53
Project quality management Cody Ronning 3/23/2015

Project quality management Cody Ronning 3/23/2015

Embed Size (px)

Citation preview

Page 1: Project quality management Cody Ronning 3/23/2015

Project quality management

Cody Ronning3/23/2015

Page 2: Project quality management Cody Ronning 3/23/2015

Outline• Introduction• Plan quality management• Perform quality assurance• Quality control• Case study

2

Page 3: Project quality management Cody Ronning 3/23/2015

3

Introduction

• Quality–

• Quality management–

Page 4: Project quality management Cody Ronning 3/23/2015

4

Introduction

• Quality– The degree that a project fulfills the requirements

• Quality management–

Page 5: Project quality management Cody Ronning 3/23/2015

5

Introduction

• Quality– The degree that a project fulfills the requirements

• Quality management– Creating and following policies and procedures to

ensure that a project meets the requirements that were defined

Page 6: Project quality management Cody Ronning 3/23/2015

6

Quality vs Grade

• Quality– The degree that a project fulfills the requirements

• Grade–

Page 7: Project quality management Cody Ronning 3/23/2015

7

Quality vs Grade

• Quality– The degree that a project fulfills the requirements

• Grade– Category assigned to products or services having the same

functional use but different technical characteristics

Page 8: Project quality management Cody Ronning 3/23/2015

8

Quality vs Grade

• Quality– The degree that a project fulfills the requirements

• Grade– Category assigned to products or services having the same

functional use but different technical characteristics

• Low quality product or service is generally always a problem. A low grade product may only mean that it does not have enough features.

Page 9: Project quality management Cody Ronning 3/23/2015

9

Evolution of quality management

• Basic quality control• Little to no feedback to production• A final inspection

Page 10: Project quality management Cody Ronning 3/23/2015

10

Evolution of quality management

• Quality efforts shift to production • Attention to every stage of the process

Page 11: Project quality management Cody Ronning 3/23/2015

11

Evolution of quality management

• Quality is defined, planned and supervised

• Standards and guidelines• Quality management

systems embedded within the organization

Page 12: Project quality management Cody Ronning 3/23/2015

12

Evolution of quality management

• Customers, employees, process, society and stakeholder orientated.

• Philosophy encouraging companies to continuously improve quality in processes and products

Page 13: Project quality management Cody Ronning 3/23/2015

13

Evolution of quality management• Six Sigma: Overall methodology

driving business improvement

• DMAIC process: define, measure, analyze, improve and control

Page 14: Project quality management Cody Ronning 3/23/2015

14

Project quality management processes

• Plan quality management• Perform quality assurance• Control quality

Page 15: Project quality management Cody Ronning 3/23/2015

15

Page 16: Project quality management Cody Ronning 3/23/2015

Outline• Introduction• Plan quality management• Perform quality assurance• Quality control• Case study

16

Page 17: Project quality management Cody Ronning 3/23/2015

17

Plan quality management

Page 18: Project quality management Cody Ronning 3/23/2015

18

Plan quality management

• Inputs– Project management plan– Stakeholder register– Risk register– Requirements documentation– Enterprise environmental factors– Organizational process assets

Page 19: Project quality management Cody Ronning 3/23/2015

19

Plan quality management tools

• Cost-benefit analysis• Cost of quality• Seven basic quality tools (7QC)• Benchmarking• Design of experiments• Statistical sampling• Meetings

Page 20: Project quality management Cody Ronning 3/23/2015

20

Plan quality management tools

• Cost of quality

Page 21: Project quality management Cody Ronning 3/23/2015

21

Plan quality management tools

• 7QC Tools – Cause-and-effect diagrams– Flowcharts– Checksheets– Pareto diagrams– Histograms– Control charts– Scatter diagrams

Page 22: Project quality management Cody Ronning 3/23/2015

22

Cause-and-effect diagram

Page 23: Project quality management Cody Ronning 3/23/2015

23

Checksheets and pareto diagrams

Page 24: Project quality management Cody Ronning 3/23/2015

24

Control charts

Page 25: Project quality management Cody Ronning 3/23/2015

25

Plan quality management output

• Quality management plan• Process improvement plan• Quality metrics• Quality checklists

Page 26: Project quality management Cody Ronning 3/23/2015

Outline• Introduction• Plan quality management• Perform quality assurance• Quality control• Case study

26

Page 27: Project quality management Cody Ronning 3/23/2015

27

Perform quality assurance

Page 28: Project quality management Cody Ronning 3/23/2015

28

Perform quality assurance inputs

• Quality management plan• Process improvement plan• Quality metrics• Quality control measurements• Project documents

