PreMaDoNA kickoff 15 oct 2004 Henk Corporaal Project Overview

Project Overview - Eindhoven University of Technology · Project Overview. 8-Dec-04 H. Corporaal -PreMaDoNA kickoff 2 Agenda 15.00 Opening and Overview Henk Corporaal Bart Mesman

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Project Overview - Eindhoven University of Technology · Project Overview. 8-Dec-04 H. Corporaal -PreMaDoNA kickoff 2 Agenda 15.00 Opening and Overview Henk Corporaal Bart Mesman

PreMaDoNAkickoff 15 oct 2004

Henk Corporaal

Project Overview

Page 2: Project Overview - Eindhoven University of Technology · Project Overview. 8-Dec-04 H. Corporaal -PreMaDoNA kickoff 2 Agenda 15.00 Opening and Overview Henk Corporaal Bart Mesman

8-Dec-04 H. Corporaal - PreMaDoNA kickoff 2

Agenda� 15.00 Opening and Overview Henk Corporaal

Bart Mesman� 15.30 Implementation and Demonstrator Patrick Groeneveld� 15.40 Project Management Bart Mesman� 15.55 Application track Peter de With

Gerard de Haan� 16.05 Simulation track Sander Stuijk

Orlando Moreira� 16.15 5 minutes coffee/thea break� 16.20 Network Architecture Layer Jef van Meerbergen

Kees GoossensMarco Bekooij

� 16.30 Design Flow Bart TheelenBart Mesman

� 16.40 Resource Management and QoS Jef van MeerbergenMilan PastrnakPeter Poplavko

� 16.50 Discussion� 17.00 Reception� 17.30 Close

Page 3: Project Overview - Eindhoven University of Technology · Project Overview. 8-Dec-04 H. Corporaal -PreMaDoNA kickoff 2 Agenda 15.00 Opening and Overview Henk Corporaal Bart Mesman

8-Dec-04 H. Corporaal - PreMaDoNA kickoff 3

PreMaDoNAPredictable Matching of Demands onNetworked Architectures

� Partners:� Philips Research� Philips Semiconductors� LogicaCMG� TU/e

Page 4: Project Overview - Eindhoven University of Technology · Project Overview. 8-Dec-04 H. Corporaal -PreMaDoNA kickoff 2 Agenda 15.00 Opening and Overview Henk Corporaal Bart Mesman

8-Dec-04 H. Corporaal - PreMaDoNA kickoff 4

Overview� Problem statement� NOC� Predictable design

� QoS management� Design flow� Architectural support for predictable design

� Work packages� Links with other projects (intern; extern)

Page 5: Project Overview - Eindhoven University of Technology · Project Overview. 8-Dec-04 H. Corporaal -PreMaDoNA kickoff 2 Agenda 15.00 Opening and Overview Henk Corporaal Bart Mesman

8-Dec-04 H. Corporaal - PreMaDoNA kickoff 5

Problem statement

� Observations

� Problem

� Solution

Page 6: Project Overview - Eindhoven University of Technology · Project Overview. 8-Dec-04 H. Corporaal -PreMaDoNA kickoff 2 Agenda 15.00 Opening and Overview Henk Corporaal Bart Mesman

8-Dec-04 H. Corporaal - PreMaDoNA kickoff 6

Observation 1:The 3 Cs

� Convergence of 3 Cs

computers, communications and consumer

electronics

� The computer enters the 3rd fase

computing power - networking - intelligent processing

� The world is 1 network

wherever, whenever, all information and communication available

����������������� ���� ������� �������� ������� ���������������������������������������

Page 7: Project Overview - Eindhoven University of Technology · Project Overview. 8-Dec-04 H. Corporaal -PreMaDoNA kickoff 2 Agenda 15.00 Opening and Overview Henk Corporaal Bart Mesman

8-Dec-04 H. Corporaal - PreMaDoNA kickoff 7

Observation 2: Current HW design practise

Logic

System

AlgorithmR/T

circuit

Behaviour Structure

Physical

Y-Chart (Gajski-Kuhn)

� Design Flow is path in Y chart

� Till RT-level largely manual flow

Start

Done !

