    Project Name

    PM with Contact details

    BUH with Contact details

    Corp Finance ClearanceODC confirmed by Admin

    No of Users

    SPOC from Project team

    IT SPOC

    Project / Engagement MSA and SOW

    Infosec Clearance

    Isolated ODC/Integrated ODC

    HW/SW requirement with user seat mapping

    ISMT and Backup Strategy Forms shared

    RFCDR/BCPlan

    Tentative Project movement date

    Issues/Concerns if any

    Project movement sign off after completion

  • 8/8/2019 Project Movement 06-9-2010

    2/21

  • 8/8/2019 Project Movement 06-9-2010

    3/21

    S.No Category

    1 Project

    2

    3

    ConnectivityRequirement

    System/ApplicationRequirement

  • 8/8/2019 Project Movement 06-9-2010

    4/21

  • 8/8/2019 Project Movement 06-9-2010

    5/21

    7

    8 Others

    SecurityRequirement

  • 8/8/2019 Project Movement 06-9-2010

    6/21

    IT Services Project Requirement Gathering Questionnaire.

    Questionnaire

    What is the Scope of project work (development, QA / Testing, Support etc) to be done from Offshore?

    What is the duration of the project?

    BUH Name/Email ID

    PM Name/Email ID/Phone Number

    is this requirement for a confirmed Order or for a RFP?

    Mention Number of Resources in this engagement and Resource working hours in this project?

    Do you require dedicated connectivity (IPLC or Internet Link- shared / premium) in this project?

    If IPLC then termination address at Customer end is required?

    Do you require 100% backup connectivity requirement in your project?

    What is the bandwidth requirement in your project?

    Is 24/7 support available at Customer end in terms of any connectivity failure of vpn failure?

    IF Yes,Contact details.

    What is the VPN Infrastructure available at Customer End? ( Pl. mention Make and version)

    Can HCLT use their vpn infrastructure to establish site to site vpn with Customer end VPN infrastructure?

    Is 24/7 HCLT IT support needed? [HCLT provides standard business day support(9am- 7pm) and providesemergency support(24x7) for mission critical services. For certain sites based on the business requirements this

    can be extended subject to funding]

    is Customer looking for setting up a dedicated ODC infrastructure or integrated ODC infrastructure? Pleasecomment on Physical and Logical isolation required in this engagement.

    What are your Project's Connectivity Requirements - VPN or Dedicated Connectivity or both?[We suggest to go inwith multiple modes of connectivity to provide enough redundancy]

    If IPLC, who will place the order for the link? Will we be using our own IP address or are we using customer's IP

    addresses?If dedicated connectivity is needed, provide complete Data Center (minimum two DC's) address of customerincluding telephone nos and PIN code?

    What is the proposed type of authentication to be used in this project (username and passwords, two factorauthentication etc)

    Do we have need for supporting customer during non-Business hours from home? If yes,please share the number of users required to support

  • 8/8/2019 Project Movement 06-9-2010

    7/21

    Where all these customer applications is hosted?

    Is all applications hosted in one region or is it spread across multiple regions?Number of users who require access to this application across the link?

    Is offshore replicated environment is also a requirement in this project?

    Do you foresee any requirement for doing data replication across the link?

    For proprietary applications, more details on the application is needed?

    Is there requirement for doing large file transfers using the link in your project?

    is there requirement to do bi-directional application access in this engagment?

    Is SAN / NAS requirement (large storage) is in the scope for this project?. If yes state the requirementsMention Backup Requirements?

    Scope for DR / BCP requirement in project

    If DR / BCP service is required then state all your DR / BCP requirements?

    Scope for Voice Requirement in this project?

    Hardware / software based voice requirement?

    Mention the user to phone ration required?

    Mention the anticipated call volume during peak hours and normal hours?

    How critical is voice service for the engagement?

    Mention the Server Hardware Requirement?

    Mention the OS requirement?

