4/9/2018 1 Project Management Centre of Excellence Inc. 2018 © Project Management Centre of Excellence Inc. 2018 © 1 Project Management Essentials Project Management Centre of Excellence Inc. 2018 © Project Management Centre of Excellence Inc. 2018 © Project Management Centre of Excellence Inc. 2011 © 2 Dale received his Doctorate of Project Management from RMIT University in Australia. Dale is President of The Project Management Centre of Excellence Inc. He is the former Executive Director for the BC Government's Project Management Centre of Excellence. Prior to this he was the Assistant Deputy Minster of Business Transformation at the BC Public Service Agency as well as the BC Leadership Centre. Dale holds a PMP and a CMC designation and his volunteer work includes in past positions as President for the Vancouver Island PMI Chapter and CMC. He is also the past Knowledge Lead for PMI Government Special Interest Group. Dale also teaches in the discipline of project management and leadership at the University of Victoria, Royal Roads, UBC, UNBC, York, Athabasca, Jaio Tong Shanghai, Pearl River (Guangzhou) Universities. He has 12 publications to his credit. He is the winner of PMI’s Project of the year.

Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

  • Upload
    others

  • View
    11

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

1

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy1

Project Management Essentials

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2011 copy2

Dale received his Doctorate of Project Management from RMIT University in Australia

Dale is President of The Project Management Centre of Excellence Inc

He is the former Executive Director for the BC Governments Project Management Centre of Excellence Prior to this he was the Assistant Deputy Minster of Business Transformation at the BC Public Service Agency as well as the BC Leadership Centre

Dale holds a PMP and a CMC designation and his volunteer work includes in past positions as President for the Vancouver Island PMI Chapter and CMC He is also the past Knowledge Lead for PMI Government Special Interest Group

Dale also teaches in the discipline of project management and leadership at the University of Victoria Royal Roads UBC UNBC York Athabasca Jaio Tong Shanghai Pearl River (Guangzhou) Universities

He has 12 publications to his credit

He is the winner of PMIrsquos Project of the year

492018

2

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy3

By the end of this Workshop you will be more aware of the importance of

Identifying and selecting successful projects

Establishing a project framework

Developing a project charter (authorization)

Developing a communication plan

Identifying project risk and mitigation strategies

Developing a project plan

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy4

1 Project Management Fundamentals 130 - 200

2 Project Initiation 200 - 230

3 Break 230 - 245

4 Project Planning 245 - 315

5 Project Execution 315 - 330

6 Project Monitoring and Control 330 - 345

7 Project Close-out 345 - 400

8 Wrap-Up Closing Comments 400 - 415

9 Questions 400 - 430

492018

3

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy5

Project Management Fundamentals

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy6

A temporary endeavour undertaken to create a unique product service or result

copyPMI reg PMBOK Guide 2017 Edition

492018

4

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy7

Increase profit

Increase productivity

Market demand

Legislative requirements

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy8

The application of knowledge skills tools and techniques to project activities to meet project requirements

copyPMI reg PMBOK Guide 2017 Edition

492018

5

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy9

Discipline

Project

Management

Science Artbull PMBoK

bull MS Project

bull Technical

Competence

amp KSAs

bull Leadership

bull Change

Management

bull Stakeholder

Relations

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy10

Increased likelihood of success

Reduced duplication

Quicker start up time

Better resource utilization

More effective management information

Better risk management

492018

6

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

492018

7

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy13

Scope

Project Management Centre of Excellence Inc 2018 copy14

Average

Time

Cost

Feature 69

74

59

The project is

completed and

operational but

over budget late

and with fewer

features

Project completed on time

on budget with all

features amp functions

originally specified

The project is cancelled

before completion or

never implemented

492018

8

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

1 On time on budget and

to specifications

2 Meet or exceed

stakeholder expectations

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy16

Senior Management Support

Clear Goals

Competent Project Manager

Adequate Resourcing

Project Management Framework

Change Control System

Project Vision

492018

9

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy17

$

Time

Initiation Planning Close Out

INITIAL CHARTER PLAN DELIVERABLE PIR

Initiation Planning Execution Close Out

INITIAL CHARTER PLAN DELIVERABLE CLOSE OUT REPORT

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy18

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

10

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Stakeholder Management

19

IntegrationManagement

Time Management

Cost Management

QualityManagement

HumanResource

Management

CommunicationManagement

RiskManagement

ProcurementManagement

ScopeManagement

Project Management Centre of Excellence Inc 2018 copy

Scope

Human Resource

Management

Quality

Management

Fixes

Risk

ManagementCommunication

Management

Procurement

Management

Integration

Management

20

Inco

rre

ct

exp

ecta

tio

ns

492018

11

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy21

PM

CustomerClientUser

Project Team members

Management team

Sponsor

PMO

Performing Organization

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Project Sponsor

Project Manager

Project Team Working Groups

StakeholdersSteering Committee

492018

12

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy23

The person that provides

the financial resources in

cash or in kind for the

project and has ultimate

accountability for project

success

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy24

Has overall

responsibility for the success of the project

492018

13

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy25

Consists of all individuals and groups who will be part of andor affected by the results of the

project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy26

Executive Director

Manger of

Functional Area 2

Manager of

Functional Area 3

Manager of

Functional Area 1

Manager Of

Functional Area 2

Resource Resource

Resource

Resource for

Project 3

Resource for

Project 3

Resource

Project Manager

for

Project 3

Resource

Resource for

Project 3

Resource

Resource

Resource for

Project 3

492018

14

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy27

1 What is a project

2 What is project management

3 What is a lifecycle

4 What are the 4 phases

5 What are the 5 processes

6 Who are the key stakeholders

7 What are the 10 knowledge areas

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy28

Defines and authorizes the project or a project phase

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

15

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy29

Project Selection

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy30

Project definition (preliminary scope statement)

Product service or result

Acceptance criteria

Requirements

Assumptions and constraints

492018

16

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy31

Project Management Centre of Excellence Inc 2018 copyApril 9 2018

32

492018

17

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy33

1 Right Need

2 Right Solution

3 Right Way

4 Right Benefit

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy34

Mandatory

Legislated

Discretionary

Business

End user

Technical

492018

18

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy35

Do we want a Project Manager or a Project Leader

Can a certified PMP Project Manager successfully manage any project

What Key PM skills do you need

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

ManagementLeadership

S

T

E

W

A

R

D

S

H

I

P

492018

19

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy37

Team Building

Coordination Skills

Interpersonal Skills

Communication Skills

Conflict Resolution Skills

Analytical Thinking

Strategic Thinking

Trouble Shooting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Trust

Influence

Negotiate

Awareness

38Project Management Centre of Excellence Inc

492018

20

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Trust = Speed Cost

OR

Trust = Speed Cost

Project Management Centre of Excellence Inc 2018 copy40

492018

21

1 Predictability

2 Reciprocation

3 Consistency and Commitment

4 Social Evidence

5 Authority

6 Liking

7 Scarcity

8 Self-interest

Project Management Centre of Excellence Inc 2018 copy492018Project Management Centre of Excellence Inc copy 2014

42

492018

22

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy43

Project Management Centre of Excellence Inc

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy44

Project Charter

492018

23

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy45

What is the what

What is the why

4Rs

Project Manager or Project Leader

Preliminary Scope Statement

Output ndash Project Charter

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy46

The processes performed to define and mature the project scope develop the project management plan and identify and schedule the project activities that

occur within the project Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

24

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Stakeholder Management

47

IntegrationManagement

Time Management

Cost Management

QualityManagement

HumanResource

Management

CommunicationManagement

RiskManagement

ProcurementManagement

ScopeManagement

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy48

Deliver the project results

492018

25

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy49

Specific

Measurable

Agreed-upon

Realistic

Time component

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy50

In-Scope Out of Scope

Includes both

492018

26

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy52

Plan and hold an event

Start

492018

27

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy53

Task A Task BFSbull Finish to Start

bull Finish to Finish Task C

Task D

FF

bull Start to Start Task E

Task F

SS

bull Start to Finish Task G Task HSF

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy54

CP= the sequence of schedule activities that determines the duration of the project

CPM-the longest path through the project forms the critical path and is also the shortest time in which a project can be completed

CPM=Forward andor backward pass

492018

28

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy55

B

Start

A

C

Finish

E

F

D

2 frac12 day float

BD

2

1 8

3 4 5 6 7

In Days

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy56

Who does the work

Select project team

Roles and Responsibilities Matrix

RACI chart

Resources can be internal or external

492018

29

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy57

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy58

35 h

20 h 15 h

30 h 35 h 35 h

25 h

5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for Bob

Hou

rs W

ork

ed

Ove

rtim

e

492018

30

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy59

35 h

20 h 15 h

30 h 35 h 35 h

20 h5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for BobH

ou

rs W

ork

ed

Ove

rtim

e

5 h

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy60

Day 1 Day 2 Day 3 Day 4 Day 6Day 5

1 brick layer

to do 6 days

of work will

take 6 days

2 brick layer

to do 6 days

of work will

take 3 days

492018

31

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy61

The planned dates for performing schedule activities and the planned dates for meeting

schedule milestones

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy62

De-scoping

ndash Analyzing alternatives on the critical path to determine how to reduce the schedule for the least amount of cost

ndash Not always a viable alternative

Crashing

ndash Analyzing the critical path to determine where to reduce the schedule for the least amount of cost while bring extra resources on

ndash Not always a viable alternative

Fast-Tracking

ndash Phases or activities that would have normally being done in sequence are done in parallel

ndash Can result in rework and increased risk

ndash Requires 3 X the amount of planning

Least $

A B

B

492018

32

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy63

Estimating

Budget preparation

Forecasting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy64

Co

st

Project target Cost

Time

Performance

Measurement

Baseline

Define the Work

Define the

Baseline Budget

Define the

Baseline ScheduleContingency

Budget

492018

33

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy65

Order of magnitude

Budget

Definitive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy66

Top down

Analogous

Parametric

Vendor bids

Bottom up

Detailed (piece by piece)

Three point or PERT

492018

34

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy67

The How

What is In and Out of Scope (detailed)

All the Work and only the Work

Network Diagram

Estimating

Critical Path

Output ndash Project Plan

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy68

Those processes performed

to complete the work

defined in the project

management plan to satisfy the project specifications

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

35

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy69

Destructive

Intervention

Constructive

Opportunity

Influence of

Stakeholders

and

Opportunity

to add value

Cost

Curve

$

Time

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy70

An uncertain event or condition

that if it occurs has a positive

or negative effect on one or

more of the project objectives

such as scope schedule

cost and quality

copyPMBOK regGuide Sixth Edition

492018

36

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy71

ldquoIncludes processes concerned with conducting risk

management planning identification analysis

responses and monitoring and control on a projectrdquo

copyPMBOK regGuide Sixth Edition

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Before the risk

Focus on prevention amp

planning

After the risk

Focus on recovery

Project

Start Project

Finish

Avoid Mitigate or Transfer Risks Use contingency plans

RiskManagement

492018

37

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy73

HighLow Impact

Hig

h

Low

Threaten

Failure

Minor

impactBig Impact if Occurs

ldquoEarthquakerdquo

Disruptive

ldquoDeath by

1000 cutsrdquo

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy74

Minimizes reactive crisis management

Increases likelihood of project success

Increases profitability

Prevents events impacting triple constraints

492018

38

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy75

1 Project Purpose

2 Objectives

3 Identified Risks

4 Risk Assessment

5 Risk Prevention

6 Risk Mitigation

7 Resources

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy76

492018

39

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy77

Work with your team and sponsor to identify stakeholders

Brainstorming works to develop a list that can be reviewed and finalized by the team

Key Stakeholders will usually emerge on their own

Stakeholders are persons and

organizations whose interests may be

positively or negatively affected by the

execution or completion of the project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy78

Ask each stakeholder 2 questions

bullWhat are your three major expectations from this project

bullWhat are your three major concerns related to this project

492018

40

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy79

Keep InformedMonitor(Minimal effort)

Manage Relationship

Closely

Keep Satisfied

InterestLow High

Low

High

Power

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy80

1 Analysis What do they need to know amp what do we want to say

1 Decide Communication Objectives2 Determine Vulnerabilities amp Issues3 Develop Key Messages4 Perform Stakeholder Analysis (interests concerns)

2 Design amp Build What methods and tools should we use

1 Build Communication Vehicles (reports websites etc)

3 Develop Plan Who How and When should they receive it

1 Develop Communication Plan 2 Update Overall Workplan for Communication Activities

4 Do it1 Execute Communication Plan2 Modify amp Adjust as needed

492018

41

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy81

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy82

1 Project Purpose

2 Objectives

3 Potential Issues

4 Key Messages

5 AudiencesStakeholders

6 Communication Vehicles

7 Communication Plan Matrix

8 Resources

492018

42

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy83

Planned the Work Now Work the Plan

But What IF (Risk Management)

85 of what PMs do is Communication

Stakeholder Management is Critical to Project

Success

Output ndash Unique product service delivery or

result

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy84

Those processes required to

track review and regulate the

progress and performance of

the project identify any areas in

which changes to the plan are

required and initiate the

corresponding changes

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

43

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy85

Is daily monitoring at the team level of resources tasks and schedule It is hellip

A vital component of tracking and managing progress

Managing the triple constraints

Relatively simple ldquouser friendlyrdquo and inexpensive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy86

Tasks

Requirements

Timing and performance

Resource utilization and outsourcing

Scope deliverables completion and product quality

Process improvement possibilities and lessons learned

Schedule and cost performance

492018

44

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy87

Initiate Assess Resolve CloseApprove

Senior team

a change

Senior team

member initiates

a change

Project manager

accepts or rejects

Project manager

accepts or rejects

change request

Change Analyst

makes assessment of

the change and gives

recommendations

Managers acceptChange Analyst

makes assessment of

the change and gives

recommendations

or reject the

change based on

the assessment

and

Managers accept

or reject the

change based on

the assessment

and

recommendations Project manager

creates and assigns

tasks if necessary

and updates project

plan

Document

closureReject

Accept

Accept

Reject

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy88

Project

Phase 1

Phase 2

Phase 3

Stage

Gate

Planning

Go No Go Decisions

492018

45

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy89

Today

Planned

Burned

Earned

Time

Co

st

CV

Planned

Finished

Actual

Finished

Late

Over

Budget

Cost Variance (CV) = Earned ndash Burned

Schedule Variance (SV) = Earned ndash Planned

SV

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy90

complete to date

Dashboard ndash scope quality time budget

Milestones and deliverables

Target revised complete

Budget

Approved spent to date estimated cost of work remaining estimated total cost

Major Risks amp Issues requiring reviewdecision

Accomplishments Plans for Next Period

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 2: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

2

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy3

By the end of this Workshop you will be more aware of the importance of

Identifying and selecting successful projects

Establishing a project framework

Developing a project charter (authorization)

Developing a communication plan

Identifying project risk and mitigation strategies

Developing a project plan

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy4

1 Project Management Fundamentals 130 - 200

2 Project Initiation 200 - 230

3 Break 230 - 245

4 Project Planning 245 - 315

5 Project Execution 315 - 330

6 Project Monitoring and Control 330 - 345

7 Project Close-out 345 - 400

8 Wrap-Up Closing Comments 400 - 415

9 Questions 400 - 430

492018

3

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy5

Project Management Fundamentals

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy6

A temporary endeavour undertaken to create a unique product service or result

copyPMI reg PMBOK Guide 2017 Edition

492018

4

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy7

Increase profit

Increase productivity

Market demand

Legislative requirements

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy8

The application of knowledge skills tools and techniques to project activities to meet project requirements

copyPMI reg PMBOK Guide 2017 Edition

492018

5

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy9

Discipline

Project

Management

Science Artbull PMBoK

bull MS Project

bull Technical

Competence

amp KSAs

bull Leadership

bull Change

Management

bull Stakeholder

Relations

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy10

Increased likelihood of success

Reduced duplication

Quicker start up time

Better resource utilization

More effective management information

Better risk management

492018

6

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

492018

7

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy13

Scope

Project Management Centre of Excellence Inc 2018 copy14

Average

Time

Cost

Feature 69

74

59

The project is

completed and

operational but

over budget late

and with fewer

features

Project completed on time

on budget with all

features amp functions

originally specified

The project is cancelled

before completion or

never implemented

492018

8

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

1 On time on budget and

to specifications

2 Meet or exceed

stakeholder expectations

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy16

Senior Management Support

Clear Goals

Competent Project Manager

Adequate Resourcing

Project Management Framework

Change Control System

Project Vision

492018

9

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy17

$

Time

Initiation Planning Close Out

INITIAL CHARTER PLAN DELIVERABLE PIR

Initiation Planning Execution Close Out

INITIAL CHARTER PLAN DELIVERABLE CLOSE OUT REPORT

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy18

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

10

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Stakeholder Management

19

IntegrationManagement

Time Management

Cost Management

QualityManagement

HumanResource

Management

CommunicationManagement

RiskManagement

ProcurementManagement

ScopeManagement

Project Management Centre of Excellence Inc 2018 copy

Scope

Human Resource

Management

Quality

Management

Fixes

Risk

ManagementCommunication

Management

Procurement

Management

Integration

Management

20

Inco

rre

ct

exp

ecta

tio

ns

492018

11

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy21

PM

CustomerClientUser

Project Team members

Management team

Sponsor

PMO

Performing Organization

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Project Sponsor

Project Manager

Project Team Working Groups

StakeholdersSteering Committee

492018

12

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy23

The person that provides

the financial resources in

cash or in kind for the

project and has ultimate

accountability for project

success

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy24

Has overall

responsibility for the success of the project

492018

13

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy25

Consists of all individuals and groups who will be part of andor affected by the results of the

project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy26

Executive Director

Manger of

Functional Area 2

Manager of

Functional Area 3

Manager of

Functional Area 1

Manager Of

Functional Area 2

Resource Resource

Resource

Resource for

Project 3

Resource for

Project 3

Resource

Project Manager

for

Project 3

Resource

Resource for

Project 3

Resource

Resource

Resource for

Project 3

492018

14

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy27

1 What is a project

2 What is project management

3 What is a lifecycle

4 What are the 4 phases

5 What are the 5 processes

6 Who are the key stakeholders

7 What are the 10 knowledge areas

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy28

Defines and authorizes the project or a project phase

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

15

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy29

Project Selection

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy30

Project definition (preliminary scope statement)

Product service or result

Acceptance criteria

Requirements

Assumptions and constraints

492018

16

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy31

Project Management Centre of Excellence Inc 2018 copyApril 9 2018

32

492018

17

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy33

1 Right Need

2 Right Solution

3 Right Way

4 Right Benefit

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy34

Mandatory

Legislated

Discretionary

Business

End user

Technical

492018

18

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy35

Do we want a Project Manager or a Project Leader

Can a certified PMP Project Manager successfully manage any project

What Key PM skills do you need

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

ManagementLeadership

S

T

E

W

A

R

D

S

H

I

P

492018

19

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy37

Team Building

Coordination Skills

Interpersonal Skills

Communication Skills

Conflict Resolution Skills

Analytical Thinking

Strategic Thinking

Trouble Shooting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Trust

Influence

Negotiate

Awareness

38Project Management Centre of Excellence Inc

492018

20

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Trust = Speed Cost

OR

Trust = Speed Cost

Project Management Centre of Excellence Inc 2018 copy40

492018

21

1 Predictability

2 Reciprocation

3 Consistency and Commitment

4 Social Evidence

5 Authority

6 Liking

7 Scarcity

8 Self-interest

Project Management Centre of Excellence Inc 2018 copy492018Project Management Centre of Excellence Inc copy 2014

42

492018

22

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy43

Project Management Centre of Excellence Inc

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy44

Project Charter

492018

23

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy45

What is the what

What is the why

4Rs

Project Manager or Project Leader

Preliminary Scope Statement

Output ndash Project Charter

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy46

The processes performed to define and mature the project scope develop the project management plan and identify and schedule the project activities that

occur within the project Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

24

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Stakeholder Management

47

IntegrationManagement

Time Management

Cost Management

QualityManagement

HumanResource

Management

CommunicationManagement

RiskManagement

ProcurementManagement

ScopeManagement

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy48

Deliver the project results

492018

25

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy49

Specific

Measurable

Agreed-upon

Realistic

Time component

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy50

In-Scope Out of Scope

Includes both

492018

26

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy52

Plan and hold an event

Start

492018

27

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy53

Task A Task BFSbull Finish to Start

bull Finish to Finish Task C

Task D

FF

bull Start to Start Task E

Task F

SS

bull Start to Finish Task G Task HSF

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy54

CP= the sequence of schedule activities that determines the duration of the project

CPM-the longest path through the project forms the critical path and is also the shortest time in which a project can be completed

CPM=Forward andor backward pass

492018

28

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy55

B

Start

A

C

Finish

E

F

D

2 frac12 day float

BD

2

1 8

3 4 5 6 7

In Days

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy56

Who does the work

Select project team

Roles and Responsibilities Matrix

RACI chart

Resources can be internal or external

492018

29

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy57

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy58

35 h

20 h 15 h

30 h 35 h 35 h

25 h

5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for Bob

Hou

rs W

ork

ed

Ove

rtim

e

492018

30

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy59

35 h

20 h 15 h

30 h 35 h 35 h

20 h5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for BobH

ou

rs W

ork

ed

Ove

rtim

e

5 h

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy60

Day 1 Day 2 Day 3 Day 4 Day 6Day 5

1 brick layer

to do 6 days

of work will

take 6 days

2 brick layer

to do 6 days

of work will

take 3 days

492018

31

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy61

The planned dates for performing schedule activities and the planned dates for meeting

schedule milestones

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy62

De-scoping

ndash Analyzing alternatives on the critical path to determine how to reduce the schedule for the least amount of cost

ndash Not always a viable alternative

Crashing

ndash Analyzing the critical path to determine where to reduce the schedule for the least amount of cost while bring extra resources on

ndash Not always a viable alternative

Fast-Tracking

ndash Phases or activities that would have normally being done in sequence are done in parallel

ndash Can result in rework and increased risk

ndash Requires 3 X the amount of planning

Least $

A B

B

492018

32

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy63

Estimating

Budget preparation

Forecasting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy64

Co

st

Project target Cost

Time

Performance

Measurement

Baseline

Define the Work

Define the

Baseline Budget

Define the

Baseline ScheduleContingency

Budget

492018

33

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy65

Order of magnitude

Budget

Definitive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy66

Top down

Analogous

Parametric

Vendor bids

Bottom up

Detailed (piece by piece)

Three point or PERT

492018

34

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy67

The How

What is In and Out of Scope (detailed)

All the Work and only the Work

Network Diagram

Estimating

Critical Path

Output ndash Project Plan

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy68

Those processes performed

to complete the work

defined in the project

management plan to satisfy the project specifications

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

35

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy69

Destructive

Intervention

Constructive

Opportunity

Influence of

Stakeholders

and

Opportunity

to add value

Cost

Curve

$

Time

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy70

An uncertain event or condition

that if it occurs has a positive

or negative effect on one or

more of the project objectives

such as scope schedule

cost and quality

copyPMBOK regGuide Sixth Edition

492018

36

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy71

ldquoIncludes processes concerned with conducting risk

management planning identification analysis

responses and monitoring and control on a projectrdquo

copyPMBOK regGuide Sixth Edition

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Before the risk

Focus on prevention amp

planning

After the risk

Focus on recovery

Project

Start Project

Finish

Avoid Mitigate or Transfer Risks Use contingency plans

RiskManagement

492018

37

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy73

HighLow Impact

Hig

h

Low

Threaten

Failure

Minor

impactBig Impact if Occurs

ldquoEarthquakerdquo

Disruptive

ldquoDeath by

1000 cutsrdquo

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy74

Minimizes reactive crisis management

Increases likelihood of project success

Increases profitability

Prevents events impacting triple constraints

492018

38

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy75

1 Project Purpose

2 Objectives

3 Identified Risks

4 Risk Assessment

5 Risk Prevention

6 Risk Mitigation

7 Resources

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy76

492018

39

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy77

Work with your team and sponsor to identify stakeholders

Brainstorming works to develop a list that can be reviewed and finalized by the team

Key Stakeholders will usually emerge on their own

Stakeholders are persons and

organizations whose interests may be

positively or negatively affected by the

execution or completion of the project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy78

Ask each stakeholder 2 questions

bullWhat are your three major expectations from this project

bullWhat are your three major concerns related to this project

492018

40

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy79

Keep InformedMonitor(Minimal effort)

Manage Relationship

Closely

Keep Satisfied

InterestLow High

Low

High

Power

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy80

1 Analysis What do they need to know amp what do we want to say

1 Decide Communication Objectives2 Determine Vulnerabilities amp Issues3 Develop Key Messages4 Perform Stakeholder Analysis (interests concerns)

2 Design amp Build What methods and tools should we use

1 Build Communication Vehicles (reports websites etc)

3 Develop Plan Who How and When should they receive it

1 Develop Communication Plan 2 Update Overall Workplan for Communication Activities

4 Do it1 Execute Communication Plan2 Modify amp Adjust as needed

492018

41

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy81

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy82

1 Project Purpose

2 Objectives

3 Potential Issues

4 Key Messages

5 AudiencesStakeholders

6 Communication Vehicles

7 Communication Plan Matrix

8 Resources

492018

42

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy83

Planned the Work Now Work the Plan

But What IF (Risk Management)

85 of what PMs do is Communication

Stakeholder Management is Critical to Project

Success

Output ndash Unique product service delivery or

result

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy84

Those processes required to

track review and regulate the

progress and performance of

the project identify any areas in

which changes to the plan are

required and initiate the

corresponding changes

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

43

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy85

Is daily monitoring at the team level of resources tasks and schedule It is hellip

A vital component of tracking and managing progress

Managing the triple constraints

Relatively simple ldquouser friendlyrdquo and inexpensive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy86

Tasks

Requirements

Timing and performance

Resource utilization and outsourcing

Scope deliverables completion and product quality

Process improvement possibilities and lessons learned

Schedule and cost performance

492018

44

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy87

Initiate Assess Resolve CloseApprove

Senior team

a change

Senior team

member initiates

a change

Project manager

accepts or rejects

Project manager

accepts or rejects

change request

Change Analyst

makes assessment of

the change and gives

recommendations

Managers acceptChange Analyst

makes assessment of

the change and gives

recommendations

or reject the

change based on

the assessment

and

Managers accept

or reject the

change based on

the assessment

and

recommendations Project manager

creates and assigns

tasks if necessary

and updates project

plan

Document

closureReject

Accept

Accept

Reject

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy88

Project

Phase 1

Phase 2

Phase 3

Stage

Gate

Planning

Go No Go Decisions

492018

45

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy89

Today

Planned

Burned

Earned

Time

Co

st

CV

Planned

Finished

Actual

Finished

Late

Over

Budget

Cost Variance (CV) = Earned ndash Burned

Schedule Variance (SV) = Earned ndash Planned

SV

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy90

complete to date

Dashboard ndash scope quality time budget

Milestones and deliverables

Target revised complete

Budget

Approved spent to date estimated cost of work remaining estimated total cost

Major Risks amp Issues requiring reviewdecision

Accomplishments Plans for Next Period

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 3: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

3

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy5

Project Management Fundamentals

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy6

A temporary endeavour undertaken to create a unique product service or result

copyPMI reg PMBOK Guide 2017 Edition

492018

4

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy7

Increase profit

Increase productivity

Market demand

Legislative requirements

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy8

The application of knowledge skills tools and techniques to project activities to meet project requirements

copyPMI reg PMBOK Guide 2017 Edition

492018

5

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy9

Discipline

Project

Management

Science Artbull PMBoK

bull MS Project

bull Technical

Competence

amp KSAs

bull Leadership

bull Change

Management

bull Stakeholder

Relations

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy10

Increased likelihood of success

Reduced duplication

Quicker start up time

Better resource utilization

More effective management information

Better risk management

492018

6

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

492018

7

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy13

Scope

Project Management Centre of Excellence Inc 2018 copy14

Average

Time

Cost

Feature 69

74

59

The project is

completed and

operational but

over budget late

and with fewer

features

Project completed on time

on budget with all

features amp functions

originally specified

The project is cancelled

before completion or

never implemented

492018

8

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

1 On time on budget and

to specifications

2 Meet or exceed

stakeholder expectations

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy16

Senior Management Support

Clear Goals

Competent Project Manager

Adequate Resourcing

Project Management Framework

Change Control System

Project Vision

492018

9

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy17

$

Time

Initiation Planning Close Out

INITIAL CHARTER PLAN DELIVERABLE PIR

Initiation Planning Execution Close Out

INITIAL CHARTER PLAN DELIVERABLE CLOSE OUT REPORT

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy18

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

10

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Stakeholder Management

19

IntegrationManagement

Time Management

Cost Management

QualityManagement

HumanResource

Management

CommunicationManagement

RiskManagement

ProcurementManagement

ScopeManagement

Project Management Centre of Excellence Inc 2018 copy

Scope

Human Resource

Management

Quality

Management

Fixes

Risk

ManagementCommunication

Management

Procurement

Management

Integration

Management

20

Inco

rre

ct

exp

ecta

tio

ns

492018

11

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy21

PM

CustomerClientUser

Project Team members

Management team

Sponsor

PMO

Performing Organization

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Project Sponsor

Project Manager

Project Team Working Groups

StakeholdersSteering Committee

492018

12

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy23

The person that provides

the financial resources in

cash or in kind for the

project and has ultimate

accountability for project

success

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy24

Has overall

responsibility for the success of the project

492018

13

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy25

Consists of all individuals and groups who will be part of andor affected by the results of the

project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy26

Executive Director

Manger of

Functional Area 2

Manager of

Functional Area 3

Manager of

Functional Area 1

Manager Of

Functional Area 2

Resource Resource

Resource

Resource for

Project 3

Resource for

Project 3

Resource

Project Manager

for

Project 3

Resource

Resource for

Project 3

Resource

Resource

Resource for

Project 3

492018

14

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy27

1 What is a project

2 What is project management

3 What is a lifecycle

4 What are the 4 phases

5 What are the 5 processes

6 Who are the key stakeholders

7 What are the 10 knowledge areas

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy28

Defines and authorizes the project or a project phase

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

15

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy29

Project Selection

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy30

Project definition (preliminary scope statement)

Product service or result

Acceptance criteria

Requirements

Assumptions and constraints

492018

16

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy31

Project Management Centre of Excellence Inc 2018 copyApril 9 2018

32

492018

17

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy33

1 Right Need

2 Right Solution

3 Right Way

4 Right Benefit

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy34

Mandatory

Legislated

Discretionary

Business

End user

Technical

492018

18

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy35

Do we want a Project Manager or a Project Leader

Can a certified PMP Project Manager successfully manage any project

What Key PM skills do you need

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

ManagementLeadership

S

T

E

W

A

R

D

S

H

I

P

492018

19

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy37

Team Building

Coordination Skills

Interpersonal Skills

Communication Skills

Conflict Resolution Skills

Analytical Thinking

Strategic Thinking

Trouble Shooting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Trust

Influence

Negotiate

Awareness

38Project Management Centre of Excellence Inc

492018

20

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Trust = Speed Cost

OR

Trust = Speed Cost

Project Management Centre of Excellence Inc 2018 copy40

492018

21

1 Predictability

2 Reciprocation

3 Consistency and Commitment

4 Social Evidence

5 Authority

6 Liking

7 Scarcity

8 Self-interest

Project Management Centre of Excellence Inc 2018 copy492018Project Management Centre of Excellence Inc copy 2014

42

492018

22

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy43

Project Management Centre of Excellence Inc

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy44

Project Charter

492018

23

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy45

What is the what

What is the why

4Rs

Project Manager or Project Leader

Preliminary Scope Statement

Output ndash Project Charter

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy46

The processes performed to define and mature the project scope develop the project management plan and identify and schedule the project activities that

occur within the project Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

24

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Stakeholder Management

47

IntegrationManagement

Time Management

Cost Management

QualityManagement

HumanResource

Management

CommunicationManagement

RiskManagement

ProcurementManagement

ScopeManagement

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy48

Deliver the project results

492018

25

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy49

Specific

Measurable

Agreed-upon

Realistic

Time component

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy50

In-Scope Out of Scope

Includes both

492018

26

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy52

Plan and hold an event

Start

492018

27

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy53

Task A Task BFSbull Finish to Start

bull Finish to Finish Task C

Task D

FF

bull Start to Start Task E

Task F

SS

bull Start to Finish Task G Task HSF

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy54

CP= the sequence of schedule activities that determines the duration of the project

CPM-the longest path through the project forms the critical path and is also the shortest time in which a project can be completed

CPM=Forward andor backward pass

492018

28

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy55

B

Start

A

C

Finish

E

F

D

2 frac12 day float

BD

2

1 8

3 4 5 6 7

In Days

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy56

Who does the work

Select project team

Roles and Responsibilities Matrix

RACI chart

Resources can be internal or external

492018

29

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy57

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy58

35 h

20 h 15 h

30 h 35 h 35 h

25 h

5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for Bob

Hou

rs W

ork

ed

Ove

rtim

e

492018

30

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy59

35 h

20 h 15 h

30 h 35 h 35 h

20 h5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for BobH

ou

rs W

ork

ed

Ove

rtim

e

5 h

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy60

Day 1 Day 2 Day 3 Day 4 Day 6Day 5

1 brick layer

to do 6 days

of work will

take 6 days

2 brick layer

to do 6 days

of work will

take 3 days

492018

31

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy61

The planned dates for performing schedule activities and the planned dates for meeting

schedule milestones

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy62

De-scoping

ndash Analyzing alternatives on the critical path to determine how to reduce the schedule for the least amount of cost

ndash Not always a viable alternative

Crashing

ndash Analyzing the critical path to determine where to reduce the schedule for the least amount of cost while bring extra resources on

ndash Not always a viable alternative

Fast-Tracking

ndash Phases or activities that would have normally being done in sequence are done in parallel

ndash Can result in rework and increased risk

ndash Requires 3 X the amount of planning

Least $

A B

B

492018

32

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy63

Estimating

Budget preparation

Forecasting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy64

Co

st

Project target Cost

Time

Performance

Measurement

Baseline

Define the Work

Define the

Baseline Budget

Define the

Baseline ScheduleContingency

Budget

492018

33

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy65

Order of magnitude

Budget

Definitive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy66

Top down

Analogous

Parametric

Vendor bids

Bottom up

Detailed (piece by piece)

Three point or PERT

492018

34

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy67

The How

What is In and Out of Scope (detailed)

All the Work and only the Work

Network Diagram

Estimating

Critical Path

Output ndash Project Plan

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy68

Those processes performed

to complete the work

defined in the project

management plan to satisfy the project specifications

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

35

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy69

Destructive

Intervention

Constructive

Opportunity

Influence of

Stakeholders

and

Opportunity

to add value

Cost

Curve

$

Time

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy70

An uncertain event or condition

that if it occurs has a positive

or negative effect on one or

more of the project objectives

such as scope schedule

cost and quality

copyPMBOK regGuide Sixth Edition

492018

36

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy71

ldquoIncludes processes concerned with conducting risk

management planning identification analysis

responses and monitoring and control on a projectrdquo

copyPMBOK regGuide Sixth Edition

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Before the risk

Focus on prevention amp

planning

After the risk

Focus on recovery

Project

Start Project

Finish

Avoid Mitigate or Transfer Risks Use contingency plans

RiskManagement

492018

37

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy73

HighLow Impact

Hig

h

Low

Threaten

Failure

Minor

impactBig Impact if Occurs

ldquoEarthquakerdquo

Disruptive

ldquoDeath by

1000 cutsrdquo

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy74

Minimizes reactive crisis management

Increases likelihood of project success

Increases profitability

Prevents events impacting triple constraints

492018

38

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy75

1 Project Purpose

2 Objectives

3 Identified Risks

4 Risk Assessment

5 Risk Prevention

6 Risk Mitigation

7 Resources

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy76

492018

39

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy77

Work with your team and sponsor to identify stakeholders

Brainstorming works to develop a list that can be reviewed and finalized by the team

Key Stakeholders will usually emerge on their own

Stakeholders are persons and

organizations whose interests may be

positively or negatively affected by the

execution or completion of the project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy78

Ask each stakeholder 2 questions

bullWhat are your three major expectations from this project

bullWhat are your three major concerns related to this project

492018

40

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy79

Keep InformedMonitor(Minimal effort)

Manage Relationship

Closely

Keep Satisfied

InterestLow High

Low

High

Power

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy80

1 Analysis What do they need to know amp what do we want to say

1 Decide Communication Objectives2 Determine Vulnerabilities amp Issues3 Develop Key Messages4 Perform Stakeholder Analysis (interests concerns)

2 Design amp Build What methods and tools should we use

1 Build Communication Vehicles (reports websites etc)

3 Develop Plan Who How and When should they receive it

1 Develop Communication Plan 2 Update Overall Workplan for Communication Activities

4 Do it1 Execute Communication Plan2 Modify amp Adjust as needed

492018

41

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy81

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy82

1 Project Purpose

2 Objectives

3 Potential Issues

4 Key Messages

5 AudiencesStakeholders

6 Communication Vehicles

7 Communication Plan Matrix

8 Resources

492018

42

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy83

Planned the Work Now Work the Plan

But What IF (Risk Management)

85 of what PMs do is Communication

Stakeholder Management is Critical to Project

Success

Output ndash Unique product service delivery or

result

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy84

Those processes required to

track review and regulate the

progress and performance of

the project identify any areas in

which changes to the plan are

required and initiate the

corresponding changes

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

43

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy85

Is daily monitoring at the team level of resources tasks and schedule It is hellip

A vital component of tracking and managing progress

Managing the triple constraints

Relatively simple ldquouser friendlyrdquo and inexpensive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy86

Tasks

Requirements

Timing and performance

Resource utilization and outsourcing

Scope deliverables completion and product quality

Process improvement possibilities and lessons learned

Schedule and cost performance

492018

44

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy87

Initiate Assess Resolve CloseApprove

Senior team

a change

Senior team

member initiates

a change

Project manager

accepts or rejects

Project manager

accepts or rejects

change request

Change Analyst

makes assessment of

the change and gives

recommendations

Managers acceptChange Analyst

makes assessment of

the change and gives

recommendations

or reject the

change based on

the assessment

and

Managers accept

or reject the

change based on

the assessment

and

recommendations Project manager

creates and assigns

tasks if necessary

and updates project

plan

Document

closureReject

Accept

Accept

Reject

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy88

Project

Phase 1

Phase 2

Phase 3

Stage

Gate

Planning

Go No Go Decisions

492018

45

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy89

Today

Planned

Burned

Earned

Time

Co

st

CV

Planned

Finished

Actual

Finished

Late

Over

Budget

Cost Variance (CV) = Earned ndash Burned

Schedule Variance (SV) = Earned ndash Planned

SV

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy90

complete to date

Dashboard ndash scope quality time budget

Milestones and deliverables

Target revised complete

Budget

Approved spent to date estimated cost of work remaining estimated total cost

Major Risks amp Issues requiring reviewdecision

Accomplishments Plans for Next Period

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 4: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

4

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy7

Increase profit

Increase productivity

Market demand

Legislative requirements

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy8

The application of knowledge skills tools and techniques to project activities to meet project requirements

copyPMI reg PMBOK Guide 2017 Edition

492018

5

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy9

Discipline

Project

Management

Science Artbull PMBoK

bull MS Project

bull Technical

Competence

amp KSAs

bull Leadership

bull Change

Management

bull Stakeholder

Relations

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy10

Increased likelihood of success

Reduced duplication

Quicker start up time

Better resource utilization

More effective management information

Better risk management

492018

6

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

492018

7

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy13

Scope

Project Management Centre of Excellence Inc 2018 copy14

Average

Time

Cost

Feature 69

74

59

The project is

completed and

operational but

over budget late

and with fewer

features

Project completed on time

on budget with all

features amp functions

originally specified

The project is cancelled

before completion or

never implemented

492018

8

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

1 On time on budget and

to specifications

2 Meet or exceed

stakeholder expectations

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy16

Senior Management Support

Clear Goals

Competent Project Manager

Adequate Resourcing

Project Management Framework

Change Control System

Project Vision

492018

9

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy17

$

Time

Initiation Planning Close Out

INITIAL CHARTER PLAN DELIVERABLE PIR

Initiation Planning Execution Close Out

INITIAL CHARTER PLAN DELIVERABLE CLOSE OUT REPORT

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy18

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

10

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Stakeholder Management

19

IntegrationManagement

Time Management

Cost Management

QualityManagement

HumanResource

Management

CommunicationManagement

RiskManagement

ProcurementManagement

ScopeManagement

Project Management Centre of Excellence Inc 2018 copy

Scope

Human Resource

Management

Quality

Management

Fixes

Risk

ManagementCommunication

Management

Procurement

Management

Integration

Management

20

Inco

rre

ct

exp

ecta

tio

ns

492018

11

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy21

PM

CustomerClientUser

Project Team members

Management team

Sponsor

PMO

Performing Organization

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Project Sponsor

Project Manager

Project Team Working Groups

StakeholdersSteering Committee

492018

12

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy23

The person that provides

the financial resources in

cash or in kind for the

project and has ultimate

accountability for project

success

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy24

Has overall

responsibility for the success of the project

492018

13

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy25

Consists of all individuals and groups who will be part of andor affected by the results of the

project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy26

Executive Director

Manger of

Functional Area 2

Manager of

Functional Area 3

Manager of

Functional Area 1

Manager Of

Functional Area 2

Resource Resource

Resource

Resource for

Project 3

Resource for

Project 3

Resource

Project Manager

for

Project 3

Resource

Resource for

Project 3

Resource

Resource

Resource for

Project 3

492018

14

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy27

1 What is a project

2 What is project management

3 What is a lifecycle

4 What are the 4 phases

5 What are the 5 processes

6 Who are the key stakeholders

7 What are the 10 knowledge areas

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy28

Defines and authorizes the project or a project phase

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

15

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy29

Project Selection

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy30

Project definition (preliminary scope statement)