Page 8: Project Overview - Eindhoven University of Technology · Project Overview. 8-Dec-04 H. Corporaal -PreMaDoNA kickoff 2 Agenda 15.00 Opening and Overview Henk Corporaal Bart Mesman

8-Dec-04 H. Corporaal - PreMaDoNA kickoff 8

Integration

TaskTask

Task

Systempeople

C

ASM

Softwarepeople

vhdl

verilogHardware

people

Paper spec

Observation 3: Informal system specification

Page 9: Project Overview - Eindhoven University of Technology · Project Overview. 8-Dec-04 H. Corporaal -PreMaDoNA kickoff 2 Agenda 15.00 Opening and Overview Henk Corporaal Bart Mesman

8-Dec-04 H. Corporaal - PreMaDoNA kickoff 9

Observation 4: Design productivity

• Yes, we can fabricate the ICs, but …• Can we design them ?• Can we program them ?

103

102

101

4 8 12 16 year

complexity

HW gap

SW gap

Process technology + 58%

HW design productivity +21 %

SW productivity + 8 %

Page 10: Project Overview - Eindhoven University of Technology · Project Overview. 8-Dec-04 H. Corporaal -PreMaDoNA kickoff 2 Agenda 15.00 Opening and Overview Henk Corporaal Bart Mesman

8-Dec-04 H. Corporaal - PreMaDoNA kickoff 10

Video

3D

Rel. CPU-load for 15 fps

0%200%400%600%800%

1000%1200%

Order ofMagnitude

0 %

25 %

50 %

75 %

100 %

0 50 100 150 200 250 300

Frame (IPPP ...)

Load (Sequence: weather, VO1, binary shape, 10Hz, 112 kbit/s, QCIF)

Factor 2

P. Kuhn, G. Diebel, “ Complexity Analysis of the MPEG-4 VM 8.0,”ISO/IEC JTC1/SC29/WG11/MPEG97/m2862, Fribourg, October 1997*

*

Obervation 5:More dynamism

Page 11: Project Overview - Eindhoven University of Technology · Project Overview. 8-Dec-04 H. Corporaal -PreMaDoNA kickoff 2 Agenda 15.00 Opening and Overview Henk Corporaal Bart Mesman

8-Dec-04 H. Corporaal - PreMaDoNA kickoff 11

Observation 6: Memory gap“ data where are you?”

µProc:55%/year

CPU

DRAM:7%/yearDRAM

1

10

100

1000

1980 1985 1990 1995 2000

Processor-MemoryPerformance Gap:(grows 50% / year)

Performance

Time

“Moore’s Law”

[Patterson]

Page 12: Project Overview - Eindhoven University of Technology · Project Overview. 8-Dec-04 H. Corporaal -PreMaDoNA kickoff 2 Agenda 15.00 Opening and Overview Henk Corporaal Bart Mesman

8-Dec-04 H. Corporaal - PreMaDoNA kickoff 12

What’s the design problem?

Given an incredible complex system, finish the design

� Yesterday� with Zero power� with Zero cost� with QoS guarantees

� At sufficient performance !

Page 13: Project Overview - Eindhoven University of Technology · Project Overview. 8-Dec-04 H. Corporaal -PreMaDoNA kickoff 2 Agenda 15.00 Opening and Overview Henk Corporaal Bart Mesman

8-Dec-04 H. Corporaal - PreMaDoNA kickoff 13

Solution ?1. Platforms

� HW and SW IP reuse� Standardization (interfaces)� Scalability and Flexibility

2. Advanced Design Flow for Platforms� Raise abstraction level� Tool support� Modeling of Power, Cost, Performance

3. Predictability� QoS (quality of service) hooks� Reason about design properties at all levels

Page 14: Project Overview - Eindhoven University of Technology · Project Overview. 8-Dec-04 H. Corporaal -PreMaDoNA kickoff 2 Agenda 15.00 Opening and Overview Henk Corporaal Bart Mesman

8-Dec-04 H. Corporaal - PreMaDoNA kickoff 14

Platform characteristics� Programmable

� One or more processor cores� Reconfigurable� Scalable and flexible� Memory hierarchy

� Exploit locality� Separate local and global wiring� HW and SW IP reuse

� Standardization (on SW and HW-interfaces)� Raising design abstraction level

� Reliable� Cheaper

Page 15: Project Overview - Eindhoven University of Technology · Project Overview. 8-Dec-04 H. Corporaal -PreMaDoNA kickoff 2 Agenda 15.00 Opening and Overview Henk Corporaal Bart Mesman

