42
Nomor & Periode Invoice : No. 32 Periode (Maret 2018) Realisasi Invoice : 25 April 2018 Nomor Loan : IBRD Loan No. 8636-ID Nama Konsultan : PT. Ganes Engineering Consultant, JO PT. Arss Baru Paket Pekerjaan : Oversight Service Provider Regional Management Paket 5 (Central Java & D.I Yogyakarta) Nomor & Tanggal Kontrak : HK.02.03/OSP-5/IBRD/SATKER-PKP/019/2014 - IBRD Ln.8213-IND Periode Kontrak : 09 Oktober 2014 s/d 30 Juni 2018 NO KOMPOSISI BIAYA AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAK I REMUNERATION ( SUB TOTAL I ) 22.365.127.192 21.049.021.163 296.465.804 21.345.486.967 1.019.640.225 1.1 PROFESSIONAL STAFF 16.109.305.195 15.167.220.518 205.232.143 15.372.452.660 736.852.535 1.2 SUPPORTING STAFF 4.695.464.286 4.413.264.286 70.550.000 4.483.814.286 211.650.000 Fee [……….% x [ 1.1+1.2 ]] II DIRECT REIMBURSABLE COST ( SUB TOTAL II ) 13.042.203.756 11.238.974.951 203.018.000 11.441.992.951 1.600.210.805 2.1 DUTY TRAVEL EXPENSES CENTRAL JAVA 1.908.366.200 1.090.078.900 5.300.000 1.095.378.900 812.987.300 Transport 1.447.316.200 848.901.400 1.900.000 850.801.400 596.514.800 Accomodation 243.550.000 114.677.500 1.400.000 116.077.500 127.472.500 OSA (Fixed) 217.500.000 126.500.000 2.000.000 128.500.000 89.000.000 2.2 DUTY TRAVEL EXPENSES DI. YOGYAKARTA 300.157.500 119.849.200 - 119.849.200 180.308.300 Transport 231.507.500 94.294.200 - 94.294.200 137.213.300 Accomodation 20.600.000 1.955.000 - 1.955.000 18.645.000 OSA (Fixed) 48.050.000 23.600.000 - 23.600.000 24.450.000 2.3 OFFICE OPERATIONAL EXPENSES (a+b+c) 2.442.537.500 2.217.702.995 41.450.000 2.259.152.995 183.384.505 2.3.1 Office Running Cost 1.402.300.000 1.295.342.281 23.200.000 1.318.542.281 83.757.719 2.3.2 Office Supply and Consumable 511.737.500 465.867.399 9.450.000 475.317.399 36.420.101 2.3.3 Communication Cost 425.000.000 372.557.976 7.300.000 379.857.976 45.142.024 2.3.4 Internet Cost 67.500.000 47.935.339 1.500.000 49.435.339 18.064.661 2.3.5 BOP Tim Percepatan 36.000.000 36.000.000 - 36.000.000 - 2.4 OFFICE EQUIPMENT EXPENSES 381.440.108 370.615.000 - 370.615.000 10.825.108 a Desktop Computer 125.000.000 125.000.000 - 125.000.000 - b Laptop 139.000.000 139.000.000 - 139.000.000 - c Printer Laser Jet 4.000.000 4.000.000 - 4.000.000 - d Printer Color A3 18.000.000 18.000.000 - 18.000.000 - e Digital Camera 2.500.000 2.500.000 - 2.500.000 - f GPS Tools 54.000.000 44.625.000 - 44.625.000 9.375.000 g LCD Projector 9.000.000 9.000.000 - 9.000.000 - PROGRAM KOTA TANPA KUMUH SATKER PENGEMBANGAN KAWASAN PERMUKIMAN BERBASIS MASYARAKAT (PKPBM) - TA 2018 PROYEK PENINGKATAN KUALITAS KAWASAN PERMUKIMAN DIREKTORAT JENDERAL CIPTA KARYA KEMENTERIAN PEKERJAAN UMUM & PERUMAHAN RAKYAT

PROGRAM KOTA TANPA KUMUH SATKER ...103.12.84.195/files/Media/Laporan/Contract Resume/osp5...NO KOMPOSISI BIAYA AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: PROGRAM KOTA TANPA KUMUH SATKER ...103.12.84.195/files/Media/Laporan/Contract Resume/osp5...NO KOMPOSISI BIAYA AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT

Nomor & Periode Invoice : No. 32 Periode (Maret 2018)

Realisasi Invoice : 25 April 2018

Nomor Loan : IBRD Loan No. 8636-ID

Nama Konsultan : PT. Ganes Engineering Consultant, JO PT. Arss Baru

Paket Pekerjaan : Oversight Service Provider Regional Management Paket 5

(Central Java & D.I Yogyakarta)

Nomor & Tanggal Kontrak : HK.02.03/OSP-5/IBRD/SATKER-PKP/019/2014 - IBRD Ln.8213-IND

Periode Kontrak : 09 Oktober 2014 s/d 30 Juni 2018

NO KOMPOSISI BIAYAAMENDMENT

CONTRACT NO. 20INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAK

I REMUNERATION ( SUB TOTAL I ) 22.365.127.192 21.049.021.163 296.465.804 21.345.486.967 1.019.640.225

1.1 PROFESSIONAL STAFF 16.109.305.195 15.167.220.518 205.232.143 15.372.452.660 736.852.535

1.2 SUPPORTING STAFF 4.695.464.286 4.413.264.286 70.550.000 4.483.814.286 211.650.000

Fee [……….% x [ 1.1+1.2 ]]

II DIRECT REIMBURSABLE COST ( SUB TOTAL II ) 13.042.203.756 11.238.974.951 203.018.000 11.441.992.951 1.600.210.805

2.1 DUTY TRAVEL EXPENSES CENTRAL JAVA 1.908.366.200 1.090.078.900 5.300.000 1.095.378.900 812.987.300

Transport 1.447.316.200 848.901.400 1.900.000 850.801.400 596.514.800

Accomodation 243.550.000 114.677.500 1.400.000 116.077.500 127.472.500

OSA (Fixed) 217.500.000 126.500.000 2.000.000 128.500.000 89.000.000

2.2 DUTY TRAVEL EXPENSES DI. YOGYAKARTA 300.157.500 119.849.200 - 119.849.200 180.308.300

Transport 231.507.500 94.294.200 - 94.294.200 137.213.300

Accomodation 20.600.000 1.955.000 - 1.955.000 18.645.000

OSA (Fixed) 48.050.000 23.600.000 - 23.600.000 24.450.000

2.3 OFFICE OPERATIONAL EXPENSES (a+b+c) 2.442.537.500 2.217.702.995 41.450.000 2.259.152.995 183.384.505

2.3.1 Office Running Cost 1.402.300.000 1.295.342.281 23.200.000 1.318.542.281 83.757.719

2.3.2 Office Supply and Consumable 511.737.500 465.867.399 9.450.000 475.317.399 36.420.101

2.3.3 Communication Cost 425.000.000 372.557.976 7.300.000 379.857.976 45.142.024

2.3.4 Internet Cost 67.500.000 47.935.339 1.500.000 49.435.339 18.064.661

2.3.5 BOP Tim Percepatan 36.000.000 36.000.000 - 36.000.000 -

2.4 OFFICE EQUIPMENT EXPENSES 381.440.108 370.615.000 - 370.615.000 10.825.108

a Desktop Computer 125.000.000 125.000.000 - 125.000.000 -

b Laptop 139.000.000 139.000.000 - 139.000.000 -

c Printer Laser Jet 4.000.000 4.000.000 - 4.000.000 -

d Printer Color A3 18.000.000 18.000.000 - 18.000.000 -

e Digital Camera 2.500.000 2.500.000 - 2.500.000 -

f GPS Tools 54.000.000 44.625.000 - 44.625.000 9.375.000

g LCD Projector 9.000.000 9.000.000 - 9.000.000 -

PROGRAM KOTA TANPA KUMUH

SATKER PENGEMBANGAN KAWASAN PERMUKIMAN BERBASIS MASYARAKAT (PKPBM) - TA 2018

PROYEK PENINGKATAN KUALITAS KAWASAN PERMUKIMAN

DIREKTORAT JENDERAL CIPTA KARYA

KEMENTERIAN PEKERJAAN UMUM & PERUMAHAN RAKYAT

Page 2: PROGRAM KOTA TANPA KUMUH SATKER ...103.12.84.195/files/Media/Laporan/Contract Resume/osp5...NO KOMPOSISI BIAYA AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT

NO KOMPOSISI BIAYAAMENDMENT

CONTRACT NO. 20INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAK

h Scanner 2.000.000 2.000.000 - 2.000.000 -

i Equipment Maintenance (Including Existing Equipment) 27.940.108 26.490.000 - 26.490.000 1.450.108

j Peta Citra Satelit (Scala 1 : 5000 ) - - - - -

2.5 RENTAL EXPENSES (a+b+c) 7.802.425.000 7.297.075.000 153.750.000 7.450.825.000 351.600.000

Office Space 473.625.000 426.675.000 46.950.000 473.625.000 -

Vehicle 7.008.000.000 6.594.000.000 96.000.000 6.690.000.000 318.000.000

Motorcycle 320.800.000 276.400.000 10.800.000 287.200.000 33.600.000

2.6 REPORTING EXPENCES (a+b+c) 42.375.000 24.808.345 1.000.000 25.808.345 16.566.655

2.6.1 Reguler Report 27.750.000 18.750.000 750.000 19.500.000 8.250.000

2.6.2 Special Report 14.625.000 6.058.345 250.000 6.308.345 8.316.655

Fee […….% x [ 2.1 + 2.2 + 2.3.1 + 2.3.2]

Fee […….% x [ 2.1 + 2.2 + 2.3.1 + 2.3.2]

III TOTAL TRAINING ACTIVITY EXPENSES [ 3.1 + Fee ] 10.051.422.855 7.442.843.355 19.975.500 7.462.818.855 2.588.604.000

3.1 Training Activity 9.711.519.667 7.191.153.000 19.300.000 7.210.453.000 2.501.066.667

Fee [ …….% x [ 3.1 ]]

IV TOTAL SOCIALIZATION ACTIVITY EXPENSES [4.1+4.2+Fee+ 4.3] 1.055.564.000 978.764.000 - 978.764.000 76.800.000

4.1 Socilization Activity in Provincial Levels - - - - -

4.2 Socilization Activity in City/Regency Levels 457.850.000 397.850.000 - 397.850.000 60.000.000

Fee [[ ……..% x [ 4.1 + 4.2 ]]

4.3 Penyusunan Dokumen RPLP/RTPLP 579.400.000 565.000.000 - 565.000.000 14.400.000

VI TOTAL V ( I + II + III + IV ) 46.514.317.802 40.709.603.470 519.459.304 41.229.062.773 5.285.255.029

VII RE PAYMENT OF ADVANCE PAYMENT 1.721.104.849 1.721.104.849 - 1.721.104.849 -

VIII 21.036.000 21.036.000 - 21.036.000 -

IX 44.772.176.953 38.967.462.621 519.459.304 39.486.921.924 5.285.255.029

Pengembalian hasil Audit BPKP TA 2016, Nomor : LAI-23

/D104/1/2017, Tgl 19 Juni 2017

GRAND TOTAL [ V+ VI ]

Page 3: PROGRAM KOTA TANPA KUMUH SATKER ...103.12.84.195/files/Media/Laporan/Contract Resume/osp5...NO KOMPOSISI BIAYA AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT

I. BREAKDOWN OF REMUNERATION

Vol Unit Price

(IDR)

Total Amount

(IDR) Vol Total Amount (IDR) Vol

Total Amount

(IDR) Vol Total Amount (IDR) Vol

Total Amount

(IDR)

16.109.305.195 15.167.220.518 205.232.143 15.372.452.660 736.852.535

1.1.1 OSP LEVEL 907.000.000 907.000.000 - 907.000.000 -

1 Program Director OC Drs. Anton Lami Suhadi, M.Si 26,68 19.000.000 507.000.000 26,68 507.000.000 - - 26,68 507.000.000 - -

2 Assisten OC Drs. Joko Warsono 26,67 7.500.000 200.000.000 26,67 200.000.000 - - 26,67 200.000.000 - -

3 Sub Spec. Legal & CHU Ardisyah Alam, SH 26,67 7.500.000 200.000.000 26,67 200.000.000 - - 26,67 200.000.000 - -

B PROVINCE CENTRAL JAVA 10.406.769.481 9.862.253.351 119.089.286 9.981.342.637 425.426.843

1 Provincial Team Leader Ir. Endar Gunarto 26,67 16.500.000 440.000.000 26,67 440.000.000 - - 26,67 440.000.000 - -

Drs. Anton Lami Suhadi, M.Si 17,09 16.500.000 282.000.000 13,09 216.000.000 1,00 16.500.000 14,09 232.500.000 3,00 49.500.000

2 Monev Specialist Drs. Elisanta Soetarjono 44,68 11.000.000 491.500.000 40,68 447.500.000 1,00 11.000.000 41,68 458.500.000 3,00 33.000.000

3 a. Sub Spec. Monev PNPM I Wayan Ardika Utama, S.Ag, SE 4,67 7.500.000 35.000.000 4,67 35.000.000 - - 4,67 35.000.000 - -

Ir. Irwan Muchtar 22,00 7.500.000 165.000.000 22,00 165.000.000 - - 22,00 165.000.000 - -

4 b. Sub Spec. Monev Advance Rudi Santoso, SE, M.Si 26,67 7.500.000 200.000.000 26,67 200.000.000 - - 26,67 200.000.000 - -

5 MIS Specialist Sartika Darma Wijaya, S.Kom 32,20 9.250.000 297.875.000 28,20 260.875.000 1,00 9.250.000 29,20 270.125.000 3,00 27.750.000

6 a. Sub Spec. MIS for PNPM Erwin Effendi, ST - - - - - - - - - - -

Eriyanti, S.Kom 23,00 7.500.000 172.500.000 23,00 172.500.000 - - 23,00 172.500.000 - -

7 Socialization Specialist Drs. Harry Faddilah - - - - - - - - - - -

Drs. Kunawi, M.Si 22,00 9.250.000 203.500.000 22,00 203.500.000 - - 22,00 203.500.000 - -

Drs. Sarsetyono, M.Pd 3,34 9.250.000 30.937.500 - - 0,14 1.321.429 0,14 1.321.429 3,20 29.616.071

8 Training Specialist Muhammad Yasak, S.Pd 26,70 9.250.000 247.000.000 26,70 247.000.000 - - 26,70 247.000.000 - -

Ir. Endar Gunarto 15,59 9.250.000 144.215.909 11,59 107.215.909 1,00 9.250.000 12,59 116.465.909 3,00 27.750.000

9 a. Sub Spec.Training/CB for PNPM Drs. Kunawi, M.Si 4,67 7.500.000 35.000.000 4,67 35.000.000 - - 4,67 35.000.000 - -

I Wayan Ardika Utama, S.Ag, SE 22,00 7.500.000 165.000.000 22,00 165.000.000 - - 22,00 165.000.000 - -

10 b. Sub Spec.SME’s I Made Sarka, S.Sos 26,67 7.500.000 200.000.000 26,67 200.000.000 - - 26,67 200.000.000 - -

11 Infrastructure Specialist Basuki Budi Susetyo, ST 30,70 9.250.000 284.000.000 30,70 284.000.000 - - 30,70 284.000.000 - -

Basuki Budi Susetyo, ST 10,50 9.250.000 97.125.000 10,00 92.500.000 0,50 4.625.000 10,50 97.125.000 - -

Ir. Sujoko 3,50 9.250.000 32.375.000 - - 0,14 1.321.429 0,14 1.321.429 3,36 31.053.571

12 a. Sub Spec. Infras. PNPM & DRM Ikhwanudin, ST.,MT 26,67 7.500.000 200.000.000 26,67 200.000.000 - - 26,67 200.000.000 - -

13 Micro Fin & Fin.Mgmt Spec. Agus Hariyanto, SE, MM, Akt 41,05 9.250.000 379.687.500 37,70 348.750.000 0,14 1.321.429 37,85 350.071.429 3,20 29.616.071

14 a. Sub Spec. Fin.Mgmt for PNPM Suyono,SE, MM 26,67 7.500.000 200.000.000 26,67 200.000.000 - - 26,67 200.000.000 - -

15 b. Sub Spec. RLF Ahmad Aris Sakhroni, SE 26,67 7.500.000 200.000.000 26,67 200.000.000 - - 26,67 200.000.000 - -

16 Local Gov & Public Policy Spec/ Drs. Sudarisman 4,70 9.250.000 43.500.000 4,70 43.500.000 - - 4,70 43.500.000 - -

Collaboration and Local Governement Spec. Drs. Sarsetyono, M.Pd 28,50 9.250.000 263.625.000 28,50 263.625.000 - - 28,50 263.625.000 - -

Rudi Santoso, SE, M.Si 5,50 9.250.000 50.875.000 1,39 12.830.645 1,00 9.250.000 2,39 22.080.645 3,11 28.794.355

17 Urban Planner Specialist Saji Wahyono, ST 43,20 9.250.000 399.625.000 39,20 362.625.000 1,00 9.250.000 40,20 371.875.000 3,00 27.750.000

18 Sub Proff. Financial (29 person)

1. Cilacap Maryati 14,70 5.750.000 84.500.000 14,70 84.500.000 - - 14,70 84.500.000 - -

Sub Proff. Administrasi Kab / Kota 3,00 5.750.000 17.250.000 3,00 17.250.000 - - 3,00 17.250.000 - -

