2016 Capital Project Schematic Design Report Wappingers Central School District September 15, 2016 R H I N E B E C K A R C H I T E C T U R E Preliminary 1 Preliminary Schematic Design Report Project Scope and Additional Opportunities shown will be refined during the budget estimating and bidding process.

Project Schematic Design Report School District Preliminary · 2016 Capital Project Schematic Design Report Wappingers Central School District September 15, 2016 R H I N E B E C K

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Project Schematic Design Report School District Preliminary · 2016 Capital Project Schematic Design Report Wappingers Central School District September 15, 2016 R H I N E B E C K

September 23, 2013

2016 Capital Project Schematic Design ReportWappingers Central School District September 15, 2016R H I N E B E C K A R C H I T E C T U R E Preliminary 1

Preliminary Schematic Design Report

Project Scope and Additional Opportunities shown will be refined during the budget estimating and bidding process.  

Page 2: Project Schematic Design Report School District Preliminary · 2016 Capital Project Schematic Design Report Wappingers Central School District September 15, 2016 R H I N E B E C K

September 23, 2013

2016 Capital Project Schematic Design ReportWappingers Central School District September 15, 2016R H I N E B E C K A R C H I T E C T U R E Preliminary 2

Schematic Design Report

Project Budget

Project ScopeSite Improvements Accessibility ImprovementsSports ImprovementsMusic, Drama and Arts ImprovementsFacilities Improvements

Project Schedule

Other Project Initiatives

Next Steps

Page 3: Project Schematic Design Report School District Preliminary · 2016 Capital Project Schematic Design Report Wappingers Central School District September 15, 2016 R H I N E B E C K

September 23, 2013

2016 Capital Project Schematic Design ReportWappingers Central School District September 15, 2016R H I N E B E C K A R C H I T E C T U R E Preliminary

Scope Construction Budget Incidental Costs Total

Facility Improvements $12,140,800 $3,035,200 $15,176,000

Accessibility Improvements $1,529,600 $382,400 $1,912,000

Sports Improvements $4,930,000 $986,000 $5,916,000

Arts Improvements $3,100,000 $619,000 $3,719,000

Total $21,700,400 $5,022,600 $26,723,000

Project Budgets

Page 4: Project Schematic Design Report School District Preliminary · 2016 Capital Project Schematic Design Report Wappingers Central School District September 15, 2016 R H I N E B E C K

September 23, 2013

2016 Capital Project Schematic Design ReportWappingers Central School District September 15, 2016R H I N E B E C K A R C H I T E C T U R E Preliminary 4

District Wide Scope of WorkBuilding RCK JJ VW WJ BE FE FP GH JE KR MC OG SR VR BG1BCS Building Rating S S S U S U U U U S U S U U UProposed ImprovementsFacilitiesPavement ‐ Roads and Lots

Sidewalks

BasketBall Courts

Site Drainage

Exterior Steps, Stairs, Ramps

Windows

Resilient Flooring

Ceilings

Stage Curtains

Lockers

Interior Doors

Interior Stair Rails

Interior Electrical Distribution

Cooling/Air Cond.  Systems

Ventilation Equipment

Unit Ventilators

HVAC Controls

AccessibilityElevators

Toilet Rooms

Signage

Stage Access

Program ImprovementsArts Program Improvements

Sports Program Improvements

Page 5: Project Schematic Design Report School District Preliminary · 2016 Capital Project Schematic Design Report Wappingers Central School District September 15, 2016 R H I N E B E C K

September 23, 2013

2016 Capital Project Schematic Design ReportWappingers Central School District September 15, 2016R H I N E B E C K A R C H I T E C T U R E Preliminary 5

Roy C Ketcham High School Site Plan 

Feature Field and Track

Soccer

Soft Ball

Baseball 

New Concession Stand and Toilet Rooms (Separate Project)

