16
OWNER EPCM CONTRACTOR PROJECT SCOPE OF WORK LOCATION MAN HOURS SITE PHOTO PROJECT MANAGER & CONTACT NO. VALUE WHEN DURATION ARCELORMITTAL LEAD ENGINEERING AND PROJECTS AMSA STOCKHOUSE 11KV INSTALLATION Supply, install, commission 2 X 11kV Motors Design, supply, install, commission 1 X 11kV Auto Transformer Design, supply, install, commission 11kV Switchgear Design, supply, install, commission PLC control system Design, supply and install power/control cabling VANDERBIJLPARK, SA 2237 STEVE CHADWICK 016 889 3637 R 7,5 MIL 2012 Q4 1 MONTH ARCELORMITTAL LEAD ENGINEERING AND PROJECTS BASIC OXIGEN FURNACE FIRE REPAIR Remove all damage cabling for BOF 1-3 New Cable routing and racking design New Lighting distribution design New UPS distribution design New MCC rooms layout design Supply and install new cable supports for BOF 1-3 (6km) Design, supply and install junction boxes Supply, install and terminate cables for BOF 1-3 (80km) Supply, install, commission Lighting distribution Supply, install, commission UPS distribution Supply, install, commission UPS Auto change over switch Supply, install, commission Instrumentation power distribution PLC software engineering on 9 PLC’s Re-design and engineer PLC communication networks Supply, install and commission Medium Voltage switchgear VANDERBIJLPARK, SA 82 953 TALLIE 016 889 9838 R 32,3MIL 2013 Q1 2 MONTHS SIERRA RUTILE LIMITED LEAD ENGINEERING AND PROJECTS ELECTRICAL PROTECTION UPGRADE Install and Commission the Dredge and Wet Plant 4.16kV Secondary Switchgear Install and Commission the Dredge and Wet Plant 13.2kV Switchgear Install and Commission the 13.2kV Secondary Switchgear & NECR Refurbish Shore Dual VCB Vacuum Beakers Refurbish Dredge and Wet Plant Main Circuit breaker SIERRA LEONE 379 PATRICK LORD +35 387 256 5370 R 1,15MIL 2013 Q2 1.5 MONTHS SIERRA RUTILE LIMITED LEAD ENGINEERING AND PROJECTS SUPLHUR REDUCTION PLANT E&I PHASE 1 MV Cable Installation from Power House 1 Transformers ( 2.5MVA, 50KVA & 10KVA ) Containerized MCC’s Sub Distribution Boards AC Drives and Soft Starters New Control System ( Consisting of HMI and PLC’s ) Field Instrumentation and Marshalling MV, LV ,Instrumentation and Network Cabling Cable Supports Plant Lighting General purpose power distribution SIERRA LEONE 4648 PATRICK LORD +35 387 256 5370 R 36.78MIL 2013 Q2 2 YEARS SIERRA RUTILE LIMITED LEAD ENGINEERING AND PROJECTS LAND PLANT & DRY MILL FINES UPGRADE E&I WORKS Containerized MV Switchgear – 2 Incomers & 7 Feeders Transformers ( 1.25MVA, 50KVA & 10KVA ) New LV Distribution Boards Upgrade Eight MCC’s with E3 Relays AC Drives and Soft Starters New Control System ( Consisting of HMI and PLC’s ) Field Instrumentation and Marshalling MV, LV ,Instrumentation and Network Cabling Cable Supports Plant Lighting General purpose power distribution SIERRA LEONE 69 862 PATRICK LORD +35 387 256 5370 R56.7m 2014 Q1 2 YEARS ABENGOA ABEINSA LEAD ENGINEERING AND PROJECTS WATER PUMP STATION Basic Engineering Detail Engineering Software Development Procurement Construction Commissioning The control system is based on a Siemens solution. The project include MCC, PLC and HMI, Instrumentation, Field Junction Boxes, Site Lighting, Earthing. POFADDER, SA 1270 JOSE JAVIER CALLEJON ROMERO +34682383884 R 5.5MIL 2013 Q3/Q4 4 MONTHS PROJECT REFERENCE LIST PROJECT REFERENCE LIST Page 1 of 16

PROJECT REFERENCE LIST - LeadEPC

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PROJECT REFERENCE LIST - LeadEPC

OWNER EPCM CONTRACTOR PROJECT SCOPE OF WORK LOCATION

MAN

HO

URS

SITE PHOTOPROJECT MANAGER

&CONTACT NO.

VALUE WHEN DURATION

ARCELORMITTAL LEAD ENGINEERING AND PROJECTS

AMSA STOCKHOUSE 11KV INSTALLATION

Supply, install, commission 2 X 11kV MotorsDesign, supply, install, commission 1 X 11kV Auto TransformerDesign, supply, install, commission 11kV SwitchgearDesign, supply, install, commission PLC control systemDesign, supply and install power/control cabling

VANDERBIJLPARK, SA 2237 STEVE CHADWICK 016 889 3637 R 7,5 MIL 2012 Q4 1 MONTH

ARCELORMITTAL LEAD ENGINEERING AND PROJECTS BASIC OXIGEN FURNACE FIRE REPAIR

Remove all damage cabling for BOF 1-3New Cable routing and racking designNew Lighting distribution designNew UPS distribution designNew MCC rooms layout designSupply and install new cable supports for BOF 1-3 (6km)Design, supply and install junction boxesSupply, install and terminate cables for BOF 1-3 (80km)Supply, install, commission Lighting distributionSupply, install, commission UPS distributionSupply, install, commission UPS Auto change over switchSupply, install, commission Instrumentation power distributionPLC software engineering on 9 PLC’sRe-design and engineer PLC communication networksSupply, install and commission Medium Voltage switchgear

VANDERBIJLPARK, SA 82 953 TALLIE 016 889 9838 R 32,3MIL 2013 Q1 2 MONTHS

SIERRA RUTILE LIMITED LEAD ENGINEERING AND PROJECTS ELECTRICAL PROTECTION UPGRADE

Install and Commission the Dredge and Wet Plant 4.16kV Secondary SwitchgearInstall and Commission the Dredge and Wet Plant 13.2kV SwitchgearInstall and Commission the 13.2kV Secondary Switchgear & NECRRefurbish Shore Dual VCB Vacuum BeakersRefurbish Dredge and Wet Plant Main Circuit breaker

SIERRA LEONE 379 PATRICK LORD+35 387 256 5370 R 1,15MIL 2013 Q2 1.5 MONTHS

SIERRA RUTILE LIMITED LEAD ENGINEERING AND PROJECTS

SUPLHUR REDUCTION PLANT E&I PHASE 1

MV Cable Installation from Power House 1Transformers ( 2.5MVA, 50KVA & 10KVA ) Containerized MCC’sSub Distribution BoardsAC Drives and Soft StartersNew Control System ( Consisting of HMI and PLC’s )Field Instrumentation and MarshallingMV, LV ,Instrumentation and Network CablingCable SupportsPlant LightingGeneral purpose power distribution

SIERRA LEONE 4648 PATRICK LORD+35 387 256 5370 R 36.78MIL 2013 Q2 2 YEARS

SIERRA RUTILE LIMITED LEAD ENGINEERING AND PROJECTS

LAND PLANT & DRY MILL FINES UPGRADE E&I WORKS

Containerized MV Switchgear – 2 Incomers & 7 FeedersTransformers ( 1.25MVA, 50KVA & 10KVA ) New LV Distribution BoardsUpgrade Eight MCC’s with E3 RelaysAC Drives and Soft StartersNew Control System ( Consisting of HMI and PLC’s )Field Instrumentation and MarshallingMV, LV ,Instrumentation and Network CablingCable SupportsPlant LightingGeneral purpose power distribution

SIERRA LEONE 69 862 PATRICK LORD+35 387 256 5370 R56.7m 2014 Q1 2 YEARS

ABENGOA ABEINSA LEAD ENGINEERING AND PROJECTS WATER PUMP STATION

Basic EngineeringDetail EngineeringSoftware DevelopmentProcurementConstructionCommissioning

The control system is based on a Siemens solution. The project include MCC, PLC and HMI, Instrumentation, Field Junction Boxes, Site Lighting, Earthing.