2. Banyumas Nurkholis 14,70 5.750.000 84.500.000 14,70 84.500.000 - - 14,70 84.500.000 - -

Sub Proff. Administrasi Kab / Kota 3,00 5.750.000 17.250.000 3,00 17.250.000 - - 3,00 17.250.000 - -

3. Banjarnegara & Purbalingga Wiwit Priyanto 14,70 5.750.000 84.500.000 14,70 84.500.000 - - 14,70 84.500.000 - -

Sub Proff. Administrasi Kab / Kota 3,00 5.750.000 17.250.000 3,00 17.250.000 - - 3,00 17.250.000 - -

4. Kebumen & Purworejo Adi Ganda Purnama 14,70 5.750.000 84.500.000 14,70 84.500.000 - - 14,70 84.500.000 - -

Sub Proff. Administrasi Kab / Kota 3,00 5.750.000 17.250.000 3,00 17.250.000 - - 3,00 17.250.000 - -

5. Kab. Magelang,Kota Magelang, Temanggung Imanuel Maryanto Nugroho 14,70 5.750.000 84.500.000 14,70 84.500.000 - - 14,70 84.500.000 - -

Sub Proff. Administrasi Kab / Kota 3,00 5.750.000 17.250.000 3,00 17.250.000 - - 3,00 17.250.000 - -

6. Klaten Niken Wijayanti 14,70 5.750.000 84.500.000 14,70 84.500.000 - - 14,70 84.500.000 - -

Sub Proff. Administrasi Kab / Kota 3,00 5.750.000 17.250.000 3,00 17.250.000 - - 3,00 17.250.000 - -

7. Klaten Kholis Mahmudah 14,70 5.750.000 84.500.000 14,70 84.500.000 - - 14,70 84.500.000 - -

INVOICE S/D SAAT INI SISA KONTRAKAMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI

OVERSIGHT SERVICE PROVIDER [ OSP ] - 5

NATIONAL SLUM UPGRADING PROGRAM (NSUP)

I. 1 PROFESSIONAL STAFF

POSISI NAMA

Page 4: PROGRAM KOTA TANPA KUMUH SATKER ...103.12.84.195/files/Media/Laporan/Contract Resume/osp5...NO KOMPOSISI BIAYA AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT

Vol Unit Price

(IDR)

Total Amount

(IDR) Vol Total Amount (IDR) Vol

Total Amount

(IDR) Vol Total Amount (IDR) Vol

Total Amount

(IDR)

INVOICE S/D SAAT INI SISA KONTRAKAMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI

POSISI NAMA

Sub Proff. Administrasi Kab / Kota 3,00 5.750.000 17.250.000 3,00 17.250.000 - - 3,00 17.250.000 - -

8. Klaten Dwi Riyanti 6,70 5.750.000 38.500.000 6,70 38.500.000 - - 6,70 38.500.000 - -

Sub Proff. Administrasi Kab / Kota Heru Prasinggih, SE - 5.750.000 - - - - - - - - -

9. Boyolali & Salatiga Muh Herlani Qosim 14,70 5.750.000 84.500.000 14,70 84.500.000 - - 14,70 84.500.000 - -

Sub Proff. Administrasi Kab / Kota 3,00 5.750.000 17.250.000 3,00 17.250.000 - - 3,00 17.250.000 - -

10. Wonogiri & Karanganyar Sugeng Prayitno 14,70 5.750.000 84.500.000 14,70 84.500.000 - - 14,70 84.500.000 - -

Sub Proff. Administrasi Kab / Kota 3,00 5.750.000 17.250.000 3,00 17.250.000 - - 3,00 17.250.000 - -

11. Sragen & Surakarta Haryani Sawitri 14,70 5.750.000 84.500.000 14,70 84.500.000 - - 14,70 84.500.000 - -

Sub Proff. Administrasi Kab / Kota 3,00 5.750.000 17.250.000 3,00 17.250.000 - - 3,00 17.250.000 - -

12. Sukoharjo Puji Hastuti 14,70 5.750.000 84.500.000 14,70 84.500.000 - - 14,70 84.500.000 - -

Sub Proff. Administrasi Kab / Kota 3,00 5.750.000 17.250.000 3,00 17.250.000 - - 3,00 17.250.000 - -

13. Blora & Grobogan Heru Susalit 14,70 5.750.000 84.500.000 14,70 84.500.000 - - 14,70 84.500.000 - -

Sub Proff. Administrasi Kab / Kota 3,00 5.750.000 17.250.000 3,00 17.250.000 - - 3,00 17.250.000 - -

14. Rembang Eko Suwarto 14,70 5.750.000 84.500.000 14,70 84.500.000 - - 14,70 84.500.000 - -

Sub Proff. Administrasi Kab / Kota 3,00 5.750.000 17.250.000 3,00 17.250.000 - - 3,00 17.250.000 - -

15. Pati Ma'ruf 14,70 5.750.000 84.500.000 14,70 84.500.000 - - 14,70 84.500.000 - -

Sub Proff. Administrasi Kab / Kota 3,00 5.750.000 17.250.000 3,00 17.250.000 - - 3,00 17.250.000 - -

16. Pati Ika Juliana 14,70 5.750.000 84.500.000 14,70 84.500.000 - - 14,70 84.500.000 - -

Sub Proff. Administrasi Kab / Kota 3,00 5.750.000 17.250.000 3,00 17.250.000 - - 3,00 17.250.000 - -

17. Jepara Kuntarsih 8,70 5.750.000 50.000.000 8,70 50.000.000 - - 8,70 50.000.000 - -

Sub Proff. Administrasi Kab / Kota Endang Sulastri, SE - 5.750.000 - - - - - - - - -

18. Kudus Noor Haris 14,70 5.750.000 84.500.000 14,70 84.500.000 - - 14,70 84.500.000 - -

Sub Proff. Administrasi Kab / Kota 3,00 5.750.000 17.250.000 3,00 17.250.000 - - 3,00 17.250.000 - -

19. Demak & Kab Semarang RM Darmawan 14,70 5.750.000 84.500.000 14,70 84.500.000 - - 14,70 84.500.000 - -

Sub Proff. Administrasi Kab / Kota 3,00 5.750.000 17.250.000 3,00 17.250.000 - - 3,00 17.250.000 - -

20. Batang & Kota Pekalongan Nani Kiswati Ekasaputri 14,70 5.750.000 84.500.000 14,70 84.500.000 - - 14,70 84.500.000 - -

Sub Proff. Administrasi Kab / Kota 3,00 5.750.000 17.250.000 3,00 17.250.000 - - 3,00 17.250.000 - -

21. Kota Semarang Sendy Yolanda H M 14,70 5.750.000 84.500.000 14,70 84.500.000 - - 14,70 84.500.000 - -

Sub Proff. Administrasi Kab / Kota 3,00 5.750.000 17.250.000 3,00 17.250.000 - - 3,00 17.250.000 - -

22. Kota Semarang Ruwaidah 14,70 5.750.000 84.500.000 14,70 84.500.000 - - 14,70 84.500.000 - -

Sub Proff. Administrasi Kab / Kota 3,00 5.750.000 17.250.000 3,00 17.250.000 - - 3,00 17.250.000 - -

23. Kendal Lis Setijaningsih Veronica 14,70 5.750.000 84.500.000 14,70 84.500.000 - - 14,70 84.500.000 - -

Sub Proff. Administrasi Kab / Kota 3,00 5.750.000 17.250.000 3,00 17.250.000 - - 3,00 17.250.000 - -

24. Pemalang Sundari 14,70 5.750.000 84.500.000 14,70 84.500.000 - - 14,70 84.500.000 - -

Sub Proff. Administrasi Kab / Kota 3,00 5.750.000 17.250.000 3,00 17.250.000 - - 3,00 17.250.000 - -

25. Kab. Tegal Warsida 14,70 5.750.000 84.500.000 14,70 84.500.000 - - 14,70 84.500.000 - -

Sub Proff. Administrasi Kab / Kota 3,00 5.750.000 17.250.000 3,00 17.250.000 - - 3,00 17.250.000 - -

26. Kab. Tegal Agus Wibowo 14,70 5.750.000 84.500.000 14,70 84.500.000 - - 14,70 84.500.000 - -

Sub Proff. Administrasi Kab / Kota 3,00 5.750.000 17.250.000 3,00 17.250.000 - - 3,00 17.250.000 - -

27. Brebes & Kota Tegal Agus Salim 14,70 5.750.000 84.500.000 14,70 84.500.000 - - 14,70 84.500.000 - -

Sub Proff. Administrasi Kab / Kota 3,00 5.750.000 17.250.000 3,00 17.250.000 - - 3,00 17.250.000 - -

27. Kab. Pekalongan Agus Sumbodo 14,70 5.750.000 84.500.000 14,70 84.500.000 - - 14,70 84.500.000 - -

Sub Proff. Administrasi Kab / Kota 3,00 5.750.000 17.250.000 3,00 17.250.000 - - 3,00 17.250.000 - -

29. Kab Pekalongan Firdaus Nurul Tataqun 14,70 5.750.000 84.500.000 14,70 84.500.000 - - 14,70 84.500.000 - -

Sub Proff. Administrasi Kab / Kota 3,00 5.750.000 17.250.000 3,00 17.250.000 - - 3,00 17.250.000 - -

19 Sub Proff. Administration (7 person) - - - - - - - - - - -

1. Sub Proff. Administration 1 Wiwin Sanjaya, S.Sos 44,70 5.750.000 257.000.000 40,70 234.000.000 1,00 5.750.000 41,70 239.750.000 3,00 17.250.000

2. Sub Proff. Administration 2 Edy Rudyanto,SE 43,20 5.750.000 248.375.000 39,08 224.725.806 1,00 5.750.000 40,08 230.475.806 3,11 17.899.194

3. Sub Proff. Administration 3 Bangun Wibowo,SE 43,20 5.750.000 248.375.000 39,08 224.725.806 1,00 5.750.000 40,08 230.475.806 3,11 17.899.194

4. Sub Proff. Administration 4 Akbar Noor Dewanto,SE 37,70 5.750.000 216.750.000 37,70 216.750.000 - - 37,70 216.750.000 - -

Sub Proff. Financial For Kab/Kota OSP-5 Jateng 1 Akbar Noor Dewanto,SE 5,50 5.750.000 31.625.000 1,50 8.625.000 1,00 5.750.000 2,50 14.375.000 3,00 17.250.000

5. Sub Proff. Administration 5 Indera Risdyakusuma,SE 43,20 5.750.000 248.375.000 39,08 224.725.806 1,00 5.750.000 40,08 230.475.806 3,11 17.899.194

6. Sub Proff. Administration 6 Agus Budi Setiawan,SE 43,20 5.750.000 248.375.000 39,08 224.725.806 1,00 5.750.000 40,08 230.475.806 3,11 17.899.194

7. Sub Proff. Administration 7 Sutrisno,SE 17,70 5.750.000 101.750.000 17,70 101.750.000 - - 17,70 101.750.000 - -

Page 5: PROGRAM KOTA TANPA KUMUH SATKER ...103.12.84.195/files/Media/Laporan/Contract Resume/osp5...NO KOMPOSISI BIAYA AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT

Vol Unit Price

(IDR)

Total Amount

(IDR) Vol Total Amount (IDR) Vol

Total Amount

(IDR) Vol Total Amount (IDR) Vol

Total Amount

(IDR)

INVOICE S/D SAAT INI SISA KONTRAKAMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI

POSISI NAMA

Lis Setijaningsih Veronica 20,00 5.750.000 115.000.000 20,00 115.000.000 - - 20,00 115.000.000 - -

Sub Proff. Financial For Kab/Kota OSP-5 Jateng 2 Lis Setijaningsih Veronica 5,50 5.750.000 31.625.000 1,50 8.625.000 1,00 5.750.000 2,50 14.375.000 3,00 17.250.000

8. Sub Proff. Administration For Kab/Kota OSP-5 Jateng Sendy Yolanda H M 20,00 5.750.000 115.000.000 20,00 115.000.000 - - 20,00 115.000.000 - -

Sub Proff. Financial For Kab/Kota OSP-5 Jateng 3 Sendy Yolanda H M 5,50 5.750.000 31.625.000 1,50 8.625.000 1,00 5.750.000 2,50 14.375.000 3,00 17.250.000

Sub Proff. Financial OSP-5 Jateng Suyono,SE, MM 6,50 5.750.000 37.375.000 6,50 37.375.000 - - 6,50 37.375.000 - -

TIM PERCEPATAN OSP-5 JATENG

20 Kota Surakarta (15 Kelurahan)

a. Sub GIS Specialist Rifki Muhammad Zulfa Fauzi, ST MT 2,48 7.500.000 18.571.429 2,48 18.571.429 - - 2,48 18.571.429 - -

b. Sub UP Specialist Felisia Femy Kartika, ST MT 2,48 7.500.000 18.571.429 2,48 18.571.429 - - 2,48 18.571.429 - -

c. Sub Arsitek Specialist/Sub Sipil Engineering Specilaist Agung Tri Widyanto, ST 2,48 7.500.000 18.571.429 2,48 18.571.429 - - 2,48 18.571.429 - -

d. Sub Environmental Specialist Dwi Yanto,ST 2,48 7.500.000 18.571.429 2,48 18.571.429 - - 2,48 18.571.429 - -

e. Cost Estimator Hiddatin Niha, SPd 1,00 6.000.000 6.000.000 1,00 6.000.000 - - 1,00 6.000.000 - -

f. Drafter/Operator : (2 person)

f.1. Drafter/Operator 1 Kurnia Mahardika Dwi Gani S 1,00 6.500.000 6.500.000 1,00 6.500.000 - - 1,00 6.500.000 - -

f.2. Drafter/Operator 2 Yudi Erwanto 1,00 6.500.000 6.500.000 1,00 6.500.000 - - 1,00 6.500.000 - -

g. Surveyor : (5 person)

g.1. Surveyor 1 Septiadi Ari Wibowo 1,00 5.000.000 5.000.000 1,00 5.000.000 - - 1,00 5.000.000 - -

g.2. Surveyor 2 Yudhi Koerniawan 1,00 5.000.000 5.000.000 1,00 5.000.000 - - 1,00 5.000.000 - -

g.3. Surveyor 3 Ruli Hari Juniarto 1,00 5.000.000 5.000.000 1,00 5.000.000 - - 1,00 5.000.000 - -

g.4. Surveyor 4 Agus Joko Purwanto, St 1,00 5.000.000 5.000.000 1,00 5.000.000 - - 1,00 5.000.000 - -

g.5. Surveyor 5 To be Name - 5.000.000 - - - - - - - - -

g.6. Surveyor 6 To be Name - 5.000.000 - - - - - - - - -

h. Ass Surveyor : (12 person) 1. Didik Iswanto 1,00 2.500.000 2.500.000 1,00 2.500.000 - - 1,00 2.500.000 - -

2. Eka Riyanta 1,00 2.500.000 2.500.000 1,00 2.500.000 - - 1,00 2.500.000 - -

3. Akhir surani 1,00 2.500.000 2.500.000 1,00 2.500.000 - - 1,00 2.500.000 - -

4. Yepri Kristian 1,00 2.500.000 2.500.000 1,00 2.500.000 - - 1,00 2.500.000 - -

5. Adhitya Twin Budianto 1,00 2.500.000 2.500.000 1,00 2.500.000 - - 1,00 2.500.000 - -

6. Rangga Bima Nur W, ST 1,00 2.500.000 2.500.000 1,00 2.500.000 - - 1,00 2.500.000 - -

7. Agus Topo 1,00 2.500.000 2.500.000 1,00 2.500.000 - - 1,00 2.500.000 - -

21 Kota Semarang (15 Kelurahan)

a. Sub GIS Specialist Izzan Arif Hutomo, ST, MT 2,29 7.500.000 17.142.857 2,29 17.142.857 - - 2,29 17.142.857 - -

b. Sub UP Specialist Setyo Wardhani, ST 2,48 7.500.000 18.571.429 2,48 18.571.429 - - 2,48 18.571.429 - -

c. Sub Arsitek Specialist/Sub Sipil Engineering Specilaist Rhisa Aidilla Suprapto, ST MSc 2,48 7.500.000 18.571.429 2,48 18.571.429 - - 2,48 18.571.429 - -

d. Sub Environmental Specialist Harsono ST 2,48 7.500.000 18.571.429 2,48 18.571.429 - - 2,48 18.571.429 - -

e. Cost Estimator Nunung Apriyanto 1,00 6.000.000 6.000.000 1,00 6.000.000 - - 1,00 6.000.000 - -

f. Drafter/Operator : (2 person)

f.1. Drafter/Operator 1 Radityo Juliar Suprapto 1,00 6.500.000 6.500.000 1,00 6.500.000 - - 1,00 6.500.000 - -

f.2. Drafter/Operator 2 Muhammad Taufik 1,00 6.500.000 6.500.000 1,00 6.500.000 - - 1,00 6.500.000 - -

g. Surveyor : (5 person)

g.1. Surveyor 1 Yovita Eka Purnama Andriyani 1,00 5.000.000 5.000.000 1,00 5.000.000 - - 1,00 5.000.000 - -

g.2. Surveyor 2 Naufal Farras 1,00 5.000.000 5.000.000 1,00 5.000.000 - - 1,00 5.000.000 - -

g.3. Surveyor 3 Akmal Ghozali 1,00 5.000.000 5.000.000 1,00 5.000.000 - - 1,00 5.000.000 - -

g.4. Surveyor 4 Adam Maulana 1,00 5.000.000 5.000.000 1,00 5.000.000 - - 1,00 5.000.000 - -

g.5. Surveyor 5 Purna Cipta Nugraha 1,00 5.000.000 5.000.000 1,00 5.000.000 - - 1,00 5.000.000 - -

g.6. Surveyor 6 To be Name - 5.000.000 - - - - - - - - -

h. Ass Surveyor : (12 person) 1. Risky Rifaldi 1,00 2.500.000 2.500.000 1,00 2.500.000 - - 1,00 2.500.000 - -

