Progress Report
Received parts
Received PCBs
Built 1 Receiver and 2 Transmitters
Began Testing and Debugging
Midterm Report!
Gantt ChartID Task Name Start Finish % Complete
1 Background Research Wed 1/12/05 Wed 4/27/05 62%
2 IEEE 802.3 Standard Tue 1/18/05 Fri 1/28/05 100%
3 VCSELs and PDs Mon 1/24/05 Mon 1/31/05 100%
4 Miscellaneous Wed 1/12/05 Wed 4/27/05 55%
5 Test Eval Board Tue 1/25/05 Mon 1/31/05 100%
6 Build & Test Practice Board Tue 2/1/05 Tue 2/8/05 100%
7 Optical Link Budget Mon 1/24/05 Thu 2/10/05 100%
8 Choose Components Mon 1/31/05 Mon 2/7/05 100%
9 Order Parts Mon 2/7/05 Mon 3/7/05 100%
10 Order VCSELs and PDs Mon 2/7/05 Fri 2/11/05 100%
11 Order Other Parts Mon 2/21/05 Mon 3/7/05 100%
12 Schematics Fri 2/11/05 Wed 2/23/05 100%
13 PCB Mon 2/14/05 Mon 3/21/05 100%
14 Design Mon 2/14/05 Fri 3/11/05 100%
15 Design Review Mon 2/21/05 Fri 3/11/05 100%
16 Order Mon 3/14/05 Mon 3/21/05 100%
17 Midterm Report Mon 2/28/05 Fri 3/25/05 50%
18 Board 1 Mon 3/21/05 Mon 4/4/05 45%
19 Construct Board Mon 3/21/05 Wed 3/23/05 100%
20 Test Board Thu 3/24/05 Mon 4/4/05 25%
21 Board 2 Mon 4/4/05 Tue 4/26/05 0%
22 Design Modifications Mon 4/4/05 Thu 4/14/05 0%
23 Construct Board Fri 4/15/05 Tue 4/19/05 0%
24 Test Board Wed 4/20/05 Tue 4/26/05 0%
25 Final Report Mon 4/18/05 Wed 4/27/05 0%
26 Midterm Exam Tue 2/22/05 Tue 2/22/05 0%
27 Midterm Report Fri 3/25/05 Fri 3/25/05 0%
28 Final Report Wed 4/27/05 Wed 4/27/05 0%
62%
100%
100%
55%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
50%
45%
100%
25%
0%
0%
0%
0%
0%
2/22
3/25
4/27
9 16 23 30 6 13 20 27 6 13 20 27 3 10 17 24 1 8Jan '05 Feb '05 Mar '05 Apr '05 May '05
Received Parts
Received all parts from DigiKey and Jameco
Received an excess of SMA connectors
All parts accounted for
Received PCB 3 PCBs arrived on time Immediate problem
Ground plane not connected to power connector’s ground
Oops! Problem rectified with an
alligator clip
Building Soldered a transmitter and receiver pair
Short was discovered and unaccounted for Soldered second transmitter
Testing
Bypassed the ground problem with alligator clip
Discovered that the laser is not lasingUsed digital camera to confirm, as well
as red Rx LOS light on GBIC Pattern Generator
Continued testing and debugging will be required to determine the problem
Upcoming Week
Finish ReportContinue Testing and Debugging
in order to determine the problem(s)
Modify schematics and board design accordingly
References http://www.bmwusa.com/bmwexperience/BmwTechnology/ http://www.cisco.com