5th BEPCII IMAC Meeting - 1 - May 10 - 12, 2007 Progress of BEPCII Storage Ring Construction Ma Li May 10, 2007

Progress of BEPCII Storage Ring Construction

  • Upload
    uri

  • View
    47

  • Download
    1

Embed Size (px)

DESCRIPTION

Progress of BEPCII Storage Ring Construction. Ma Li May 10, 2007. Design goal of BEPCII. The BEPCII serves the purposes of both high energy physics experiments and synchrotron radiation applications. Main Parameters of BEPCII. N. Layout of BEPCII. SC cavities. SC IR magnets. BESIII. - PowerPoint PPT Presentation

Citation preview

Page 1: Progress of BEPCII Storage Ring Construction

5th BEPCII IMAC Meeting - 1 - May 10 - 12, 2007

Progress of BEPCII Storage Ring Construction

Ma Li

May 10, 2007

Page 2: Progress of BEPCII Storage Ring Construction

5th BEPCII IMAC Meeting - 2 - May 10 - 12, 2007

The BEPCII serves the purposes of both high energy physics experiments and synchrotron radiation applications.

Design goal of BEPCII

Page 3: Progress of BEPCII Storage Ring Construction

5th BEPCII IMAC Meeting - 3 - May 10 - 12, 2007

Main Parameters of BEPCII

Page 4: Progress of BEPCII Storage Ring Construction

5th BEPCII IMAC Meeting - 4 - May 10 - 12, 2007

Layout of BEPCII

N

SC cavities

e+ inj. point e inj. point

SC IR magnets BESIII

Page 5: Progress of BEPCII Storage Ring Construction

5th BEPCII IMAC Meeting - 5 - May 10 - 12, 2007

Goal and schedule of ring in 2006/2007 Goal of 2006

– Complete the installation of all equipments (except superconducting IR magnets)

– Try to start the SR user operation

Scheduleplan achieved

2006/03/02 start installation of storage ring

2006/10/10 2006/11/12 start outer ring commissioning (backup scheme)

2006/11/09 2006/11/25 start SR beam line commissioning and user operation

2006/12/29 2007/02/06 start commissioning e ring

2007/01/26 2007/03/03 start commissioning e ring

2007/03/25 first beam collision (backup scheme)

2007/06/15 start SR user operation (backup scheme)

2007/02/23 2007/08/01 SCQs move into the IR (about 5-month delay)

2007/04/01 start commissioning e ring with SCQ

2007/04/21 start commissioning e ring with SCQ

2007/05/11 start commissioning for collision mode

Page 6: Progress of BEPCII Storage Ring Construction

5th BEPCII IMAC Meeting - 6 - May 10 - 12, 2007

Main tasks of the ring systems

Magnet 300-plus dipoles, quads, sextupols, correctors

Vacuum 200-plus chambers, 175 photon absorbers, 150 bellows …

Align & Install 84 pre-assembly magnet rafts, survey and align, install …

RF 2 SC cavities and PS, LLRF

IR 2 SC IR magnets, 10 special magnets, IR chamber …

AP lattice design, high-level software, beam instability study …

PS 300-plus PS, magnet coil temperature monitor …

Injection 4 injection kickers and PS

Control PSC/PSI, network, timing, database, software develop …

Instrumentation 138 BPM, DCCT, BCM, BLM, tune meter, TBF …

Pay more attention to critical paths

Page 7: Progress of BEPCII Storage Ring Construction

5th BEPCII IMAC Meeting - 7 - May 10 - 12, 2007

Critical path 1: Pre-assembly and installation

2006/02/end Complete all 80 arc chambers, including correction of 20 distorted chambers.2006/03/02 Start installation of the first magnet raft in the ring tunnel. Only 31 of 84 rafts (37%) had been completed at the time. According to schedule, 2 rafts have to be completed in 5 days. No weekend and holidays.2006/07/18 Start PS test and combined commissioning with magnets and control, in parallel with installation.2006/08/21 Complete TiN coating of 70 positron beam pipes