2. Hanif Hisyam Hernanta 1,00 2.500.000 2.500.000 1,00 2.500.000 - - 1,00 2.500.000 - -

3. Subrata Mahardika 1,00 2.500.000 2.500.000 1,00 2.500.000 - - 1,00 2.500.000 - -

4. Restian Nur Ikhsan 1,00 2.500.000 2.500.000 1,00 2.500.000 - - 1,00 2.500.000 - -

5. Gloria Putri Pancarani 1,00 2.500.000 2.500.000 1,00 2.500.000 - - 1,00 2.500.000 - -

6. Winda Hayuningtyas 1,00 2.500.000 2.500.000 1,00 2.500.000 - - 1,00 2.500.000 - -

Page 6: PROGRAM KOTA TANPA KUMUH SATKER ...103.12.84.195/files/Media/Laporan/Contract Resume/osp5...NO KOMPOSISI BIAYA AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT

Vol Unit Price

(IDR)

Total Amount

(IDR) Vol Total Amount (IDR) Vol

Total Amount

(IDR) Vol Total Amount (IDR) Vol

Total Amount

(IDR)

INVOICE S/D SAAT INI SISA KONTRAKAMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI

POSISI NAMA

7. Aziz Anjar Santoso 1,00 2.500.000 2.500.000 1,00 2.500.000 - - 1,00 2.500.000 - -

8. Tiya Dwi Yunita 1,00 2.500.000 2.500.000 1,00 2.500.000 - - 1,00 2.500.000 - -

9. Pandu Farchan Jannata 1,00 2.500.000 2.500.000 1,00 2.500.000 - - 1,00 2.500.000 - -

10. Cahya Wisuda Hukama 1,00 2.500.000 2.500.000 1,00 2.500.000 - - 1,00 2.500.000 - -

22 Kota Pekalongan (4 Kelurahan)

a. Sub GIS Specialist Achmad Tsani Fahdian, ST 2,48 7.500.000 18.571.429 2,48 18.571.429 - - 2,48 18.571.429 - -

b. Sub UP Specialist Yan Marina, ST MT 2,48 7.500.000 18.571.429 2,48 18.571.429 - - 2,48 18.571.429 - -

c. Sub Arsitek Specialist/Sub Sipil Engineering Specilaist Elisabet Nungky Septania, ST MT 2,48 7.500.000 18.571.429 2,48 18.571.429 - - 2,48 18.571.429 - -

d. Sub Environmental Specialist Sri Rahayu, ST 2,48 7.500.000 18.571.429 2,48 18.571.429 - - 2,48 18.571.429 - -

e. Cost Estimator Jossy Purwoko 1,00 6.000.000 6.000.000 1,00 6.000.000 - - 1,00 6.000.000 - -

f. Drafter/Operator : (2 person) - -

f.1. Drafter/Operator 1 Lurisa Herdwiantomo 1,00 6.500.000 6.500.000 1,00 6.500.000 - - 1,00 6.500.000 - -

f.2. Drafter/Operator 2 To be Name - 6.500.000 - - - - - - - - -

g. Surveyor : (5 person) - - - - - - - - - - -

g.1. Surveyor 1 Danang Billy Budiharjo 1,00 5.000.000 5.000.000 1,00 5.000.000 - - 1,00 5.000.000 - -

g.2. Surveyor 2 Bintoro Agung Sugiato 1,00 5.000.000 5.000.000 1,00 5.000.000 - - 1,00 5.000.000 - -

g.3. Surveyor 3 To be Name - 5.000.000 - - - - - - - - -

g.4. Surveyor 4 To be Name - 5.000.000 - - - - - - - - -

g.5. Surveyor 5 To be Name - 5.000.000 - - - - - - - - -

h. Ass Surveyor : (10 person) 1. Syamsul Hadi 1,00 2.500.000 2.500.000 1,00 2.500.000 - - 1,00 2.500.000 - -

2. Sardjiyo 1,00 2.500.000 2.500.000 1,00 2.500.000 - - 1,00 2.500.000 - -

3. Eko Prasetyo 1,00 2.500.000 2.500.000 1,00 2.500.000 - - 1,00 2.500.000 - -

4. Haryoto 1,00 2.500.000 2.500.000 1,00 2.500.000 - - 1,00 2.500.000 - -

PROVINCE DI YOGYAKARTA 4.795.535.714 4.397.967.166 86.142.857 4.484.110.023 311.425.691

1 Provincial Team Leader Drs. Nanang Priyana 44,68 14.750.000 659.000.000 40,68 600.000.000 1,00 14.750.000 41,68 614.750.000 3,00 44.250.000

2 Monev Specialist Ir. Sri Juwarni 44,68 11.000.000 491.500.000 40,68 447.500.000 1,00 11.000.000 41,68 458.500.000 3,00 33.000.000

3 MIS Specialist Tri Datha Younathan, S.Kom 26,70 9.250.000 247.000.000 26,70 247.000.000 - - 26,70 247.000.000 - -

Yuliana Anggarwati 5,50 9.250.000 50.875.000 1,39 12.830.645 1,00 9.250.000 2,39 22.080.645 3,11 28.794.355

4 Socialization Specialist Handayani Candraningsih, SP 26,70 9.250.000 247.000.000 26,70 247.000.000 - - 26,70 247.000.000 - -

Handayani Candraningsih, SP 3,34 9.250.000 30.937.500 - - 0,14 1.321.429 0,14 1.321.429 3,20 29.616.071

5 Training Specialist Aris Haryanto, S.Pd 43,20 9.250.000 399.625.000 39,20 362.625.000 1,00 9.250.000 40,20 371.875.000 3,00 27.750.000

6 a. Sub Spec.SME’s Raharja Mulya Atmaja, A.Md 26,67 7.500.000 200.000.000 26,67 200.000.000 - - 26,67 200.000.000 - -

7 Infrastructure Specialist Ir. Nurokhman, MT 44,70 9.250.000 413.500.000 40,70 376.500.000 1,00 9.250.000 41,70 385.750.000 3,00 27.750.000

8 Micro Fin & Fin.Mgmt Spec. Agus Subiyantoro, SE, M.Si 0,70 9.250.000 6.500.000 0,70 6.500.000 - - 0,70 6.500.000 - -

Dwi Hery Agustriyanto, SE 35,34 9.250.000 326.937.500 32,00 296.000.000 0,14 1.321.429 32,14 297.321.429 3,20 29.616.071

9 a. Sub Spec. RLF Dwi Hery Agustriyanto, SE 5,67 7.500.000 42.500.000 5,67 42.500.000 - - 5,67 42.500.000 - -

Dwi Riyanti 20,00 7.500.000 150.000.000 20,00 150.000.000 - - 20,00 150.000.000 - -

10 Local Gov & Public Policy Spec Setyadi, SE.,M.Si - - - - - - - - - - -

Collaboration and Local Governement Spec. Drs. Sudarisman 34,00 9.250.000 314.500.000 30,00 277.500.000 1,00 9.250.000 31,00 286.750.000 3,00 27.750.000

11 Urban Planner Specialist Budhi Kristiyanto Widodo, ST 26,70 9.250.000 247.000.000 26,70 247.000.000 - - 26,70 247.000.000 - -

Andina Utaminingtyas, ST 15,50 9.250.000 143.375.000 11,50 106.375.000 1,00 9.250.000 12,50 115.625.000 3,00 27.750.000

12 Sub Proff. Financial (3 person)

1. Sub Proff. Finacial Kota Yogyakarta Dwi Retno Sriharjanti 14,70 5.750.000 84.500.000 14,70 84.500.000 - - 14,70 84.500.000 - -

Sub Proff. Administrasi Kab / Kota 3,00 5.750.000 17.250.000 3,00 17.250.000 - - 3,00 17.250.000 - -

2. Sub Proff. Finacial Kab. Bantul Wahyu Puguh Hartono 14,70 5.750.000 84.500.000 14,70 84.500.000 - - 14,70 84.500.000 - -

Sub Proff. Administrasi Kab / Kota 3,00 5.750.000 17.250.000 3,00 17.250.000 - - 3,00 17.250.000 - -

3. Sub Proff. Finacial Kab. Sleman Basuki Rakhmad 6,70 5.750.000 38.500.000 6,70 38.500.000 - - 6,70 38.500.000 - -

Sub Proff. Administrasi Kab / Kota Ign Siswadi, SE - 5.750.000 - - - - - - - - -

13 Sub Proff. Administration (1 person)

1. Sub Proff. Administration (1 person) Alief Rusdiana N, SE, MM 44,70 5.750.000 257.000.000 40,70 234.000.000 1,00 5.750.000 41,70 239.750.000 3,00 17.250.000

2. Sub Proff. Administration For Kab/Kota OSP-5 DIY Wahyu Puguh Hartono 20,00 5.750.000 115.000.000 20,00 115.000.000 - - 20,00 115.000.000 - -

Page 7: PROGRAM KOTA TANPA KUMUH SATKER ...103.12.84.195/files/Media/Laporan/Contract Resume/osp5...NO KOMPOSISI BIAYA AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT

Vol Unit Price

(IDR)

Total Amount

(IDR) Vol Total Amount (IDR) Vol

Total Amount

(IDR) Vol Total Amount (IDR) Vol

Total Amount

(IDR)

INVOICE S/D SAAT INI SISA KONTRAKAMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI

POSISI NAMA

Sub Proff. Finacial OSP-5 DI Yogyakarta Dwi Riyanti 12,00 5.750.000 69.000.000 7,89 45.350.806 1,00 5.750.000 8,89 51.100.806 3,11 17.899.194

TIM PERCEPATAN OSP-5 DI YOGYAKARTA

14 Kota Yogyakarta (10 Kelurahan)

a. Sub GIS Specialist Muhammad Hanifuddin, ST 2,48 7.500.000 18.571.429 2,48 18.571.429 - - 2,48 18.571.429 - -

b. Sub UP Specialist Ir Djendra Supranawa 2,48 7.500.000 18.571.429 2,48 18.571.429 - - 2,48 18.571.429 - -

c. Sub Arsitek Specialist/Sub Sipil Engineering Specilaist Andrian, ST 2,48 7.500.000 18.571.429 2,48 18.571.429 - - 2,48 18.571.429 - -

d. Sub Environmental Specialist Nurul Zakiyah, ST 2,48 7.500.000 18.571.429 2,48 18.571.429 - - 2,48 18.571.429 - -

e. Cost Estimator Erwan Rochmadi 1,00 6.000.000 6.000.000 1,00 6.000.000 - - 1,00 6.000.000 - -

f. Drafter/Operator : (2 person)

f.1. Drafter/Operator 1 Apriansyah, ST 1,50 6.500.000 9.750.000 1,50 9.750.000 - - 1,50 9.750.000 - -

f.2. Drafter/Operator 2 Warsito 1,50 6.500.000 9.750.000 1,50 9.750.000 - - 1,50 9.750.000 - -

g. Surveyor : (5 person)

g.1. Surveyor 1 Janitra Febrian Ichwanto 1,00 5.000.000 5.000.000 1,00 5.000.000 - - 1,00 5.000.000 - -

g.2. Surveyor 2 Nofid Yulianto, Amd 1,00 5.000.000 5.000.000 1,00 5.000.000 - - 1,00 5.000.000 - -

g.3. Surveyor 3 Gufron Al Fajri 1,00 5.000.000 5.000.000 1,00 5.000.000 - - 1,00 5.000.000 - -

g.4. Surveyor 4 Syahrudin Yunus 1,00 5.000.000 5.000.000 1,00 5.000.000 - - 1,00 5.000.000 - -

g.5. Surveyor 5 Shahreza Rashendriansyah Sasmita 1,00 5.000.000 5.000.000 1,00 5.000.000 - - 1,00 5.000.000 - -

h. Ass Surveyor : (10 person) 1. Rozikin Hadi Prabowo 1,00 2.500.000 2.500.000 1,00 2.500.000 - - 1,00 2.500.000 - -

2. Muhammad Choliq 1,00 2.500.000 2.500.000 1,00 2.500.000 - - 1,00 2.500.000 - -

3. Ali Budi Santos 1,00 2.500.000 2.500.000 1,00 2.500.000 - - 1,00 2.500.000 - -

4. Maskuri 1,00 2.500.000 2.500.000 1,00 2.500.000 - - 1,00 2.500.000 - -

5. Agus Tri Wahyono 1,00 2.500.000 2.500.000 1,00 2.500.000 - - 1,00 2.500.000 - -

6. Bima Semi Raharjo 1,00 2.500.000 2.500.000 1,00 2.500.000 - - 1,00 2.500.000 - -

7. Abdul Basir Nugroho 1,00 2.500.000 2.500.000 1,00 2.500.000 - - 1,00 2.500.000 - -

4.695.464.286 4.413.264.286 70.550.000 4.483.814.286 211.650.000

PROVINCE CENTRAL JAVA 891.371.429 818.171.429 18.300.000 836.471.429 54.900.000

1 Office Manager Pujiono Santoso 40,71 4.250.000 173.000.000 40,71 173.000.000 - - 40,71 173.000.000 - -

Syarwani 4,00 4.250.000 17.000.000 - - 1,00 4.250.000 1,00 4.250.000 3,00 12.750.000

2 Assisten Office Manager Fian Arie Madhona 26,77 3.250.000 87.000.000 26,77 87.000.000 - - 26,77 87.000.000 - -

Pujiono Santoso 4,00 3.250.000 13.000.000 - - 1,00 3.250.000 1,00 3.250.000 3,00 9.750.000

3 Secretary M. Arifin 5,73 2.750.000 15.750.000 5,73 15.750.000 - - 5,73 15.750.000 - -

Adinda Ayuningtiyas 39,00 2.750.000 107.250.000 35,00 96.250.000 1,00 2.750.000 36,00 99.000.000 3,00 8.250.000

4 Computer Operator (3 person) TBN

a. Computer Operator 1 Fathur Rohman 26,75 2.000.000 53.500.000 26,75 53.500.000 - - 26,75 53.500.000 - -

b. Computer Operator 2 Syaifur Rohman 44,75 2.000.000 89.500.000 40,75 81.500.000 1,00 2.000.000 41,75 83.500.000 3,00 6.000.000

c. Computer Operator 3 Miftahul Kharis 41,75 2.000.000 83.500.000 37,75 75.500.000 1,00 2.000.000 38,75 77.500.000 3,00 6.000.000

5 Office Boy (1 person) Kasturi 44,74 1.350.000 60.400.000 40,74 55.000.000 1,00 1.350.000 41,74 56.350.000 3,00 4.050.000

6 Security (2 person) TBN

a. Security 1 Suwardjianto 11,74 1.350.000 15.850.000 11,74 15.850.000 - - 11,74 15.850.000 - -

Sangirin / Fathur Rohman 33,00 1.350.000 44.550.000 29,00 39.150.000 1,00 1.350.000 30,00 40.500.000 3,00 4.050.000

b. Security 2 Basuki 44,74 1.350.000 60.400.000 40,74 55.000.000 1,00 1.350.000 41,74 56.350.000 3,00 4.050.000

- - - - - - - - -

SUPPORTING STAFF TIM PERCEPATAN OSP-5 JATENG

7 Kota Surakarta :

Assisten Office Manager Sri Handayani, S Kom 2,48 3.250.000 8.047.619 2,48 8.047.619 - - 2,48 8.047.619 - -

Secretary / Computer Operator Widiyanti, Se 2,48 2.750.000 6.809.524 2,48 6.809.524 - - 2,48 6.809.524 - -

Office Boy (1 person) Eka Yunita Ningrum 2,48 1.350.000 3.342.857 2,48 3.342.857 - - 2,48 3.342.857 - -

Security (2 person) F Agi Setiawan 2,48 1.350.000 3.342.857 2,48 3.342.857 - - 2,48 3.342.857 - -

Kariman 2,48 1.350.000 3.342.857 2,48 3.342.857 - - 2,48 3.342.857 - -

8 Kota Semarang :

Assisten Office Manager Adinda Ayu 2,48 3.250.000 8.047.619 2,48 8.047.619 - - 2,48 8.047.619 - -

I. 2 SUPPORTING STAFF

Page 8: PROGRAM KOTA TANPA KUMUH SATKER ...103.12.84.195/files/Media/Laporan/Contract Resume/osp5...NO KOMPOSISI BIAYA AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT

Vol Unit Price

(IDR)

Total Amount

(IDR) Vol Total Amount (IDR) Vol

Total Amount

(IDR) Vol Total Amount (IDR) Vol

Total Amount

(IDR)

INVOICE S/D SAAT INI SISA KONTRAKAMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI

POSISI NAMA

Secretary / Computer Operator Nindyah Ayu Nugraheni 2,48 2.750.000 6.809.524 2,48 6.809.524 - - 2,48 6.809.524 - -

Office Boy (1 person) Kasmini 2,48 1.350.000 3.342.857 2,48 3.342.857 - - 2,48 3.342.857 - -

Security (2 person) Yoko Wijaya 2,48 1.350.000 3.342.857 2,48 3.342.857 - - 2,48 3.342.857 - -

Hartono 2,48 1.350.000 3.342.857 2,48 3.342.857 - - 2,48 3.342.857 - -

9 Kota Pekalongan :

Assisten Office Manager Linah Setiawati 2,48 3.250.000 8.047.619 2,48 8.047.619 - - 2,48 8.047.619 - -

