Programming in BIM environment 1
Taija Puolitaival, Department of Construction, Unitec
Construction Sequence simulation using Navisworks
4DBIM, Construction Programme
Taija Puolitaival, Department of Construction, Unitec
BIM dimensions(BIMporn, 2013)
Taija Puolitaival, Department of Construction, Unitec
Quantity take-off from 2D paper documents PDF http://www.youtube.com/watch?v=WjuFEflSf9M AutoCAD
http://www.youtube.com/watch?v=kC9W0LTYwCM BIM (part of 5D BIM)
http://www.youtube.com/watch?v=M_7wTpfkbqQ Many software options
Quantity take-off options inside the software
Quantity take –off
1. Determine the work activities = WBS2. Determine activities duration (Quantities +
Rawlinsons)3. Determine activities relationships =
dependencies & lags Finish to Start Start to Start Start to Finish
4. Review and analyse the programme5. Cost/resource allocation6. Resource levelling7. Implement the programme8. Monitor and control the programme9. Revise the database and record feedback
Programming steps
(adapted from Mubarak 2010)Taija Puolitaival, Department of Construction, Unitec 2014
WBS / Programme Distinction
WBS Comprehensive
classification of project scope
Contains no activity duration
No resource assignments
No dependencies
Programme Actual work to be
done (only the activities on the last level of the WBS)
Contains activity durations
Contains assignment of resources to activities
Contains dependencies Taija Puolitaival, Department of Construction, Unitec 2014
Quantity Take-off
Construction manager’s point of view - order of the activities- right size activities
how to build the building
vs.
Quantity surveyor’s point of view- what is the total amount of quantities
how much does it cost to build the building
Taija Puolitaival, Department of Construction, Unitec 2014
1. Nature of the work/homogeneity2. Location/floor3. Size/duration4. Timing/chronology5. Responsibility6. Others
= programmer’s mentality in breaking down the project
(Mubarak 2010)
determining of work activitiesthings to be considered
Taija Puolitaival, Department of Construction, Unitec 2014
BIMporn (March 25, 2013). [Web log]. Retrieved from http://bimporn.tumblr.com/
DSG Quantity Surveyors (2013). DSG Quantity Take 0ff - Tutorial [Video]. Retrieved from http://www.youtube.com/watch?v=M_7wTpfkbqQ
Mubarak, S. (2010). Scheduling and control (2nd ed.). Hoboken, New Jersey: John Wiley & Sons
Patterson, G. (2009). Autodesk QTO 2010 - #2 Working With .pdf Files [Video]. Ideate Inc. Retrieved from http://www.youtube.com/watch?v=WjuFEflSf9M
Sell, C. (2013). CM492 - Autodesk Quantity Takeoff 2013 [Video]. Retrieved from http://www.youtube.com/watch?v=kC9W0LTYwCM