8-Dec-04 H. Corporaal - PreMaDoNA kickoff 15

Platform and platform design

Realization

Applications

System design

Platform design

RaiseabstractionlevelPlatform

Design once, reuse many times

Page 16: Project Overview - Eindhoven University of Technology · Project Overview. 8-Dec-04 H. Corporaal -PreMaDoNA kickoff 2 Agenda 15.00 Opening and Overview Henk Corporaal Bart Mesman

8-Dec-04 H. Corporaal - PreMaDoNA kickoff 16

Example Platforms: Bus-based: Philips Nexperia

Philips Nexperia

Page 17: Project Overview - Eindhoven University of Technology · Project Overview. 8-Dec-04 H. Corporaal -PreMaDoNA kickoff 2 Agenda 15.00 Opening and Overview Henk Corporaal Bart Mesman

8-Dec-04 H. Corporaal - PreMaDoNA kickoff 17

Reconfigurable logic based:Xilinx Virtex II-Pro

��� ����

� ���

Up to 16 serial transceivers

� �����

���������� � ���� ����������

PowerPC

Reconfigurable logicblocks

Memory blocks

GHz IO: Up to 16 serial transceivers

Page 18: Project Overview - Eindhoven University of Technology · Project Overview. 8-Dec-04 H. Corporaal -PreMaDoNA kickoff 2 Agenda 15.00 Opening and Overview Henk Corporaal Bart Mesman

8-Dec-04 H. Corporaal - PreMaDoNA kickoff 18

IP NetworkInterface

R

R

R

R

R

R

R

R

R

NetworkInterface

IP

NetworkInterface

IP

RouterNetwork

Built-in network guarantees

NoC based: Philips AETHEREAL

Page 19: Project Overview - Eindhoven University of Technology · Project Overview. 8-Dec-04 H. Corporaal -PreMaDoNA kickoff 2 Agenda 15.00 Opening and Overview Henk Corporaal Bart Mesman

8-Dec-04 H. Corporaal - PreMaDoNA kickoff 19

Future platformsit's not only about HW !

Example: Smart Networked Devices

radio programmablehardware

reconfig.hardware

OS&

RMlibrary

Virtual MachineProtocols

Multimedia (MPEG 21)

Networkacceleratorhardware

Page 20: Project Overview - Eindhoven University of Technology · Project Overview. 8-Dec-04 H. Corporaal -PreMaDoNA kickoff 2 Agenda 15.00 Opening and Overview Henk Corporaal Bart Mesman

8-Dec-04 H. Corporaal - PreMaDoNA kickoff 20

On-chipNetwork

Networkinterface

NoC realization

���� ������

�������� �������������� !"#���

�$�%&'���' �"�( !"#���

�)#*����� ���� �"�+ !"#���

���,$

�-�,$

�.�&,/���0

Future platforms:realization

Page 21: Project Overview - Eindhoven University of Technology · Project Overview. 8-Dec-04 H. Corporaal -PreMaDoNA kickoff 2 Agenda 15.00 Opening and Overview Henk Corporaal Bart Mesman

8-Dec-04 H. Corporaal - PreMaDoNA kickoff 21

synthesis

idea

user requirements

non-executable specification

executable specification

HW-SW partitioning

compilation

platform

hardware software

transformation and refinement steps

algorithm design

architecture design

requirement capturing

(System specification)

(System implementation)

(System behavior)

(System architecture)

(System realization)

(System idea)

System Design trajectory

(reference code)

Page 22: Project Overview - Eindhoven University of Technology · Project Overview. 8-Dec-04 H. Corporaal -PreMaDoNA kickoff 2 Agenda 15.00 Opening and Overview Henk Corporaal Bart Mesman

8-Dec-04 H. Corporaal - PreMaDoNA kickoff 22

Sequential C/C++ description

control parts streaming parts

KPN

BDF / SDF

System design trajectory: specifics

modeling

Informal description

NoC Platform

POOSL / RPN

Page 23: Project Overview - Eindhoven University of Technology · Project Overview. 8-Dec-04 H. Corporaal -PreMaDoNA kickoff 2 Agenda 15.00 Opening and Overview Henk Corporaal Bart Mesman

