver Skids,

Project Name: El Sharara (NC-115) Development Project - Storage Tanks

Country: Libya

Name of employer: Akakus Oil Operations (Former Repsol Oil Operations)

Value: 82,389,000 US$

Contract Role: Main Contractor

Start Date: 1997

Completion Date: 2006

The El Sharara Development Project NC-115 - Azzawiya Terminal - included the engineering, procure-ment, fabrication & installation of 9 floating-roof tanks of 300,000 bbl capacity each, equipment & instru-mentation systems, construction of civil facilities, testing & commissioning for storage of the processed crude oil. The oil is transferred through the 30’’ main transmission pipeline from the development fields (A, B and H) for exportation from Azzawiya Terminal (capacity 1,050,000 BOPD).

Additional works included 2 foam generation plants, fire-fighting system,, control building, load-out, re-lief and sump pumps, relief and fire water tanks, instrument air package, oily water separation plant and evaporation pond, electrical and power distribution systems, buildings, roads and utilities.

Page 17: PROJECTS - iDrainTheSwamp · PDF filesecuring of projects and corporate finance, ... some of which were on a “design and build” basis. ... Pig Launcher / Pig Receiver Skids,

Project Name: Petroleum Products Storage and Distribution Facilities - Sarir Refinery and Depot

Country: Libya

Name of employer: Brega Petroleum Marketing Company

Value: 60,000,000 US$

Contract Role: Main Contractor

Start Date: 1992

Completion Date: 1995

Turnkey project for the detailed engineering, procurement, construction, testing and commissioning of the “Petroleum Products Storage and Distribution Facilities” at Sarir Refinery and Sarir Depot.

· Extra storage capacity at the existing Sarir refinery · New Sarir depot storage and product road-loading facilities · Accommodation area adjacent to Sarir depot · 14 Steel plate tanks · Road-loading station with 10 No oil product road-loading arms · 8 No Product loading pumps and ancillary re-injection and drainage pumps · Fire fighting comprising of foam, cooling water and hydrants · Buildings (9,500 m2)

Page 18: PROJECTS - iDrainTheSwamp · PDF filesecuring of projects and corporate finance, ... some of which were on a “design and build” basis. ... Pig Launcher / Pig Receiver Skids,

Project Name: Hellenic Petroleum - Polypropylene Plant

Country: Greece

Name of employer: Hellenic Petroleum

Value: 42,100,000 US$

Contract Role: Construction Contractor

Start Date: 1998

Completion Date: 2000

Plant of a total capacity of 176,000 tons/year.

· Civil Works, including erection of steel structures with all associated mechanical, electrical and instrumentation works · The supply of steel structures · The engineering, procurement, supply, and installation/construction of the propylene pipeline and sea unloading facilities

Page 19: PROJECTS - iDrainTheSwamp · PDF filesecuring of projects and corporate finance, ... some of which were on a “design and build” basis. ... Pig Launcher / Pig Receiver Skids,

Project Name: Hellenic Petroleum Revamping & Expansion Works

Country: Greece

Name of employer: Hellenic Petroleum

Value: 18,710,000 US$

Contract Role: Construction Contractor

Start Date: 1995

Completion Date: 1999

Revamping of Naphtha Isomerization Unit 4600Part of the Hellenic Aspropyrgos Refinery Modernization Project allowing the transformation of the exist-ing Unit to a Total Isomerization Process (TIP) Unit.

Crude and Vacuum Distillation Unit (U-2000)Capacity: One (1) Atmospheric distillation section : 55,000 BPSD One (1) Vacuum distillation section : 15,000 BPSD

Interconnecting Works of New Units U-3400 and U-2750.The scope included civil works, piperack supply and installation, electrical and instrumentation.

Revamping of Mild Hydrocracker Unit (U-4000). The scope included civil and structural steel works, equipment installation, piping, electrical and instrumentation works.

Page 20: PROJECTS - iDrainTheSwamp · PDF filesecuring of projects and corporate finance, ... some of which were on a “design and build” basis. ... Pig Launcher / Pig Receiver Skids,

Project Name: Dahra Liquid Recovery Plant (LRP)

Country: Libya

Name of employer: Waha Oil Company

Value: 13,550,000 US$

Contract Role: Main Contractor

Start Date: 1999

Completion Date: 2000

Construction of a new Liquid Recovery Plant for sour service with a capacity of 20 MMSCFD to recover bu-tanes and heavier components from the associated gas produced at oil separation facilities at Bahi, PL-7 and PL-5 and degassing vessels at Dahra and refrigeration compressor packages. In addition, installation of a new Central Control System (CCS) for LRP.