Product service or result

Acceptance criteria

Requirements

Assumptions and constraints

492018

16

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy31

Project Management Centre of Excellence Inc 2018 copyApril 9 2018

32

492018

17

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy33

1 Right Need

2 Right Solution

3 Right Way

4 Right Benefit

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy34

Mandatory

Legislated

Discretionary

Business

End user

Technical

492018

18

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy35

Do we want a Project Manager or a Project Leader

Can a certified PMP Project Manager successfully manage any project

What Key PM skills do you need

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

ManagementLeadership

S

T

E

W

A

R

D

S

H

I

P

492018

19

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy37

Team Building

Coordination Skills

Interpersonal Skills

Communication Skills

Conflict Resolution Skills

Analytical Thinking

Strategic Thinking

Trouble Shooting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Trust

Influence

Negotiate

Awareness

38Project Management Centre of Excellence Inc

492018

20

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Trust = Speed Cost

OR

Trust = Speed Cost

Project Management Centre of Excellence Inc 2018 copy40

492018

21

1 Predictability

2 Reciprocation

3 Consistency and Commitment

4 Social Evidence

5 Authority

6 Liking

7 Scarcity

8 Self-interest

Project Management Centre of Excellence Inc 2018 copy492018Project Management Centre of Excellence Inc copy 2014

42

492018

22

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy43

Project Management Centre of Excellence Inc

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy44

Project Charter

492018

23

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy45

What is the what

What is the why

4Rs

Project Manager or Project Leader

Preliminary Scope Statement

Output ndash Project Charter

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy46

The processes performed to define and mature the project scope develop the project management plan and identify and schedule the project activities that

occur within the project Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

24

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Stakeholder Management

47

IntegrationManagement

Time Management

Cost Management

QualityManagement

HumanResource

Management

CommunicationManagement

RiskManagement

ProcurementManagement

ScopeManagement

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy48

Deliver the project results

492018

25

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy49

Specific

Measurable

Agreed-upon

Realistic

Time component

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy50

In-Scope Out of Scope

Includes both

492018

26

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy52

Plan and hold an event

Start

492018

27

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy53

Task A Task BFSbull Finish to Start

bull Finish to Finish Task C

Task D

FF

bull Start to Start Task E

Task F

SS

bull Start to Finish Task G Task HSF

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy54

CP= the sequence of schedule activities that determines the duration of the project

CPM-the longest path through the project forms the critical path and is also the shortest time in which a project can be completed

CPM=Forward andor backward pass

492018

28

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy55

B

Start

A

C

Finish

E

F

D

2 frac12 day float

BD

2

1 8

3 4 5 6 7

In Days

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy56

Who does the work

Select project team

Roles and Responsibilities Matrix

RACI chart

Resources can be internal or external

492018

29

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy57

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy58

35 h

20 h 15 h

30 h 35 h 35 h

25 h

5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for Bob

Hou

rs W

ork

ed

Ove

rtim

e

492018

30

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy59

35 h

20 h 15 h

30 h 35 h 35 h

20 h5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for BobH

ou

rs W

ork

ed

Ove

rtim

e

5 h

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy60

Day 1 Day 2 Day 3 Day 4 Day 6Day 5

1 brick layer

to do 6 days

of work will

take 6 days

2 brick layer

to do 6 days

of work will

take 3 days

492018

31

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy61

The planned dates for performing schedule activities and the planned dates for meeting

schedule milestones

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy62

De-scoping

ndash Analyzing alternatives on the critical path to determine how to reduce the schedule for the least amount of cost

ndash Not always a viable alternative

Crashing

ndash Analyzing the critical path to determine where to reduce the schedule for the least amount of cost while bring extra resources on

ndash Not always a viable alternative

Fast-Tracking

ndash Phases or activities that would have normally being done in sequence are done in parallel

ndash Can result in rework and increased risk

ndash Requires 3 X the amount of planning

Least $

A B

B

492018

32

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy63

Estimating

Budget preparation

Forecasting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy64

Co

st

Project target Cost

Time

Performance

Measurement

Baseline

Define the Work

Define the

Baseline Budget

Define the

Baseline ScheduleContingency

Budget

492018

33

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy65

Order of magnitude

Budget

Definitive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy66

Top down

Analogous

Parametric

Vendor bids

Bottom up

Detailed (piece by piece)

Three point or PERT

492018

34

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy67

The How

What is In and Out of Scope (detailed)

All the Work and only the Work

Network Diagram

Estimating

Critical Path

Output ndash Project Plan

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy68

Those processes performed

to complete the work

defined in the project

management plan to satisfy the project specifications

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

35

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy69

Destructive

Intervention

Constructive

Opportunity

Influence of

Stakeholders

and

Opportunity

to add value

Cost

Curve

$

Time

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy70

An uncertain event or condition

that if it occurs has a positive

or negative effect on one or

more of the project objectives

such as scope schedule

cost and quality

copyPMBOK regGuide Sixth Edition

492018

36

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy71

ldquoIncludes processes concerned with conducting risk

management planning identification analysis

responses and monitoring and control on a projectrdquo

copyPMBOK regGuide Sixth Edition

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Before the risk

Focus on prevention amp

planning

After the risk

Focus on recovery

Project

Start Project

Finish

Avoid Mitigate or Transfer Risks Use contingency plans

RiskManagement

492018

37

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy73

HighLow Impact

Hig

h

Low

Threaten

Failure

Minor

impactBig Impact if Occurs

ldquoEarthquakerdquo

Disruptive

ldquoDeath by

1000 cutsrdquo

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy74

Minimizes reactive crisis management

Increases likelihood of project success

Increases profitability

Prevents events impacting triple constraints

492018

38

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy75

1 Project Purpose

2 Objectives

3 Identified Risks

4 Risk Assessment

5 Risk Prevention

6 Risk Mitigation

7 Resources

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy76

492018

39

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy77

Work with your team and sponsor to identify stakeholders

Brainstorming works to develop a list that can be reviewed and finalized by the team

Key Stakeholders will usually emerge on their own

Stakeholders are persons and

organizations whose interests may be

positively or negatively affected by the

execution or completion of the project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy78

Ask each stakeholder 2 questions

bullWhat are your three major expectations from this project

bullWhat are your three major concerns related to this project

492018

40

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy79

Keep InformedMonitor(Minimal effort)

Manage Relationship

Closely

Keep Satisfied

InterestLow High

Low

High

Power

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy80

1 Analysis What do they need to know amp what do we want to say

1 Decide Communication Objectives2 Determine Vulnerabilities amp Issues3 Develop Key Messages4 Perform Stakeholder Analysis (interests concerns)

2 Design amp Build What methods and tools should we use

1 Build Communication Vehicles (reports websites etc)

3 Develop Plan Who How and When should they receive it

1 Develop Communication Plan 2 Update Overall Workplan for Communication Activities

4 Do it1 Execute Communication Plan2 Modify amp Adjust as needed

492018

41

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy81

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy82

1 Project Purpose

2 Objectives

3 Potential Issues

4 Key Messages

5 AudiencesStakeholders

6 Communication Vehicles

7 Communication Plan Matrix

8 Resources

492018

42

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy83

Planned the Work Now Work the Plan

But What IF (Risk Management)

85 of what PMs do is Communication

Stakeholder Management is Critical to Project

Success

Output ndash Unique product service delivery or

result

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy84

Those processes required to

track review and regulate the

progress and performance of

the project identify any areas in

which changes to the plan are

required and initiate the

corresponding changes

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

43

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy85

Is daily monitoring at the team level of resources tasks and schedule It is hellip

A vital component of tracking and managing progress

Managing the triple constraints

Relatively simple ldquouser friendlyrdquo and inexpensive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy86

Tasks

Requirements

Timing and performance

Resource utilization and outsourcing

Scope deliverables completion and product quality

Process improvement possibilities and lessons learned

Schedule and cost performance

492018

44

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy87

Initiate Assess Resolve CloseApprove

Senior team

a change

Senior team

member initiates

a change

Project manager

accepts or rejects

Project manager

accepts or rejects

change request

Change Analyst

makes assessment of

the change and gives

recommendations

Managers acceptChange Analyst

makes assessment of

the change and gives

recommendations

or reject the

change based on

the assessment

and

Managers accept

or reject the

change based on

the assessment

and

recommendations Project manager

creates and assigns

tasks if necessary

and updates project

plan

Document

closureReject

Accept

Accept

Reject

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy88

Project

Phase 1

Phase 2

Phase 3

Stage

Gate

Planning

Go No Go Decisions

492018

45

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy89

Today

Planned

Burned

Earned

Time

Co

st

CV

Planned

Finished

Actual

Finished

Late

Over

Budget

Cost Variance (CV) = Earned ndash Burned

Schedule Variance (SV) = Earned ndash Planned

SV

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy90

complete to date

Dashboard ndash scope quality time budget

Milestones and deliverables

Target revised complete

Budget

Approved spent to date estimated cost of work remaining estimated total cost

Major Risks amp Issues requiring reviewdecision

Accomplishments Plans for Next Period

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 5: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

5

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy9

Discipline

Project

Management

Science Artbull PMBoK

bull MS Project

bull Technical

Competence

amp KSAs

bull Leadership

bull Change

Management

bull Stakeholder

Relations

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy10

Increased likelihood of success

Reduced duplication

Quicker start up time

Better resource utilization

More effective management information

Better risk management

492018

6

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

492018

7

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy13

Scope

Project Management Centre of Excellence Inc 2018 copy14

Average

Time

Cost

Feature 69

74

59

The project is

completed and

operational but

over budget late

and with fewer

features

Project completed on time

on budget with all

features amp functions

originally specified

The project is cancelled

before completion or

never implemented

492018

8

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

1 On time on budget and

to specifications

2 Meet or exceed

stakeholder expectations

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy16

Senior Management Support

Clear Goals

Competent Project Manager

Adequate Resourcing

Project Management Framework

Change Control System

Project Vision

492018

9

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy17

$

Time

Initiation Planning Close Out

INITIAL CHARTER PLAN DELIVERABLE PIR

Initiation Planning Execution Close Out

INITIAL CHARTER PLAN DELIVERABLE CLOSE OUT REPORT

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy18

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

10

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Stakeholder Management

19

IntegrationManagement

Time Management

Cost Management

QualityManagement

HumanResource

Management

CommunicationManagement

RiskManagement

ProcurementManagement

ScopeManagement

Project Management Centre of Excellence Inc 2018 copy

Scope

Human Resource

Management

Quality

Management

Fixes

Risk

ManagementCommunication

Management

Procurement

Management

Integration

Management

20

Inco

rre

ct

exp

ecta

tio

ns

492018

11

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy21

PM

CustomerClientUser

Project Team members

Management team

Sponsor

PMO

Performing Organization

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Project Sponsor

Project Manager

Project Team Working Groups

StakeholdersSteering Committee

492018

12

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy23

The person that provides

the financial resources in

cash or in kind for the

project and has ultimate

accountability for project

success

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy24

Has overall

responsibility for the success of the project

492018

13

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy25

Consists of all individuals and groups who will be part of andor affected by the results of the

project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy26

Executive Director

Manger of

Functional Area 2

Manager of

Functional Area 3

Manager of

Functional Area 1

Manager Of

Functional Area 2

Resource Resource

Resource

Resource for

Project 3

Resource for

Project 3

Resource

Project Manager

for

Project 3

Resource

Resource for

Project 3

Resource

Resource

Resource for

Project 3

492018

14

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy27

1 What is a project

2 What is project management

3 What is a lifecycle

4 What are the 4 phases

5 What are the 5 processes

6 Who are the key stakeholders

7 What are the 10 knowledge areas

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy28

Defines and authorizes the project or a project phase

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

15

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy29

Project Selection

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy30

Project definition (preliminary scope statement)

Product service or result

Acceptance criteria

Requirements

Assumptions and constraints

492018

16

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy31

Project Management Centre of Excellence Inc 2018 copyApril 9 2018

32

492018

17

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy33

1 Right Need

2 Right Solution

3 Right Way

4 Right Benefit

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy34

Mandatory

Legislated

Discretionary

Business

End user

Technical

492018

18

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy35

Do we want a Project Manager or a Project Leader

Can a certified PMP Project Manager successfully manage any project

What Key PM skills do you need

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

ManagementLeadership

S

T

E

W

A

R

D

S

H

I

P

492018

19

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy37

Team Building

Coordination Skills

Interpersonal Skills

Communication Skills

Conflict Resolution Skills

Analytical Thinking

Strategic Thinking

Trouble Shooting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Trust

Influence

Negotiate

Awareness

38Project Management Centre of Excellence Inc

492018

20

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Trust = Speed Cost

OR

Trust = Speed Cost

Project Management Centre of Excellence Inc 2018 copy40

492018

21

1 Predictability

2 Reciprocation

3 Consistency and Commitment

4 Social Evidence

5 Authority

6 Liking

7 Scarcity

8 Self-interest

Project Management Centre of Excellence Inc 2018 copy492018Project Management Centre of Excellence Inc copy 2014

42

492018

22

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy43

Project Management Centre of Excellence Inc

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy44

Project Charter

492018

23

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy45

What is the what

What is the why

4Rs

Project Manager or Project Leader

Preliminary Scope Statement

Output ndash Project Charter

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy46

The processes performed to define and mature the project scope develop the project management plan and identify and schedule the project activities that

occur within the project Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

24

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Stakeholder Management

47

IntegrationManagement

Time Management

Cost Management

QualityManagement

HumanResource

Management

CommunicationManagement

RiskManagement

ProcurementManagement

ScopeManagement

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy48

Deliver the project results

492018

25

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy49

Specific

Measurable

Agreed-upon

Realistic

Time component

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy50

In-Scope Out of Scope

Includes both

492018

26

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy52

Plan and hold an event

Start

492018

27

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy53

Task A Task BFSbull Finish to Start

bull Finish to Finish Task C

Task D

FF

bull Start to Start Task E

Task F

SS

bull Start to Finish Task G Task HSF

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy54

CP= the sequence of schedule activities that determines the duration of the project

CPM-the longest path through the project forms the critical path and is also the shortest time in which a project can be completed

CPM=Forward andor backward pass

492018

28

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy55

B

Start

A

C

Finish

E

F

D

2 frac12 day float

BD

2

1 8

3 4 5 6 7

In Days

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy56

Who does the work

Select project team

Roles and Responsibilities Matrix

RACI chart

Resources can be internal or external

492018

29

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy57

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy58

35 h

20 h 15 h

30 h 35 h 35 h

25 h

5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for Bob

Hou

rs W

ork

ed

Ove

rtim

e

492018

30

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy59

35 h

20 h 15 h

30 h 35 h 35 h

20 h5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for BobH

ou

rs W

ork

ed

Ove

rtim

e

5 h

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy60

Day 1 Day 2 Day 3 Day 4 Day 6Day 5

1 brick layer

to do 6 days

of work will

take 6 days

2 brick layer

to do 6 days

of work will

take 3 days

492018

31

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy61

The planned dates for performing schedule activities and the planned dates for meeting

schedule milestones

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy62

De-scoping

ndash Analyzing alternatives on the critical path to determine how to reduce the schedule for the least amount of cost

ndash Not always a viable alternative

Crashing

ndash Analyzing the critical path to determine where to reduce the schedule for the least amount of cost while bring extra resources on

ndash Not always a viable alternative

Fast-Tracking

ndash Phases or activities that would have normally being done in sequence are done in parallel

ndash Can result in rework and increased risk

ndash Requires 3 X the amount of planning

Least $

A B

B

492018

32

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy63

Estimating

Budget preparation

Forecasting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy64

Co

st

Project target Cost

Time

Performance

Measurement

Baseline

Define the Work

Define the

Baseline Budget

Define the

Baseline ScheduleContingency

Budget

492018

33

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy65

Order of magnitude

Budget

Definitive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy66

Top down

Analogous

Parametric

Vendor bids

Bottom up

Detailed (piece by piece)

Three point or PERT

492018

34

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy67

The How

What is In and Out of Scope (detailed)

All the Work and only the Work

Network Diagram

Estimating

Critical Path

Output ndash Project Plan

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy68

Those processes performed

to complete the work

defined in the project

management plan to satisfy the project specifications

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

35

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy69

Destructive

Intervention

Constructive

Opportunity

Influence of

Stakeholders

and

Opportunity

to add value

Cost

Curve

$

Time

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy70

An uncertain event or condition

that if it occurs has a positive

or negative effect on one or

more of the project objectives

such as scope schedule

cost and quality

copyPMBOK regGuide Sixth Edition

492018

36

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy71

ldquoIncludes processes concerned with conducting risk

management planning identification analysis

responses and monitoring and control on a projectrdquo

copyPMBOK regGuide Sixth Edition

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Before the risk

Focus on prevention amp

planning

After the risk

Focus on recovery

Project

Start Project

Finish

Avoid Mitigate or Transfer Risks Use contingency plans

RiskManagement

492018

37

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy73

HighLow Impact

Hig

h

Low

Threaten

Failure

Minor

impactBig Impact if Occurs

ldquoEarthquakerdquo

Disruptive

ldquoDeath by

1000 cutsrdquo

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy74

Minimizes reactive crisis management

Increases likelihood of project success

Increases profitability

Prevents events impacting triple constraints

492018

38

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy75

1 Project Purpose

2 Objectives

3 Identified Risks

4 Risk Assessment

5 Risk Prevention

6 Risk Mitigation

7 Resources

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy76

492018

39

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy77

Work with your team and sponsor to identify stakeholders

Brainstorming works to develop a list that can be reviewed and finalized by the team

Key Stakeholders will usually emerge on their own

Stakeholders are persons and

organizations whose interests may be

positively or negatively affected by the

execution or completion of the project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy78

Ask each stakeholder 2 questions

bullWhat are your three major expectations from this project

bullWhat are your three major concerns related to this project

492018

40

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy79

Keep InformedMonitor(Minimal effort)

Manage Relationship

Closely

Keep Satisfied

InterestLow High

Low

High

Power

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy80

1 Analysis What do they need to know amp what do we want to say

1 Decide Communication Objectives2 Determine Vulnerabilities amp Issues3 Develop Key Messages4 Perform Stakeholder Analysis (interests concerns)

2 Design amp Build What methods and tools should we use

1 Build Communication Vehicles (reports websites etc)

3 Develop Plan Who How and When should they receive it

1 Develop Communication Plan 2 Update Overall Workplan for Communication Activities

4 Do it1 Execute Communication Plan2 Modify amp Adjust as needed

492018

41

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy81

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy82

1 Project Purpose

2 Objectives

3 Potential Issues

4 Key Messages

5 AudiencesStakeholders

6 Communication Vehicles

7 Communication Plan Matrix

8 Resources

492018

42

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy83

Planned the Work Now Work the Plan

But What IF (Risk Management)

85 of what PMs do is Communication

Stakeholder Management is Critical to Project

Success

Output ndash Unique product service delivery or

result

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy84

Those processes required to

track review and regulate the

progress and performance of

the project identify any areas in

which changes to the plan are

required and initiate the

corresponding changes

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

43

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy85

Is daily monitoring at the team level of resources tasks and schedule It is hellip

A vital component of tracking and managing progress

Managing the triple constraints

Relatively simple ldquouser friendlyrdquo and inexpensive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy86

Tasks

Requirements

Timing and performance

Resource utilization and outsourcing

Scope deliverables completion and product quality

Process improvement possibilities and lessons learned

Schedule and cost performance

492018

44

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy87

Initiate Assess Resolve CloseApprove

Senior team

a change

Senior team

member initiates

a change

Project manager

accepts or rejects

Project manager

accepts or rejects

change request

Change Analyst

makes assessment of

the change and gives

recommendations

Managers acceptChange Analyst

makes assessment of

the change and gives

recommendations

or reject the

change based on

the assessment

and

Managers accept

or reject the

change based on

the assessment

and

recommendations Project manager

creates and assigns

tasks if necessary

and updates project

plan

Document

closureReject

Accept

Accept

Reject

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy88

Project

Phase 1

Phase 2

Phase 3

Stage

Gate

Planning

Go No Go Decisions

492018

45

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy89

Today

Planned

Burned

Earned

Time

Co

st

CV

Planned

Finished

Actual

Finished

Late

Over

Budget

Cost Variance (CV) = Earned ndash Burned

Schedule Variance (SV) = Earned ndash Planned

SV

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy90

complete to date

Dashboard ndash scope quality time budget

Milestones and deliverables

Target revised complete

Budget

Approved spent to date estimated cost of work remaining estimated total cost

Major Risks amp Issues requiring reviewdecision

Accomplishments Plans for Next Period

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 6: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

6

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

492018

7

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy13

Scope

Project Management Centre of Excellence Inc 2018 copy14

Average

Time

Cost

Feature 69

74

59

The project is

completed and

operational but

over budget late

and with fewer

features

Project completed on time

on budget with all

features amp functions

originally specified

The project is cancelled

before completion or

never implemented

492018

8

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

1 On time on budget and

to specifications

2 Meet or exceed

stakeholder expectations

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy16

Senior Management Support

Clear Goals

Competent Project Manager

Adequate Resourcing

Project Management Framework

Change Control System

Project Vision

492018

9

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy17

$

Time

Initiation Planning Close Out

INITIAL CHARTER PLAN DELIVERABLE PIR

Initiation Planning Execution Close Out

INITIAL CHARTER PLAN DELIVERABLE CLOSE OUT REPORT

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy18

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

10

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Stakeholder Management

19

IntegrationManagement

Time Management

Cost Management

QualityManagement

HumanResource

Management

CommunicationManagement

RiskManagement

ProcurementManagement

ScopeManagement

Project Management Centre of Excellence Inc 2018 copy

Scope

Human Resource

Management

Quality

Management

Fixes

Risk

ManagementCommunication

Management

Procurement

Management

Integration

Management

20

Inco

rre

ct

exp

ecta

tio

ns

492018

11

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy21

PM

CustomerClientUser

Project Team members

Management team

Sponsor

PMO

Performing Organization

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Project Sponsor

Project Manager

Project Team Working Groups

StakeholdersSteering Committee

492018

12

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy23

The person that provides

the financial resources in

cash or in kind for the

project and has ultimate

accountability for project

success

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy24

Has overall

responsibility for the success of the project

492018

13

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy25

Consists of all individuals and groups who will be part of andor affected by the results of the

project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy26

Executive Director

Manger of

Functional Area 2

Manager of

Functional Area 3

Manager of

Functional Area 1

Manager Of

Functional Area 2

Resource Resource

Resource

Resource for

Project 3

Resource for

Project 3

Resource

Project Manager

for

Project 3

Resource

Resource for

Project 3

Resource

Resource

Resource for

Project 3

492018

14

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy27

1 What is a project

2 What is project management

3 What is a lifecycle

4 What are the 4 phases

5 What are the 5 processes

6 Who are the key stakeholders

7 What are the 10 knowledge areas

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy28

Defines and authorizes the project or a project phase

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

15

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy29

Project Selection

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy30

Project definition (preliminary scope statement)

Product service or result

Acceptance criteria

Requirements

Assumptions and constraints

492018

16

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy31

Project Management Centre of Excellence Inc 2018 copyApril 9 2018

32

492018

17

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy33

1 Right Need

2 Right Solution

3 Right Way

4 Right Benefit

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy34

Mandatory

Legislated

Discretionary

Business

End user

Technical

492018

18

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy35

Do we want a Project Manager or a Project Leader

Can a certified PMP Project Manager successfully manage any project

What Key PM skills do you need

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

ManagementLeadership

S

T

E

W

A

R

D

S

H

I

P

492018

19

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy37

Team Building

Coordination Skills

Interpersonal Skills

Communication Skills

Conflict Resolution Skills

Analytical Thinking

Strategic Thinking

Trouble Shooting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Trust

Influence

Negotiate

Awareness

38Project Management Centre of Excellence Inc

492018

20

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Trust = Speed Cost

OR

Trust = Speed Cost

Project Management Centre of Excellence Inc 2018 copy40

492018

21

1 Predictability

2 Reciprocation

3 Consistency and Commitment

4 Social Evidence

5 Authority

6 Liking

7 Scarcity

8 Self-interest

Project Management Centre of Excellence Inc 2018 copy492018Project Management Centre of Excellence Inc copy 2014

42

492018

22

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy43

Project Management Centre of Excellence Inc

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy44

Project Charter

492018

23

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy45

What is the what

What is the why

4Rs

Project Manager or Project Leader

Preliminary Scope Statement

Output ndash Project Charter

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy46

The processes performed to define and mature the project scope develop the project management plan and identify and schedule the project activities that

occur within the project Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

24

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Stakeholder Management

47

IntegrationManagement

Time Management

Cost Management

QualityManagement

HumanResource

Management

CommunicationManagement

RiskManagement

ProcurementManagement

ScopeManagement

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy48

Deliver the project results

492018

25

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy49

Specific

Measurable

Agreed-upon

Realistic

Time component

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy50

In-Scope Out of Scope

Includes both

492018

26

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy52

Plan and hold an event

Start

492018

27

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy53

Task A Task BFSbull Finish to Start

bull Finish to Finish Task C

Task D

FF

bull Start to Start Task E

Task F

SS

bull Start to Finish Task G Task HSF

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy54

CP= the sequence of schedule activities that determines the duration of the project

CPM-the longest path through the project forms the critical path and is also the shortest time in which a project can be completed

CPM=Forward andor backward pass

492018

28

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy55

B

Start

A

C

Finish

E

F

D

2 frac12 day float

BD

2

1 8

3 4 5 6 7

In Days

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy56

Who does the work

Select project team

Roles and Responsibilities Matrix

RACI chart

Resources can be internal or external

492018

29

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy57

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy58

35 h

20 h 15 h

30 h 35 h 35 h

25 h

5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for Bob

Hou

rs W

ork

ed

Ove

rtim

e

492018

30

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy59

35 h

20 h 15 h

30 h 35 h 35 h

20 h5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for BobH

ou

rs W

ork

ed

Ove

rtim

e

5 h

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy60

Day 1 Day 2 Day 3 Day 4 Day 6Day 5

1 brick layer

to do 6 days

of work will

take 6 days

2 brick layer

to do 6 days

of work will

take 3 days

492018

31

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy61

The planned dates for performing schedule activities and the planned dates for meeting

schedule milestones

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy62

De-scoping

ndash Analyzing alternatives on the critical path to determine how to reduce the schedule for the least amount of cost

ndash Not always a viable alternative

Crashing

ndash Analyzing the critical path to determine where to reduce the schedule for the least amount of cost while bring extra resources on

ndash Not always a viable alternative

Fast-Tracking

ndash Phases or activities that would have normally being done in sequence are done in parallel

ndash Can result in rework and increased risk

ndash Requires 3 X the amount of planning

Least $

A B

B

492018

32

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy63

Estimating

Budget preparation

Forecasting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy64

Co

st

Project target Cost

Time

Performance

Measurement

Baseline

Define the Work

Define the

Baseline Budget

Define the

Baseline ScheduleContingency

Budget

492018

33

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy65

Order of magnitude

Budget

Definitive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy66

Top down

Analogous

Parametric

Vendor bids

Bottom up

Detailed (piece by piece)

Three point or PERT

492018

34

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy67

The How

What is In and Out of Scope (detailed)

All the Work and only the Work

Network Diagram

Estimating

Critical Path

Output ndash Project Plan

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy68

Those processes performed

to complete the work

defined in the project

management plan to satisfy the project specifications

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

35

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy69

Destructive

Intervention

Constructive

Opportunity

Influence of

Stakeholders

and

Opportunity

to add value

Cost

Curve

$

Time

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy70

An uncertain event or condition

that if it occurs has a positive

or negative effect on one or

more of the project objectives

such as scope schedule

cost and quality

copyPMBOK regGuide Sixth Edition

492018

36

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy71

ldquoIncludes processes concerned with conducting risk

management planning identification analysis

responses and monitoring and control on a projectrdquo

copyPMBOK regGuide Sixth Edition

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Before the risk

Focus on prevention amp

planning

After the risk

Focus on recovery

Project

Start Project

Finish

Avoid Mitigate or Transfer Risks Use contingency plans

RiskManagement

492018

37

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy73

HighLow Impact

Hig

h

Low

Threaten

Failure

Minor

impactBig Impact if Occurs

ldquoEarthquakerdquo

Disruptive

ldquoDeath by

1000 cutsrdquo

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy74

Minimizes reactive crisis management

Increases likelihood of project success

Increases profitability

Prevents events impacting triple constraints

492018

38

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy75

1 Project Purpose

2 Objectives

3 Identified Risks

4 Risk Assessment

5 Risk Prevention

6 Risk Mitigation

7 Resources

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy76

492018

39

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy77

Work with your team and sponsor to identify stakeholders

Brainstorming works to develop a list that can be reviewed and finalized by the team

Key Stakeholders will usually emerge on their own

Stakeholders are persons and

organizations whose interests may be

positively or negatively affected by the

execution or completion of the project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy78

Ask each stakeholder 2 questions

bullWhat are your three major expectations from this project

bullWhat are your three major concerns related to this project

492018

40

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy79

Keep InformedMonitor(Minimal effort)

Manage Relationship

Closely

Keep Satisfied

InterestLow High

Low

High

Power

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy80

1 Analysis What do they need to know amp what do we want to say

1 Decide Communication Objectives2 Determine Vulnerabilities amp Issues3 Develop Key Messages4 Perform Stakeholder Analysis (interests concerns)

2 Design amp Build What methods and tools should we use

1 Build Communication Vehicles (reports websites etc)

3 Develop Plan Who How and When should they receive it

1 Develop Communication Plan 2 Update Overall Workplan for Communication Activities

4 Do it1 Execute Communication Plan2 Modify amp Adjust as needed

492018

41

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy81

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy82

1 Project Purpose

2 Objectives

3 Potential Issues

4 Key Messages

5 AudiencesStakeholders

6 Communication Vehicles

7 Communication Plan Matrix

8 Resources

492018

42

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy83

Planned the Work Now Work the Plan

But What IF (Risk Management)

85 of what PMs do is Communication

Stakeholder Management is Critical to Project

Success

Output ndash Unique product service delivery or

result

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy84

Those processes required to

track review and regulate the

progress and performance of

the project identify any areas in

which changes to the plan are

required and initiate the

corresponding changes

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

43

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy85

Is daily monitoring at the team level of resources tasks and schedule It is hellip

A vital component of tracking and managing progress

Managing the triple constraints

Relatively simple ldquouser friendlyrdquo and inexpensive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy86

Tasks

Requirements

Timing and performance

Resource utilization and outsourcing

Scope deliverables completion and product quality

Process improvement possibilities and lessons learned

Schedule and cost performance

492018

44

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy87

Initiate Assess Resolve CloseApprove

Senior team

a change

Senior team

member initiates

a change

Project manager

accepts or rejects

Project manager

accepts or rejects

change request

Change Analyst

makes assessment of

the change and gives

recommendations

Managers acceptChange Analyst

makes assessment of

the change and gives

recommendations

or reject the

change based on

the assessment

and

Managers accept

or reject the

change based on

the assessment

and

recommendations Project manager

creates and assigns

tasks if necessary

and updates project

plan

Document

closureReject

Accept

Accept

Reject

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy88

Project

Phase 1

Phase 2

Phase 3

Stage

Gate

Planning

Go No Go Decisions

492018

45

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy89

Today

Planned

Burned

Earned

Time

Co

st

CV

Planned

Finished

Actual

Finished

Late

Over

Budget

Cost Variance (CV) = Earned ndash Burned

Schedule Variance (SV) = Earned ndash Planned

SV

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy90

complete to date

Dashboard ndash scope quality time budget

Milestones and deliverables

Target revised complete

Budget

Approved spent to date estimated cost of work remaining estimated total cost

Major Risks amp Issues requiring reviewdecision

Accomplishments Plans for Next Period

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 7: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

7

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy13

Scope

Project Management Centre of Excellence Inc 2018 copy14

Average

Time

Cost

Feature 69

74

59

The project is

completed and

operational but

over budget late

and with fewer

features

Project completed on time

on budget with all

features amp functions

originally specified

The project is cancelled

before completion or

never implemented

492018

8

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

1 On time on budget and

to specifications

2 Meet or exceed

stakeholder expectations

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy16

Senior Management Support

Clear Goals

Competent Project Manager

Adequate Resourcing

Project Management Framework

Change Control System

Project Vision

492018

9

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy17

$

Time

Initiation Planning Close Out

INITIAL CHARTER PLAN DELIVERABLE PIR

Initiation Planning Execution Close Out

INITIAL CHARTER PLAN DELIVERABLE CLOSE OUT REPORT

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy18

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

10

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Stakeholder Management

19

IntegrationManagement

Time Management

Cost Management

QualityManagement

HumanResource

Management

CommunicationManagement

RiskManagement

ProcurementManagement

ScopeManagement

Project Management Centre of Excellence Inc 2018 copy

Scope

Human Resource

Management

Quality

Management

Fixes

Risk

ManagementCommunication

Management

Procurement

Management

Integration

Management

20

Inco

rre

ct

exp

ecta

tio

ns

492018

11

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy21

PM

CustomerClientUser

Project Team members

Management team

Sponsor

PMO

Performing Organization

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Project Sponsor

Project Manager

Project Team Working Groups

StakeholdersSteering Committee

492018

12

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy23

The person that provides

the financial resources in

cash or in kind for the

project and has ultimate

accountability for project

success

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy24

Has overall

responsibility for the success of the project

492018

13

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy25

Consists of all individuals and groups who will be part of andor affected by the results of the

project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy26

Executive Director

Manger of

Functional Area 2

Manager of

Functional Area 3

Manager of

Functional Area 1

Manager Of

Functional Area 2

Resource Resource

Resource

Resource for

Project 3

Resource for

Project 3

Resource

Project Manager

for

Project 3

Resource

Resource for

Project 3

Resource

Resource

Resource for

Project 3

492018

14

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy27

1 What is a project

2 What is project management

3 What is a lifecycle

4 What are the 4 phases

5 What are the 5 processes

6 Who are the key stakeholders

7 What are the 10 knowledge areas

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy28

Defines and authorizes the project or a project phase

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

15

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy29

Project Selection

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy30

Project definition (preliminary scope statement)

Product service or result

Acceptance criteria

Requirements

Assumptions and constraints

492018

16

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy31

Project Management Centre of Excellence Inc 2018 copyApril 9 2018

32

492018

17

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy33

1 Right Need

2 Right Solution

3 Right Way

4 Right Benefit

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy34

Mandatory

Legislated

Discretionary

Business

End user

Technical

492018

18

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy35

Do we want a Project Manager or a Project Leader

Can a certified PMP Project Manager successfully manage any project

What Key PM skills do you need

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

ManagementLeadership

S

T

E

W

A

R

D

S

H

I

P

492018

19

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy37

Team Building

Coordination Skills

Interpersonal Skills

Communication Skills

Conflict Resolution Skills

Analytical Thinking

Strategic Thinking

Trouble Shooting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Trust

Influence

Negotiate

Awareness

38Project Management Centre of Excellence Inc

492018

20

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Trust = Speed Cost

OR

Trust = Speed Cost

Project Management Centre of Excellence Inc 2018 copy40

492018

21

1 Predictability

2 Reciprocation

3 Consistency and Commitment

4 Social Evidence

5 Authority

6 Liking

7 Scarcity

8 Self-interest

Project Management Centre of Excellence Inc 2018 copy492018Project Management Centre of Excellence Inc copy 2014

42

492018

22

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy43

Project Management Centre of Excellence Inc

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy44

Project Charter

492018

23

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy45

What is the what

What is the why

4Rs

Project Manager or Project Leader

Preliminary Scope Statement

Output ndash Project Charter

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy46

The processes performed to define and mature the project scope develop the project management plan and identify and schedule the project activities that

occur within the project Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

24

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Stakeholder Management

47

IntegrationManagement

Time Management

Cost Management

QualityManagement

HumanResource

Management

CommunicationManagement

RiskManagement

ProcurementManagement

ScopeManagement

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy48

Deliver the project results

492018

25

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy49

Specific

Measurable

Agreed-upon

Realistic

Time component

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy50

In-Scope Out of Scope

Includes both

492018

26

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy52

Plan and hold an event

Start

492018

27

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy53

Task A Task BFSbull Finish to Start

bull Finish to Finish Task C

Task D

FF

bull Start to Start Task E

Task F

SS

bull Start to Finish Task G Task HSF

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy54

CP= the sequence of schedule activities that determines the duration of the project

CPM-the longest path through the project forms the critical path and is also the shortest time in which a project can be completed

CPM=Forward andor backward pass

492018

28

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy55

B

Start

A

C

Finish

E

F

D

2 frac12 day float

BD

2

1 8

3 4 5 6 7

In Days

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy56

Who does the work

Select project team

Roles and Responsibilities Matrix

RACI chart

Resources can be internal or external

492018

29

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy57

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy58

35 h

20 h 15 h

30 h 35 h 35 h

25 h

5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for Bob

Hou

rs W

ork

ed

Ove

rtim

e

492018

30

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy59

35 h

20 h 15 h

30 h 35 h 35 h

20 h5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for BobH

ou

rs W

ork

ed

Ove

rtim

e

5 h

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy60

Day 1 Day 2 Day 3 Day 4 Day 6Day 5

1 brick layer

to do 6 days

of work will

take 6 days

2 brick layer

to do 6 days

of work will

take 3 days

492018

31

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy61

The planned dates for performing schedule activities and the planned dates for meeting

schedule milestones

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy62

De-scoping

ndash Analyzing alternatives on the critical path to determine how to reduce the schedule for the least amount of cost

ndash Not always a viable alternative

Crashing

ndash Analyzing the critical path to determine where to reduce the schedule for the least amount of cost while bring extra resources on

ndash Not always a viable alternative

Fast-Tracking

ndash Phases or activities that would have normally being done in sequence are done in parallel

ndash Can result in rework and increased risk

ndash Requires 3 X the amount of planning

Least $

A B

B

492018

32

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy63

Estimating

Budget preparation

Forecasting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy64

Co

st

Project target Cost

Time

Performance

Measurement

Baseline

Define the Work

Define the

Baseline Budget

Define the

Baseline ScheduleContingency

Budget

492018

33

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy65

Order of magnitude

Budget

Definitive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy66

Top down

Analogous

Parametric

Vendor bids

Bottom up

Detailed (piece by piece)

Three point or PERT

492018

34

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy67

The How

What is In and Out of Scope (detailed)

All the Work and only the Work

Network Diagram

Estimating

Critical Path

Output ndash Project Plan

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy68

Those processes performed

to complete the work

defined in the project

management plan to satisfy the project specifications

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

35

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy69

Destructive

Intervention

Constructive

Opportunity

Influence of

Stakeholders

and

Opportunity

to add value

Cost

Curve

$

Time

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy70

An uncertain event or condition

that if it occurs has a positive

or negative effect on one or

more of the project objectives

such as scope schedule

cost and quality

copyPMBOK regGuide Sixth Edition

492018

36

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy71

ldquoIncludes processes concerned with conducting risk

management planning identification analysis

responses and monitoring and control on a projectrdquo

copyPMBOK regGuide Sixth Edition

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Before the risk

Focus on prevention amp

planning

After the risk

Focus on recovery

Project

Start Project

Finish

Avoid Mitigate or Transfer Risks Use contingency plans

RiskManagement

492018

37

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy73

HighLow Impact

Hig

h

Low

Threaten

Failure

Minor

impactBig Impact if Occurs

ldquoEarthquakerdquo

Disruptive

ldquoDeath by

1000 cutsrdquo

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy74

Minimizes reactive crisis management

Increases likelihood of project success

Increases profitability

Prevents events impacting triple constraints

492018

38

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy75

1 Project Purpose

2 Objectives

3 Identified Risks

4 Risk Assessment

5 Risk Prevention

6 Risk Mitigation

7 Resources

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy76

492018

39

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy77

Work with your team and sponsor to identify stakeholders

Brainstorming works to develop a list that can be reviewed and finalized by the team