POFADDER, SA 1270 JOSE JAVIER CALLEJON ROMERO+34682383884 R 5.5MIL 2013 Q3/Q4 4 MONTHS

PROJECTREFERENCE LIST

PROJECT REFERENCE LIST Page 1 of 16

Page 2: PROJECT REFERENCE LIST - LeadEPC

OWNER EPCM CONTRACTOR PROJECT SCOPE OF WORK LOCATION

MAN

HO

URS

SITE PHOTOPROJECT MANAGER

&CONTACT NO.

VALUE WHEN DURATION

PROJECTREFERENCE LIST

NOBLE SIVEST PROJECT ZINDZI ELECTRICAL & INSTRUMENTATION INSTALLATION

Project Management for the supply, delivery offloading, installation, cabling, testingand commissioning of all electrical, control and instrumentation works. STANDERTON, SA 653 A Wewege R 0.8MIL 2013 Q3/Q4 3 MONTHS

PETRO SA SIEMENS PETRO SA Commissioning Support MOSSELBAY, SA 338 CHARLES HENDRICK R 0.3MIL 2013 Q3 1 MONTH

HULAMIN LEAD ENGINEERING AND PROJECTS S6 FIRE DAMAGE REPAIR

Remove all damaged cabling Repair damaged cable supportsProcure cablingSupply, install and terminate cables (5km)

PIETERMARITZBURG, SA 7 300 R 3MIL 2013 Q4 10 DAYS

ARCELORMITTAL LEAD ENGINEERING AND PROJECTS

HIGH PRESSURE BOILER HOUSE ID FAN

Supply, Install and Commission of the following:-1x 1250KVA Transfomer-1x 900KW Induction Motor-1x 690V Variable Speed Drive completed in panel- 1x Local Operator Panel- Refurbish one 3.3KV Circuit breaker- All Power Cabling- All Control Cabling

VANDERBIJLPARK, SA 6 380 JOSE PEREIRA +27 (0)83 413 6286 R 4.7MIL 2013/2014 1 MONTH

TRANSNET SIEMENS LANGLAAGTE PHASE 3 MECHANICAL DEFECT REPAIR

Complete setting out, fabrication, installation, testing and commissioning of the various installations and related pipework and appurtenancesSetting out of the Works prior to construction, supply, fabrication, installation, testing and commissioning of pipework and equipmentInstallation, testing and commissioningAll non-destructive testing, including 100% radiography on welds, magnetic particle testand hydrostatic pressure testLeak test on all related flanged connectionsUpdating and “As-Builting”

JOHANNESBURG, SA 9 732 LESLIE STRAUCH +27 (0)72 444 1506 R 1.4MIL 2013/2014 3 MONTHS

ARCELORMITTAL LEAD ENGINEERING AND PROJECTS

PUMP STATION 'REPLACE 6.6KV MOTORS ON A & B

SYSTEM

Supply one new drives for 375KW motorsSupply one new 375KW 525V motorsEach motor supply shall have a local lockable isolatorSupply new 6,6kVAC, 525VAC, 220VAC, 110V AC/DC and other specified cables in areas where neededRe-route, join and extend old cables, if additional cable are to be supplied approval should be sought from ArcelorMittal Remove the old motors.Install the new VSD drives on new MCCSupply and install signal cables from VSDs to theN26 PLCProgram the VSDsDisconnect and mark all cables, feeder name and wire numbers from old panel and motors.Reconnect cables to the new panels/drives and motors.Terminate all 6,6KVAC, 525VAC, 220VAC and 110V AC/DC cables Do cold and hot commissioning.Supply final drawings on CD as per standard of our drawing office (Autocad). Standards will be discussed and issued to successful tenderer.Supply minimum spares for normal operation.

NEWCASTLE, SA 8 122 BRENDAN MARAIS+27 82 784 8940 R 7.5MIL 2014 Q1/Q2 1 MONTH

PROJECT REFERENCE LIST Page 2 of 16

Page 3: PROJECT REFERENCE LIST - LeadEPC

OWNER EPCM CONTRACTOR PROJECT SCOPE OF WORK LOCATION

MAN

HO

URS

SITE PHOTOPROJECT MANAGER

&CONTACT NO.

VALUE WHEN DURATION

PROJECTREFERENCE LIST

ABENGOA ABEINSA LEAD ENGINEERING AND PROJECTS

KAXU SOLAR 1 CSP 100MW Energy Generation Plant

ELECTRICAL & INSTRUMENTATION INSTALLATION

Electrical and Instrumentation installation for a 100MW Power Generation Plant. Cable tray and support installation;Cable installation (Power and Instrumentation);Cable termination;Instrumentation calibration & installation;Electrical Cabinet and Instrumentation Junction Box mounting and installation;Provision of Commissioning support to Abeinsa EPC, the main project contractor.Lead EPC also performed the Power and Control cable, the cable tray, support structure installation and the field and cabinet termination of the Heat Tracing cables.

POFADDER, SA 171 248 JOSE JAVIER CALLEJON ROMERO+34682383884 R53m 2013 Q3/Q4 8 MONTHS

IBERDROLA / GROUP FIVE

LEAD ENGINEERING AND PROJECTS JASPER PV 75MW SOLAR PLANT

- PV modules interconnection.- Electrical boards installation and connection.- Wiring LV and MV cables laying, connection and labeling.- Earth Wiring laying and connection.- Wiring Communications cables and Fiber Optic laying, connection and labeling.- Testing and commissioning of the installation, except inverters, buildings, transformers, MV switchgears, Security System, Monitoring System and Weather Stations.

POSTMASBURG 62 532 Mercedes Guzmán IndiasTel +34 91 713 35 72 R17.8m 2014 Q1/Q2 4 MONTH

MAKENI, SIERRA LEONE, WEST AFRICA

LEAD ENGINEERING AND PROJECTS

ELECTRICAL AND INSTRUMENTATION INSTALLATION, CONSTRUCTION AND

COMMISIONING ASSISTANCE

- Cable support- Cabling, MV, LV, network and Instrumentation- Electrical cabinets- Earth Wiring laying and connection.- Plant lighting- Plant commissioning assistance - Installation Quality control - Site health, safety and environmental compliance

SIERRA LEONE 7 834 R7MIL 2014 Q1 4 MONTH

ABENGOA ABEINSA LEAD ENGINEERING AND PROJECTS

IN HOUSE FABRICATION OF CABINET STRUCTURAL BED FRAMES AND CONDENSATE POTS FOR UP TO

16 000Pa

- Engineering and Fabrication drawings- Design verification according to ASME standards- WPS & PQR Qualifications- Welder Qualifications- Material Procurement and Certification - Fabrication - NDT testing (X-ray & Die-pen testing) - AIA approval - Hydro Testing - Sub-contractor Management (X-ray, AIA, Hydro testing)

POFADDER, SA 1 006 JOSE JAVIER CALLEJON ROMERO+34682383884 R1MIL 2014 Q2 2 MONTHS

TRANSNET LEAD ENGINEERING AND PROJECTS

TRANSNET TARLTON DEPOT

THE FABRICATION, INSTALLATION, TESTING AND COMMISSIONING OF THE MANIFOLD

MODIFICATIONS REQUIRED FOR THE SIEMENS TELECONTROL UPGRADE

- WPS, PQR and Welder Qualifications to ASME standards.- Material Procurement & Certification- Fabrication including NDT testing (X-rays)- Sandblast & Painting- Installation on site includes 1/2" to 10" piping, valves, safety valves, pipe supports, grouting.- Hydro Testing on site. - Sub-contractor Management (X-ray, AIA, Hydro testing) -Commissioning assistance Instrument Calibration and Testing

TARLTON, GAUTENG, SA 9 153 ESTHER MUTALE +27 (0) 11 765 2359 082 469 9228

R4.2MIL 2014 Q4 3 MONTHS

OMNIA LEAD ENGINEERING AND PROJECTS

ELECTRICAL DRAWINGS UPDATED - Updated drawings for PGAN & Nitric Acid Plants SASOLBURG, SA 404 RENé PAGE R30K 2014 Q4 1 WEEK

SASOLLEAD ENGINEERING AND

PROJECTSPOLYMERS PP2 REVAMP

VSD Panel Supply and Installation 0.75KW and 22KWCable TerminationsEngineering and commisioning

SECUNDA, SAVICTOR LEAL

+27 010 202 5548R625K 2015 Q1 1 MONTH

PROJECT REFERENCE LIST Page 3 of 16

Page 4: PROJECT REFERENCE LIST - LeadEPC

OWNER EPCM CONTRACTOR PROJECT SCOPE OF WORK LOCATION

MAN

HO

URS

SITE PHOTOPROJECT MANAGER

&CONTACT NO.

