Construction of Pantai 2 Sewage Treatment Plant, Federal Territory of Kuala Lumpur (Design & Build)
Presentation by BEWG (M) Sdn. Bhd.
Project Briefing Contract no: KeTTHA / JPP / RMK10 / 11 / K2
P2STP Half Day Seminar 2013
Presenter Background
2
Mohd Subuki bin Fadzil joined BEWG as Chief Technical Officer.
He obtained his Bachelor of Engineering in Civil Engineering from the
University of Salford, United Kingdom.
Mohd Subuki Fadzil has more than 23 years experience
in civil engineering works especially in water related industry
such as Water Treatment Plant, Waste Water Treatment Plant and
River Beautification Works.
Presenter Background
3
Mohd Subuki Fadzil has served several established organizations such as;
- Public Work Department (JKR) under Water Supply Division.
- Antah-Biwater Shellabear Sdn. Bhd., a Turnkey Contractor for Rural Water
Supply Scheme throughout Malaysia.
- Puncak Niaga Holding Bhd., as Project Manager undertaking the
construction of Sungai Selangor Water Supply Scheme and Distribution
Network in Selangor and Wilayah Persekutuan.
- WWE Holding Bhd., as an Executive Director and Project Director for
Jelutong Sewage Treatment Plant, Penang (biggest SBR Sewage
Treatment Plant in Malaysia with a capacity of 1.2 million P.E.).
- Ewaan Global Company Ltd., as a Senior Project Manager for Saudi
Company developing 4 million m2 of land in Jeddah and Riyadh.
Catchment Areas & Regional Plants
4
LOWER
KERAYONG
Sewerage Catchments & Regional Plants Within DBKL
Proposed Pantai 2 STP (1.4 Mil. P.E.)
Kuala Lumpur Jurisdiction
Pantai Catchment Area
Pantai STP
Pantai 1 STP (0.4 Mil. P.E.)
Government of Malaysia
Ministry of Energy, Green Technology & Water (KeTTHA)
Sewerage Service Department (JPP)
BEWG (M) Sdn. Bhd.
M&E
SMHB Sdn. Bhd.
Planner SS Planning & Consul t
TIA Runding Trafik
MZK Sdn. Bhd.
Project Management Consulting Agreement
Project Management
Process Design
BEWG
HQ
BEWG Limited Novation
Agreement
QS Perunding NFL Sdn. Bhd.
C&S, Geotechnical Engineering and Environmental
Consultants Sdn. Bhd.
Dilapidation
P-CON Building
Surveyors
Sdn. Bhd.
Landscape
PTA Design
Sdn. Bhd.
EIA ASMA Environmental Consultancy Sdn. Bhd.
Comm. Plan Silver Kreatif
Sdn. Bhd.
Contractual rel ationshi ps
Functional relationship
Licensed
Surveyor
GeoDatum Survey
Quality
Professional &
Excellent Sdn.Bhd.
HAZOP
ERM
Sub-
Consultant
SMEDRIC
Architect Kuek Wee Chien
Architect
Kumpulan Ikhtisas
Projek (M) Sdn Bhd –
MECIP (M) Sdn Bhd JV
GBI Facilitator Prudenergy Sdn Bhd
3
Major Stakeholders
Project Particular
Project Title
Construction of Pantai 2 Sewage Treatment Plant, Federal Territory of Kuala Lumpur (Design & Build)
Owner The Ministry of Energy, Green Technology & Water (KeTTHA)
Implementing Agency Sewerage Services Department (JPP)
Project Management Consultant Kumpulan Iktisas Projek (M) Sdn. Bhd. – MECIP (M) Sdn. Bhd. JV (KI-MECIP JV)
Design & Build Contractor Beijing Enterprises Water Group Limited (BEWG)
Plant Capacity 1,423,000 PE
Treatment System Advance A2O Biological Treatment System (Liquid Stream) with Mesophilic Anaerobic Digester (Solid Stream)
Contract Cost
Date Letter of Acceptance 4th July 2011
Date of Site Possession 28th July 2011
Overall Contract Period Six (6) years
Construction Period Four (4) years
Operation and Maintenance (O&M) for The Treatment Plant
Two (2) years from date of completion of STP
Overall Completion Date 27th July 2017
Project Background
Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7
Detailed Design
Temporary Treatment Facilities
STP Construction & Installation (Underground
Structure)
STP Construction & Installation (Aboveground
Structure)
Construction of the Facilities
O&M and DLP of the Plant/STP
Defect Maintenance & DLP of the Facilities
• CPC = Certificate of Practical Completion
• DLP = Defect Liability Period • STP = Sewage Treatment Plant • O&M = Operation & Maintenance
2011 2012 2013 2014 2015 2016 2017 2018
CPC
Project Schedule
27/1/2015 (flow in)
To improve treatment efficiency