8-Dec-04 H. Corporaal - PreMaDoNA kickoff 23

System level: events and streaming

• hardware + software • RT guarantees (throughput), DSP• parallelism in space• added value, differentiating factor• build on DSP/application knowledge

• Processing of events• Controlling host-CPU (GP Risc e.g. ARM)• standard OS• ‘classical’ SW complexity• general purpose approach

status

Event_in Event_out

stream_in stream_out

mode

Page 24: Project Overview - Eindhoven University of Technology · Project Overview. 8-Dec-04 H. Corporaal -PreMaDoNA kickoff 2 Agenda 15.00 Opening and Overview Henk Corporaal Bart Mesman

8-Dec-04 H. Corporaal - PreMaDoNA kickoff 24

Predictability: What is needed ?

Deal with dynamism� Changing application set� Changing application behavior:

� Scenario switches

� Less dramatic load changes� e.g. changing number of objects / scene

Page 25: Project Overview - Eindhoven University of Technology · Project Overview. 8-Dec-04 H. Corporaal -PreMaDoNA kickoff 2 Agenda 15.00 Opening and Overview Henk Corporaal Bart Mesman

8-Dec-04 H. Corporaal - PreMaDoNA kickoff 25

PredictabilityArchitecture level aspects� Deterministic control of all shared resources

should be possible� caches

� software control

� shared memories� network

� guaranteed throughput

Page 26: Project Overview - Eindhoven University of Technology · Project Overview. 8-Dec-04 H. Corporaal -PreMaDoNA kickoff 2 Agenda 15.00 Opening and Overview Henk Corporaal Bart Mesman

8-Dec-04 H. Corporaal - PreMaDoNA kickoff 26

PredictabilityDesign flow aspects� Design time

� Determine of upper bounds on time and resources�pareto curves

� Scenario discovery: � separate your application in parts for which upper

bounds not too far from worst case

Freq

Load

Sc1

Sc2

Sc3

Page 27: Project Overview - Eindhoven University of Technology · Project Overview. 8-Dec-04 H. Corporaal -PreMaDoNA kickoff 2 Agenda 15.00 Opening and Overview Henk Corporaal Bart Mesman

8-Dec-04 H. Corporaal - PreMaDoNA kickoff 27

Predictability: Compositionality

High leveldesign

Low leveldesign

x

y

z

ab

x

y

z

ab

P(x,y) if [P(a,b),...] !

P(x,y) if [P(a,b),...] ?

Page 28: Project Overview - Eindhoven University of Technology · Project Overview. 8-Dec-04 H. Corporaal -PreMaDoNA kickoff 2 Agenda 15.00 Opening and Overview Henk Corporaal Bart Mesman

8-Dec-04 H. Corporaal - PreMaDoNA kickoff 28

Mapping multiple jobs T1 T2T0

Multiple jobs can be active simultaneously.

When can a second job start ?

Are the requested resources available ?If not, can the quality level be lowered ?

If not, can other jobs go for a lower quality ?

If yes, independent from other jobs ?

resources

time

100%

reconfiguration

How to give guarantees?

Page 29: Project Overview - Eindhoven University of Technology · Project Overview. 8-Dec-04 H. Corporaal -PreMaDoNA kickoff 2 Agenda 15.00 Opening and Overview Henk Corporaal Bart Mesman

8-Dec-04 H. Corporaal - PreMaDoNA kickoff 29

Predictability: ComposabilityCan we add Pareto points?

Q

Cost (resources)

Q

Cost (resources)

+

application 1 application 2

(q1,c1) (q2,c2)

(q1+q2,c1+c2) ?

Page 30: Project Overview - Eindhoven University of Technology · Project Overview. 8-Dec-04 H. Corporaal -PreMaDoNA kickoff 2 Agenda 15.00 Opening and Overview Henk Corporaal Bart Mesman

8-Dec-04 H. Corporaal - PreMaDoNA kickoff 30

Local manager

Application n

Predictability� Run time aspects

� Scalable applications � QoS management

Local manager

Global manager

Application n / Scenario m

Platform

QoS protocol

Page 31: Project Overview - Eindhoven University of Technology · Project Overview. 8-Dec-04 H. Corporaal -PreMaDoNA kickoff 2 Agenda 15.00 Opening and Overview Henk Corporaal Bart Mesman

