46
Project Management Project Management Tutorial Tutorial

Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

Embed Size (px)

Citation preview

Page 1: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

Project ManagementProject Management Tutorial Tutorial

Page 2: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

ObjectivesObjectives

This tutorial provides an overview of Project

Management. For the full details of our

methodology, download the pdf of the methodology from

this site. There are also templates

available to assist with projects.

Page 3: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

TopicsTopics

What is a Project? Common Project Terms What does a Project Manager do? What’s in a Project? Project Management Processes Getting Started Planning a Project Executing the Plan Finishing the Project

Page 4: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

What is a project?What is a project?

A project is an activity that : is temporary having a start and end

date is unique brings about change has unknown elements, which

therefore create risk

Page 5: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

Generally projects are formed to solve a problem or take advantage of an opportunity. It is difficult to get buy-in from people to assist on a project if it is not delivering a reasonable benefit or solving an annoying problem.

Business as usual activities can often be mistaken for projects, as they may be completed using project methods. Generally it is the uniqueness of the activity that is the deciding factor – do we do this every year? If so, then it is not truly a project – although you can use project methods to get it done.

Page 6: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

QuizQuiz

Building a deck

A restaurant planning a menu

Implementing a new system

Mowing the lawn

Planning a wedding

Setting up a business

Planning a student graduation

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

Yes No

ContinueBack to Topics List

Page 7: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

You are correct.

This is a project because it is a unique, one-off activity

Well done!

Back

Page 8: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

You are correct.

This is not a project because it is not a unique, one-off activity

Well done!

Back

Page 9: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

Sorry, that is not correct.

This is a project because it is a unique, one-off activity

Try again

Back

Page 10: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

Sorry that is not correct.

This is not a project because it is not a unique, one-off activity

Try again

Back

Page 11: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

Common project termsCommon project terms

Deliverables: Tangible ‘things’ that the project produces

Milestones: Dates by which major activities are performed.

Tasks: Also called Actions. Activities undertaken during the project

Risks: Potential problems that may arise Issues: Risks that have happened Gantt Chart: A specific type of chart showing

time and tasks. Usually created by a Project Management programme like MS Project.

Stakeholder: Any person or group of people who may be affected by your project

Page 12: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

Example – Building a deckExample – Building a deck

Deliverables: A plan, a consent form, the deck Milestones:

Tasks:

Plan draftedPlan approved

1 Dec15 Dec

Plan submittedPlan approved

16 Dec15 Jan

Materials purchasedResources bookedEquipment identifiedDeck constructedDeck testedDeck quality approved“Deck warming” completed

16 Jan16 Jan16 Jan19 Jan23 Jan24 Jan28 Jan

Milestone Tasks

Plan drafted Requirement gatheredBest practice researchedDraft 1 preparedDistributed to stakeholders

Plan approved Feedback gatheredAmendments madeFinal plan preparedDistributed to shareholdersSign-off obtained

Page 13: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

Example ContinuedExample Continued

Risks: •Plan is not approved after first round of feedback

•Materials are unavailable at the required time•Resources are not available at the required time•Plan is not given consentFor each you should have a contingency plan, or do some activity that may prevent it happening in the first place. What are some ways these risks could be reduced?

Issues: If any of the above actually happens, then it becomes an issue to solve.

Gantt Chart:

Stakeholder: House owner, Builder, Council, ???

Back to Topics List Continue

Page 14: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

What does a PM do?What does a PM do?

Project managers are essentially jugglers. They must make sure that everything keeps to task, that potential issues are quickly eliminated and the project is delivered on time, all the while making sure everyone knows what is happening and the project quality and budget are acceptable. Specifically they: direct all activities required to successfully meet the

project objectives manage risk – scanning ahead for potential issues

and resolving them before they become a problem solve problems - recommending alternative

approaches to problems that arise and providing guidance to the Project Sponsor

track and report project progress communicate to all stakeholders in the project

Back to Topics List Continue

Page 15: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

What’s in a project?What’s in a project?

