16
Project FIRST APC Power Electronics Spoke at The University of Nottingham John O’Brien 16 February 2016

Project FIRST - Power ElectronicsProject Motivation High idle fuel burn in the target Euro6 transit bus application Robustness and functionality limitations of current solutions Increasing

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Project FIRST - Power ElectronicsProject Motivation High idle fuel burn in the target Euro6 transit bus application Robustness and functionality limitations of current solutions Increasing

Project FIRST

APC Power Electronics Spoke atThe University of Nottingham

John O’Brien

16 February 2016

Page 2: Project FIRST - Power ElectronicsProject Motivation High idle fuel burn in the target Euro6 transit bus application Robustness and functionality limitations of current solutions Increasing

Introduction

John O’Brien

Technical Advisor, Cummins Research & Technology

Based in Stamford, Lincs.

Manufacturing and Combustion/Emissions background(s)

>10 years experience with engine optimization for and system integration ofvarious types of hybrid and electrification technology

Overall Technical Project Leader for FIRST

2

Page 3: Project FIRST - Power ElectronicsProject Motivation High idle fuel burn in the target Euro6 transit bus application Robustness and functionality limitations of current solutions Increasing

Cummins

A Rich History Rooted in Innovation

Founded in 1919 by Clessie Cummins and W.G. Irwin

Pioneered the development of diesel engines

Promoted diesels as a reliable source of power

3

Page 4: Project FIRST - Power ElectronicsProject Motivation High idle fuel burn in the target Euro6 transit bus application Robustness and functionality limitations of current solutions Increasing

Cummins

Complimentary Businesses

4

PowerGeneration

Components DistributionEngine

EmissionSolutions

TurboTechnologies

Filtration Fuel Systems

Page 5: Project FIRST - Power ElectronicsProject Motivation High idle fuel burn in the target Euro6 transit bus application Robustness and functionality limitations of current solutions Increasing

49 hp

4,400 hp

QSK95QSF2.85

Cummins – Engine Business

Product Range

Page 6: Project FIRST - Power ElectronicsProject Motivation High idle fuel burn in the target Euro6 transit bus application Robustness and functionality limitations of current solutions Increasing

We deliver products and services to worldwide customers

6

v

Cummins – Global Partnerships

Page 7: Project FIRST - Power ElectronicsProject Motivation High idle fuel burn in the target Euro6 transit bus application Robustness and functionality limitations of current solutions Increasing

7

190+Countries

and territories

Develop, designand manufacture

products on

6continents

Cummins Globally

2014 Revenue

$19.2BEmployeesworldwide

55,000

Page 8: Project FIRST - Power ElectronicsProject Motivation High idle fuel burn in the target Euro6 transit bus application Robustness and functionality limitations of current solutions Increasing

EBU Daventry*

DBUWellingborough

EBU ReconCumbernauld

EBU Darlington*CES DarlingtonCBS Stockton

CTT Huddersfield*

CPG Kent

CGTPeterborough/Stamford*

* denotes Tech Centre locationMultiple distributor locations not shown

Cummins in UK

In UK since 1956

~5,500 employees

4 technical centres,multiple manufacturingsites and distributorlocations

8

Page 9: Project FIRST - Power ElectronicsProject Motivation High idle fuel burn in the target Euro6 transit bus application Robustness and functionality limitations of current solutions Increasing

What is FIRST?

9

Frequent, Integrated, Robust, Stop/Start Technology (FIRST)

APC1 funded project, with ~£10M total spend

Consortium Partners

Cummins

Dynex Semiconductor

Castlet Ltd (SME)

University of Nottingham

Page 10: Project FIRST - Power ElectronicsProject Motivation High idle fuel burn in the target Euro6 transit bus application Robustness and functionality limitations of current solutions Increasing

FIRST

Project Motivation

High idle fuel burn in the target Euro6 transit bus application

Robustness and functionality limitationsof current solutions

Increasing base electrical power demand

High cost of traditional hybrid solutions

Technology Trends

– Stop/Start

– Engine Downsizing

10

– Accessory Electrification

– Smart Charging

Page 11: Project FIRST - Power ElectronicsProject Motivation High idle fuel burn in the target Euro6 transit bus application Robustness and functionality limitations of current solutions Increasing

FIRST

Scope – Durability, Cost, Performance

Durability over aggressive duty cycles and long vehicle lifetimes

– Engine, turbocharger and electronics development for durability

Low cost through system rightsizingand integration

– Subsystem development in Motor/Generator,Power Electronics, Energy Storage

– Cooling, packaging and controls integration

– Minimized changes to OEM vehicle interfaces

Additional functionality over conventionalstop/start systems

11

Page 12: Project FIRST - Power ElectronicsProject Motivation High idle fuel burn in the target Euro6 transit bus application Robustness and functionality limitations of current solutions Increasing

FIRST

Power Electronics development

Novel PE topologies, integration, packaging and control strategies

Advanced power module technologies and dynamicrating optimization

Prognostics and lifetimeprediction

High temperature electronics

Lower cost electronics package

12

Page 13: Project FIRST - Power ElectronicsProject Motivation High idle fuel burn in the target Euro6 transit bus application Robustness and functionality limitations of current solutions Increasing

FIRST

Project Benefits

Significant fuel consumption savings

Robustness to high-frequency stop/start over the life of a transit bus

Lower OEM integration cost and effort

Increased electrical power available for vehicle loads

Much lower cost than hybrid systems (target payback < 2 years),enabling widespread adoption

13

Page 14: Project FIRST - Power ElectronicsProject Motivation High idle fuel burn in the target Euro6 transit bus application Robustness and functionality limitations of current solutions Increasing

Benefits of APC support

APC funding and consortium

Connects UK partners that may not have otherwise collaborated

Funding brings “just below the line” activities “above the line”

Allows partners to leverage each others’ experience and expertise

For FIRST, the APC support has allowed usto tap into the expertise of our partners andbring these components together in anintegrated system in a way we had not donebefore.

14

Page 15: Project FIRST - Power ElectronicsProject Motivation High idle fuel burn in the target Euro6 transit bus application Robustness and functionality limitations of current solutions Increasing

Continuing Collaboration

Cummins Innovation Centre

Official Opening March 2012

A World Class Centre of Excellence inthe Research of Electrical MachineTechnology

A 5 year strategic alliance betweenCummins and The University ofNottingham

Led by Prof. Chris Gerada

Co-sponsored by The Royal Academyof Engineering

15

Page 16: Project FIRST - Power ElectronicsProject Motivation High idle fuel burn in the target Euro6 transit bus application Robustness and functionality limitations of current solutions Increasing

Continuing Collaboration

University involvement

Working with UoN provides industry with access to:

– world class expertise and facilities

– top talent

– additional engineering resources

– significant additional funding

This partnership has provided real value to Cummins

Congratulations to The University of Nottingham!

16