8-Dec-04 H. Corporaal - PreMaDoNA kickoff 31

4 levels� Level 3: System

� Multiple applications running simultaneously

� Level 2: Application� started/stopped by user� e.g. DVD player

� Level 1: Job� e.g. SDF graph for the sound-part of a DVD player

� Level 0: Task � e.g. SDF actor

Page 32: Project Overview - Eindhoven University of Technology · Project Overview. 8-Dec-04 H. Corporaal -PreMaDoNA kickoff 2 Agenda 15.00 Opening and Overview Henk Corporaal Bart Mesman

8-Dec-04 H. Corporaal - PreMaDoNA kickoff 32

PreMaDoNA proposes a solution based on the removal and/or software control of unpredictable elements in the architectures in

combination with a predictable mapping methodology that supportsreasoning about throughput.

An FPGA demonstrator will prove that1. That our predictable design methodology saves a lot of design

iterations.2. That NoCs can be used as an adequate target for real-time video

applications.3. That dynamically application demands can be matched with the

available NoC resources. Video quality should gracefully reduce when resources are limited.

Page 33: Project Overview - Eindhoven University of Technology · Project Overview. 8-Dec-04 H. Corporaal -PreMaDoNA kickoff 2 Agenda 15.00 Opening and Overview Henk Corporaal Bart Mesman

8-Dec-04 H. Corporaal - PreMaDoNA kickoff 33

Relations between WPs

QOS management: WP3

NoC architecture: WP1

NoC implementation: WP2

Application: WP6

Resource management: WP3

NoC realisation: WP2

Mapping: WP5Simulation: WP4

Application(Platformindependent)

Platform(Applicationindependent)

Compute jobs

Resourcebudgets

Page 34: Project Overview - Eindhoven University of Technology · Project Overview. 8-Dec-04 H. Corporaal -PreMaDoNA kickoff 2 Agenda 15.00 Opening and Overview Henk Corporaal Bart Mesman

8-Dec-04 H. Corporaal - PreMaDoNA kickoff 34

Application characteristics� Task level: well-known compute intensive

kernels� Job level: data dependent dynamic

applications (jobs)� Application level: multiple jobs

� System level: mutiple applications� Streaming dominates the cost

VideoIn1

NR HSRC VSRC

mem

Page 35: Project Overview - Eindhoven University of Technology · Project Overview. 8-Dec-04 H. Corporaal -PreMaDoNA kickoff 2 Agenda 15.00 Opening and Overview Henk Corporaal Bart Mesman

8-Dec-04 H. Corporaal - PreMaDoNA kickoff 35

Application package� Case studies

� Video Scaler (Bart Barenbrug; Philips Research)� FM radio (Caracas architecture; Philips

Semiconductor)� Arbitrary Shape (Object) Texture decoder

Page 36: Project Overview - Eindhoven University of Technology · Project Overview. 8-Dec-04 H. Corporaal -PreMaDoNA kickoff 2 Agenda 15.00 Opening and Overview Henk Corporaal Bart Mesman

8-Dec-04 H. Corporaal - PreMaDoNA kickoff 36

Links to related projects� Internal:

� Epicurus: Demons, FAME, Promes, Betsy, ….

� External:� Philips Research: Aethereal and Hydra� Philips Semiconductor� Progress projects: SCALP, Artemisia, SmartCam,

IMEC MPSoC, M4, Matador, SLI� and many others….

Page 37: Project Overview - Eindhoven University of Technology · Project Overview. 8-Dec-04 H. Corporaal -PreMaDoNA kickoff 2 Agenda 15.00 Opening and Overview Henk Corporaal Bart Mesman

8-Dec-04 H. Corporaal - PreMaDoNA kickoff 37

PreMaDoNAPredictable Matching of Demands

on Networked Architectures

Being able to design NoC-based real-time systems in a predictable way, such that we

can guarantee non-functional requirements,

while being able to dynamically match quality versus available resources.

Solution based on the removal and/or software control of unpredictable elements in the architectures in combination with a

predictable mapping methodology that supports reasoning about non-functional properties

Page 38: Project Overview - Eindhoven University of Technology · Project Overview. 8-Dec-04 H. Corporaal -PreMaDoNA kickoff 2 Agenda 15.00 Opening and Overview Henk Corporaal Bart Mesman

8-Dec-04 H. Corporaal - PreMaDoNA kickoff 38

THE END