Key Stakeholders will usually emerge on their own

Stakeholders are persons and

organizations whose interests may be

positively or negatively affected by the

execution or completion of the project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy78

Ask each stakeholder 2 questions

bullWhat are your three major expectations from this project

bullWhat are your three major concerns related to this project

492018

40

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy79

Keep InformedMonitor(Minimal effort)

Manage Relationship

Closely

Keep Satisfied

InterestLow High

Low

High

Power

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy80

1 Analysis What do they need to know amp what do we want to say

1 Decide Communication Objectives2 Determine Vulnerabilities amp Issues3 Develop Key Messages4 Perform Stakeholder Analysis (interests concerns)

2 Design amp Build What methods and tools should we use

1 Build Communication Vehicles (reports websites etc)

3 Develop Plan Who How and When should they receive it

1 Develop Communication Plan 2 Update Overall Workplan for Communication Activities

4 Do it1 Execute Communication Plan2 Modify amp Adjust as needed

492018

41

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy81

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy82

1 Project Purpose

2 Objectives

3 Potential Issues

4 Key Messages

5 AudiencesStakeholders

6 Communication Vehicles

7 Communication Plan Matrix

8 Resources

492018

42

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy83

Planned the Work Now Work the Plan

But What IF (Risk Management)

85 of what PMs do is Communication

Stakeholder Management is Critical to Project

Success

Output ndash Unique product service delivery or

result

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy84

Those processes required to

track review and regulate the

progress and performance of

the project identify any areas in

which changes to the plan are

required and initiate the

corresponding changes

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

43

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy85

Is daily monitoring at the team level of resources tasks and schedule It is hellip

A vital component of tracking and managing progress

Managing the triple constraints

Relatively simple ldquouser friendlyrdquo and inexpensive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy86

Tasks

Requirements

Timing and performance

Resource utilization and outsourcing

Scope deliverables completion and product quality

Process improvement possibilities and lessons learned

Schedule and cost performance

492018

44

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy87

Initiate Assess Resolve CloseApprove

Senior team

a change

Senior team

member initiates

a change

Project manager

accepts or rejects

Project manager

accepts or rejects

change request

Change Analyst

makes assessment of

the change and gives

recommendations

Managers acceptChange Analyst

makes assessment of

the change and gives

recommendations

or reject the

change based on

the assessment

and

Managers accept

or reject the

change based on

the assessment

and

recommendations Project manager

creates and assigns

tasks if necessary

and updates project

plan

Document

closureReject

Accept

Accept

Reject

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy88

Project

Phase 1

Phase 2

Phase 3

Stage

Gate

Planning

Go No Go Decisions

492018

45

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy89

Today

Planned

Burned

Earned

Time

Co

st

CV

Planned

Finished

Actual

Finished

Late

Over

Budget

Cost Variance (CV) = Earned ndash Burned

Schedule Variance (SV) = Earned ndash Planned

SV

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy90

complete to date

Dashboard ndash scope quality time budget

Milestones and deliverables

Target revised complete

Budget

Approved spent to date estimated cost of work remaining estimated total cost

Major Risks amp Issues requiring reviewdecision

Accomplishments Plans for Next Period

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 8: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

8

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

1 On time on budget and

to specifications

2 Meet or exceed

stakeholder expectations

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy16

Senior Management Support

Clear Goals

Competent Project Manager

Adequate Resourcing

Project Management Framework

Change Control System

Project Vision

492018

9

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy17

$

Time

Initiation Planning Close Out

INITIAL CHARTER PLAN DELIVERABLE PIR

Initiation Planning Execution Close Out

INITIAL CHARTER PLAN DELIVERABLE CLOSE OUT REPORT

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy18

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

10

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Stakeholder Management

19

IntegrationManagement

Time Management

Cost Management

QualityManagement

HumanResource

Management

CommunicationManagement

RiskManagement

ProcurementManagement

ScopeManagement

Project Management Centre of Excellence Inc 2018 copy

Scope

Human Resource

Management

Quality

Management

Fixes

Risk

ManagementCommunication

Management

Procurement

Management

Integration

Management

20

Inco

rre

ct

exp

ecta

tio

ns

492018

11

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy21

PM

CustomerClientUser

Project Team members

Management team

Sponsor

PMO

Performing Organization

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Project Sponsor

Project Manager

Project Team Working Groups

StakeholdersSteering Committee

492018

12

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy23

The person that provides

the financial resources in

cash or in kind for the

project and has ultimate

accountability for project

success

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy24

Has overall

responsibility for the success of the project

492018

13

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy25

Consists of all individuals and groups who will be part of andor affected by the results of the

project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy26

Executive Director

Manger of

Functional Area 2

Manager of

Functional Area 3

Manager of

Functional Area 1

Manager Of

Functional Area 2

Resource Resource

Resource

Resource for

Project 3

Resource for

Project 3

Resource

Project Manager

for

Project 3

Resource

Resource for

Project 3

Resource

Resource

Resource for

Project 3

492018

14

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy27

1 What is a project

2 What is project management

3 What is a lifecycle

4 What are the 4 phases

5 What are the 5 processes

6 Who are the key stakeholders

7 What are the 10 knowledge areas

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy28

Defines and authorizes the project or a project phase

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

15

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy29

Project Selection

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy30

Project definition (preliminary scope statement)

Product service or result

Acceptance criteria

Requirements

Assumptions and constraints

492018

16

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy31

Project Management Centre of Excellence Inc 2018 copyApril 9 2018

32

492018

17

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy33

1 Right Need

2 Right Solution

3 Right Way

4 Right Benefit

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy34

Mandatory

Legislated

Discretionary

Business

End user

Technical

492018

18

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy35

Do we want a Project Manager or a Project Leader

Can a certified PMP Project Manager successfully manage any project

What Key PM skills do you need

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

ManagementLeadership

S

T

E

W

A

R

D

S

H

I

P

492018

19

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy37

Team Building

Coordination Skills

Interpersonal Skills

Communication Skills

Conflict Resolution Skills

Analytical Thinking

Strategic Thinking

Trouble Shooting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Trust

Influence

Negotiate

Awareness

38Project Management Centre of Excellence Inc

492018

20

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Trust = Speed Cost

OR

Trust = Speed Cost

Project Management Centre of Excellence Inc 2018 copy40

492018

21

1 Predictability

2 Reciprocation

3 Consistency and Commitment

4 Social Evidence

5 Authority

6 Liking

7 Scarcity

8 Self-interest

Project Management Centre of Excellence Inc 2018 copy492018Project Management Centre of Excellence Inc copy 2014

42

492018

22

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy43

Project Management Centre of Excellence Inc

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy44

Project Charter

492018

23

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy45

What is the what

What is the why

4Rs

Project Manager or Project Leader

Preliminary Scope Statement

Output ndash Project Charter

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy46

The processes performed to define and mature the project scope develop the project management plan and identify and schedule the project activities that

occur within the project Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

24

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Stakeholder Management

47

IntegrationManagement

Time Management

Cost Management

QualityManagement

HumanResource

Management

CommunicationManagement

RiskManagement

ProcurementManagement

ScopeManagement

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy48

Deliver the project results

492018

25

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy49

Specific

Measurable

Agreed-upon

Realistic

Time component

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy50

In-Scope Out of Scope

Includes both

492018

26

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy52

Plan and hold an event

Start

492018

27

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy53

Task A Task BFSbull Finish to Start

bull Finish to Finish Task C

Task D

FF

bull Start to Start Task E

Task F

SS

bull Start to Finish Task G Task HSF

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy54

CP= the sequence of schedule activities that determines the duration of the project

CPM-the longest path through the project forms the critical path and is also the shortest time in which a project can be completed

CPM=Forward andor backward pass

492018

28

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy55

B

Start

A

C

Finish

E

F

D

2 frac12 day float

BD

2

1 8

3 4 5 6 7

In Days

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy56

Who does the work

Select project team

Roles and Responsibilities Matrix

RACI chart

Resources can be internal or external

492018

29

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy57

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy58

35 h

20 h 15 h

30 h 35 h 35 h

25 h

5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for Bob

Hou

rs W

ork

ed

Ove

rtim

e

492018

30

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy59

35 h

20 h 15 h

30 h 35 h 35 h

20 h5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for BobH

ou

rs W

ork

ed

Ove

rtim

e

5 h

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy60

Day 1 Day 2 Day 3 Day 4 Day 6Day 5

1 brick layer

to do 6 days

of work will

take 6 days

2 brick layer

to do 6 days

of work will

take 3 days

492018

31

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy61

The planned dates for performing schedule activities and the planned dates for meeting

schedule milestones

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy62

De-scoping

ndash Analyzing alternatives on the critical path to determine how to reduce the schedule for the least amount of cost

ndash Not always a viable alternative

Crashing

ndash Analyzing the critical path to determine where to reduce the schedule for the least amount of cost while bring extra resources on

ndash Not always a viable alternative

Fast-Tracking

ndash Phases or activities that would have normally being done in sequence are done in parallel

ndash Can result in rework and increased risk

ndash Requires 3 X the amount of planning

Least $

A B

B

492018

32

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy63

Estimating

Budget preparation

Forecasting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy64

Co

st

Project target Cost

Time

Performance

Measurement

Baseline

Define the Work

Define the

Baseline Budget

Define the

Baseline ScheduleContingency

Budget

492018

33

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy65

Order of magnitude

Budget

Definitive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy66

Top down

Analogous

Parametric

Vendor bids

Bottom up

Detailed (piece by piece)

Three point or PERT

492018

34

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy67

The How

What is In and Out of Scope (detailed)

All the Work and only the Work

Network Diagram

Estimating

Critical Path

Output ndash Project Plan

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy68

Those processes performed

to complete the work

defined in the project

management plan to satisfy the project specifications

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

35

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy69

Destructive

Intervention

Constructive

Opportunity

Influence of

Stakeholders

and

Opportunity

to add value

Cost

Curve

$

Time

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy70

An uncertain event or condition

that if it occurs has a positive

or negative effect on one or

more of the project objectives

such as scope schedule

cost and quality

copyPMBOK regGuide Sixth Edition

492018

36

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy71

ldquoIncludes processes concerned with conducting risk

management planning identification analysis

responses and monitoring and control on a projectrdquo

copyPMBOK regGuide Sixth Edition

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Before the risk

Focus on prevention amp

planning

After the risk

Focus on recovery

Project

Start Project

Finish

Avoid Mitigate or Transfer Risks Use contingency plans

RiskManagement

492018

37

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy73

HighLow Impact

Hig

h

Low

Threaten

Failure

Minor

impactBig Impact if Occurs

ldquoEarthquakerdquo

Disruptive

ldquoDeath by

1000 cutsrdquo

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy74

Minimizes reactive crisis management

Increases likelihood of project success

Increases profitability

Prevents events impacting triple constraints

492018

38

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy75

1 Project Purpose

2 Objectives

3 Identified Risks

4 Risk Assessment

5 Risk Prevention

6 Risk Mitigation

7 Resources

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy76

492018

39

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy77

Work with your team and sponsor to identify stakeholders

Brainstorming works to develop a list that can be reviewed and finalized by the team

Key Stakeholders will usually emerge on their own

Stakeholders are persons and

organizations whose interests may be

positively or negatively affected by the

execution or completion of the project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy78

Ask each stakeholder 2 questions

bullWhat are your three major expectations from this project

bullWhat are your three major concerns related to this project

492018

40

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy79

Keep InformedMonitor(Minimal effort)

Manage Relationship

Closely

Keep Satisfied

InterestLow High

Low

High

Power

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy80

1 Analysis What do they need to know amp what do we want to say

1 Decide Communication Objectives2 Determine Vulnerabilities amp Issues3 Develop Key Messages4 Perform Stakeholder Analysis (interests concerns)

2 Design amp Build What methods and tools should we use

1 Build Communication Vehicles (reports websites etc)

3 Develop Plan Who How and When should they receive it

1 Develop Communication Plan 2 Update Overall Workplan for Communication Activities

4 Do it1 Execute Communication Plan2 Modify amp Adjust as needed

492018

41

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy81

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy82

1 Project Purpose

2 Objectives

3 Potential Issues

4 Key Messages

5 AudiencesStakeholders

6 Communication Vehicles

7 Communication Plan Matrix

8 Resources

492018

42

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy83

Planned the Work Now Work the Plan

But What IF (Risk Management)

85 of what PMs do is Communication

Stakeholder Management is Critical to Project

Success

Output ndash Unique product service delivery or

result

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy84

Those processes required to

track review and regulate the

progress and performance of

the project identify any areas in

which changes to the plan are

required and initiate the

corresponding changes

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

43

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy85

Is daily monitoring at the team level of resources tasks and schedule It is hellip

A vital component of tracking and managing progress

Managing the triple constraints

Relatively simple ldquouser friendlyrdquo and inexpensive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy86

Tasks

Requirements

Timing and performance

Resource utilization and outsourcing

Scope deliverables completion and product quality

Process improvement possibilities and lessons learned

Schedule and cost performance

492018

44

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy87

Initiate Assess Resolve CloseApprove

Senior team

a change

Senior team

member initiates

a change

Project manager

accepts or rejects

Project manager

accepts or rejects

change request

Change Analyst

makes assessment of

the change and gives

recommendations

Managers acceptChange Analyst

makes assessment of

the change and gives

recommendations

or reject the

change based on

the assessment

and

Managers accept

or reject the

change based on

the assessment

and

recommendations Project manager

creates and assigns

tasks if necessary

and updates project

plan

Document

closureReject

Accept

Accept

Reject

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy88

Project

Phase 1

Phase 2

Phase 3

Stage

Gate

Planning

Go No Go Decisions

492018

45

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy89

Today

Planned

Burned

Earned

Time

Co

st

CV

Planned

Finished

Actual

Finished

Late

Over

Budget

Cost Variance (CV) = Earned ndash Burned

Schedule Variance (SV) = Earned ndash Planned

SV

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy90

complete to date

Dashboard ndash scope quality time budget

Milestones and deliverables

Target revised complete

Budget

Approved spent to date estimated cost of work remaining estimated total cost

Major Risks amp Issues requiring reviewdecision

Accomplishments Plans for Next Period

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 9: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

9

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy17

$

Time

Initiation Planning Close Out

INITIAL CHARTER PLAN DELIVERABLE PIR

Initiation Planning Execution Close Out

INITIAL CHARTER PLAN DELIVERABLE CLOSE OUT REPORT

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy18

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

10

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Stakeholder Management

19

IntegrationManagement

Time Management

Cost Management

QualityManagement

HumanResource

Management

CommunicationManagement

RiskManagement

ProcurementManagement

ScopeManagement

Project Management Centre of Excellence Inc 2018 copy

Scope

Human Resource

Management

Quality

Management

Fixes

Risk

ManagementCommunication

Management

Procurement

Management

Integration

Management

20

Inco

rre

ct

exp

ecta

tio

ns

492018

11

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy21

PM

CustomerClientUser

Project Team members

Management team

Sponsor

PMO

Performing Organization

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Project Sponsor

Project Manager

Project Team Working Groups

StakeholdersSteering Committee

492018

12

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy23

The person that provides

the financial resources in

cash or in kind for the

project and has ultimate

accountability for project

success

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy24

Has overall

responsibility for the success of the project

492018

13

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy25

Consists of all individuals and groups who will be part of andor affected by the results of the

project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy26

Executive Director

Manger of

Functional Area 2

Manager of

Functional Area 3

Manager of

Functional Area 1

Manager Of

Functional Area 2

Resource Resource

Resource

Resource for

Project 3

Resource for

Project 3

Resource

Project Manager

for

Project 3

Resource

Resource for

Project 3

Resource

Resource

Resource for

Project 3

492018

14

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy27

1 What is a project

2 What is project management

3 What is a lifecycle

4 What are the 4 phases

5 What are the 5 processes

6 Who are the key stakeholders

7 What are the 10 knowledge areas

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy28

Defines and authorizes the project or a project phase

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

15

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy29

Project Selection

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy30

Project definition (preliminary scope statement)

Product service or result

Acceptance criteria

Requirements

Assumptions and constraints

492018

16

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy31

Project Management Centre of Excellence Inc 2018 copyApril 9 2018

32

492018

17

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy33

1 Right Need

2 Right Solution

3 Right Way

4 Right Benefit

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy34

Mandatory

Legislated

Discretionary

Business

End user

Technical

492018

18

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy35

Do we want a Project Manager or a Project Leader

Can a certified PMP Project Manager successfully manage any project

What Key PM skills do you need

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

ManagementLeadership

S

T

E

W

A

R

D

S

H

I

P

492018

19

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy37

Team Building

Coordination Skills

Interpersonal Skills

Communication Skills

Conflict Resolution Skills

Analytical Thinking

Strategic Thinking

Trouble Shooting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Trust

Influence

Negotiate

Awareness

38Project Management Centre of Excellence Inc

492018

20

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Trust = Speed Cost

OR

Trust = Speed Cost

Project Management Centre of Excellence Inc 2018 copy40

492018

21

1 Predictability

2 Reciprocation

3 Consistency and Commitment

4 Social Evidence

5 Authority

6 Liking

7 Scarcity

8 Self-interest

Project Management Centre of Excellence Inc 2018 copy492018Project Management Centre of Excellence Inc copy 2014

42

492018

22

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy43

Project Management Centre of Excellence Inc

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy44

Project Charter

492018

23

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy45

What is the what

What is the why

4Rs

Project Manager or Project Leader

Preliminary Scope Statement

Output ndash Project Charter

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy46

The processes performed to define and mature the project scope develop the project management plan and identify and schedule the project activities that

occur within the project Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

24

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Stakeholder Management

47

IntegrationManagement

Time Management

Cost Management

QualityManagement

HumanResource

Management

CommunicationManagement

RiskManagement

ProcurementManagement

ScopeManagement

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy48

Deliver the project results

492018

25

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy49

Specific

Measurable

Agreed-upon

Realistic

Time component

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy50

In-Scope Out of Scope

Includes both

492018

26

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy52

Plan and hold an event

Start

492018

27

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy53

Task A Task BFSbull Finish to Start

bull Finish to Finish Task C

Task D

FF

bull Start to Start Task E

Task F

SS

bull Start to Finish Task G Task HSF

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy54

CP= the sequence of schedule activities that determines the duration of the project

CPM-the longest path through the project forms the critical path and is also the shortest time in which a project can be completed

CPM=Forward andor backward pass

492018

28

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy55

B

Start

A

C

Finish

E

F

D

2 frac12 day float

BD

2

1 8

3 4 5 6 7

In Days

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy56

Who does the work

Select project team

Roles and Responsibilities Matrix

RACI chart

Resources can be internal or external

492018

29

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy57

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy58

35 h

20 h 15 h

30 h 35 h 35 h

25 h

5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for Bob

Hou

rs W

ork

ed

Ove

rtim

e

492018

30

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy59

35 h

20 h 15 h

30 h 35 h 35 h

20 h5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for BobH

ou

rs W

ork

ed

Ove

rtim

e

5 h

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy60

Day 1 Day 2 Day 3 Day 4 Day 6Day 5

1 brick layer

to do 6 days

of work will

take 6 days

2 brick layer

to do 6 days

of work will

take 3 days

492018

31

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy61

The planned dates for performing schedule activities and the planned dates for meeting

schedule milestones

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy62

De-scoping

ndash Analyzing alternatives on the critical path to determine how to reduce the schedule for the least amount of cost

ndash Not always a viable alternative

Crashing

ndash Analyzing the critical path to determine where to reduce the schedule for the least amount of cost while bring extra resources on

ndash Not always a viable alternative

Fast-Tracking

ndash Phases or activities that would have normally being done in sequence are done in parallel

ndash Can result in rework and increased risk

ndash Requires 3 X the amount of planning

Least $

A B

B

492018

32

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy63

Estimating

Budget preparation

Forecasting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy64

Co

st

Project target Cost

Time

Performance

Measurement

Baseline

Define the Work

Define the

Baseline Budget

Define the

Baseline ScheduleContingency

Budget

492018

33

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy65

Order of magnitude

Budget

Definitive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy66

Top down

Analogous

Parametric

Vendor bids

Bottom up

Detailed (piece by piece)

Three point or PERT

492018

34

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy67

The How

What is In and Out of Scope (detailed)

All the Work and only the Work

Network Diagram

Estimating

Critical Path

Output ndash Project Plan

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy68

Those processes performed

to complete the work

defined in the project

management plan to satisfy the project specifications

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

35

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy69

Destructive

Intervention

Constructive

Opportunity

Influence of

Stakeholders

and

Opportunity

to add value

Cost

Curve

$

Time

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy70

An uncertain event or condition

that if it occurs has a positive

or negative effect on one or

more of the project objectives

such as scope schedule

cost and quality

copyPMBOK regGuide Sixth Edition

492018

36

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy71

ldquoIncludes processes concerned with conducting risk

management planning identification analysis

responses and monitoring and control on a projectrdquo

copyPMBOK regGuide Sixth Edition

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Before the risk

Focus on prevention amp

planning

After the risk

Focus on recovery

Project

Start Project

Finish

Avoid Mitigate or Transfer Risks Use contingency plans

RiskManagement

492018

37

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy73

HighLow Impact

Hig

h

Low

Threaten

Failure

Minor

impactBig Impact if Occurs

ldquoEarthquakerdquo

Disruptive

ldquoDeath by

1000 cutsrdquo

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy74

Minimizes reactive crisis management

Increases likelihood of project success

Increases profitability

Prevents events impacting triple constraints

492018

38

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy75

1 Project Purpose

2 Objectives

3 Identified Risks

4 Risk Assessment

5 Risk Prevention

6 Risk Mitigation

7 Resources

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy76

492018

39

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy77

Work with your team and sponsor to identify stakeholders

Brainstorming works to develop a list that can be reviewed and finalized by the team

Key Stakeholders will usually emerge on their own

Stakeholders are persons and

organizations whose interests may be

positively or negatively affected by the

execution or completion of the project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy78

Ask each stakeholder 2 questions

bullWhat are your three major expectations from this project

bullWhat are your three major concerns related to this project

492018

40

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy79

Keep InformedMonitor(Minimal effort)

Manage Relationship

Closely

Keep Satisfied

InterestLow High

Low

High

Power

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy80

1 Analysis What do they need to know amp what do we want to say

1 Decide Communication Objectives2 Determine Vulnerabilities amp Issues3 Develop Key Messages4 Perform Stakeholder Analysis (interests concerns)

2 Design amp Build What methods and tools should we use

1 Build Communication Vehicles (reports websites etc)

3 Develop Plan Who How and When should they receive it

1 Develop Communication Plan 2 Update Overall Workplan for Communication Activities

4 Do it1 Execute Communication Plan2 Modify amp Adjust as needed

492018

41

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy81

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy82

1 Project Purpose

2 Objectives

3 Potential Issues

4 Key Messages

5 AudiencesStakeholders

6 Communication Vehicles

7 Communication Plan Matrix

8 Resources

492018

42

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy83

Planned the Work Now Work the Plan

But What IF (Risk Management)

85 of what PMs do is Communication

Stakeholder Management is Critical to Project

Success

Output ndash Unique product service delivery or

result

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy84

Those processes required to

track review and regulate the

progress and performance of

the project identify any areas in

which changes to the plan are

required and initiate the

corresponding changes

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

43

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy85

Is daily monitoring at the team level of resources tasks and schedule It is hellip

A vital component of tracking and managing progress

Managing the triple constraints

Relatively simple ldquouser friendlyrdquo and inexpensive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy86

Tasks

Requirements

Timing and performance

Resource utilization and outsourcing

Scope deliverables completion and product quality

Process improvement possibilities and lessons learned

Schedule and cost performance

492018

44

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy87

Initiate Assess Resolve CloseApprove

Senior team

a change

Senior team

member initiates

a change

Project manager

accepts or rejects

Project manager

accepts or rejects

change request

Change Analyst

makes assessment of

the change and gives

recommendations

Managers acceptChange Analyst

makes assessment of

the change and gives

recommendations

or reject the

change based on

the assessment

and

Managers accept

or reject the

change based on

the assessment

and

recommendations Project manager

creates and assigns

tasks if necessary

and updates project

plan

Document

closureReject

Accept

Accept

Reject

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy88

Project

Phase 1

Phase 2

Phase 3

Stage

Gate

Planning

Go No Go Decisions

492018

45

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy89

Today

Planned

Burned

Earned

Time

Co

st

CV

Planned

Finished

Actual

Finished

Late

Over

Budget

Cost Variance (CV) = Earned ndash Burned

Schedule Variance (SV) = Earned ndash Planned

SV

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy90

complete to date

Dashboard ndash scope quality time budget

Milestones and deliverables

Target revised complete

Budget

Approved spent to date estimated cost of work remaining estimated total cost

Major Risks amp Issues requiring reviewdecision

Accomplishments Plans for Next Period

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 10: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

10

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Stakeholder Management

19

IntegrationManagement

Time Management

Cost Management

QualityManagement

HumanResource

Management

CommunicationManagement

RiskManagement

ProcurementManagement

ScopeManagement

Project Management Centre of Excellence Inc 2018 copy

Scope

Human Resource

Management

Quality

Management

Fixes

Risk

ManagementCommunication

Management

Procurement

Management

Integration

Management

20

Inco

rre

ct

exp

ecta

tio

ns

492018

11

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy21

PM

CustomerClientUser

Project Team members

Management team

Sponsor

PMO

Performing Organization

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Project Sponsor

Project Manager

Project Team Working Groups

StakeholdersSteering Committee

492018

12

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy23

The person that provides

the financial resources in

cash or in kind for the

project and has ultimate

accountability for project

success

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy24

Has overall

responsibility for the success of the project

492018

13

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy25

Consists of all individuals and groups who will be part of andor affected by the results of the

project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy26

Executive Director

Manger of

Functional Area 2

Manager of

Functional Area 3

Manager of

Functional Area 1

Manager Of

Functional Area 2

Resource Resource

Resource

Resource for

Project 3

Resource for

Project 3

Resource

Project Manager

for

Project 3

Resource

Resource for

Project 3

Resource

Resource

Resource for

Project 3

492018

14

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy27

1 What is a project

2 What is project management

3 What is a lifecycle

4 What are the 4 phases

5 What are the 5 processes

6 Who are the key stakeholders

7 What are the 10 knowledge areas

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy28

Defines and authorizes the project or a project phase

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

15

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy29

Project Selection

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy30

Project definition (preliminary scope statement)

Product service or result

Acceptance criteria

Requirements

Assumptions and constraints

492018

16

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy31

Project Management Centre of Excellence Inc 2018 copyApril 9 2018

32

492018

17

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy33

1 Right Need

2 Right Solution

3 Right Way

4 Right Benefit

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy34

Mandatory

Legislated

Discretionary

Business

End user

Technical

492018

18

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy35

Do we want a Project Manager or a Project Leader

Can a certified PMP Project Manager successfully manage any project

What Key PM skills do you need

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

ManagementLeadership

S

T

E

W

A

R

D

S

H

I

P

492018

19

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy37

Team Building

Coordination Skills

Interpersonal Skills

Communication Skills

Conflict Resolution Skills

Analytical Thinking

Strategic Thinking

Trouble Shooting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Trust

Influence

Negotiate

Awareness

38Project Management Centre of Excellence Inc

492018

20

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Trust = Speed Cost

OR

Trust = Speed Cost

Project Management Centre of Excellence Inc 2018 copy40

492018

21

1 Predictability

2 Reciprocation

3 Consistency and Commitment

4 Social Evidence

5 Authority

6 Liking

7 Scarcity

8 Self-interest

Project Management Centre of Excellence Inc 2018 copy492018Project Management Centre of Excellence Inc copy 2014

42

492018

22

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy43

Project Management Centre of Excellence Inc

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy44

Project Charter

492018

23

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy45

What is the what

What is the why

4Rs

Project Manager or Project Leader

Preliminary Scope Statement

Output ndash Project Charter

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy46

The processes performed to define and mature the project scope develop the project management plan and identify and schedule the project activities that

occur within the project Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

24

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Stakeholder Management

47

IntegrationManagement

Time Management

Cost Management

QualityManagement

HumanResource

Management

CommunicationManagement

RiskManagement

ProcurementManagement

ScopeManagement

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy48

Deliver the project results

492018

25

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy49

Specific

Measurable

Agreed-upon

Realistic

Time component

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy50

In-Scope Out of Scope

Includes both

492018

26

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy52

Plan and hold an event

Start

492018

27

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy53

Task A Task BFSbull Finish to Start

bull Finish to Finish Task C

Task D

FF

bull Start to Start Task E

Task F

SS

bull Start to Finish Task G Task HSF

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy54

CP= the sequence of schedule activities that determines the duration of the project

CPM-the longest path through the project forms the critical path and is also the shortest time in which a project can be completed

CPM=Forward andor backward pass

492018

28

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy55

B

Start

A

C

Finish

E

F

D

2 frac12 day float

BD

2

1 8

3 4 5 6 7

In Days

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy56

Who does the work

Select project team

Roles and Responsibilities Matrix

RACI chart

Resources can be internal or external

492018

29

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy57

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy58

35 h

20 h 15 h

30 h 35 h 35 h

25 h

5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for Bob

Hou

rs W

ork

ed

Ove

rtim

e

492018

30

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy59

35 h

20 h 15 h

30 h 35 h 35 h

20 h5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for BobH

ou

rs W

ork

ed

Ove

rtim

e

5 h

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy60

Day 1 Day 2 Day 3 Day 4 Day 6Day 5

1 brick layer

to do 6 days

of work will

take 6 days

2 brick layer

to do 6 days

of work will

take 3 days

492018

31

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy61

The planned dates for performing schedule activities and the planned dates for meeting

schedule milestones

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy62

De-scoping

ndash Analyzing alternatives on the critical path to determine how to reduce the schedule for the least amount of cost

ndash Not always a viable alternative

Crashing

ndash Analyzing the critical path to determine where to reduce the schedule for the least amount of cost while bring extra resources on

ndash Not always a viable alternative

Fast-Tracking

ndash Phases or activities that would have normally being done in sequence are done in parallel

ndash Can result in rework and increased risk

ndash Requires 3 X the amount of planning

Least $

A B

B

492018

32

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy63

Estimating

Budget preparation

Forecasting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy64

Co

st

Project target Cost

Time

Performance

Measurement

Baseline

Define the Work

Define the

Baseline Budget

Define the

Baseline ScheduleContingency

Budget

492018

33

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy65

Order of magnitude

Budget

Definitive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy66

Top down

Analogous

Parametric

Vendor bids

Bottom up

Detailed (piece by piece)

Three point or PERT

492018

34

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy67

The How

What is In and Out of Scope (detailed)

All the Work and only the Work

Network Diagram

Estimating

Critical Path

Output ndash Project Plan

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy68

Those processes performed

to complete the work

defined in the project

management plan to satisfy the project specifications

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

35

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy69

Destructive

Intervention

Constructive

Opportunity

Influence of

Stakeholders

and

Opportunity

to add value

Cost

Curve

$

Time

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy70

An uncertain event or condition

that if it occurs has a positive

or negative effect on one or

more of the project objectives

such as scope schedule

cost and quality

copyPMBOK regGuide Sixth Edition

492018

36

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy71

ldquoIncludes processes concerned with conducting risk

management planning identification analysis

responses and monitoring and control on a projectrdquo

copyPMBOK regGuide Sixth Edition

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Before the risk

Focus on prevention amp

planning

After the risk

Focus on recovery

Project

Start Project

Finish

Avoid Mitigate or Transfer Risks Use contingency plans

RiskManagement

492018

37

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy73

HighLow Impact

Hig

h

Low

Threaten

Failure

Minor

impactBig Impact if Occurs

ldquoEarthquakerdquo

Disruptive

ldquoDeath by

1000 cutsrdquo

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy74

Minimizes reactive crisis management

Increases likelihood of project success

Increases profitability

Prevents events impacting triple constraints

492018

38

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy75

1 Project Purpose

2 Objectives

3 Identified Risks

4 Risk Assessment

5 Risk Prevention

6 Risk Mitigation

7 Resources

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy76

492018

39

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy77

Work with your team and sponsor to identify stakeholders

Brainstorming works to develop a list that can be reviewed and finalized by the team

Key Stakeholders will usually emerge on their own

Stakeholders are persons and

organizations whose interests may be

positively or negatively affected by the

execution or completion of the project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy78

Ask each stakeholder 2 questions

bullWhat are your three major expectations from this project

bullWhat are your three major concerns related to this project

492018

40

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy79

Keep InformedMonitor(Minimal effort)

Manage Relationship

Closely

Keep Satisfied

InterestLow High

Low

High

Power

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy80

1 Analysis What do they need to know amp what do we want to say

1 Decide Communication Objectives2 Determine Vulnerabilities amp Issues3 Develop Key Messages4 Perform Stakeholder Analysis (interests concerns)

2 Design amp Build What methods and tools should we use

1 Build Communication Vehicles (reports websites etc)

3 Develop Plan Who How and When should they receive it

1 Develop Communication Plan 2 Update Overall Workplan for Communication Activities

4 Do it1 Execute Communication Plan2 Modify amp Adjust as needed

492018

41

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy81

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy82

1 Project Purpose

2 Objectives

3 Potential Issues

4 Key Messages

5 AudiencesStakeholders

6 Communication Vehicles

7 Communication Plan Matrix

8 Resources

492018

42

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy83

Planned the Work Now Work the Plan

But What IF (Risk Management)

85 of what PMs do is Communication

Stakeholder Management is Critical to Project

Success

Output ndash Unique product service delivery or

result

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy84

Those processes required to

track review and regulate the

progress and performance of

the project identify any areas in

which changes to the plan are

required and initiate the

corresponding changes

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

43

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy85

Is daily monitoring at the team level of resources tasks and schedule It is hellip

A vital component of tracking and managing progress

Managing the triple constraints

Relatively simple ldquouser friendlyrdquo and inexpensive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy86

Tasks

Requirements

Timing and performance

Resource utilization and outsourcing

Scope deliverables completion and product quality

Process improvement possibilities and lessons learned

Schedule and cost performance

492018

44

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy87

Initiate Assess Resolve CloseApprove

Senior team

a change

Senior team

member initiates

a change

Project manager

accepts or rejects

Project manager

accepts or rejects

change request

Change Analyst

makes assessment of

the change and gives

recommendations

Managers acceptChange Analyst

makes assessment of

the change and gives

recommendations

or reject the

change based on

the assessment

and

Managers accept

or reject the

change based on

the assessment

and

recommendations Project manager

creates and assigns

tasks if necessary

and updates project

plan

Document

closureReject

Accept

Accept

Reject

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy88

Project

Phase 1

Phase 2

Phase 3

Stage

Gate

Planning

Go No Go Decisions

492018

45

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy89

Today

Planned

Burned

Earned

Time

Co

st

CV

Planned

Finished

Actual

Finished

Late

Over

Budget

Cost Variance (CV) = Earned ndash Burned

Schedule Variance (SV) = Earned ndash Planned

SV

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy90

complete to date

Dashboard ndash scope quality time budget

Milestones and deliverables

Target revised complete

Budget

Approved spent to date estimated cost of work remaining estimated total cost

Major Risks amp Issues requiring reviewdecision

Accomplishments Plans for Next Period

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 11: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

11

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy21

PM

CustomerClientUser

Project Team members

Management team

Sponsor

PMO

Performing Organization

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Project Sponsor

Project Manager

Project Team Working Groups

StakeholdersSteering Committee

492018

12

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy23

The person that provides

the financial resources in

cash or in kind for the

project and has ultimate

accountability for project

success

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy24

Has overall

responsibility for the success of the project

492018

13

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy25

Consists of all individuals and groups who will be part of andor affected by the results of the

project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy26

Executive Director

Manger of

Functional Area 2

Manager of

Functional Area 3

Manager of

Functional Area 1

Manager Of

Functional Area 2

Resource Resource

Resource

Resource for

Project 3

Resource for

Project 3

Resource

Project Manager

for

Project 3

Resource

Resource for

Project 3

Resource

Resource

Resource for

Project 3

492018

14

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy27

1 What is a project

2 What is project management

3 What is a lifecycle

4 What are the 4 phases

5 What are the 5 processes

6 Who are the key stakeholders

7 What are the 10 knowledge areas

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy28

Defines and authorizes the project or a project phase

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

15

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy29

Project Selection

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy30

Project definition (preliminary scope statement)

Product service or result

Acceptance criteria

Requirements

Assumptions and constraints

492018

16

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy31

Project Management Centre of Excellence Inc 2018 copyApril 9 2018

32

492018

17

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy33

1 Right Need

2 Right Solution

3 Right Way

4 Right Benefit

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy34

Mandatory

Legislated

Discretionary

Business

End user

Technical

492018

18

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy35

Do we want a Project Manager or a Project Leader

Can a certified PMP Project Manager successfully manage any project

What Key PM skills do you need

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

ManagementLeadership

S

T

E

W

A

R

D

S

H

I

P

492018

19

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy37

Team Building

Coordination Skills

Interpersonal Skills

Communication Skills

Conflict Resolution Skills

Analytical Thinking

Strategic Thinking

Trouble Shooting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Trust

Influence

Negotiate

Awareness

38Project Management Centre of Excellence Inc

492018

20

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Trust = Speed Cost

OR

Trust = Speed Cost

Project Management Centre of Excellence Inc 2018 copy40

492018

21

1 Predictability

2 Reciprocation

3 Consistency and Commitment

4 Social Evidence

5 Authority

6 Liking

7 Scarcity

8 Self-interest

Project Management Centre of Excellence Inc 2018 copy492018Project Management Centre of Excellence Inc copy 2014

42

492018

22

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy43

Project Management Centre of Excellence Inc

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy44

Project Charter

492018

23

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy45

What is the what

What is the why

4Rs

Project Manager or Project Leader

Preliminary Scope Statement

Output ndash Project Charter

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy46

The processes performed to define and mature the project scope develop the project management plan and identify and schedule the project activities that

occur within the project Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

24

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Stakeholder Management

47

IntegrationManagement

Time Management

Cost Management

QualityManagement

HumanResource

Management

CommunicationManagement

RiskManagement

ProcurementManagement

ScopeManagement

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy48

Deliver the project results

492018

25

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy49

Specific

Measurable

Agreed-upon

Realistic

Time component

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy50

In-Scope Out of Scope

Includes both

492018

26

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy52

Plan and hold an event

Start

492018

27

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy53

Task A Task BFSbull Finish to Start

bull Finish to Finish Task C

Task D

FF

bull Start to Start Task E

Task F

SS

bull Start to Finish Task G Task HSF

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy54

CP= the sequence of schedule activities that determines the duration of the project

CPM-the longest path through the project forms the critical path and is also the shortest time in which a project can be completed

CPM=Forward andor backward pass

492018

28

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy55

B

Start

A

C

Finish

E

F

D

2 frac12 day float

BD

2

1 8

3 4 5 6 7

In Days

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy56

Who does the work

Select project team

Roles and Responsibilities Matrix

RACI chart

Resources can be internal or external

492018

29

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy57

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy58

35 h

20 h 15 h

30 h 35 h 35 h

25 h

5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for Bob

Hou

rs W

ork

ed

Ove

rtim

e

492018

30

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy59

35 h

20 h 15 h

30 h 35 h 35 h

20 h5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for BobH

ou

rs W

ork

ed

Ove

rtim

e

5 h

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy60

Day 1 Day 2 Day 3 Day 4 Day 6Day 5

1 brick layer

to do 6 days

of work will

take 6 days

2 brick layer

to do 6 days

of work will

take 3 days

492018

31

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy61

The planned dates for performing schedule activities and the planned dates for meeting

schedule milestones

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy62

De-scoping

ndash Analyzing alternatives on the critical path to determine how to reduce the schedule for the least amount of cost

ndash Not always a viable alternative

Crashing

ndash Analyzing the critical path to determine where to reduce the schedule for the least amount of cost while bring extra resources on

ndash Not always a viable alternative

Fast-Tracking

ndash Phases or activities that would have normally being done in sequence are done in parallel

ndash Can result in rework and increased risk

ndash Requires 3 X the amount of planning

Least $

A B

B

492018

32

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy63

Estimating

Budget preparation

Forecasting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy64

Co

st

Project target Cost

Time

Performance

Measurement

Baseline

Define the Work

Define the

Baseline Budget

Define the

Baseline ScheduleContingency

Budget

492018

33

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy65

Order of magnitude

Budget

Definitive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy66

Top down

Analogous

Parametric

Vendor bids

Bottom up

Detailed (piece by piece)

Three point or PERT

492018

34

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy67

The How

What is In and Out of Scope (detailed)