Practice

Scope of Work• Sports Improvements

Feature Field Improvements:  New  Artificial Turf, Lighting,  Portable Bleachers Improve Soccer and Baseball Fields Re‐sod Practice Football Field Add storage building for equipment

• Paving, Walks, and Drainage Improvements

New Paving

Page 6: Project Schematic Design Report School District Preliminary · 2016 Capital Project Schematic Design Report Wappingers Central School District September 15, 2016 R H I N E B E C K

September 23, 2013

2016 Capital Project Schematic Design ReportWappingers Central School District September 15, 2016R H I N E B E C K A R C H I T E C T U R E Preliminary 6

Roy C Ketcham High School 

First FloorAuditorium

Band

Chorus

Scope of WorkArts Program Improvements Auditorium Upgrades,  New Stage lighting,   Acoustic Shell for Stage  Band Room Improvements  New Sound and Video Recording     Systems and Production Labs  Video monitors for Green Rooms    Renovate Ceramic Classroom, Replace Art Room Sinks  

Air Conditioning Upgrades:Main Office and Music Rooms

Second Floor

Video RecordingClassroom 227

Ceramics236

Video Production and Darkroom241

Main Office

Page 7: Project Schematic Design Report School District Preliminary · 2016 Capital Project Schematic Design Report Wappingers Central School District September 15, 2016 R H I N E B E C K

September 23, 2013

2016 Capital Project Schematic Design ReportWappingers Central School District September 15, 2016R H I N E B E C K A R C H I T E C T U R E Preliminary

Feature Field

Soccer/Soft Ball

To Baseball Field

Toilet Rooms Field House

Basketball

7

John Jay High School Site Plan 

Sports Improvements Feature Field Improvements:  New  Artificial Turf, Upgrade lighting New   

Scoreboard  Regrade Baseball Field, new Sod at              

Soccer and Baseball Fields

Re‐sod Practice Football Field New Fencing Renovate Toilet Rooms, Field House Improvements Add Storage Building for Equipment Outside Basketball Court Upgrade

Paving, Walks, and Site Improvements

`

New Paving

New Paving

Page 8: Project Schematic Design Report School District Preliminary · 2016 Capital Project Schematic Design Report Wappingers Central School District September 15, 2016 R H I N E B E C K

September 23, 2013

2016 Capital Project Schematic Design ReportWappingers Central School District September 15, 2016R H I N E B E C K A R C H I T E C T U R E Preliminary 8

John Jay Senior High School 

Scope of WorkArts Program Improvements Auditorium Upgrades New Stage Lighting Acoustic Shell for Stage  Band and Chorus Room Improvements New Practice Rooms  New Sound and Video Recording     Systems and Production Labs  Video monitors for Green Rooms    Renovate 3D Classroom, Replace Art Room Sinks

Replace Ceiling Tiles in Corridors

Auditorium

Band

Chorus

3D CRVideo RecordingCR

Partial First Floor Plan

First Floor PlanNew Art CR Sinks

Page 9: Project Schematic Design Report School District Preliminary · 2016 Capital Project Schematic Design Report Wappingers Central School District September 15, 2016 R H I N E B E C K

September 23, 2013

2016 Capital Project Schematic Design ReportWappingers Central School District September 15, 2016R H I N E B E C K A R C H I T E C T U R E Preliminary 9

Van Wyck Junior High School 

Replace Boys Gym Lockers

Accessible Toilet Rooms ‐ 2nd floor

Replace Selected Corridor Lockers

First Floor

Second Floor

Page 10: Project Schematic Design Report School District Preliminary · 2016 Capital Project Schematic Design Report Wappingers Central School District September 15, 2016 R H I N E B E C K

September 23, 2013

2016 Capital Project Schematic Design ReportWappingers Central School District September 15, 2016R H I N E B E C K A R C H I T E C T U R E Preliminary 10

