19
Project Management Pembangunan Pabrik Minyak Kelapa Iskandar Muda

Project management grand presentation

Embed Size (px)

Citation preview

Page 1: Project management grand presentation

Project ManagementPembangunan Pabrik Minyak Kelapa

Iskandar Muda

Page 2: Project management grand presentation

Kerangka Manajemen ProyekProject Purpose = Beneficial Change

Works Method

Organizational Structure

Project Objectives

Project Scope of Work

Work Breakdown Structure Linear

Responsibility Matrix / Chart

-Tasks’ Volume-Capacity-Est. Duration

Resource NeedsProject Schedule

Resource Allocation

Unit Cost

TOP fromPrj Owner

TOP toVendor

ProjectCost Budget“S” Curve

Project Cash Out Flow

Project Cash In Flow

Page 3: Project management grand presentation

Project PurposeUntuk membantu petani Kelapa di Malingping-Bayah

(Lebak) dengan menyerap hasil kelapa yang tidak terjual. Selain itu untuk meningkatkan nilai dari

produk unggulan pertanian.

Page 4: Project management grand presentation

Kerangka Manajemen ProyekProject Purpose = Beneficial Change

Works Method

Organizational Structure

Project Objectives

Project Scope of Work

Work Breakdown Structure Linear

Responsibility Matrix / Chart

-Tasks’ Volume-Capacity-Est. Duration

Resource NeedsProject Schedule

Resource Allocation

Unit Cost

TOP fromPrj Owner

TOP toVendor

ProjectCost Budget“S” Curve

Project Cash Out Flow

Project Cash In Flow

Page 5: Project management grand presentation

Project Objectives

Mendirikan pabrik minyak kelapa yang dapat beroperasi dengan kapasitas 4 ton/hari

Dapat beroperasi dalam waktu 6 bulan setelah MoU dengan investor

Anggaran sedapat mungkin kurang dari 700 Juta Rupiah

Page 6: Project management grand presentation

Kerangka Manajemen ProyekProject Purpose = Beneficial Change

Works Method

Organizational Structure

Project Objectives

Project Scope of Work

Work Breakdown Structure Linear

Responsibility Matrix / Chart

-Tasks’ Volume-Capacity-Est. Duration

Resource NeedsProject Schedule

Resource Allocation

Unit Cost

TOP fromPrj Owner

TOP toVendor

ProjectCost Budget“S” Curve

Project Cash Out Flow

Project Cash In Flow

Page 7: Project management grand presentation

Scope of Project

Posisi:

Penggagas & Pemilik Proyek + Pelaksana Harian ke depan

Cakupan1. Mendapatkan investor2. Pembangunan pabrik minyak kelapa dengan kapasitas 4 ton/hari di

Malingping-Bayah (Lebak) 3. Pengadaan mesin dan peralatan sampai uji coba berhasil4. Penyiapan tenaga kerja dan manajemen

Page 8: Project management grand presentation

Kerangka Manajemen ProyekProject Purpose = Beneficial Change

Works Method

Organizational Structure

Project Objectives

Project Scope of Work

Work Breakdown Structure Linear

Responsibility Matrix / Chart

-Tasks’ Volume-Capacity-Est. Duration

Resource NeedsProject Schedule

Resource Allocation

Unit Cost

TOP fromPrj Owner

TOP toVendor

ProjectCost Budget“S” Curve

Project Cash Out Flow

Project Cash In Flow

Page 9: Project management grand presentation

Work Breakdown Structure & Organizational Structure

1. Preliminary Study 1. Mendapatkan Investor 1. Pembangunan Plant 1. Uji coba dan Peresmian2. Mendapatkan Buyer 2. Instalasi Mesin & Peralatan3. Mendapatkan Supplier 3. Perekrutan Karyawan4. Pengurusan Aspek Legal 5. Pencarian Lokasi Plant

Study & Design Preparation

Proyek Pembangunan Pabrik Minyak Kelapa

Build and Installation

Production Ramp-Up

Page 10: Project management grand presentation

Responsibility Matrix

Page 11: Project management grand presentation

Kerangka Manajemen ProyekProject Purpose = Beneficial Change

Works Method

Organizational Structure

Project Objectives

Project Scope of Work

Work Breakdown Structure Linear

Responsibility Matrix / Chart

-Tasks’ Volume-Capacity-Est. Duration

Resource NeedsProject Schedule

Resource Allocation

Unit Cost

TOP fromPrj Owner

TOP toVendor

ProjectCost Budget“S” Curve

Project Cash Out Flow

Project Cash In Flow

Page 12: Project management grand presentation

Gantt Chart

Page 13: Project management grand presentation

Network Diagram

Page 14: Project management grand presentation

Kerangka Manajemen ProyekProject Purpose = Beneficial Change

Works Method

Organizational Structure

Project Objectives

Project Scope of Work

Work Breakdown Structure Linear

Responsibility Matrix / Chart

-Tasks’ Volume-Capacity-Est. Duration

Resource NeedsProject Schedule

Resource Allocation

Unit Cost

TOP fromPrj Owner

TOP toVendor

ProjectCost Budget“S” Curve

Project Cash Out Flow

Project Cash In Flow

Page 15: Project management grand presentation

Resource AllocationPekerjaan: Feasibility Study Volume: 1Satuan:

Sumber Daya SatuanDuration (Week)

Jumlah Biaya Satuan Biaya

Workers Senior Staff manweek 1 100% 875,000Rp 875,000Rp Junior Staff manweek 1 200% 625,000Rp 1,250,000Rp Process Expert manweek 1 875,000Rp -Rp

Total 2,125,000Rp Material Administrasi & Data 300,000Rp

Total 300,000Rp

Transportation Biaya Perjalanan Trip 12 60,000Rp 720,000Rp

Total 720,000Rp

Subcontract % of Contract 120,000,000Rp -Rp Total -Rp

Legal Consultant % of Contract 5% 15,000,000Rp 750,000Rp Total 750,000Rp

Total Direct Cost 3,895,000Rp

Page 16: Project management grand presentation

Resource AllocationSenior Staff Junior Staff Process Expert Contractor Legal Consultant

Rp 875,000 Rp 625,000 Rp 875,000 Rp 120,000,000 Rp 15,000,000

1 Preliminary Study 36 days1.1 Feasibility Study 1 100% 200% 5%1.2 Pencarian tenaga ahli 2 100%1.3 Perancangan Proses 2 100% 100% 100%1.4 Pemilihan Mesin dan peralatan 1 50% 50% 100%2 Buyer 18 days

2.1 Mendapatkan pembeli 2 100%2.2 MoU dengan Buyer 1 100% 5%3 Supply 18 days

3.1 Mendapatkan Supply yang stabil dan terjamin 2 100%3.2 MoU dengan Supplier 1 100% 5%4 Pencarian Lokasi untuk Pabrik 1 100% 100% 5%5 Investor 30 days

5.1 Temu Investor 2 300% 200%5.2 Survey Lokasi bersama investor 1 100% 100%5.3 MoU dengan investor 1 100% 5%5.4 Pencairan dana 1 50%6 Legal 84 days 50% 70%7 Pembangunan Plant 48 days 100% 95%8 Mesin dan Peralatan 36 days

8.1 Pemesanan Mesin dan peralatan 3 50% 50%8.2 Instalasi Mesin dan Peralatan 1 100% 100% 100% 5%8.3 Uji coba 1 100% 100% 100%9 Tenaga Kerja 18 days

9.1 Pencarian tenaga manajemen 2 200% 100%9.2 Pencarian operator dan non-ahli 2 200% 100%9.3 Kontrak kerja dan peraturan 1 100% 5%10 Peresmian Pabrik 1 day 100% 300%

Duration (Week)

TaskWBS

Internal Eksternal

Page 17: Project management grand presentation

Kerangka Manajemen ProyekProject Purpose = Beneficial Change

Works Method

Organizational Structure

Project Objectives

Project Scope of Work

Work Breakdown Structure Linear

Responsibility Matrix / Chart

-Tasks’ Volume-Capacity-Est. Duration

Resource NeedsProject Schedule

Resource Allocation

Unit Cost

TOP fromPrj Owner

TOP toVendor

ProjectCost Budget“S” Curve

Project Cash Out Flow

Project Cash In Flow

Page 18: Project management grand presentation

S-Curve

Page 19: Project management grand presentation

Risk ManagementPreventif Protektif

Membeli perusahaan dengan izin yang sudah lengkap

Memajukan jadwal pengurusan legal lebih awal

Berkordinasi dengan Legal Consultant yang berpengalaman

Pengecekan yang intensif

Tidak mendapatkan lahanMembeli atau menyewa gudang kemudian direnovasi

Pembangunan terlalu mahal

Tidak cukup waktu

Stok tidak adaMajukan tanggal pemesanan

Pengiriman terlambatPemantauan secara intensif (tracking pengiriman)

Spec tidak sesuaiPemilihan dilakukan lebih awal

Kesalahan prosedurKordinasi dengan Process Expert sejak awal

Kerusakan alatPemilihan sesuai dengan process designProses instalasi diawasi dengan seksama termasuk oleh Process ExpertMesin yang dipilih sepaket

Pengadaan Mesin dan peralatan

Jadwal terhambatMengikat kontrak dengan

perusahaan pengadaan mesin

Proses instalasi merupakan bagian dari kontrak

pembelian dari vendor

Lakukan proses penyesuaian atau

modifikasi

Ketidak cocokan peralatan

Uji coba gagal atau instalasi gagal

Instalasi dan Uji coba

Melakukan proses negosiasi

Mentransfer resiko dengan mengontrak konsultan

hukum secara paket, sampai keseluruhan aspek legal

selesai

Tidak dapat berproduksiPembangunan Pabrik Melakukan proses negosiasi

terhadap batasan waktu pembangunan pabrikMembeli pabrik yang sudah

tidak beroperasi

Menggunakan jasa kontraktor secara borongan

Pengurusan Aspek Legal Hukum

Proyek tidak dapat berlanjut atau terhambat

Izin dan aspek legal lainnya ditolak atau terlambat

keluar

MitigasiArea Kritis Resiko Penyebab Transfering