There are typically four phases to a project. A large project will move formally through each phase, in a small project some phases may be combined. They may have different names in different organisations, but essentially they are:

Propose Prepare Produce Present

Page 16: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

ProposePropose

In this phase the project moves from an idea through to a project proposal. It will culminate with either a business case or a formal proposal to continue. For a small project this may simply be an acceptance from the budget holder to continue.

The question to be answered is “Are we going to do the right thing?”

Page 17: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

PreparePrepare

In this phase the planning will commence in earnest. The project will be fully scoped, the outcomes designed and resourcing assigned. This phase will finish with a Project Management Plan and completed user requirements, design and test documents.

The question to be answered is “Are we going to do the thing right?”

Page 18: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

ProduceProduce

In this phase the creation of the major deliverable is undertaken – eg build a computer system, implement a vendor computer system, create processes, build a deck. This stage ends with an elegant handover to operational areas who take full responsibility for the outcomes.

The question to be answered is “Are we getting the thing done right?”

Page 19: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

PresentPresent

In this phase the project outcomes are presented back to major stakeholders. It includes a formal handover to support services, a post implementation review that reflects achievements against the business case, future actions and lessons learned, and finally project closure.

The question to be answered is “Did we do the right thing?”

Back to Topics List Continue

Page 20: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

Project Management ProcessesProject Management Processes

During each phase, there are five process groups that Project Management will undergo. InitiatingPlanningExecutingClosingControlling

Page 21: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

InitiatingInitiating

In early phases, types of activities here include scoping the project, preparing terms of reference, engaging sponsors and project teams. In later phases, it is checking that the scope of the project is still valid, that all parties are clear about what is going to be delivered and confirming that the project should still continue.

Activities in this group are: Develop Project Charter (Terms of Reference) Develop Preliminary Project Scope Document Confirmation the project should continue

Page 22: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

PlanningPlanningIn the early phases, this is preparing the Project Management Plan and defining exactly what will happen. In later phases it is ensuring that the earlier planning is still valid, and incorporating any changes in resources or contingencies arising.Activities in this group are:

Develop Project management Plan Scope Planning

Scope definition Create Work Breakdown Structure

Activity Definition Activity Sequencing

Activity Resource Estimating Activity Duration Estimating

Schedule Development Cost Estimating

Cost Budgeting Quality Planning

Human Resource Planning Communications Planning

Risk Management Planning Risk Identification

Qualitative Risk Analysis Quantitative Risk Analysis

Risk Response Planning Plan Purchases and Acquisitions

Plan Contracting

Page 23: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

ExecutingExecuting

In early phases, this is undertaking the actions required to complete the deliverables – maybe the business case, or the user requirements. In later phases this becomes the biggest process, where the major project outcomes are developed and delivered. Assigning resources, communication and quality assurance are major parts of this process group.

Activities in this group are:

•Direct and Manage Project Execution•Perform Quality Assurance•Acquire Project team•Develop Project Team•Information Distribution•Request Seller Responses•Select Sellers

Page 24: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

Monitor and ControlMonitor and Control

During all of the phases and the process groups, regular monitoring and controls are required. These include scope change management, change management, quality control, time management, budget management, risk management and contract administration.

Activities in this group are: Monitor and Control Project Work Integrated Change Control Scope Verification Scope Control Schedule Control Cost Control Perform Quality Control Manage Project Team Performance Reporting Manage Stakeholders Risk Monitoring and Control Contract Administration

Page 25: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

ClosingClosing

In the early phases, this is determining that the deliverables for the phase are complete, before handing over to the next phase. In the Present phase, this would result in the closing of the project itself.

Activities in this group are: Close Project Contract Closure

Page 26: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

TimingTimingAcross the phase, the process groups resemble the first picture.For small projects there will appear to be only one phase (“do project”), and therefore the PM processes will also only be used once. For large projects, where there is a formal handover between the four phases, the PM Processes will repeat for each phase. So in a big project, the Closing Process in Phase 1 - Propose, forms the start of the Initiating Process in Phase 2 – Prepare. In the University environment there will be overlaps, as information collected in one phase is used for another. Understanding the difference between phases and processes is important to understanding how to manage projects. Project Management follows the project management processes, project delivery follows the phases.