All the Work and only the Work

Network Diagram

Estimating

Critical Path

Output ndash Project Plan

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy68

Those processes performed

to complete the work

defined in the project

management plan to satisfy the project specifications

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

35

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy69

Destructive

Intervention

Constructive

Opportunity

Influence of

Stakeholders

and

Opportunity

to add value

Cost

Curve

$

Time

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy70

An uncertain event or condition

that if it occurs has a positive

or negative effect on one or

more of the project objectives

such as scope schedule

cost and quality

copyPMBOK regGuide Sixth Edition

492018

36

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy71

ldquoIncludes processes concerned with conducting risk

management planning identification analysis

responses and monitoring and control on a projectrdquo

copyPMBOK regGuide Sixth Edition

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Before the risk

Focus on prevention amp

planning

After the risk

Focus on recovery

Project

Start Project

Finish

Avoid Mitigate or Transfer Risks Use contingency plans

RiskManagement

492018

37

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy73

HighLow Impact

Hig

h

Low

Threaten

Failure

Minor

impactBig Impact if Occurs

ldquoEarthquakerdquo

Disruptive

ldquoDeath by

1000 cutsrdquo

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy74

Minimizes reactive crisis management

Increases likelihood of project success

Increases profitability

Prevents events impacting triple constraints

492018

38

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy75

1 Project Purpose

2 Objectives

3 Identified Risks

4 Risk Assessment

5 Risk Prevention

6 Risk Mitigation

7 Resources

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy76

492018

39

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy77

Work with your team and sponsor to identify stakeholders

Brainstorming works to develop a list that can be reviewed and finalized by the team

Key Stakeholders will usually emerge on their own

Stakeholders are persons and

organizations whose interests may be

positively or negatively affected by the

execution or completion of the project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy78

Ask each stakeholder 2 questions

bullWhat are your three major expectations from this project

bullWhat are your three major concerns related to this project

492018

40

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy79

Keep InformedMonitor(Minimal effort)

Manage Relationship

Closely

Keep Satisfied

InterestLow High

Low

High

Power

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy80

1 Analysis What do they need to know amp what do we want to say

1 Decide Communication Objectives2 Determine Vulnerabilities amp Issues3 Develop Key Messages4 Perform Stakeholder Analysis (interests concerns)

2 Design amp Build What methods and tools should we use

1 Build Communication Vehicles (reports websites etc)

3 Develop Plan Who How and When should they receive it

1 Develop Communication Plan 2 Update Overall Workplan for Communication Activities

4 Do it1 Execute Communication Plan2 Modify amp Adjust as needed

492018

41

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy81

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy82

1 Project Purpose

2 Objectives

3 Potential Issues

4 Key Messages

5 AudiencesStakeholders

6 Communication Vehicles

7 Communication Plan Matrix

8 Resources

492018

42

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy83

Planned the Work Now Work the Plan

But What IF (Risk Management)

85 of what PMs do is Communication

Stakeholder Management is Critical to Project

Success

Output ndash Unique product service delivery or

result

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy84

Those processes required to

track review and regulate the

progress and performance of

the project identify any areas in

which changes to the plan are

required and initiate the

corresponding changes

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

43

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy85

Is daily monitoring at the team level of resources tasks and schedule It is hellip

A vital component of tracking and managing progress

Managing the triple constraints

Relatively simple ldquouser friendlyrdquo and inexpensive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy86

Tasks

Requirements

Timing and performance

Resource utilization and outsourcing

Scope deliverables completion and product quality

Process improvement possibilities and lessons learned

Schedule and cost performance

492018

44

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy87

Initiate Assess Resolve CloseApprove

Senior team

a change

Senior team

member initiates

a change

Project manager

accepts or rejects

Project manager

accepts or rejects

change request

Change Analyst

makes assessment of

the change and gives

recommendations

Managers acceptChange Analyst

makes assessment of

the change and gives

recommendations

or reject the

change based on

the assessment

and

Managers accept

or reject the

change based on

the assessment

and

recommendations Project manager

creates and assigns

tasks if necessary

and updates project

plan

Document

closureReject

Accept

Accept

Reject

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy88

Project

Phase 1

Phase 2

Phase 3

Stage

Gate

Planning

Go No Go Decisions

492018

45

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy89

Today

Planned

Burned

Earned

Time

Co

st

CV

Planned

Finished

Actual

Finished

Late

Over

Budget

Cost Variance (CV) = Earned ndash Burned

Schedule Variance (SV) = Earned ndash Planned

SV

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy90

complete to date

Dashboard ndash scope quality time budget

Milestones and deliverables

Target revised complete

Budget

Approved spent to date estimated cost of work remaining estimated total cost

Major Risks amp Issues requiring reviewdecision

Accomplishments Plans for Next Period

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 12: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

12

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy23

The person that provides

the financial resources in

cash or in kind for the

project and has ultimate

accountability for project

success

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy24

Has overall

responsibility for the success of the project

492018

13

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy25

Consists of all individuals and groups who will be part of andor affected by the results of the

project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy26

Executive Director

Manger of

Functional Area 2

Manager of

Functional Area 3

Manager of

Functional Area 1

Manager Of

Functional Area 2

Resource Resource

Resource

Resource for

Project 3

Resource for

Project 3

Resource

Project Manager

for

Project 3

Resource

Resource for

Project 3

Resource

Resource

Resource for

Project 3

492018

14

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy27

1 What is a project

2 What is project management

3 What is a lifecycle

4 What are the 4 phases

5 What are the 5 processes

6 Who are the key stakeholders

7 What are the 10 knowledge areas

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy28

Defines and authorizes the project or a project phase

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

15

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy29

Project Selection

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy30

Project definition (preliminary scope statement)

Product service or result

Acceptance criteria

Requirements

Assumptions and constraints

492018

16

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy31

Project Management Centre of Excellence Inc 2018 copyApril 9 2018

32

492018

17

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy33

1 Right Need

2 Right Solution

3 Right Way

4 Right Benefit

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy34

Mandatory

Legislated

Discretionary

Business

End user

Technical

492018

18

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy35

Do we want a Project Manager or a Project Leader

Can a certified PMP Project Manager successfully manage any project

What Key PM skills do you need

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

ManagementLeadership

S

T

E

W

A

R

D

S

H

I

P

492018

19

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy37

Team Building

Coordination Skills

Interpersonal Skills

Communication Skills

Conflict Resolution Skills

Analytical Thinking

Strategic Thinking

Trouble Shooting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Trust

Influence

Negotiate

Awareness

38Project Management Centre of Excellence Inc

492018

20

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Trust = Speed Cost

OR

Trust = Speed Cost

Project Management Centre of Excellence Inc 2018 copy40

492018

21

1 Predictability

2 Reciprocation

3 Consistency and Commitment

4 Social Evidence

5 Authority

6 Liking

7 Scarcity

8 Self-interest

Project Management Centre of Excellence Inc 2018 copy492018Project Management Centre of Excellence Inc copy 2014

42

492018

22

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy43

Project Management Centre of Excellence Inc

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy44

Project Charter

492018

23

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy45

What is the what

What is the why

4Rs

Project Manager or Project Leader

Preliminary Scope Statement

Output ndash Project Charter

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy46

The processes performed to define and mature the project scope develop the project management plan and identify and schedule the project activities that

occur within the project Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

24

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Stakeholder Management

47

IntegrationManagement

Time Management

Cost Management

QualityManagement

HumanResource

Management

CommunicationManagement

RiskManagement

ProcurementManagement

ScopeManagement

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy48

Deliver the project results

492018

25

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy49

Specific

Measurable

Agreed-upon

Realistic

Time component

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy50

In-Scope Out of Scope

Includes both

492018

26

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy52

Plan and hold an event

Start

492018

27

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy53

Task A Task BFSbull Finish to Start

bull Finish to Finish Task C

Task D

FF

bull Start to Start Task E

Task F

SS

bull Start to Finish Task G Task HSF

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy54

CP= the sequence of schedule activities that determines the duration of the project

CPM-the longest path through the project forms the critical path and is also the shortest time in which a project can be completed

CPM=Forward andor backward pass

492018

28

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy55

B

Start

A

C

Finish

E

F

D

2 frac12 day float

BD

2

1 8

3 4 5 6 7

In Days

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy56

Who does the work

Select project team

Roles and Responsibilities Matrix

RACI chart

Resources can be internal or external

492018

29

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy57

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy58

35 h

20 h 15 h

30 h 35 h 35 h

25 h

5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for Bob

Hou

rs W

ork

ed

Ove

rtim

e

492018

30

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy59

35 h

20 h 15 h

30 h 35 h 35 h

20 h5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for BobH

ou

rs W

ork

ed

Ove

rtim

e

5 h

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy60

Day 1 Day 2 Day 3 Day 4 Day 6Day 5

1 brick layer

to do 6 days

of work will

take 6 days

2 brick layer

to do 6 days

of work will

take 3 days

492018

31

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy61

The planned dates for performing schedule activities and the planned dates for meeting

schedule milestones

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy62

De-scoping

ndash Analyzing alternatives on the critical path to determine how to reduce the schedule for the least amount of cost

ndash Not always a viable alternative

Crashing

ndash Analyzing the critical path to determine where to reduce the schedule for the least amount of cost while bring extra resources on

ndash Not always a viable alternative

Fast-Tracking

ndash Phases or activities that would have normally being done in sequence are done in parallel

ndash Can result in rework and increased risk

ndash Requires 3 X the amount of planning

Least $

A B

B

492018

32

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy63

Estimating

Budget preparation

Forecasting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy64

Co

st

Project target Cost

Time

Performance

Measurement

Baseline

Define the Work

Define the

Baseline Budget

Define the

Baseline ScheduleContingency

Budget

492018

33

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy65

Order of magnitude

Budget

Definitive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy66

Top down

Analogous

Parametric

Vendor bids

Bottom up

Detailed (piece by piece)

Three point or PERT

492018

34

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy67

The How

What is In and Out of Scope (detailed)

All the Work and only the Work

Network Diagram

Estimating

Critical Path

Output ndash Project Plan

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy68

Those processes performed

to complete the work

defined in the project

management plan to satisfy the project specifications

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

35

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy69

Destructive

Intervention

Constructive

Opportunity

Influence of

Stakeholders

and

Opportunity

to add value

Cost

Curve

$

Time

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy70

An uncertain event or condition

that if it occurs has a positive

or negative effect on one or

more of the project objectives

such as scope schedule

cost and quality

copyPMBOK regGuide Sixth Edition

492018

36

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy71

ldquoIncludes processes concerned with conducting risk

management planning identification analysis

responses and monitoring and control on a projectrdquo

copyPMBOK regGuide Sixth Edition

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Before the risk

Focus on prevention amp

planning

After the risk

Focus on recovery

Project

Start Project

Finish

Avoid Mitigate or Transfer Risks Use contingency plans

RiskManagement

492018

37

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy73

HighLow Impact

Hig

h

Low

Threaten

Failure

Minor

impactBig Impact if Occurs

ldquoEarthquakerdquo

Disruptive

ldquoDeath by

1000 cutsrdquo

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy74

Minimizes reactive crisis management

Increases likelihood of project success

Increases profitability

Prevents events impacting triple constraints

492018

38

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy75

1 Project Purpose

2 Objectives

3 Identified Risks

4 Risk Assessment

5 Risk Prevention

6 Risk Mitigation

7 Resources

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy76

492018

39

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy77

Work with your team and sponsor to identify stakeholders

Brainstorming works to develop a list that can be reviewed and finalized by the team

Key Stakeholders will usually emerge on their own

Stakeholders are persons and

organizations whose interests may be

positively or negatively affected by the

execution or completion of the project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy78

Ask each stakeholder 2 questions

bullWhat are your three major expectations from this project

bullWhat are your three major concerns related to this project

492018

40

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy79

Keep InformedMonitor(Minimal effort)

Manage Relationship

Closely

Keep Satisfied

InterestLow High

Low

High

Power

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy80

1 Analysis What do they need to know amp what do we want to say

1 Decide Communication Objectives2 Determine Vulnerabilities amp Issues3 Develop Key Messages4 Perform Stakeholder Analysis (interests concerns)

2 Design amp Build What methods and tools should we use

1 Build Communication Vehicles (reports websites etc)

3 Develop Plan Who How and When should they receive it

1 Develop Communication Plan 2 Update Overall Workplan for Communication Activities

4 Do it1 Execute Communication Plan2 Modify amp Adjust as needed

492018

41

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy81

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy82

1 Project Purpose

2 Objectives

3 Potential Issues

4 Key Messages

5 AudiencesStakeholders

6 Communication Vehicles

7 Communication Plan Matrix

8 Resources

492018

42

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy83

Planned the Work Now Work the Plan

But What IF (Risk Management)

85 of what PMs do is Communication

Stakeholder Management is Critical to Project

Success

Output ndash Unique product service delivery or

result

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy84

Those processes required to

track review and regulate the

progress and performance of

the project identify any areas in

which changes to the plan are

required and initiate the

corresponding changes

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

43

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy85

Is daily monitoring at the team level of resources tasks and schedule It is hellip

A vital component of tracking and managing progress

Managing the triple constraints

Relatively simple ldquouser friendlyrdquo and inexpensive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy86

Tasks

Requirements

Timing and performance

Resource utilization and outsourcing

Scope deliverables completion and product quality

Process improvement possibilities and lessons learned

Schedule and cost performance

492018

44

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy87

Initiate Assess Resolve CloseApprove

Senior team

a change

Senior team

member initiates

a change

Project manager

accepts or rejects

Project manager

accepts or rejects

change request

Change Analyst

makes assessment of

the change and gives

recommendations

Managers acceptChange Analyst

makes assessment of

the change and gives

recommendations

or reject the

change based on

the assessment

and

Managers accept

or reject the

change based on

the assessment

and

recommendations Project manager

creates and assigns

tasks if necessary

and updates project

plan

Document

closureReject

Accept

Accept

Reject

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy88

Project

Phase 1

Phase 2

Phase 3

Stage

Gate

Planning

Go No Go Decisions

492018

45

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy89

Today

Planned

Burned

Earned

Time

Co

st

CV

Planned

Finished

Actual

Finished

Late

Over

Budget

Cost Variance (CV) = Earned ndash Burned

Schedule Variance (SV) = Earned ndash Planned

SV

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy90

complete to date

Dashboard ndash scope quality time budget

Milestones and deliverables

Target revised complete

Budget

Approved spent to date estimated cost of work remaining estimated total cost

Major Risks amp Issues requiring reviewdecision

Accomplishments Plans for Next Period

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 13: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

13

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy25

Consists of all individuals and groups who will be part of andor affected by the results of the

project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy26

Executive Director

Manger of

Functional Area 2

Manager of

Functional Area 3

Manager of

Functional Area 1

Manager Of

Functional Area 2

Resource Resource

Resource

Resource for

Project 3

Resource for

Project 3

Resource

Project Manager

for

Project 3

Resource

Resource for

Project 3

Resource

Resource

Resource for

Project 3

492018

14

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy27

1 What is a project

2 What is project management

3 What is a lifecycle

4 What are the 4 phases

5 What are the 5 processes

6 Who are the key stakeholders

7 What are the 10 knowledge areas

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy28

Defines and authorizes the project or a project phase

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

15

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy29

Project Selection

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy30

Project definition (preliminary scope statement)

Product service or result

Acceptance criteria

Requirements

Assumptions and constraints

492018

16

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy31

Project Management Centre of Excellence Inc 2018 copyApril 9 2018

32

492018

17

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy33

1 Right Need

2 Right Solution

3 Right Way

4 Right Benefit

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy34

Mandatory

Legislated

Discretionary

Business

End user

Technical

492018

18

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy35

Do we want a Project Manager or a Project Leader

Can a certified PMP Project Manager successfully manage any project

What Key PM skills do you need

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

ManagementLeadership

S

T

E

W

A

R

D

S

H

I

P

492018

19

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy37

Team Building

Coordination Skills

Interpersonal Skills

Communication Skills

Conflict Resolution Skills

Analytical Thinking

Strategic Thinking

Trouble Shooting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Trust

Influence

Negotiate

Awareness

38Project Management Centre of Excellence Inc

492018

20

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Trust = Speed Cost

OR

Trust = Speed Cost

Project Management Centre of Excellence Inc 2018 copy40

492018

21

1 Predictability

2 Reciprocation

3 Consistency and Commitment

4 Social Evidence

5 Authority

6 Liking

7 Scarcity

8 Self-interest

Project Management Centre of Excellence Inc 2018 copy492018Project Management Centre of Excellence Inc copy 2014

42

492018

22

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy43

Project Management Centre of Excellence Inc

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy44

Project Charter

492018

23

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy45

What is the what

What is the why

4Rs

Project Manager or Project Leader

Preliminary Scope Statement

Output ndash Project Charter

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy46

The processes performed to define and mature the project scope develop the project management plan and identify and schedule the project activities that

occur within the project Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

24

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Stakeholder Management

47

IntegrationManagement

Time Management

Cost Management

QualityManagement

HumanResource

Management

CommunicationManagement

RiskManagement

ProcurementManagement

ScopeManagement

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy48

Deliver the project results

492018

25

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy49

Specific

Measurable

Agreed-upon

Realistic

Time component

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy50

In-Scope Out of Scope

Includes both

492018

26

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy52

Plan and hold an event

Start

492018

27

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy53

Task A Task BFSbull Finish to Start

bull Finish to Finish Task C

Task D

FF

bull Start to Start Task E

Task F

SS

bull Start to Finish Task G Task HSF

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy54

CP= the sequence of schedule activities that determines the duration of the project

CPM-the longest path through the project forms the critical path and is also the shortest time in which a project can be completed

CPM=Forward andor backward pass

492018

28

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy55

B

Start

A

C

Finish

E

F

D

2 frac12 day float

BD

2

1 8

3 4 5 6 7

In Days

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy56

Who does the work

Select project team

Roles and Responsibilities Matrix

RACI chart

Resources can be internal or external

492018

29

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy57

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy58

35 h

20 h 15 h

30 h 35 h 35 h

25 h

5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for Bob

Hou

rs W

ork

ed

Ove

rtim

e

492018

30

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy59

35 h

20 h 15 h

30 h 35 h 35 h

20 h5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for BobH

ou

rs W

ork

ed

Ove

rtim

e

5 h

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy60

Day 1 Day 2 Day 3 Day 4 Day 6Day 5

1 brick layer

to do 6 days

of work will

take 6 days

2 brick layer

to do 6 days

of work will

take 3 days

492018

31

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy61

The planned dates for performing schedule activities and the planned dates for meeting

schedule milestones

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy62

De-scoping

ndash Analyzing alternatives on the critical path to determine how to reduce the schedule for the least amount of cost

ndash Not always a viable alternative

Crashing

ndash Analyzing the critical path to determine where to reduce the schedule for the least amount of cost while bring extra resources on

ndash Not always a viable alternative

Fast-Tracking

ndash Phases or activities that would have normally being done in sequence are done in parallel

ndash Can result in rework and increased risk

ndash Requires 3 X the amount of planning

Least $

A B

B

492018

32

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy63

Estimating

Budget preparation

Forecasting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy64

Co

st

Project target Cost

Time

Performance

Measurement

Baseline

Define the Work

Define the

Baseline Budget

Define the

Baseline ScheduleContingency

Budget

492018

33

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy65

Order of magnitude

Budget

Definitive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy66

Top down

Analogous

Parametric

Vendor bids

Bottom up

Detailed (piece by piece)

Three point or PERT

492018

34

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy67

The How

What is In and Out of Scope (detailed)

All the Work and only the Work

Network Diagram

Estimating

Critical Path

Output ndash Project Plan

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy68

Those processes performed

to complete the work

defined in the project

management plan to satisfy the project specifications

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

35

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy69

Destructive

Intervention

Constructive

Opportunity

Influence of

Stakeholders

and

Opportunity

to add value

Cost

Curve

$

Time

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy70

An uncertain event or condition

that if it occurs has a positive

or negative effect on one or

more of the project objectives

such as scope schedule

cost and quality

copyPMBOK regGuide Sixth Edition

492018

36

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy71

ldquoIncludes processes concerned with conducting risk

management planning identification analysis

responses and monitoring and control on a projectrdquo

copyPMBOK regGuide Sixth Edition

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Before the risk

Focus on prevention amp

planning

After the risk

Focus on recovery

Project

Start Project

Finish

Avoid Mitigate or Transfer Risks Use contingency plans

RiskManagement

492018

37

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy73

HighLow Impact

Hig

h

Low

Threaten

Failure

Minor

impactBig Impact if Occurs

ldquoEarthquakerdquo

Disruptive

ldquoDeath by

1000 cutsrdquo

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy74

Minimizes reactive crisis management

Increases likelihood of project success

Increases profitability

Prevents events impacting triple constraints

492018

38

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy75

1 Project Purpose

2 Objectives

3 Identified Risks

4 Risk Assessment

5 Risk Prevention

6 Risk Mitigation

7 Resources

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy76

492018

39

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy77

Work with your team and sponsor to identify stakeholders

Brainstorming works to develop a list that can be reviewed and finalized by the team

Key Stakeholders will usually emerge on their own

Stakeholders are persons and

organizations whose interests may be

positively or negatively affected by the

execution or completion of the project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy78

Ask each stakeholder 2 questions

bullWhat are your three major expectations from this project

bullWhat are your three major concerns related to this project

492018

40

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy79

Keep InformedMonitor(Minimal effort)

Manage Relationship

Closely

Keep Satisfied

InterestLow High

Low

High

Power

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy80

1 Analysis What do they need to know amp what do we want to say

1 Decide Communication Objectives2 Determine Vulnerabilities amp Issues3 Develop Key Messages4 Perform Stakeholder Analysis (interests concerns)

2 Design amp Build What methods and tools should we use

1 Build Communication Vehicles (reports websites etc)

3 Develop Plan Who How and When should they receive it

1 Develop Communication Plan 2 Update Overall Workplan for Communication Activities

4 Do it1 Execute Communication Plan2 Modify amp Adjust as needed

492018

41

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy81

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy82

1 Project Purpose

2 Objectives

3 Potential Issues

4 Key Messages

5 AudiencesStakeholders

6 Communication Vehicles

7 Communication Plan Matrix

8 Resources

492018

42

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy83

Planned the Work Now Work the Plan

But What IF (Risk Management)

85 of what PMs do is Communication

Stakeholder Management is Critical to Project

Success

Output ndash Unique product service delivery or

result

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy84

Those processes required to

track review and regulate the

progress and performance of

the project identify any areas in

which changes to the plan are

required and initiate the

corresponding changes

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

43

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy85

Is daily monitoring at the team level of resources tasks and schedule It is hellip

A vital component of tracking and managing progress

Managing the triple constraints

Relatively simple ldquouser friendlyrdquo and inexpensive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy86

Tasks

Requirements

Timing and performance

Resource utilization and outsourcing

Scope deliverables completion and product quality

Process improvement possibilities and lessons learned

Schedule and cost performance

492018

44

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy87

Initiate Assess Resolve CloseApprove

Senior team

a change

Senior team

member initiates

a change

Project manager

accepts or rejects

Project manager

accepts or rejects

change request

Change Analyst

makes assessment of

the change and gives

recommendations

Managers acceptChange Analyst

makes assessment of

the change and gives

recommendations

or reject the

change based on

the assessment

and

Managers accept

or reject the

change based on

the assessment

and

recommendations Project manager

creates and assigns

tasks if necessary

and updates project

plan

Document

closureReject

Accept

Accept

Reject

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy88

Project

Phase 1

Phase 2

Phase 3

Stage

Gate

Planning

Go No Go Decisions

492018

45

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy89

Today

Planned

Burned

Earned

Time

Co

st

CV

Planned

Finished

Actual

Finished

Late

Over

Budget

Cost Variance (CV) = Earned ndash Burned

Schedule Variance (SV) = Earned ndash Planned

SV

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy90

complete to date

Dashboard ndash scope quality time budget

Milestones and deliverables

Target revised complete

Budget

Approved spent to date estimated cost of work remaining estimated total cost

Major Risks amp Issues requiring reviewdecision

Accomplishments Plans for Next Period

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 14: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

14

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy27

1 What is a project

2 What is project management

3 What is a lifecycle

4 What are the 4 phases

5 What are the 5 processes

6 Who are the key stakeholders

7 What are the 10 knowledge areas

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy28

Defines and authorizes the project or a project phase

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

15

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy29

Project Selection

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy30

Project definition (preliminary scope statement)

Product service or result

Acceptance criteria

Requirements

Assumptions and constraints

492018

16

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy31

Project Management Centre of Excellence Inc 2018 copyApril 9 2018

32

492018

17

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy33

1 Right Need

2 Right Solution

3 Right Way

4 Right Benefit

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy34

Mandatory

Legislated

Discretionary

Business

End user

Technical

492018

18

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy35

Do we want a Project Manager or a Project Leader

Can a certified PMP Project Manager successfully manage any project

What Key PM skills do you need

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

ManagementLeadership

S

T

E

W

A

R

D

S

H

I

P

492018

19

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy37

Team Building

Coordination Skills

Interpersonal Skills

Communication Skills

Conflict Resolution Skills

Analytical Thinking

Strategic Thinking

Trouble Shooting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Trust

Influence

Negotiate

Awareness

38Project Management Centre of Excellence Inc

492018

20

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Trust = Speed Cost

OR

Trust = Speed Cost

Project Management Centre of Excellence Inc 2018 copy40

492018

21

1 Predictability

2 Reciprocation

3 Consistency and Commitment

4 Social Evidence

5 Authority

6 Liking

7 Scarcity

8 Self-interest

Project Management Centre of Excellence Inc 2018 copy492018Project Management Centre of Excellence Inc copy 2014

42

492018

22

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy43

Project Management Centre of Excellence Inc

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy44

Project Charter

492018

23

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy45

What is the what

What is the why

4Rs

Project Manager or Project Leader

Preliminary Scope Statement

Output ndash Project Charter

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy46

The processes performed to define and mature the project scope develop the project management plan and identify and schedule the project activities that

occur within the project Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

24

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Stakeholder Management

47

IntegrationManagement

Time Management

Cost Management

QualityManagement

HumanResource

Management

CommunicationManagement

RiskManagement

ProcurementManagement

ScopeManagement

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy48

Deliver the project results

492018

25

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy49

Specific

Measurable

Agreed-upon

Realistic

Time component

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy50

In-Scope Out of Scope

Includes both

492018

26

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy52

Plan and hold an event

Start

492018

27

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy53

Task A Task BFSbull Finish to Start

bull Finish to Finish Task C

Task D

FF

bull Start to Start Task E

Task F

SS

bull Start to Finish Task G Task HSF

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy54

CP= the sequence of schedule activities that determines the duration of the project

CPM-the longest path through the project forms the critical path and is also the shortest time in which a project can be completed

CPM=Forward andor backward pass

492018

28

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy55

B

Start

A

C

Finish

E

F

D

2 frac12 day float

BD

2

1 8

3 4 5 6 7

In Days

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy56

Who does the work

Select project team

Roles and Responsibilities Matrix

RACI chart

Resources can be internal or external

492018

29

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy57

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy58

35 h

20 h 15 h

30 h 35 h 35 h

25 h

5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for Bob

Hou

rs W

ork

ed

Ove

rtim

e

492018

30

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy59

35 h

20 h 15 h

30 h 35 h 35 h

20 h5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for BobH

ou

rs W

ork

ed

Ove

rtim

e

5 h

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy60

Day 1 Day 2 Day 3 Day 4 Day 6Day 5

1 brick layer

to do 6 days

of work will

take 6 days

2 brick layer

to do 6 days

of work will

take 3 days

492018

31

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy61

The planned dates for performing schedule activities and the planned dates for meeting

schedule milestones

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy62

De-scoping

ndash Analyzing alternatives on the critical path to determine how to reduce the schedule for the least amount of cost

ndash Not always a viable alternative

Crashing

ndash Analyzing the critical path to determine where to reduce the schedule for the least amount of cost while bring extra resources on

ndash Not always a viable alternative

Fast-Tracking

ndash Phases or activities that would have normally being done in sequence are done in parallel

ndash Can result in rework and increased risk

ndash Requires 3 X the amount of planning

Least $

A B

B

492018

32

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy63

Estimating

Budget preparation

Forecasting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy64

Co

st

Project target Cost

Time

Performance

Measurement

Baseline

Define the Work

Define the

Baseline Budget

Define the

Baseline ScheduleContingency

Budget

492018

33

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy65

Order of magnitude

Budget

Definitive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy66

Top down

Analogous

Parametric

Vendor bids

Bottom up

Detailed (piece by piece)

Three point or PERT

492018

34

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy67

The How

What is In and Out of Scope (detailed)

All the Work and only the Work

Network Diagram

Estimating

Critical Path

Output ndash Project Plan

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy68

Those processes performed

to complete the work

defined in the project

management plan to satisfy the project specifications

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

35

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy69

Destructive

Intervention

Constructive

Opportunity

Influence of

Stakeholders

and

Opportunity

to add value

Cost

Curve

$

Time

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy70

An uncertain event or condition

that if it occurs has a positive

or negative effect on one or

more of the project objectives

such as scope schedule

cost and quality

copyPMBOK regGuide Sixth Edition

492018

36

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy71

ldquoIncludes processes concerned with conducting risk

management planning identification analysis

responses and monitoring and control on a projectrdquo

copyPMBOK regGuide Sixth Edition

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Before the risk

Focus on prevention amp

planning

After the risk

Focus on recovery

Project

Start Project

Finish

Avoid Mitigate or Transfer Risks Use contingency plans

RiskManagement

492018

37

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy73

HighLow Impact

Hig

h

Low

Threaten

Failure

Minor

impactBig Impact if Occurs

ldquoEarthquakerdquo

Disruptive

ldquoDeath by

1000 cutsrdquo

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy74

Minimizes reactive crisis management

Increases likelihood of project success

Increases profitability

Prevents events impacting triple constraints

492018

38

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy75

1 Project Purpose

2 Objectives

3 Identified Risks

4 Risk Assessment

5 Risk Prevention

6 Risk Mitigation

7 Resources

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy76

492018

39

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy77

Work with your team and sponsor to identify stakeholders

Brainstorming works to develop a list that can be reviewed and finalized by the team

Key Stakeholders will usually emerge on their own

Stakeholders are persons and

organizations whose interests may be

positively or negatively affected by the

execution or completion of the project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy78

Ask each stakeholder 2 questions

bullWhat are your three major expectations from this project

bullWhat are your three major concerns related to this project

492018

40

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy79

Keep InformedMonitor(Minimal effort)

Manage Relationship

Closely

Keep Satisfied

InterestLow High

Low

High

Power

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy80

1 Analysis What do they need to know amp what do we want to say

1 Decide Communication Objectives2 Determine Vulnerabilities amp Issues3 Develop Key Messages4 Perform Stakeholder Analysis (interests concerns)

2 Design amp Build What methods and tools should we use

1 Build Communication Vehicles (reports websites etc)

3 Develop Plan Who How and When should they receive it

1 Develop Communication Plan 2 Update Overall Workplan for Communication Activities

4 Do it1 Execute Communication Plan2 Modify amp Adjust as needed

492018

41

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy81

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy82

1 Project Purpose

2 Objectives

3 Potential Issues

4 Key Messages

5 AudiencesStakeholders

6 Communication Vehicles

7 Communication Plan Matrix

8 Resources

492018

42

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy83

Planned the Work Now Work the Plan

But What IF (Risk Management)

85 of what PMs do is Communication

Stakeholder Management is Critical to Project

Success

Output ndash Unique product service delivery or

result

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy84

Those processes required to

track review and regulate the

progress and performance of

the project identify any areas in

which changes to the plan are

required and initiate the

corresponding changes

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

43

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy85

Is daily monitoring at the team level of resources tasks and schedule It is hellip

A vital component of tracking and managing progress

Managing the triple constraints

Relatively simple ldquouser friendlyrdquo and inexpensive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy86

Tasks

Requirements

Timing and performance

Resource utilization and outsourcing

Scope deliverables completion and product quality

Process improvement possibilities and lessons learned

Schedule and cost performance

492018

44

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy87

Initiate Assess Resolve CloseApprove

Senior team

a change

Senior team

member initiates

a change

Project manager

accepts or rejects

Project manager

accepts or rejects

change request

Change Analyst

makes assessment of

the change and gives

recommendations

Managers acceptChange Analyst

makes assessment of

the change and gives

recommendations

or reject the

change based on

the assessment

and

Managers accept

or reject the

change based on

the assessment

and

recommendations Project manager

creates and assigns

tasks if necessary

and updates project

plan

Document

closureReject

Accept

Accept

Reject

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy88

Project

Phase 1

Phase 2

Phase 3

Stage

Gate

Planning

Go No Go Decisions

492018

45

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy89

Today

Planned

Burned

Earned

Time

Co

st

CV

Planned

Finished

Actual

Finished

Late

Over

Budget

Cost Variance (CV) = Earned ndash Burned

Schedule Variance (SV) = Earned ndash Planned

SV

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy90

complete to date

Dashboard ndash scope quality time budget

Milestones and deliverables

Target revised complete

Budget

Approved spent to date estimated cost of work remaining estimated total cost

Major Risks amp Issues requiring reviewdecision

Accomplishments Plans for Next Period

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 15: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

15

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy29

Project Selection

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy30

Project definition (preliminary scope statement)

Product service or result

Acceptance criteria

Requirements

Assumptions and constraints

492018

16

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy31

Project Management Centre of Excellence Inc 2018 copyApril 9 2018

32

492018

17

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy33

1 Right Need

2 Right Solution

3 Right Way

4 Right Benefit

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy34

Mandatory

Legislated

Discretionary

Business

End user

Technical

492018

18

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy35

Do we want a Project Manager or a Project Leader

Can a certified PMP Project Manager successfully manage any project

What Key PM skills do you need

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

ManagementLeadership

S

T

E

W

A

R

D

S

H

I

P

492018

19

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy37

Team Building

Coordination Skills

Interpersonal Skills

Communication Skills

Conflict Resolution Skills

Analytical Thinking

Strategic Thinking

Trouble Shooting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Trust

Influence

Negotiate

Awareness

38Project Management Centre of Excellence Inc

492018

20

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Trust = Speed Cost

OR

Trust = Speed Cost

Project Management Centre of Excellence Inc 2018 copy40

492018

21

1 Predictability

2 Reciprocation

3 Consistency and Commitment

4 Social Evidence

5 Authority

6 Liking

7 Scarcity

8 Self-interest

Project Management Centre of Excellence Inc 2018 copy492018Project Management Centre of Excellence Inc copy 2014

42

492018

22

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy43

Project Management Centre of Excellence Inc

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy44

Project Charter

492018

23

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy45

What is the what

What is the why

4Rs

Project Manager or Project Leader

Preliminary Scope Statement

Output ndash Project Charter

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy46

The processes performed to define and mature the project scope develop the project management plan and identify and schedule the project activities that

occur within the project Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

24

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Stakeholder Management

47

IntegrationManagement

Time Management

Cost Management

QualityManagement

HumanResource

Management

CommunicationManagement

RiskManagement

ProcurementManagement

ScopeManagement

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy48

Deliver the project results

492018

25

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy49

Specific

Measurable

Agreed-upon

Realistic

Time component

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy50

In-Scope Out of Scope

Includes both

492018

26

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy52

Plan and hold an event

Start

492018

27

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy53

Task A Task BFSbull Finish to Start

bull Finish to Finish Task C

Task D

FF

bull Start to Start Task E

Task F

SS

bull Start to Finish Task G Task HSF

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy54

CP= the sequence of schedule activities that determines the duration of the project

CPM-the longest path through the project forms the critical path and is also the shortest time in which a project can be completed

CPM=Forward andor backward pass

492018

28

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy55

B

Start

A

C

Finish

E

F

D

2 frac12 day float

BD

2

1 8

3 4 5 6 7

In Days

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy56

Who does the work

Select project team

Roles and Responsibilities Matrix

RACI chart

Resources can be internal or external

492018

29

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy57

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy58

35 h

20 h 15 h

30 h 35 h 35 h

25 h

5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for Bob

Hou

rs W

ork

ed

Ove

rtim

e

492018

30

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy59

35 h

20 h 15 h

30 h 35 h 35 h

20 h5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for BobH

ou

rs W

ork

ed

Ove

rtim

e

5 h

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy60

Day 1 Day 2 Day 3 Day 4 Day 6Day 5

1 brick layer

to do 6 days

of work will

take 6 days

2 brick layer

to do 6 days

of work will

take 3 days

492018

31

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy61

The planned dates for performing schedule activities and the planned dates for meeting

schedule milestones

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy62

De-scoping

ndash Analyzing alternatives on the critical path to determine how to reduce the schedule for the least amount of cost

ndash Not always a viable alternative

Crashing

ndash Analyzing the critical path to determine where to reduce the schedule for the least amount of cost while bring extra resources on

ndash Not always a viable alternative

Fast-Tracking

ndash Phases or activities that would have normally being done in sequence are done in parallel

ndash Can result in rework and increased risk

ndash Requires 3 X the amount of planning

Least $

A B

B

492018

32

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy63

Estimating

Budget preparation

Forecasting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy64

Co

st

Project target Cost

Time

Performance

Measurement

Baseline

Define the Work

Define the

Baseline Budget

Define the

Baseline ScheduleContingency

Budget

492018

33

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy65

Order of magnitude

Budget

Definitive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy66

Top down

Analogous

Parametric

Vendor bids

Bottom up

Detailed (piece by piece)

Three point or PERT

492018

34

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy67

The How

What is In and Out of Scope (detailed)

All the Work and only the Work

Network Diagram

Estimating

Critical Path

Output ndash Project Plan

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy68

Those processes performed

to complete the work

defined in the project

management plan to satisfy the project specifications

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

35

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy69

Destructive

Intervention

Constructive

Opportunity

Influence of

Stakeholders

and

Opportunity

to add value

Cost

Curve

$

Time

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy70

An uncertain event or condition

that if it occurs has a positive

or negative effect on one or

more of the project objectives

such as scope schedule

cost and quality

copyPMBOK regGuide Sixth Edition

492018

36

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy71

ldquoIncludes processes concerned with conducting risk

management planning identification analysis

responses and monitoring and control on a projectrdquo

copyPMBOK regGuide Sixth Edition

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Before the risk

Focus on prevention amp

planning

After the risk

Focus on recovery

Project

Start Project

Finish

Avoid Mitigate or Transfer Risks Use contingency plans

RiskManagement

492018

37

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy73

HighLow Impact

Hig

h

Low

Threaten

Failure

Minor

impactBig Impact if Occurs

ldquoEarthquakerdquo

Disruptive

ldquoDeath by

1000 cutsrdquo

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy74

Minimizes reactive crisis management

Increases likelihood of project success

Increases profitability

Prevents events impacting triple constraints

492018

38

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy75

1 Project Purpose

2 Objectives

3 Identified Risks

4 Risk Assessment

5 Risk Prevention

6 Risk Mitigation

7 Resources

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy76

492018

39

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy77

Work with your team and sponsor to identify stakeholders

Brainstorming works to develop a list that can be reviewed and finalized by the team

Key Stakeholders will usually emerge on their own

Stakeholders are persons and

organizations whose interests may be

positively or negatively affected by the

execution or completion of the project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy78

Ask each stakeholder 2 questions

bullWhat are your three major expectations from this project

bullWhat are your three major concerns related to this project

492018

40

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy79

Keep InformedMonitor(Minimal effort)

Manage Relationship

Closely

Keep Satisfied

InterestLow High

Low

High

Power

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy80

1 Analysis What do they need to know amp what do we want to say

1 Decide Communication Objectives2 Determine Vulnerabilities amp Issues3 Develop Key Messages4 Perform Stakeholder Analysis (interests concerns)

2 Design amp Build What methods and tools should we use

1 Build Communication Vehicles (reports websites etc)

3 Develop Plan Who How and When should they receive it

1 Develop Communication Plan 2 Update Overall Workplan for Communication Activities

4 Do it1 Execute Communication Plan2 Modify amp Adjust as needed

492018

41

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy81

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy82

1 Project Purpose

2 Objectives

3 Potential Issues

4 Key Messages

5 AudiencesStakeholders

6 Communication Vehicles

7 Communication Plan Matrix

8 Resources

492018

42

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy83

Planned the Work Now Work the Plan

But What IF (Risk Management)

85 of what PMs do is Communication

Stakeholder Management is Critical to Project

Success

Output ndash Unique product service delivery or

result

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy84

Those processes required to

track review and regulate the

progress and performance of

the project identify any areas in

which changes to the plan are

required and initiate the

corresponding changes

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

43

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy85

Is daily monitoring at the team level of resources tasks and schedule It is hellip

A vital component of tracking and managing progress

Managing the triple constraints

Relatively simple ldquouser friendlyrdquo and inexpensive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy86