Secretary / Computer Operator Saefur Rokhman 2,48 2.750.000 6.809.524 2,48 6.809.524 - - 2,48 6.809.524 - -

Office Boy (1 person) Ahmad Hakim 2,48 1.350.000 3.342.857 2,48 3.342.857 - - 2,48 3.342.857 - -

Security (2 person) To be Name 2,00 1.350.000 2.700.000 2,00 2.700.000 - - 2,00 2.700.000 - -

PROVINCE DI YOGYAKARTA 614.242.857 566.042.857 12.050.000 578.092.857 36.150.000

1 Ass Office Manager Vadeani Perwitasari 44,77 3.250.000 145.500.000 40,77 132.500.000 1,00 3.250.000 41,77 135.750.000 3,00 9.750.000

2 Secretary Herni Budiarti Santoso 44,73 2.750.000 123.000.000 40,73 112.000.000 1,00 2.750.000 41,73 114.750.000 3,00 8.250.000

3 Computer Operator (2 person)

a. Computer Operator 1 Indra Kurniawan 44,75 2.000.000 89.500.000 40,75 81.500.000 1,00 2.000.000 41,75 83.500.000 3,00 6.000.000

b. Computer Operator 2 Widiarto Adi 26,75 2.000.000 53.500.000 26,75 53.500.000 - - 26,75 53.500.000 - -

4 Office Boy (1 person) Tri Wahyudi 44,74 1.350.000 60.400.000 40,74 55.000.000 1,00 1.350.000 41,74 56.350.000 3,00 4.050.000

5 Security (2 person)

a. Security 1 Rudi Wasdianto 44,74 1.350.000 60.400.000 40,74 55.000.000 1,00 1.350.000 41,74 56.350.000 3,00 4.050.000

b. Security 2 Ali Mamasta 3,74 1.350.000 5.050.000 3,74 5.050.000 - - 3,74 5.050.000 - -

Agus Ristanto 41,00 1.350.000 55.350.000 37,00 49.950.000 1,00 1.350.000 38,00 51.300.000 3,00 4.050.000

SUPPORTING STAFF TIM PERCEPATAN OSP-5 DIY

6 Kota Yogyakarta :

Assisten Office Manager Lina Wiji Astiwi, Amd 2,48 3.250.000 8.047.619 2,48 8.047.619 - - 2,48 8.047.619 - -

Secretary / Computer Operator Anisa Soraya, S.Sos 2,48 2.750.000 6.809.524 2,48 6.809.524 - - 2,48 6.809.524 - -

Office Boy (1 person) Sugeng Mulyono 2,48 1.350.000 3.342.857 2,48 3.342.857 - - 2,48 3.342.857 - -

Security (2 person) Slamet Widodo 2,48 1.350.000 3.342.857 2,48 3.342.857 - - 2,48 3.342.857 - -

3.189.850.000 3.029.050.000 40.200.000 3.069.250.000 120.600.000

1 Computer Operator

PROVINCE CENTRAL JAVA

a. Korkot Purbalingga (44 kelurahan) Syarif Chamdani 29,75 2.000.000 59.500.000 29,75 59.500.000 - - 29,75 59.500.000 - -

b. Korkot Magelang (27 kelurahan) Eko Prasetyo 29,75 2.000.000 59.500.000 29,75 59.500.000 - - 29,75 59.500.000 - -

Korkot Kota Magelang (17 kelurahan) Eko Prasetyo - 2.000.000 - - - - - - - - -

c. Korkot Blora (45 kelurahan) Yuaningsih 29,75 2.000.000 59.500.000 29,75 59.500.000 - - 29,75 59.500.000 - -

d. Korkot Temanggung (41 kelurahan) Ary Prihatiningsih 29,75 2.000.000 59.500.000 29,75 59.500.000 - - 29,75 59.500.000 - -

e. Korkot Batang (39 kelurahan) Eni Sofiati,S.Kom 29,75 2.000.000 59.500.000 29,75 59.500.000 - - 29,75 59.500.000 - -

f. Korkot Brebes (38 kelurahan) Utin Agustina 29,75 2.000.000 59.500.000 29,75 59.500.000 - - 29,75 59.500.000 - -

1 g. Korkot Kota Pekalongan (27 kelurahan) Iis Sugiarti 4,75 2.000.000 9.500.000 4,75 9.500.000 - - 4,75 9.500.000 - -

Mochammad Yasir 40,00 2.000.000 80.000.000 36,00 72.000.000 1,00 2.000.000 37,00 74.000.000 3,00 6.000.000

h. Korkot Banyumas (85 kelurahan) Susanti 6,75 2.000.000 13.500.000 6,75 13.500.000 - - 6,75 13.500.000 - -

Cessi Ani Prasetiyas Ningsih 23,00 2.000.000 46.000.000 23,00 46.000.000 - - 23,00 46.000.000 - -

i. Korkot Kebumen (54 kelurahan) Dwi Fitriana 29,75 2.000.000 59.500.000 29,75 59.500.000 - - 29,75 59.500.000 - -

j. Korkot Boyolali (61 kelurahan) Tri Puji Wahyudi 29,75 2.000.000 59.500.000 29,75 59.500.000 - - 29,75 59.500.000 - -

k. Korkot Sukoharjo (83 kelurahan) Yenie Rahmawati 29,75 2.000.000 59.500.000 29,75 59.500.000 - - 29,75 59.500.000 - -

l. Korkot Karanganyar (51 kelurahan) Sumini 29,75 2.000.000 59.500.000 29,75 59.500.000 - - 29,75 59.500.000 - -

m. Korkot Rembang (54 kelurahan) Muh Mohlisin 29,75 2.000.000 59.500.000 29,75 59.500.000 - - 29,75 59.500.000 - -

n. Korkot Kudus (86 kelurahan) Oni Firmansyah 29,75 2.000.000 59.500.000 29,75 59.500.000 - - 29,75 59.500.000 - -

o. Korkot Jepara (86 kelurahan) Susilo Ningsih 29,75 2.000.000 59.500.000 29,75 59.500.000 - - 29,75 59.500.000 - -

2 p. Korkot Kendal (57 kelurahan) Wardatun Nikmah 44,75 2.000.000 89.500.000 40,75 81.500.000 1,00 2.000.000 41,75 83.500.000 3,00 6.000.000

3 q. Korkot Pemalang (79 kelurahan) Dewi Setiani 8,75 2.000.000 17.500.000 8,75 17.500.000 - - 8,75 17.500.000 - -

Dewi Setiani 36,00 2.000.000 72.000.000 32,00 64.000.000 1,00 2.000.000 33,00 66.000.000 3,00 6.000.000

CITY COORDINATORS OFFICE (29 Korkot)

Page 9: PROGRAM KOTA TANPA KUMUH SATKER ...103.12.84.195/files/Media/Laporan/Contract Resume/osp5...NO KOMPOSISI BIAYA AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT

Vol Unit Price

(IDR)

Total Amount

(IDR) Vol Total Amount (IDR) Vol

Total Amount

(IDR) Vol Total Amount (IDR) Vol

Total Amount

(IDR)

INVOICE S/D SAAT INI SISA KONTRAKAMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI

POSISI NAMA

4 r. Korkot Kota Surakarta (51 kelurahan) Sabar Purnomo 44,75 2.000.000 89.500.000 40,75 81.500.000 1,00 2.000.000 41,75 83.500.000 3,00 6.000.000

s. Korkot Pati (101 kelurahan) Santosa 9,75 2.000.000 19.500.000 9,75 19.500.000 - - 9,75 19.500.000 - -

Novia Metalica Agusta 20,00 2.000.000 40.000.000 20,00 40.000.000 - - 20,00 40.000.000 - -

5 t. Korkot Pekalongan (119 kelurahan) Iin Yulianti 44,75 2.000.000 89.500.000 40,75 81.500.000 1,00 2.000.000 41,75 83.500.000 3,00 6.000.000

u. Korkot Tegal (116 kelurahan) Antonius Dani Prayatomo 29,75 2.000.000 59.500.000 29,75 59.500.000 - - 29,75 59.500.000 - -

6 Korkot Kota Tegal (27 kelurahan) Antonius Dani Prayatomo 15,00 2.000.000 30.000.000 11,00 22.000.000 1,00 2.000.000 12,00 24.000.000 3,00 6.000.000

7 v. Korkot Kota Semarang (177 kelurahan) Sheilla Chusnul Chotimah 44,75 2.000.000 89.500.000 40,75 81.500.000 1,00 2.000.000 41,75 83.500.000 3,00 6.000.000

w. Korkot Klaten (212 kelurahan) Siti Yuliana 29,75 2.000.000 59.500.000 29,75 59.500.000 - - 29,75 59.500.000 - -

x. Korkot Banjarnegara To be Name - 2.000.000 - - - - - - - - -

8 y. Korkot Purworejo (27 kelurahan) Dwi Fitriana 15,00 2.000.000 30.000.000 11,00 22.000.000 1,00 2.000.000 12,00 24.000.000 3,00 6.000.000

9 z. Korkot Kab Semarang (177 kelurahan ) Onesia Pramisianti 15,00 2.000.000 30.000.000 11,00 22.000.000 1,00 2.000.000 12,00 24.000.000 3,00 6.000.000

10 a.1. Korkot kota Demak (19 kelurahan ) Fidiana Rahmawati 15,00 2.000.000 30.000.000 11,00 22.000.000 1,00 2.000.000 12,00 24.000.000 3,00 6.000.000

11 b.1. Korkot Kab Wonosobo (20 kelurahan ) Pamungkas Hery 15,00 2.000.000 30.000.000 11,00 22.000.000 1,00 2.000.000 12,00 24.000.000 3,00 6.000.000

PROVINCE DI YOGYAKARTA

1 a. Korkot Kota Yogyakarta Aris Sukoco 44,75 2.000.000 89.500.000 40,75 81.500.000 1,00 2.000.000 41,75 83.500.000 3,00 6.000.000

b. Korkot Sleman Ernawati 5,75 2.000.000 11.500.000 5,75 11.500.000 - - 5,75 11.500.000 - -

Suwardiyono 24,00 2.000.000 48.000.000 24,00 48.000.000 - - 24,00 48.000.000 - -

c. Korkot Bantul Dian Alyani Nurainina 29,75 2.000.000 59.500.000 29,75 59.500.000 - - 29,75 59.500.000 - -

- - - - - - - - - - -

2 Office Boy

PROVINCE CENTRAL JAVA

a. Korkot Purbalingga (44 kelurahan) Tataq Araludin Syah 20,24 1.350.000 27.325.000 20,24 27.325.000 - - 20,24 27.325.000 - -

Nurkholis 9,50 1.350.000 12.825.000 9,50 12.825.000 - - 9,50 12.825.000 - -

b. Korkot Magelang (27 kelurahan) Priharyatno 29,74 1.350.000 40.150.000 29,74 40.150.000 - - 29,74 40.150.000 - -

Korkot Kota Magelang (17 kelurahan) Priharyatno - 1.350.000 - - - - - - - - -

c. Korkot Blora (45 kelurahan) Dina Miranti 29,74 1.350.000 40.150.000 29,74 40.150.000 - - 29,74 40.150.000 - -

d. Korkot Temanggung (41 kelurahan) Mukhotib Muhammad 29,74 1.350.000 40.150.000 29,74 40.150.000 - - 29,74 40.150.000 - -

e. Korkot Batang (39 kelurahan) Rokhayah 29,74 1.350.000 40.150.000 29,74 40.150.000 - - 29,74 40.150.000 - -

f. Korkot Brebes (38 kelurahan) Lukni Maulana 11,74 1.350.000 15.850.000 11,74 15.850.000 - - 11,74 15.850.000 - -

Aris Sunanto 18,00 1.350.000 24.300.000 18,00 24.300.000 - - 18,00 24.300.000 - -

1 g. Korkot Kota Pekalongan (27 kelurahan) Eka Choerunnisya 44,74 1.350.000 60.400.000 40,74 55.000.000 1,00 1.350.000 41,74 56.350.000 3,00 4.050.000

h. Korkot Banyumas (85 kelurahan) Catur Setiawan 29,74 1.350.000 40.150.000 29,74 40.150.000 - - 29,74 40.150.000 - -

i. Korkot Kebumen (54 kelurahan) Dodi Prihatin 29,74 1.350.000 40.150.000 29,74 40.150.000 - - 29,74 40.150.000 - -

j. Korkot Boyolali (61 kelurahan) Suparmi 29,74 1.350.000 40.150.000 29,74 40.150.000 - - 29,74 40.150.000 - -

k. Korkot Sukoharjo (83 kelurahan) Dwi Erlita Meindarwati 9,74 1.350.000 13.150.000 9,74 13.150.000 - - 9,74 13.150.000 - -

Apriyana Dian Permata 20,00 1.350.000 27.000.000 20,00 27.000.000 - - 20,00 27.000.000 - -

l. Korkot Karanganyar (51 kelurahan) Suparno 29,74 1.350.000 40.150.000 29,74 40.150.000 - - 29,74 40.150.000 - -

m. Korkot Rembang (54 kelurahan) Putri Nurjanah 29,74 1.350.000 40.150.000 29,74 40.150.000 - - 29,74 40.150.000 - -

n. Korkot Kudus (86 kelurahan) Alfa Fitria Safoarifa 29,74 1.350.000 40.150.000 29,74 40.150.000 - - 29,74 40.150.000 - -

o. Korkot Jepara (86 kelurahan) Andreas Sony Sanjaya 29,74 1.350.000 40.150.000 29,74 40.150.000 - - 29,74 40.150.000 - -

2 p. Korkot Kendal (57 kelurahan) Umi Khoirul ummah 44,74 1.350.000 60.400.000 40,74 55.000.000 1,00 1.350.000 41,74 56.350.000 3,00 4.050.000

3 q. Korkot Pemalang (79 kelurahan) Arif Muzaki 44,74 1.350.000 60.400.000 40,74 55.000.000 1,00 1.350.000 41,74 56.350.000 3,00 4.050.000

4 r. Korkot Kota Surakarta (51 kelurahan) Yudho Waseso 44,74 1.350.000 60.400.000 40,74 55.000.000 1,00 1.350.000 41,74 56.350.000 3,00 4.050.000

s. Korkot Pati (101 kelurahan) Lusi Ana 29,74 1.350.000 40.150.000 29,74 40.150.000 - - 29,74 40.150.000 - -

5 t. Korkot Kab Pekalongan (119 kelurahan) Guntur Dwi Prasetyo 44,74 1.350.000 60.400.000 40,74 55.000.000 1,00 1.350.000 41,74 56.350.000 3,00 4.050.000

u. Korkot Tegal (116 kelurahan) Nurkholis 21,74 1.350.000 29.350.000 21,74 29.350.000 - - 21,74 29.350.000 - -

To be Name 8,00 1.350.000 10.800.000 8,00 10.800.000 - - 8,00 10.800.000 - -

6 Korkot Kota Tegal (27 kelurahan) Tanusi 12,00 1.350.000 16.200.000 8,00 10.800.000 1,00 1.350.000 9,00 12.150.000 3,00 4.050.000

7 v. Korkot Kota Semarang (177 kelurahan) Pungkas Dimas Sasongko 9,74 1.350.000 13.150.000 9,74 13.150.000 - - 9,74 13.150.000 - -

Amirah 35,00 1.350.000 47.250.000 31,00 41.850.000 1,00 1.350.000 32,00 43.200.000 3,00 4.050.000

w. Korkot Klaten A Bambang Heru Sasomo 29,74 1.350.000 40.150.000 29,74 40.150.000 - - 29,74 40.150.000 - -

x. Korkot Banjarnegara To be Name - - - - - - - - - - -

Page 10: PROGRAM KOTA TANPA KUMUH SATKER ...103.12.84.195/files/Media/Laporan/Contract Resume/osp5...NO KOMPOSISI BIAYA AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT

Vol Unit Price

(IDR)

Total Amount

(IDR) Vol Total Amount (IDR) Vol

Total Amount

(IDR) Vol Total Amount (IDR) Vol

Total Amount

(IDR)

INVOICE S/D SAAT INI SISA KONTRAKAMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI

POSISI NAMA

8 y. Korkot Purworejo (27 kelurahan) Dodi Prihatin 15,00 1.350.000 20.250.000 11,00 14.850.000 1,00 1.350.000 12,00 16.200.000 3,00 4.050.000

9 z. Korkot Kab Semarang (177 kelurahan ) Nurkholis 15,00 1.350.000 20.250.000 11,00 14.850.000 1,00 1.350.000 12,00 16.200.000 3,00 4.050.000

10 a.1. Korkot kota Demak (19 kelurahan ) Suhartomo 15,00 1.350.000 20.250.000 11,00 14.850.000 1,00 1.350.000 12,00 16.200.000 3,00 4.050.000

11 b.1. Korkot Kab Wonosobo (20 kelurahan ) Romadhon 15,00 1.350.000 20.250.000 11,00 14.850.000 1,00 1.350.000 12,00 16.200.000 3,00 4.050.000

PROVINCE DI YOGYAKARTA

1 a. Korkot Kota Yogyakarta Slamet Riyanto 44,74 1.350.000 60.400.000 40,74 55.000.000 1,00 1.350.000 41,74 56.350.000 3,00 4.050.000

2 b. Korkot Sleman Bagus Tri Joko 29,74 1.350.000 40.150.000 29,74 40.150.000 - - 29,74 40.150.000 - -

c. Korkot Bantul Wachid Nur'Aini 29,74 1.350.000 40.150.000 29,74 40.150.000 - - 29,74 40.150.000 - -

