BEC Group of Companies c/o 18 Boon Lay Way TradeHub 21 Singapore 609966 Tel: +(65) 6778 6858 Website: www.be-con.com Email: [email protected] Cert No: QS - 2009 - 14 Member of the IAF MLA for QMS Owner Shell Eastern Petroleum Pte Ltd Chimney EPC Contractor Balanced Engineering & Construction Pte Ltd CASE STUDY SULPHUR RECOVERY UNIT PROJECT CHIMNEY DESIGN AND BUILD Shell Eastern Petroleum Pte Ltd was building a Sulphur Recovery Unit on Shell’s Pulau Bukom Refinery. Plant Engineering Construction Pte Ltd was the main contractor for the project. Project Participants Sulphur Recovery Unit Project The world is increasingly dominated by high-sulphur, heavier crudes and a changing product mix with tighter product specifications and more stringent environmental regulations. Refiners are therefore required to adjust their sulphur management strategies, introduce new sulphur recovery solutions and upgrade existing refineries. Effective sulphur recovery is a vital tool for optimising environmental performance in refinery operations. Shell has provided high-level sulphur recovery unit (SRU) designs for many years based on the Shell Claus Off-gas Treating (SCOT) system. The SCOT process allows conversion of over 99.9% of the sulphur compounds fed to the SRU to elemental sulphur. New features in the SCOT process allow it to consume less energy through better catalytic systems and to treat lower concentrations of hydrogen sulphide in the treated gas. Detail of work by BEC BEC was involved in the Design & Build of the chimney, including piling, pilecap, slipform, heavy lifting of roof, floors and flues, installation of internal rack and pinion hoist, AWL’s, internal lighting, lightning conductor, earthing works. Challenges Extremely limited space available for the construction of this stack inside the live SRU refinery area Considerable coordination with refinery operations to ensure no delays or stoppages to the live refinery Specialised construction techniques involved to construct this chimney inside the live refinery area SULPHUR RECOVERY PLANT #10-159/162 Fax: +(65) 6690 9259 Lining System A517 GR70

Project CHIMNEY DESIGN AND BUILD Participants · Shell Eastern Petroleum Pte Ltd was building a Sulphur Recovery Unit on Shell’s Pulau ... BEC was involved in the Design & Build

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Project CHIMNEY DESIGN AND BUILD Participants · Shell Eastern Petroleum Pte Ltd was building a Sulphur Recovery Unit on Shell’s Pulau ... BEC was involved in the Design & Build

BEC Group of Companiesc/o 18 Boon Lay Way

TradeHub 21Singapore 609966

Tel: +(65) 6778 6858

Website: www.be-con.comEmail: [email protected]

Cert No: QS - 2009 - 14

Member of the IAF MLA for QMS

Owner

Shell Eastern Petroleum Pte Ltd

Chimney EPC Contractor

Balanced Engineering & Construction Pte Ltd

CASE STUDY SULPHUR RECOVERY

UNIT PROJECT

CHIMNEY DESIGN AND BUILD

Shell Eastern Petroleum Pte Ltd was building a Sulphur Recovery Unit on Shell’s Pulau Bukom Refinery. Plant Engineering Construction Pte Ltd was the main contractor for the project.

ProjectParticipants

Sulphur Recovery Unit ProjectThe world is increasingly dominated by high-sulphur, heavier crudes and a changing product mix with tighter product specifications and more stringent environmental regulations. Refiners are therefore required to adjust their sulphur management strategies, introduce new sulphur recovery solutions and upgrade existing refineries. Effective sulphur recovery is a vital tool for optimising environmental performance in refinery operations. Shell has provided high-level sulphur recovery unit (SRU) designs for many years based on the Shell Claus Off-gas Treating (SCOT) system. The SCOT process allows conversion of over 99.9% of the sulphur compounds fed to the SRU to elemental sulphur. New features in the SCOT process allow it to consume less energy through better catalytic systems and to treat lower concentrations of hydrogen sulphide in the treated gas.

Detail of work by BECBEC was involved in the Design & Build of the chimney, including piling, pilecap, slipform, heavy lifting of roof, floors and flues, installation of internal rack and pinion hoist, AWL’s, internal lighting, lightning conductor, earthing works.

Challenges• Extremely limited space available for the construction of this stack inside the live SRU refinery area • Considerable coordination with refinery operations to ensure no delays or stoppages to the live refinery • Specialised construction techniques involved to construct this chimney inside the live refinery area

SU

LPH

UR

RE

CO

VE

RY

PLA

NT

#10-159/162 Fax: +(65) 6690 9259

Lining System

A517 GR70

Page 2: Project CHIMNEY DESIGN AND BUILD Participants · Shell Eastern Petroleum Pte Ltd was building a Sulphur Recovery Unit on Shell’s Pulau ... BEC was involved in the Design & Build

SRU stack elevation

100m

3

3

1.05m

6.3m – 6.0m

24 Nos. x 356 x 356 x 134kg/m

10.1m x 2.0m deep

Chimney data:

Height

No. of internal steel flues

No. of internal platforms

Diameter of internal flues

External concrete diameter

Piles

Pile cap

Completed chimney Slip forming rig assembly

Slip forming in progress Chimney construction in progress

Installing and hanging the first liner can

5.00 PBDL

8.80

EXPANSION JOINT ONOUTSIDE BY OTHERS

20.0m

+50.00

4 NO.– 1000 X 1000 AWL OPENINGS

+61.00

16 NO. 500 WIDE X 2000 HIGH LOUVRED VENTILATION OPENINGS

97.50

104.00

AIRCRAFT WARNING LIGHT

INTE

RNAL

DIA

MET

ER

WAL

L TH

ICKN

ESS

EXTE

RNAL

DIA

MET

ER

250

Ø600

0

VARI

ES 4

00 –

250

AT

5mm

/m O

N O

UTSI

DE F

ACE

VARI

ES Ø

6300

– Ø

6000

400

Ø630

0

3800

C

2900 X 3800 LOUVRED ACCESS OPENING

Ø550

0

2900