Tasks

Requirements

Timing and performance

Resource utilization and outsourcing

Scope deliverables completion and product quality

Process improvement possibilities and lessons learned

Schedule and cost performance

492018

44

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy87

Initiate Assess Resolve CloseApprove

Senior team

a change

Senior team

member initiates

a change

Project manager

accepts or rejects

Project manager

accepts or rejects

change request

Change Analyst

makes assessment of

the change and gives

recommendations

Managers acceptChange Analyst

makes assessment of

the change and gives

recommendations

or reject the

change based on

the assessment

and

Managers accept

or reject the

change based on

the assessment

and

recommendations Project manager

creates and assigns

tasks if necessary

and updates project

plan

Document

closureReject

Accept

Accept

Reject

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy88

Project

Phase 1

Phase 2

Phase 3

Stage

Gate

Planning

Go No Go Decisions

492018

45

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy89

Today

Planned

Burned

Earned

Time

Co

st

CV

Planned

Finished

Actual

Finished

Late

Over

Budget

Cost Variance (CV) = Earned ndash Burned

Schedule Variance (SV) = Earned ndash Planned

SV

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy90

complete to date

Dashboard ndash scope quality time budget

Milestones and deliverables

Target revised complete

Budget

Approved spent to date estimated cost of work remaining estimated total cost

Major Risks amp Issues requiring reviewdecision

Accomplishments Plans for Next Period

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 16: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

16

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy31

Project Management Centre of Excellence Inc 2018 copyApril 9 2018

32

492018

17

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy33

1 Right Need

2 Right Solution

3 Right Way

4 Right Benefit

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy34

Mandatory

Legislated

Discretionary

Business

End user

Technical

492018

18

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy35

Do we want a Project Manager or a Project Leader

Can a certified PMP Project Manager successfully manage any project

What Key PM skills do you need

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

ManagementLeadership

S

T

E

W

A

R

D

S

H

I

P

492018

19

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy37

Team Building

Coordination Skills

Interpersonal Skills

Communication Skills

Conflict Resolution Skills

Analytical Thinking

Strategic Thinking

Trouble Shooting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Trust

Influence

Negotiate

Awareness

38Project Management Centre of Excellence Inc

492018

20

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Trust = Speed Cost

OR

Trust = Speed Cost

Project Management Centre of Excellence Inc 2018 copy40

492018

21

1 Predictability

2 Reciprocation

3 Consistency and Commitment

4 Social Evidence

5 Authority

6 Liking

7 Scarcity

8 Self-interest

Project Management Centre of Excellence Inc 2018 copy492018Project Management Centre of Excellence Inc copy 2014

42

492018

22

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy43

Project Management Centre of Excellence Inc

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy44

Project Charter

492018

23

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy45

What is the what

What is the why

4Rs

Project Manager or Project Leader

Preliminary Scope Statement

Output ndash Project Charter

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy46

The processes performed to define and mature the project scope develop the project management plan and identify and schedule the project activities that

occur within the project Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

24

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Stakeholder Management

47

IntegrationManagement

Time Management

Cost Management

QualityManagement

HumanResource

Management

CommunicationManagement

RiskManagement

ProcurementManagement

ScopeManagement

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy48

Deliver the project results

492018

25

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy49

Specific

Measurable

Agreed-upon

Realistic

Time component

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy50

In-Scope Out of Scope

Includes both

492018

26

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy52

Plan and hold an event

Start

492018

27

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy53

Task A Task BFSbull Finish to Start

bull Finish to Finish Task C

Task D

FF

bull Start to Start Task E

Task F

SS

bull Start to Finish Task G Task HSF

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy54

CP= the sequence of schedule activities that determines the duration of the project

CPM-the longest path through the project forms the critical path and is also the shortest time in which a project can be completed

CPM=Forward andor backward pass

492018

28

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy55

B

Start

A

C

Finish

E

F

D

2 frac12 day float

BD

2

1 8

3 4 5 6 7

In Days

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy56

Who does the work

Select project team

Roles and Responsibilities Matrix

RACI chart

Resources can be internal or external

492018

29

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy57

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy58

35 h

20 h 15 h

30 h 35 h 35 h

25 h

5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for Bob

Hou

rs W

ork

ed

Ove

rtim

e

492018

30

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy59

35 h

20 h 15 h

30 h 35 h 35 h

20 h5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for BobH

ou

rs W

ork

ed

Ove

rtim

e

5 h

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy60

Day 1 Day 2 Day 3 Day 4 Day 6Day 5

1 brick layer

to do 6 days

of work will

take 6 days

2 brick layer

to do 6 days

of work will

take 3 days

492018

31

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy61

The planned dates for performing schedule activities and the planned dates for meeting

schedule milestones

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy62

De-scoping

ndash Analyzing alternatives on the critical path to determine how to reduce the schedule for the least amount of cost

ndash Not always a viable alternative

Crashing

ndash Analyzing the critical path to determine where to reduce the schedule for the least amount of cost while bring extra resources on

ndash Not always a viable alternative

Fast-Tracking

ndash Phases or activities that would have normally being done in sequence are done in parallel

ndash Can result in rework and increased risk

ndash Requires 3 X the amount of planning

Least $

A B

B

492018

32

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy63

Estimating

Budget preparation

Forecasting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy64

Co

st

Project target Cost

Time

Performance

Measurement

Baseline

Define the Work

Define the

Baseline Budget

Define the

Baseline ScheduleContingency

Budget

492018

33

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy65

Order of magnitude

Budget

Definitive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy66

Top down

Analogous

Parametric

Vendor bids

Bottom up

Detailed (piece by piece)

Three point or PERT

492018

34

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy67

The How

What is In and Out of Scope (detailed)

All the Work and only the Work

Network Diagram

Estimating

Critical Path

Output ndash Project Plan

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy68

Those processes performed

to complete the work

defined in the project

management plan to satisfy the project specifications

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

35

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy69

Destructive

Intervention

Constructive

Opportunity

Influence of

Stakeholders

and

Opportunity

to add value

Cost

Curve

$

Time

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy70

An uncertain event or condition

that if it occurs has a positive

or negative effect on one or

more of the project objectives

such as scope schedule

cost and quality

copyPMBOK regGuide Sixth Edition

492018

36

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy71

ldquoIncludes processes concerned with conducting risk

management planning identification analysis

responses and monitoring and control on a projectrdquo

copyPMBOK regGuide Sixth Edition

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Before the risk

Focus on prevention amp

planning

After the risk

Focus on recovery

Project

Start Project

Finish

Avoid Mitigate or Transfer Risks Use contingency plans

RiskManagement

492018

37

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy73

HighLow Impact

Hig

h

Low

Threaten

Failure

Minor

impactBig Impact if Occurs

ldquoEarthquakerdquo

Disruptive

ldquoDeath by

1000 cutsrdquo

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy74

Minimizes reactive crisis management

Increases likelihood of project success

Increases profitability

Prevents events impacting triple constraints

492018

38

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy75

1 Project Purpose

2 Objectives

3 Identified Risks

4 Risk Assessment

5 Risk Prevention

6 Risk Mitigation

7 Resources

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy76

492018

39

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy77

Work with your team and sponsor to identify stakeholders

Brainstorming works to develop a list that can be reviewed and finalized by the team

Key Stakeholders will usually emerge on their own

Stakeholders are persons and

organizations whose interests may be

positively or negatively affected by the

execution or completion of the project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy78

Ask each stakeholder 2 questions

bullWhat are your three major expectations from this project

bullWhat are your three major concerns related to this project

492018

40

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy79

Keep InformedMonitor(Minimal effort)

Manage Relationship

Closely

Keep Satisfied

InterestLow High

Low

High

Power

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy80

1 Analysis What do they need to know amp what do we want to say

1 Decide Communication Objectives2 Determine Vulnerabilities amp Issues3 Develop Key Messages4 Perform Stakeholder Analysis (interests concerns)

2 Design amp Build What methods and tools should we use

1 Build Communication Vehicles (reports websites etc)

3 Develop Plan Who How and When should they receive it

1 Develop Communication Plan 2 Update Overall Workplan for Communication Activities

4 Do it1 Execute Communication Plan2 Modify amp Adjust as needed

492018

41

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy81

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy82

1 Project Purpose

2 Objectives

3 Potential Issues

4 Key Messages

5 AudiencesStakeholders

6 Communication Vehicles

7 Communication Plan Matrix

8 Resources

492018

42

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy83

Planned the Work Now Work the Plan

But What IF (Risk Management)

85 of what PMs do is Communication

Stakeholder Management is Critical to Project

Success

Output ndash Unique product service delivery or

result

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy84

Those processes required to

track review and regulate the

progress and performance of

the project identify any areas in

which changes to the plan are

required and initiate the

corresponding changes

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

43

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy85

Is daily monitoring at the team level of resources tasks and schedule It is hellip

A vital component of tracking and managing progress

Managing the triple constraints

Relatively simple ldquouser friendlyrdquo and inexpensive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy86

Tasks

Requirements

Timing and performance

Resource utilization and outsourcing

Scope deliverables completion and product quality

Process improvement possibilities and lessons learned

Schedule and cost performance

492018

44

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy87

Initiate Assess Resolve CloseApprove

Senior team

a change

Senior team

member initiates

a change

Project manager

accepts or rejects

Project manager

accepts or rejects

change request

Change Analyst

makes assessment of

the change and gives

recommendations

Managers acceptChange Analyst

makes assessment of

the change and gives

recommendations

or reject the

change based on

the assessment

and

Managers accept

or reject the

change based on

the assessment

and

recommendations Project manager

creates and assigns

tasks if necessary

and updates project

plan

Document

closureReject

Accept

Accept

Reject

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy88

Project

Phase 1

Phase 2

Phase 3

Stage

Gate

Planning

Go No Go Decisions

492018

45

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy89

Today

Planned

Burned

Earned

Time

Co

st

CV

Planned

Finished

Actual

Finished

Late

Over

Budget

Cost Variance (CV) = Earned ndash Burned

Schedule Variance (SV) = Earned ndash Planned

SV

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy90

complete to date

Dashboard ndash scope quality time budget

Milestones and deliverables

Target revised complete

Budget

Approved spent to date estimated cost of work remaining estimated total cost

Major Risks amp Issues requiring reviewdecision

Accomplishments Plans for Next Period

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 17: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

17

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy33

1 Right Need

2 Right Solution

3 Right Way

4 Right Benefit

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy34

Mandatory

Legislated

Discretionary

Business

End user

Technical

492018

18

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy35

Do we want a Project Manager or a Project Leader

Can a certified PMP Project Manager successfully manage any project

What Key PM skills do you need

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

ManagementLeadership

S

T

E

W

A

R

D

S

H

I

P

492018

19

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy37

Team Building

Coordination Skills

Interpersonal Skills

Communication Skills

Conflict Resolution Skills

Analytical Thinking

Strategic Thinking

Trouble Shooting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Trust

Influence

Negotiate

Awareness

38Project Management Centre of Excellence Inc

492018

20

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Trust = Speed Cost

OR

Trust = Speed Cost

Project Management Centre of Excellence Inc 2018 copy40

492018

21

1 Predictability

2 Reciprocation

3 Consistency and Commitment

4 Social Evidence

5 Authority

6 Liking

7 Scarcity

8 Self-interest

Project Management Centre of Excellence Inc 2018 copy492018Project Management Centre of Excellence Inc copy 2014

42

492018

22

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy43

Project Management Centre of Excellence Inc

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy44

Project Charter

492018

23

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy45

What is the what

What is the why

4Rs

Project Manager or Project Leader

Preliminary Scope Statement

Output ndash Project Charter

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy46

The processes performed to define and mature the project scope develop the project management plan and identify and schedule the project activities that

occur within the project Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

24

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Stakeholder Management

47

IntegrationManagement

Time Management

Cost Management

QualityManagement

HumanResource

Management

CommunicationManagement

RiskManagement

ProcurementManagement

ScopeManagement

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy48

Deliver the project results

492018

25

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy49

Specific

Measurable

Agreed-upon

Realistic

Time component

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy50

In-Scope Out of Scope

Includes both

492018

26

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy52

Plan and hold an event

Start

492018

27

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy53

Task A Task BFSbull Finish to Start

bull Finish to Finish Task C

Task D

FF

bull Start to Start Task E

Task F

SS

bull Start to Finish Task G Task HSF

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy54

CP= the sequence of schedule activities that determines the duration of the project

CPM-the longest path through the project forms the critical path and is also the shortest time in which a project can be completed

CPM=Forward andor backward pass

492018

28

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy55

B

Start

A

C

Finish

E

F

D

2 frac12 day float

BD

2

1 8

3 4 5 6 7

In Days

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy56

Who does the work

Select project team

Roles and Responsibilities Matrix

RACI chart

Resources can be internal or external

492018

29

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy57

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy58

35 h

20 h 15 h

30 h 35 h 35 h

25 h

5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for Bob

Hou

rs W

ork

ed

Ove

rtim

e

492018

30

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy59

35 h

20 h 15 h

30 h 35 h 35 h

20 h5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for BobH

ou

rs W

ork

ed

Ove

rtim

e

5 h

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy60

Day 1 Day 2 Day 3 Day 4 Day 6Day 5

1 brick layer

to do 6 days

of work will

take 6 days

2 brick layer

to do 6 days

of work will

take 3 days

492018

31

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy61

The planned dates for performing schedule activities and the planned dates for meeting

schedule milestones

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy62

De-scoping

ndash Analyzing alternatives on the critical path to determine how to reduce the schedule for the least amount of cost

ndash Not always a viable alternative

Crashing

ndash Analyzing the critical path to determine where to reduce the schedule for the least amount of cost while bring extra resources on

ndash Not always a viable alternative

Fast-Tracking

ndash Phases or activities that would have normally being done in sequence are done in parallel

ndash Can result in rework and increased risk

ndash Requires 3 X the amount of planning

Least $

A B

B

492018

32

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy63

Estimating

Budget preparation

Forecasting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy64

Co

st

Project target Cost

Time

Performance

Measurement

Baseline

Define the Work

Define the

Baseline Budget

Define the

Baseline ScheduleContingency

Budget

492018

33

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy65

Order of magnitude

Budget

Definitive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy66

Top down

Analogous

Parametric

Vendor bids

Bottom up

Detailed (piece by piece)

Three point or PERT

492018

34

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy67

The How

What is In and Out of Scope (detailed)

All the Work and only the Work

Network Diagram

Estimating

Critical Path

Output ndash Project Plan

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy68

Those processes performed

to complete the work

defined in the project

management plan to satisfy the project specifications

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

35

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy69

Destructive

Intervention

Constructive

Opportunity

Influence of

Stakeholders

and

Opportunity

to add value

Cost

Curve

$

Time

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy70

An uncertain event or condition

that if it occurs has a positive

or negative effect on one or

more of the project objectives

such as scope schedule

cost and quality

copyPMBOK regGuide Sixth Edition

492018

36

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy71

ldquoIncludes processes concerned with conducting risk

management planning identification analysis

responses and monitoring and control on a projectrdquo

copyPMBOK regGuide Sixth Edition

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Before the risk

Focus on prevention amp

planning

After the risk

Focus on recovery

Project

Start Project

Finish

Avoid Mitigate or Transfer Risks Use contingency plans

RiskManagement

492018

37

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy73

HighLow Impact

Hig

h

Low

Threaten

Failure

Minor

impactBig Impact if Occurs

ldquoEarthquakerdquo

Disruptive

ldquoDeath by

1000 cutsrdquo

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy74

Minimizes reactive crisis management

Increases likelihood of project success

Increases profitability

Prevents events impacting triple constraints

492018

38

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy75

1 Project Purpose

2 Objectives

3 Identified Risks

4 Risk Assessment

5 Risk Prevention

6 Risk Mitigation

7 Resources

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy76

492018

39

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy77

Work with your team and sponsor to identify stakeholders

Brainstorming works to develop a list that can be reviewed and finalized by the team

Key Stakeholders will usually emerge on their own

Stakeholders are persons and

organizations whose interests may be

positively or negatively affected by the

execution or completion of the project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy78

Ask each stakeholder 2 questions

bullWhat are your three major expectations from this project

bullWhat are your three major concerns related to this project

492018

40

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy79

Keep InformedMonitor(Minimal effort)

Manage Relationship

Closely

Keep Satisfied

InterestLow High

Low

High

Power

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy80

1 Analysis What do they need to know amp what do we want to say

1 Decide Communication Objectives2 Determine Vulnerabilities amp Issues3 Develop Key Messages4 Perform Stakeholder Analysis (interests concerns)

2 Design amp Build What methods and tools should we use

1 Build Communication Vehicles (reports websites etc)

3 Develop Plan Who How and When should they receive it

1 Develop Communication Plan 2 Update Overall Workplan for Communication Activities

4 Do it1 Execute Communication Plan2 Modify amp Adjust as needed

492018

41

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy81

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy82

1 Project Purpose

2 Objectives

3 Potential Issues

4 Key Messages

5 AudiencesStakeholders

6 Communication Vehicles

7 Communication Plan Matrix

8 Resources

492018

42

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy83

Planned the Work Now Work the Plan

But What IF (Risk Management)

85 of what PMs do is Communication

Stakeholder Management is Critical to Project

Success

Output ndash Unique product service delivery or

result

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy84

Those processes required to

track review and regulate the

progress and performance of

the project identify any areas in

which changes to the plan are

required and initiate the

corresponding changes

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

43

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy85

Is daily monitoring at the team level of resources tasks and schedule It is hellip

A vital component of tracking and managing progress

Managing the triple constraints

Relatively simple ldquouser friendlyrdquo and inexpensive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy86

Tasks

Requirements

Timing and performance

Resource utilization and outsourcing

Scope deliverables completion and product quality

Process improvement possibilities and lessons learned

Schedule and cost performance

492018

44

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy87

Initiate Assess Resolve CloseApprove

Senior team

a change

Senior team

member initiates

a change

Project manager

accepts or rejects

Project manager

accepts or rejects

change request

Change Analyst

makes assessment of

the change and gives

recommendations

Managers acceptChange Analyst

makes assessment of

the change and gives

recommendations

or reject the

change based on

the assessment

and

Managers accept

or reject the

change based on

the assessment

and

recommendations Project manager

creates and assigns

tasks if necessary

and updates project

plan

Document

closureReject

Accept

Accept

Reject

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy88

Project

Phase 1

Phase 2

Phase 3

Stage

Gate

Planning

Go No Go Decisions

492018

45

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy89

Today

Planned

Burned

Earned

Time

Co

st

CV

Planned

Finished

Actual

Finished

Late

Over

Budget

Cost Variance (CV) = Earned ndash Burned

Schedule Variance (SV) = Earned ndash Planned

SV

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy90

complete to date

Dashboard ndash scope quality time budget

Milestones and deliverables

Target revised complete

Budget

Approved spent to date estimated cost of work remaining estimated total cost

Major Risks amp Issues requiring reviewdecision

Accomplishments Plans for Next Period

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 18: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

18

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy35

Do we want a Project Manager or a Project Leader

Can a certified PMP Project Manager successfully manage any project

What Key PM skills do you need

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

ManagementLeadership

S

T

E

W

A

R

D

S

H

I

P

492018

19

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy37

Team Building

Coordination Skills

Interpersonal Skills

Communication Skills

Conflict Resolution Skills

Analytical Thinking

Strategic Thinking

Trouble Shooting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Trust

Influence

Negotiate

Awareness

38Project Management Centre of Excellence Inc

492018

20

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Trust = Speed Cost

OR

Trust = Speed Cost

Project Management Centre of Excellence Inc 2018 copy40

492018

21

1 Predictability

2 Reciprocation

3 Consistency and Commitment

4 Social Evidence

5 Authority

6 Liking

7 Scarcity

8 Self-interest

Project Management Centre of Excellence Inc 2018 copy492018Project Management Centre of Excellence Inc copy 2014

42

492018

22

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy43

Project Management Centre of Excellence Inc

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy44

Project Charter

492018

23

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy45

What is the what

What is the why

4Rs

Project Manager or Project Leader

Preliminary Scope Statement

Output ndash Project Charter

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy46

The processes performed to define and mature the project scope develop the project management plan and identify and schedule the project activities that

occur within the project Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

24

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Stakeholder Management

47

IntegrationManagement

Time Management

Cost Management

QualityManagement

HumanResource

Management

CommunicationManagement

RiskManagement

ProcurementManagement

ScopeManagement

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy48

Deliver the project results

492018

25

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy49

Specific

Measurable

Agreed-upon

Realistic

Time component

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy50

In-Scope Out of Scope

Includes both

492018

26

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy52

Plan and hold an event

Start

492018

27

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy53

Task A Task BFSbull Finish to Start

bull Finish to Finish Task C

Task D

FF

bull Start to Start Task E

Task F

SS

bull Start to Finish Task G Task HSF

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy54

CP= the sequence of schedule activities that determines the duration of the project

CPM-the longest path through the project forms the critical path and is also the shortest time in which a project can be completed

CPM=Forward andor backward pass

492018

28

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy55

B

Start

A

C

Finish

E

F

D

2 frac12 day float

BD

2

1 8

3 4 5 6 7

In Days

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy56

Who does the work

Select project team

Roles and Responsibilities Matrix

RACI chart

Resources can be internal or external

492018

29

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy57

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy58

35 h

20 h 15 h

30 h 35 h 35 h

25 h

5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for Bob

Hou

rs W

ork

ed

Ove

rtim

e

492018

30

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy59

35 h

20 h 15 h

30 h 35 h 35 h

20 h5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for BobH

ou

rs W

ork

ed

Ove

rtim

e

5 h

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy60

Day 1 Day 2 Day 3 Day 4 Day 6Day 5

1 brick layer

to do 6 days

of work will

take 6 days

2 brick layer

to do 6 days

of work will

take 3 days

492018

31

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy61

The planned dates for performing schedule activities and the planned dates for meeting

schedule milestones

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy62

De-scoping

ndash Analyzing alternatives on the critical path to determine how to reduce the schedule for the least amount of cost

ndash Not always a viable alternative

Crashing

ndash Analyzing the critical path to determine where to reduce the schedule for the least amount of cost while bring extra resources on

ndash Not always a viable alternative

Fast-Tracking

ndash Phases or activities that would have normally being done in sequence are done in parallel

ndash Can result in rework and increased risk

ndash Requires 3 X the amount of planning

Least $

A B

B

492018

32

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy63

Estimating

Budget preparation

Forecasting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy64

Co

st

Project target Cost

Time

Performance

Measurement

Baseline

Define the Work

Define the

Baseline Budget

Define the

Baseline ScheduleContingency

Budget

492018

33

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy65

Order of magnitude

Budget

Definitive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy66

Top down

Analogous

Parametric

Vendor bids

Bottom up

Detailed (piece by piece)

Three point or PERT

492018

34

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy67

The How

What is In and Out of Scope (detailed)

All the Work and only the Work

Network Diagram

Estimating

Critical Path

Output ndash Project Plan

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy68

Those processes performed

to complete the work

defined in the project

management plan to satisfy the project specifications

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

35

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy69

Destructive

Intervention

Constructive

Opportunity

Influence of

Stakeholders

and

Opportunity

to add value

Cost

Curve

$

Time

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy70

An uncertain event or condition

that if it occurs has a positive

or negative effect on one or

more of the project objectives

such as scope schedule

cost and quality

copyPMBOK regGuide Sixth Edition

492018

36

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy71

ldquoIncludes processes concerned with conducting risk

management planning identification analysis

responses and monitoring and control on a projectrdquo

copyPMBOK regGuide Sixth Edition

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Before the risk

Focus on prevention amp

planning

After the risk

Focus on recovery

Project

Start Project

Finish

Avoid Mitigate or Transfer Risks Use contingency plans

RiskManagement

492018

37

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy73

HighLow Impact

Hig

h

Low

Threaten

Failure

Minor

impactBig Impact if Occurs

ldquoEarthquakerdquo

Disruptive

ldquoDeath by

1000 cutsrdquo

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy74

Minimizes reactive crisis management

Increases likelihood of project success

Increases profitability

Prevents events impacting triple constraints

492018

38

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy75

1 Project Purpose

2 Objectives

3 Identified Risks

4 Risk Assessment

5 Risk Prevention

6 Risk Mitigation

7 Resources

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy76

492018

39

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy77

Work with your team and sponsor to identify stakeholders

Brainstorming works to develop a list that can be reviewed and finalized by the team

Key Stakeholders will usually emerge on their own

Stakeholders are persons and

organizations whose interests may be

positively or negatively affected by the

execution or completion of the project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy78

Ask each stakeholder 2 questions

bullWhat are your three major expectations from this project

bullWhat are your three major concerns related to this project

492018

40

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy79

Keep InformedMonitor(Minimal effort)

Manage Relationship

Closely

Keep Satisfied

InterestLow High

Low

High

Power

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy80

1 Analysis What do they need to know amp what do we want to say

1 Decide Communication Objectives2 Determine Vulnerabilities amp Issues3 Develop Key Messages4 Perform Stakeholder Analysis (interests concerns)

2 Design amp Build What methods and tools should we use

1 Build Communication Vehicles (reports websites etc)

3 Develop Plan Who How and When should they receive it

1 Develop Communication Plan 2 Update Overall Workplan for Communication Activities

4 Do it1 Execute Communication Plan2 Modify amp Adjust as needed

492018

41

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy81

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy82

1 Project Purpose

2 Objectives

3 Potential Issues

4 Key Messages

5 AudiencesStakeholders

6 Communication Vehicles

7 Communication Plan Matrix

8 Resources

492018

42

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy83

Planned the Work Now Work the Plan

But What IF (Risk Management)

85 of what PMs do is Communication

Stakeholder Management is Critical to Project

Success

Output ndash Unique product service delivery or

result

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy84

Those processes required to

track review and regulate the

progress and performance of

the project identify any areas in

which changes to the plan are

required and initiate the

corresponding changes

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

43

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy85

Is daily monitoring at the team level of resources tasks and schedule It is hellip

A vital component of tracking and managing progress

Managing the triple constraints

Relatively simple ldquouser friendlyrdquo and inexpensive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy86

Tasks

Requirements

Timing and performance

Resource utilization and outsourcing

Scope deliverables completion and product quality

Process improvement possibilities and lessons learned

Schedule and cost performance

492018

44

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy87

Initiate Assess Resolve CloseApprove

Senior team

a change

Senior team

member initiates

a change

Project manager

accepts or rejects

Project manager

accepts or rejects

change request

Change Analyst

makes assessment of

the change and gives

recommendations

Managers acceptChange Analyst

makes assessment of

the change and gives

recommendations

or reject the

change based on

the assessment

and

Managers accept

or reject the

change based on

the assessment

and

recommendations Project manager

creates and assigns

tasks if necessary

and updates project

plan

Document

closureReject

Accept

Accept

Reject

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy88

Project

Phase 1

Phase 2

Phase 3

Stage

Gate

Planning

Go No Go Decisions

492018

45

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy89

Today

Planned

Burned

Earned

Time

Co

st

CV

Planned

Finished

Actual

Finished

Late

Over

Budget

Cost Variance (CV) = Earned ndash Burned

Schedule Variance (SV) = Earned ndash Planned

SV

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy90

complete to date

Dashboard ndash scope quality time budget

Milestones and deliverables

Target revised complete

Budget

Approved spent to date estimated cost of work remaining estimated total cost

Major Risks amp Issues requiring reviewdecision

Accomplishments Plans for Next Period

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 19: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

19

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy37

Team Building

Coordination Skills

Interpersonal Skills

Communication Skills

Conflict Resolution Skills

Analytical Thinking

Strategic Thinking

Trouble Shooting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Trust

Influence

Negotiate

Awareness

38Project Management Centre of Excellence Inc

492018

20

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Trust = Speed Cost

OR

Trust = Speed Cost

Project Management Centre of Excellence Inc 2018 copy40

492018

21

1 Predictability

2 Reciprocation

3 Consistency and Commitment

4 Social Evidence

5 Authority

6 Liking

7 Scarcity

8 Self-interest

Project Management Centre of Excellence Inc 2018 copy492018Project Management Centre of Excellence Inc copy 2014

42

492018

22

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy43

Project Management Centre of Excellence Inc

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy44

Project Charter

492018

23

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy45

What is the what

What is the why

4Rs

Project Manager or Project Leader

Preliminary Scope Statement

Output ndash Project Charter

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy46

The processes performed to define and mature the project scope develop the project management plan and identify and schedule the project activities that

occur within the project Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

24

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Stakeholder Management

47

IntegrationManagement

Time Management

Cost Management

QualityManagement

HumanResource

Management

CommunicationManagement

RiskManagement

ProcurementManagement

ScopeManagement

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy48

Deliver the project results

492018

25

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy49

Specific

Measurable

Agreed-upon

Realistic

Time component

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy50

In-Scope Out of Scope

Includes both

492018

26

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy52

Plan and hold an event

Start

492018

27

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy53

Task A Task BFSbull Finish to Start

bull Finish to Finish Task C

Task D

FF

bull Start to Start Task E

Task F

SS

bull Start to Finish Task G Task HSF

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy54

CP= the sequence of schedule activities that determines the duration of the project

CPM-the longest path through the project forms the critical path and is also the shortest time in which a project can be completed

CPM=Forward andor backward pass

492018

28

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy55

B

Start

A

C

Finish

E

F

D

2 frac12 day float

BD

2

1 8

3 4 5 6 7

In Days

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy56

Who does the work

Select project team

Roles and Responsibilities Matrix

RACI chart

Resources can be internal or external

492018

29

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy57

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy58

35 h

20 h 15 h

30 h 35 h 35 h

25 h

5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for Bob

Hou

rs W

ork

ed

Ove

rtim

e

492018

30

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy59

35 h

20 h 15 h

30 h 35 h 35 h

20 h5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for BobH

ou

rs W

ork

ed

Ove

rtim

e

5 h

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy60

Day 1 Day 2 Day 3 Day 4 Day 6Day 5

1 brick layer

to do 6 days

of work will

take 6 days

2 brick layer

to do 6 days

of work will

take 3 days

492018

31

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy61

The planned dates for performing schedule activities and the planned dates for meeting

schedule milestones

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy62

De-scoping

ndash Analyzing alternatives on the critical path to determine how to reduce the schedule for the least amount of cost

ndash Not always a viable alternative

Crashing

ndash Analyzing the critical path to determine where to reduce the schedule for the least amount of cost while bring extra resources on

ndash Not always a viable alternative

Fast-Tracking

ndash Phases or activities that would have normally being done in sequence are done in parallel

ndash Can result in rework and increased risk

ndash Requires 3 X the amount of planning

Least $

A B

B

492018

32

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy63

Estimating

Budget preparation

Forecasting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy64

Co

st

Project target Cost

Time

Performance

Measurement

Baseline

Define the Work

Define the

Baseline Budget

Define the

Baseline ScheduleContingency

Budget

492018

33

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy65

Order of magnitude

Budget

Definitive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy66

Top down

Analogous

Parametric

Vendor bids

Bottom up

Detailed (piece by piece)

Three point or PERT

492018

34

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy67

The How

What is In and Out of Scope (detailed)

All the Work and only the Work

Network Diagram

Estimating

Critical Path

Output ndash Project Plan

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy68

Those processes performed

to complete the work

defined in the project

management plan to satisfy the project specifications

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

35

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy69

Destructive

Intervention

Constructive

Opportunity

Influence of

Stakeholders

and

Opportunity

to add value

Cost

Curve

$

Time

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy70

An uncertain event or condition

that if it occurs has a positive

or negative effect on one or

more of the project objectives

such as scope schedule

cost and quality

copyPMBOK regGuide Sixth Edition

492018

36

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy71

ldquoIncludes processes concerned with conducting risk

management planning identification analysis

responses and monitoring and control on a projectrdquo

copyPMBOK regGuide Sixth Edition

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Before the risk

Focus on prevention amp

planning

After the risk

Focus on recovery

Project

Start Project

Finish

Avoid Mitigate or Transfer Risks Use contingency plans

RiskManagement

492018

37

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy73

HighLow Impact

Hig

h

Low

Threaten

Failure

Minor

impactBig Impact if Occurs

ldquoEarthquakerdquo

Disruptive

ldquoDeath by

1000 cutsrdquo

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy74

Minimizes reactive crisis management

Increases likelihood of project success

Increases profitability

Prevents events impacting triple constraints

492018

38

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy75

1 Project Purpose

2 Objectives

3 Identified Risks

4 Risk Assessment

5 Risk Prevention

6 Risk Mitigation

7 Resources

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy76

492018

39

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy77

Work with your team and sponsor to identify stakeholders

Brainstorming works to develop a list that can be reviewed and finalized by the team

Key Stakeholders will usually emerge on their own

Stakeholders are persons and

organizations whose interests may be

positively or negatively affected by the

execution or completion of the project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy78

Ask each stakeholder 2 questions

bullWhat are your three major expectations from this project

bullWhat are your three major concerns related to this project

492018

40

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy79

Keep InformedMonitor(Minimal effort)

Manage Relationship

Closely

Keep Satisfied

InterestLow High

Low

High

Power

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy80

1 Analysis What do they need to know amp what do we want to say

1 Decide Communication Objectives2 Determine Vulnerabilities amp Issues3 Develop Key Messages4 Perform Stakeholder Analysis (interests concerns)

2 Design amp Build What methods and tools should we use

1 Build Communication Vehicles (reports websites etc)

3 Develop Plan Who How and When should they receive it

1 Develop Communication Plan 2 Update Overall Workplan for Communication Activities

4 Do it1 Execute Communication Plan2 Modify amp Adjust as needed

492018

41

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy81

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy82

1 Project Purpose

2 Objectives

3 Potential Issues

4 Key Messages

5 AudiencesStakeholders

6 Communication Vehicles

7 Communication Plan Matrix

8 Resources

492018

42

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy83

Planned the Work Now Work the Plan

But What IF (Risk Management)

85 of what PMs do is Communication

Stakeholder Management is Critical to Project

Success

Output ndash Unique product service delivery or

result

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy84

Those processes required to

track review and regulate the

progress and performance of

the project identify any areas in

which changes to the plan are

required and initiate the

corresponding changes

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

43

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy85

Is daily monitoring at the team level of resources tasks and schedule It is hellip

A vital component of tracking and managing progress

Managing the triple constraints

Relatively simple ldquouser friendlyrdquo and inexpensive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy86

Tasks

Requirements

Timing and performance

Resource utilization and outsourcing

Scope deliverables completion and product quality

Process improvement possibilities and lessons learned

Schedule and cost performance

492018

44

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy87

Initiate Assess Resolve CloseApprove

Senior team

a change

Senior team

member initiates

a change

Project manager

accepts or rejects

Project manager

accepts or rejects

change request

Change Analyst

makes assessment of

the change and gives

recommendations

Managers acceptChange Analyst

makes assessment of

the change and gives

recommendations

or reject the

change based on

the assessment

and

Managers accept

or reject the

change based on

the assessment

and

recommendations Project manager

creates and assigns

tasks if necessary

and updates project

plan

Document

closureReject

Accept

Accept

Reject

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy88

Project

Phase 1

Phase 2

Phase 3

Stage

Gate

Planning

Go No Go Decisions

492018

45

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy89

Today

Planned

Burned

Earned

Time

Co

st

CV

Planned

Finished

Actual

Finished

Late

Over

Budget

Cost Variance (CV) = Earned ndash Burned

Schedule Variance (SV) = Earned ndash Planned

SV

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy90

complete to date

Dashboard ndash scope quality time budget

Milestones and deliverables

Target revised complete

Budget

Approved spent to date estimated cost of work remaining estimated total cost

Major Risks amp Issues requiring reviewdecision

Accomplishments Plans for Next Period

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 20: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

20

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Trust = Speed Cost

OR

Trust = Speed Cost

Project Management Centre of Excellence Inc 2018 copy40

492018

21

1 Predictability

2 Reciprocation

3 Consistency and Commitment

4 Social Evidence

5 Authority

6 Liking

7 Scarcity

8 Self-interest

Project Management Centre of Excellence Inc 2018 copy492018Project Management Centre of Excellence Inc copy 2014

42

492018

22

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy43

Project Management Centre of Excellence Inc

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy44

Project Charter

492018

23

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy45

What is the what

What is the why

4Rs

Project Manager or Project Leader

Preliminary Scope Statement

Output ndash Project Charter

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy46

The processes performed to define and mature the project scope develop the project management plan and identify and schedule the project activities that

occur within the project Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

24

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Stakeholder Management

47

IntegrationManagement

Time Management

Cost Management

QualityManagement

HumanResource

Management

CommunicationManagement

RiskManagement

ProcurementManagement

ScopeManagement

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy48

Deliver the project results

492018

25

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy49

Specific

Measurable

Agreed-upon

Realistic

Time component

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy50

In-Scope Out of Scope

Includes both

492018

26

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy52

Plan and hold an event

Start

492018

27

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy53

Task A Task BFSbull Finish to Start

bull Finish to Finish Task C

Task D

FF

bull Start to Start Task E

Task F

SS

bull Start to Finish Task G Task HSF

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy54

CP= the sequence of schedule activities that determines the duration of the project

CPM-the longest path through the project forms the critical path and is also the shortest time in which a project can be completed

CPM=Forward andor backward pass

492018

28

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy55

B

Start

A

C

Finish

E

F

D

2 frac12 day float

BD

2

1 8

3 4 5 6 7

In Days

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy56

Who does the work

Select project team

Roles and Responsibilities Matrix

RACI chart

Resources can be internal or external

492018

29

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy57

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy58

35 h

20 h 15 h

30 h 35 h 35 h

25 h

5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for Bob

Hou

rs W

ork

ed

Ove

rtim

e

492018

30

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy59

35 h

20 h 15 h

30 h 35 h 35 h

20 h5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for BobH

ou

rs W

ork

ed

Ove

rtim

e

5 h

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy60

Day 1 Day 2 Day 3 Day 4 Day 6Day 5

1 brick layer

to do 6 days

of work will

take 6 days

2 brick layer

to do 6 days

of work will

take 3 days

492018

31

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy61

The planned dates for performing schedule activities and the planned dates for meeting

schedule milestones

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy62

De-scoping

ndash Analyzing alternatives on the critical path to determine how to reduce the schedule for the least amount of cost

ndash Not always a viable alternative

Crashing

ndash Analyzing the critical path to determine where to reduce the schedule for the least amount of cost while bring extra resources on

ndash Not always a viable alternative

Fast-Tracking

ndash Phases or activities that would have normally being done in sequence are done in parallel

ndash Can result in rework and increased risk

ndash Requires 3 X the amount of planning

Least $

A B

B

492018

32

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy63

Estimating

Budget preparation

Forecasting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy64

Co

st

Project target Cost

Time

Performance

Measurement

Baseline

Define the Work

Define the

Baseline Budget

Define the

Baseline ScheduleContingency

Budget

492018

33

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy65

Order of magnitude

Budget

Definitive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy66

Top down

Analogous

Parametric

Vendor bids

Bottom up

Detailed (piece by piece)

Three point or PERT

492018

34

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy67

The How

What is In and Out of Scope (detailed)

All the Work and only the Work

Network Diagram

Estimating

Critical Path

Output ndash Project Plan

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy68

Those processes performed

to complete the work

defined in the project

management plan to satisfy the project specifications

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

35

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy69

Destructive

Intervention

Constructive

Opportunity

Influence of

Stakeholders

and

Opportunity

to add value

Cost

Curve

$

Time

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy70

An uncertain event or condition

that if it occurs has a positive

or negative effect on one or

more of the project objectives

such as scope schedule

cost and quality

copyPMBOK regGuide Sixth Edition

492018

36

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy71

ldquoIncludes processes concerned with conducting risk

management planning identification analysis

responses and monitoring and control on a projectrdquo

copyPMBOK regGuide Sixth Edition

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Before the risk

Focus on prevention amp

planning

After the risk

Focus on recovery

Project

Start Project

Finish

Avoid Mitigate or Transfer Risks Use contingency plans

RiskManagement

492018

37

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy73

HighLow Impact

Hig

h

Low

Threaten

Failure

Minor

impactBig Impact if Occurs

ldquoEarthquakerdquo

Disruptive

ldquoDeath by

1000 cutsrdquo

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy74

Minimizes reactive crisis management

Increases likelihood of project success

Increases profitability

Prevents events impacting triple constraints

492018

38

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy75

1 Project Purpose

2 Objectives

3 Identified Risks

4 Risk Assessment

5 Risk Prevention

6 Risk Mitigation

7 Resources

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy76

492018

39

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy77

Work with your team and sponsor to identify stakeholders

Brainstorming works to develop a list that can be reviewed and finalized by the team

Key Stakeholders will usually emerge on their own

Stakeholders are persons and

organizations whose interests may be

positively or negatively affected by the

execution or completion of the project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy78

Ask each stakeholder 2 questions

bullWhat are your three major expectations from this project

bullWhat are your three major concerns related to this project

492018

40

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy79

Keep InformedMonitor(Minimal effort)

Manage Relationship

Closely

Keep Satisfied

InterestLow High

Low

High

Power

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy80

1 Analysis What do they need to know amp what do we want to say

1 Decide Communication Objectives2 Determine Vulnerabilities amp Issues3 Develop Key Messages4 Perform Stakeholder Analysis (interests concerns)