2006/09/10 Complete installation of last magnet raft in the ring tunnel

2006/10/29 Complete installation of all chambers and vacuum components

2006/11/09 Complete fine alignment of the ring magnets

2006/11/12 Start ring commissioning

Page 8: Progress of BEPCII Storage Ring Construction

5th BEPCII IMAC Meeting - 8 - May 10 - 12, 2007

Pre-assembly and pre-alignment

Page 9: Progress of BEPCII Storage Ring Construction

5th BEPCII IMAC Meeting - 9 - May 10 - 12, 2007

Alignment in the tunnel

Page 10: Progress of BEPCII Storage Ring Construction

5th BEPCII IMAC Meeting - 10 - May 10 - 12, 2007

Installation of vacuum components

Page 11: Progress of BEPCII Storage Ring Construction

5th BEPCII IMAC Meeting - 11 - May 10 - 12, 2007

Page 12: Progress of BEPCII Storage Ring Construction

5th BEPCII IMAC Meeting - 12 - May 10 - 12, 2007

Installation of magnet rafts

Page 13: Progress of BEPCII Storage Ring Construction

5th BEPCII IMAC Meeting - 13 - May 10 - 12, 2007

2006/03/26 East SC cavity assembly completed

2006/04/28 West SC cavity assembly completed

2006/06/30 Q0 of east SC cavity reached to 5.5×108 @2MV (design goal is 5×108)

2006/07/31 East SC cavity positioned and aligned in the ring tunnel

2006/08/26 Q0 of west SC cavity reached to 9.9×108 @2MV

2006/09/07 West SC cavity positioned and aligned in the ring tunnel

2006/10/29 East SC cavity conditioned to 1.5MV, in parallel with installation

2006/10/31 West SC cavity conditioned to 1.5MV, in parallel with installation

2006/11/04 Commissioning of east SC RF system completed and ready for beam

2006/11/12 Start ring commissioning

2007/02/26 West SC cavity put into operation with beam

S.Kurokawa, K.Hosoyama, T.Furuya, K.Akai, S.Mitsunobu of KEK came here many times during test and commissioning of SC cavities. Thanks a lot.

Critical path 2: superconducting RF system

Page 14: Progress of BEPCII Storage Ring Construction

5th BEPCII IMAC Meeting - 14 - May 10 - 12, 2007

Assembly and tunnel installation of superconducting cavity

Page 15: Progress of BEPCII Storage Ring Construction

5th BEPCII IMAC Meeting - 15 - May 10 - 12, 2007

LLRF installation and commissioning

Page 16: Progress of BEPCII Storage Ring Construction

5th BEPCII IMAC Meeting - 16 - May 10 - 12, 2007

Horizontal high power test of east superconducting cavity

Page 17: Progress of BEPCII Storage Ring Construction

5th BEPCII IMAC Meeting - 17 - May 10 - 12, 2007

2006/06/21 Q1a, Q1b, ISPB, Q2, Q3 passed acceptance test

2006/08/18 Two superconducting IR magnets cooled-down

2006/08/end Two superconducting IR magnets and PS, quench protection system tested.

The magnets are powered with 20-50% rated current.

PS and quench protection system showed a good performance.

Valve-box and current leads have to be modified.

2-Q and 1-B backup scheme was proposed to replace 2-B scheme.

2006/09/29 Two superconducting IR magnets moved out off the ring

2006/10/begin BPM welding on the OFHC IR chambers had some troubles.

Decide to fabricate substitutions of stainless steel chambers

for OFHC chambers.

2006/10/26 Complete fabrication of stainless steel IR chambers

2006/10/29 Complete installation of IR chambers and vacuum pumps

2006/11/05 Complete cable connections and chamber baking

2006/11/10 Complete combined commissioning of IR magnets, PS and control systems

2006/11/12 Start ring commissioning

Critical path 3: IR magnets and chambers

Page 18: Progress of BEPCII Storage Ring Construction

5th BEPCII IMAC Meeting - 18 - May 10 - 12, 2007

Installation superconducting IR magnets and valve-box

Page 19: Progress of BEPCII Storage Ring Construction

5th BEPCII IMAC Meeting - 19 - May 10 - 12, 2007

Horizontal test of superconducting IR magnets

Page 20: Progress of BEPCII Storage Ring Construction

5th BEPCII IMAC Meeting - 20 - May 10 - 12, 2007

Backup scheme with 2 dipoles (April, 2006)

With this 2-dipole backup scheme, the collision mode cannot be commissioned.

