Upload
others
View
6
Download
0
Embed Size (px)
Citation preview
390.5
15.37
300
11.81
380 14.96
JDWDS
SHEET: 01 OF 05
DATEJDW DRAUGHTING SERVICESJ.A.M. DE WAAL. 12 BRIGHTWELL STREET PAPAKURA 2110. NEW ZEALAND. PHONE: OO64 09 2988815. MOB: 0211791000 E-MAIL: [email protected].
MODEL SCALE: 1:1DRAWING CONTENTSDWG SCALE: 1:1 @A3 OR AS SHOWN
TITLE
Copyright ©
A3
PROJECTION
J.A.M. DE WAAL PAPAKURA NZ
NOTES: THE ORIGINAL DRAWINGS WERE GIVEN TO ME. THE ORIGINAL DRAWING'S TITLE IS "BRIANS DONKEY". THE DRAFTER/DESINGER OF THIS MODEL IS BRIAN RUPNOW. I HAVE CONVERTED THE DDRAWINGS TO METRIC MEASUREMENTS
No: 09B-20-00-SHT01GENERAL ARRANGEMENTA 2x1 CYLINDER STEAM ENGINE OPERATED
WINCH WITH CLUTCH (STEAM DONKEY)
PROJECT No 09B-20-00
JULY 2018
X ECCENTRIC
CRANK PIN
CRANK DISC
ALU/MS
45°
M8 23-4PL
100
10 R16.5
27
13
100
2
7 13
R7
R16.5
10
6 19 38 6
R14
R19 R16.5
10
40 120 78 40
87.5
7.5
87.5
7.5
R16.5
22
15
10-2PL M12-2PL
15
16
23
8-4PL 10
15
15
116.5
116.5
110P
CD
STEAM/AIR IN
STEAM/AIR IN
10-CB 8-4PL
8
16-CB 8-4PL
8
22
4 15-4PL
65
10
23
10 1
1
SCALE 1:3
4 10-8PL 2
8 R18
10
18
18
12 12 9
R20
RM
10
28PCD
AA
1-02.1
1-02.1
1-02.2
1-02.31-02.4
BRS
SYN
5
8
4
1-02.4
4-4PL
4.5
27
4.5
6 38 6 2.5mm THICKSCALE 1:1:5
1-02.3
4.5
4.5
5
5
10
SECTION A-ASCALE 1 : 1.5
38
6
6
12
M5 10-2PL
7
6
18
M10 9
3
3
13.5
13.5
4.5
4.5
M4 10-4PL
25
7 5
10.5 10.5
5 CL
ALL 10mm DEEP
15
1
9 25 25
M10
M10
13.5
13.5
4.5
4.5
19 19 6 6
20
8
5 40 4-4PL SCALE 1:1:5
5RM
M10
11
13 9
18
1-02.2
BRZ
5R
M M
10
14H
EX
4 15
BRZ
14H
X
4 15
7R
M M
12
BRS
20
42
4-4PL
45°
28
PCD
5
SCALE 1:1:5 1
7.5 1.5
5 5
11 11 8 8
9
9
4 4 R5
SCALE 1:2
M4
36
46
9 32 7.5
40
12
19 19
12
SCALE 1:2
1-08.5
14
RM
16PF
24
9.5 9.5
4
1.5 1.5
DAA
SCALE 1:2
1-08.2
22.5 22.5
16
M4-
2PL
30°
16PF 36PCD
SCALE 1:2
R22.5
22.5 22.5
28
50.5 10.5 61
11
15 15
R21.5
R7 R7
15
12
34
M4
27
28.3 28.3
12.5
12.5
10
21
39 39 M8 M8
18
16PF
12PF
R130 R130R145 R145
SCALE 1:2
7 7
2.5
2.5 M5 10-2PL
M5
13-2
PL
1-08.1
M5 M5
9.5 9.5
11 11
4
DAA1-08.3
9R
M
12PF
7 7 2.5 2.5
4 DAA
SCALE 1:2
1-08.4
7 7
5-2PL
12.5 12.5
4 DAA
THE OFF SET ANGLE OF THE ECCENTRIC IN RELATION TO THE CRANK AXIS TO BE EXPERIMENTALLY DETERMINED FOR THE SMOOTH RUNNING OF THE ENGINE AND SATISFACTION OF THE BUILDER