Wappingers Junior High School 

Scope of Work• Elevator and Accessible Toilet Rooms• Wheelchair Lift• Replace Windows• Exterior Stair Repairs• Electrical Panel Replacements• Ventilation System Upgrades• Heating Upgrades• Stage Curtains

First Floor

New Elevator

Office

Second Floor

Second Floor Elevator PlanFirst Floor Similar

Accessible Toilet Rooms

Wheel Chair Lift

Page 11: Project Schematic Design Report School District Preliminary · 2016 Capital Project Schematic Design Report Wappingers Central School District September 15, 2016 R H I N E B E C K

September 23, 2013

2016 Capital Project Schematic Design ReportWappingers Central School District September 15, 2016R H I N E B E C K A R C H I T E C T U R E Preliminary 11

Brinckerhoff Elementary School 

First Floor Plan

Fishkill Elementary School Scope of Work• Accessible Toilet Rooms• Exterior Stair Rails• Stage Curtains

Scope of Work• Exterior Caulking

at Ramps• Repoint Chimney• Replace Library and Office

Rooftop Units

First Floor PlanNew Roof Top AC units

Page 12: Project Schematic Design Report School District Preliminary · 2016 Capital Project Schematic Design Report Wappingers Central School District September 15, 2016 R H I N E B E C K

September 23, 2013

2016 Capital Project Schematic Design ReportWappingers Central School District September 15, 2016R H I N E B E C K A R C H I T E C T U R E Preliminary 12

Fishkill Plains Elementary School 

First Floor Plan

Faculty Room and New Toilet Rooms

New Stage Curtains

New Accessible Toilet RoomsReconfigure Faculty Room

New Hand Rails

Accessible Toilet Rooms

Faculty Room280 SF

Page 13: Project Schematic Design Report School District Preliminary · 2016 Capital Project Schematic Design Report Wappingers Central School District September 15, 2016 R H I N E B E C K

September 23, 2013

2016 Capital Project Schematic Design ReportWappingers Central School District September 15, 2016R H I N E B E C K A R C H I T E C T U R E Preliminary 13

Gayhead Elementary School Site Plan 

Scope of Site Work• Paving and Drainage Improvements• Exterior Stair Repairs• Reconstruct Damaged Sidewalks• Outside Basketball Court 

Improvements• Remove Modulars

Page 14: Project Schematic Design Report School District Preliminary · 2016 Capital Project Schematic Design Report Wappingers Central School District September 15, 2016 R H I N E B E C K

September 23, 2013

2016 Capital Project Schematic Design ReportWappingers Central School District September 15, 2016R H I N E B E C K A R C H I T E C T U R E Preliminary 14

Gayhead Elementary School Scope of Interior Work• Elevator• Accessible Toilet Rooms

First Floor Plan

Lower Level Floor Plan

Lower Level Elevator

First FloorElevator

New Ramp

Page 15: Project Schematic Design Report School District Preliminary · 2016 Capital Project Schematic Design Report Wappingers Central School District September 15, 2016 R H I N E B E C K

September 23, 2013

2016 Capital Project Schematic Design ReportWappingers Central School District September 15, 2016R H I N E B E C K A R C H I T E C T U R E Preliminary 15

James Evans Elementary School Site Improvements 

Scope of Site Work• Paving and Drainage Improvements• Sidewalk Replacement

New Paving

Page 16: Project Schematic Design Report School District Preliminary · 2016 Capital Project Schematic Design Report Wappingers Central School District September 15, 2016 R H I N E B E C K

September 23, 2013

2016 Capital Project Schematic Design ReportWappingers Central School District September 15, 2016R H I N E B E C K A R C H I T E C T U R E Preliminary 16

James Evans Elementary SchoolScope of Interior Work• Elevator and Accessible Toilet Rooms• Stair Rails• Access to Stage• New VCT in 1st Floor Corridors and Stairs