Page 21: Progress of BEPCII Storage Ring Construction

5th BEPCII IMAC Meeting - 21 - May 10 - 12, 2007

原有

2700X970X628(支架长X宽X )高 2700X970X628(支架长X宽X )高 1800X1200(长X )宽

西

原有

批准

R0版本号

A0

图 幅

审核

计算机文件名

设计编号 更改单 修改 更 改 内 容 日 期

中国科学院高能物理研究所 I HEP-BEPCI I

共 张

比 例1: 15

未注公差的尺寸

重 量

第 张

数 量对撞区设备布置图

1序号

2

绘 图

批 准

审 核 校 核

审 定 会 签

设 计

13 (GB1804-79)按 级公差 制造

绘图软件名AutoCAD2004

谱仪中心轴

2. 7长 M支架中心线

图 号 名 称 数量 备 注材料 总重12345

9876

141312

1011

序号

1800X1200(长X )宽

谱仪轨道钢板 谱仪轨道钢板

2对撞区代用方案

李春华

21

-对撞区总体 lch

R4 R3

束流中心

水泥支撑台 水泥支撑台

16171819

15

202122232425

ISPBQ1aQ1b ISPB Q1a Q1b

26

单重

I P对撞点

小B铁160Q 160Q

I P对撞点

BEPC magnet supports are used to saving time and cost

Change scheme with 2 quads and 1 dipole (September, 2006)

Page 22: Progress of BEPCII Storage Ring Construction

5th BEPCII IMAC Meeting - 22 - May 10 - 12, 2007

Installation of IR components

Page 23: Progress of BEPCII Storage Ring Construction

5th BEPCII IMAC Meeting - 23 - May 10 - 12, 2007

Systems not on the critical path

AP lattice design, high-level software, beam instability study …

Power Supply 300-plus PS, magnet coil temperature monitor …

Injection 4 injection kickers and PS

Control PSC/PSI, network, timing, database, software develop …

Instrumentation 138 BPM, DCCT, BCM, BLM, tune meter, TBF …

All efforts have been made to prevent these systems from becoming a new critical path.

Page 24: Progress of BEPCII Storage Ring Construction

5th BEPCII IMAC Meeting - 24 - May 10 - 12, 2007

impedance measurement solenoid for suppressing ECI

Page 25: Progress of BEPCII Storage Ring Construction

5th BEPCII IMAC Meeting - 25 - May 10 - 12, 2007

Commissioning and test of the magnet PS

Page 26: Progress of BEPCII Storage Ring Construction

5th BEPCII IMAC Meeting - 26 - May 10 - 12, 2007

Injection kickers and PS

Page 27: Progress of BEPCII Storage Ring Construction

5th BEPCII IMAC Meeting - 27 - May 10 - 12, 2007

Installation and commissioning of PS control system

Page 28: Progress of BEPCII Storage Ring Construction

5th BEPCII IMAC Meeting - 28 - May 10 - 12, 2007

Center control room

Page 29: Progress of BEPCII Storage Ring Construction

5th BEPCII IMAC Meeting - 29 - May 10 - 12, 2007

BPM

Page 30: Progress of BEPCII Storage Ring Construction

5th BEPCII IMAC Meeting - 30 - May 10 - 12, 2007

Synchrotron light monitor

Page 31: Progress of BEPCII Storage Ring Construction

5th BEPCII IMAC Meeting - 31 - May 10 - 12, 2007

Transverse beam feedback system

Page 32: Progress of BEPCII Storage Ring Construction

5th BEPCII IMAC Meeting - 32 - May 10 - 12, 2007

Step-by-step inspection performed before the commissioning

开机后发现仍然有差错– 内、外环电源搞错– 磁铁极性接反– 部分磁铁线包有短路

经验:不同人员反复检查

Page 33: Progress of BEPCII Storage Ring Construction

5th BEPCII IMAC Meeting - 33 - May 10 - 12, 2007

Milestone of ring commissioning2006/09/22 First meeting of the Ring Commissioning Group led by Jiuqing Wang

2006/11/12 Start ring commissioning

2006/11/18 First e beam storage in outer ring (SR ring)

2006/12/25 Start SR user operation

2007/02/02 Stop SR user operation

2007/02/09 First beam storage in e ring

2007/02/18 Spring Festival (7-day holiday)

2007/03/04 First beam storage in e ring

2007/03/25 First trial of beam collision at 6mA×6mA

2007/04/10 150mA ebeam current reached

2007/04/21 100mA ebeam current reached

Jiuqing will give detailed descriptions for the ring commissioning.