Page 29: Project quality management Cody Ronning 3/23/2015

29

Perform quality assurance tools• Tools from planning process• Quality management and control tools

• Quality audits• Process analysis

– Affinity diagrams– Process decision program

charts– Interrelationship digraphs– Tree diagrams

– Prioritization matrices– Activity network diagrams– Matrix diagrams

Page 30: Project quality management Cody Ronning 3/23/2015

30

Perform quality assurance output

• Project management plan updates• Project document updates• Organizational process assets updates• Change requests

Page 31: Project quality management Cody Ronning 3/23/2015

Outline• Introduction• Plan quality management• Perform quality assurance• Quality control• Case study

31

Page 32: Project quality management Cody Ronning 3/23/2015

32

Quality control

Page 33: Project quality management Cody Ronning 3/23/2015

33

Quality control inputs

• Project management plan• Quality metrics• Quality checklists• Work performance data• Approved change requests• Deliverables• Project documents

Page 34: Project quality management Cody Ronning 3/23/2015

34

Quality control tools

• Seven quality tools• Statistical sampling• Inspection• Approved change requests review

Page 35: Project quality management Cody Ronning 3/23/2015

35

Quality control outputs

• Quality control measurements• Validated changes• Verified deliverables• Work performance information• Change requests• Project management plan updates

Page 36: Project quality management Cody Ronning 3/23/2015

36

Project quality management processes

• Plan quality management• Perform quality assurance• Control quality

Page 37: Project quality management Cody Ronning 3/23/2015

Outline• Introduction• Plan quality management• Perform quality assurance• Quality control• Case study

37

Page 38: Project quality management Cody Ronning 3/23/2015

Project quality case study

• Case study on improving quality management of W company’s new product development– Jiangping Wan– Ming Zeng– June 1, 2013– South China University of Technology

38

Page 39: Project quality management Cody Ronning 3/23/2015

Case study processes

• Analysis of current situation (baseline)• Improvement study and implementation• Monitoring implementation for success

analysis

39

Page 40: Project quality management Cody Ronning 3/23/2015

W companies background

• 20 years of business• Located in China with offices world wide• Innovative technology

40

Page 41: Project quality management Cody Ronning 3/23/2015

Analysis of current situation

• Activities must follow companies quality policy– Defect rate from major design is zero– System quality score above 90%– Product failure less than 10%– Customer satisfaction greater than 93%

41

Page 42: Project quality management Cody Ronning 3/23/2015

Problem identification

1. Reliability performance of new products is poor2. Quality of products is low due to rapid development3. Performance of purchased products is low4. Customer complaints have increased over time5. Quality organization can’t support all of the business6. Roles of quality management not defined7. Organizational structure does not adequately support quality

groups8. Quality management activities are not clear9. Processes do not integrate well with quality management10. Evaluation of system not well defined

42

Page 43: Project quality management Cody Ronning 3/23/2015

Problem identification

11. Design standards are not well defined12. New product quality standards not well defined13. Quality target decomposition mechanism problems14. Project planning and kickoff phase lacks management15. Lack of monitoring and evaluation mechanism16. Management of new product project data is weak17. Quality resources not fully utilized18. Lacking support of IT tools for quality management19. Engineering methods are not concurrent throughout the company.20. Quality awareness between employees is poor

43

Page 44: Project quality management Cody Ronning 3/23/2015

44

Page 45: Project quality management Cody Ronning 3/23/2015

Results from cause and effect

• 31 causes revealed • Performed cluster analysis and found 7

influencing factors ranked by company experts using the expert scoring method

45

Page 46: Project quality management Cody Ronning 3/23/2015

46

Page 47: Project quality management Cody Ronning 3/23/2015

47

Page 48: Project quality management Cody Ronning 3/23/2015

Quality management improvement scheme• Reinforce construction, implementation of the

quality organization• Introduce complete quality management system

for new product development• Intensify training to promote quality

consciousness• Upgrade management of suppliers quality control• Improve resource utilization efficiency

48

Page 49: Project quality management Cody Ronning 3/23/2015

Integrated portfolio management team

49

Page 50: Project quality management Cody Ronning 3/23/2015

Organizational structure quality activities of new product development

50

Page 51: Project quality management Cody Ronning 3/23/2015

51

Page 52: Project quality management Cody Ronning 3/23/2015

Reference

J. Wan and M. Zeng, "Case Study on Improving Quality Management of W Company’s New Product Development Project," Technology and Investment, Vol. 4 No. 3, 2013, pp. 153-163.

52

Page 53: Project quality management Cody Ronning 3/23/2015

Project quality management

• Thank you for your time• Questions and feedback are welcome

53