VALUE WHEN DURATION

PROJECTREFERENCE LIST

ARCELORMITTAL LEAD ENGINEERING AND PROJECTS

NEW DISTRIBUTION BOARD AT SMP SUBSTATION OSM FOR LADLE FURNACE 3 AT

OSM

Disconnect Panel at ESMTransport Panel to SMP substationInstallation in SMPCommissioningCable rackingCables from transformer to panel supply installation and connectingStripping of old connections between old board and transformersRe connect workshop supply at ESM

VANDERBIJLPARK, SA 350DION (D) Zijlstra+27 16 889 9109

R432K 2015 Q2 1 MONTH

SOLAR RESERVE LEAD ENGINEERING AND PROJECTS

KUILSVILLE SCHOOL

Rooftop PV Solar installationDesign, Install and Commission a turnkey 42.48KW photovoltaicrooftop plant consisting of only the equipment as mentioned in this proposal whichincludes:· Photovoltaic modules· Inverter· Substructure· Cables, cable sleeves and trenching· Equipotential bonding.· Temperature, anemometer and an irradiance sensor.

DANIELSKUIL, SA 601Jason Gerber

+27 11 582 6880R692K 2015 Q2 2 MONTHS

BOMBELA CIVIL JOINT VENTURE

LEAD ENGINEERING AND PROJECTS

M&E REMEDIAL WORKS AT GAUTRAIN Engineering JOHANNESBURG, SASteven Lawrence

+27 (0) 11 253 2044R94K 2015 Q2 1 MONTH

ABENGOA ABEINSA LEAD ENGINEERING AND PROJECTS SUPPLY OF LOW VOLTAGE CABLES Supply and Deliver low voltage cables to site at poffadder POFADDER, SA Armando Molina-Prados Aragonés

Cell: (+34) 619457590 (+27747444096) R502K 2015 Q2 1 WEEK

ARCELORMITTAL LEAD ENGINEERING AND PROJECTS

AMSA VANDERBIJLPARK HOT STRIP MILL

R1 SCREWDOWN DRIVE

2 Siltron drives for the R1 screqdownsDesign, engineer, supply, install and commission 2 new drivesDC Machine – 2 individual drives and controlDynamic braking, for a controlled stop of the drive in a trip conditionnew pulse tachometers and cablingProfibus capabilities

VANDERBIJLPARK, SA 855Samiksha Bhoola

+27 (0) 16 889 5233R5.8m 2015 Q2 3 MONTHS

ARCELORMITTAL LEAD ENGINEERING AND PROJECTS

AMSA VANDERBIJLPARK HOT STRIP MILL

R2 FRONT END REPLACEMENT DRIVES

• 12 Pulse ABB DC Armature Drive for R2 Top and Bottom Motor• Two quadrant DC Drive for Field Supply for R2 Top and Bottom Motor• Re-Routing of Motor Field Cables• Extension of Field Supply Cables• No Provision is made for PLC or Panel Views

VANDERBIJLPARK, SA 1242Samiksha Bhoola

+27 (0) 16 889 5233R5.37MIL 2015 Q2 3 MONTHS

ARCELORMITTAL LEAD ENGINEERING AND PROJECTS

SIEMENS PLC EQUIPMENT Design, Manufacture, Supply, Deliver, Installation and Commissioning of a new Siemens S7 - 1500 PLC VEREENIGING, SA 777Hennie Oosthuizen

+27 16 440 3513R1.13MIL 2015 Q2 1 MONTH

ARCELORMITTAL LEAD ENGINEERING AND PROJECTS

SUPPLY AND DELIVER ROT5 VSD DRIVES Supply of: 7 x ACS880 Drives (Including Drive Software) VANDERBIJLPARK, SAHannes Ferreira+27 16 889 5302

R4.02MIL 2015 Q2 1 MONTH

ARCELORMITTAL LEAD ENGINEERING AND PROJECTS

A61 COOLER FAN ELECTRICS

We have offered a turnkey solution inclusive of the following;• 3300V/690V Transformer• LV VSD• LV 690V 6Pole Motor• MV and LV Cables• PLC as Stand Alone System with no Interface to existing PLC System• MCC DOL Buckets• Junction Box

VANDERBIJLPARK, SA 2390Emmanuel Xaba

+27 (0) 16 889 3354R5.63MIL 2015 Q3 2 MONTHS

SOLAR RESERVELEAD ENGINEERING AND

PROJECTS

PROVISION OF PV SOLAR IRRIGATION SYSTEM FOR A SCHOOL IN GROENWATER, NORTHERN

CAPE

* Drilling of a new Bore hole to a depth of 40 meters. A casing will also be installed inside the borehole shaft to prevent the borehole for closer.* Installation of 18, 295Wp solar panels on the roof of the school complete with sub-structure. *Altivar 3 kW VSD solar pump drive complete in enclosure.*All associated cabling*2.2kW Borehole pump and motor complete with motor protection unit*Irrigation system complete with Hunter 12 Zone irrigation controller and pop-up spray nozzles and Hunter Solenoid Valves. The soccer field irrigation has been removed as requested.

DANIELSKUIL, SAJason Gerber

+27 11 582 6880R1.20MIL 2015 Q3 2 MONTHS

PROJECT REFERENCE LIST Page 4 of 16

Page 5: PROJECT REFERENCE LIST - LeadEPC

OWNER EPCM CONTRACTOR PROJECT SCOPE OF WORK LOCATION

MAN

HO

URS

SITE PHOTOPROJECT MANAGER

&CONTACT NO.

VALUE WHEN DURATION

PROJECTREFERENCE LIST

NETCARELEAD ENGINEERING AND

PROJECTS

SOLAR PV TURNKEY ROLLOUT V1.0 - ALBERLITO By Engineering, Procurement and

Construction Suppliers (EPC)

• Photovoltaic Plant Design• Engineering, Procurement and Construction.• Integration with monitoring system• Lightweight and high quality rooftop substructure239.4kWp Photovoltaic Solar plant

DOLPHIN COAST, KWAZULU NATAL, SA

3192 Johan Durand R3.99MIL 2015 Q3 6 WEEKS

NETCARELEAD ENGINEERING AND

PROJECTS

SOLAR PV TURNKEY ROLLOUT V1.0 - OLIVEDALE By Engineering, Procurement and

Construction Suppliers (EPC)

• Photovoltaic Plant Design• Engineering, Procurement and Construction.• Integration with monitoring system• Lightweight and high quality rooftop substructure419.3kWp Photovoltaic Solar plant

JOHANNESBURG, SA 6359 Johan Durand R6.83MIL 2015 Q3 8 WEEKS

GARMCOLEAD ENGINEERING AND

PROJECTSUPGRADE OF CTL #1 LINE PLC

Supply of Main PLC ChassisSupply of remote PLC ChassisSiemens S7-1500 PLC equipmentWINCC HMI Stand AloneEthernet switch for ethernet networkAll PLC and HMI software All relavant drawings of the new PLC control systemHMI training manualPlant specific training3 Comfort panels at Local Control StationsEthernet Network cables for new equipmentNew LOP Panels & Control Desk

KINGDOM OF BAHRAINSAYED HASAN EBRAHIM SHARAF EBR

Tel. : 17731000R1.52MIL 2015 Q3 2 WEEKS

SOLAR RESERVELEAD ENGINEERING AND

PROJECTSO&M JASPER ROOF TOP PV SOLAR

Design, Install and Commission a turnkey 21.24kWp (installed power) photovoltaicrooftop plant consisting of only the equipment as mentioned in this proposal whichincludes:· Photovoltaic modules· Inverter· Substructure· Cables, cable sleeves and trenching· Equipotential bonding.· Temperature, anemometer and an irradiance sensor.