OTHER ABBREVIATIONSDP = DEEPDAA= DRILL AFTER ASSEMBLYD&TAA= DRILL AND TAP AFTER ASSEMBLYCF = CLOSE FIT (SIZE FOR SIZE)PF = PRESS FITPFAA= PRESS FIT AFTER ASSEMBLYPCD = PITCH CIRCLE DIAMETERRM = REAMHEX = HEXACON, 6SIDEDCP = COMPRESSEDKNL = KNURLEDCB = COUNTER BORECSK = COUNTERSINKPL = PLACESDWL= DOWELSPF= SPOTFACE(T)HESOP=(TAPPED)HOLES EQUALLY SPACED ON PCD(T)HESOC=(TAPPED)HOLES EQUALLY SPACED ON CIRCUMFERENCESA-xxx = SUB ASSEMBLY-xxx
NOTES:0. ALL DRAWINGS ARE IN METRIC MEASUREMENTS1. ALL ENGINEERING PRACTICES SHALL BE APPLIED WITH REGARDS TO HOLE AND SHAFT TOLERANCES.2. WHERE SCREWS OR BOLTS ARE USED THE CLEARANCE HOLES SHALL BE APPROXIMATELY 5% TO 8% LARGER THAN THE MATCHING TAPPED HOLE.3. PREFERABLY ALL TAPPED HOLES AND MATCHING SCREWS AND/OR BOLTS TO BE METRIC FINE (MF)4. MATERIALS SPECIFIED ON THE DRAWINGS ARE INDICATIVE ONLY. THE BUILDER CAN MAKE HIS/HER OWN MATERIAL CHOICE.5. ALL CONNECTIONS/JOINTS WHICH HAVE STEAM PRESSURE APPLIED TO IT SHALL BE SILVER/HARD SOLDERED.6. COMPRESSION SPRINGS ARE DRAWN IN COMPRESSED STATE (CP), UNCOMPRESSED STATE IS APPROX 40% TO 60% LONGER THEN COMPRESSED STATE.7. WHERE PREFERRED SCREW OR RIVETED CONNECTIONS CAN BE OMITTED AND PARTS CAN BE BONDED TOGETHER BY USING EITHER HIGH STRENGTH GLUE, EPOXY RESIN, OR SOLDER.8. PARTS WHICH ARE DIRECTLY EXPOSED TO STEAM AND/OR WATER SHOULD BE CONSTRUCTED USING NON-FERROUS OR NON CORROSIVE MATERIAL SUCH AS BRASS, BRONZE, GUNMETAL, STAINLESS STEEL, COPPER OR MONEL.9. THE ORDER IN WHICH THE PARTS/COMPONENTS ARE MANUFACTURED AND THE MODEL IS ASSEMBLED IS ENTIRELY LEFT TO THE BUILDER/MODEL MAKER.10. A COLOUR SCHEME FOR THIS PROJECT IS ENTIRELY LEFT UP TO THE MODEL MAKER.11. THE MANNER IN WHICH THE PARTS/COMPONENTS ARE MANUFACTURED IS ENTIRELY LEFT UP TO THE BUILDER.12. USE LOCTITE, ON SCREW OR PRESS FIT CONNECTIONS OR SURFACES, WERE DEEMED NECESSARY TO PREVENT PARTS FROM LOOSENING.13. WASHERS AND/OR SPRINGWASHERS SHALL BE USED WHERE DEEMED NECESSARY.XX. ERRORS AND/OR OMISSIONS MAY OCCUR IN THE DRAWINGS, DO NOT HESITATE TO CONTACT ME SO THAT THE ERRORS/OMISSIONS CAN BE RECTIFIED.