Back to Topics List Continue

Page 27: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

Getting StartedGetting Started

Projects start in the Propose phase - the first step is to determine what exactly is the problem or advantage you are hoping to achieve. Identify stakeholders and expectations Gather information from stakeholders as to their

requirements Define exactly the problem you want to solve or the

benefit you want to gain Define scope – how much do we want to do/ what

won’t we do? Complete risk assessment – what is the worst that

could happen? How likely is it?

The Phase ends with a Project Terms of Reference that details what the project will deliver. It is important that a sponsor group signs off this document as it is your mandate to continue with the project. It may also result in an approved Business Case for funding.

Page 28: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

Managing expectationsManaging expectations

When the project is started, you will be meeting with stakeholders, gathering information and requirements – this unfortunately has the added effect of waking up some stakeholders to expect that the project will meet every need they can think of. You will need to manage the message to ensure that they are not disappointed.

The best way to do this is to divide requirements into: Must have Should have Like to have

Get agreement on them, to ensure that expectations are not raised past the level the project can deliver. Generally the must haves will be done, as many should haves will be done as possible and the like to haves may be done if time and cost permit.

Page 29: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

Planning for managing “scope Planning for managing “scope creep” creep” If a requirement can be misinterpreted, then the

probability is that it will be. There will always be those that believe the project is planning to achieve something different than what they expected. It is important then to plan for that.

Define the requirements carefully, and use as many mediums as you need to get a common understanding – picture, graphs, physical models – the more effort you spend now, the less heartache later.

Get key stakeholders to explain back to you what they believe the requirements mean – and not just generally but in detail.

Get a picture in stakeholders minds of what the project will look like when it is done – and clearly articulate this in writing. The project will be completed when……..

Define a process to follow where there is conflict after the Project Charter is signed off and deliverables are completed that were not what was expected.

ContinueBack to Topics List

Page 30: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

Planning a ProjectPlanning a Project

The next phase is Prepare. You need to take the information in the Project Terms of Reference and Risk assessment and come up with a plan of how you will finish the project. In this phase, it helps to always think of what the project will look like when it is finished (keep your eye on the prize). This will help to decide what you need to do to get there.

Page 31: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

Work Breakdown StructuresWork Breakdown Structures

Work Breadkdown Structures (WBS) identify all tasks to complete the project. Start with high level deliverables, and then break each one down into work packages. At the end, you should have a list of tasks that you can then start estimating time and attaching resource to.

Page 32: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

Activity scheduling Activity scheduling

Network Diagrams The most popular method is called Activity on

Node (which is what most computer packages use).

The task (activity) is represented by a node, which also shows the time expected.

Take the list of tasks from your Work Breakdown Structure

Determine any tasks that depend on other tasks.

Attach resources to each task (people cannot do two jobs at once).

Determine the timeline for the project.

Task 120 days

Task 210 days

Task 32 days

Page 33: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

CostingCosting

The easiest way to cost the project is to take the WBS and estimate the costs of each activity. Other considerations include capital costs, disbursements, costs of delays, contingencies.

Page 34: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

Implementation planImplementation plan

This plan details who will be affected, how they will be affected and the plans for transitioning the change. It ensures you have considered training and after change support. What will happen when the project winds up?

Page 35: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

Quality planQuality plan

This plan details the level of quality required in the deliverables. It shows how quality is going to be assured in the project, and what quality control measures you will use. It also may list standards that your deliverables will be measured against (particularly where a product is involved).

Page 36: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

Communications planCommunications plan

The objectives of the Communication Plan are:

Help manage expectations regarding the project.

Ensure methods used for communication will be most effective.

Assure appropriate levels of communication with internal and external project stakeholders.

Provide relevant, accurate, consistent information at all times.

Generate and sustain enthusiasm and support for the project

Page 37: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

What is in a project plan? What is in a project plan?