DANIELSKUIL, SA 321Jason Gerber

+27 11 582 6880R250K 2015 Q3 2 MONTHS

PHILLIP BRONKHORSTLEAD ENGINEERING AND

PROJECTSSOLAR PV ROOF TOP

Design, Install and Commission a turnkey 60kWp photovoltaicrooftop plant consisting of only the equipment as mentioned in this proposal whichincludes:· Photovoltaic modules· Inverter· Substructure· Cables, cable sleeves and trenching· Equipotential bonding.· Temperature, anemometer and an irradiance sensor.

DENEYSVILLE, SAPHILLIP BRONKHORST

+27 82 654 7883R1.16MIL 2015 Q3 1 MONTH

STERLING AND WILSONLEAD ENGINEERING AND

PROJECTSSOLAR PV PROJECT MANPOWER 50MWP Solar PV Project manpower loading PHILIPPINES 5563

Pravesh Kumar+91 120 4071000

R3.42MIL 2015 Q3 4 MONTHS

TRANSNET LEAD ENGINEERING AND

PROJECTSSOCKET ON STRAINER DOME Mechanical and Piping TARLTON, SA 24 R74K 2016 Q1 2 WEEKS

CRONIMETLEAD ENGINEERING AND

PROJECTS Cronimet Mine Thabazimbi

Supply and Installation of :500mm single core cableCable LadderTrenchingPanel installation

RUSTENBURG SA 2456 R2.7MIL 2016 Q1 8 WEEKS

PROJECT REFERENCE LIST Page 5 of 16

Page 6: PROJECT REFERENCE LIST - LeadEPC

OWNER EPCM CONTRACTOR PROJECT SCOPE OF WORK LOCATION

MAN

HO

URS

SITE PHOTOPROJECT MANAGER

&CONTACT NO.

VALUE WHEN DURATION

PROJECTREFERENCE LIST

NOVO DOMUSLEAD ENGINEERING AND

PROJECTSTSR ROOF TOP SOLAR PV

Full TurnkeyDesign suppply and install:Solar Panels SubstructuresCablingMonitoring equipmentCable Supports

Midrand 2560

Natie Odendaal083 6484518

[email protected]

TSR Contract

R6.03MIL 2016 Q1 6 WEEKS

TRANSNET LEAD ENGINEERING AND

PROJECTSFIT 3/4 INCH SOCKETS ON ROAD LOADING

STRAINER COVERSMechanical and Piping TARLTON, SA 24 R119K 2016 Q1 2 WEEKS

ESKOM KUSILE POWER STATION

LEAD ENGINEERING AND PROJECTS

KUSILE ELECTRICAL AND INSTRUMENTATION INSTALLATION FOR UNIT 1 AND 2

INTERGRATION MANAGEMENTTRUNK CABLE INSTALLATIONINSTRUMENTATION INSTALLATION AND QC CHECKSSUPERVISIONDIRECT FIELD LABOURMATERIAL SUPPLY

WITBANK SA 600 000N Verrier

071 548 5927 R120MIL2016 Q1

ONWARDSONGOING

ARCELORMITTAL LEAD ENGINEERING AND PROJECTS BOF LADLE FURNACE FIRE DAMAGE

Supply and Installation of :Cables Cable LadderPanel installation

VANDERBIJLPARK, SA 1 576Paul Kloppers084 653 5739

[email protected] R 877K 2016 Q1 1 WEEK

ARCELORMITTAL LEAD ENGINEERING AND PROJECTS BRINE TREATMENT

DESIGN, SUPPLY AND INSTALL:MCCCABLINGTRANSFORMERSCABLE LADDERLIGTHINGPLCPNUEMATIC TUBINGJUNCTION BOXES

VANDERBIJLPARK, SA 6 475 S Van Staden072 375 9195 R 3.33MIL 2016 Q1 6 WEEKS

ARCELORMITTAL LEAD ENGINEERING AND PROJECTS COARSE PARTICLE SEPERATOR

SUPPLY AND INSTALLRollingExpansion BelowsLoad Spring HangersTransportPaint

SALDANHA SA 3 146 A Van Staden083 304 0322 R 4.95MIL 2016 Q1 12 WEEKS

NETCARELEAD ENGINEERING AND

PROJECTS

SOLAR PV TURNKEY ROLLOUT PRETORIA By Engineering, Procurement andConstruction Suppliers (EPC)

Photovoltaic Plant DesignEngineering, Procurement and Construction.Integration with monitoring systemLightweight and high quality rooftop substructurePhotovoltaic Solar plant

PRETORIA, SA 8270Johan Durand011 301 0282

R10.80MIL 2016 Q1 12 WEEKS

PROJECT REFERENCE LIST Page 6 of 16

Page 7: PROJECT REFERENCE LIST - LeadEPC

OWNER EPCM CONTRACTOR PROJECT SCOPE OF WORK LOCATION

MAN

HO

URS

SITE PHOTOPROJECT MANAGER

&CONTACT NO.

VALUE WHEN DURATION

PROJECTREFERENCE LIST

BUILDING ENERGYLEAD ENGINEERING AND

PROJECTSTORORO UGANDA SOLAR PV 10MW PROJECT

Photovoltaic Plant Design Full TurnkeyEngineering, Procurement and Construction.Integration with monitoring systemHigh quality ground mount substructurePhotovoltaic Solar plantDesign supply and install:SubstructuresCablingMonitoring equipmentCable SupportsGrid ConnectionGrid Connection StudyCivil EngineeringCivil Construction

TORORO, UGANDA 62615JACO BRITS

072 603 0982R52m 2017 Q1 7 MONTHS

SASOLLEAD ENGINEERING AND

PROJECTSSasol Secunda Ash Plant PLC Replacement

Turnkey, Siemens, PCS7 solution for the implementation of a new PLC and SCADA system to replace the redundant existing equipment. The project include the following;PLC Hardware and softwarePLC PanelsPLC Marshalling PanelsFibre Optic CablingConstructionCommissioning

SasolSecunda

Joppie Botha017 610 4689

R18m 2017 Q3 6 MONTHS

ARCELORMITTAL LEAD ENGINEERING AND

PROJECTSCPL#3 Multidrive Project

Engineering, Supply, Installation and Commissioning of the Multi-drive system comprising of 2 Regenerative Units supplying common DC Bus with 17 inverters ranging from 75kW up to 500kWABB ACS 880 Multi-drive equipment was usedBraking Resistors were provided to stop the Process Line under power failure conditionsLoad sharing Software was developed to ensure tension in the strip remains constant under line operating conditionsThe project was implemented over a 10 day Shutdown period

VANDERBIJLPARK, SAJOSE PEREIRA

+27 (0)83 413 6286R14m 2017 Q2 8 MONTHS

HOSAF FIBRESLEAD ENGINEERING AND

PROJECTSExpansion Project Electrical, Control and Instrumentation Installation Specification