MATERIAL ABBREVIATIONS:ALU = ALUMINIUMHALU= HARD ALUMINIUMBRS = BRASSBRZ = BRONZE OR GUNMETAL (BRZ/GM)CI = CAST IRONCU = COPPERGRA = GRAPHITEMS = MILD STEEL/BRIGHT MILD STEELSS = SILVER STEEL OR STAINLESS STEELSPS = SPRING STEELPEEK= POLYETHER ETHER KETONESYN = SYNTHETIC MATERIAL SUCH AS VETON, NYLON, TEFLON OR RUBBER
IN GENERAL SYNTHETIC MATERIALS SOULD BE ABLE TO WITHSTAND THE HEAT AND PRESSURE(S) APPLIED TO THEM.
nnn/nnn MEANS THAT EITHER MATERIAL CAN BE USED
1-01
1-03
1-05
1-06
1-07
QTY. PART NUMBER1 DONKEY-1-01-BASE PLATE1 DONKEY-1-02-CYLINDER1 DONKEY-1-02-CYLINDER2 DONKEY-1-03-VALVE SPINDLE GLAND NUT2 DONKEY-1-04-CROSSHEAD GUIDE2 DONKEY-1-05-PISTON ROD GLAND NUT2 DONKEY-1-06-CYLINDER FRONT COVER2 DONKEY-1-07-CROSSHEAD GUIDE HOLDING BRACKET2 DONKEY-1-08-WINCH DRUM BEARING STAND1 DONKEY-1-09-DUMMY BOILER1 DONKEY-1-10-DUMMY BOILER FIRE BOX DOOR4 DONKEY-1-11-VALVE CHEST INLET NIPPLE2 DONKEY-1-12-VALVE CHEST INLET STOPPER1 DONKEY-1-13-STEAM SUPPLY VALVE BRACKET1 DONKEY-1-14-STEAM SUPPLY VALVE BODY1 DONKEY-1-15-STEAM SUPPLY VALVE+HANDLE6 DONKEY-1-16-STEAM PIPE NUT1 DONKEY-1-17-STEAM SUPPLY PIPE1 DONKEY-1-18-EXHAUST STEAM PIPE1 DONKEY-1-18-EXHAUST STEAM PIPE1 DONKEY-1-19-DUMMY BOILER CLADDING1 DONKEY-1-20-CLUTCH LEVER HANDLE BLOCK2 DONKEY-2-01-PISTON+ROD+CROSSHEAD1 DONKEY-2-02-CRANKSHAFT1 DONKEY-2-03-CRANK DISC1 DONKEY-2-03-CRANK DISC2 DONKEY-2-04-CON-ROD2 DONKEY-2-05-SLIDE VALVE+SPINDLE2 DONKEY-2-06-ECCENTRIC SHEAVE1 DONKEY-2-07-ECCENTRIC STRAP1 DONKEY-2-07-ECCENTRIC STRAP1 DONKEY-2-08-WINCH DRUM SHAFT1 DONKEY-2-09-WINCH DRUM GEARWHEEL1 DONKEY-2-10-CRANKSHAFT GEARWHEEL2 DONKEY-2-11-CLUTCH SHOE1 DONKEY-2-12-CLUTCH SLIDER HUB2 DONKEY-2-13-CLUTCH SLIDER BLOCK2 DONKEY-2-14-CLUTCH SLIDER BLOCK LINK1 DONKEY-2-15-WINCH DRUM1 