21
QuickTime™ and a TIFF (Uncompressed) decompressor are needed to see this picture. PROJECT OVERVIEW COOLING POND REMOVAL Sydney Tar Ponds & Coke Ovens Clean Up :

PROJECT OVERVIEW COOLING POND REMOVAL Sydney Tar Ponds & Coke Ovens Clean Up :

Embed Size (px)

Citation preview

Page 1: PROJECT OVERVIEW COOLING POND REMOVAL Sydney Tar Ponds & Coke Ovens Clean Up :

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.

PROJECT OVERVIEW

COOLING POND REMOVAL

Sydney Tar Ponds & Coke Ovens Clean Up:

Page 2: PROJECT OVERVIEW COOLING POND REMOVAL Sydney Tar Ponds & Coke Ovens Clean Up :

Presentation Overview

• Overview: clean up• Profile Cooling Pond project• Consider relationship with First

Nations• Local Economic Benefits

Page 3: PROJECT OVERVIEW COOLING POND REMOVAL Sydney Tar Ponds & Coke Ovens Clean Up :

Project Overview• Clean up is 25 years in the making

• One of the most intensely studied and vigorously debated projects of its kind

• Budgeted at $400 million

• Funded by Canada & Nova Scotia - cost share is 70%-30%

Page 4: PROJECT OVERVIEW COOLING POND REMOVAL Sydney Tar Ponds & Coke Ovens Clean Up :

Construction-Clean Up

Related Costs

S1

$290,000,000

$110,000,000

$0

$50,000,000

$100,000,000

$150,000,000

$200,000,000

$250,000,000

$300,000,000Allocation of Funds

Related Activities include: preventative works, pre-design, environmental impact assessment, IE, design oversight, & agency operations

Page 5: PROJECT OVERVIEW COOLING POND REMOVAL Sydney Tar Ponds & Coke Ovens Clean Up :

Clean Up Scope & Complexion• Spans 7 years

• Begins this summer

• Local contractors expected to supply most services

• Business model - Competitive bid process

Page 6: PROJECT OVERVIEW COOLING POND REMOVAL Sydney Tar Ponds & Coke Ovens Clean Up :

Scope & Complexion

11 Projects Comprise Clean Up

Channels

Decontamination Facility

S&S

Surface Cap-TPCO Brook Connector

Cutoff Walls

Groundwater Collection

Water Treatment

Landfill

CO Surface Cap

Page 7: PROJECT OVERVIEW COOLING POND REMOVAL Sydney Tar Ponds & Coke Ovens Clean Up :

Governance

PMC

Sydney Tar Ponds

Agency

Independent Engineer

Design Engineer

CLC

Contractors

First Nations

EMC

OAC

Page 8: PROJECT OVERVIEW COOLING POND REMOVAL Sydney Tar Ponds & Coke Ovens Clean Up :

Background

• October 2005 - Protocol Agreement

Signed

Canada, Nova Scotia, First Nations

Page 9: PROJECT OVERVIEW COOLING POND REMOVAL Sydney Tar Ponds & Coke Ovens Clean Up :

Background cont’d

Cooling Pond designated Aboriginal set aside in

2005

QuickTime™ and aTIFF (Uncompressed) decompressor

are needed to see this picture.

Page 10: PROJECT OVERVIEW COOLING POND REMOVAL Sydney Tar Ponds & Coke Ovens Clean Up :

Background cont’d

• Cooling pond went to tender in 2006

• Recommendations of Environmental Review Panel required a rethink of construction method

• Project pulled back and changed in line with panel recommendations

• Cooling Pond going to tender this summer

Page 11: PROJECT OVERVIEW COOLING POND REMOVAL Sydney Tar Ponds & Coke Ovens Clean Up :

Cooling Pond Set Aside cont’d

• Changed construction method this time

Originally-Design Build• Contractor sets out design &

constructs

• Overall responsibility with contractor

• First nations involvement via partnerships

• Non-FN companies in the lead

• Limited FN content

Originally-Design Build• Contractor sets out design &

constructs

• Overall responsibility with contractor

• First nations involvement via partnerships

• Non-FN companies in the lead

• Limited FN content

Currently-Time & Materials• Earth Tech (DE) construction

manager

• Overall responsibility for design implementation with Earth Tech

• First nations involvement direct

• FN companies supply needed labour & materials

• Expanded FN content

Currently-Time & Materials• Earth Tech (DE) construction

manager

• Overall responsibility for design implementation with Earth Tech

• First nations involvement direct

• FN companies supply needed labour & materials

• Expanded FN content

Page 12: PROJECT OVERVIEW COOLING POND REMOVAL Sydney Tar Ponds & Coke Ovens Clean Up :

Cooling Pond Set Aside cont’d

• FN contractors will be pre-qualified for standing offer list

• Contractors will be engaged for additional set-aside projects going forward

Page 13: PROJECT OVERVIEW COOLING POND REMOVAL Sydney Tar Ponds & Coke Ovens Clean Up :

First Nations

• Discussions going well with FN economic benefits Steering Committee led by Membertou

• Agreement on the establishment of FN LEB Office

• Briefings held with Steering Committee and FN vendors

Page 14: PROJECT OVERVIEW COOLING POND REMOVAL Sydney Tar Ponds & Coke Ovens Clean Up :

First Nations cont’d

• Negotiations progressing between government partners and First Nations on a procurement agreement specific to tar ponds and Coke Ovens clean up

• Agreement expected this fall

Page 15: PROJECT OVERVIEW COOLING POND REMOVAL Sydney Tar Ponds & Coke Ovens Clean Up :

First Nations cont’dLooking beyond the Cooling Pond, options for involvement of First Nations under discussion

Possible additional projects: i.e.: access roads, capping, materials handling

FN Participation

Models

Set AsideSet Aside

Standing OfferStanding Offer

Page 16: PROJECT OVERVIEW COOLING POND REMOVAL Sydney Tar Ponds & Coke Ovens Clean Up :

Local Economic Benefits

Cape Breton content in the clean up is an Agency priority

The way bid packages are scored reflects this

Page 17: PROJECT OVERVIEW COOLING POND REMOVAL Sydney Tar Ponds & Coke Ovens Clean Up :

Benefits - Point AllocationBig picture -

Allocation of Points - Macro100 in total

Benefits

Technical & Costing

15

85

Page 18: PROJECT OVERVIEW COOLING POND REMOVAL Sydney Tar Ponds & Coke Ovens Clean Up :

Benefits - Point Breakdown

+

Labour & Materials

8 points

Community Input

2 points Ownership

5 points

Page 19: PROJECT OVERVIEW COOLING POND REMOVAL Sydney Tar Ponds & Coke Ovens Clean Up :

Clean Up Particulars

• Fundamentally, it’s a big construction project• So, we’ll be needing …

– Aggregates – gravels, stone, clay, till, rip rap– Trucking – Equipment – loaders, excavators, dozers– Operators, labourers, supervisors, testing– Specific materials – liners, pumps, erosion

– Aggregates – gravels, stone, clay, till, rip rap– Trucking – Equipment – loaders, excavators, dozers– Operators, labourers, supervisors, testing– Specific materials – liners, pumps, erosion

Page 20: PROJECT OVERVIEW COOLING POND REMOVAL Sydney Tar Ponds & Coke Ovens Clean Up :

Conclusion

• Significant opportunities

• Know your capacity

• Online business directory

• www.tarpondscleanup.ca

Page 21: PROJECT OVERVIEW COOLING POND REMOVAL Sydney Tar Ponds & Coke Ovens Clean Up :

Questions / Discussion