The work performed under this contract consisted of installation, pre-commissioning and commission-ing of mechanical, electrical/instrumentation equipment supplied by Client, and control facilities for the replacement of the Liquid Recovery Plant at Dahra.

Main skid mounted equipment: 3 Process Modules, 2 Refrigeration Compression Packages, Depropanizer Reboiler Fuel Gas Unit

Main non-skid mounted equipment: Inlet separator, Depropanizer, Refrigeration cooler and Condenser, Process Gas Compressor.

Page 21: PROJECTS - iDrainTheSwamp · PDF filesecuring of projects and corporate finance, ... some of which were on a “design and build” basis. ... Pig Launcher / Pig Receiver Skids,

Project Name: Power Generation System for El-Feel Field

Country: Libya

Name of employer: ENI Oil Company

Value: 110,600,000 US$

Contract Role: Main Contractor

Start Date: 2007

Completion Date: 2010

All engineering, procurement and installation/construction works for Power Generation System for El-Feel Field, including:

· Installation of 4 No. Nuovo Pignone Turbine Generators of 20 MW capacity each · Supply and installation of Switchgear Building including 11kV LV Switchgears · Supply and installation of Power Transformers of 70 MVA size and Distribution Transformers

· Supply and installation of Auxiliary Systems to support/service the above as well as Instrument Air Pack-age, Nitrogen Air Package, Emergency Diesel Generator, Fire Fighting System and interconnecting works.

Page 22: PROJECTS - iDrainTheSwamp · PDF filesecuring of projects and corporate finance, ... some of which were on a “design and build” basis. ... Pig Launcher / Pig Receiver Skids,

Project Name: Vasilikos Power Station - Units 4, 5, 6 - Combined Cycle Gas Turbine Plant

Country: Cyprus

Name of employer: Electricity Authority of Cyprus

Value: Not available

Contract Role: Main Contractor

Start Date: 2006

Completion Date: 2013

Engineering, procurement, supply, installation, construction, pre-commissioning and commissioning of the combined cycle power station of 2 x 130 MW (Unit 4) and 220 MW each (Units 5 & 6).

Combined cycle each consisting of two GE gas turbines, 6fA+E, two waste heat boilers, one steam turbine and sea water open cooled condenser.

Page 23: PROJECTS - iDrainTheSwamp · PDF filesecuring of projects and corporate finance, ... some of which were on a “design and build” basis. ... Pig Launcher / Pig Receiver Skids,

Project Name: El Sharara (NC-115) Development Project - Civil and Building Projects

Country: Libya

Name of employer: Akakus Oil Operations (Former Repsol Oil Operations)

Value: 78,500,000 US$

Contract Role: Main Contractor

Start Date: 1996

Completion Date: 1998

The design, procurement and construction of a small self-contained satellite township (Central Complex Facilities) to accommodate and provide back-up facilities for oil company employees necessary to run and maintain oil extraction and processing complexes located in the southern regions of the Sahara de-sert. Facilities include accommodation blocks, administration building, control building, reception build-ing, mosque, laundry, kitchen with mess hall, bulk food store, warehouses, workshops, petrol, diesel and fire stations, water treatment plant building, substation, recreational facilities including swimming pool and external works and services, road and utilities networks.

Also, construction of an extensive asphalt road network for the various oil fields and processing installa-tions and all interconnecting asphalt roads.

Additional accommodation blocks at the various oil fields and processing installations.

Page 24: PROJECTS - iDrainTheSwamp · PDF filesecuring of projects and corporate finance, ... some of which were on a “design and build” basis. ... Pig Launcher / Pig Receiver Skids,

Project Name: Haradh Bachelor Camp, Haradh

Country: Saudi Arabia

Name of employer: Saudi Arabian Oil Company (Saudi Aramco)

Value: 73,892,000 US$

Contract Role: Main Contractor

Start Date: 2000

Completion Date: 2003

Construction of residential buildings, community centres, medical clinics, various facilities for operation and maintenance and associated services, infrastructure and airstrip.