DONKEY-2-16-PRESSURE SPRING1 DONKEY-2-17-CLUTCH OPERATER HANDLE1 DONKEY-2-18-HANDLE GUIDE SCREW4 DONKEY-M3 NUT4 DONKEY-M3 WASHER-BRASS4 DONKEY-M3x4.5 GRUB SREW10 DONKEY-M3x6 A-K CYL HEAD SCREW4 DONKEY-M3x12 A-K CYL HEAD SCREW8 DONKEY-M4 DOME NUT8 DONKEY-M4 NUT2 DONKEY-M4 WASHER-BRASS2 DONKEY-M4x5 GRUB SREW2 DONKEY-M4x14 GRUB SREW24 DONKEY-M4x18 A-K CYL HEAD SCREW3 DONKEY-M4x36 A-K CYL HEAD SCREW8 DONKEY-M4x38 STUD2 DONKEY-M5 NUT2 DONKEY-M5x9 A-K CYL HEAD SCREW4 DONKEY-M5x11 GRUB SREW2 DONKEY-M5x22 A-K C-SINK SCREW8 DONKEY-M5x22 A-K CYL HEAD SCREW4 DONKEY-M5x34 A-K CYL HEAD SCREW2 DONKEY-M6 NUT4 DONKEY-M8x26 A-K CYL HEAD SCREW4 DONKEY-M8x36 A-K CYL HEAD SCREW1 DONKEY-M10x18 A-K CYL HEAD SCREW1 DONKEY-M10x50 A-K CYL HEAD SCREW
JDWDS
SHEET: 02 OF 05
DATEJDW DRAUGHTING SERVICESJ.A.M. DE WAAL. 12 BRIGHTWELL STREET PAPAKURA 2110. NEW ZEALAND. PHONE: OO64 09 2988815. MOB: 0211791000 E-MAIL: [email protected].
MODEL SCALE: 1:1DRAWING CONTENTSDWG SCALE: 1:1 @A3 OR AS SHOWN
TITLE
Copyright ©
A3
PROJECTION
J.A.M. DE WAAL PAPAKURA NZ
NOTES: THE ORIGINAL DRAWINGS WERE GIVEN TO ME. THE ORIGINAL DRAWING'S TITLE IS "BRIANS DONKEY". THE DRAFTER/DESINGER OF THIS MODEL IS BRIAN RUPNOW. I HAVE CONVERTED THE DDRAWINGS TO METRIC MEASUREMENTS
No: 09B-20-00-SHT02BILL OF MATERIALS, NOTESPARTS AND ASSEMBLY
A 2x1 CYLINDER STEAM ENGINE OPERATED WINCH WITH CLUTCH (STEAM DONKEY)
PROJECT No 09B-20-00
JULY 2018
HALU/MS
BRS
36
42
41 45°
83
25RM
29
49°
49°
BB
45°
7R
M
4-4PL
5
A
A
25
RM
36
LPF
5
R12
22.5 94 7.5
R12
13.5
13.5
R12 SECTION B-B
SCALE 1 : 1.5
45°
29
28PCD
6.5-
4PL
1-08.3
1-08.11-08.5
1-08.2
1-08.4
ALU/MSBRZ
BRZ
REFER TO SHEET-02 FOR PARTS
M12
16.5
36
LPF
42
20
1.5 7.5 5 4
12 SECTION A-ASCALE 1 : 1.5
7
10
140LPF
8-4PL
45°
30PF
110PCD
5mm THICK SCALE 1:4