20.804.769.481 19.580.484.803 275.782.143 19.856.266.946 948.502.535 TOTAL REMUNERATION

Page 11: PROGRAM KOTA TANPA KUMUH SATKER ...103.12.84.195/files/Media/Laporan/Contract Resume/osp5...NO KOMPOSISI BIAYA AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT

II. DIRECT REEIMBURSABLE COST

2.1. DUTY TRAVEL EXPENSES FOR CENTRAL JAVA PROVINCE

Vol Unit Price

(IDR)

Total Amount

(IDR)

2.1.1 IN PROVINCE T A O Trans Acom OSA T A O Trans Acom OSA T A O Trans Acom OSA T A O Trans Acom OSA

2.1.1.1

FOR SPOTCHECK PROVINCE TO KELURAHAN (3 %

x

Number of Kelurahan)

89.200.000 19.100.000 30.779.000 16.150.000 - - - 19.100.000 30.779.000 16.150.000 5.500.000 5.500.000 11.871.000 5.800.000

a To Cilacap & Banyumas (100 kel x 3% = 4 kel)

Transport 7 300.000 2.100.000 7 2.100.000 - - 7 2.100.000 - - -

Acomodation 14 150.000 2.100.000 14 2.070.000 - - 14 2.070.000 - 30.000

OSA 21 50.000 1.050.000 21 1.050.000 - - 21 1.050.000 - -

b To Purbalingga & Banjarnegara (57 kel x 3% = 3 kel)

Transport 7 200.000 1.400.000 7 1.400.000 - - 7 1.400.000 - - -

Acomodation 14 150.000 2.100.000 14 2.100.000 - - 14 2.100.000 - -

OSA 21 50.000 1.050.000 21 1.050.000 - - 21 1.050.000 - -

c To Kebumen, Purworejo dan Wonosobo (101 kel x 3% = 4 kel)

Transport 7 200.000 1.400.000 7 1.400.000 - - 7 1.400.000 - - -

Acomodation 16 150.000 2.400.000 16 2.175.000 - - 16 2.175.000 - 225.000

OSA 23 50.000 1.150.000 23 1.150.000 - - 23 1.150.000 - -

d To Magelang, Temanggung & Kota Magelang (85 kel x 3% = 4 kel)

Transport 7 200.000 1.400.000 7 1.400.000 - - 7 1.400.000 - - -

Acomodation 15 150.000 2.250.000 15 2.100.000 - - 15 2.100.000 - 150.000

OSA 22 50.000 1.100.000 22 1.100.000 - - 22 1.100.000 - -

e To Boyolali, Klaten & Sukoharjo (356 kel x 3% = 12 kel)

Transport 7 200.000 1.400.000 7 1.400.000 - - 7 1.400.000 - - -

Acomodation 17 150.000 2.550.000 17 2.300.000 - - 17 2.300.000 - 250.000

OSA 24 50.000 1.200.000 24 1.200.000 - - 24 1.200.000 - -

f To Wonogiri & Karanganyar (77 kel x 3% = 3 kel)

Transport 6 200.000 1.200.000 6 1.200.000 - - 6 1.200.000 - - -

Acomodation 12 150.000 1.800.000 12 1.770.000 - - 12 1.770.000 - 30.000

OSA 18 50.000 900.000 18 900.000 - - 18 900.000 - -

g To Kota Surakarta & Sragen (67 kel x 3% = 3 kel)

Transport 8 200.000 1.600.000 8 1.600.000 - - 8 1.600.000 - - -

Acomodation 16 150.000 2.400.000 16 2.380.000 - - 16 2.380.000 - 20.000

OSA 26 50.000 1.300.000 26 1.300.000 - - 26 1.300.000 - -

h To Grobogan & Blora (62 kel x 3% = 3 kel)

Transport 7 300.000 2.100.000 7 2.100.000 - - 7 2.100.000 - - -

Acomodation 15 150.000 2.250.000 15 2.250.000 - - 15 2.250.000 - -

OSA 22 50.000 1.100.000 22 1.100.000 - - 22 1.100.000 - -

i Transport Rembang, Pati & Jepara (241 kel x 3% = 9 kel)

Transport 7 200.000 1.400.000 7 1.400.000 - - 7 1.400.000 - - -

Acomodation 17 150.000 2.550.000 17 2.300.000 - - 17 2.300.000 - 250.000

OSA 24 50.000 1.200.000 24 1.200.000 - - 24 1.200.000 - -

j To Kudus & Demak (105 kel x 3% = 4 kel)

Transport 7 100.000 700.000 7 700.000 - - 7 700.000 - - -

Acomodation 13 150.000 1.950.000 13 1.950.000 - - 13 1.950.000 - -

OSA - 200.000 - - - - - - - - -

22 50.000 1.100.000 22 1.100.000 - - 22 1.100.000 - -

k To Semarang & Salatiga (53 kel x 3% = 2 kel)

Transport 6 100.000 600.000 6 600.000 - - 6 600.000 - - -

Acomodation 12 150.000 1.800.000 12 1.800.000 - - 12 1.800.000 - -

OSA - 200.000 - - - - - - - - -

18 50.000 900.000 18 900.000 - - 18 900.000 - -

l To Batang, Pekalongan, Pemalang, Kota Pekalongan (284 kel x 3% = 11 kel)

Transport 9 200.000 1.800.000 9 1.800.000 - - 9 1.800.000 - - -

Acomodation 20 150.000 3.000.000 20 2.934.000 - - 20 2.934.000 - 66.000

OSA - 200.000 - - - - - - - - -

32 50.000 1.600.000 32 1.600.000 - - 32 1.600.000 - -

m To Tegal, Brebes, Kota Tegal (181 kel x 3% = 7 kel)

Transport 7 200.000 1.400.000 7 1.400.000 - - 7 1.400.000 - - -

Acomodation 17 150.000 2.550.000 17 2.550.000 - - 17 2.550.000 - -

OSA - 200.000 - - - - - - - - -

24 50.000 1.200.000 24 1.200.000 - - 24 1.200.000 - -

n To Kendal, Kota Semarang (234 kel x 3% = 8 kel)

Transport 6 100.000 600.000 6 600.000 - - 6 600.000 - - -

Acomodation 14 150.000 2.100.000 14 2.100.000 - - 14 2.100.000 - -

OSA - 200.000 - - - - - - - - -

26 50.000 1.300.000 26 1.300.000 - - 26 1.300.000 - -

UJI PETIK OSP KE KOTA DAN KELURAHAN

a Kota Semarang to Kab. Karanganyar

Transport 2 200.000 400.000 - - - - - - 2 400.000 400.000

Acomodation 4 350.000 1.400.000 - - - - - - 4 1.400.000

OSA 6 100.000 600.000 - - - - - - 6 600.000

b Kota Semarang to Kab. Pati

Transport 2 200.000 400.000 - - - - - - 2 400.000 400.000

Acomodation 4 350.000 1.400.000 - - - - - - 4 1.400.000

OSA 6 100.000 600.000 - - - - - - 6 600.000

c Kota Semarang to Kab. Pekalongan

Transport 2 200.000 400.000 - - - - - - 2 400.000 400.000

Acomodation 4 350.000 1.400.000 - - - - - - 4 1.400.000

OSA 6 100.000 600.000 - - - - - - 6 600.000

NO. URAIAN

AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAK

Vol Total Amount (IDR) Vol Total Amount (IDR) Vol Total Amount (IDR) Vol Total Amount (IDR)

Page 12: PROGRAM KOTA TANPA KUMUH SATKER ...103.12.84.195/files/Media/Laporan/Contract Resume/osp5...NO KOMPOSISI BIAYA AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT

Vol Unit Price

(IDR)

Total Amount

(IDR)

NO. URAIAN

AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAK

Vol Total Amount (IDR) Vol Total Amount (IDR) Vol Total Amount (IDR) Vol Total Amount (IDR)

d Kota Semarang to Kota Semarang

Transport - 200.000 - - - - - - - - - -

Acomodation - 350.000 - - - - - - - - -

OSA 6 100.000 600.000 - - - - - - 6 600.000

e Kota Semarang to Kota Pekalongan

Transport 2 200.000 400.000 - - - - - - 2 400.000 400.000

Acomodation 4 350.000 1.400.000 - - - - - - 4 1.400.000

OSA 6 100.000 600.000 - - - - - - 6 600.000

f Kota Semarang to Kota Tegal

Transport 2 300.000 600.000 - - - - - - 2 600.000 600.000

Acomodation 4 350.000 1.400.000 - - - - - - 4 1.400.000

OSA 6 100.000 600.000 - - - - - - 6 600.000

Uji Petik Tematik OSP-5 Jawa Tengah

a Uji Petik Tematik OSP - 5 Jateng....... 11 300.000 3.300.000 - - - - 11 3.300.000 3.300.000

Transport 11 350.000 3.850.000 - - - - 11 3.850.000

Acomodation 22 100.000 2.200.000 - - - - 22 2.200.000

OSA

2.1.1.2SPOOTCHECK KOTA/KAB FOR ASS. CITY

COORDINATOR INFRA AND FM21.650.000 - - - - - - - - - 8.800.000 8.800.000 6.450.000 6.400.000

A. For City Coordinator and Assistance City Coordinator

(2003 Kel x 50%) x 3 - 50.000 - - - - - - - - - -

Cost / Day Rp. 50.000.- 1 Day cover 2 kel

(2003-1-20+22+1 Kel x 50%) x 3 - 50.000 - - - - - - - - - -

Cost / Day Rp. 50.000.- 1 Day cover 2 kel

Periode Januari - September 2016 -

(1983/2 Kel x 50%) x 3 - 50.000 - - - - - - - - - -

Cost / Day Rp. 50.000.- 1 Day cover 2 kel

B. For Ass. City Coordinator Infrastructure and FM in the city

(2003 Kel - 196 Kel luar kota) x 50%) x 7 - 50.000 - - - - - - - - - -

Cost / Day Rp. 50.000.- 1 Day cover 2 kel

(2003-1-20+22+1 Kel x 50%) x 7 - 50.000 - - - - - - - - - -

Cost / Day Rp. 50.000.- 1 Day cover 2 kel

Periode Januari - September 2016 -

(1983 Kel x 50%) x 9 bulan - 50.000 - - - - - - - - - -

Cost / Day Rp. 50.000.- 1 Day cover 2 kel

Periode Mei - Agustus 2017

MONITORING KORKOT PADA LEVEL KELURAHAN/DESA

1 Monitoring Tim Korkot Kendal di Dalam Kota

KEL/DESA KUMUH DI KOTA SKALA KOTA

Transport 2 50.000 100.000 - - - - - - 2 100.000 100.000

KEL/DESA NON KUMUH

Transport 2 50.000 100.000 - - - - - - 2 100.000 100.000

2 Monitoring Tim Korkot Kendal Ke (1) Wonosobo

KEL/DESA KUMUH DI NON KOTA SKALA KOTA

Transport to Wonosobo 1 200.000 200.000 - - - - - - 1 200.000 200.000

Acomodation 1 150.000 150.000 - - - - - - 1 150.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

KEL/DESA NON KUMUH

Transport to Wonosobo 1 200.000 200.000 - - - - - - 1 200.000 200.000

Acomodation 1 150.000 150.000 - - - - - - 1 150.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

3 Monitoring Tim Korkot Demak di Dalam Kota

KEL/DESA KUMUH DI KOTA SKALA KOTA

Transport 1 50.000 50.000 - - - - - - 1 50.000 50.000

KEL/DESA NON KUMUH

Transport 1 50.000 50.000 - - - - - - 1 50.000 50.000

4 Monitoring Tim Korkot Demak Ke (1) Jepara, (2) Kudus, (3) Pati

KEL/DESA KUMUH DI NON KOTA SKALA KOTA

Transport to Jepara 1 100.000 100.000 - - - - - - 1 100.000 100.000

Acomodation 1 150.000 150.000 - - - - - - 1 150.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

Transport to Kudus 1 100.000 100.000 - - - - - - 1 100.000 100.000

Acomodation 1 150.000 150.000 - - - - - - 1 150.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

Transport to Pati 1 100.000 100.000 - - - - - - 1 100.000 100.000

Acomodation 1 150.000 150.000 - - - - - - 1 150.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

Page 13: PROGRAM KOTA TANPA KUMUH SATKER ...103.12.84.195/files/Media/Laporan/Contract Resume/osp5...NO KOMPOSISI BIAYA AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT

Vol Unit Price

(IDR)

Total Amount

(IDR)

NO. URAIAN

AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAK

Vol Total Amount (IDR) Vol Total Amount (IDR) Vol Total Amount (IDR) Vol Total Amount (IDR)

KEL/DESA NON KUMUH

Transport to Jepara 1 100.000 100.000 - - - - - - 1 100.000 100.000

Acomodation 1 150.000 150.000 - - - - - - 1 150.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

Transport to Kudus 1 100.000 100.000 - - - - - - 1 100.000 100.000

Acomodation 1 150.000 150.000 - - - - - - 1 150.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

Transport to Pati 1 100.000 100.000 - - - - - - 1 100.000 100.000

Acomodation 1 150.000 150.000 - - - - - - 1 150.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

5 Monitoring Tim Korkot Semarang di Dalam Kota

KEL/DESA KUMUH DI KOTA SKALA KOTA

Transport 1 50.000 50.000 - - - - - - 1 50.000 50.000

KEL/DESA NON KUMUH

Transport 1 50.000 50.000 - - - - - - 1 50.000 50.000

6 Monitoring Tim Korkot Semarang Ke (1) Temanggung, (2) Kota Salatiga

KEL/DESA KUMUH DI NON KOTA SKALA KOTA

Transport to Temanggung 1 200.000 200.000 - - - - - - 1 200.000 200.000

Acomodation 1 150.000 150.000 - - - - - - 1 150.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

Transport to Salatiga 1 100.000 100.000 - - - - - - 1 100.000 100.000

Acomodation 1 150.000 150.000 - - - - - - 1 150.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

KEL/DESA NON KUMUH

Transport to Temanggung 1 200.000 200.000 - - - - - - 1 200.000 200.000

Acomodation 1 150.000 150.000 - - - - - - 1 150.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

Transport to Salatiga 1 100.000 100.000 - - - - - - 1 100.000 100.000

Acomodation 1 150.000 150.000 - - - - - - 1 150.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

7 Monitoring Tim Korkot Kota Pekalongan di Dalam Kota

KEL/DESA KUMUH DI KOTA SKALA KOTA

Transport 2 50.000 100.000 - - - - - - 2 100.000 100.000

KEL/DESA NON KUMUH

Transport 2 50.000 100.000 - - - - - - 2 100.000 100.000

8 Monitoring Tim Korkot Kota Pekalongan Ke (1) Batang

KEL/DESA KUMUH DI NON KOTA SKALA KOTA

Transport to Batang 1 100.000 100.000 - - - - - - 1 100.000 100.000

Acomodation 1 150.000 150.000 - - - - - - 1 150.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

KEL/DESA NON KUMUH

Transport to Batang 1 100.000 100.000 - - - - - - 1 100.000 100.000

Acomodation 1 150.000 150.000 - - - - - - 1 150.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

9 Monitoring Tim Korkot Kota Tegal di Dalam Kota

KEL/DESA KUMUH DI KOTA SKALA KOTA

Transport 2 50.000 100.000 - - - - - - 2 100.000 100.000

KEL/DESA NON KUMUH

Transport 2 50.000 100.000 - - - - - - 2 100.000 100.000

10 Monitoring Tim Korkot Kota Tegal Ke (1) Tegal, (2) Brebes

KEL/DESA KUMUH DI NON KOTA SKALA KOTA

Transport to Tegal 1 100.000 100.000 - - - - - - 1 100.000 100.000

Acomodation 1 150.000 150.000 - - - - - - 1 150.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

Transport to Brebes 1 100.000 100.000 - - - - - - 1 100.000 100.000

Acomodation 1 150.000 150.000 - - - - - - 1 150.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

KEL/DESA NON KUMUH

Transport to Tegal 1 100.000 100.000 - - - - - - 1 100.000 100.000

Acomodation 1 150.000 150.000 - - - - - - 1 150.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

Transport to Brebes 1 100.000 100.000 - - - - - - 1 100.000 100.000

Acomodation 1 150.000 150.000 - - - - - - 1 150.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

11 Monitoring Tim Korkot Pekalongan di Dalam Kota

KEL/DESA KUMUH DI KOTA SKALA KOTA

Transport 5 50.000 250.000 - - - - - - 5 250.000 250.000

Page 14: PROGRAM KOTA TANPA KUMUH SATKER ...103.12.84.195/files/Media/Laporan/Contract Resume/osp5...NO KOMPOSISI BIAYA AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT

Vol Unit Price

(IDR)

Total Amount

(IDR)

NO. URAIAN

AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAK

Vol Total Amount (IDR) Vol Total Amount (IDR) Vol Total Amount (IDR) Vol Total Amount (IDR)

KEL/DESA NON KUMUH

Transport 5 50.000 250.000 - - - - - - 5 250.000 250.000

12 Monitoring Tim Korkot Pemalang di Dalam Kota

KEL/DESA KUMUH DI KOTA SKALA KOTA

Transport 2 50.000 100.000 - - - - - - 2 100.000 100.000

KEL/DESA NON KUMUH

Transport 2 50.000 100.000 - - - - - - 2 100.000 100.000

13 Monitoring Tim Korkot Kota Semarang di Dalam Kota

KEL/DESA KUMUH DI KOTA SKALA KOTA

Transport - 50.000 - - - - - - -

KEL/DESA NON KUMUH

Transport 2 50.000 100.000 - - - - - - 2 100.000 100.000

14 Monitoring Tim Korkot Kota Semarang ke (1) Grobogan, (2) Rembang, (3) Blora

KEL/DESA KUMUH DI KOTA SKALA KOTA

Transport to Grobogan 1 200.000 200.000 - - - - - - 1 200.000 200.000

Acomodation 1 150.000 150.000 - - - - - - 1 150.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