· Earthworks : 1,500,000 m3 · Buildings : 52,050 m2 · Runways/Taxiways : 156,618 m2

Page 25: PROJECTS - iDrainTheSwamp · PDF filesecuring of projects and corporate finance, ... some of which were on a “design and build” basis. ... Pig Launcher / Pig Receiver Skids,

CERTIFICATES

Page 26: PROJECTS - iDrainTheSwamp · PDF filesecuring of projects and corporate finance, ... some of which were on a “design and build” basis. ... Pig Launcher / Pig Receiver Skids,
Page 27: PROJECTS - iDrainTheSwamp · PDF filesecuring of projects and corporate finance, ... some of which were on a “design and build” basis. ... Pig Launcher / Pig Receiver Skids,
Page 28: PROJECTS - iDrainTheSwamp · PDF filesecuring of projects and corporate finance, ... some of which were on a “design and build” basis. ... Pig Launcher / Pig Receiver Skids,
Page 29: PROJECTS - iDrainTheSwamp · PDF filesecuring of projects and corporate finance, ... some of which were on a “design and build” basis. ... Pig Launcher / Pig Receiver Skids,
Page 30: PROJECTS - iDrainTheSwamp · PDF filesecuring of projects and corporate finance, ... some of which were on a “design and build” basis. ... Pig Launcher / Pig Receiver Skids,
Page 31: PROJECTS - iDrainTheSwamp · PDF filesecuring of projects and corporate finance, ... some of which were on a “design and build” basis. ... Pig Launcher / Pig Receiver Skids,
Page 32: PROJECTS - iDrainTheSwamp · PDF filesecuring of projects and corporate finance, ... some of which were on a “design and build” basis. ... Pig Launcher / Pig Receiver Skids,
Page 33: PROJECTS - iDrainTheSwamp · PDF filesecuring of projects and corporate finance, ... some of which were on a “design and build” basis. ... Pig Launcher / Pig Receiver Skids,
Page 34: PROJECTS - iDrainTheSwamp · PDF filesecuring of projects and corporate finance, ... some of which were on a “design and build” basis. ... Pig Launcher / Pig Receiver Skids,

Registered OfficeCanada Court,Upland Road, St. Peter Port,Guernsey, GY1 3BQ,Channel IslandsTelephone No: +44 1481 744000Fax No:+44 1481 744520

Saudi Arabia

RiyadhP.O. Box 5881, Riyadh - 11432Tel:+966 1 4040004Fax:+966 1 4010123 Email: [email protected]

Al KhobarP.O. Box 720, Al Khobar 31952Tel:+966 3 8573984, 8571966, 8579096Fax:+966 3 8572308

JeddahP.O. Box 5028, Jeddah - 21422Tel:+966 2 6674551Fax:+966 2 6604515

United Arab Emirates

Abu DhabiP.O. Box 2536Tel:+971 2 6221533Fax:+971 2 6221536 Email: [email protected]

DubaiBaniyas Street, P.O. Box 4624, Deira, DubaiTel:+971 4 2212248Fax:+971 4 2284365 Email: [email protected]

DubaiP.O. Box 30980,Tel:+971 4 3353320Fax:+971 4 3353212 Email: [email protected]

Sultanate of Oman

MuscatP.O. Box 603, Muscat 113Tel:+968 2 4490200Fax:+968 2 4490699 Email: [email protected]

Qatar

DohaP.O. Box 18637, Doha.Tel:+974 4 675429Fax:+974 4 675433 Email: [email protected]

Egypt

Cairo9 Shehab Street, Mohandeseen, Giza, CairoTel:+20 2 33388376, 37485403Fax:+20 2 37499161 Email: [email protected]

Pakistan

Karachi38/1, Bangalore Town, P.O. Box 13084, Kara-

chi-75350Tel:+92 21 34545854, 34545855

Fax:+92 21 34546111 Email: [email protected]

Libya

TripoliP.O. Box 6072.

Tel:+218 21 5670101-15, 5622465-6Fax:+218 21 5622089

Email: [email protected]

BenghaziP.O. Box 2055.

Tel:+218 61 2225448-9Fax:+218 61 2225447, 2230071

Jordan

AmmanMecca Street, Al Hussaini Complex No.607,

P.O. Box 5145, 11953 AmmanTel:+962 6 5524403

Fax:+962 6 5522586 Email: [email protected]

Greece

AthensJ&P Energy & Industrial Projects S.A.

27, Frangoklisias Street, 151 25 Marousi, AthensTel:+30 210 6389100

Fax:+30 210 6104595 Email: [email protected]

Cyprus

NicosiaJoannou & Paraskevaides Group

1, Byron Avenue, P.O. Box 21178, CY-1503 Nicosia Tel:+357 22 868600

Fax:+357 22 818868Email: [email protected]

Associated Offices

United Kingdom16 Hanover Street, London W1S 1YL

Tel:+44 2074625000Fax:+44 2074930059

Email:[email protected]

WEBSITE: www.jandp-group.com