1-09.2 9
4.5
58.5
35°
TUBE 7x6
SCALE 1:2
1-09.7
4-6HESOP
10
55
20
PCD
4mm THICK SCALE 1:21-09.6
7 3
0 2
05
22PF
30PF SCALE 1:3
1-09.4
140LPF
17.5
147
30
55 65
43
54.5
90 7
55
1-09.3
SCALE 1:4
140LPF 150
M10
70
121
18
M5-2PL
26
25 CC
1-09.1
SCALE 1:4
46.5° 46.50°
7 7
SECTION C-CSCALE 1 : 4
M10 22PF
15
20
SCALE 1:2
1-09.5
1-09.11-09.2
1-09.4
1-09.5
1-09.3
1-09.6
1-09.7
1-09.8
SOLDER
SOLDER
ALU
BRS
CU
20
R17.5
92
10
TUBE 7x6
SOCKET 8x7
SOLDER
SCALE 1:21-09.8
ALU
37.8 37.8
19
4
20
4
19
25
25
30 30
10
15 R6
R6
SCALE 1:2
3.5 29° 29°
21
6
R75
BRS 7 M10
4
10
8
M10 12HEX
BRS
4
8
M10
12HEX
BRS
11.5 11.5
18
5
5
5
5
CSK
SCALE 1:2
15
16
2.5 18 2.5
R75
14
14
8
3-2PL
R6
10
10
4
10
4 10
M3
12-4
PL
R2
5 5
9 9 D
DSCALE 1:1.5
1-14.1
1-14.21-14.3
BRS
SYN
14
2
1-14.3
10
10
5 5 4 4
4
4
5R
M
3-4PL R2
2mm THICKSCALE 1:1.5
1-14.2
7
7
10
10
5
9R
M
14
2
12
SECTION D-DSCALE 1 : 1.5
M10
M10
8 8
M3
4-2P
L
1-14.1
5 12
R3
2.5
45
9C
F
5 2.5PF
6 8 8 4 5C
F
SCALE 1:1.5
BRS SS
7
4
1.5
SCALE 1:2
BRS
SYN
M10
12H
EX
9
2
12
7
SEAL
CU
95 95
6 6 20
66
73.5
ALL TUBE 7x6
T-SOCKET 8x7
SOLDER ALL
SCALE 1:3
R11.5
32
R8.5
R8.5
CU
86.5
107
45
R11.5
R11.5
TUBE 7x6
SCALE 1:3
45°
1 OFF LEFTHAND1 OFF RIGHTHAND
WOOD
BRS
10
120
10
110
10
28
24
76
37
66
R6
83
STRAPS 1mm THICK
TAKE OVER FROM 1-09.1
SCALE 1:5
150-ID
36 PLANKS 13x3mm
4
7
6
3 OFF
14 21
13
R21.5
30°
4-3PL
R3
36PCD
SCALE 1:1.5
M6
6 6
2.5
SA-1-1011-04 1-031-05
1-06
1-02
1-161-16
1-11 1-11
1-12
1-18
SA-1-102
1-04
1-03
1-06 1-02
1-161-16
1-11
1-11
1-12
1-18
1-04.1
1-04.21-04.3
1-10
1-11
1-12
1-13
1-15.1
1-15.2
1-16
1-17
1-18
1-19
1-20.1
1-20.2
JDWDS
SHEET: 03 OF 05
DATEJDW DRAUGHTING SERVICESJ.A.M. DE WAAL. 12 BRIGHTWELL STREET PAPAKURA 2110. NEW ZEALAND. PHONE: OO64 09 2988815. MOB: 0211791000 E-MAIL: [email protected].