DURBAN, SAHugo van Schalkwyk <[email protected]>

cell +27 83 655 9313 R13,5m 2017 Q2 6 MONTHS

Italian Consulate LEAD ENGINEERING AND

PROJECTSItalian Consulate PV Project ( BE )

Detailed Engineering and PV Plant DesignSupply of PV Modules, String Inverters, Combiner Boxes, Mounting Systems, DC & ACCabling, Cable Trays, Monitoring & Control Equipment, LV Swithgear and TerminationsAll relevan Civil, Mechanical and LV Electrical WorkAll Project ManagementAll HSE & QC ManagementComplianca with all relevant legal codes and standardsStructural Engineer EvaluationCOC

JACO BRITS072 603 0982

R0,5m 2017 Q2 ONGOING

LEAD ENGINEERING AND PROJECTS

Rhenosterberg Rural Area PH4 & PH5 NORTHERN CAPE, SA R1,5m 2017 Q2 ONGOING

NETCARELEAD ENGINEERING AND

PROJECTS

SOLAR PV TURNKEY ROLLOUT KROONSTAD By Engineering, Procurement andConstruction Suppliers (EPC)

• Photovoltaic Plant Design• Engineering, Procurement and Construction.• Integration with monitoring system• Lightweight and high quality rooftop substructurePhotovoltaic Solar plant

KROONSTAD, SAJohan Durand011 301 0282

R4m 2017 Q2 ONGOING

NETCARELEAD ENGINEERING AND

PROJECTS

SOLAR PV TURNKEY ROLLOUT KRUGERSDORP By Engineering, Procurement and

Construction Suppliers (EPC)

• Photovoltaic Plant Design• Engineering, Procurement and Construction.• Integration with monitoring system• Lightweight and high quality rooftop substructurePhotovoltaic Solar plant

KRUGERSDORP, SAJohan Durand011 301 0282

R3,9m 2017 Q2 ONGOING

PROJECT REFERENCE LIST Page 7 of 16

Page 8: PROJECT REFERENCE LIST - LeadEPC

OWNER EPCM CONTRACTOR PROJECT SCOPE OF WORK LOCATION

MAN

HO

URS

SITE PHOTOPROJECT MANAGER

&CONTACT NO.

VALUE WHEN DURATION

PROJECTREFERENCE LIST

NETCARELEAD ENGINEERING AND

PROJECTS

SOLAR PV TURNKEY ROLLOUT POLOKWANE By Engineering, Procurement and

Construction Suppliers (EPC)

• Photovoltaic Plant Design• Engineering, Procurement and Construction.• Integration with monitoring system• Lightweight and high quality rooftop substructurePhotovoltaic Solar plant

POLOKWANE, SAJohan Durand011 301 0282

R6,9m 2017 Q2 ONGOING

SIVESTLEAD ENGINEERING AND

PROJECTS2018 Olympic Winter Games Korea

Engineering done for the Olympic Games 2018 in South Korea included:Load flow AnalysisVoltage DropsShort Circuit LevelsProtection Coordination, Discrimination StudyGrounding, Earth Mat Design

SOUTH KOREAAntonie vd Lingen

083 661 [email protected]

R2,5m 2017 Q1 ONGOING

GARMCOLEAD ENGINEERING AND

PROJECTSGARMCO Hot mill profile gauge upgrade

Upgrading the existing PDA system:Upgrading of the current LicensesibaPDA Interface PLC Explorer Ethernet UpgradeSupply and Install PLC cardsSupply and Install Ethernet Switches

BAHRAINAASHISH K CHANDAK

+97317731000 R0,24m 2017 Q2 2 WEEKS

SASOLLEAD ENGINEERING AND

PROJECTSSASOL Secunda De-bottlenecking of Power

Supply

Complete Design, Detail Engineering, Procurement, Quality assurance/control, Expediting and Preparation of all specified project documentation of the materials in accordance with the scope. Civil Building ExpansionsCivil Work for Transformer BayMove Transformers to new bayDesign Supply and Install MCC PanelSupply and Install CablesSupply and Install Busduct 6400ASupply and Install Ligthing and Small PowerSupply and Install HVACSupply and Install Battery Tripping UnitSupply and Intall Earthing SystemSoil resistivity Testing Trenching

SECUNDA, SACarminni Padayachy

'+27 16 960 3993R 9,5M 2017 Q3 6 MONTHS

TWINSAVER / SIVESTLEAD ENGINEERING AND

PROJECTSProject Paradigm TM5 Twinsaver Tissue

Electircal Supply and Install of the following:MV Cables and Terminations and JointsLV Cables and TerminationsCable rackingLighting and Small PowerInstallation of DB PanelsInstallation of Junction BoxesInstallation of Lights

KLIPRIVER, SADeshmai Ramnarin

+27 31 581 1500R 6,6M 2017 Q3 5 MONTHS

SASOLLEAD ENGINEERING AND

PROJECTSSASOL - PP1 Peroxide Feeding Sytem

Design, Supply and Install of the PP! Peroxide Feeding System:FlowmetersControl ValvesMechanical and Piping WorkLV Cables and TerminationsPneumatic hook up material

SECUNDA, SAZanele Mohoto

'+27 17 610 7919R 2,1M 2017 Q3 ONGOING

PROJECT REFERENCE LIST Page 8 of 16

Page 9: PROJECT REFERENCE LIST - LeadEPC

OWNER EPCM CONTRACTOR PROJECT SCOPE OF WORK LOCATION

MAN

HO

URS

SITE PHOTOPROJECT MANAGER

&CONTACT NO.

VALUE WHEN DURATION

PROJECTREFERENCE LIST

MEGCHEMLEAD ENGINEERING AND

PROJECTSSASOL - Megchem SERPL Sasol C&I Synthol

Energy Recovery Project

Provide Control and Instrumentation Engineering:Attending MeetingsSIL Determination ExcludedHAZOP Study30% Model ReviewRisk Review MFD ReviewConstructability ReviewC&I Design PhilosophyTechnology SelectionInstrument Data SheetsInstrumentation Location PlanCreatting BOQ'sSDE Review

SECUNDA, SA R 0,40M 2017 Q3 ONGOING

TRANSNET LEAD ENGINEERING AND

PROJECTSMetal Work TPL at Langlaagte Pumpstation RANDBURG, SA

Thabani Shabalala031 361 2939

R48 MIL 2017 Q3 2 MONTHS

SOLAR RESERVELEAD ENGINEERING AND

PROJECTSDanielskuil Solar Street Lights

Supply and Installation of Solar Street LightsInstallation Quality ControlSite Health, Safety and Environmental compliance

DANIELSKUIL, SAMasego Mogosti27 11 582 6881

R1,1 M 2017 Q3 ONGOING

ESKOM SOC LTDLEAD ENGINEERING AND

PROJECTSEskom Lethabo Power Station - Water

Flowmeters

Supply, delivery, installation, functional testing and in-situ verification of allflow meters and level measurement instrumentation in all major waterstreams, dams, reservoirs and tanks at Lethabo Power Station.Supply steelwork Fabrication of spool piecesInstallation of Spool piecesSupply of instrumentation Installation of instrumentationSupply and Install cablesSupply and Install Junction BoxesSupply and install EarthingSupply and Install cable rackingExcavations of trenches

LETHABO POWER STATION, SAKarabo Musa016 457 5018

R 17,6 M 2017 Q3 ONGOING

PROJECT REFERENCE LIST Page 9 of 16

Page 10: PROJECT REFERENCE LIST - LeadEPC

OWNER EPCM CONTRACTOR PROJECT SCOPE OF WORK LOCATION

MAN

HO

URS

SITE PHOTOPROJECT MANAGER

&CONTACT NO.

