Project GabEECE 135 – Spring 2005

Omar Al-JaddaPatrick CrosbyRahmin Sarabi

Adam Durity

Spring Break

Progress Report

Received parts

Received PCBs

Built 1 Receiver and 2 Transmitters

Began Testing and Debugging

Midterm Report!

Gantt ChartID Task Name Start Finish % Complete

1 Background Research Wed 1/12/05 Wed 4/27/05 62%

2 IEEE 802.3 Standard Tue 1/18/05 Fri 1/28/05 100%

3 VCSELs and PDs Mon 1/24/05 Mon 1/31/05 100%

4 Miscellaneous Wed 1/12/05 Wed 4/27/05 55%

5 Test Eval Board Tue 1/25/05 Mon 1/31/05 100%

6 Build & Test Practice Board Tue 2/1/05 Tue 2/8/05 100%

7 Optical Link Budget Mon 1/24/05 Thu 2/10/05 100%

8 Choose Components Mon 1/31/05 Mon 2/7/05 100%

9 Order Parts Mon 2/7/05 Mon 3/7/05 100%

10 Order VCSELs and PDs Mon 2/7/05 Fri 2/11/05 100%

11 Order Other Parts Mon 2/21/05 Mon 3/7/05 100%

12 Schematics Fri 2/11/05 Wed 2/23/05 100%

13 PCB Mon 2/14/05 Mon 3/21/05 100%

14 Design Mon 2/14/05 Fri 3/11/05 100%

15 Design Review Mon 2/21/05 Fri 3/11/05 100%

16 Order Mon 3/14/05 Mon 3/21/05 100%

17 Midterm Report Mon 2/28/05 Fri 3/25/05 50%

18 Board 1 Mon 3/21/05 Mon 4/4/05 45%

19 Construct Board Mon 3/21/05 Wed 3/23/05 100%

20 Test Board Thu 3/24/05 Mon 4/4/05 25%

21 Board 2 Mon 4/4/05 Tue 4/26/05 0%

22 Design Modifications Mon 4/4/05 Thu 4/14/05 0%

23 Construct Board Fri 4/15/05 Tue 4/19/05 0%

24 Test Board Wed 4/20/05 Tue 4/26/05 0%

25 Final Report Mon 4/18/05 Wed 4/27/05 0%

26 Midterm Exam Tue 2/22/05 Tue 2/22/05 0%

27 Midterm Report Fri 3/25/05 Fri 3/25/05 0%

28 Final Report Wed 4/27/05 Wed 4/27/05 0%

62%

100%

100%

55%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

50%

45%

100%

25%

0%

0%

0%

0%

0%

2/22

3/25

4/27

9 16 23 30 6 13 20 27 6 13 20 27 3 10 17 24 1 8Jan '05 Feb '05 Mar '05 Apr '05 May '05

Received Parts

Received all parts from DigiKey and Jameco

Received an excess of SMA connectors

All parts accounted for

Received PCB 3 PCBs arrived on time Immediate problem

Ground plane not connected to power connector’s ground

Oops! Problem rectified with an

alligator clip

Building Soldered a transmitter and receiver pair

Short was discovered and unaccounted for Soldered second transmitter

Testing

Bypassed the ground problem with alligator clip

Discovered that the laser is not lasingUsed digital camera to confirm, as well

as red Rx LOS light on GBIC Pattern Generator

Continued testing and debugging will be required to determine the problem

Midterm Report

Draft nearly completedWill be posted to website by 5:00pm

tomorrow

Upcoming Week

Finish ReportContinue Testing and Debugging

in order to determine the problem(s)

Modify schematics and board design accordingly