Transport to Rembang 1 200.000 200.000 - - - - - - 1 200.000 200.000

Acomodation 1 150.000 150.000 - - - - - - 1 150.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

Transport to Blora 1 200.000 200.000 - - - - - - 1 200.000 200.000

Acomodation 1 150.000 150.000 - - - - - - 1 150.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

KEL/DESA NON KUMUH

Transport to Grobogan 1 200.000 200.000 - - - - - - 1 200.000 200.000

Acomodation 1 150.000 150.000 - - - - - - 1 150.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

Transport to Rembang 1 200.000 200.000 - - - - - - 1 200.000 200.000

Acomodation 1 150.000 150.000 - - - - - - 1 150.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

Transport to Blora 1 200.000 200.000 - - - - - - 1 200.000 200.000

Acomodation 1 150.000 150.000 - - - - - - 1 150.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

15 Monitoring Tim Korkot Kab. Wonosobo di Dalam Kota

KEL/DESA KUMUH DI KOTA SKALA KOTA

Transport 2 50.000 100.000 - - - - - - 2 100.000 100.000

KEL/DESA NON KUMUH

Transport 2 50.000 100.000 - - - - - - 2 100.000 100.000

16 Monitoring Tim Korkot Kab. Wonosobo ke Temanggung

KEL/DESA KUMUH DI KOTA SKALA KOTA

Transport to Temanggung 1 200.000 200.000 - - - - - - 1 200.000 200.000

Acomodation 1 150.000 150.000 - - - - - - 1 150.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

KEL/DESA NON KUMUH

Transport to Temanggung 1 200.000 200.000 - - - - - - 1 200.000 200.000

Acomodation 1 150.000 150.000 - - - - - - 1 150.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

17 Monitoring Tim Korkot Kab. Pati di Dalam Kota

KEL/DESA KUMUH DI KOTA SKALA KOTA

Transport - 50.000 - - - - - - - - - -

KEL/DESA NON KUMUH

Transport - 50.000 - - - - - - - - - -

18 Monitoring Tim Korkot Kab. Pati ke Rembang, Blora

KEL/DESA KUMUH DI KOTA SKALA KOTA

Transport to Rembang - 100.000 - - - - - - - - - -

Acomodation - 150.000 - - - - - - - - -

OSA - 50.000 - - - - - - - - -

Transport to Blora 2 100.000 200.000 - - - - - - 2 200.000 200.000

Acomodation 2 150.000 300.000 - - - - - - 2 300.000

OSA 3 50.000 150.000 - - - - - - 3 150.000

KEL/DESA NON KUMUH

Transport to Rembang - 100.000 - - - - - - - - - -

Acomodation - 150.000 - - - - - - - - - -

OSA - 50.000 - - - - - - - - - -

Transport to Blora - 100.000 - - - - - - - - - -

Acomodation - 150.000 - - - - - - - - - -

OSA - 50.000 - - - - - - - - - -

19 Monitoring Tim Korkot Kota Surakarta di Dalam Kota -

KEL/DESA KUMUH DI KOTA SKALA KOTA -

Transport 14 50.000 700.000 - - - - - - 14 700.000 700.000 -

Page 15: PROGRAM KOTA TANPA KUMUH SATKER ...103.12.84.195/files/Media/Laporan/Contract Resume/osp5...NO KOMPOSISI BIAYA AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT

Vol Unit Price

(IDR)

Total Amount

(IDR)

NO. URAIAN

AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAK

Vol Total Amount (IDR) Vol Total Amount (IDR) Vol Total Amount (IDR) Vol Total Amount (IDR)

KEL/DESA NON KUMUH -

Transport - 50.000 - - - - - - - - - -

20 Monitoring Tim Korkot Kota Surakarta Ke (1) Sukoharjo, (2) Karanganyar, (3) Sragen -

KEL/DESA KUMUH DI NON KOTA SKALA KOTA -

Transport to Sukoharjo 1 100.000 100.000 - - - - - - 1 100.000 100.000

Acomodation 1 150.000 150.000 - - - - - - 1 150.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

-

Transport to Karanganyar 1 100.000 100.000 - - - - - - 1 100.000 100.000

Acomodation 1 150.000 150.000 - - - - - - 1 150.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

Transport to Sragen 1 100.000 100.000 - - - - - - 1 100.000 100.000

Acomodation 1 150.000 150.000 - - - - - - 1 150.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

KEL/DESA NON KUMUH

Transport to Sukoharjo 1 100.000 100.000 - - - - - - 1 100.000 100.000

Acomodation 1 150.000 150.000 - - - - - - 1 150.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

Transport to Karanganyar 1 100.000 100.000 - - - - - - 1 100.000 100.000

Acomodation 1 150.000 150.000 - - - - - - 1 150.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

Transport to Sragen 1 100.000 100.000 - - - - - - 1 100.000 100.000

Acomodation 1 150.000 150.000 - - - - - - 1 150.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

21 Monitoring Tim Korkot Purworejo di Dalam Kota

KEL/DESA KUMUH DI KOTA SKALA KOTA

Transport 2 50.000 100.000 - - - - - - 2 100.000 100.000

KEL/DESA NON KUMUH

Transport 4 50.000 200.000 - - - - - - 4 200.000 200.000

22 Monitoring Tim Korkot Purworejo Ke (1) Magelang, (2) Kota Magelang

KEL/DESA KUMUH DI NON KOTA SKALA KOTA

Transport to Kab Magelang 1 200.000 200.000 - - - - - - 1 200.000 200.000

Acomodation - 150.000 - - - - - - - - -

OSA 1 50.000 50.000 - - - - - - 1 50.000

Transport to Kota Magelang 1 200.000 200.000 - - - - - - 1 200.000 200.000

Acomodation - 150.000 - - - - - - - - -

OSA 2 50.000 100.000 - - - - - - 2 100.000

KEL/DESA NON KUMUH -

Transport to Kab Magelang 1 200.000 200.000 - - - - - - 1 200.000 200.000

Acomodation 1 150.000 150.000 - - - - - - 1 150.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

Transport to Kota Magelang 1 200.000 200.000 - - - - - - 1 200.000 200.000

Acomodation 2 150.000 300.000 - - - - - - 2 300.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

23 Monitoring Tim Korkot Klaten di Dalam Kota

KEL/DESA KUMUH DI NON KOTA SKALA KOTA

Transport - 50.000 - - - - - - - - - -

KEL/DESA NON KUMUH

Transport - 50.000 - - - - - - - - - -

24 Monitoring Tim Korkot Klaten Ke (1) Boyolali, (2) Wonogiri

KEL/DESA KUMUH DI NON KOTA SKALA KOTA

Transport to Boyolali - 100.000 - - - - - - - - - -

Acomodation - 150.000 - - - - - - - - -

OSA - 50.000 - - - - - - - - -

Transport to Wonogiri - 200.000 - - - - - - - - - -

Acomodation - 150.000 - - - - - - - - -

OSA - 50.000 - - - - - - - - -

KEL/DESA NON KUMUH

Transport to Boyolali - 100.000 - - - - - - - - - -

Acomodation - 150.000 - - - - - - - - -

OSA - 50.000 - - - - - - - - -

Transport to Wonogiri - 200.000 - - - - - - - - - -

Acomodation - 150.000 - - - - - - - - -

OSA - 50.000 - - - - - - - - -

25 Monitoring Tim Korkot Kebumen di Dalam Kota

KEL/DESA KUMUH DI NON KOTA SKALA KOTA

Transport - 50.000 - - - - - - - - - -

KEL/DESA NON KUMUH

Transport - 50.000 - - - - - - - - - -

Page 16: PROGRAM KOTA TANPA KUMUH SATKER ...103.12.84.195/files/Media/Laporan/Contract Resume/osp5...NO KOMPOSISI BIAYA AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT

Vol Unit Price

(IDR)

Total Amount

(IDR)

NO. URAIAN

AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAK

Vol Total Amount (IDR) Vol Total Amount (IDR) Vol Total Amount (IDR) Vol Total Amount (IDR)

26 Monitoring Tim Korkot Kebumen ke (1) Purbalingga, (2) Cilacap, (3) Banyumas

KEL/DESA KUMUH DI NON KOTA SKALA KOTA

Transport to Purbalingga - 100.000 - - - - - - - - - -

Acomodation - 150.000 - - - - - - - - -

OSA - 50.000 - - - - - - - - -

Transport to Cilacap - 100.000 - - - - - - - - - -

Acomodation - 150.000 - - - - - - - - -

OSA - 50.000 - - - - - - - - -

Transport to Banyumas - 100.000 - - - - - - - - - -

Acomodation - 150.000 - - - - - - - - -

OSA - 50.000 - - - - - - - - -

KEL/DESA NON KUMUH

Transport to Purbalingga - 100.000 - - - - - - - - - -

Acomodation - 150.000 - - - - - - - - -

OSA - 50.000 - - - - - - - - -

Transport to Cilacap - 100.000 - - - - - - - - - -

Acomodation - 150.000 - - - - - - - - -

OSA - 50.000 - - - - - - - - -

Transport to Banyumas - 100.000 - - - - - - - - - -

Acomodation - 150.000 - - - - - - - - -

OSA - 50.000 - - - - - - - - -

Uji Petik Korkot To Kelurahan :

1 KAB. WONOSOBO to KAB. BANYUMAS

Transport to Banyumas 1 100.000 100.000 - - - - - - 1 100.000 100.000

Acomodation 1 150.000 150.000 - - - - - - 1 150.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

2 KAB. PURWOREJO to KAB. KEBUMEN

Transport to Kebumen 1 100.000 100.000 - - - - - - 1 100.000 100.000

Acomodation 1 150.000 150.000 - - - - - - 1 150.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

3 KAB. PURWOREJO to KAB. PURWOREJO -

OSA 2 50.000 100.000 - - - - - - 2 100.000

4 KAB. WONOSOBO to KAB. WONOSOBO

OSA 2 50.000 100.000 - - - - - - 2 100.000

5 KAB. SURAKARTA to KAB. KARANGANYAR

OSA 2 50.000 100.000 - - - - - - 2 100.000

6 KAB. DEMAK to KAB. PATI

Transport to Pati 1 100.000 100.000 - - - - - - 1 100.000 100.000

Acomodation 1 150.000 150.000 - - - - - - 1 150.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

7 KAB. DEMAK to KAB. KUDUS

Transport to Kudus 1 100.000 100.000 - - - - - - 1 100.000 100.000

Acomodation 1 150.000 150.000 - - - - - - 1 150.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

8 KAB. DEMAK to KAB. DEMAK

OSA 2 50.000 100.000 - - - - - - 2 100.000

9 KAB. SEMARANG to KAB. SEMARANG

OSA 2 50.000 100.000 - - - - - - 2 100.000

10 KAB. KENDAL to KAB. KENDAL

OSA 2 50.000 100.000 - - - - - - 2 100.000

11 KAB. PEKALONGAN to KAB. PEKALONGAN

OSA 4 50.000 200.000 - - - - - - 4 200.000

12 KAB. PEMALANG to KAB. PEMALANG

OSA 4 50.000 200.000 - - - - - - 4 200.000

13 KOTA TEGAL to KAB. BREBES

Transport to Brebes 1 100.000 100.000 - - - - - - 1 100.000 100.000

Acomodation 1 150.000 150.000 - - - - - - 1 150.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

14 KAB. WONOSOBO to KOTA MAGELANG

Transport to Banyumas 1 100.000 100.000 - - - - - - 1 100.000 100.000

Acomodation 1 150.000 150.000 - - - - - - 1 150.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

15 KOTA SURAKARTA to KOTA SURAKARTA

OSA 6 50.000 300.000 - - - - - - 6 300.000

16 KOTA SEMARANG to KOTA SEMARANG

OSA 10 50.000 500.000 - - - - - - 10 500.000

17 KOTA PEKALONGAN to KOTA PEKALONGAN

OSA 4 50.000 200.000 - - - - - - 4 200.000

18 KOTA TEGAL to KOTA TEGAL

OSA 2 50.000 100.000 - - - - - - 2 100.000

C. For Ass. City Coordinator Infrastructure and FM out of the town

1 Banyumas to Cilacap

Transport - 50.000 - - - - - - - - - -

2 Purbalingga to Banjarnegara

Transport - 50.000 - - - - - - - - - -

Page 17: PROGRAM KOTA TANPA KUMUH SATKER ...103.12.84.195/files/Media/Laporan/Contract Resume/osp5...NO KOMPOSISI BIAYA AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT

Vol Unit Price

(IDR)

Total Amount

(IDR)

NO. URAIAN

AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAK

Vol Total Amount (IDR) Vol Total Amount (IDR) Vol Total Amount (IDR) Vol Total Amount (IDR)

3 Temanggung To Wonosobo

Transport - 50.000 - - - - - - - - - -

4 Magelang to Kota Magelang

Transport - 50.000 - - - - - - - - - -

5 Karanganyar to Sragen

Transport - 50.000 - - - - - - - - - -

6 Kudus to Demak

Transport - 50.000 - - - - - - - - - -

7 Kota Semarang to Semarang

Transport - 50.000 - - - - - - - - - -

8 Boyolali to Kota Salatiga

Transport - 50.000 - - - - - - - - - -

9 Sukoharjo to Wonogiri

Transport - 50.000 - - - - - - - - - -

10 Blora to Grobogan

Transport - 50.000 - - - - - - - - - -

11 Kebumen to Purworejo

Transport - 50.000 - - - - - - - - - -

12 Brebes to Kota Tegal

Transport - 50.000 - - - - - - - - - -

2.1.1.3 FOR CB ACTIVITY BY ASKOT TO FASKEL - - - - - - - - - - - - - -

1 Cilacap to Banyumas

Transport - 50.000 - - - - - - - - - -

Banyumas to Cilacap

Transport - 50.000 - - - - - - - - - -

2 Purbalingga to Banjarnegara

Transport - 50.000 - - - - - - - - - -

3 Temanggung To Wonosobo

Transport - 50.000 - - - - - - - - - -

4 Magelang to Kota Magelang

Transport - 50.000 - - - - - - - - - -

5 Karanganyar to Sragen

Transport - 50.000 - - - - - - - - - -

6 Kudus to Demak

Transport - 50.000 - - - - - - - - - -

7 Semarang to Kota Semarang

Transport - 50.000 - - - - - - - - - -

Kota Semarang to Kab. Semarang

Transport - 50.000 - - - - - - - - - -

8 Boyolali to Kota Salatiga

Transport - 50.000 - - - - - - - - - -

9 Wonogiri to Sukoharjo

Transport - 50.000 - - - - - - - - - -

Sukoharjo to Wonogiri

Transport - 50.000 - - - - - - - - - -

10 Grobogan to Karanganyar

Transport - 50.000 - - - - - - - - - -

Blora to Grobogan

Transport - 50.000 - - - - - - - - - -

11 Brebes to Kota Tegal

Transport - 50.000 - - - - - - - - - -

12 Kebumen to Purworejo

Transport - 50.000 - - - - - - - - - -

2.1.1.4FROM KAB/KOTA TO TL OFFICE FOR

COORDINATION MEETING218.700.000 75.100.000 56.200.000 22.000.000 - - - 75.100.000 56.200.000 22.000.000 19.800.000 19.800.000 32.600.000 13.000.000

a From Cilacap, Banyumas To Semarang

Transport 21 300.000 6.300.000 19 5.700.000 - - 19 5.700.000 2 600.000 600.000

Acomodation 19 200.000 3.800.000 15 3.000.000 - - 15 3.000.000 4 800.000

OSA 27 50.000 1.350.000 21 1.050.000 - - 21 1.050.000 6 300.000

b From Purbalingga, Banjarnegara To Semarang

Transport 20 200.000 4.000.000 19 3.800.000 - - 19 3.800.000 1 200.000 200.000

Acomodation 16 200.000 3.200.000 14 2.800.000 - - 14 2.800.000 2 400.000

OSA 27 50.000 1.350.000 24 1.200.000 - - 24 1.200.000 3 150.000

c From Kebumen, Purworejo & Wonosobo To Semarang

Transport 34 200.000 6.800.000 25 5.000.000 - - 25 5.000.000 9 1.800.000 1.800.000

Acomodation 38 200.000 7.600.000 19 3.800.000 - - 19 3.800.000 19 3.800.000

OSA 56 50.000 2.800.000 29 1.450.000 - - 29 1.450.000 27 1.350.000

d From Kota Magelang, Magelang & Temanggung To Semarang

Transport 33 200.000 6.600.000 30 6.000.000 - - 30 6.000.000 3 600.000 600.000

Acomodation 30 200.000 6.000.000 23 4.600.000 - - 23 4.600.000 7 1.400.000

OSA 46 50.000 2.300.000 36 1.800.000 - - 36 1.800.000 10 500.000

e From Boyolali, Klaten & Sukoharjo To Semarang

Transport 46 200.000 9.200.000 45 9.000.000 - - 45 9.000.000 1 200.000 200.000

Acomodation 39 200.000 7.800.000 36 7.200.000 - - 36 7.200.000 3 600.000

OSA 56 50.000 2.800.000 53 2.650.000 - - 53 2.650.000 3 150.000

Page 18: PROGRAM KOTA TANPA KUMUH SATKER ...103.12.84.195/files/Media/Laporan/Contract Resume/osp5...NO KOMPOSISI BIAYA AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT

Vol Unit Price

(IDR)

Total Amount

(IDR)

NO. URAIAN

AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAK

Vol Total Amount (IDR) Vol Total Amount (IDR) Vol Total Amount (IDR) Vol Total Amount (IDR)

f From Wonogiri, Karanganyar To Semarang

Transport 20 200.000 4.000.000 18 3.600.000 - - 18 3.600.000 2 400.000 400.000

Acomodation 18 200.000 3.600.000 13 2.600.000 - - 13 2.600.000 5 1.000.000

OSA 28 50.000 1.400.000 22 1.100.000 - - 22 1.100.000 6 300.000

g From Kota Surakarta & Sragen To Semarang

Transport 29 200.000 5.800.000 20 4.000.000 - - 20 4.000.000 9 1.800.000 1.800.000

Acomodation 24 200.000 4.800.000 13 2.600.000 - - 13 2.600.000 11 2.200.000

OSA 51 50.000 2.550.000 29 1.450.000 - - 29 1.450.000 22 1.100.000

h From Grobogan & Blora To Semarang

Transport 18 300.000 5.400.000 17 5.100.000 - - 17 5.100.000 1 300.000 300.000

Acomodation 16 200.000 3.200.000 14 2.800.000 - - 14 2.800.000 2 400.000

OSA 23 50.000 1.150.000 20 1.000.000 - - 20 1.000.000 3 150.000

i From Rembang, Pati & Jepara To Semarang

Transport 43 200.000 8.600.000 41 8.200.000 - - 41 8.200.000 2 400.000 400.000

Acomodation 37 200.000 7.400.000 33 6.600.000 - - 33 6.600.000 4 800.000

OSA 54 50.000 2.700.000 48 2.400.000 - - 48 2.400.000 6 300.000

j From Kudus, Demak To Semarang

Transport 25 100.000 2.500.000 20 2.000.000 - - 20 2.000.000 5 500.000 500.000

Acomodation 27 200.000 5.400.000 16 3.200.000 - - 16 3.200.000 11 2.200.000

OSA 39 50.000 1.950.000 24 1.200.000 - - 24 1.200.000 15 750.000

k From Semarang, Kota Salatiga To Semarang

Transport 15 100.000 1.500.000 11 1.100.000 - - 11 1.100.000 4 400.000 400.000

Acomodation 18 200.000 3.600.000 9 1.800.000 - - 9 1.800.000 9 1.800.000

OSA 25 50.000 1.250.000 13 650.000 - - 13 650.000 12 600.000

l From Batang, Pekalongan, Pemalang & Kota Pekalongan To Semarang

Transport 74 200.000 14.800.000 57 11.400.000 - - 57 11.400.000 17 3.400.000 3.400.000

Acomodation 71 200.000 14.200.000 41 8.200.000 - - 41 8.200.000 30 6.000.000

OSA 120 50.000 6.000.000 73 3.650.000 - - 73 3.650.000 47 2.350.000

m From Tegal, Kota Tegal & Brebes To Semarang

Transport 36 300.000 10.800.000 30 9.000.000 - - 30 9.000.000 6 1.800.000 1.800.000

Acomodation 39 200.000 7.800.000 26 5.200.000 - - 26 5.200.000 13 2.600.000

OSA 54 50.000 2.700.000 34 1.700.000 - - 34 1.700.000 20 1.000.000

n From Kendal To Semarang

Transport 16 100.000 1.600.000 12 1.200.000 - - 12 1.200.000 4 400.000 400.000

Acomodation 18 200.000 3.600.000 9 1.800.000 - - 9 1.800.000 9 1.800.000

OSA 26 50.000 1.300.000 14 700.000 - - 14 700.000 12 600.000

DUTY TRAVEL FOR KBIK PROVINCE

a From Cilacap, Banyumas To Semarang

Transport 2 300.000 600.000 - - - - - - 2 600.000 600.000

Acomodation 2 200.000 400.000 - - - - - - 2 400.000

OSA 4 50.000 200.000 - - - - - - 4 200.000

b From Purbalingga, Banjarnegara To Semarang

Transport 2 200.000 400.000 - - - - - - 2 400.000 400.000

Acomodation 2 200.000 400.000 - - - - - - 2 400.000

OSA 4 50.000 200.000 - - - - - - 4 200.000

c From Kebumen, Purworejo & Wonosobo To Semarang

Transport 3 200.000 600.000 - - - - - - 3 600.000 600.000

Acomodation 3 200.000 600.000 - - - - - - 3 600.000

OSA 6 50.000 300.000 - - - - - - 6 300.000

d From Kota Magelang, Magelang & Temanggung To Semarang

Transport 3 200.000 600.000 - - - - - - 3 600.000 600.000

Acomodation 3 200.000 600.000 - - - - - - 3 600.000

OSA 6 50.000 300.000 - - - - - - 6 300.000

e From Boyolali, Klaten & Sukoharjo To Semarang

Transport 3 200.000 600.000 - - - - - - 3 600.000 600.000

Acomodation 3 200.000 600.000 - - - - - - 3 600.000

OSA 6 50.000 300.000 - - - - - - 6 300.000

f From Wonogiri, Karanganyar To Semarang

Transport 2 200.000 400.000 - - - - - - 2 400.000 400.000

Acomodation 2 200.000 400.000 - - - - - - 2 400.000

OSA 4 50.000 200.000 - - - - - - 4 200.000

g From Kota Surakarta & Sragen To Semarang

Transport 2 200.000 400.000 - - - - - - 2 400.000 400.000

Acomodation 2 200.000 400.000 - - - - - - 2 400.000

OSA 4 50.000 200.000 - - - - - - 4 200.000

h From Grobogan & Blora To Semarang

Transport 2 300.000 600.000 - - - - - - 2 600.000 600.000

Acomodation 2 200.000 400.000 - - - - - - 2 400.000

OSA 4 50.000 200.000 - - - - - - 4 200.000

i From Rembang, Pati & Jepara To Semarang

Transport 3 200.000 600.000 - - - - - - 3 600.000 600.000

Acomodation 3 200.000 600.000 - - - - - - 3 600.000

OSA 6 50.000 300.000 - - - - - - 6 300.000

j From Kudus, Demak To Semarang

Transport 2 100.000 200.000 - - - - - - 2 200.000 200.000

Acomodation 2 200.000 400.000 - - - - - - 2 400.000

OSA 4 50.000 200.000 - - - - - - 4 200.000

k From Kab Semarang, Kota Salatiga To Semarang

Transport 2 100.000 200.000 - - - - - - 2 200.000 200.000

Acomodation 2 200.000 400.000 - - - - - - 2 400.000

OSA 4 50.000 200.000 - - - - - - 4 200.000

Page 19: PROGRAM KOTA TANPA KUMUH SATKER ...103.12.84.195/files/Media/Laporan/Contract Resume/osp5...NO KOMPOSISI BIAYA AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT

Vol Unit Price

(IDR)

Total Amount

(IDR)

NO. URAIAN

AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAK

Vol Total Amount (IDR) Vol Total Amount (IDR) Vol Total Amount (IDR) Vol Total Amount (IDR)

l From Batang, Pekalongan, Pemalang & Kota Pekalongan To Semarang

Transport 4 200.000 800.000 - - - - - - 4 800.000 800.000

Acomodation 4 200.000 800.000 - - - - - - 4 800.000

OSA 8 50.000 400.000 - - - - - - 8 400.000

m From Tegal, Kota Tegal & Brebes To Semarang

Transport 3 300.000 900.000 - - - - - - 3 900.000 900.000

Acomodation 3 200.000 600.000 - - - - - - 3 600.000

OSA 6 50.000 300.000 - - - - - - 6 300.000

n From Kendal To Semarang

Transport 1 100.000 100.000 - - - - - - 1 100.000 100.000

Acomodation 1 200.000 200.000 - - - - - - 1 200.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

2.1.1.5FOR SEVERAL TRAINING & SPECIAL EVENT FROM

KAB. TO SEMARANG852.150.000 564.400.000 - 3.650.000 - - - 564.400.000 - 3.650.000 274.700.000 274.700.000 8.400.000 1.000.000

For Training

Inland Transport for Korkot&Askot (35 Kota/Kab) on OSP Consolidation

a From Cilacap, Banyumas To Semarang

Inland transport 27 300.000 8.100.000 23 6.900.000 - - 23 6.900.000 4 1.200.000 1.200.000

b From Purbalingga, Banjarnegara To Semarang

Transport 21 200.000 4.200.000 17 3.400.000 - - 17 3.400.000 4 800.000 800.000

c From Kebumen, Purworejo & Wonosobo To Semarang

Transport 69 200.000 13.800.000 38 7.600.000 - - 38 7.600.000 31 6.200.000 6.200.000

d From Kota Magelang, Magelang & Temanggung To Semarang

Transport 44 200.000 8.800.000 31 6.200.000 - - 31 6.200.000 13 2.600.000 2.600.000

e From Boyolali, Klaten & Sukoharjo To Semarang

Transport 73 200.000 14.600.000 61 12.200.000 - - 61 12.200.000 12 2.400.000 2.400.000

f From Wonogiri, Karanganyar To Semarang

Transport 19 200.000 3.800.000 15 3.000.000 - - 15 3.000.000 4 800.000 800.000

g From Kota Surakarta & Sragen To Semarang

Transport 39 200.000 7.800.000 35 7.000.000 - - 35 7.000.000 4 800.000 800.000

h From Grobogan & Blora To Semarang

Transport 25 300.000 7.500.000 21 6.100.000 - - 21 6.100.000 4 1.400.000 1.400.000

i From Rembang, Pati & Jepara To Semarang

Transport 62 200.000 12.400.000 56 11.200.000 - - 56 11.200.000 6 1.200.000 1.200.000

j From Kudus, Demak To Semarang

Transport 47 100.000 4.700.000 34 3.500.000 - - 34 3.500.000 13 1.200.000 1.200.000

k From Semarang, Kota Salatiga To Semarang

Transport 27 100.000 2.700.000 12 1.200.000 - - 12 1.200.000 15 1.500.000 1.500.000

l From Batang, Pekalongan, Pemalang & Kota Pekalongan To Semarang

Transport 134 200.000 26.800.000 98 19.600.000 - - 98 19.600.000 36 7.200.000 7.200.000

m From Tegal,, Kota Tegal & Brebes To Semarang

Transport 69 300.000 20.700.000 58 17.400.000 - - 58 17.400.000 11 3.300.000 3.300.000

n From Kendal To Semarang

Transport 35 100.000 3.500.000 22 2.200.000 - - 22 2.200.000 13 1.300.000 1.300.000

DUTY TRAVEL KONSOLIDASI PEMANDU DAN PELATIHAN TIM KORKOT

a From Cilacap, Banyumas To Semarang

Inland transport 2 300.000 600.000 - - - - - - 2 600.000 600.000

b From Purbalingga, Banjarnegara To Semarang

Transport 1 200.000 200.000 - - - - - - 1 200.000 200.000

c From Kebumen, Purworejo & Wonosobo To Semarang

Transport 15 200.000 3.000.000 - - - - - - 15 3.000.000 3.000.000

d From Kota Magelang, Magelang & Temanggung To Semarang

Transport 3 200.000 600.000 - - - - - - 3 600.000 600.000

e From Sukoharjo To Semarang

Transport 1 200.000 200.000 - - - - - - 1 200.000 200.000

f From Wonogiri, Karanganyar To Semarang

Transport 2 200.000 400.000 - - - - - - 2 400.000 400.000

g From Kota Surakarta & Sragen To Semarang

Transport 8 200.000 1.600.000 - - - - - - 8 1.600.000 1.600.000

h From Blora To Semarang

Transport 1 300.000 300.000 - - - - - - 1 300.000 300.000

i From Rembang, Pati & Jepara To Semarang

Transport 3 200.000 600.000 - - - - - - 3 600.000 600.000

j From Kudus, Demak To Semarang

Transport 8 100.000 800.000 - - - - - - 8 800.000 800.000

k From Kab Semarang To Semarang

Transport 7 100.000 700.000 - - - - - - 7 700.000 700.000

l From Batang, Pekalongan, Pemalang & Kota Pekalongan To Semarang

Transport 22 200.000 4.400.000 - - - - - - 22 4.400.000 4.400.000

m From Tegal,, Kota Tegal & Brebes To Semarang

Transport 9 300.000 2.700.000 - - - - - - 9 2.700.000 2.700.000

n From Kendal To Semarang

Transport 7 100.000 700.000 - - - - - - 7 700.000 700.000

DUTY TRAVEL PELATIHAN ASMANDAT DAN ASINFRA

1 From Purworejo & Wonosobo To Semarang

Transport 4 200.000 800.000 - - - - - - 4 800.000 800.000

2 From Kota Surakarta To Semarang

Transport 2 200.000 400.000 - - - - - - 2 400.000 400.000

Page 20: PROGRAM KOTA TANPA KUMUH SATKER ...103.12.84.195/files/Media/Laporan/Contract Resume/osp5...NO KOMPOSISI BIAYA AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT

Vol Unit Price

(IDR)

Total Amount

(IDR)

NO. URAIAN

AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAK

Vol Total Amount (IDR) Vol Total Amount (IDR) Vol Total Amount (IDR) Vol Total Amount (IDR)

3 From Demak To Semarang

Transport 2 100.000 200.000 - - - - - - 2 200.000 200.000

4 From Kab Semarang To Semarang

Transport 2 100.000 200.000 - - - - - - 2 200.000 200.000

5 From Kab Pekalongan, Kab Pemalang & Kota Pekalongan To Semarang

Transport 6 200.000 1.200.000 - - - - - - 6 1.200.000 1.200.000

6 From Kota Tegal To Semarang

Transport 2 300.000 600.000 - - - - - - 2 600.000 600.000

7 From Kendal To Semarang

Transport 2 100.000 200.000 - - - - - - 2 200.000 200.000

Cluster

Inland Transport for Korkot&Askot (35 Kota/Kab) on OSP Consolidation

a From Cilacap, Banyumas To Banyumas

Inland transport - 100.000 - - - - - - - - - -

b From Purbalingga, Banjarnegara To Banyumas

Transport - 100.000 - - - - - - - - - -

c From Kebumen, Purworejo & Wonosobo To Banyumas

Transport - 200.000 - - - - - - - - - -

d From Kota Magelang, Magelang & Temanggung To Semarang

Transport - 200.000 - - - - - - - - - -

e From Boyolali, Klaten & Sukoharjo To Surakarta

Transport - 100.000 - - - - - - - - - -

f From Wonogiri, Karanganyar To Surakarta

Transport - 100.000 - - - - - - - - - -

g From Kota Surakarta & Sragen To Surakarta

Transport - 100.000 - - - - - - - - - -

h From Grobogan & Blora To Semarang

Transport - 300.000 - - - - - - - - - -

i From Rembang, Pati & Jepara To Semarang

Transport - 300.000 - - - - - - - - - -

j From Kudus, Demak To Semarang

Transport - 100.000 - - - - - - - - - -

k From Semarang, Kota Salatiga To Semarang

Transport - 100.000 - - - - - - - - - -

l From Batang, Pekalongan, Pemalang & Kota Pekalongan To Pekalongan

Transport - 100.000 - - - - - - - - - -

m From Tegal,, Kota Tegal & Brebes To Pekalongan

Transport - 200.000 - - - - - - - - - -

n From Kendal To Semarang

Transport - 100.000 - - - - - - - - - -

Inland Transport for SF, FT, FE, FS (35 Kota/Kab)

a From Cilacap, Banyumas To Semarang

Inland transport 68 300.000 20.400.000 68 20.400.000 - - 68 20.400.000 - - -

b From Purbalingga, Banjarnegara To Semarang

Transport 34 200.000 6.800.000 34 6.800.000 - - 34 6.800.000 - - -

c From Kebumen, Purworejo & Wonosobo To Semarang

Transport 107 200.000 21.400.000 89 17.800.000 - - 89 17.800.000 18 3.600.000 3.600.000

d From Kota Magelang, Magelang & Temanggung To Semarang

Transport 58 200.000 11.600.000 58 11.600.000 - - 58 11.600.000 - - -

e From Boyolali, Klaten & Sukoharjo To Semarang

Transport 209 200.000 41.800.000 209 41.800.000 - - 209 41.800.000 - - -

f From Wonogiri, Karanganyar To Semarang

Transport 54 200.000 10.800.000 54 10.800.000 - - 54 10.800.000 - - -

g From Kota Surakarta & Sragen To Semarang

Transport 153 200.000 30.600.000 153 30.600.000 - - 153 30.600.000 - - -

h From Grobogan & Blora To Semarang

Transport 44 300.000 13.200.000 44 13.200.000 - - 44 13.200.000 - - -

i From Rembang, Pati & Jepara To Semarang

Transport 212 200.000 42.400.000 167 33.400.000 - - 167 33.400.000 45 9.000.000 9.000.000

j From Kudus, Demak To Semarang

Transport 91 100.000 9.100.000 81 8.100.000 - - 81 8.100.000 10 1.000.000 1.000.000

k From Semarang, Kota Salatiga To Semarang

Transport 62 100.000 6.200.000 47 4.700.000 - - 47 4.700.000 15 1.500.000 1.500.000

l From Batang, Pekalongan, Pemalang & Kota Pekalongan To Semarang

Transport 449 200.000 89.800.000 339 67.800.000 - - 339 67.800.000 110 22.000.000 22.000.000

m From Tegal,, Kota Tegal & Brebes To Semarang

Transport 152 300.000 45.600.000 151 45.300.000 - - 151 45.300.000 1 300.000 300.000

n From Kendal To Semarang

Transport 106 100.000 10.600.000 74 7.400.000 - - 74 7.400.000 32 3.200.000 3.200.000