As much or as little as you need to demonstrate to stakeholders that you have thought of everything, and have a plan to get there.

Your plan may include: Introduction

Overview, Deliverables, Constraints, Definitions Management structure

Project reporting, Communication, Risk Management, Change management

Planning and Control Activity schedule Resource identification, Resource allocation Project Charter, Quality Assurance Plan, Test and/or

Training plans, Implementation Plan.

Back to Topics List Continue

Page 38: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

Executing the PlanExecuting the Plan

The Produce phase is where you actually get on with it. It is the easiest phase to get lost in, and where most projects fail. If your planning has been good, and you have some good change processes in place, it should be easier.

Page 39: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

Developing teams Developing teams

Leadership comes in many forms. As a project manager, you may be expected to lead without formal organisational authority. This is referred to as “conferred authority” – influence without power.

So faced with total responsibility, maximum accountability, minimum authority and shared/limited resources, you must rely on a variety of interpersonal, organisation and political skills to ensure support from within you team and outside it.

Ways to achieve this are: Provide leadership Encourage participation Facilitate communication Anticipate events Use proven PM tools Delegate not abdicate Provide adequate training to grow people Keep records Manage conflict

Page 40: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

““Managing” versus “Doing” Managing” versus “Doing”

If you are a Project manager in an organisation of scarce resources, it is very easy to become the project do-er as well as the manager. You may find that there is little or no project team, functional units who were supposed to supply resource have a crisis and cannot do that, and you end up being the project.

It is important firstly to recognise that this is happening. Once you do, you can request assistance from your Sponsor(s) to change the situation. Once you are the doing the project instead of managing the project, you will find that the PM tasks slip – communication is the first to go, followed quickly by risk management.

Page 41: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

Useful Project Meetings Useful Project Meetings

Useful meetings are facilitated by Project Managers who: Encourage participation Keep people to the point Have a clear agenda Ensure everyone is heard when making

decisions Manages difference of opinion to a

consensus Have clear actions arising from the

meeting

Page 42: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

Change requests and scope Change requests and scope management management Helpful tools for managing change are the

Action and/or Issue register and the Change Control form/register. What these two documents do is help you control the issues/risks/actions that people are raising, and if they will change your project outcomes (time, cost or scope) a change process where the change is identified and approved. Just because someone thinks a change would be a good idea doesn’t mean it should be added to your project. Once you start to deliver something amazing, everyone will want to have a say. The challenge is to manage their expectations without compromising your original plan.

Page 43: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

Status reporting Status reporting

What did we plan to achieve this period? What did we actually achieve? Why is there a difference? What do we plan to achieve next period? How are we managing existing risks? Are there any new risks? What are the current major issues? What are we doing about them? Are there any change requests to be

authorised?

ContinueBack to Topics List

Page 44: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

Finishing the ProjectFinishing the Project

This is the Present phase of a project. A project by definition is a one-off activity, with a start and end date. Otherwise you are said to be engaged in operational activity only, as what you are doing is ongoing. In this phase you can also evaluate the project against your original benefits, and present back to the stakeholders your wonderful achievements in the form of a post implementation review.

Page 45: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

Post Implementation Review Post Implementation Review

Once the project deliverables have been handed over to operational areas, it is helpful to do a review of how the project went, and whether it achieved the results expected.

If a business case was prepared, it can be measured against that, otherwise some useful headings to consider are:

Description of Project Review Process Review Findings Non-Financial Analysis Financial Analysis Detailed Key Results Project Timeline Risk Management Lessons Learned

Page 46: Project Management Tutorial. Objectives This tutorial provides an overview of Project Management. For the full details of our methodology, download the

How to close and stay closed! How to close and stay closed!

It is important that each project gets closed, and there is a simple mechanism for doing this called the Project Closure Statement. This document requires sign-off by the Sponsor Group, and once signed, the only thing left to do is to archive the project documents. Any issues that have not been resolved can be held over for a new project, or handed to an operational area to complete if they agree.

Back to Topics List End