2 Design amp Build What methods and tools should we use

1 Build Communication Vehicles (reports websites etc)

3 Develop Plan Who How and When should they receive it

1 Develop Communication Plan 2 Update Overall Workplan for Communication Activities

4 Do it1 Execute Communication Plan2 Modify amp Adjust as needed

492018

41

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy81

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy82

1 Project Purpose

2 Objectives

3 Potential Issues

4 Key Messages

5 AudiencesStakeholders

6 Communication Vehicles

7 Communication Plan Matrix

8 Resources

492018

42

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy83

Planned the Work Now Work the Plan

But What IF (Risk Management)

85 of what PMs do is Communication

Stakeholder Management is Critical to Project

Success

Output ndash Unique product service delivery or

result

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy84

Those processes required to

track review and regulate the

progress and performance of

the project identify any areas in

which changes to the plan are

required and initiate the

corresponding changes

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

43

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy85

Is daily monitoring at the team level of resources tasks and schedule It is hellip

A vital component of tracking and managing progress

Managing the triple constraints

Relatively simple ldquouser friendlyrdquo and inexpensive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy86

Tasks

Requirements

Timing and performance

Resource utilization and outsourcing

Scope deliverables completion and product quality

Process improvement possibilities and lessons learned

Schedule and cost performance

492018

44

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy87

Initiate Assess Resolve CloseApprove

Senior team

a change

Senior team

member initiates

a change

Project manager

accepts or rejects

Project manager

accepts or rejects

change request

Change Analyst

makes assessment of

the change and gives

recommendations

Managers acceptChange Analyst

makes assessment of

the change and gives

recommendations

or reject the

change based on

the assessment

and

Managers accept

or reject the

change based on

the assessment

and

recommendations Project manager

creates and assigns

tasks if necessary

and updates project

plan

Document

closureReject

Accept

Accept

Reject

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy88

Project

Phase 1

Phase 2

Phase 3

Stage

Gate

Planning

Go No Go Decisions

492018

45

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy89

Today

Planned

Burned

Earned

Time

Co

st

CV

Planned

Finished

Actual

Finished

Late

Over

Budget

Cost Variance (CV) = Earned ndash Burned

Schedule Variance (SV) = Earned ndash Planned

SV

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy90

complete to date

Dashboard ndash scope quality time budget

Milestones and deliverables

Target revised complete

Budget

Approved spent to date estimated cost of work remaining estimated total cost

Major Risks amp Issues requiring reviewdecision

Accomplishments Plans for Next Period

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 21: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

21

1 Predictability

2 Reciprocation

3 Consistency and Commitment

4 Social Evidence

5 Authority

6 Liking

7 Scarcity

8 Self-interest

Project Management Centre of Excellence Inc 2018 copy492018Project Management Centre of Excellence Inc copy 2014

42

492018

22

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy43

Project Management Centre of Excellence Inc

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy44

Project Charter

492018

23

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy45

What is the what

What is the why

4Rs

Project Manager or Project Leader

Preliminary Scope Statement

Output ndash Project Charter

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy46

The processes performed to define and mature the project scope develop the project management plan and identify and schedule the project activities that

occur within the project Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

24

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Stakeholder Management

47

IntegrationManagement

Time Management

Cost Management

QualityManagement

HumanResource

Management

CommunicationManagement

RiskManagement

ProcurementManagement

ScopeManagement

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy48

Deliver the project results

492018

25

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy49

Specific

Measurable

Agreed-upon

Realistic

Time component

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy50

In-Scope Out of Scope

Includes both

492018

26

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy52

Plan and hold an event

Start

492018

27

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy53

Task A Task BFSbull Finish to Start

bull Finish to Finish Task C

Task D

FF

bull Start to Start Task E

Task F

SS

bull Start to Finish Task G Task HSF

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy54

CP= the sequence of schedule activities that determines the duration of the project

CPM-the longest path through the project forms the critical path and is also the shortest time in which a project can be completed

CPM=Forward andor backward pass

492018

28

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy55

B

Start

A

C

Finish

E

F

D

2 frac12 day float

BD

2

1 8

3 4 5 6 7

In Days

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy56

Who does the work

Select project team

Roles and Responsibilities Matrix

RACI chart

Resources can be internal or external

492018

29

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy57

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy58

35 h

20 h 15 h

30 h 35 h 35 h

25 h

5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for Bob

Hou

rs W

ork

ed

Ove

rtim

e

492018

30

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy59

35 h

20 h 15 h

30 h 35 h 35 h

20 h5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for BobH

ou

rs W

ork

ed

Ove

rtim

e

5 h

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy60

Day 1 Day 2 Day 3 Day 4 Day 6Day 5

1 brick layer

to do 6 days

of work will

take 6 days

2 brick layer

to do 6 days

of work will

take 3 days

492018

31

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy61

The planned dates for performing schedule activities and the planned dates for meeting

schedule milestones

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy62

De-scoping

ndash Analyzing alternatives on the critical path to determine how to reduce the schedule for the least amount of cost

ndash Not always a viable alternative

Crashing

ndash Analyzing the critical path to determine where to reduce the schedule for the least amount of cost while bring extra resources on

ndash Not always a viable alternative

Fast-Tracking

ndash Phases or activities that would have normally being done in sequence are done in parallel

ndash Can result in rework and increased risk

ndash Requires 3 X the amount of planning

Least $

A B

B

492018

32

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy63

Estimating

Budget preparation

Forecasting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy64

Co

st

Project target Cost

Time

Performance

Measurement

Baseline

Define the Work

Define the

Baseline Budget

Define the

Baseline ScheduleContingency

Budget

492018

33

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy65

Order of magnitude

Budget

Definitive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy66

Top down

Analogous

Parametric

Vendor bids

Bottom up

Detailed (piece by piece)

Three point or PERT

492018

34

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy67

The How

What is In and Out of Scope (detailed)

All the Work and only the Work

Network Diagram

Estimating

Critical Path

Output ndash Project Plan

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy68

Those processes performed

to complete the work

defined in the project

management plan to satisfy the project specifications

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

35

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy69

Destructive

Intervention

Constructive

Opportunity

Influence of

Stakeholders

and

Opportunity

to add value

Cost

Curve

$

Time

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy70

An uncertain event or condition

that if it occurs has a positive

or negative effect on one or

more of the project objectives

such as scope schedule

cost and quality

copyPMBOK regGuide Sixth Edition

492018

36

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy71

ldquoIncludes processes concerned with conducting risk

management planning identification analysis

responses and monitoring and control on a projectrdquo

copyPMBOK regGuide Sixth Edition

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Before the risk

Focus on prevention amp

planning

After the risk

Focus on recovery

Project

Start Project

Finish

Avoid Mitigate or Transfer Risks Use contingency plans

RiskManagement

492018

37

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy73

HighLow Impact

Hig

h

Low

Threaten

Failure

Minor

impactBig Impact if Occurs

ldquoEarthquakerdquo

Disruptive

ldquoDeath by

1000 cutsrdquo

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy74

Minimizes reactive crisis management

Increases likelihood of project success

Increases profitability

Prevents events impacting triple constraints

492018

38

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy75

1 Project Purpose

2 Objectives

3 Identified Risks

4 Risk Assessment

5 Risk Prevention

6 Risk Mitigation

7 Resources

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy76

492018

39

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy77

Work with your team and sponsor to identify stakeholders

Brainstorming works to develop a list that can be reviewed and finalized by the team

Key Stakeholders will usually emerge on their own

Stakeholders are persons and

organizations whose interests may be

positively or negatively affected by the

execution or completion of the project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy78

Ask each stakeholder 2 questions

bullWhat are your three major expectations from this project

bullWhat are your three major concerns related to this project

492018

40

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy79

Keep InformedMonitor(Minimal effort)

Manage Relationship

Closely

Keep Satisfied

InterestLow High

Low

High

Power

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy80

1 Analysis What do they need to know amp what do we want to say

1 Decide Communication Objectives2 Determine Vulnerabilities amp Issues3 Develop Key Messages4 Perform Stakeholder Analysis (interests concerns)

2 Design amp Build What methods and tools should we use

1 Build Communication Vehicles (reports websites etc)

3 Develop Plan Who How and When should they receive it

1 Develop Communication Plan 2 Update Overall Workplan for Communication Activities

4 Do it1 Execute Communication Plan2 Modify amp Adjust as needed

492018

41

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy81

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy82

1 Project Purpose

2 Objectives

3 Potential Issues

4 Key Messages

5 AudiencesStakeholders

6 Communication Vehicles

7 Communication Plan Matrix

8 Resources

492018

42

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy83

Planned the Work Now Work the Plan

But What IF (Risk Management)

85 of what PMs do is Communication

Stakeholder Management is Critical to Project

Success

Output ndash Unique product service delivery or

result

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy84

Those processes required to

track review and regulate the

progress and performance of

the project identify any areas in

which changes to the plan are

required and initiate the

corresponding changes

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

43

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy85

Is daily monitoring at the team level of resources tasks and schedule It is hellip

A vital component of tracking and managing progress

Managing the triple constraints

Relatively simple ldquouser friendlyrdquo and inexpensive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy86

Tasks

Requirements

Timing and performance

Resource utilization and outsourcing

Scope deliverables completion and product quality

Process improvement possibilities and lessons learned

Schedule and cost performance

492018

44

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy87

Initiate Assess Resolve CloseApprove

Senior team

a change

Senior team

member initiates

a change

Project manager

accepts or rejects

Project manager

accepts or rejects

change request

Change Analyst

makes assessment of

the change and gives

recommendations

Managers acceptChange Analyst

makes assessment of

the change and gives

recommendations

or reject the

change based on

the assessment

and

Managers accept

or reject the

change based on

the assessment

and

recommendations Project manager

creates and assigns

tasks if necessary

and updates project

plan

Document

closureReject

Accept

Accept

Reject

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy88

Project

Phase 1

Phase 2

Phase 3

Stage

Gate

Planning

Go No Go Decisions

492018

45

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy89

Today

Planned

Burned

Earned

Time

Co

st

CV

Planned

Finished

Actual

Finished

Late

Over

Budget

Cost Variance (CV) = Earned ndash Burned

Schedule Variance (SV) = Earned ndash Planned

SV

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy90

complete to date

Dashboard ndash scope quality time budget

Milestones and deliverables

Target revised complete

Budget

Approved spent to date estimated cost of work remaining estimated total cost

Major Risks amp Issues requiring reviewdecision

Accomplishments Plans for Next Period

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 22: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

22

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy43

Project Management Centre of Excellence Inc

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy44

Project Charter

492018

23

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy45

What is the what

What is the why

4Rs

Project Manager or Project Leader

Preliminary Scope Statement

Output ndash Project Charter

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy46

The processes performed to define and mature the project scope develop the project management plan and identify and schedule the project activities that

occur within the project Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

24

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Stakeholder Management

47

IntegrationManagement

Time Management

Cost Management

QualityManagement

HumanResource

Management

CommunicationManagement

RiskManagement

ProcurementManagement

ScopeManagement

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy48

Deliver the project results

492018

25

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy49

Specific

Measurable

Agreed-upon

Realistic

Time component

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy50

In-Scope Out of Scope

Includes both

492018

26

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy52

Plan and hold an event

Start

492018

27

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy53

Task A Task BFSbull Finish to Start

bull Finish to Finish Task C

Task D

FF

bull Start to Start Task E

Task F

SS

bull Start to Finish Task G Task HSF

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy54

CP= the sequence of schedule activities that determines the duration of the project

CPM-the longest path through the project forms the critical path and is also the shortest time in which a project can be completed

CPM=Forward andor backward pass

492018

28

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy55

B

Start

A

C

Finish

E

F

D

2 frac12 day float

BD

2

1 8

3 4 5 6 7

In Days

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy56

Who does the work

Select project team

Roles and Responsibilities Matrix

RACI chart

Resources can be internal or external

492018

29

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy57

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy58

35 h

20 h 15 h

30 h 35 h 35 h

25 h

5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for Bob

Hou

rs W

ork

ed

Ove

rtim

e

492018

30

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy59

35 h

20 h 15 h

30 h 35 h 35 h

20 h5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for BobH

ou

rs W

ork

ed

Ove

rtim

e

5 h

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy60

Day 1 Day 2 Day 3 Day 4 Day 6Day 5

1 brick layer

to do 6 days

of work will

take 6 days

2 brick layer

to do 6 days

of work will

take 3 days

492018

31

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy61

The planned dates for performing schedule activities and the planned dates for meeting

schedule milestones

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy62

De-scoping

ndash Analyzing alternatives on the critical path to determine how to reduce the schedule for the least amount of cost

ndash Not always a viable alternative

Crashing

ndash Analyzing the critical path to determine where to reduce the schedule for the least amount of cost while bring extra resources on

ndash Not always a viable alternative

Fast-Tracking

ndash Phases or activities that would have normally being done in sequence are done in parallel

ndash Can result in rework and increased risk

ndash Requires 3 X the amount of planning

Least $

A B

B

492018

32

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy63

Estimating

Budget preparation

Forecasting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy64

Co

st

Project target Cost

Time

Performance

Measurement

Baseline

Define the Work

Define the

Baseline Budget

Define the

Baseline ScheduleContingency

Budget

492018

33

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy65

Order of magnitude

Budget

Definitive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy66

Top down

Analogous

Parametric

Vendor bids

Bottom up

Detailed (piece by piece)

Three point or PERT

492018

34

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy67

The How

What is In and Out of Scope (detailed)

All the Work and only the Work

Network Diagram

Estimating

Critical Path

Output ndash Project Plan

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy68

Those processes performed

to complete the work

defined in the project

management plan to satisfy the project specifications

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

35

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy69

Destructive

Intervention

Constructive

Opportunity

Influence of

Stakeholders

and

Opportunity

to add value

Cost

Curve

$

Time

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy70

An uncertain event or condition

that if it occurs has a positive

or negative effect on one or

more of the project objectives

such as scope schedule

cost and quality

copyPMBOK regGuide Sixth Edition

492018

36

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy71

ldquoIncludes processes concerned with conducting risk

management planning identification analysis

responses and monitoring and control on a projectrdquo

copyPMBOK regGuide Sixth Edition

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Before the risk

Focus on prevention amp

planning

After the risk

Focus on recovery

Project

Start Project

Finish

Avoid Mitigate or Transfer Risks Use contingency plans

RiskManagement

492018

37

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy73

HighLow Impact

Hig

h

Low

Threaten

Failure

Minor

impactBig Impact if Occurs

ldquoEarthquakerdquo

Disruptive

ldquoDeath by

1000 cutsrdquo

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy74

Minimizes reactive crisis management

Increases likelihood of project success

Increases profitability

Prevents events impacting triple constraints

492018

38

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy75

1 Project Purpose

2 Objectives

3 Identified Risks

4 Risk Assessment

5 Risk Prevention

6 Risk Mitigation

7 Resources

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy76

492018

39

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy77

Work with your team and sponsor to identify stakeholders

Brainstorming works to develop a list that can be reviewed and finalized by the team

Key Stakeholders will usually emerge on their own

Stakeholders are persons and

organizations whose interests may be

positively or negatively affected by the

execution or completion of the project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy78

Ask each stakeholder 2 questions

bullWhat are your three major expectations from this project

bullWhat are your three major concerns related to this project

492018

40

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy79

Keep InformedMonitor(Minimal effort)

Manage Relationship

Closely

Keep Satisfied

InterestLow High

Low

High

Power

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy80

1 Analysis What do they need to know amp what do we want to say

1 Decide Communication Objectives2 Determine Vulnerabilities amp Issues3 Develop Key Messages4 Perform Stakeholder Analysis (interests concerns)

2 Design amp Build What methods and tools should we use

1 Build Communication Vehicles (reports websites etc)

3 Develop Plan Who How and When should they receive it

1 Develop Communication Plan 2 Update Overall Workplan for Communication Activities

4 Do it1 Execute Communication Plan2 Modify amp Adjust as needed

492018

41

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy81

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy82

1 Project Purpose

2 Objectives

3 Potential Issues

4 Key Messages

5 AudiencesStakeholders

6 Communication Vehicles

7 Communication Plan Matrix

8 Resources

492018

42

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy83

Planned the Work Now Work the Plan

But What IF (Risk Management)

85 of what PMs do is Communication

Stakeholder Management is Critical to Project

Success

Output ndash Unique product service delivery or

result

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy84

Those processes required to

track review and regulate the

progress and performance of

the project identify any areas in

which changes to the plan are

required and initiate the

corresponding changes

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

43

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy85

Is daily monitoring at the team level of resources tasks and schedule It is hellip

A vital component of tracking and managing progress

Managing the triple constraints

Relatively simple ldquouser friendlyrdquo and inexpensive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy86

Tasks

Requirements

Timing and performance

Resource utilization and outsourcing

Scope deliverables completion and product quality

Process improvement possibilities and lessons learned

Schedule and cost performance

492018

44

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy87

Initiate Assess Resolve CloseApprove

Senior team

a change

Senior team

member initiates

a change

Project manager

accepts or rejects

Project manager

accepts or rejects

change request

Change Analyst

makes assessment of

the change and gives

recommendations

Managers acceptChange Analyst

makes assessment of

the change and gives

recommendations

or reject the

change based on

the assessment

and

Managers accept

or reject the

change based on

the assessment

and

recommendations Project manager

creates and assigns

tasks if necessary

and updates project

plan

Document

closureReject

Accept

Accept

Reject

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy88

Project

Phase 1

Phase 2

Phase 3

Stage

Gate

Planning

Go No Go Decisions

492018

45

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy89

Today

Planned

Burned

Earned

Time

Co

st

CV

Planned

Finished

Actual

Finished

Late

Over

Budget

Cost Variance (CV) = Earned ndash Burned

Schedule Variance (SV) = Earned ndash Planned

SV

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy90

complete to date

Dashboard ndash scope quality time budget

Milestones and deliverables

Target revised complete

Budget

Approved spent to date estimated cost of work remaining estimated total cost

Major Risks amp Issues requiring reviewdecision

Accomplishments Plans for Next Period

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 23: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

23

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy45

What is the what

What is the why

4Rs

Project Manager or Project Leader

Preliminary Scope Statement

Output ndash Project Charter

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy46

The processes performed to define and mature the project scope develop the project management plan and identify and schedule the project activities that

occur within the project Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

24

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Stakeholder Management

47

IntegrationManagement

Time Management

Cost Management

QualityManagement

HumanResource

Management

CommunicationManagement

RiskManagement

ProcurementManagement

ScopeManagement

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy48

Deliver the project results

492018

25

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy49

Specific

Measurable

Agreed-upon

Realistic

Time component

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy50

In-Scope Out of Scope

Includes both

492018

26

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy52

Plan and hold an event

Start

492018

27

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy53

Task A Task BFSbull Finish to Start

bull Finish to Finish Task C

Task D

FF

bull Start to Start Task E

Task F

SS

bull Start to Finish Task G Task HSF

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy54

CP= the sequence of schedule activities that determines the duration of the project

CPM-the longest path through the project forms the critical path and is also the shortest time in which a project can be completed

CPM=Forward andor backward pass

492018

28

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy55

B

Start

A

C

Finish

E

F

D

2 frac12 day float

BD

2

1 8

3 4 5 6 7

In Days

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy56

Who does the work

Select project team

Roles and Responsibilities Matrix

RACI chart

Resources can be internal or external

492018

29

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy57

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy58

35 h

20 h 15 h

30 h 35 h 35 h

25 h

5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for Bob

Hou

rs W

ork

ed

Ove

rtim

e

492018

30

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy59

35 h

20 h 15 h

30 h 35 h 35 h

20 h5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for BobH

ou

rs W

ork

ed

Ove

rtim

e

5 h

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy60

Day 1 Day 2 Day 3 Day 4 Day 6Day 5

1 brick layer

to do 6 days

of work will

take 6 days

2 brick layer

to do 6 days

of work will

take 3 days

492018

31

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy61

The planned dates for performing schedule activities and the planned dates for meeting

schedule milestones

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy62

De-scoping

ndash Analyzing alternatives on the critical path to determine how to reduce the schedule for the least amount of cost

ndash Not always a viable alternative

Crashing

ndash Analyzing the critical path to determine where to reduce the schedule for the least amount of cost while bring extra resources on

ndash Not always a viable alternative

Fast-Tracking

ndash Phases or activities that would have normally being done in sequence are done in parallel

ndash Can result in rework and increased risk

ndash Requires 3 X the amount of planning

Least $

A B

B

492018

32

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy63

Estimating

Budget preparation

Forecasting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy64

Co

st

Project target Cost

Time

Performance

Measurement

Baseline

Define the Work

Define the

Baseline Budget

Define the

Baseline ScheduleContingency

Budget

492018

33

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy65

Order of magnitude

Budget

Definitive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy66

Top down

Analogous

Parametric

Vendor bids

Bottom up

Detailed (piece by piece)

Three point or PERT

492018

34

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy67

The How

What is In and Out of Scope (detailed)

All the Work and only the Work

Network Diagram

Estimating

Critical Path

Output ndash Project Plan

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy68

Those processes performed

to complete the work

defined in the project

management plan to satisfy the project specifications

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

35

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy69

Destructive

Intervention

Constructive

Opportunity

Influence of

Stakeholders

and

Opportunity

to add value

Cost

Curve

$

Time

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy70

An uncertain event or condition

that if it occurs has a positive

or negative effect on one or

more of the project objectives

such as scope schedule

cost and quality

copyPMBOK regGuide Sixth Edition

492018

36

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy71

ldquoIncludes processes concerned with conducting risk

management planning identification analysis

responses and monitoring and control on a projectrdquo

copyPMBOK regGuide Sixth Edition

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Before the risk

Focus on prevention amp

planning

After the risk

Focus on recovery

Project

Start Project

Finish

Avoid Mitigate or Transfer Risks Use contingency plans

RiskManagement

492018

37

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy73

HighLow Impact

Hig

h

Low

Threaten

Failure

Minor

impactBig Impact if Occurs

ldquoEarthquakerdquo

Disruptive

ldquoDeath by

1000 cutsrdquo

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy74

Minimizes reactive crisis management

Increases likelihood of project success

Increases profitability

Prevents events impacting triple constraints

492018

38

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy75

1 Project Purpose

2 Objectives

3 Identified Risks

4 Risk Assessment

5 Risk Prevention

6 Risk Mitigation

7 Resources

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy76

492018

39

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy77

Work with your team and sponsor to identify stakeholders

Brainstorming works to develop a list that can be reviewed and finalized by the team

Key Stakeholders will usually emerge on their own

Stakeholders are persons and

organizations whose interests may be

positively or negatively affected by the

execution or completion of the project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy78

Ask each stakeholder 2 questions

bullWhat are your three major expectations from this project

bullWhat are your three major concerns related to this project

492018

40

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy79

Keep InformedMonitor(Minimal effort)

Manage Relationship

Closely

Keep Satisfied

InterestLow High

Low

High

Power

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy80

1 Analysis What do they need to know amp what do we want to say

1 Decide Communication Objectives2 Determine Vulnerabilities amp Issues3 Develop Key Messages4 Perform Stakeholder Analysis (interests concerns)

2 Design amp Build What methods and tools should we use

1 Build Communication Vehicles (reports websites etc)

3 Develop Plan Who How and When should they receive it

1 Develop Communication Plan 2 Update Overall Workplan for Communication Activities

4 Do it1 Execute Communication Plan2 Modify amp Adjust as needed

492018

41

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy81

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy82

1 Project Purpose

2 Objectives

3 Potential Issues

4 Key Messages

5 AudiencesStakeholders

6 Communication Vehicles

7 Communication Plan Matrix

8 Resources

492018

42

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy83

Planned the Work Now Work the Plan

But What IF (Risk Management)

85 of what PMs do is Communication

Stakeholder Management is Critical to Project

Success

Output ndash Unique product service delivery or

result

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy84

Those processes required to

track review and regulate the

progress and performance of

the project identify any areas in

which changes to the plan are

required and initiate the

corresponding changes

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

43

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy85

Is daily monitoring at the team level of resources tasks and schedule It is hellip

A vital component of tracking and managing progress

Managing the triple constraints

Relatively simple ldquouser friendlyrdquo and inexpensive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy86

Tasks

Requirements

Timing and performance

Resource utilization and outsourcing

Scope deliverables completion and product quality

Process improvement possibilities and lessons learned

Schedule and cost performance

492018

44

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy87

Initiate Assess Resolve CloseApprove

Senior team

a change

Senior team

member initiates

a change

Project manager

accepts or rejects

Project manager

accepts or rejects

change request

Change Analyst

makes assessment of

the change and gives

recommendations

Managers acceptChange Analyst

makes assessment of

the change and gives

recommendations

or reject the

change based on

the assessment

and

Managers accept

or reject the

change based on

the assessment

and

recommendations Project manager

creates and assigns

tasks if necessary

and updates project

plan

Document

closureReject

Accept

Accept

Reject

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy88

Project

Phase 1

Phase 2

Phase 3

Stage

Gate

Planning

Go No Go Decisions

492018

45

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy89

Today

Planned

Burned

Earned

Time

Co

st

CV

Planned

Finished

Actual

Finished

Late

Over

Budget

Cost Variance (CV) = Earned ndash Burned

Schedule Variance (SV) = Earned ndash Planned

SV

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy90

complete to date

Dashboard ndash scope quality time budget

Milestones and deliverables

Target revised complete

Budget

Approved spent to date estimated cost of work remaining estimated total cost

Major Risks amp Issues requiring reviewdecision

Accomplishments Plans for Next Period

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 24: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

24

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Stakeholder Management

47

IntegrationManagement

Time Management

Cost Management

QualityManagement

HumanResource

Management

CommunicationManagement

RiskManagement

ProcurementManagement

ScopeManagement

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy48

Deliver the project results

492018

25

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy49

Specific

Measurable

Agreed-upon

Realistic

Time component

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy50

In-Scope Out of Scope

Includes both

492018

26

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy52

Plan and hold an event

Start

492018

27

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy53

Task A Task BFSbull Finish to Start

bull Finish to Finish Task C

Task D

FF

bull Start to Start Task E

Task F

SS

bull Start to Finish Task G Task HSF

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy54

CP= the sequence of schedule activities that determines the duration of the project

CPM-the longest path through the project forms the critical path and is also the shortest time in which a project can be completed

CPM=Forward andor backward pass

492018

28

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy55

B

Start

A

C

Finish

E

F

D

2 frac12 day float

BD

2

1 8

3 4 5 6 7

In Days

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy56

Who does the work

Select project team

Roles and Responsibilities Matrix

RACI chart

Resources can be internal or external

492018

29

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy57

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy58

35 h

20 h 15 h

30 h 35 h 35 h

25 h

5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for Bob

Hou

rs W

ork

ed

Ove

rtim

e

492018

30

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy59

35 h

20 h 15 h

30 h 35 h 35 h

20 h5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for BobH

ou

rs W

ork

ed

Ove

rtim

e

5 h

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy60

Day 1 Day 2 Day 3 Day 4 Day 6Day 5

1 brick layer

to do 6 days

of work will

take 6 days

2 brick layer

to do 6 days

of work will

take 3 days

492018

31

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy61

The planned dates for performing schedule activities and the planned dates for meeting

schedule milestones

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy62

De-scoping

ndash Analyzing alternatives on the critical path to determine how to reduce the schedule for the least amount of cost

ndash Not always a viable alternative

Crashing

ndash Analyzing the critical path to determine where to reduce the schedule for the least amount of cost while bring extra resources on

ndash Not always a viable alternative

Fast-Tracking

ndash Phases or activities that would have normally being done in sequence are done in parallel

ndash Can result in rework and increased risk

ndash Requires 3 X the amount of planning

Least $

A B

B

492018

32

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy63

Estimating

Budget preparation

Forecasting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy64

Co

st

Project target Cost

Time

Performance

Measurement

Baseline

Define the Work

Define the

Baseline Budget

Define the

Baseline ScheduleContingency

Budget

492018

33

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy65

Order of magnitude

Budget

Definitive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy66

Top down

Analogous

Parametric

Vendor bids

Bottom up

Detailed (piece by piece)

Three point or PERT

492018

34

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy67

The How

What is In and Out of Scope (detailed)

All the Work and only the Work

Network Diagram

Estimating

Critical Path

Output ndash Project Plan

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy68

Those processes performed

to complete the work

defined in the project

management plan to satisfy the project specifications

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

35

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy69

Destructive

Intervention

Constructive

Opportunity

Influence of

Stakeholders

and

Opportunity

to add value

Cost

Curve

$

Time

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy70

An uncertain event or condition

that if it occurs has a positive

or negative effect on one or

more of the project objectives

such as scope schedule

cost and quality

copyPMBOK regGuide Sixth Edition

492018

36

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy71

ldquoIncludes processes concerned with conducting risk

management planning identification analysis

responses and monitoring and control on a projectrdquo

copyPMBOK regGuide Sixth Edition

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Before the risk

Focus on prevention amp

planning

After the risk

Focus on recovery

Project

Start Project

Finish

Avoid Mitigate or Transfer Risks Use contingency plans

RiskManagement

492018

37

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy73

HighLow Impact

Hig

h

Low

Threaten

Failure

Minor

impactBig Impact if Occurs

ldquoEarthquakerdquo

Disruptive

ldquoDeath by

1000 cutsrdquo

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy74

Minimizes reactive crisis management

Increases likelihood of project success

Increases profitability

Prevents events impacting triple constraints

492018

38

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy75

1 Project Purpose

2 Objectives

3 Identified Risks

4 Risk Assessment

5 Risk Prevention

6 Risk Mitigation

7 Resources

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy76

492018

39

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy77

Work with your team and sponsor to identify stakeholders

Brainstorming works to develop a list that can be reviewed and finalized by the team

Key Stakeholders will usually emerge on their own

Stakeholders are persons and

organizations whose interests may be

positively or negatively affected by the

execution or completion of the project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy78

Ask each stakeholder 2 questions

bullWhat are your three major expectations from this project

bullWhat are your three major concerns related to this project

492018

40

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy79

Keep InformedMonitor(Minimal effort)

Manage Relationship

Closely

Keep Satisfied

InterestLow High

Low

High

Power

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy80

1 Analysis What do they need to know amp what do we want to say

1 Decide Communication Objectives2 Determine Vulnerabilities amp Issues3 Develop Key Messages4 Perform Stakeholder Analysis (interests concerns)

2 Design amp Build What methods and tools should we use

1 Build Communication Vehicles (reports websites etc)

3 Develop Plan Who How and When should they receive it

1 Develop Communication Plan 2 Update Overall Workplan for Communication Activities

4 Do it1 Execute Communication Plan2 Modify amp Adjust as needed

492018

41

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy81

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy82

1 Project Purpose

2 Objectives

3 Potential Issues

4 Key Messages

5 AudiencesStakeholders

6 Communication Vehicles

7 Communication Plan Matrix

8 Resources

492018

42

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy83

Planned the Work Now Work the Plan

But What IF (Risk Management)

85 of what PMs do is Communication

Stakeholder Management is Critical to Project

Success

Output ndash Unique product service delivery or

result

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy84

Those processes required to

track review and regulate the

progress and performance of

the project identify any areas in

which changes to the plan are

required and initiate the

corresponding changes

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

43

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy85

Is daily monitoring at the team level of resources tasks and schedule It is hellip

A vital component of tracking and managing progress

Managing the triple constraints

Relatively simple ldquouser friendlyrdquo and inexpensive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy86

Tasks

Requirements

Timing and performance

Resource utilization and outsourcing

Scope deliverables completion and product quality

Process improvement possibilities and lessons learned

Schedule and cost performance

492018

44

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy87

Initiate Assess Resolve CloseApprove

Senior team

a change

Senior team

member initiates

a change

Project manager

accepts or rejects

Project manager

accepts or rejects

change request

Change Analyst

makes assessment of

the change and gives

recommendations

Managers acceptChange Analyst

makes assessment of

the change and gives

recommendations

or reject the

change based on

the assessment

and

Managers accept

or reject the

change based on

the assessment

and

recommendations Project manager

creates and assigns

tasks if necessary

and updates project

plan

Document

closureReject

Accept

Accept

Reject

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy88

Project

Phase 1

Phase 2

Phase 3

Stage

Gate

Planning

Go No Go Decisions

492018

45

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy89

Today

Planned

Burned

Earned

Time

Co

st

CV

Planned

Finished

Actual

Finished

Late

Over

Budget

Cost Variance (CV) = Earned ndash Burned

Schedule Variance (SV) = Earned ndash Planned

SV

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy90

complete to date

Dashboard ndash scope quality time budget

Milestones and deliverables

Target revised complete

Budget

Approved spent to date estimated cost of work remaining estimated total cost

Major Risks amp Issues requiring reviewdecision

Accomplishments Plans for Next Period

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 25: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

25

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy49

Specific

Measurable

Agreed-upon

Realistic

Time component

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy50

In-Scope Out of Scope

Includes both

492018

26

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy52

Plan and hold an event

Start

492018

27

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy53

Task A Task BFSbull Finish to Start

bull Finish to Finish Task C

Task D

FF

bull Start to Start Task E

Task F

SS

bull Start to Finish Task G Task HSF

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy54

CP= the sequence of schedule activities that determines the duration of the project

CPM-the longest path through the project forms the critical path and is also the shortest time in which a project can be completed

CPM=Forward andor backward pass

492018

28

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy55

B

Start

A

C

Finish

E

F

D

2 frac12 day float

BD

2

1 8

3 4 5 6 7

In Days

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy56

Who does the work

Select project team

Roles and Responsibilities Matrix

RACI chart

Resources can be internal or external

492018

29

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy57

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy58

35 h

20 h 15 h

30 h 35 h 35 h

25 h

5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for Bob

Hou

rs W

ork

ed

Ove

rtim

e

492018

30

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy59

35 h

20 h 15 h

30 h 35 h 35 h

20 h5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for BobH

ou

rs W

ork

ed

Ove

rtim

e

5 h

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy60

Day 1 Day 2 Day 3 Day 4 Day 6Day 5

1 brick layer

to do 6 days

of work will

take 6 days

2 brick layer

to do 6 days

of work will

take 3 days

492018

31

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy61

The planned dates for performing schedule activities and the planned dates for meeting

schedule milestones

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy62

De-scoping

ndash Analyzing alternatives on the critical path to determine how to reduce the schedule for the least amount of cost

ndash Not always a viable alternative

Crashing

ndash Analyzing the critical path to determine where to reduce the schedule for the least amount of cost while bring extra resources on

ndash Not always a viable alternative

Fast-Tracking

ndash Phases or activities that would have normally being done in sequence are done in parallel

ndash Can result in rework and increased risk

ndash Requires 3 X the amount of planning

Least $

A B

B

492018

32

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy63

Estimating

Budget preparation

Forecasting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy64

Co

st

Project target Cost

Time

Performance

Measurement

Baseline

Define the Work

Define the

Baseline Budget

Define the

Baseline ScheduleContingency

Budget

492018

33

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy65

Order of magnitude

Budget

Definitive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy66

Top down

Analogous

Parametric

Vendor bids

Bottom up

Detailed (piece by piece)

Three point or PERT

492018

34

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy67

The How

What is In and Out of Scope (detailed)

All the Work and only the Work

Network Diagram

Estimating

Critical Path

Output ndash Project Plan

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy68

Those processes performed

to complete the work

defined in the project

management plan to satisfy the project specifications

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

35

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy69

Destructive

Intervention

Constructive

Opportunity

Influence of

Stakeholders

and

Opportunity

to add value

Cost

Curve

$

Time

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy70

An uncertain event or condition

that if it occurs has a positive

or negative effect on one or

more of the project objectives

such as scope schedule

cost and quality

copyPMBOK regGuide Sixth Edition

492018

36

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy71

ldquoIncludes processes concerned with conducting risk

management planning identification analysis

responses and monitoring and control on a projectrdquo

copyPMBOK regGuide Sixth Edition

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Before the risk

Focus on prevention amp

planning

After the risk

Focus on recovery

Project

Start Project

Finish

Avoid Mitigate or Transfer Risks Use contingency plans

RiskManagement

492018

37

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy73

HighLow Impact

Hig

h

Low

Threaten

Failure

Minor

impactBig Impact if Occurs

ldquoEarthquakerdquo

Disruptive

ldquoDeath by

1000 cutsrdquo

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy74

Minimizes reactive crisis management

Increases likelihood of project success

Increases profitability

Prevents events impacting triple constraints

492018

38

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy75

1 Project Purpose

2 Objectives

3 Identified Risks

4 Risk Assessment

5 Risk Prevention

6 Risk Mitigation

7 Resources

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy76

492018

39

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy77

Work with your team and sponsor to identify stakeholders

Brainstorming works to develop a list that can be reviewed and finalized by the team

Key Stakeholders will usually emerge on their own

Stakeholders are persons and

organizations whose interests may be

positively or negatively affected by the

execution or completion of the project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy78

Ask each stakeholder 2 questions

bullWhat are your three major expectations from this project

bullWhat are your three major concerns related to this project

492018

40

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy79

Keep InformedMonitor(Minimal effort)

Manage Relationship

Closely

Keep Satisfied

InterestLow High

Low

High

Power

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy80

1 Analysis What do they need to know amp what do we want to say

1 Decide Communication Objectives2 Determine Vulnerabilities amp Issues3 Develop Key Messages4 Perform Stakeholder Analysis (interests concerns)

2 Design amp Build What methods and tools should we use

1 Build Communication Vehicles (reports websites etc)

3 Develop Plan Who How and When should they receive it

1 Develop Communication Plan 2 Update Overall Workplan for Communication Activities

4 Do it1 Execute Communication Plan2 Modify amp Adjust as needed

492018

41

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy81

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy82

1 Project Purpose

2 Objectives

3 Potential Issues

4 Key Messages

5 AudiencesStakeholders

6 Communication Vehicles

7 Communication Plan Matrix

8 Resources

492018

42

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy83

Planned the Work Now Work the Plan

But What IF (Risk Management)

85 of what PMs do is Communication

Stakeholder Management is Critical to Project

Success

Output ndash Unique product service delivery or

result

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy84

Those processes required to

track review and regulate the

progress and performance of

the project identify any areas in

which changes to the plan are

required and initiate the

corresponding changes

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

43

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy85

Is daily monitoring at the team level of resources tasks and schedule It is hellip

A vital component of tracking and managing progress

Managing the triple constraints

Relatively simple ldquouser friendlyrdquo and inexpensive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy86

Tasks

Requirements

Timing and performance

Resource utilization and outsourcing

Scope deliverables completion and product quality

Process improvement possibilities and lessons learned

Schedule and cost performance

492018

44

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy87

Initiate Assess Resolve CloseApprove

Senior team

a change

Senior team

member initiates

a change

Project manager

accepts or rejects

Project manager

accepts or rejects

change request

Change Analyst

makes assessment of

the change and gives

recommendations

Managers acceptChange Analyst

makes assessment of

the change and gives

recommendations

or reject the

change based on

the assessment

and

Managers accept

or reject the

change based on

the assessment

and

recommendations Project manager

creates and assigns

tasks if necessary

and updates project

plan

Document

closureReject

Accept

Accept

Reject

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy88

Project

Phase 1

Phase 2

Phase 3

Stage

Gate

Planning

Go No Go Decisions

492018

45

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy89

Today

Planned

Burned

Earned

Time

Co

st

CV

Planned

Finished

Actual

Finished

Late

Over

Budget

Cost Variance (CV) = Earned ndash Burned

Schedule Variance (SV) = Earned ndash Planned

SV

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy90

complete to date

Dashboard ndash scope quality time budget

Milestones and deliverables

Target revised complete

Budget

Approved spent to date estimated cost of work remaining estimated total cost

Major Risks amp Issues requiring reviewdecision

Accomplishments Plans for Next Period

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 26: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

26

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy52

Plan and hold an event

Start

492018

27

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy53

Task A Task BFSbull Finish to Start

bull Finish to Finish Task C

Task D

FF

bull Start to Start Task E

Task F

SS

bull Start to Finish Task G Task HSF

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy54

CP= the sequence of schedule activities that determines the duration of the project

CPM-the longest path through the project forms the critical path and is also the shortest time in which a project can be completed