VALUE WHEN DURATION

PROJECTREFERENCE LIST

SASOLLEAD ENGINEERING AND

PROJECTSSCO Nitro – Fertilisers dam sluice automation

Instrumentation and Electrical Concept Packages for Nitro Sluice Gate Automation 1. Newly installed supply protection devices in existing MCC’s2. The supply cables to the 525VAC Distribution boards3. The 50kVA Transformers4. The 230VAC Lighting circuits5. The 115VAC Analyser Shelter supplyold equipment will be moved EngineeringSite visits• As building for queries on existing documentation• Civil works as per our pricing schedule and attached drawings• FAT & SAT procedures• Start-up spares list• Commissioning procedure• Hardware FAT• Hardware SAT• Quality check, checkout and handover procedures• COC’s• Removal of old equipment• SHE files• Arranging of permits.• Use of existing infrastructure• Functional specifications

SECUNDA, SAEsteé van Zyl

'+27 17 610 6096 / +27 71 384 2450

R 6,9M 2017 Q3 ONGOING

TRANSNET LEAD ENGINEERING AND

PROJECTSWALTLOO FUEL TERMINAL E&I INSTALLTION

Design, Engineering, Supply, Manufacturing, Erection, Application, Delivery, Handling, Hauling, Uploading, Installation, Construction, Assembly, System Testing, Calibration, Configuration, Quality, Assurance, Loop Testing and Commissioning of all Instrumentation, Actuators, Motors, Equipment, Cabling, Racking and Trenching Reticulation associated with the Automation of WAO and replacement of the Fire SystemDesign, Supply, Installation and Commissioning and Certification of Cathodic Protection Systems on the Incoming PipelinesDesign, Supply, Installation and Commissioning of a Safety Earthing and Lightning Protection SystemRepair of existing Instrumentation, Actuators, and Motors currentky installed.Certification of IS LoopsSupply and Installation of Fire Fighting Panels

PRETORIA, SAGERALD DE LANGE

031 361 1357 083 278 6404R 14,4M 2017 Q3 8 MONTHS

BELLOW WELDLEAD ENGINEERING AND

PROJECTSBELLOW WELD 200 NB BELLOWS RANDVAAL, SA 2018 Q3 1 MONTH

PROJECT REFERENCE LIST Page 10 of 16

Page 11: PROJECT REFERENCE LIST - LeadEPC

OWNER EPCM CONTRACTOR PROJECT SCOPE OF WORK LOCATION

MAN

HO

URS

SITE PHOTOPROJECT MANAGER

&CONTACT NO.

VALUE WHEN DURATION

PROJECTREFERENCE LIST

PICKOLEAD ENGINEERING AND

PROJECTSPICKO BRIQUTTE

Procurement of equipmentFabrication of sheet metal workFitment of all equipment in their respective panelsWiring of all equipment in their respective panelsEquipment, wire and panel labelsFAT Tesiting of panelsRedlined drawingsQCP DocumentationHandover data pack of manufactured panels

PICKO, SA R5 MIL 2018 Q3 2 MONTH

SASOLLEAD ENGINEERING AND

PROJECTSHVPEC INSTALLATION

• Removal and transporting of two (2) redundant panels (PLC and Hopper Level Alarm panels).• Supply and install 525VAC 50ka Switchboard• Supply, installation, jointing and terminating of LV and control cables• Fire proofing of cable exits• Rerouting of existing cables• New false floor structure• Bonding of the 525V switchboard to safety earth network• Removal and transporting of six (6) existing control panels• Installation, Site testing and commissioning of six (6) free issued control panels• Installation, Site testing and commissioning of two (2) free issued auxiliary control• panels.• Earthing of control panels• Supply and installation of new cables• The removal and transporting of existing six (6) Transformer-Rectifier sets• Installation, Site testing and commissioning of six (6) free issued HVPE T/R• sets.• Installation of six (6) drip oil trays for new transformer rectifiers• Supply and installation of six (6) HV bus ducting and tubing• Supply and installation of new cables from the substation to the ESP roof• Supply and installation of new cable trays from the substation to the ESP roof• Earthing of new structures and equipment• Modification of the existing structure on the roof of the ESP• Supply and installation of new crawl beams on the roof of the ESP• Design, supply and installation of sunroofs for each T/R set• Fire proofing of all substation cable entries and exits• Bonding of the new equipment to safety earth network

SECUNDA, SATheuns Fourie

[email protected] 871 5424

R12 M ONGOING 6 MONTH

SASOLLEAD ENGINEERING AND

PROJECTSFIRE AND GAS DETECTION

Smoke Detection and Activation of Fire DoorsAn automated PA system to warn occupants of fire or gasGas detection at the designated areasActivate the HVAC dampers to close in case of an emergencyReplace existing Honeywell BMSProvide PC's for the Mimic Display at the allocated areasE-PIT/VertiscanHandy scan Verification on external defectsUltrasonic Wall Thickness measurements spot check1 TeamAnalysis of results and all reporting

SECUNDA, SAJacques de Beer

081 010 [email protected]

R1.5 M ONGOING 2 MONTH

SASOLLEAD ENGINEERING AND

PROJECTSK-TRON REPLACEMENT PP2

Detail Engineering and DesignMFD/P&ID Mark-upsManagament and co-ordination of ProcurementQuality Assurance during construction on all manufacturing, installation and construction WorksManagement of FAT and SATAssistance with commissioningCompilation of handover packagesAs-built documentationAll deliverables as described herein

SECUNDA, SAJacques de Beer

081 010 [email protected]

R2.2 M ONGOING 2 MONTH

PROJECT REFERENCE LIST Page 11 of 16

Page 12: PROJECT REFERENCE LIST - LeadEPC

OWNER EPCM CONTRACTOR PROJECT SCOPE OF WORK LOCATION

MAN

HO

URS

SITE PHOTOPROJECT MANAGER

&CONTACT NO.

VALUE WHEN DURATION

PROJECTREFERENCE LIST

GARMCOLEAD ENGINEERING AND

PROJECTSHOLDING FURNACE UPGRADE

Design, Manufacture, Supply, Supervision of Installation and Commissioning of the complete upgrade to Garmco's Cut to Length 1 Line, along with all the Mechanical, Electrical Control, and Instrumentation Equipment necessary for safe, reliable and efficient operation.

BAHRAINAhmed Farah

+973 353 88087ONGOING 2 MONTH

ARCELORMITTALLEAD ENGINEERING AND

PROJECTSSTITCHER UPGRADE

The replacement of old and design, supply and installation of a Stitcher on the existing Organic Coating line (Paint Line) at Cold Mills South at ArcelorMittal South Africa Vanderbijlpark Works, including:engineering, supply, erection, supervision, and commissioning of the Stitcher on the existing Organic Coating line (Paint Line) at Cold Mills South

VANDERBIJLPARK, SAPeter Nott

'+27 (0) 16 889 3354'+27 (0) 82 318 4151

R 7,2 M ONGOING 4 MONTH

ARCELORMITTALLEAD ENGINEERING AND

PROJECTSPAINT LINE AUTOMATION

Design, Supply, Manufacture, Delivery to site, Offloading, Handling, Installation and Commissioning of the following:- 1 AC Motor- 1 Rockwell PwerFlex VSD including cabinet- 1 PLC cabinet included Rockwell PLC equipment- 1 Entry Operating Station with a HMI loacted near the stitcher- 2 FIFE Centre Guide Systems- Instruments for the Semi Automation operation of the Entry Section- Installation of 2 free issued Taylor Winfield strip centering units- The moving of the deburring roll

VANDERBIJLPARK, SAKen Patrick

+27 (0)16 440 3787 [email protected]

R3.6 MIL ONGOING 2 MONTH

SASOLLEAD ENGINEERING AND

PROJECTSMCC 5100 REPLACEMENT

Turnkey EPC project for the:-Engineering-Procurement-Construction

of two MCC's to be replaced in Sasolburg

SASOLBURG, SALutendo Mammburu

+27 16 960 [email protected]

