2
CREATING JOBS FOR NEW HAMPSHIRE RESIDENTS TOTAL NUMBER OF JOB MONTHS This data depicts "shovel-ready" trails projects as contributed by respondents to the American Trails "Shovel- ready" Trail Project Survey. Shovel-ready trail projects are projects that, if funding is available and working conditions are safe, could be providing jobs by the summer of 2021. A project can be "shovel-ready" in any phase of development (e.g., acquisition/ROW, planning, design, construction, maintenance), as long as jobs would be created before summer 2021 if the project were funded now. PROJECTS THESE PROJECTS WILL BUILD AT LEAST ACESSIBLE TRAILS TRAILS FOR CYCLISTS TRAILS FOR EQUESTRIANS TRAILS FOR PEDESTRIANS TRAIL FOR MOTORIZED USE PUTTING MONEY BACK INTO THE COMMUNITY TOTAL SPENT ON PROJECTS AVERAGE SPENT PER PROJECT AVERAGE PER PROJECT MILES OF TRAILS IMPACTED TOTAL TRAIL MILES Research conducted by American Trails in partnership with Penn State's Recreation, Park, and Tourism Management Department AT LEAST AVERAGE PER PROJECT

PROJECT LOCATIONS AT A GLANCE · T h is d a ta d e p i c t s " shov el-ready" t ra ils pr oje c ts as c ontribute d by res pondents to the Am eric an Trails "Sh ovel- r ea d y

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PROJECT LOCATIONS AT A GLANCE · T h is d a ta d e p i c t s " shov el-ready" t ra ils pr oje c ts as c ontribute d by res pondents to the Am eric an Trails "Sh ovel- r ea d y

CREATING JOBS FOR NEW HAMPSHIRE RESIDENTS

TOTAL NUMBER OF JOB MONTHS

This data depicts "shovel-ready" trails projects as contributed by respondents to the American Trails "Shovel-ready" Trail Project Survey. Shovel-ready trail projects are projects that, if funding is available and workingconditions are safe, could be providing jobs by the summer of 2021. A project can be "shovel-ready" in anyphase of development (e.g., acquisition/ROW, planning, design, construction, maintenance), as long as jobswould be created before summer 2021 if the project were funded now.

NHNew Hampshire Trail

projects that are ready to

go by the summer of 202119

P R O J E C T S

THESE PROJECTS WILL BUILD AT LEAST

042170

ACESSIBLE TRAILS

TRAILS FOR CYCLISTS

TRAILS FOR EQUESTRIANS

TRAILS FOR PEDESTRIANS

TRAIL FOR MOTORIZED USE

P U T T I N G M O N E YB A C K I N T O T H E

C O M M U N I T Y

$9,690,728

$510,038

TOTAL SPENT ON PROJECTS

AVERAGE SPENT PER PROJECT

AVERAGE PER PROJECT

257 14

MILES OF TRAILSIMPACTED

TOTAL TRAIL MILES

767 40

Research conducted by American Trails in partnership with Penn State's Recreation, Park, and Tourism Management Department

A T L E A S T

AVERAGE PER PROJECT

Page 2: PROJECT LOCATIONS AT A GLANCE · T h is d a ta d e p i c t s " shov el-ready" t ra ils pr oje c ts as c ontribute d by res pondents to the Am eric an Trails "Sh ovel- r ea d y

PROJECT LOCATIONS AT A GLANCE

PROJECT IMPACT BY CONGRESSIONAL DISTRICT

CONTACT INFORMATION

QUESTIONS ABOUT THE SURVEY BACKGROUND AND USE: AMERICAN TRAILS, [email protected], 530-645-9683

QUESTIONS ABOUT THE SURVEY METHODOLOGY: PENN STATE'S RECREATION, PARK, AND TOURISM MANAGEMENT DEPARTMENT,[email protected], +1 202-258-5146

OFFICE OF GOVERNOR CHRIS SUNUNU (603) 271-2121