CPM=Forward andor backward pass

492018

28

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy55

B

Start

A

C

Finish

E

F

D

2 frac12 day float

BD

2

1 8

3 4 5 6 7

In Days

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy56

Who does the work

Select project team

Roles and Responsibilities Matrix

RACI chart

Resources can be internal or external

492018

29

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy57

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy58

35 h

20 h 15 h

30 h 35 h 35 h

25 h

5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for Bob

Hou

rs W

ork

ed

Ove

rtim

e

492018

30

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy59

35 h

20 h 15 h

30 h 35 h 35 h

20 h5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for BobH

ou

rs W

ork

ed

Ove

rtim

e

5 h

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy60

Day 1 Day 2 Day 3 Day 4 Day 6Day 5

1 brick layer

to do 6 days

of work will

take 6 days

2 brick layer

to do 6 days

of work will

take 3 days

492018

31

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy61

The planned dates for performing schedule activities and the planned dates for meeting

schedule milestones

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy62

De-scoping

ndash Analyzing alternatives on the critical path to determine how to reduce the schedule for the least amount of cost

ndash Not always a viable alternative

Crashing

ndash Analyzing the critical path to determine where to reduce the schedule for the least amount of cost while bring extra resources on

ndash Not always a viable alternative

Fast-Tracking

ndash Phases or activities that would have normally being done in sequence are done in parallel

ndash Can result in rework and increased risk

ndash Requires 3 X the amount of planning

Least $

A B

B

492018

32

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy63

Estimating

Budget preparation

Forecasting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy64

Co

st

Project target Cost

Time

Performance

Measurement

Baseline

Define the Work

Define the

Baseline Budget

Define the

Baseline ScheduleContingency

Budget

492018

33

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy65

Order of magnitude

Budget

Definitive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy66

Top down

Analogous

Parametric

Vendor bids

Bottom up

Detailed (piece by piece)

Three point or PERT

492018

34

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy67

The How

What is In and Out of Scope (detailed)

All the Work and only the Work

Network Diagram

Estimating

Critical Path

Output ndash Project Plan

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy68

Those processes performed

to complete the work

defined in the project

management plan to satisfy the project specifications

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

35

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy69

Destructive

Intervention

Constructive

Opportunity

Influence of

Stakeholders

and

Opportunity

to add value

Cost

Curve

$

Time

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy70

An uncertain event or condition

that if it occurs has a positive

or negative effect on one or

more of the project objectives

such as scope schedule

cost and quality

copyPMBOK regGuide Sixth Edition

492018

36

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy71

ldquoIncludes processes concerned with conducting risk

management planning identification analysis

responses and monitoring and control on a projectrdquo

copyPMBOK regGuide Sixth Edition

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Before the risk

Focus on prevention amp

planning

After the risk

Focus on recovery

Project

Start Project

Finish

Avoid Mitigate or Transfer Risks Use contingency plans

RiskManagement

492018

37

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy73

HighLow Impact

Hig

h

Low

Threaten

Failure

Minor

impactBig Impact if Occurs

ldquoEarthquakerdquo

Disruptive

ldquoDeath by

1000 cutsrdquo

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy74

Minimizes reactive crisis management

Increases likelihood of project success

Increases profitability

Prevents events impacting triple constraints

492018

38

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy75

1 Project Purpose

2 Objectives

3 Identified Risks

4 Risk Assessment

5 Risk Prevention

6 Risk Mitigation

7 Resources

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy76

492018

39

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy77

Work with your team and sponsor to identify stakeholders

Brainstorming works to develop a list that can be reviewed and finalized by the team

Key Stakeholders will usually emerge on their own

Stakeholders are persons and

organizations whose interests may be

positively or negatively affected by the

execution or completion of the project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy78

Ask each stakeholder 2 questions

bullWhat are your three major expectations from this project

bullWhat are your three major concerns related to this project

492018

40

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy79

Keep InformedMonitor(Minimal effort)

Manage Relationship

Closely

Keep Satisfied

InterestLow High

Low

High

Power

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy80

1 Analysis What do they need to know amp what do we want to say

1 Decide Communication Objectives2 Determine Vulnerabilities amp Issues3 Develop Key Messages4 Perform Stakeholder Analysis (interests concerns)

2 Design amp Build What methods and tools should we use

1 Build Communication Vehicles (reports websites etc)

3 Develop Plan Who How and When should they receive it

1 Develop Communication Plan 2 Update Overall Workplan for Communication Activities

4 Do it1 Execute Communication Plan2 Modify amp Adjust as needed

492018

41

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy81

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy82

1 Project Purpose

2 Objectives

3 Potential Issues

4 Key Messages

5 AudiencesStakeholders

6 Communication Vehicles

7 Communication Plan Matrix

8 Resources

492018

42

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy83

Planned the Work Now Work the Plan

But What IF (Risk Management)

85 of what PMs do is Communication

Stakeholder Management is Critical to Project

Success

Output ndash Unique product service delivery or

result

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy84

Those processes required to

track review and regulate the

progress and performance of

the project identify any areas in

which changes to the plan are

required and initiate the

corresponding changes

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

43

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy85

Is daily monitoring at the team level of resources tasks and schedule It is hellip

A vital component of tracking and managing progress

Managing the triple constraints

Relatively simple ldquouser friendlyrdquo and inexpensive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy86

Tasks

Requirements

Timing and performance

Resource utilization and outsourcing

Scope deliverables completion and product quality

Process improvement possibilities and lessons learned

Schedule and cost performance

492018

44

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy87

Initiate Assess Resolve CloseApprove

Senior team

a change

Senior team

member initiates

a change

Project manager

accepts or rejects

Project manager

accepts or rejects

change request

Change Analyst

makes assessment of

the change and gives

recommendations

Managers acceptChange Analyst

makes assessment of

the change and gives

recommendations

or reject the

change based on

the assessment

and

Managers accept

or reject the

change based on

the assessment

and

recommendations Project manager

creates and assigns

tasks if necessary

and updates project

plan

Document

closureReject

Accept

Accept

Reject

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy88

Project

Phase 1

Phase 2

Phase 3

Stage

Gate

Planning

Go No Go Decisions

492018

45

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy89

Today

Planned

Burned

Earned

Time

Co

st

CV

Planned

Finished

Actual

Finished

Late

Over

Budget

Cost Variance (CV) = Earned ndash Burned

Schedule Variance (SV) = Earned ndash Planned

SV

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy90

complete to date

Dashboard ndash scope quality time budget

Milestones and deliverables

Target revised complete

Budget

Approved spent to date estimated cost of work remaining estimated total cost

Major Risks amp Issues requiring reviewdecision

Accomplishments Plans for Next Period

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 27: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

27

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy53

Task A Task BFSbull Finish to Start

bull Finish to Finish Task C

Task D

FF

bull Start to Start Task E

Task F

SS

bull Start to Finish Task G Task HSF

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy54

CP= the sequence of schedule activities that determines the duration of the project

CPM-the longest path through the project forms the critical path and is also the shortest time in which a project can be completed

CPM=Forward andor backward pass

492018

28

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy55

B

Start

A

C

Finish

E

F

D

2 frac12 day float

BD

2

1 8

3 4 5 6 7

In Days

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy56

Who does the work

Select project team

Roles and Responsibilities Matrix

RACI chart

Resources can be internal or external

492018

29

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy57

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy58

35 h

20 h 15 h

30 h 35 h 35 h

25 h

5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for Bob

Hou

rs W

ork

ed

Ove

rtim

e

492018

30

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy59

35 h

20 h 15 h

30 h 35 h 35 h

20 h5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for BobH

ou

rs W

ork

ed

Ove

rtim

e

5 h

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy60

Day 1 Day 2 Day 3 Day 4 Day 6Day 5

1 brick layer

to do 6 days

of work will

take 6 days

2 brick layer

to do 6 days

of work will

take 3 days

492018

31

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy61

The planned dates for performing schedule activities and the planned dates for meeting

schedule milestones

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy62

De-scoping

ndash Analyzing alternatives on the critical path to determine how to reduce the schedule for the least amount of cost

ndash Not always a viable alternative

Crashing

ndash Analyzing the critical path to determine where to reduce the schedule for the least amount of cost while bring extra resources on

ndash Not always a viable alternative

Fast-Tracking

ndash Phases or activities that would have normally being done in sequence are done in parallel

ndash Can result in rework and increased risk

ndash Requires 3 X the amount of planning

Least $

A B

B

492018

32

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy63

Estimating

Budget preparation

Forecasting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy64

Co

st

Project target Cost

Time

Performance

Measurement

Baseline

Define the Work

Define the

Baseline Budget

Define the

Baseline ScheduleContingency

Budget

492018

33

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy65

Order of magnitude

Budget

Definitive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy66

Top down

Analogous

Parametric

Vendor bids

Bottom up

Detailed (piece by piece)

Three point or PERT

492018

34

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy67

The How

What is In and Out of Scope (detailed)

All the Work and only the Work

Network Diagram

Estimating

Critical Path

Output ndash Project Plan

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy68

Those processes performed

to complete the work

defined in the project

management plan to satisfy the project specifications

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

35

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy69

Destructive

Intervention

Constructive

Opportunity

Influence of

Stakeholders

and

Opportunity

to add value

Cost

Curve

$

Time

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy70

An uncertain event or condition

that if it occurs has a positive

or negative effect on one or

more of the project objectives

such as scope schedule

cost and quality

copyPMBOK regGuide Sixth Edition

492018

36

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy71

ldquoIncludes processes concerned with conducting risk

management planning identification analysis

responses and monitoring and control on a projectrdquo

copyPMBOK regGuide Sixth Edition

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Before the risk

Focus on prevention amp

planning

After the risk

Focus on recovery

Project

Start Project

Finish

Avoid Mitigate or Transfer Risks Use contingency plans

RiskManagement

492018

37

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy73

HighLow Impact

Hig

h

Low

Threaten

Failure

Minor

impactBig Impact if Occurs

ldquoEarthquakerdquo

Disruptive

ldquoDeath by

1000 cutsrdquo

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy74

Minimizes reactive crisis management

Increases likelihood of project success

Increases profitability

Prevents events impacting triple constraints

492018

38

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy75

1 Project Purpose

2 Objectives

3 Identified Risks

4 Risk Assessment

5 Risk Prevention

6 Risk Mitigation

7 Resources

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy76

492018

39

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy77

Work with your team and sponsor to identify stakeholders

Brainstorming works to develop a list that can be reviewed and finalized by the team

Key Stakeholders will usually emerge on their own

Stakeholders are persons and

organizations whose interests may be

positively or negatively affected by the

execution or completion of the project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy78

Ask each stakeholder 2 questions

bullWhat are your three major expectations from this project

bullWhat are your three major concerns related to this project

492018

40

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy79

Keep InformedMonitor(Minimal effort)

Manage Relationship

Closely

Keep Satisfied

InterestLow High

Low

High

Power

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy80

1 Analysis What do they need to know amp what do we want to say

1 Decide Communication Objectives2 Determine Vulnerabilities amp Issues3 Develop Key Messages4 Perform Stakeholder Analysis (interests concerns)

2 Design amp Build What methods and tools should we use

1 Build Communication Vehicles (reports websites etc)

3 Develop Plan Who How and When should they receive it

1 Develop Communication Plan 2 Update Overall Workplan for Communication Activities

4 Do it1 Execute Communication Plan2 Modify amp Adjust as needed

492018

41

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy81

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy82

1 Project Purpose

2 Objectives

3 Potential Issues

4 Key Messages

5 AudiencesStakeholders

6 Communication Vehicles

7 Communication Plan Matrix

8 Resources

492018

42

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy83

Planned the Work Now Work the Plan

But What IF (Risk Management)

85 of what PMs do is Communication

Stakeholder Management is Critical to Project

Success

Output ndash Unique product service delivery or

result

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy84

Those processes required to

track review and regulate the

progress and performance of

the project identify any areas in

which changes to the plan are

required and initiate the

corresponding changes

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

43

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy85

Is daily monitoring at the team level of resources tasks and schedule It is hellip

A vital component of tracking and managing progress

Managing the triple constraints

Relatively simple ldquouser friendlyrdquo and inexpensive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy86

Tasks

Requirements

Timing and performance

Resource utilization and outsourcing

Scope deliverables completion and product quality

Process improvement possibilities and lessons learned

Schedule and cost performance

492018

44

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy87

Initiate Assess Resolve CloseApprove

Senior team

a change

Senior team

member initiates

a change

Project manager

accepts or rejects

Project manager

accepts or rejects

change request

Change Analyst

makes assessment of

the change and gives

recommendations

Managers acceptChange Analyst

makes assessment of

the change and gives

recommendations

or reject the

change based on

the assessment

and

Managers accept

or reject the

change based on

the assessment

and

recommendations Project manager

creates and assigns

tasks if necessary

and updates project

plan

Document

closureReject

Accept

Accept

Reject

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy88

Project

Phase 1

Phase 2

Phase 3

Stage

Gate

Planning

Go No Go Decisions

492018

45

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy89

Today

Planned

Burned

Earned

Time

Co

st

CV

Planned

Finished

Actual

Finished

Late

Over

Budget

Cost Variance (CV) = Earned ndash Burned

Schedule Variance (SV) = Earned ndash Planned

SV

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy90

complete to date

Dashboard ndash scope quality time budget

Milestones and deliverables

Target revised complete

Budget

Approved spent to date estimated cost of work remaining estimated total cost

Major Risks amp Issues requiring reviewdecision

Accomplishments Plans for Next Period

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 28: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

28

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy55

B

Start

A

C

Finish

E

F

D

2 frac12 day float

BD

2

1 8

3 4 5 6 7

In Days

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy56

Who does the work

Select project team

Roles and Responsibilities Matrix

RACI chart

Resources can be internal or external

492018

29

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy57

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy58

35 h

20 h 15 h

30 h 35 h 35 h

25 h

5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for Bob

Hou

rs W

ork

ed

Ove

rtim

e

492018

30

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy59

35 h

20 h 15 h

30 h 35 h 35 h

20 h5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for BobH

ou

rs W

ork

ed

Ove

rtim

e

5 h

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy60

Day 1 Day 2 Day 3 Day 4 Day 6Day 5

1 brick layer

to do 6 days

of work will

take 6 days

2 brick layer

to do 6 days

of work will

take 3 days

492018

31

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy61

The planned dates for performing schedule activities and the planned dates for meeting

schedule milestones

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy62

De-scoping

ndash Analyzing alternatives on the critical path to determine how to reduce the schedule for the least amount of cost

ndash Not always a viable alternative

Crashing

ndash Analyzing the critical path to determine where to reduce the schedule for the least amount of cost while bring extra resources on

ndash Not always a viable alternative

Fast-Tracking

ndash Phases or activities that would have normally being done in sequence are done in parallel

ndash Can result in rework and increased risk

ndash Requires 3 X the amount of planning

Least $

A B

B

492018

32

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy63

Estimating

Budget preparation

Forecasting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy64

Co

st

Project target Cost

Time

Performance

Measurement

Baseline

Define the Work

Define the

Baseline Budget

Define the

Baseline ScheduleContingency

Budget

492018

33

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy65

Order of magnitude

Budget

Definitive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy66

Top down

Analogous

Parametric

Vendor bids

Bottom up

Detailed (piece by piece)

Three point or PERT

492018

34

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy67

The How

What is In and Out of Scope (detailed)

All the Work and only the Work

Network Diagram

Estimating

Critical Path

Output ndash Project Plan

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy68

Those processes performed

to complete the work

defined in the project

management plan to satisfy the project specifications

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

35

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy69

Destructive

Intervention

Constructive

Opportunity

Influence of

Stakeholders

and

Opportunity

to add value

Cost

Curve

$

Time

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy70

An uncertain event or condition

that if it occurs has a positive

or negative effect on one or

more of the project objectives

such as scope schedule

cost and quality

copyPMBOK regGuide Sixth Edition

492018

36

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy71

ldquoIncludes processes concerned with conducting risk

management planning identification analysis

responses and monitoring and control on a projectrdquo

copyPMBOK regGuide Sixth Edition

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Before the risk

Focus on prevention amp

planning

After the risk

Focus on recovery

Project

Start Project

Finish

Avoid Mitigate or Transfer Risks Use contingency plans

RiskManagement

492018

37

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy73

HighLow Impact

Hig

h

Low

Threaten

Failure

Minor

impactBig Impact if Occurs

ldquoEarthquakerdquo

Disruptive

ldquoDeath by

1000 cutsrdquo

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy74

Minimizes reactive crisis management

Increases likelihood of project success

Increases profitability

Prevents events impacting triple constraints

492018

38

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy75

1 Project Purpose

2 Objectives

3 Identified Risks

4 Risk Assessment

5 Risk Prevention

6 Risk Mitigation

7 Resources

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy76

492018

39

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy77

Work with your team and sponsor to identify stakeholders

Brainstorming works to develop a list that can be reviewed and finalized by the team

Key Stakeholders will usually emerge on their own

Stakeholders are persons and

organizations whose interests may be

positively or negatively affected by the

execution or completion of the project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy78

Ask each stakeholder 2 questions

bullWhat are your three major expectations from this project

bullWhat are your three major concerns related to this project

492018

40

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy79

Keep InformedMonitor(Minimal effort)

Manage Relationship

Closely

Keep Satisfied

InterestLow High

Low

High

Power

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy80

1 Analysis What do they need to know amp what do we want to say

1 Decide Communication Objectives2 Determine Vulnerabilities amp Issues3 Develop Key Messages4 Perform Stakeholder Analysis (interests concerns)

2 Design amp Build What methods and tools should we use

1 Build Communication Vehicles (reports websites etc)

3 Develop Plan Who How and When should they receive it

1 Develop Communication Plan 2 Update Overall Workplan for Communication Activities

4 Do it1 Execute Communication Plan2 Modify amp Adjust as needed

492018

41

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy81

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy82

1 Project Purpose

2 Objectives

3 Potential Issues

4 Key Messages

5 AudiencesStakeholders

6 Communication Vehicles

7 Communication Plan Matrix

8 Resources

492018

42

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy83

Planned the Work Now Work the Plan

But What IF (Risk Management)

85 of what PMs do is Communication

Stakeholder Management is Critical to Project

Success

Output ndash Unique product service delivery or

result

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy84

Those processes required to

track review and regulate the

progress and performance of

the project identify any areas in

which changes to the plan are

required and initiate the

corresponding changes

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

43

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy85

Is daily monitoring at the team level of resources tasks and schedule It is hellip

A vital component of tracking and managing progress

Managing the triple constraints

Relatively simple ldquouser friendlyrdquo and inexpensive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy86

Tasks

Requirements

Timing and performance

Resource utilization and outsourcing

Scope deliverables completion and product quality

Process improvement possibilities and lessons learned

Schedule and cost performance

492018

44

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy87

Initiate Assess Resolve CloseApprove

Senior team

a change

Senior team

member initiates

a change

Project manager

accepts or rejects

Project manager

accepts or rejects

change request

Change Analyst

makes assessment of

the change and gives

recommendations

Managers acceptChange Analyst

makes assessment of

the change and gives

recommendations

or reject the

change based on

the assessment

and

Managers accept

or reject the

change based on

the assessment

and

recommendations Project manager

creates and assigns

tasks if necessary

and updates project

plan

Document

closureReject

Accept

Accept

Reject

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy88

Project

Phase 1

Phase 2

Phase 3

Stage

Gate

Planning

Go No Go Decisions

492018

45

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy89

Today

Planned

Burned

Earned

Time

Co

st

CV

Planned

Finished

Actual

Finished

Late

Over

Budget

Cost Variance (CV) = Earned ndash Burned

Schedule Variance (SV) = Earned ndash Planned

SV

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy90

complete to date

Dashboard ndash scope quality time budget

Milestones and deliverables

Target revised complete

Budget

Approved spent to date estimated cost of work remaining estimated total cost

Major Risks amp Issues requiring reviewdecision

Accomplishments Plans for Next Period

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 29: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

29

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy57

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy58

35 h

20 h 15 h

30 h 35 h 35 h

25 h

5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for Bob

Hou

rs W

ork

ed

Ove

rtim

e

492018

30

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy59

35 h

20 h 15 h

30 h 35 h 35 h

20 h5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for BobH

ou

rs W

ork

ed

Ove

rtim

e

5 h

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy60

Day 1 Day 2 Day 3 Day 4 Day 6Day 5

1 brick layer

to do 6 days

of work will

take 6 days

2 brick layer

to do 6 days

of work will

take 3 days

492018

31

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy61

The planned dates for performing schedule activities and the planned dates for meeting

schedule milestones

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy62

De-scoping

ndash Analyzing alternatives on the critical path to determine how to reduce the schedule for the least amount of cost

ndash Not always a viable alternative

Crashing

ndash Analyzing the critical path to determine where to reduce the schedule for the least amount of cost while bring extra resources on

ndash Not always a viable alternative

Fast-Tracking

ndash Phases or activities that would have normally being done in sequence are done in parallel

ndash Can result in rework and increased risk

ndash Requires 3 X the amount of planning

Least $

A B

B

492018

32

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy63

Estimating

Budget preparation

Forecasting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy64

Co

st

Project target Cost

Time

Performance

Measurement

Baseline

Define the Work

Define the

Baseline Budget

Define the

Baseline ScheduleContingency

Budget

492018

33

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy65

Order of magnitude

Budget

Definitive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy66

Top down

Analogous

Parametric

Vendor bids

Bottom up

Detailed (piece by piece)

Three point or PERT

492018

34

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy67

The How

What is In and Out of Scope (detailed)

All the Work and only the Work

Network Diagram

Estimating

Critical Path

Output ndash Project Plan

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy68

Those processes performed

to complete the work

defined in the project

management plan to satisfy the project specifications

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

35

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy69

Destructive

Intervention

Constructive

Opportunity

Influence of

Stakeholders

and

Opportunity

to add value

Cost

Curve

$

Time

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy70

An uncertain event or condition

that if it occurs has a positive

or negative effect on one or

more of the project objectives

such as scope schedule

cost and quality

copyPMBOK regGuide Sixth Edition

492018

36

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy71

ldquoIncludes processes concerned with conducting risk

management planning identification analysis

responses and monitoring and control on a projectrdquo

copyPMBOK regGuide Sixth Edition

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Before the risk

Focus on prevention amp

planning

After the risk

Focus on recovery

Project

Start Project

Finish

Avoid Mitigate or Transfer Risks Use contingency plans

RiskManagement

492018

37

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy73

HighLow Impact

Hig

h

Low

Threaten

Failure

Minor

impactBig Impact if Occurs

ldquoEarthquakerdquo

Disruptive

ldquoDeath by

1000 cutsrdquo

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy74

Minimizes reactive crisis management

Increases likelihood of project success

Increases profitability

Prevents events impacting triple constraints

492018

38

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy75

1 Project Purpose

2 Objectives

3 Identified Risks

4 Risk Assessment

5 Risk Prevention

6 Risk Mitigation

7 Resources

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy76

492018

39

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy77

Work with your team and sponsor to identify stakeholders

Brainstorming works to develop a list that can be reviewed and finalized by the team

Key Stakeholders will usually emerge on their own

Stakeholders are persons and

organizations whose interests may be

positively or negatively affected by the

execution or completion of the project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy78

Ask each stakeholder 2 questions

bullWhat are your three major expectations from this project

bullWhat are your three major concerns related to this project

492018

40

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy79

Keep InformedMonitor(Minimal effort)

Manage Relationship

Closely

Keep Satisfied

InterestLow High

Low

High

Power

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy80

1 Analysis What do they need to know amp what do we want to say

1 Decide Communication Objectives2 Determine Vulnerabilities amp Issues3 Develop Key Messages4 Perform Stakeholder Analysis (interests concerns)

2 Design amp Build What methods and tools should we use

1 Build Communication Vehicles (reports websites etc)

3 Develop Plan Who How and When should they receive it

1 Develop Communication Plan 2 Update Overall Workplan for Communication Activities

4 Do it1 Execute Communication Plan2 Modify amp Adjust as needed

492018

41

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy81

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy82

1 Project Purpose

2 Objectives

3 Potential Issues

4 Key Messages

5 AudiencesStakeholders

6 Communication Vehicles

7 Communication Plan Matrix

8 Resources

492018

42

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy83

Planned the Work Now Work the Plan

But What IF (Risk Management)

85 of what PMs do is Communication

Stakeholder Management is Critical to Project

Success

Output ndash Unique product service delivery or

result

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy84

Those processes required to

track review and regulate the

progress and performance of

the project identify any areas in

which changes to the plan are

required and initiate the

corresponding changes

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

43

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy85

Is daily monitoring at the team level of resources tasks and schedule It is hellip

A vital component of tracking and managing progress

Managing the triple constraints

Relatively simple ldquouser friendlyrdquo and inexpensive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy86

Tasks

Requirements

Timing and performance

Resource utilization and outsourcing

Scope deliverables completion and product quality

Process improvement possibilities and lessons learned

Schedule and cost performance

492018

44

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy87

Initiate Assess Resolve CloseApprove

Senior team

a change

Senior team

member initiates

a change

Project manager

accepts or rejects

Project manager

accepts or rejects

change request

Change Analyst

makes assessment of

the change and gives

recommendations

Managers acceptChange Analyst

makes assessment of

the change and gives

recommendations

or reject the

change based on

the assessment

and

Managers accept

or reject the

change based on

the assessment

and

recommendations Project manager

creates and assigns

tasks if necessary

and updates project

plan

Document

closureReject

Accept

Accept

Reject

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy88

Project

Phase 1

Phase 2

Phase 3

Stage

Gate

Planning

Go No Go Decisions

492018

45

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy89

Today

Planned

Burned

Earned

Time

Co

st

CV

Planned

Finished

Actual

Finished

Late

Over

Budget

Cost Variance (CV) = Earned ndash Burned

Schedule Variance (SV) = Earned ndash Planned

SV

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy90

complete to date

Dashboard ndash scope quality time budget

Milestones and deliverables

Target revised complete

Budget

Approved spent to date estimated cost of work remaining estimated total cost

Major Risks amp Issues requiring reviewdecision

Accomplishments Plans for Next Period

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 30: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

30

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy59

35 h

20 h 15 h

30 h 35 h 35 h

20 h5 h

0

20

40

60

80

Week 1 Week 2 Week 3 Week 4 Week 5 Week 6

Resource Utilization for BobH

ou

rs W

ork

ed

Ove

rtim

e

5 h

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy60

Day 1 Day 2 Day 3 Day 4 Day 6Day 5

1 brick layer

to do 6 days

of work will

take 6 days

2 brick layer

to do 6 days

of work will

take 3 days

492018

31

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy61

The planned dates for performing schedule activities and the planned dates for meeting

schedule milestones

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy62

De-scoping

ndash Analyzing alternatives on the critical path to determine how to reduce the schedule for the least amount of cost

ndash Not always a viable alternative

Crashing

ndash Analyzing the critical path to determine where to reduce the schedule for the least amount of cost while bring extra resources on

ndash Not always a viable alternative

Fast-Tracking

ndash Phases or activities that would have normally being done in sequence are done in parallel

ndash Can result in rework and increased risk

ndash Requires 3 X the amount of planning

Least $

A B

B

492018

32

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy63

Estimating

Budget preparation

Forecasting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy64

Co

st

Project target Cost

Time

Performance

Measurement

Baseline

Define the Work

Define the

Baseline Budget

Define the

Baseline ScheduleContingency

Budget

492018

33

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy65

Order of magnitude

Budget

Definitive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy66

Top down

Analogous

Parametric

Vendor bids

Bottom up

Detailed (piece by piece)

Three point or PERT

492018

34

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy67

The How

What is In and Out of Scope (detailed)

All the Work and only the Work

Network Diagram

Estimating

Critical Path

Output ndash Project Plan

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy68

Those processes performed

to complete the work

defined in the project

management plan to satisfy the project specifications

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

35

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy69

Destructive

Intervention

Constructive

Opportunity

Influence of

Stakeholders

and

Opportunity

to add value

Cost

Curve

$

Time

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy70

An uncertain event or condition

that if it occurs has a positive

or negative effect on one or

more of the project objectives

such as scope schedule

cost and quality

copyPMBOK regGuide Sixth Edition

492018

36

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy71

ldquoIncludes processes concerned with conducting risk

management planning identification analysis

responses and monitoring and control on a projectrdquo

copyPMBOK regGuide Sixth Edition

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Before the risk

Focus on prevention amp

planning

After the risk

Focus on recovery

Project

Start Project

Finish

Avoid Mitigate or Transfer Risks Use contingency plans

RiskManagement

492018

37

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy73

HighLow Impact

Hig

h

Low

Threaten

Failure

Minor

impactBig Impact if Occurs

ldquoEarthquakerdquo

Disruptive

ldquoDeath by

1000 cutsrdquo

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy74

Minimizes reactive crisis management

Increases likelihood of project success

Increases profitability

Prevents events impacting triple constraints

492018

38

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy75

1 Project Purpose

2 Objectives

3 Identified Risks

4 Risk Assessment

5 Risk Prevention

6 Risk Mitigation

7 Resources

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy76

492018

39

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy77

Work with your team and sponsor to identify stakeholders

Brainstorming works to develop a list that can be reviewed and finalized by the team

Key Stakeholders will usually emerge on their own

Stakeholders are persons and

organizations whose interests may be

positively or negatively affected by the

execution or completion of the project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy78

Ask each stakeholder 2 questions

bullWhat are your three major expectations from this project

bullWhat are your three major concerns related to this project

492018

40

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy79

Keep InformedMonitor(Minimal effort)

Manage Relationship

Closely

Keep Satisfied

InterestLow High

Low

High

Power

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy80

1 Analysis What do they need to know amp what do we want to say

1 Decide Communication Objectives2 Determine Vulnerabilities amp Issues3 Develop Key Messages4 Perform Stakeholder Analysis (interests concerns)

2 Design amp Build What methods and tools should we use

1 Build Communication Vehicles (reports websites etc)

3 Develop Plan Who How and When should they receive it

1 Develop Communication Plan 2 Update Overall Workplan for Communication Activities

4 Do it1 Execute Communication Plan2 Modify amp Adjust as needed

492018

41

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy81

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy82

1 Project Purpose

2 Objectives

3 Potential Issues

4 Key Messages

5 AudiencesStakeholders

6 Communication Vehicles

7 Communication Plan Matrix

8 Resources

492018

42

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy83

Planned the Work Now Work the Plan

But What IF (Risk Management)

85 of what PMs do is Communication

Stakeholder Management is Critical to Project

Success

Output ndash Unique product service delivery or

result

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy84

Those processes required to

track review and regulate the

progress and performance of

the project identify any areas in

which changes to the plan are

required and initiate the

corresponding changes

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

43

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy85

Is daily monitoring at the team level of resources tasks and schedule It is hellip

A vital component of tracking and managing progress

Managing the triple constraints

Relatively simple ldquouser friendlyrdquo and inexpensive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy86

Tasks

Requirements

Timing and performance

Resource utilization and outsourcing

Scope deliverables completion and product quality

Process improvement possibilities and lessons learned

Schedule and cost performance

492018

44

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy87

Initiate Assess Resolve CloseApprove

Senior team

a change

Senior team

member initiates

a change

Project manager

accepts or rejects

Project manager

accepts or rejects

change request

Change Analyst

makes assessment of

the change and gives

recommendations

Managers acceptChange Analyst

makes assessment of

the change and gives

recommendations

or reject the

change based on

the assessment

and

Managers accept

or reject the

change based on

the assessment

and

recommendations Project manager

creates and assigns

tasks if necessary

and updates project

plan

Document

closureReject

Accept

Accept

Reject

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy88

Project

Phase 1

Phase 2

Phase 3

Stage

Gate

Planning

Go No Go Decisions

492018

45

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy89

Today

Planned

Burned

Earned

Time

Co

st

CV

Planned

Finished

Actual

Finished

Late

Over

Budget

Cost Variance (CV) = Earned ndash Burned

Schedule Variance (SV) = Earned ndash Planned

SV

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy90

complete to date

Dashboard ndash scope quality time budget

Milestones and deliverables

Target revised complete

Budget

Approved spent to date estimated cost of work remaining estimated total cost

Major Risks amp Issues requiring reviewdecision

Accomplishments Plans for Next Period

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 31: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

31

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy61

The planned dates for performing schedule activities and the planned dates for meeting

schedule milestones

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy62

De-scoping

ndash Analyzing alternatives on the critical path to determine how to reduce the schedule for the least amount of cost

ndash Not always a viable alternative

Crashing

ndash Analyzing the critical path to determine where to reduce the schedule for the least amount of cost while bring extra resources on

ndash Not always a viable alternative

Fast-Tracking

ndash Phases or activities that would have normally being done in sequence are done in parallel

ndash Can result in rework and increased risk

ndash Requires 3 X the amount of planning

Least $

A B

B

492018

32

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy63

Estimating

Budget preparation

Forecasting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy64

Co

st

Project target Cost

Time

Performance

Measurement

Baseline

Define the Work

Define the

Baseline Budget

Define the

Baseline ScheduleContingency

Budget

492018

33

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy65

Order of magnitude

Budget

Definitive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy66

Top down

Analogous

Parametric

Vendor bids

Bottom up

Detailed (piece by piece)

Three point or PERT

492018

34

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy67

The How

What is In and Out of Scope (detailed)

All the Work and only the Work

Network Diagram

Estimating

Critical Path

Output ndash Project Plan

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy68

Those processes performed

to complete the work

defined in the project

management plan to satisfy the project specifications

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

35

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy69

Destructive

Intervention

Constructive

Opportunity

Influence of

Stakeholders

and

Opportunity

to add value

Cost

Curve

$

Time

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy70

An uncertain event or condition

that if it occurs has a positive

or negative effect on one or

more of the project objectives

such as scope schedule

cost and quality

copyPMBOK regGuide Sixth Edition

492018

36

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy71

ldquoIncludes processes concerned with conducting risk

management planning identification analysis

responses and monitoring and control on a projectrdquo

copyPMBOK regGuide Sixth Edition

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Before the risk

Focus on prevention amp

planning

After the risk

Focus on recovery

Project

Start Project

Finish

Avoid Mitigate or Transfer Risks Use contingency plans

RiskManagement

492018

37

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy73

HighLow Impact

Hig

h

Low

Threaten

Failure

Minor

impactBig Impact if Occurs

ldquoEarthquakerdquo

Disruptive

ldquoDeath by

1000 cutsrdquo

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy74

Minimizes reactive crisis management

Increases likelihood of project success

Increases profitability

Prevents events impacting triple constraints

492018

38

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy75

1 Project Purpose

2 Objectives

3 Identified Risks

4 Risk Assessment

5 Risk Prevention

6 Risk Mitigation

7 Resources

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy76

492018

39

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy77

Work with your team and sponsor to identify stakeholders

Brainstorming works to develop a list that can be reviewed and finalized by the team

Key Stakeholders will usually emerge on their own

Stakeholders are persons and

organizations whose interests may be

positively or negatively affected by the

execution or completion of the project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy78

Ask each stakeholder 2 questions

bullWhat are your three major expectations from this project

bullWhat are your three major concerns related to this project

492018

40

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy79

Keep InformedMonitor(Minimal effort)

Manage Relationship

Closely

Keep Satisfied

InterestLow High

Low

High

Power

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy80

1 Analysis What do they need to know amp what do we want to say

1 Decide Communication Objectives2 Determine Vulnerabilities amp Issues3 Develop Key Messages4 Perform Stakeholder Analysis (interests concerns)

2 Design amp Build What methods and tools should we use

1 Build Communication Vehicles (reports websites etc)

3 Develop Plan Who How and When should they receive it

1 Develop Communication Plan 2 Update Overall Workplan for Communication Activities

4 Do it1 Execute Communication Plan2 Modify amp Adjust as needed

492018

41

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy81

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy82

1 Project Purpose

2 Objectives

3 Potential Issues

4 Key Messages

5 AudiencesStakeholders

6 Communication Vehicles

7 Communication Plan Matrix

8 Resources

492018

42

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy83

Planned the Work Now Work the Plan

But What IF (Risk Management)

85 of what PMs do is Communication

Stakeholder Management is Critical to Project

Success

Output ndash Unique product service delivery or

result

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy84

Those processes required to

track review and regulate the

progress and performance of

the project identify any areas in

which changes to the plan are

required and initiate the

corresponding changes

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

43

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy85

Is daily monitoring at the team level of resources tasks and schedule It is hellip

A vital component of tracking and managing progress

Managing the triple constraints

Relatively simple ldquouser friendlyrdquo and inexpensive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy86

Tasks

Requirements

Timing and performance

Resource utilization and outsourcing

Scope deliverables completion and product quality

Process improvement possibilities and lessons learned

Schedule and cost performance

492018

44

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy87

Initiate Assess Resolve CloseApprove

Senior team

a change

Senior team

member initiates

a change

Project manager

accepts or rejects

Project manager

accepts or rejects

change request

Change Analyst

makes assessment of

the change and gives

recommendations

Managers acceptChange Analyst

makes assessment of

the change and gives

recommendations

or reject the

change based on

the assessment

and

Managers accept

or reject the

change based on

the assessment

and

recommendations Project manager

creates and assigns

tasks if necessary

and updates project

plan

Document

closureReject

Accept

Accept

Reject

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy88

Project

Phase 1

Phase 2

Phase 3

Stage

Gate

Planning

Go No Go Decisions

492018

45

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy89

Today

Planned

Burned

Earned

Time

Co

st

CV

Planned

Finished

Actual

Finished

Late

Over

Budget

Cost Variance (CV) = Earned ndash Burned

Schedule Variance (SV) = Earned ndash Planned

SV

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy90

complete to date

Dashboard ndash scope quality time budget

Milestones and deliverables

Target revised complete

Budget

Approved spent to date estimated cost of work remaining estimated total cost

Major Risks amp Issues requiring reviewdecision

Accomplishments Plans for Next Period

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 32: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

32

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy63

Estimating

Budget preparation

Forecasting

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy64

Co

st

Project target Cost

Time

Performance

Measurement

Baseline

Define the Work

Define the

Baseline Budget

Define the

Baseline ScheduleContingency

Budget

492018

33

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy65

Order of magnitude

Budget

Definitive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy66

Top down

Analogous

Parametric

Vendor bids

Bottom up

Detailed (piece by piece)

Three point or PERT

492018

34

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy67

The How

What is In and Out of Scope (detailed)

All the Work and only the Work

Network Diagram

Estimating

Critical Path

Output ndash Project Plan

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy68

Those processes performed

to complete the work

defined in the project

management plan to satisfy the project specifications

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

35

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy69

Destructive

Intervention

Constructive

Opportunity

Influence of

Stakeholders

and

Opportunity

to add value

Cost

Curve

$

Time

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy70

An uncertain event or condition

that if it occurs has a positive

or negative effect on one or

more of the project objectives

such as scope schedule

cost and quality

copyPMBOK regGuide Sixth Edition

492018

36

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy71

ldquoIncludes processes concerned with conducting risk

management planning identification analysis

responses and monitoring and control on a projectrdquo

copyPMBOK regGuide Sixth Edition

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Before the risk

Focus on prevention amp

planning

After the risk

Focus on recovery

Project

Start Project

Finish

Avoid Mitigate or Transfer Risks Use contingency plans

RiskManagement

492018

37

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy73

HighLow Impact

Hig

h

Low

Threaten

Failure

Minor

impactBig Impact if Occurs

ldquoEarthquakerdquo

Disruptive

ldquoDeath by

1000 cutsrdquo

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy74

Minimizes reactive crisis management

Increases likelihood of project success

Increases profitability

Prevents events impacting triple constraints

492018

38

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy75

1 Project Purpose

2 Objectives

3 Identified Risks

4 Risk Assessment

5 Risk Prevention

6 Risk Mitigation

7 Resources

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy76

492018

39

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy77

Work with your team and sponsor to identify stakeholders

Brainstorming works to develop a list that can be reviewed and finalized by the team

Key Stakeholders will usually emerge on their own

Stakeholders are persons and

organizations whose interests may be

positively or negatively affected by the

execution or completion of the project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy78

Ask each stakeholder 2 questions

bullWhat are your three major expectations from this project

bullWhat are your three major concerns related to this project

492018

40

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy79

Keep InformedMonitor(Minimal effort)

Manage Relationship

Closely

Keep Satisfied

InterestLow High

Low

High

Power

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy80

1 Analysis What do they need to know amp what do we want to say

1 Decide Communication Objectives2 Determine Vulnerabilities amp Issues3 Develop Key Messages4 Perform Stakeholder Analysis (interests concerns)

2 Design amp Build What methods and tools should we use

1 Build Communication Vehicles (reports websites etc)

3 Develop Plan Who How and When should they receive it

1 Develop Communication Plan 2 Update Overall Workplan for Communication Activities

4 Do it1 Execute Communication Plan2 Modify amp Adjust as needed

492018

41

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy81

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy82

1 Project Purpose

2 Objectives

3 Potential Issues

4 Key Messages

5 AudiencesStakeholders

6 Communication Vehicles

7 Communication Plan Matrix

8 Resources

492018

42

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy83

Planned the Work Now Work the Plan

But What IF (Risk Management)

85 of what PMs do is Communication

Stakeholder Management is Critical to Project

Success

Output ndash Unique product service delivery or

result

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy84

Those processes required to

track review and regulate the

progress and performance of

the project identify any areas in

which changes to the plan are

required and initiate the

corresponding changes

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

43

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy85

Is daily monitoring at the team level of resources tasks and schedule It is hellip

A vital component of tracking and managing progress

Managing the triple constraints

Relatively simple ldquouser friendlyrdquo and inexpensive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy86