First Floor Plan

Lower Level Floor Plan

Partial First Floor Plan at Elevator

New ElevatorReconfigure Classroom, Office and OT/PT

New ElevatorReconfigure Art Classroom and Faculty Room

New Classroom

OT/PT

Office

Elevator

Accessible Toilet Rooms

Cafeteria

Gym

Office

Nurse

New VCT

Page 17: Project Schematic Design Report School District Preliminary · 2016 Capital Project Schematic Design Report Wappingers Central School District September 15, 2016 R H I N E B E C K

September 23, 2013

2016 Capital Project Schematic Design ReportWappingers Central School District September 15, 2016R H I N E B E C K A R C H I T E C T U R E Preliminary 17

Kinry Road Elementary School 

Scope of Work• Paving, Walks, and Drainage 

Improvements• Provide ADA Access to Stage• New Stage Curtains

New Paving

Page 18: Project Schematic Design Report School District Preliminary · 2016 Capital Project Schematic Design Report Wappingers Central School District September 15, 2016 R H I N E B E C K

September 23, 2013

2016 Capital Project Schematic Design ReportWappingers Central School District September 15, 2016R H I N E B E C K A R C H I T E C T U R E Preliminary 18

Myers Corners Elementary School Site Plan 

Scope of Work• Paving and Walks Improvements• Outside Basketball Court 

Improvements

Page 19: Project Schematic Design Report School District Preliminary · 2016 Capital Project Schematic Design Report Wappingers Central School District September 15, 2016 R H I N E B E C K

September 23, 2013

2016 Capital Project Schematic Design ReportWappingers Central School District September 15, 2016R H I N E B E C K A R C H I T E C T U R E Preliminary 19

Myers Corners Elementary School 

Partial Second Floor Plan

AccessibleToilets and Elevator

New Handrails at Interior Stairs

First Floor Plan

New Stage Curtains and 

Access to Stage

Exterior Handrails

Partial First Floor Plan at Elevator

EntranceLobbyMain 

Office

ElevatorAccessibleToilets

Page 20: Project Schematic Design Report School District Preliminary · 2016 Capital Project Schematic Design Report Wappingers Central School District September 15, 2016 R H I N E B E C K

September 23, 2013

2016 Capital Project Schematic Design ReportWappingers Central School District September 15, 2016R H I N E B E C K A R C H I T E C T U R E Preliminary 20

Oak Grove Elementary School 

Drainage Improvements

Exterior Stair Replacement

Access to Stage andNew Stage Curtains

First Floor Plan

Page 21: Project Schematic Design Report School District Preliminary · 2016 Capital Project Schematic Design Report Wappingers Central School District September 15, 2016 R H I N E B E C K

September 23, 2013

2016 Capital Project Schematic Design ReportWappingers Central School District September 15, 2016R H I N E B E C K A R C H I T E C T U R E Preliminary 21

Sheafe Road Elementary School 

Access to Stage

Accessible Toilet Rooms

Entrance Walk Replacement

First Floor Plan

New VCT

Page 22: Project Schematic Design Report School District Preliminary · 2016 Capital Project Schematic Design Report Wappingers Central School District September 15, 2016 R H I N E B E C K

September 23, 2013

2016 Capital Project Schematic Design ReportWappingers Central School District September 15, 2016R H I N E B E C K A R C H I T E C T U R E Preliminary 22

Vassar Road Elementary School 

New Stage 

Curtains

Exterior Ramp Replacement

Accessible Toilet Rooms

Paving and Side Walk Replacements

First Floor Plan

Paving Plan

Page 23: Project Schematic Design Report School District Preliminary · 2016 Capital Project Schematic Design Report Wappingers Central School District September 15, 2016 R H I N E B E C K

September 23, 2013

2016 Capital Project Schematic Design ReportWappingers Central School District September 15, 2016R H I N E B E C K A R C H I T E C T U R E Preliminary 23

Transportation Office at Wappingers Jr. HS

Scope of Work• Accessible Toilet Room• Exterior Stair Repairs• Window Replacement

