4
Willmer LIMITED PROJECT TRACKER S-Curves and progress reporting made easy! One click import from... Primavera P6 Microsoft Project Asta Powerproject We have used our experience of the challenges facing project teams in tracking project progress, and have developed a simple-to-use S-Curve generation application - Project Tracker. Project Tracker is a Windows-based application that imports project information from Primavera P6, Microsoft Project and Asta Powerproject to create S-Curves which are used to analyze the progress of the project...

PROJECT TRACKER Willmer - P6 Consulting · S-Curves and progress reporting made easy! One click import from... Primavera P6 Microsoft Project Asta Powerproject We have used our experience

  • Upload
    others

  • View
    10

  • Download
    0

Embed Size (px)

Citation preview

Willmer L I M I T E DPROJECT TRACKER

S-Curves and progressreporting made easy!

One click import from...

Primavera P6Microsoft ProjectAsta Powerproject

We have used our experience of the

challenges facing projectteams in tracking project progress,and have developed a simple-to-useS-Curve generation application -Project Tracker.

Project Tracker is a Windows-based application that imports project information from Primavera P6, Microsoft Project and AstaPowerproject to create S-Curves which are used to analyze the progress of the project...

Willmer bro 2 Final Will_Layout 1 22/05/2014 09:25 Page 1

KEY BENEFITS OF USING PROJECT TRACKER

1. Import project and baselines from P6, MSP or Asta

2. No need to have P6 installed on PC

3. Create S-Curves without adding resources or costs

4. Create S-Curves without exporting to MS Excel

5. View the Gantt Chart under the S-Curve

6. Fully configurable and easy to use and learn

7. Filter by WBS, Activity code and/or Resource

8. Batch print for multiple one-click reports

9. Text-based progress report included

10. Fully customisable data table

EASILY CREATE S CURVESFROM YOUR FAVOURITEPLANNING SOFTWARE

An S-Curve is a graphical representation of cumulativecosts, man hours or time measured against the overallproject plan. It is an ideal tool for managers to quicklyassess where the project stands in terms of completion,deadlines, and budget. Additionally many clients willask for an S-Curve report as part of the regular progress update.

PAYS FOR ITSELF AFTER ONEPROGRESS CYCLE…

Traditional methods of exporting data to a spreadsheetrequire a number of steps and a certain level of knowledgeincluding how to add resources or costs to the plan, how tocreate time phased exports from the PM tool, how to openthe data in the spreadsheet and how to create graphs fromthe data. Project Tracker eliminates all of these steps.

Aside from the number of steps required to export datafrom PM software to a spreadsheet, this method can beacceptable as a reporting medium, but the problem is thatthe analytical possibilities are not available as the data is

now disconnected from the actual plan.

Therefore, rather than just importing the datarequired to plot a curve, Project Tracker importsthe activity data and is able to optionally plot aGantt Chart under the S-Curve, allowing theproject manager to assess which activities maybe causing issues and what action can be taken.

Once data has been imported, Project Trackerallows graphs to be created for a portfolio ofprojects, individual projects, WBS hierarchy andActivity Code. Additionally filter by resource forman hour and material curves.

ProjectT R A C K E R

Willmer bro 2 Final Will_Layout 1 22/05/2014 09:25 Page 2

View the Gantt chart under the S Curve - Critical path is displayed.

Project Tracker allows dynamic tracking of where the project is bymoving the mouse over the forecast curve.

Once data has beenimported, ProjectTracker allowsgraphs to be createdfor a portfolio ofprojects, individualprojects, WBShierarchy andActivity Code.Additionally filter by resource for manhour and materialcurves.

Fully customisabledata table can bedisplayed includingconfigurable weeknumbering.

Project Tracker can import XER or XML files without the need to havePrimavera P6 orMicrosoft Projectinstalled on your PC!

ProjectT R A C K E R

Willmer bro 2 Final Will_Layout 1 22/05/2014 09:25 Page 3

Willmer L I M I T E D

System Requirements Supported Operating System: Windows Server 2003, Windows Server 2008, WindowsVista, Windows XP, Windows 8

Processor: 400 MHz Pentium processor or equivalent (Minimum);1GHz Pentium processor or equivalent (Recommended)

RAM:96 MB (Minimum); 256 MB (Recommended)

Hard Disk: Up to 500 MB of available space may be required

CD or DVD Drive: Not required

Display: 800 x 600, 256 colours (Minimum); 1024 x 768 high colour, 32-bit (Recommended)

About WillmerWillmer Limited is a UK-based company that offersplanning and training services for any company involved in projects. The founders have many years’ experience ofimplementing, training and delivering planning andscheduling services to the construction, rail, oil and gas and engineering industries. Additionally we have worked with finance, IT and pharmaceutical companies.

CONTACTWeb: www.willmer.co.uk Email: [email protected]

Willmer Limited: 145-157 St John Street, London EC1V 4PW

Project Tracker plots a per period bar graph of baseline and forecast values. This is useful to see if too much or too little work has been planned at certain dates.

Text-based progress reports included

Target at completion

Target finish date 20/05/2015Planned finish date 27/04/2015Project Slip 23 DaysTarget Total 1036 DaysPlanned Total 1036 DaysProject growth 0 Days

Summary Progress

Actual 235 DaysBaseline 263 DaysVariance -28 DaysPercent Complete 22.68%Planned Percent Complete 25.39%Percent Complete Variance -2.70%Slip 25 Days

S Curve Analysis

Initial analysis of the S Curve reveals thefollowing about the status of the project...

* There has been no change in scope. (The Target S Curve is level with thebaseline S Curve)

* The project has slipped. (The Target S Curve finishes to the right of theBaseline S Curve

Willmer bro 2 Final Will_Layout 1 22/05/2014 09:25 Page 4