Tasks

Requirements

Timing and performance

Resource utilization and outsourcing

Scope deliverables completion and product quality

Process improvement possibilities and lessons learned

Schedule and cost performance

492018

44

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy87

Initiate Assess Resolve CloseApprove

Senior team

a change

Senior team

member initiates

a change

Project manager

accepts or rejects

Project manager

accepts or rejects

change request

Change Analyst

makes assessment of

the change and gives

recommendations

Managers acceptChange Analyst

makes assessment of

the change and gives

recommendations

or reject the

change based on

the assessment

and

Managers accept

or reject the

change based on

the assessment

and

recommendations Project manager

creates and assigns

tasks if necessary

and updates project

plan

Document

closureReject

Accept

Accept

Reject

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy88

Project

Phase 1

Phase 2

Phase 3

Stage

Gate

Planning

Go No Go Decisions

492018

45

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy89

Today

Planned

Burned

Earned

Time

Co

st

CV

Planned

Finished

Actual

Finished

Late

Over

Budget

Cost Variance (CV) = Earned ndash Burned

Schedule Variance (SV) = Earned ndash Planned

SV

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy90

complete to date

Dashboard ndash scope quality time budget

Milestones and deliverables

Target revised complete

Budget

Approved spent to date estimated cost of work remaining estimated total cost

Major Risks amp Issues requiring reviewdecision

Accomplishments Plans for Next Period

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 33: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

33

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy65

Order of magnitude

Budget

Definitive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy66

Top down

Analogous

Parametric

Vendor bids

Bottom up

Detailed (piece by piece)

Three point or PERT

492018

34

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy67

The How

What is In and Out of Scope (detailed)

All the Work and only the Work

Network Diagram

Estimating

Critical Path

Output ndash Project Plan

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy68

Those processes performed

to complete the work

defined in the project

management plan to satisfy the project specifications

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

35

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy69

Destructive

Intervention

Constructive

Opportunity

Influence of

Stakeholders

and

Opportunity

to add value

Cost

Curve

$

Time

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy70

An uncertain event or condition

that if it occurs has a positive

or negative effect on one or

more of the project objectives

such as scope schedule

cost and quality

copyPMBOK regGuide Sixth Edition

492018

36

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy71

ldquoIncludes processes concerned with conducting risk

management planning identification analysis

responses and monitoring and control on a projectrdquo

copyPMBOK regGuide Sixth Edition

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Before the risk

Focus on prevention amp

planning

After the risk

Focus on recovery

Project

Start Project

Finish

Avoid Mitigate or Transfer Risks Use contingency plans

RiskManagement

492018

37

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy73

HighLow Impact

Hig

h

Low

Threaten

Failure

Minor

impactBig Impact if Occurs

ldquoEarthquakerdquo

Disruptive

ldquoDeath by

1000 cutsrdquo

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy74

Minimizes reactive crisis management

Increases likelihood of project success

Increases profitability

Prevents events impacting triple constraints

492018

38

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy75

1 Project Purpose

2 Objectives

3 Identified Risks

4 Risk Assessment

5 Risk Prevention

6 Risk Mitigation

7 Resources

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy76

492018

39

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy77

Work with your team and sponsor to identify stakeholders

Brainstorming works to develop a list that can be reviewed and finalized by the team

Key Stakeholders will usually emerge on their own

Stakeholders are persons and

organizations whose interests may be

positively or negatively affected by the

execution or completion of the project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy78

Ask each stakeholder 2 questions

bullWhat are your three major expectations from this project

bullWhat are your three major concerns related to this project

492018

40

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy79

Keep InformedMonitor(Minimal effort)

Manage Relationship

Closely

Keep Satisfied

InterestLow High

Low

High

Power

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy80

1 Analysis What do they need to know amp what do we want to say

1 Decide Communication Objectives2 Determine Vulnerabilities amp Issues3 Develop Key Messages4 Perform Stakeholder Analysis (interests concerns)

2 Design amp Build What methods and tools should we use

1 Build Communication Vehicles (reports websites etc)

3 Develop Plan Who How and When should they receive it

1 Develop Communication Plan 2 Update Overall Workplan for Communication Activities

4 Do it1 Execute Communication Plan2 Modify amp Adjust as needed

492018

41

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy81

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy82

1 Project Purpose

2 Objectives

3 Potential Issues

4 Key Messages

5 AudiencesStakeholders

6 Communication Vehicles

7 Communication Plan Matrix

8 Resources

492018

42

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy83

Planned the Work Now Work the Plan

But What IF (Risk Management)

85 of what PMs do is Communication

Stakeholder Management is Critical to Project

Success

Output ndash Unique product service delivery or

result

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy84

Those processes required to

track review and regulate the

progress and performance of

the project identify any areas in

which changes to the plan are

required and initiate the

corresponding changes

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

43

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy85

Is daily monitoring at the team level of resources tasks and schedule It is hellip

A vital component of tracking and managing progress

Managing the triple constraints

Relatively simple ldquouser friendlyrdquo and inexpensive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy86

Tasks

Requirements

Timing and performance

Resource utilization and outsourcing

Scope deliverables completion and product quality

Process improvement possibilities and lessons learned

Schedule and cost performance

492018

44

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy87

Initiate Assess Resolve CloseApprove

Senior team

a change

Senior team

member initiates

a change

Project manager

accepts or rejects

Project manager

accepts or rejects

change request

Change Analyst

makes assessment of

the change and gives

recommendations

Managers acceptChange Analyst

makes assessment of

the change and gives

recommendations

or reject the

change based on

the assessment

and

Managers accept

or reject the

change based on

the assessment

and

recommendations Project manager

creates and assigns

tasks if necessary

and updates project

plan

Document

closureReject

Accept

Accept

Reject

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy88

Project

Phase 1

Phase 2

Phase 3

Stage

Gate

Planning

Go No Go Decisions

492018

45

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy89

Today

Planned

Burned

Earned

Time

Co

st

CV

Planned

Finished

Actual

Finished

Late

Over

Budget

Cost Variance (CV) = Earned ndash Burned

Schedule Variance (SV) = Earned ndash Planned

SV

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy90

complete to date

Dashboard ndash scope quality time budget

Milestones and deliverables

Target revised complete

Budget

Approved spent to date estimated cost of work remaining estimated total cost

Major Risks amp Issues requiring reviewdecision

Accomplishments Plans for Next Period

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 34: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

34

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy67

The How

What is In and Out of Scope (detailed)

All the Work and only the Work

Network Diagram

Estimating

Critical Path

Output ndash Project Plan

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy68

Those processes performed

to complete the work

defined in the project

management plan to satisfy the project specifications

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

35

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy69

Destructive

Intervention

Constructive

Opportunity

Influence of

Stakeholders

and

Opportunity

to add value

Cost

Curve

$

Time

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy70

An uncertain event or condition

that if it occurs has a positive

or negative effect on one or

more of the project objectives

such as scope schedule

cost and quality

copyPMBOK regGuide Sixth Edition

492018

36

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy71

ldquoIncludes processes concerned with conducting risk

management planning identification analysis

responses and monitoring and control on a projectrdquo

copyPMBOK regGuide Sixth Edition

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Before the risk

Focus on prevention amp

planning

After the risk

Focus on recovery

Project

Start Project

Finish

Avoid Mitigate or Transfer Risks Use contingency plans

RiskManagement

492018

37

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy73

HighLow Impact

Hig

h

Low

Threaten

Failure

Minor

impactBig Impact if Occurs

ldquoEarthquakerdquo

Disruptive

ldquoDeath by

1000 cutsrdquo

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy74

Minimizes reactive crisis management

Increases likelihood of project success

Increases profitability

Prevents events impacting triple constraints

492018

38

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy75

1 Project Purpose

2 Objectives

3 Identified Risks

4 Risk Assessment

5 Risk Prevention

6 Risk Mitigation

7 Resources

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy76

492018

39

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy77

Work with your team and sponsor to identify stakeholders

Brainstorming works to develop a list that can be reviewed and finalized by the team

Key Stakeholders will usually emerge on their own

Stakeholders are persons and

organizations whose interests may be

positively or negatively affected by the

execution or completion of the project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy78

Ask each stakeholder 2 questions

bullWhat are your three major expectations from this project

bullWhat are your three major concerns related to this project

492018

40

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy79

Keep InformedMonitor(Minimal effort)

Manage Relationship

Closely

Keep Satisfied

InterestLow High

Low

High

Power

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy80

1 Analysis What do they need to know amp what do we want to say

1 Decide Communication Objectives2 Determine Vulnerabilities amp Issues3 Develop Key Messages4 Perform Stakeholder Analysis (interests concerns)

2 Design amp Build What methods and tools should we use

1 Build Communication Vehicles (reports websites etc)

3 Develop Plan Who How and When should they receive it

1 Develop Communication Plan 2 Update Overall Workplan for Communication Activities

4 Do it1 Execute Communication Plan2 Modify amp Adjust as needed

492018

41

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy81

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy82

1 Project Purpose

2 Objectives

3 Potential Issues

4 Key Messages

5 AudiencesStakeholders

6 Communication Vehicles

7 Communication Plan Matrix

8 Resources

492018

42

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy83

Planned the Work Now Work the Plan

But What IF (Risk Management)

85 of what PMs do is Communication

Stakeholder Management is Critical to Project

Success

Output ndash Unique product service delivery or

result

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy84

Those processes required to

track review and regulate the

progress and performance of

the project identify any areas in

which changes to the plan are

required and initiate the

corresponding changes

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

43

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy85

Is daily monitoring at the team level of resources tasks and schedule It is hellip

A vital component of tracking and managing progress

Managing the triple constraints

Relatively simple ldquouser friendlyrdquo and inexpensive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy86

Tasks

Requirements

Timing and performance

Resource utilization and outsourcing

Scope deliverables completion and product quality

Process improvement possibilities and lessons learned

Schedule and cost performance

492018

44

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy87

Initiate Assess Resolve CloseApprove

Senior team

a change

Senior team

member initiates

a change

Project manager

accepts or rejects

Project manager

accepts or rejects

change request

Change Analyst

makes assessment of

the change and gives

recommendations

Managers acceptChange Analyst

makes assessment of

the change and gives

recommendations

or reject the

change based on

the assessment

and

Managers accept

or reject the

change based on

the assessment

and

recommendations Project manager

creates and assigns

tasks if necessary

and updates project

plan

Document

closureReject

Accept

Accept

Reject

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy88

Project

Phase 1

Phase 2

Phase 3

Stage

Gate

Planning

Go No Go Decisions

492018

45

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy89

Today

Planned

Burned

Earned

Time

Co

st

CV

Planned

Finished

Actual

Finished

Late

Over

Budget

Cost Variance (CV) = Earned ndash Burned

Schedule Variance (SV) = Earned ndash Planned

SV

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy90

complete to date

Dashboard ndash scope quality time budget

Milestones and deliverables

Target revised complete

Budget

Approved spent to date estimated cost of work remaining estimated total cost

Major Risks amp Issues requiring reviewdecision

Accomplishments Plans for Next Period

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 35: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

35

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy69

Destructive

Intervention

Constructive

Opportunity

Influence of

Stakeholders

and

Opportunity

to add value

Cost

Curve

$

Time

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy70

An uncertain event or condition

that if it occurs has a positive

or negative effect on one or

more of the project objectives

such as scope schedule

cost and quality

copyPMBOK regGuide Sixth Edition

492018

36

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy71

ldquoIncludes processes concerned with conducting risk

management planning identification analysis

responses and monitoring and control on a projectrdquo

copyPMBOK regGuide Sixth Edition

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Before the risk

Focus on prevention amp

planning

After the risk

Focus on recovery

Project

Start Project

Finish

Avoid Mitigate or Transfer Risks Use contingency plans

RiskManagement

492018

37

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy73

HighLow Impact

Hig

h

Low

Threaten

Failure

Minor

impactBig Impact if Occurs

ldquoEarthquakerdquo

Disruptive

ldquoDeath by

1000 cutsrdquo

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy74

Minimizes reactive crisis management

Increases likelihood of project success

Increases profitability

Prevents events impacting triple constraints

492018

38

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy75

1 Project Purpose

2 Objectives

3 Identified Risks

4 Risk Assessment

5 Risk Prevention

6 Risk Mitigation

7 Resources

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy76

492018

39

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy77

Work with your team and sponsor to identify stakeholders

Brainstorming works to develop a list that can be reviewed and finalized by the team

Key Stakeholders will usually emerge on their own

Stakeholders are persons and

organizations whose interests may be

positively or negatively affected by the

execution or completion of the project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy78

Ask each stakeholder 2 questions

bullWhat are your three major expectations from this project

bullWhat are your three major concerns related to this project

492018

40

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy79

Keep InformedMonitor(Minimal effort)

Manage Relationship

Closely

Keep Satisfied

InterestLow High

Low

High

Power

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy80

1 Analysis What do they need to know amp what do we want to say

1 Decide Communication Objectives2 Determine Vulnerabilities amp Issues3 Develop Key Messages4 Perform Stakeholder Analysis (interests concerns)

2 Design amp Build What methods and tools should we use

1 Build Communication Vehicles (reports websites etc)

3 Develop Plan Who How and When should they receive it

1 Develop Communication Plan 2 Update Overall Workplan for Communication Activities

4 Do it1 Execute Communication Plan2 Modify amp Adjust as needed

492018

41

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy81

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy82

1 Project Purpose

2 Objectives

3 Potential Issues

4 Key Messages

5 AudiencesStakeholders

6 Communication Vehicles

7 Communication Plan Matrix

8 Resources

492018

42

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy83

Planned the Work Now Work the Plan

But What IF (Risk Management)

85 of what PMs do is Communication

Stakeholder Management is Critical to Project

Success

Output ndash Unique product service delivery or

result

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy84

Those processes required to

track review and regulate the

progress and performance of

the project identify any areas in

which changes to the plan are

required and initiate the

corresponding changes

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

43

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy85

Is daily monitoring at the team level of resources tasks and schedule It is hellip

A vital component of tracking and managing progress

Managing the triple constraints

Relatively simple ldquouser friendlyrdquo and inexpensive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy86

Tasks

Requirements

Timing and performance

Resource utilization and outsourcing

Scope deliverables completion and product quality

Process improvement possibilities and lessons learned

Schedule and cost performance

492018

44

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy87

Initiate Assess Resolve CloseApprove

Senior team

a change

Senior team

member initiates

a change

Project manager

accepts or rejects

Project manager

accepts or rejects

change request

Change Analyst

makes assessment of

the change and gives

recommendations

Managers acceptChange Analyst

makes assessment of

the change and gives

recommendations

or reject the

change based on

the assessment

and

Managers accept

or reject the

change based on

the assessment

and

recommendations Project manager

creates and assigns

tasks if necessary

and updates project

plan

Document

closureReject

Accept

Accept

Reject

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy88

Project

Phase 1

Phase 2

Phase 3

Stage

Gate

Planning

Go No Go Decisions

492018

45

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy89

Today

Planned

Burned

Earned

Time

Co

st

CV

Planned

Finished

Actual

Finished

Late

Over

Budget

Cost Variance (CV) = Earned ndash Burned

Schedule Variance (SV) = Earned ndash Planned

SV

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy90

complete to date

Dashboard ndash scope quality time budget

Milestones and deliverables

Target revised complete

Budget

Approved spent to date estimated cost of work remaining estimated total cost

Major Risks amp Issues requiring reviewdecision

Accomplishments Plans for Next Period

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 36: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

36

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy71

ldquoIncludes processes concerned with conducting risk

management planning identification analysis

responses and monitoring and control on a projectrdquo

copyPMBOK regGuide Sixth Edition

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Before the risk

Focus on prevention amp

planning

After the risk

Focus on recovery

Project

Start Project

Finish

Avoid Mitigate or Transfer Risks Use contingency plans

RiskManagement

492018

37

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy73

HighLow Impact

Hig

h

Low

Threaten

Failure

Minor

impactBig Impact if Occurs

ldquoEarthquakerdquo

Disruptive

ldquoDeath by

1000 cutsrdquo

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy74

Minimizes reactive crisis management

Increases likelihood of project success

Increases profitability

Prevents events impacting triple constraints

492018

38

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy75

1 Project Purpose

2 Objectives

3 Identified Risks

4 Risk Assessment

5 Risk Prevention

6 Risk Mitigation

7 Resources

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy76

492018

39

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy77

Work with your team and sponsor to identify stakeholders

Brainstorming works to develop a list that can be reviewed and finalized by the team

Key Stakeholders will usually emerge on their own

Stakeholders are persons and

organizations whose interests may be

positively or negatively affected by the

execution or completion of the project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy78

Ask each stakeholder 2 questions

bullWhat are your three major expectations from this project

bullWhat are your three major concerns related to this project

492018

40

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy79

Keep InformedMonitor(Minimal effort)

Manage Relationship

Closely

Keep Satisfied

InterestLow High

Low

High

Power

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy80

1 Analysis What do they need to know amp what do we want to say

1 Decide Communication Objectives2 Determine Vulnerabilities amp Issues3 Develop Key Messages4 Perform Stakeholder Analysis (interests concerns)

2 Design amp Build What methods and tools should we use

1 Build Communication Vehicles (reports websites etc)

3 Develop Plan Who How and When should they receive it

1 Develop Communication Plan 2 Update Overall Workplan for Communication Activities

4 Do it1 Execute Communication Plan2 Modify amp Adjust as needed

492018

41

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy81

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy82

1 Project Purpose

2 Objectives

3 Potential Issues

4 Key Messages

5 AudiencesStakeholders

6 Communication Vehicles

7 Communication Plan Matrix

8 Resources

492018

42

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy83

Planned the Work Now Work the Plan

But What IF (Risk Management)

85 of what PMs do is Communication

Stakeholder Management is Critical to Project

Success

Output ndash Unique product service delivery or

result

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy84

Those processes required to

track review and regulate the

progress and performance of

the project identify any areas in

which changes to the plan are

required and initiate the

corresponding changes

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

43

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy85

Is daily monitoring at the team level of resources tasks and schedule It is hellip

A vital component of tracking and managing progress

Managing the triple constraints

Relatively simple ldquouser friendlyrdquo and inexpensive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy86

Tasks

Requirements

Timing and performance

Resource utilization and outsourcing

Scope deliverables completion and product quality

Process improvement possibilities and lessons learned

Schedule and cost performance

492018

44

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy87

Initiate Assess Resolve CloseApprove

Senior team

a change

Senior team

member initiates

a change

Project manager

accepts or rejects

Project manager

accepts or rejects

change request

Change Analyst

makes assessment of

the change and gives

recommendations

Managers acceptChange Analyst

makes assessment of

the change and gives

recommendations

or reject the

change based on

the assessment

and

Managers accept

or reject the

change based on

the assessment

and

recommendations Project manager

creates and assigns

tasks if necessary

and updates project

plan

Document

closureReject

Accept

Accept

Reject

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy88

Project

Phase 1

Phase 2

Phase 3

Stage

Gate

Planning

Go No Go Decisions

492018

45

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy89

Today

Planned

Burned

Earned

Time

Co

st

CV

Planned

Finished

Actual

Finished

Late

Over

Budget

Cost Variance (CV) = Earned ndash Burned

Schedule Variance (SV) = Earned ndash Planned

SV

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy90

complete to date

Dashboard ndash scope quality time budget

Milestones and deliverables

Target revised complete

Budget

Approved spent to date estimated cost of work remaining estimated total cost

Major Risks amp Issues requiring reviewdecision

Accomplishments Plans for Next Period

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 37: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

37

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy73

HighLow Impact

Hig

h

Low

Threaten

Failure

Minor

impactBig Impact if Occurs

ldquoEarthquakerdquo

Disruptive

ldquoDeath by

1000 cutsrdquo

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy74

Minimizes reactive crisis management

Increases likelihood of project success

Increases profitability

Prevents events impacting triple constraints

492018

38

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy75

1 Project Purpose

2 Objectives

3 Identified Risks

4 Risk Assessment

5 Risk Prevention

6 Risk Mitigation

7 Resources

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy76

492018

39

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy77

Work with your team and sponsor to identify stakeholders

Brainstorming works to develop a list that can be reviewed and finalized by the team

Key Stakeholders will usually emerge on their own

Stakeholders are persons and

organizations whose interests may be

positively or negatively affected by the

execution or completion of the project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy78

Ask each stakeholder 2 questions

bullWhat are your three major expectations from this project

bullWhat are your three major concerns related to this project

492018

40

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy79

Keep InformedMonitor(Minimal effort)

Manage Relationship

Closely

Keep Satisfied

InterestLow High

Low

High

Power

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy80

1 Analysis What do they need to know amp what do we want to say

1 Decide Communication Objectives2 Determine Vulnerabilities amp Issues3 Develop Key Messages4 Perform Stakeholder Analysis (interests concerns)

2 Design amp Build What methods and tools should we use

1 Build Communication Vehicles (reports websites etc)

3 Develop Plan Who How and When should they receive it

1 Develop Communication Plan 2 Update Overall Workplan for Communication Activities

4 Do it1 Execute Communication Plan2 Modify amp Adjust as needed

492018

41

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy81

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy82

1 Project Purpose

2 Objectives

3 Potential Issues

4 Key Messages

5 AudiencesStakeholders

6 Communication Vehicles

7 Communication Plan Matrix

8 Resources

492018

42

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy83

Planned the Work Now Work the Plan

But What IF (Risk Management)

85 of what PMs do is Communication

Stakeholder Management is Critical to Project

Success

Output ndash Unique product service delivery or

result

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy84

Those processes required to

track review and regulate the

progress and performance of

the project identify any areas in

which changes to the plan are

required and initiate the

corresponding changes

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

43

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy85

Is daily monitoring at the team level of resources tasks and schedule It is hellip

A vital component of tracking and managing progress

Managing the triple constraints

Relatively simple ldquouser friendlyrdquo and inexpensive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy86

Tasks

Requirements

Timing and performance

Resource utilization and outsourcing

Scope deliverables completion and product quality

Process improvement possibilities and lessons learned

Schedule and cost performance

492018

44

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy87

Initiate Assess Resolve CloseApprove

Senior team

a change

Senior team

member initiates

a change

Project manager

accepts or rejects

Project manager

accepts or rejects

change request

Change Analyst

makes assessment of

the change and gives

recommendations

Managers acceptChange Analyst

makes assessment of

the change and gives

recommendations

or reject the

change based on

the assessment

and

Managers accept

or reject the

change based on

the assessment

and

recommendations Project manager

creates and assigns

tasks if necessary

and updates project

plan

Document

closureReject

Accept

Accept

Reject

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy88

Project

Phase 1

Phase 2

Phase 3

Stage

Gate

Planning

Go No Go Decisions

492018

45

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy89

Today

Planned

Burned

Earned

Time

Co

st

CV

Planned

Finished

Actual

Finished

Late

Over

Budget

Cost Variance (CV) = Earned ndash Burned

Schedule Variance (SV) = Earned ndash Planned

SV

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy90

complete to date

Dashboard ndash scope quality time budget

Milestones and deliverables

Target revised complete

Budget

Approved spent to date estimated cost of work remaining estimated total cost

Major Risks amp Issues requiring reviewdecision

Accomplishments Plans for Next Period

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 38: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

38

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy75

1 Project Purpose

2 Objectives

3 Identified Risks

4 Risk Assessment

5 Risk Prevention

6 Risk Mitigation

7 Resources

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy76

492018

39

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy77

Work with your team and sponsor to identify stakeholders

Brainstorming works to develop a list that can be reviewed and finalized by the team

Key Stakeholders will usually emerge on their own

Stakeholders are persons and

organizations whose interests may be

positively or negatively affected by the

execution or completion of the project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy78

Ask each stakeholder 2 questions

bullWhat are your three major expectations from this project

bullWhat are your three major concerns related to this project

492018

40

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy79

Keep InformedMonitor(Minimal effort)

Manage Relationship

Closely

Keep Satisfied

InterestLow High

Low

High

Power

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy80

1 Analysis What do they need to know amp what do we want to say

1 Decide Communication Objectives2 Determine Vulnerabilities amp Issues3 Develop Key Messages4 Perform Stakeholder Analysis (interests concerns)

2 Design amp Build What methods and tools should we use

1 Build Communication Vehicles (reports websites etc)

3 Develop Plan Who How and When should they receive it

1 Develop Communication Plan 2 Update Overall Workplan for Communication Activities

4 Do it1 Execute Communication Plan2 Modify amp Adjust as needed

492018

41

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy81

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy82

1 Project Purpose

2 Objectives

3 Potential Issues

4 Key Messages

5 AudiencesStakeholders

6 Communication Vehicles

7 Communication Plan Matrix

8 Resources

492018

42

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy83

Planned the Work Now Work the Plan

But What IF (Risk Management)

85 of what PMs do is Communication

Stakeholder Management is Critical to Project

Success

Output ndash Unique product service delivery or

result

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy84

Those processes required to

track review and regulate the

progress and performance of

the project identify any areas in

which changes to the plan are

required and initiate the

corresponding changes

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

43

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy85

Is daily monitoring at the team level of resources tasks and schedule It is hellip

A vital component of tracking and managing progress

Managing the triple constraints

Relatively simple ldquouser friendlyrdquo and inexpensive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy86

Tasks

Requirements

Timing and performance

Resource utilization and outsourcing

Scope deliverables completion and product quality

Process improvement possibilities and lessons learned

Schedule and cost performance

492018

44

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy87

Initiate Assess Resolve CloseApprove

Senior team

a change

Senior team

member initiates

a change

Project manager

accepts or rejects

Project manager

accepts or rejects

change request

Change Analyst

makes assessment of

the change and gives

recommendations

Managers acceptChange Analyst

makes assessment of

the change and gives

recommendations

or reject the

change based on

the assessment

and

Managers accept

or reject the

change based on

the assessment

and

recommendations Project manager

creates and assigns

tasks if necessary

and updates project

plan

Document

closureReject

Accept

Accept

Reject

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy88

Project

Phase 1

Phase 2

Phase 3

Stage

Gate

Planning

Go No Go Decisions

492018

45

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy89

Today

Planned

Burned

Earned

Time

Co

st

CV

Planned

Finished

Actual

Finished

Late

Over

Budget

Cost Variance (CV) = Earned ndash Burned

Schedule Variance (SV) = Earned ndash Planned

SV

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy90

complete to date

Dashboard ndash scope quality time budget

Milestones and deliverables

Target revised complete

Budget

Approved spent to date estimated cost of work remaining estimated total cost

Major Risks amp Issues requiring reviewdecision

Accomplishments Plans for Next Period

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 39: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

39

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy77

Work with your team and sponsor to identify stakeholders

Brainstorming works to develop a list that can be reviewed and finalized by the team

Key Stakeholders will usually emerge on their own

Stakeholders are persons and

organizations whose interests may be

positively or negatively affected by the

execution or completion of the project

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy78

Ask each stakeholder 2 questions

bullWhat are your three major expectations from this project

bullWhat are your three major concerns related to this project

492018

40

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy79

Keep InformedMonitor(Minimal effort)

Manage Relationship

Closely

Keep Satisfied

InterestLow High

Low

High

Power

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy80

1 Analysis What do they need to know amp what do we want to say

1 Decide Communication Objectives2 Determine Vulnerabilities amp Issues3 Develop Key Messages4 Perform Stakeholder Analysis (interests concerns)

2 Design amp Build What methods and tools should we use

1 Build Communication Vehicles (reports websites etc)

3 Develop Plan Who How and When should they receive it

1 Develop Communication Plan 2 Update Overall Workplan for Communication Activities

4 Do it1 Execute Communication Plan2 Modify amp Adjust as needed

492018

41

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy81

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy82

1 Project Purpose

2 Objectives

3 Potential Issues

4 Key Messages

5 AudiencesStakeholders

6 Communication Vehicles

7 Communication Plan Matrix

8 Resources

492018

42

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy83

Planned the Work Now Work the Plan

But What IF (Risk Management)

85 of what PMs do is Communication

Stakeholder Management is Critical to Project

Success

Output ndash Unique product service delivery or

result

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy84

Those processes required to

track review and regulate the

progress and performance of

the project identify any areas in

which changes to the plan are

required and initiate the

corresponding changes

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

43

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy85

Is daily monitoring at the team level of resources tasks and schedule It is hellip

A vital component of tracking and managing progress

Managing the triple constraints

Relatively simple ldquouser friendlyrdquo and inexpensive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy86

Tasks

Requirements

Timing and performance

Resource utilization and outsourcing

Scope deliverables completion and product quality

Process improvement possibilities and lessons learned

Schedule and cost performance

492018

44

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy87

Initiate Assess Resolve CloseApprove

Senior team

a change

Senior team

member initiates

a change

Project manager

accepts or rejects

Project manager

accepts or rejects

change request

Change Analyst

makes assessment of

the change and gives

recommendations

Managers acceptChange Analyst

makes assessment of

the change and gives

recommendations

or reject the

change based on

the assessment

and

Managers accept

or reject the

change based on

the assessment

and

recommendations Project manager

creates and assigns

tasks if necessary

and updates project

plan

Document

closureReject

Accept

Accept

Reject

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy88

Project

Phase 1

Phase 2

Phase 3

Stage

Gate

Planning

Go No Go Decisions

492018

45

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy89

Today

Planned

Burned

Earned

Time

Co

st

CV

Planned

Finished

Actual

Finished

Late

Over

Budget

Cost Variance (CV) = Earned ndash Burned

Schedule Variance (SV) = Earned ndash Planned

SV

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy90

complete to date

Dashboard ndash scope quality time budget

Milestones and deliverables

Target revised complete

Budget

Approved spent to date estimated cost of work remaining estimated total cost

Major Risks amp Issues requiring reviewdecision

Accomplishments Plans for Next Period

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 40: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

40

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy79

Keep InformedMonitor(Minimal effort)

Manage Relationship

Closely

Keep Satisfied

InterestLow High

Low

High

Power

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy80

1 Analysis What do they need to know amp what do we want to say

1 Decide Communication Objectives2 Determine Vulnerabilities amp Issues3 Develop Key Messages4 Perform Stakeholder Analysis (interests concerns)

2 Design amp Build What methods and tools should we use

1 Build Communication Vehicles (reports websites etc)

3 Develop Plan Who How and When should they receive it

1 Develop Communication Plan 2 Update Overall Workplan for Communication Activities

4 Do it1 Execute Communication Plan2 Modify amp Adjust as needed

492018

41

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy81

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy82

1 Project Purpose

2 Objectives

3 Potential Issues

4 Key Messages

5 AudiencesStakeholders

6 Communication Vehicles

7 Communication Plan Matrix

8 Resources

492018

42

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy83

Planned the Work Now Work the Plan

But What IF (Risk Management)

85 of what PMs do is Communication

Stakeholder Management is Critical to Project

Success

Output ndash Unique product service delivery or

result

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy84

Those processes required to

track review and regulate the

progress and performance of

the project identify any areas in

which changes to the plan are

required and initiate the

corresponding changes

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

43

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy85

Is daily monitoring at the team level of resources tasks and schedule It is hellip

A vital component of tracking and managing progress

Managing the triple constraints

Relatively simple ldquouser friendlyrdquo and inexpensive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy86

Tasks

Requirements

Timing and performance

Resource utilization and outsourcing

Scope deliverables completion and product quality

Process improvement possibilities and lessons learned

Schedule and cost performance

492018

44

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy87

Initiate Assess Resolve CloseApprove

Senior team

a change

Senior team

member initiates

a change

Project manager

accepts or rejects

Project manager

accepts or rejects

change request

Change Analyst

makes assessment of

the change and gives

recommendations

Managers acceptChange Analyst

makes assessment of

the change and gives

recommendations

or reject the

change based on

the assessment

and

Managers accept

or reject the

change based on

the assessment

and

recommendations Project manager

creates and assigns

tasks if necessary

and updates project

plan

Document

closureReject

Accept

Accept

Reject

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy88

Project

Phase 1

Phase 2

Phase 3

Stage

Gate

Planning

Go No Go Decisions

492018

45

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy89

Today

Planned

Burned

Earned

Time

Co

st

CV

Planned

Finished

Actual

Finished

Late

Over

Budget

Cost Variance (CV) = Earned ndash Burned

Schedule Variance (SV) = Earned ndash Planned

SV

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy90

complete to date

Dashboard ndash scope quality time budget

Milestones and deliverables

Target revised complete

Budget

Approved spent to date estimated cost of work remaining estimated total cost

Major Risks amp Issues requiring reviewdecision

Accomplishments Plans for Next Period

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 41: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

41

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy81

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy82

1 Project Purpose

2 Objectives

3 Potential Issues

4 Key Messages

5 AudiencesStakeholders

6 Communication Vehicles

7 Communication Plan Matrix

8 Resources

492018

42

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy83

Planned the Work Now Work the Plan

But What IF (Risk Management)

85 of what PMs do is Communication

Stakeholder Management is Critical to Project

Success

Output ndash Unique product service delivery or

result

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy84

Those processes required to

track review and regulate the

progress and performance of

the project identify any areas in

which changes to the plan are

required and initiate the

corresponding changes

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

43

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy85

Is daily monitoring at the team level of resources tasks and schedule It is hellip

A vital component of tracking and managing progress

Managing the triple constraints

Relatively simple ldquouser friendlyrdquo and inexpensive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy86

Tasks

Requirements

Timing and performance

Resource utilization and outsourcing

Scope deliverables completion and product quality

Process improvement possibilities and lessons learned

Schedule and cost performance

492018

44

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy87

Initiate Assess Resolve CloseApprove

Senior team

a change

Senior team

member initiates

a change

Project manager

accepts or rejects

Project manager

accepts or rejects

change request

Change Analyst

makes assessment of

the change and gives

recommendations

Managers acceptChange Analyst

makes assessment of

the change and gives

recommendations

or reject the

change based on

the assessment

and

Managers accept

or reject the

change based on

the assessment

and

recommendations Project manager

creates and assigns

tasks if necessary

and updates project

plan

Document

closureReject

Accept

Accept

Reject

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy88

Project

Phase 1

Phase 2

Phase 3

Stage

Gate

Planning

Go No Go Decisions

492018

45

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy89

Today

Planned

Burned

Earned

Time

Co

st

CV

Planned

Finished

Actual

Finished

Late

Over

Budget

Cost Variance (CV) = Earned ndash Burned

Schedule Variance (SV) = Earned ndash Planned

SV

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy90

complete to date

Dashboard ndash scope quality time budget

Milestones and deliverables

Target revised complete

Budget

Approved spent to date estimated cost of work remaining estimated total cost

Major Risks amp Issues requiring reviewdecision

Accomplishments Plans for Next Period

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 42: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

42

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy83

Planned the Work Now Work the Plan

But What IF (Risk Management)

85 of what PMs do is Communication

Stakeholder Management is Critical to Project

Success

Output ndash Unique product service delivery or

result

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy84

Those processes required to

track review and regulate the

progress and performance of

the project identify any areas in

which changes to the plan are

required and initiate the

corresponding changes

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

43

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy85

Is daily monitoring at the team level of resources tasks and schedule It is hellip

A vital component of tracking and managing progress

Managing the triple constraints

Relatively simple ldquouser friendlyrdquo and inexpensive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy86

Tasks

Requirements

Timing and performance

Resource utilization and outsourcing

Scope deliverables completion and product quality

Process improvement possibilities and lessons learned

Schedule and cost performance

492018

44

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy87

Initiate Assess Resolve CloseApprove

Senior team

a change

Senior team

member initiates

a change

Project manager

accepts or rejects

Project manager

accepts or rejects

change request

Change Analyst

makes assessment of

the change and gives

recommendations

Managers acceptChange Analyst

makes assessment of

the change and gives

recommendations

or reject the

change based on

the assessment

and

Managers accept

or reject the

change based on

the assessment

and

recommendations Project manager

creates and assigns

tasks if necessary

and updates project

plan

Document

closureReject

Accept

Accept

Reject

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy88

Project

Phase 1

Phase 2

Phase 3

Stage

Gate

Planning

Go No Go Decisions

492018

45

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy89

Today

Planned

Burned

Earned

Time

Co

st

CV

Planned

Finished

Actual

Finished

Late

Over

Budget

Cost Variance (CV) = Earned ndash Burned

Schedule Variance (SV) = Earned ndash Planned

SV

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy90

complete to date

Dashboard ndash scope quality time budget

Milestones and deliverables

Target revised complete

Budget

Approved spent to date estimated cost of work remaining estimated total cost

Major Risks amp Issues requiring reviewdecision

Accomplishments Plans for Next Period

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 43: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

43

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy85

Is daily monitoring at the team level of resources tasks and schedule It is hellip

A vital component of tracking and managing progress

Managing the triple constraints

Relatively simple ldquouser friendlyrdquo and inexpensive

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy86

Tasks

Requirements

Timing and performance

Resource utilization and outsourcing

Scope deliverables completion and product quality

Process improvement possibilities and lessons learned

Schedule and cost performance

492018

44

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy87

Initiate Assess Resolve CloseApprove

Senior team

a change

Senior team

member initiates

a change

Project manager

accepts or rejects

Project manager

accepts or rejects

change request

Change Analyst

makes assessment of

the change and gives

recommendations

Managers acceptChange Analyst

makes assessment of

the change and gives

recommendations

or reject the

change based on

the assessment

and

Managers accept

or reject the

change based on

the assessment

and

recommendations Project manager

creates and assigns

tasks if necessary

and updates project

plan

Document

closureReject

Accept

Accept

Reject

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy88

Project

Phase 1

Phase 2

Phase 3

Stage

Gate

Planning

Go No Go Decisions

492018

45

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy89

Today

Planned

Burned

Earned

Time

Co

st

CV

Planned

Finished

Actual

Finished

Late

Over

Budget

Cost Variance (CV) = Earned ndash Burned

Schedule Variance (SV) = Earned ndash Planned

SV

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy90

complete to date

Dashboard ndash scope quality time budget

Milestones and deliverables

Target revised complete

Budget

Approved spent to date estimated cost of work remaining estimated total cost

Major Risks amp Issues requiring reviewdecision

Accomplishments Plans for Next Period

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 44: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

44

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy87

Initiate Assess Resolve CloseApprove

Senior team

a change

Senior team

member initiates

a change

Project manager

accepts or rejects

Project manager

accepts or rejects

change request

Change Analyst

makes assessment of

the change and gives

recommendations

Managers acceptChange Analyst

makes assessment of

the change and gives

recommendations

or reject the

change based on

the assessment

and

Managers accept

or reject the

change based on

the assessment

and

recommendations Project manager

creates and assigns

tasks if necessary

and updates project

plan

Document

closureReject

Accept

Accept

Reject

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy88

Project

Phase 1

Phase 2

Phase 3

Stage

Gate

Planning

Go No Go Decisions

492018

45

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy89

Today

Planned

Burned

Earned

Time

Co

st

CV

Planned

Finished

Actual

Finished

Late

Over

Budget

Cost Variance (CV) = Earned ndash Burned

Schedule Variance (SV) = Earned ndash Planned

SV

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy90

complete to date

Dashboard ndash scope quality time budget

Milestones and deliverables

Target revised complete

Budget

Approved spent to date estimated cost of work remaining estimated total cost

Major Risks amp Issues requiring reviewdecision

Accomplishments Plans for Next Period

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 45: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

45

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy89

Today

Planned

Burned

Earned

Time

Co

st

CV

Planned

Finished

Actual

Finished

Late

Over

Budget

Cost Variance (CV) = Earned ndash Burned

Schedule Variance (SV) = Earned ndash Planned

SV

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy90

complete to date

Dashboard ndash scope quality time budget

Milestones and deliverables

Target revised complete

Budget

Approved spent to date estimated cost of work remaining estimated total cost

Major Risks amp Issues requiring reviewdecision

Accomplishments Plans for Next Period

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 46: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

46

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy91

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

its

of

wo

rk 5050 rule

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy92

0

10

20

30

40

50

60

70

80

90

100

10 20 30 40 50 60 70 80 90 100

Percentage of time

Un

it o

f w

ork

5050 rule

5070 rule

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 47: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

47

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy93

Status Reporting

Change Control

Earned Value

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy94

The process of finalizing all activities across all of the project process groups to formally close the project

copyPMBOK regGuide 2017 Edition

Initiating

Processes

Planning

Processes

Executing

Processes

Controlling

Processes

Closing

Processes

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 48: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

48

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy95

Administrative Contract Closure

Acceptance and hand off

Staff re-deployment

Facilities and equipment decommissioning

Project Evaluation

Celebration

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy

Lesson Learned

versus

Post Implementation Reviews

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca

Web WWWPMCOECA

Page 49: Project Management Essentials - in1touch AIA Conf... · Project Management Essentials Project Management Centre of Excellence Inc. 2018 ©Project Management Centre of Excellence Inc

492018

49

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy97

Close out activities

Knowledge Management Lessons Learned

Post Implementation Review

Close out Report

Project Management Centre of Excellence Inc 2018 copyProject Management Centre of Excellence Inc 2018 copy98

Dr Dale Christenson DPM PMP CMC

E-mail dchristensonpmcoeca