R15MIL 2018 Q2 5 MONTH

SASOLLEAD ENGINEERING AND

PROJECTSBLOWER SURGE PROTECTION

Multidiscipline Engineering for the:Replacement of control valvesAnnubar's and anti-surge controllersUpgrading the power supply and the InstallationCommissioning and Testing of a new Surge Control System

SECUNDA, SA R20 MIL ONGOING 6 MONTH

MUSTEKLEAD ENGINEERING AND

PROJECTSMUSTEK ROOFTOP SOLAR INSTALLATION –

61,88kWp

Turnkey solution inclusive of the following:• Photovoltaic Plant Design• Engineering, Procurement and Construction.• Integration with monitoring system• Lightweight and high-quality rooftop substructure

JOHANNESBURG, SAMike Cassidy011 237 1000

R 502K ONGOING 1 MONTH

TRANSNET LEAD ENGINEERING AND

PROJECTSCoalbrook Pump Staion Fire Damage Repair

(Electrical, Instrumentation and Civil)

Design, engineering, supply, manufacture, erection, application, delivery, handling, hauling, unloading / receiving, installation, construction, assembly, system testing, quality assurance and commissioning of all instrumentation, actuators, equipment, cabling, racking reticulation associated with the Electrical, Instrumentation and Civil Portion of the Repair of the Coalbrook Pump Station

COALBROOKLinnert. T Madondo

031-3611087R 1,6 MIL ONGOING 2 MONTH

PROJECT REFERENCE LIST Page 12 of 16

Page 13: PROJECT REFERENCE LIST - LeadEPC

OWNER EPCM CONTRACTOR PROJECT SCOPE OF WORK LOCATION

MAN

HO

URS

SITE PHOTOPROJECT MANAGER

&CONTACT NO.

VALUE WHEN DURATION

PROJECTREFERENCE LIST

PDPSLEAD ENGINEERING AND

PROJECTSSASOL - SALTY WATER PIT LOAD REDUCTION -

ENGINEERING

Engineering:Control & Instrumentation Engineering: Draughtsman -Electrical Engineering

SECUNDA, SALindi Strauss

[email protected] ONGOING 3 MONTH

MEGCHEMLEAD ENGINEERING AND

PROJECTS

ELECTRICAL ENGINEERING AND FIRE AND GAS ENGINEERING FOR THE UNIT 230/030

CHLORIDE TREATERS PROJECT AT SASOL SECUNDA

1) Compile a Detailed Engineering and Design Package for the Fire and Gas as well as the Electrical Work of the Chloride Treater Project for Units 030 and 230, to a cost effective, safe and reliable operation in fulfilment of the scope of work, and issue an Approved for Construction design package, inclusive but not limited to the following.2) Review the Basic Engineering Package.3) Obtain Drawings and information from the Sasol system.4) Attendance and participation in the Project Kick-off meeting as well attendance and participation of technical and progress meetings.5) Attend and participate in all reviews, inclusive of 90% Model Review.6) DB Schematics and connection diagrams.7) Earthing Layouts.8) Equipment lighting layouts.9) Technology selection (New data sheets)10) Detailed cable and wire schedules and terminations.11) Update the Hazard Area Classification Drawing from information supplied by Sasol.12) Compile Tagged Equipment list.13) Compile Equipment data sheets.14) Compile a drawing list.15) Lighting study (LUX Levels).16) Field verification and as-built drawings for detail design.17) Engineering and Design for Fire and Gas.18) Squad checks.19) Generate complete set of AFC Drawings, and submit final AFC documentation.20) Design report.

SECUNDA, SAFrank Saieva 082 495 2014

R280K ONGOING 2 MONTH

NETCARELEAD ENGINEERING AND

PROJECTS

SOLAR PV TURNKEY ROLLOUT ST. ANNES By Engineering, Procurement andConstruction Suppliers (EPC)

• Photovoltaic Plant Design• Engineering, Procurement and Construction.• Integration with monitoring system• Lightweight and high quality rooftop substructurePhotovoltaic Solar plant

JOHANNESBURG, SAJohan Durand011 301 0282

R 1,2 MIL ONGOING 3 MONTH

MUSTEKLEAD ENGINEERING AND

PROJECTSMUSTEK SOLAR INSTALLATION 70.85KWP

Solar modules (325wp) installations Sub-structure supply,Sub-structure installation,Inverters installation,Electrical reticulation supply costs electrical reticulation installation Cables supply costs Cables installation Trenches / trays supplyTrenches /trays installation costs solar design & drawings/ approval

CAPE TOWN, SATanja Rheeders 011 237 1417

R612K ONGOING 2 MONTH

SASOLLEAD ENGINEERING AND

PROJECTSAN & EXPLOSIVE PUMPS

Process Engineering;Mechanical Engineering;C & I Electrical (BEP for Protection Systems on all AN Pumps

SECUNDA, SAJ de Beer

081 010 [email protected]

ONGOING 3 MONTH

SASOLLEAD ENGINEERING AND

PROJECTSJB SYSTEMS UPGRADE SECUNDA, SA

J de Beer081 010 2855

[email protected] 3 MONTH

SASOLLEAD ENGINEERING AND

PROJECTSSASOL CAFETERIA UPGRADE

Upgrade Electrical Infrastructure Install Electrical Mini-substationUpgrade DB System

SECUNDA, SAJ de Beer

081 010 [email protected]

ONGOING 2 MONTH

NETCARELEAD ENGINEERING AND

PROJECTS

SOLAR PV TURNKEY ROLLOUT MILLPARK By Engineering, Procurement andConstruction Suppliers (EPC)

• Photovoltaic Plant Design• Engineering, Procurement and Construction.• Integration with monitoring system• Lightweight and high quality rooftop substructurePhotovoltaic Solar plant

JOHANNESBURG, SAJohan Durand011 301 0282

R 999k ONGOING 2 MONTH

PROJECT REFERENCE LIST Page 13 of 16

Page 14: PROJECT REFERENCE LIST - LeadEPC

OWNER EPCM CONTRACTOR PROJECT SCOPE OF WORK LOCATION

MAN

HO

URS

SITE PHOTOPROJECT MANAGER

&CONTACT NO.

VALUE WHEN DURATION

PROJECTREFERENCE LIST

METKA EGNLEAD ENGINEERING AND

PROJECTS10 MW SOLAR PROJECT, UGANDA

Mechanical, Civil & Electrical Works:Sub-structure supply,Sub-structure installation,Inverters installation,Electrical reticulation supply costs electrical reticulation installation Cables supply costs Cables installation Trenches / trays supplyPiling works

BUFULUBI, UGANDA

Aris SpiropoulosT: 02080013341

M: 00447756248132 E: [email protected]

W: www.metka-egn.com

R 14 MIL ONGOING 3 MONTH

ARCELORMITTALLEAD ENGINEERING AND

PROJECTSGANTRY POT FOR NEW CRANE

Installation and supply of the new crane gantries and associated reinforcements required for the installation.Responsibilities include:- Manufacturing- Inspection and Testing- Supply, and Procurement- Transporting and delivering to site- Off-load, storage and safekeeping- Building and Constructing - Assembly and Installation- Quality Assurance- Commissioning- Safety Management and Equipment

VANDERBIJLPARK, SAT. Potgieter

072 145 [email protected]

R1.02MIL COMPLETE 2 MONTHS

ARCELORMITTALLEAD ENGINEERING AND

PROJECTSLADLE BURNER STRUCTURES

Supply, Installation & Manufacturing and Repair of 3 Ladle Burner Support Structures complete with a Burner Hood.