Page 34: Progress of BEPCII Storage Ring Construction

5th BEPCII IMAC Meeting - 34 - May 10 - 12, 2007

Equipment failures and problems 2007/1/2, 2007/4/26 and 2007/5/9, three primary windings of 10kV rectifier tran

sformer of ring main dipole magnet PS had broke down, respectively. There are 8 transformers, with 3 such windings each. It is quality problem.

2007/1/6, compressor of cryogenic system shut down due to power line failure, causing superconducting RF cavity warmed up to 40K. It was recovered 26 hours after.

2007/1/7, compressor of cryogenic system shut down due to water-cooling problem. It was recovered 20 hours after.

2007/2/11, cryogenic system failure, causing superconducting RF cavity warm up to 20K. It was recovered 17 hours after.

2007/2/13, compressor of cryogenic system shut down due to a misoperation. It was recovered 8 hours after.

2007/1/30, a quench happened during conditioning of east cavity. Pressure in cryostat up to 1.26bara threshold due to quench protection system was not functioned in 10ms, causing the safety valve opened. It was recovered 21 hours after.

During commissioning, RF trip frequently occurred by vacuum, arc, quench, klystron pump PS, and sometimes noise, 2-3 times per day on average.

Sometimes beam loss happened during the energy ramping from 1.89GeV to 2.5GeV.

Page 35: Progress of BEPCII Storage Ring Construction

5th BEPCII IMAC Meeting - 35 - May 10 - 12, 2007

Main tasks of ring in 2007 Hardware

– IR chambers (3 types of SCQ, Y-shape and ISPB chambers)

– Superconducting IR magnets (high power test, field measurement, installation)

– 14 fixed and 2 movable masks

Commissioning and operation

– Collision mode (backup scheme)

– One-month SR operation, beam lifetime 8-10 hours @150mA/2.5GeV

– Collision mode with superconducting IR magnets

Page 36: Progress of BEPCII Storage Ring Construction

5th BEPCII IMAC Meeting - 36 - May 10 - 12, 2007

Schedule of IR

2007/04/30-2007/05/10 SCQ and SSM cool-down2007/05/11-2007/06/03 cryogenic system commissioning and SCQ high power test2007/06/04-2007/07/31 SCQ field measurement with SSM2007/08/01-2007/08/22 move SCQ into IR2007/08/23-2007/09/21 SCQ field measurement in IR without detector2007/09/22-2007/10/10 install IR components

2007/10/11-2008/02/09 commissioning (4 months)2008/02/10-2008/03/20 SR user operation2008/03/21-2008/05/07 move BESIII detector into IR2008/05/08-2008/06/22 BESIII tuning2008/06/23-2008/12/31 BESIII physics operation

Page 37: Progress of BEPCII Storage Ring Construction

5th BEPCII IMAC Meeting - 37 - May 10 - 12, 2007

Modification of SC IR magnet valve-box and current leads

Page 38: Progress of BEPCII Storage Ring Construction

5th BEPCII IMAC Meeting - 38 - May 10 - 12, 2007

Superconducting IR magnets are ready for field measurement

Page 39: Progress of BEPCII Storage Ring Construction

5th BEPCII IMAC Meeting - 39 - May 10 - 12, 2007

SCQ chamber Y-shape

ISPB chamber

Page 40: Progress of BEPCII Storage Ring Construction

5th BEPCII IMAC Meeting - 40 - May 10 - 12, 2007

Open questions

When is the suitable time for installation of background masks?

The east superconducting cavity shows a different performance during commissioning of e ring. What is the reason?

Whether the phase-lock loop between master oscillators of the injector linac and the rings is necessary?

Page 41: Progress of BEPCII Storage Ring Construction

5th BEPCII IMAC Meeting - 41 - May 10 - 12, 2007

Summary

A big progress for the construction and commissioning of the BEPCII storage rings has been made since last IMAC meeting.

It took about 16 months to complete the installation of BEPCII rings (except the superconducting IR magnets and IR chambers) after the BEPC ring shut-down in July 4, 2005.

Commissioning of the BEPCII (with backup scheme) started in mid November 2006. It is useful for us to gain experience for the future commissioning with superconducting IR magnets.

Although there are some problems, basic equipments and devices of ring systems show a good performance during the half-year commissioning and operation.

The final test of the superconducting IR magnets with modified valve-box and current leads is in progress. Success of the test is very important to reach the goal of the BEPCII project in time.

Page 42: Progress of BEPCII Storage Ring Construction

5th BEPCII IMAC Meeting - 42 - May 10 - 12, 2007

Thank you for attentions !