MODEL SCALE: 1:1DRAWING CONTENTSDWG SCALE: 1:1 @A3 OR AS SHOWN
TITLE
Copyright ©
A3
PROJECTION
J.A.M. DE WAAL PAPAKURA NZ
NOTES: THE ORIGINAL DRAWINGS WERE GIVEN TO ME. THE ORIGINAL DRAWING'S TITLE IS "BRIANS DONKEY". THE DRAFTER/DESINGER OF THIS MODEL IS BRIAN RUPNOW. I HAVE CONVERTED THE DDRAWINGS TO METRIC MEASUREMENTS
No: 09B-20-00-SHT03PARTS AND ASSEMBLYA 2x1 CYLINDER STEAM ENGINE OPERATED
WINCH WITH CLUTCH (STEAM DONKEY)
PROJECT No 09B-20-00
JULY 2018
SA-1-103
1-09
1-191-10
SA-1-104
SA-1-104
1-14 1-16
1-16
1-15
SA-1-105
1-17
1-08
1-08 1-20
1-07
SA-1-103
SA-1-101
SA-1-102
M5
20
CF
5x1.5=7.5
17.5
2-01.1
3 15 4
M4
6CF 12
2-01.5
6 3-2PL
7
7 3
3
8 4.5 11.5 2mm THICKSCALE 1:1.5
2-01.4
2-01.6 2-01.1 2-01.2
2-01.3
2-01.4
2-01.4
2-01.5
CI
SS BRZ
BRSMS
M6
4.5
7.5 12.5 11.5
20°
20°
M3
7
7
4.5
4.5
14
2-01.3SCALE 1:1.5
7.5 18 78.5
M5
7C
F
M6
2-01.2
5.5 5.5
15
25
CF
17.5-ID
1.5 2-01.6
SCALE 1:1.5
242 9CF
14 14 2-02.1
SCALE 1:1.5
14
3 2-02.2
3
1.5 3
1.5
2-02.2
2-02.22-02.1 MS
BRS
BRS
M8
63 76
6
6
R7 R7
20°
2
19 19
20°
44PCD
9 SCALE 1:1.5
10
15
1.5
2-03.3
2-03.3
ALU/MS
MS
BRS
M8
14 10.5 3
2
15
2 10CF SCALE 1:1.5
3
M5
M5
1.5
DETAIL ASCALE 1 : 1.5
14 15
0.5
7.5
19
MS
BRZ
BRZ
6RM 9PF
14
R4 R
4 4
4
10RM
13PM
17
166-MAX/MIN
=7=
3
4.5 4.5
112-MAX/MIN
5
5
8 8
M5 7mm THICK
2-05.2
2-05.1 2-05.2
2-05.4
BRZ
BRS
SS
MS MS
3 3 12
5CF
M3 M
3
16.5
5
R4.5
2-05.4
18 25
M5
M5
5CF 90
SCALE 1:1.5 11
2.5
2.5 5.25 16.5 5.25
10 7 10
10
4.5
2-05.1
5.5
5
5.5
M5
9
7 14
11
3
6 3
96.5-MAX/MIN
MS
5.5
9
33
M4
3.5
7 1.5 1.5
29
M4
6
7 5.5 R4.5
5RM MS
MS MS
BRZ2-07.3
2-07.1
7
R20
29RM 33PF
7.5 7.5
4 45° 28
28
R3.5-TYP
52
20
R71.5
R71.5
SPLIT LINE
SCALE 1:1.5
10.5 30
9 M
4 4
M4
70 16 68
R48R48
SCALE 1:1.5 6 2-07.1
24
24
M4
4
4
7
3.5 2-07.3
MS
14CF 14
112 22 64
50
7
14 26 4
20
SCALE 1:2
MS
BRZ
21.5 21.5
R7
=14
= 19
35
-4PL
43 43
17 14 134-ROOT 138-PCD 142-OD
B
B
80 TEETH1
10
20
30
40
50
60
70
80
SCALE 1:2.5
118
14 19
13
14
RM
17PF
SECTION B-BSCALE 1 : 2.5
1
2.8
DETAIL D
PCD
MS
9 18-ROOT 22-PCD 26-OD
12 TEETH TO MATCH 2-09SCALE 1:1.5
1
5
10
6 19 6
M3-4PL
18
2-11.2
OAK
MS
M5
3.5
10PF
2-11.2
R53.5
R15 10PF R7
15°
15°
14
SCALE 1:2
5.5
9.5
MS/ALU
2-12.3
2-12.2 4P
F
26 2-12.3
26 3P
F
55.5
7.5
23 23
3.5
8.25
16.5
4PF 3PF-2PL 45°
SCALE 1:1.5
7
18 18
7
14
13
13 R3
.5 R3.5
1.5
10.5 10.5
3P
F 14
2-13.2
5 R7
14
10
3P
F
MS/ALUBRS
2-13.2
5.5
4.5
5
3
3.5 3.5
9.5 9.5 7 7
5.5
3 3
15
R3.5
7
7mm THICKBRS
SPS
6
1
0.7
16 4.3ID
10 COILS
2-03.1
2-03.2
2-04
2-05.32-05.5
2-06
2-07.2
2-08
2-09
2-10
2-11.1
2-12.2
2-12.1
2-13.12-14
2-16.1
2-16.2
JDWDS
SHEET: 04 OF 05
DATEJDW DRAUGHTING SERVICESJ.A.M. DE WAAL. 12 BRIGHTWELL STREET PAPAKURA 2110. NEW ZEALAND. PHONE: OO64 09 2988815. MOB: 0211791000 E-MAIL: [email protected].