VANDERBIJLPARK, SAT. Potgieter

072 145 [email protected]

R2.2MIL ONGOING 6 WEEKS

ARCELORMITTALLEAD ENGINEERING AND

PROJECTSSIEMENS BLOWER DUCTING Fabrication, Installation and Supply of blower ducting. VANDERBIJLPARK, SA

T. Potgieter072 145 2408

[email protected] ONGOING 4 WEEKS

PREMIER FOODSLEAD ENGINEERING AND

PROJECTSPV PLANT POTCHEFSTROOM, SA

L. Rautenbach083 286 8946

[email protected] ONGOING

WATER UTILITIES CORPORATION

LEAD ENGINEERING AND PROJECTS

PUMP STATION UPGRADE Refurbishment of the North South Carrier Pump Station 0. BOTSWANA. RSAM. Barnes

083 736 [email protected]

R40MIL ONGOING

PROJECT REFERENCE LIST Page 14 of 16

Page 15: PROJECT REFERENCE LIST - LeadEPC

OWNER EPCM CONTRACTOR PROJECT SCOPE OF WORK LOCATION

MAN

HO

URS

SITE PHOTOPROJECT MANAGER

&CONTACT NO.

VALUE WHEN DURATION

PROJECTREFERENCE LIST

SCATECLEAD ENGINEERING AND

PROJECTS40 MW SOLAR PROJECT, MOZAMBIQUE

Mechanical, & Electrical Works:Sub-structure supply,Sub-structure installation,Inverters installation,Electrical reticulation supply costs electrical reticulation installation Cables supply costs Cables installation Trenches / trays supplySecurity lightning Protection

MOCUBA, MOZAMBIQUE

Aris SpiropoulosT: 02080013341

M: 00447756248132 E: [email protected]

W: www.metka-egn.com

R 85 MIL ONGOING 4 MONTH

NATREFLEAD ENGINEERING AND

PROJECTSJ11064 TURBINE REPLACEMENT PROJECT

Excavations and back filling for extension to pump foundationsCore drilling new holding down bolts for pump baseDemolition of existing structural steelRemoval of complete pump assemblyRemoval and storage of the pumpInstallation of required pump cooling, seal, flush and oil linesElectrical works (including earthing, fireproofing, terminating and modification)Installation of Control Valves and Flow TransmitterPanel wiring in the DCS and ESD Cabinets for additional power (24V)Piping works

SASOLBURG, SAT. Potgieter

072 145 [email protected]

R2.6 MIL

SCAW METALS LEAD ENGINEERING AND

PROJECTSFIRE DAMAGE REPAIRS

Project Co-ordination Task assessment and scope of works Procurement and supply of equipmentEngineeringBuilding of panels and junction boxesPLC engineering and instrumentationConstruction including 33kV installation of switchgear, low voltage cabling & instrument cabling Commissioning. ·

GERMISTON RSAH. Engela

083 284 [email protected]

R5 MIL ONGOING

AMATOLA WATERLEAD ENGINEERING AND

PROJECTS

CONSTRUCTION OF THREE CLEAR WATER PUMP STATIONS - MECHANICAL &

ELECTRICAL WORKS

Detailed design of all mechanical and electrical systems Supply and installation of all mechanical and electrical control and instrument components Connections to ESKOM power supply points (outside pumpstation buildings) and associated buried power cable to MCC Connections to existing supply reservoir pipework Connections to existing rising mains Minor building modifications (suction and delivery pipework through brick walls). Minor concrete works (construction of pump plinths and anchor blocks). Minor structural steel work (suction and delivery manifold supports). Terminal box for signals for remote monitoring of pumpstation status (telemetry by others under a separate Contract). Performance acceptance testing and commissioning Issue of Electrical Certificates of Compliance Training of OR Tambo District Municipality Operations staff Liaison and cooperation with the OR Tambo District Municipality Operations staff Rectification of any defects during a 12 month Defects Notification Period (DNP) Quarterly service and maintenance of equipment during the DNP Production of as-built drawings Operation and Maintenance Manuals Environmental, Health and Safety compliance and management.

MTHATHA, EASTERN CAPEH. Engela

083 284 [email protected]

R 28 MIL ONGOING

DANIELI AUTOMATIONLEAD ENGINEERING AND

PROJECTSELECTRICAL INSTALLATION AT STEEL MAKING

FACTORY

INSTALLATION AND ASSEMBLY OF MACHINERY / FITTINGS / EQUIPMENTVerification of existing foundations after removal of existing equipment.Execution of coring (or small demolition) for the routing of new cables to new motorsElectrical erection punch list cleareanceLid placement on the cable ways and other areas envisaged by the project Closing of all the field mounted electrical equipment (switchboards, control boxes, remote I/Os, junction boxes, etc) Sealing of all the cable ways in slabs and traps, conduits, shafts, etc. with fireproof rubber cement and/or other fireproof material approved by the Contractor. Sealing of all the switchboard, electrical fitting and substation cable entrances with fireproof rubber cement and/or other fireproof material approved by the Contractor. Final cleaning of all the installed fittings and machinery before the consignment

MIDDELBURG, MPUMALANGA.H. Engela

083 284 [email protected]

R1,2 MIL ONGOING

PROJECT REFERENCE LIST Page 15 of 16

Page 16: PROJECT REFERENCE LIST - LeadEPC

OWNER EPCM CONTRACTOR PROJECT SCOPE OF WORK LOCATION

MAN

HO

URS

SITE PHOTOPROJECT MANAGER

&CONTACT NO.

VALUE WHEN DURATION

PROJECTREFERENCE LIST

SCAW METALS LEAD ENGINEERING AND

PROJECTSLarge Bar Mill Project, Morgan Mill

1. Install hydraulic lines to DPCOMK-JD01-P5700-CD301 2, Install oil lubrication lines 3, Install grease lines 4, Do modification to hydraulic unit 5, Install compressed and instrumentation airline 6, Install waterlines 7, Do mechanical installation of machinery. 8, Electrical and Instrumentation Installation

GERMISTON RSAH. Engela

083 284 [email protected]

R20 MIL ONGOING

SASOL SECUNDALEAD ENGINEERING AND

PROJECTSJB Systems Cubicle Retrofit H1EE537A

1, Lighting Removal 2, Removal of Glands and Terminations 3, New lighting Installation 4, New Glands and Terminations 5, Cable Supply and Installation 6, CCG Box and Installation 7, Racking and Containment supply and Installation 8, New Lighting Pole supply and Installation 9, Engeineering 10, Red line Existing Drawings 11, Update Exiting Electrical Load List 12, Update existing SLD's 13, Upate Existing GA's 14, Update Existing Equipment layout drawings. 15, Update Wxisting Connection Diagrams 16, Update existing Earthing Layouts 17, Update Existing Racking Layout drawings 18, Update Existing ligting Layout. 1 9, Update existing Calbe Schedule - Power Cables

SECUNDA, SAH. Engela

083 284 [email protected]

R1 MIL

SASOL SECUNDALEAD ENGINEERING AND

PROJECTSLight Replacement Unit 232 Construction work do be done. SECUNDA, SA

H. Engela083 284 6260

[email protected]

SASOL SECUNDALEAD ENGINEERING AND

PROJECTSSewer Networdk Evaluation

1, Perform a visual inspection on ninety-four (94) lifting stations of Sasal Secunda, evaluating against Sasol Specifications and Standatd Drawings. 2. Compile a report consisting of one page per lifting station the deviatons from the specification and the action required ro rectify the deviations. 3. Assign a Safety and Operational ranking to each lifting station based on the severity of the deviations.

SECUNDA, SAH. Engela

083 284 [email protected]

R1 MIL

So SimpleLEAD ENGINEERING AND

PROJECTSInstallaton Installation of inverter base grid tied PV Installation POTCHEFSTROOM, SA

H. Engela083 284 6260

[email protected]

SASOL SECUNDALEAD ENGINEERING AND

PROJECTSFuse Isolator Replacement

1, Detailed Engineering, Supply and Installation of new CFS unit. 2. The development of a detailed engineering package and updating of all drawings associated with the mentioned MCC. 3, Procurement and Installation of the required replacement equipment. 4, Quality Insurance. 5, Project and Engineering Management.

H. Engela083 284 6260

[email protected],9MIL

PROJECT REFERENCE LIST Page 16 of 16