    Mention the list of applications to be used in this project?

    Mention the number of licenses required for each application?

    Does the project need any dedicated infrastructure servers(Domain Controller,Fileserver etc)

    If answer to previous question is no then will customer ship their vpn device to HCLT to host it in their network? Plsmention vpn make, model etc and will it be pre-configured?

    What are the possible applications to be used / accessed across the link? Will the applications work on links withlatency of 300 to 400 ms?

    Name the type of application access provided to the Offshore team - Citrix based / Terminal based / Client-serverbased application access? [We recommend citrix mode of access when the applications used over the link aredemanding in nature on the network subjected to the feasibility of running applications on citrix environment]

    Will customer be interested in extending the existing VOIP server to offshore for onsiteso that offshore phones can get registered directly to the onsite VOIP server?

    Is hardware requirement can be taken rental or only to bepurchased?

    Who will be providing the licenses for the applications and OS to be used in this project? [please note if theapplications/OS are propriety in nature then customer has to provide the necessary product/security updates. Alsoif the applications/OS requires any key code/authorization code for updation,then customer has to share therelevant information to update the systems]

  • 8/8/2019 Project Movement 06-9-2010

    8/21

    Does the project require redundany in hardware.(eg:Server redundancy,Network equipment redundancy)

    Is there any specific customer security requirement to be adhered?

    Share copy of MSA / Contract / SOW documents with ITS / InfoSec team?

    Who will provide Security systems for protecting the project infrastructure?

    For customer communication via email, is encryption mandatory?

    Please explain the Customer Incident Handling Process?

    Is Internet access permitted?

    Can a Call between HCLT IT and Customer IT team to understand any other specific requirement be scheduled?

    Who will be the IT contact point from customer's side?

    Is there any recommendation for usage of specific security system in the project? If yes, state the product andvendor.

    In this section, you may provide additional inputs that you may have for this requirementwith ITS?

  • 8/8/2019 Project Movement 06-9-2010

    9/21

    ITS / InfoSec Feedback Remarks

    Customer / Project Team

    Feedback

  • 8/8/2019 Project Movement 06-9-2010

    10/21

  • 8/8/2019 Project Movement 06-9-2010

    11/21

  • 8/8/2019 Project Movement 06-9-2010

    12/21

    Sl No: User Name SAP Code

  • 8/8/2019 Project Movement 06-9-2010

    13/21

    User email ID Access Card Number User Contact no:

  • 8/8/2019 Project Movement 06-9-2010

    14/21

    User Seat/Workstation no: Hardware Requirements Software Requirements

  • 8/8/2019 Project Movement 06-9-2010

    15/21

    Type of connectivity required? Admin Access requirement

  • 8/8/2019 Project Movement 06-9-2010

    16/21

    Justification for Admin Access Remote Access requirement

  • 8/8/2019 Project Movement 06-9-2010

    17/21

    Addn IT requirements if anySTD/ISD code required or Not for CiscoPhones?

  • 8/8/2019 Project Movement 06-9-2010

    18/21

    Project folder requirement PM Remarks

    1 Update ISMF 013 - Information Access Request Form

    2 Update ITSF006-Backup Strategy form

    3 Project Folder Approximate Size

    General Information

    1 Please note that by the limit of 20 GB/ project folder. In case more storage

    2 No storage of PST, EXE, Movie files allowed in the server

    3 Changes will be carried as per the change Management specified in the for

    4 Changes will be made only after the approval of PM

    5 Please allow atleast two day notice for the access updation

    6

  • 8/8/2019 Project Movement 06-9-2010

    19/21

    ITS Remarks

    required, Project needs to go for dedicated server storage

    ITSF006-BaStrategy for

    Information AccRequest Form- I

  • 8/8/2019 Project Movement 06-9-2010

    20/21

    kup.doc

    ssSM

  • 8/8/2019 Project Movement 06-9-2010

    21/21