MODEL SCALE: 1:1DRAWING CONTENTSDWG SCALE: 1:1 @A3 OR AS SHOWN
TITLE
Copyright ©
A3
PROJECTION
J.A.M. DE WAAL PAPAKURA NZ
NOTES: THE ORIGINAL DRAWINGS WERE GIVEN TO ME. THE ORIGINAL DRAWING'S TITLE IS "BRIANS DONKEY". THE DRAFTER/DESINGER OF THIS MODEL IS BRIAN RUPNOW. I HAVE CONVERTED THE DDRAWINGS TO METRIC MEASUREMENTS
No: 09B-20-00-SHT04PARTS AND ASSEMBLYA 2x1 CYLINDER STEAM ENGINE OPERATED
WINCH WITH CLUTCH (STEAM DONKEY)
PROJECT No 09B-20-00
JULY 2018
30
24PF
20RM
2.25
126
79
LPF
85
9 12 5
2-15.1SCALE 1:2
2-15.12-15.2 2-15.3
MS/ALU
BRZ
BRZ
79
LPF
85
76
2-15.2SCALE 1:2
20
RM
79
LPF
85
126
9
14
24
PF
107
12 19
SCALE 1:2
2-15.3 9
38
54
5PF SCALE 1:2
2-17.2
MS
5PF SR7
20 25 33.5
7
14
4 20°
1.8
7mm DEEP
SCALE 1:22-17.2
MS
4
5
5
3
10 2
1.5
SA-2-201
2-03
2-03
2-022-10
2-06
38 213
2-06
ECC-AECC-B
70° 20°
DISC-A
CRANKPIN
ECC-BECC-A
2-11
2-13
SA-2-202
SA-2-205SA-1-105
SA-2-201
SA-2-202
SA-2-202
2-15 2-09
2-17
2-18
2-12
2-14
SA-2-205
2-01 2-01
2-052-05
2-07 2-07
2-04
2-04
2-17 2-18
2-082-162-12
2-17.1 2-18THE ECCENTRIC SHEAVES ARE 90deg OFF-SET
JDWDS
SHEET: 05 OF 05
DATEJDW DRAUGHTING SERVICESJ.A.M. DE WAAL. 12 BRIGHTWELL STREET PAPAKURA 2110. NEW ZEALAND. PHONE: OO64 09 2988815. MOB: 0211791000 E-MAIL: [email protected].
MODEL SCALE: 1:1DRAWING CONTENTSDWG SCALE: 1:1 @A3 OR AS SHOWN
TITLE
Copyright ©
A3
PROJECTION
J.A.M. DE WAAL PAPAKURA NZ
NOTES: THE ORIGINAL DRAWINGS WERE GIVEN TO ME. THE ORIGINAL DRAWING'S TITLE IS "BRIANS DONKEY". THE DRAFTER/DESINGER OF THIS MODEL IS BRIAN RUPNOW. I HAVE CONVERTED THE DDRAWINGS TO METRIC MEASUREMENTS
No: 09B-20-00-SHT05PARTS AND ASSEMBLYA 2x1 CYLINDER STEAM ENGINE OPERATED
WINCH WITH CLUTCH (STEAM DONKEY)
PROJECT No 09B-20-00
JULY 2018