Page 24: Project Schematic Design Report School District Preliminary · 2016 Capital Project Schematic Design Report Wappingers Central School District September 15, 2016 R H I N E B E C K

September 23, 2013

2016 Capital Project Schematic Design ReportWappingers Central School District September 15, 2016R H I N E B E C K A R C H I T E C T U R E Preliminary 24

Other Project Initiatives

Smart School Bond Act ProjectsDistrict Wide Hardware UpgradeDistrict Wide Security VestibulesDistrict Wide AC in Server Rooms

StudiesAir Conditioning for HS AuditoriumsAir Conditioning for John Jay HS CafeteriaSite Improvement Study for Myers Corners ESSite Improvement Study for John Jay HS

Page 25: Project Schematic Design Report School District Preliminary · 2016 Capital Project Schematic Design Report Wappingers Central School District September 15, 2016 R H I N E B E C K

September 23, 2013

2016 Capital Project Schematic Design ReportWappingers Central School District September 15, 2016R H I N E B E C K A R C H I T E C T U R E Preliminary 25

Project Schedule

Schematic Design 9/7/16Design Development 10/24/16Construction Documents Phase 1 11/15/16Phase 1 SED Review Complete 3/17Bid & Award Phase 1 4/17Construction Starts Phase 1 6/17

Construction Documents Phase 2 12/20/16Phase 2 SED Review Complete 6/17Bid & Award Phase 2 7/17Construction Starts Phase 2                           TBD(dependent on scope and school schedule)

Page 26: Project Schematic Design Report School District Preliminary · 2016 Capital Project Schematic Design Report Wappingers Central School District September 15, 2016 R H I N E B E C K

September 23, 2013

2016 Capital Project Schematic Design ReportWappingers Central School District September 15, 2016R H I N E B E C K A R C H I T E C T U R E Preliminary 26

Next Steps

Continue with the Design Development Phase

Establish Phase 1 Scope

Complete Phase 1 Construction Document Packages for Early Submission to SED 

Confirm Construction Schedules

Questions or Comments?

Page 27: Project Schematic Design Report School District Preliminary · 2016 Capital Project Schematic Design Report Wappingers Central School District September 15, 2016 R H I N E B E C K

September 23, 2013

2016 Capital Project Schematic Design ReportWappingers Central School District September 15, 2016R H I N E B E C K A R C H I T E C T U R E Preliminary 27

Building Additional Scope and Studies (Additional Scope not accepted yet by District)  Construction BudgetRCK Review adding AC to Auditorium $700,000JJ Review for new Sewer Line and Water line to street TBDJJ Study for improving front Entrance TBDJJ Review adding AC to Auditorium $1,000,000RCK Review adding AC to Cafeteria $350,000WJ Replace paving and walks at front circle $660,000BR Repair repoint Chimney $10,000

FI Replace VAT in selected classrooms:  get unit price for abatement.  Assume 5000 sf for budget $100,000

FP Replace paving and walks at front $180,000FP Replace VAT in front corridor with VCT:  3600 sf $80,000GH Replace ceilings in two cafeterias and lobby  8500 sf $50,000

JE Replace VAT floor tiles: corridors and Main Office.  Replace stair treads $160,000 budget) $160,000

JE Replace ceilings in first floor corridor, lobby and Main Office 3,000 sf  $30,000

MC Replace Corridor and lobby ceilings $200,000MC Review safety at play areas/roadway TBDOG Repave driveway and parking, replace damaged sidewalks $585,000OG Replace VAT in Cafetorium with VCT  2200 sf $55,000SR Replace front walk and curb $80,000SR Replace corridor ceilings $100,000SR Replace VAT in 4 classrooms $80,000VR Replace VAT  Get unit price per room  Assume 4 CR for budget $80,000

Total Additional Scope (not including results of Studies)  $4,500,000