Optimization of land use
Green Technology Application
To reduce pollution due to direct discharge
to river/sea
Objectives
1 Site Preparation Works
Decommissioning existing aerated lagoon with Desludging
Site preparation
Earthworks
Excavation Works (deep excavation)
2 Construct & operate the Temporary Treatment Facility (TTF)
3 Geotechnical & Piling Works
Scope of Works
Layout Plan
4 Process Operation Works
“Equipment installation at Inlet Pump Station Pantai 1”
“Preliminary Treatment”
“Balancing Tank”
“Advance A2O Tank”
“Clarifier”
“Sludge Holding Tank”
“Sludge Thickener & Dewatering”
“Sludge Anaerobic Digester with Biogas System”
“Gas Storage Tanks”
“Odour Removal System”
“Temporary Sludge Storage Facility”
“Instrumentation System”
“SCADA System”
Scope of Works
5 Infrastructure Works
Road & Drainage works
Water supply system
Sewerage system
Fencing
Landscape works
R.C. utility drainage
Scope of Works
6 Building Works
Transportation Depot
TNB Substation & Power house
Guardhouse
Garbage Collection Centre
7 Mechanical & Electrical Works, Building & Infrastructure
Electrical Infrastructure
External Fire Protection System
Scope of Works
8 “The Facilities”
Football Field
Basketball Court
Sepak Takraw Court
Futsal Court
Badminton Court
Jogging Track & Training Station
Playground
Multipurpose/Community Hall
Landscape
Scope of Works
9 Testing & Commissioning
10 Operation & Maintenance
Plant Operation & Maintenance
The Facilities Operation will be implemented by IWK Sdn. Bhd. for 2 years during the DLP period
Scope of Works
Flow Diagram – Advanced Process A2O
Preliminary Treatment
Advanced A2O Bio-Reator
Clarifier Disinfection
Influent of
Sewage
Treated
Effluent Sludge Treatment
ADVANTAGES OF ADVANCED A20
Able to treat and produce better effluent
quality
High efficiency in removing
nitrogen and phosphorus during the treatment process
The Operation System is
more stable
Minimum waste sludge
production
Small footprint
Minimum investment &
operation cost
Advanced A2O
Anaerobic Zone
Anoxic Zone
Aerobic Zone
Influent of Sewage
Treated Effluent
(Standard A)
Return Activated Sludge (RAS)
Nitrates Recycle
Anoxic Recycle
Waste Sludge
Bioreactor consists of : - Anaerobic Zone (A) – Anoxic Zone (A) – Aerobic Zone (O) - Can achieve BOD, Nitrogen, Phosphorus removal
Clarifier
Advanced A2O
Photographs – completed work - Contiguous Bored Piles
Photographs – completed work - Jet Grouting Columns
Photographs – work in progress - Soil Nail, & Shotcrete
Photographs – work in progress - Ground Anchor
Photographs – work in progress - Excavation
Photographs – work in progress - Clarifier Base Slab
Photographs – work in progress - Anti Flotation Anchor
Green Technology
27
No. Description Remark
(Savings)
1. Biogas – Combined Heat & Power
(CHP)
0.7 MW Power Generated
( ≡ 3,000 houses )
2. Recycled Treated Effluent
(Effluent Reuse)
2,000 m3/ day
( ≡ 5,000 houses –
non-potable)
3. Wastewater Source Heat Pump 1,200 kW (cooling load)
( ≡ 400 houses )
4. Rainwater Harvesting 80 m3 / day
( ≡ 200 houses – flushing )
5. Solar Panel 200 kW
( ≡ 300 houses )
6. Aquatic Skylight + Skylight (300m + 200m) x 6m
( ≡ 30 kW - daytime)
Photographs – Aerial View
August 2011
November 2012
Photographs – Aerial View
August 2013
Photographs – Aerial View - Existing STP & Aerated lagoon
Future View of P2STP
Cross-Section View
Admin Building & Community Center
Admin Building for STP
Main function of the building is to house the personnel and support activities that facilitate / support daily operation of the plant & green education.
-- Administrative area
-- Laboratories
-- Auditorium & seminar rooms
-- Exhibition area
Community Centre
Kindergarten for the neighbourhood & multi-purpose hall for wedding receptions, meetings and other functions.
- - The reception / Information counter,
- - Management office,
- - Cafeteria
- - Surau
- - Kindergarten
Outdoor Facilities
Basketball Court
Tennis Court
Jogging Track
Volleyball Court
Futsal Court Football
Field
Sepak Takraw Court
Children’s Playground
35