ROSEDALE HILLS DRAINAGE IMPROVEMENTS SD-39-062 The Indianapolis Department of Public Works (DPW) continues to transform Indianapolis neighborhoods through the restoration of deteriorating thoroughfares, residential streets, sidewalks and bridges, as well as addressing neighborhood drainage and flooding issues. This investment continues to transform neighborhoods throughout Indianapolis. These projects create local jobs and increase public safety for neighborhoods and residents, which support DPW’s commitment to make Indianapolis a more livable city. PROJECT NUMBER: SD-39-062 PROJECT STATUS: In Design ANTICIPATED CONSTRUCTION PERIOD: Spring 2021 - Spring 2022 (Phase I) EST. CONSTRUCTION COST: $2M - Phase I; Total Project: $6M NEIGHBORHOODS: Rosedale Hills - Phase I, II and III This project will address historic flooding issues in the Rosedale Hills neighborhood, including obstructed ditches, persistent ponding, flash flooding and failing driveway culverts. Proposed improvements may include maintenance of existing ditches, driveway culvert replacement or hybrid ditch and storm sewer installations. Due to its large scope, the project will be split into phases with the first phase expected to get underway in Spring 2021. Phases 2 and 3 will be prioritized with other needs citywide; construction timetables are pending. [email protected] 317-327-2656 • indy.gov/DPW FOR MORE INFORMATION PROJECT DETAILS

PROJECT DETAILS€¦ · PROJECT NUMBER:Hills neighborhood, including obstructed ditches, persistent SD-39-062 PROJECT STATUS: In Design ANTICIPATED CONSTRUCTION PERIOD: Spring 2021

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PROJECT DETAILS€¦ · PROJECT NUMBER:Hills neighborhood, including obstructed ditches, persistent SD-39-062 PROJECT STATUS: In Design ANTICIPATED CONSTRUCTION PERIOD: Spring 2021

ROSEDALE HILLS DRAINAGE IMPROVEMENTS • SD-39-062

The Indianapolis Department of Public Works (DPW) continues to transform Indianapolis neighborhoods through the restoration of deteriorating thoroughfares, residential streets, sidewalks and bridges, as well as addressing neighborhood drainage and flooding issues. This investment continues to transform neighborhoods throughout Indianapolis.

These projects create local jobs and increase public safety for neighborhoods and residents, which support DPW’s commitment to make Indianapolis a more livable city.

PROJECT NUMBER: SD-39-062 PROJECT STATUS: In DesignANTICIPATED CONSTRUCTION PERIOD: Spring 2021 - Spring 2022 (Phase I) EST. CONSTRUCTION COST: $2M - Phase I; Total Project: $6MNEIGHBORHOODS: Rosedale Hills - Phase I, II and III

This project will address historic flooding issues in the Rosedale Hills neighborhood, including obstructed ditches, persistent ponding, flash flooding and failing driveway culverts. Proposed improvements may include maintenance of existing ditches, driveway culvert replacement or hybrid ditch and storm sewer installations. Due to its large scope, the project will be split into phases with the first phase expected to get underway in Spring 2021. Phases 2 and 3 will be prioritized with other needs citywide; construction timetables are pending.

[email protected] • indy.gov/DPW

FOR MORE INFORMATION

PROJECT DETAILS

Page 2: PROJECT DETAILS€¦ · PROJECT NUMBER:Hills neighborhood, including obstructed ditches, persistent SD-39-062 PROJECT STATUS: In Design ANTICIPATED CONSTRUCTION PERIOD: Spring 2021

Keep the Stormwater Clean and Flowing!

Keep ditches free of high grasses and debris.

Clear away any leaves from storm drains.

Only rain belongsin the storm drain.

Mow grass to 8 inches or less.

Remove trash andlitter blockingstormwater inlets.

HOMEOWNER RESPONSIBILITIES

Pick up after pets.

Maintain cleanand clear culverts.

The stormwater system ends in our waterways.Let’s keep it clean and draining quickly!