DUTY TRAVEL SF DAN FASKEL PELATIHAN TIM FASKEL

a From Cilacap, Banyumas To Semarang

Inland transport 50 300.000 15.000.000 - - - - - - 50 15.000.000 15.000.000

b From PurbalinggaTo Semarang

Transport 20 200.000 4.000.000 - - - - - - 20 4.000.000 4.000.000

c From Kebumen, Purworejo & Wonosobo To Semarang

Transport 50 200.000 10.000.000 - - - - - - 50 10.000.000 10.000.000

d From Kab Magelang & Temanggung To Semarang

Transport 35 200.000 7.000.000 - - - - - - 35 7.000.000 7.000.000

Page 21: PROGRAM KOTA TANPA KUMUH SATKER ...103.12.84.195/files/Media/Laporan/Contract Resume/osp5...NO KOMPOSISI BIAYA AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT

Vol Unit Price

(IDR)

Total Amount

(IDR)

NO. URAIAN

AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAK

Vol Total Amount (IDR) Vol Total Amount (IDR) Vol Total Amount (IDR) Vol Total Amount (IDR)

e From Sukoharjo To Semarang

Transport 35 200.000 7.000.000 - - - - - - 35 7.000.000 7.000.000

f From Wonogiri, Karanganyar To Semarang

Transport 45 200.000 9.000.000 - - - - - - 45 9.000.000 9.000.000

g From Kota Surakarta & Sragen To Semarang

Transport 55 200.000 11.000.000 - - - - - - 55 11.000.000 11.000.000

h From Blora To Semarang

Transport 25 300.000 7.500.000 - - - - - - 25 7.500.000 7.500.000

i From Rembang, Pati & Jepara To Semarang

Transport 110 200.000 22.000.000 - - - - - - 110 22.000.000 22.000.000

j From Kudus, Demak To Semarang

Transport 50 100.000 5.000.000 - - - - - - 50 5.000.000 5.000.000

k From Kab Semarang, Kota Salatiga To Semarang

Transport 25 100.000 2.500.000 - - - - - - 25 2.500.000 2.500.000

l From Batang, Pekalongan, Pemalang & Kota Pekalongan To Semarang

Transport 145 200.000 29.000.000 - - - - - - 145 29.000.000 29.000.000

m From Tegal,, Kota Tegal & Brebes To Semarang

Transport 80 300.000 24.000.000 - - - - - - 80 24.000.000 24.000.000

n From Kendal To Semarang

Transport 30 100.000 3.000.000 - - - - - - 30 3.000.000 3.000.000

Inland Transport for SF, FT, FE, FS (35 Kota/Kab)

a From Cilacap, Banyumas To Banyumas

Inland transport (Reguler) 8 100.000 800.000 8 800.000 - - 8 800.000 - - -

b From Purbalingga, Banjarnegara To Banyumas

Transport 33 100.000 3.300.000 33 3.300.000 - - 33 3.300.000 - - -

c From Kebumen, Purworejo & Wonosobo To Banyumas

Transport 55 200.000 11.000.000 55 11.000.000 - - 55 11.000.000 - - -

d From Kota Magelang, Magelang & Temanggung To Semarang

Transport 47 200.000 9.400.000 47 9.400.000 - - 47 9.400.000 - - -

e From Boyolali, Klaten & Sukoharjo To Surakarta

Transport 208 100.000 20.800.000 208 20.800.000 - - 208 20.800.000 - - -

f From Wonogiri, Karanganyar To Surakarta

Transport 47 100.000 4.700.000 47 4.700.000 - - 47 4.700.000 - - -

g From Kota Surakarta & Sragen To Surakarta

Transport 10 100.000 1.000.000 10 1.000.000 - - 10 1.000.000 - - -

h From Grobogan & Blora To Semarang

Transport 38 300.000 11.400.000 38 11.400.000 - - 38 11.400.000 - - -

i From Rembang, Pati & Jepara To Semarang

Transport - 300.000 -

j From Kudus, Demak To Semarang

Transport 47 100.000 4.700.000 47 4.700.000 - - 47 4.700.000 - - -

k From Semarang, Kota Salatiga To Semarang

Transport 23 100.000 2.300.000 23 2.300.000 - - 23 2.300.000 - - -

l From Batang, Pekalongan, Pemalang & Kota Pekalongan To Pekalongan

Transport 126 100.000 12.600.000 126 12.600.000 - - 126 12.600.000 - - -

m From Tegal,, Kota Tegal & Brebes To Pekalongan

Transport 94 200.000 18.800.000 94 18.800.000 - - 94 18.800.000 - - -

n From Kendal To Semarang

Transport 31 100.000 3.100.000 31 3.100.000 - - 31 3.100.000 - - -

Special Event (by request)

a From Cilacap, Banyumas To Semarang

Transport 3 300.000 900.000 2 600.000 - - 2 600.000 1 300.000 300.000

Acomodation 3 200.000 600.000 - - - - - - 3 600.000

OSA 6 50.000 300.000 2 100.000 - - 2 100.000 4 200.000

b From Purbalingga, Banjarnegara To Semarang

Transport 3 200.000 600.000 2 400.000 - - 2 400.000 1 200.000 200.000

Acomodation 3 200.000 600.000 - - - - - - 3 600.000

OSA 6 50.000 300.000 4 200.000 - - 4 200.000 2 100.000

c From Kebumen, Purworejo & Wonosobo To Semarang

Transport 3 200.000 600.000 3 600.000 - - 3 600.000 - - -

Acomodation 3 200.000 600.000 - - - - - - 3 600.000

OSA 6 50.000 300.000 6 300.000 - - 6 300.000 - -

d From Kota Magelang, Magelang& Temanggung To Semarang

Transport 3 200.000 600.000 3 600.000 - - 3 600.000 - - -

Acomodation 3 200.000 600.000 - - - - - - 3 600.000

OSA 6 50.000 300.000 6 300.000 - - 6 300.000 - -

e From Boyolali, Klaten & Sukoharjo To Semarang

Transport 3 200.000 600.000 3 600.000 - - 3 600.000 - - -

Acomodation 3 200.000 600.000 - - - - - - 3 600.000

OSA 6 50.000 300.000 6 300.000 - - 6 300.000 - -

f From Wonogiri, Karanganyar To Semarang

Transport 3 200.000 600.000 2 400.000 - - 2 400.000 1 200.000 200.000

Acomodation 3 200.000 600.000 - - - - - - 3 600.000

OSA 6 50.000 300.000 4 200.000 - - 4 200.000 2 100.000

g From Kota Surakarta & Sragen To Semarang

Transport 3 200.000 600.000 2 400.000 - - 2 400.000 1 200.000 200.000

Acomodation 3 200.000 600.000 - - - - - - 3 600.000

OSA 6 50.000 300.000 4 200.000 - - 4 200.000 2 100.000

h From Grobogan & Blora To Semarang

Transport 3 300.000 900.000 2 600.000 - - 2 600.000 1 300.000 300.000

Page 22: PROGRAM KOTA TANPA KUMUH SATKER ...103.12.84.195/files/Media/Laporan/Contract Resume/osp5...NO KOMPOSISI BIAYA AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT

Vol Unit Price

(IDR)

Total Amount

(IDR)

NO. URAIAN

AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAK

Vol Total Amount (IDR) Vol Total Amount (IDR) Vol Total Amount (IDR) Vol Total Amount (IDR)

Acomodation 3 200.000 600.000 - - - - - - 3 600.000

OSA 6 50.000 300.000 4 200.000 - - 4 200.000 2 100.000

i From Rembang, Pati & Jepara To Semarang

Transport 3 200.000 600.000 3 600.000 - - 3 600.000 - - -

Acomodation 3 200.000 600.000 - - - - - - 3 600.000

OSA 6 50.000 300.000 6 300.000 - - 6 300.000 - -

j From Kudus, Demak To Semarang

Transport 3 100.000 300.000 2 200.000 - - 2 200.000 1 100.000 100.000

Acomodation 3 200.000 600.000 - - - - - - 3 600.000

OSA 6 50.000 300.000 4 200.000 - - 4 200.000 2 100.000

k From Semarang, Kota Salatiga To Semarang

Transport 3 100.000 300.000 2 200.000 - - 2 200.000 1 100.000 100.000

Acomodation 3 200.000 600.000 - - - - - - 3 600.000

OSA 6 50.000 300.000 4 200.000 - - 4 200.000 2 100.000

l From Batang, Pekalongan, Pemalang & Kota Pekalongan To Semarang

Transport 3 200.000 600.000 3 600.000 - - 3 600.000 - - -

Acomodation 3 200.000 600.000 - - - - - - 3 600.000

OSA 6 50.000 300.000 6 300.000 - - 6 300.000 - -

m From Tegal, Kota Tegal & Brebes To Semarang

Transport 3 300.000 900.000 3 900.000 - - 3 900.000 - - -

Acomodation 3 200.000 600.000 - - - - - - 3 600.000

OSA 6 50.000 300.000 6 300.000 - - 6 300.000 - -

n From Kendal To Semarang

Transport 3 100.000 300.000 1 100.000 - - 1 100.000 2 200.000 200.000

Acomodation 3 200.000 600.000 - - - - - - 3 600.000

OSA 6 50.000 300.000 2 100.000 - - 2 100.000 4 200.000

o From Kota Semarang To DI Yogyakarta

Transport 1 300.000 300.000 1 300.000 - - 1 300.000 - - -

Acomodation - - - - - -

OSA 3 50.000 150.000 3 150.000 - - 3 150.000 - -

p From Kota Surakarta To DI Yogyakarta

Transport 1 100.000 100.000 1 100.000 - - 1 100.000 - - -

Acomodation - - - - - -

OSA 3 50.000 150.000 3 150.000 - - 3 150.000 - -

q From Kota Pekalongan To DI Yogyakarta

Transport 1 300.000 300.000 1 300.000 - - 1 300.000 - - -

Acomodation - - - - - -

OSA 3 50.000 150.000 3 150.000 - - 3 150.000 - -

2.1.1.6 FROM OSP Level TO KAB/KOTA & PROVINCE 266.050.000 38.750.000 25.253.500 34.300.000 1.900.000 1.400.000 2.000.000 40.650.000 26.653.500 36.300.000 64.950.000 66.850.000 64.096.500 33.400.000

a From Semarang To Kab/Kota in Central Java Province

Transport 10 100.000 1.000.000 10 1.000.000 - - 10 1.000.000 - -

36 200.000 7.200.000 16 3.300.000 - - 16 3.300.000 20 3.900.000 3.900.000

Acomodation 5 150.000 750.000 5 750.000 - - 5 750.000 - -

30 350.000 10.500.000 8 2.322.000 - - 8 2.322.000 22 8.178.000

OSA 61 100.000 6.100.000 42 4.100.000 - - 42 4.100.000 19 2.000.000

b From Semarang To D.I. Yogyakarta Province

Transport 10 200.000 2.000.000 10 2.000.000 - - 10 2.000.000 - - -

40 300.000 12.000.000 18 5.100.000 - - 18 5.100.000 22 6.900.000 6.900.000

Acomodation 9 200.000 1.800.000 8 1.600.000 - - 8 1.600.000 1 200.000

40 350.000 14.000.000 14 4.000.000 - - 14 4.000.000 26 10.000.000

OSA 80 100.000 8.000.000 48 4.800.000 - - 48 4.800.000 32 3.200.000

c From Semarang To Kab/Kota in Central Java Province (Special Event)

Transport 278 300.000 83.400.000 137 27.350.000 11 1.900.000 148 29.250.000 130 54.150.000 56.050.000

Acomodation 182 350.000 63.700.000 47 16.581.500 4 1.400.000 51 17.981.500 131 45.718.500

OSA 556 100.000 55.600.000 254 25.400.000 20 2.000.000 274 27.400.000 282 28.200.000

2.1.2 TO JAKARTA -

2.1.2.1FOR SEVERAL TRAINING TO JAKARTA BY

REQUEST- - - - - - - - - - - - - -

Air Transport - 2.182.000 - - - - - - - - - -

In land Travel in Jakarta - 200.000 - - - - - - - - - -

- 300.000 - - - - - - - - - -

OSA - 100.000 - - - - - - - - -

For Koorkot and Faskel lokasi program kumuh ( 48 person )

Air Transport - 2.182.000 - - - - - - - - - -

In land Travel in Jakarta - 200.000 - - - - - - - - - -

OSA - 100.000 - - - - - - - - -

2.1.2.2 FOR EGM TO JAKARTA 97.370.000 33.811.500 - 6.800.000 - - - 33.811.500 - 6.800.000 49.958.500 49.958.500 - 6.800.000

Air Transport

1 EGM TA/SubTA Training 3 2.182.000 6.546.000 2 3.544.000 - - 2 3.544.000 1 3.002.000 3.002.000

2 EGM TA Sosialisasi 2 2.182.000 4.364.000 1 1.665.500 - - 1 1.665.500 1 2.698.500 2.698.500

3 EGM TA/SubTA MK/Sub TA RLF 4 2.182.000 8.728.000 2 3.175.500 - - 2 3.175.500 2 5.552.500 5.552.500

4 EGM TA/SubTA INFRA/Sub TA Safeguard 4 2.182.000 8.728.000 3 4.988.000 - - 3 4.988.000 1 3.740.000 3.740.000

5 EGM TA/SubTA Monev /Sub TA Legal HCU 4 2.182.000 8.728.000 3 5.329.000 - - 3 5.329.000 1 3.399.000 3.399.000

6 EGM TA/SubTA SIM 4 2.182.000 8.728.000 4 6.168.000 - - 4 6.168.000 - 2.560.000 2.560.000

7 EGM TA Local Goverment 3 2.182.000 6.546.000 1 1.731.500 - - 1 1.731.500 2 4.814.500 4.814.500

8 EGM TA Urban Planner 3 2.182.000 6.546.000 2 3.610.000 - - 2 3.610.000 1 2.936.000 2.936.000

-

In land Transport in Jakarta 13 200.000 2.600.000 13 2.600.000 - - 13 2.600.000 - - -

8 300.000 2.400.000 5 1.000.000 - - 5 1.000.000 3 1.400.000 1.400.000

Page 23: PROGRAM KOTA TANPA KUMUH SATKER ...103.12.84.195/files/Media/Laporan/Contract Resume/osp5...NO KOMPOSISI BIAYA AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT

Vol Unit Price

(IDR)

Total Amount

(IDR)

NO. URAIAN

AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAK

Vol Total Amount (IDR) Vol Total Amount (IDR) Vol Total Amount (IDR) Vol Total Amount (IDR)

OSA 80 100.000 8.000.000 68 6.800.000 - - 68 6.800.000 12 1.200.000

-

EGP Periode Maret - Juni 2018 -

-

Air Transport -

1 EGM TA/SubTA Training 1 2.182.000 2.182.000 - - - - - - 1 2.182.000 2.182.000

2 EGM TA Sosialisasi 1 2.182.000 2.182.000 - - - - - - 1 2.182.000 2.182.000

3 EGM TA/SubTA MK/Sub TA RLF 1 2.182.000 2.182.000 - - - - - - 1 2.182.000 2.182.000

4 EGM TA/SubTA INFRA/Sub TA Safeguard 1 2.182.000 2.182.000 - - - - - - 1 2.182.000 2.182.000

5 EGM TA/SubTA Monev /Sub TA Legal HCU 1 2.182.000 2.182.000 - - - - - - 1 2.182.000 2.182.000

6 EGM TA/SubTA SIM 1 2.182.000 2.182.000 - - - - - - 1 2.182.000 2.182.000

7 EGM TA Local Goverment 1 2.182.000 2.182.000 - - - - - - 1 2.182.000 2.182.000

8 EGM TA Urban Planner 1 2.182.000 2.182.000 - - - - - - 1 2.182.000 2.182.000

-

In land Transport in Jakarta 8 300.000 2.400.000 - - - - - - 8 2.400.000 2.400.000

-

OSA 56 100.000 5.600.000 - - - - - - 56 5.600.000

2.1.2.3FOR COORDINATION MEETING TO JAKARTA (by

request)37.584.000 16.218.700 445.000 2.500.000 - - - 16.218.700 445.000 2.500.000 13.465.300 13.465.300 2.555.000 2.400.000

Air Transport 10 2.182.000 21.820.000 9 14.018.700 - - 9 14.018.700 1 7.801.300 7.801.300

In land Transport in Jakarta 4 200.000 800.000 4 800.000 - - 4 800.000 - - -

7 300.000 2.100.000 5 1.400.000 - - 5 1.400.000 2 700.000 700.000

Hotel Accommodation - 300.000 - - - - - - - - - -

6 500.000 3.000.000 1 445.000 - - 1 445.000 5 2.555.000

OSA 35 100.000 3.500.000 25 2.500.000 - - 25 2.500.000 10 1.000.000

-

Air Transport 2 2.182.000 4.364.000 - - - - - - 2 4.364.000 4.364.000

In land Transport in Jakarta 2 300.000 600.000 - - - - - - 2 600.000 600.000

OSA 14 100.000 1.400.000 - - - - - - 14 1.400.000

-

2.1.2.4

FOR COORDINATION MEETING CITY

COORDINATOR

TO JAKARTA (by request)

254.142.000 74.231.000 - 34.800.000 - - - 74.231.000 - 34.800.000 126.211.000 126.211.000 - 18.900.000

TOT Pemandu Nasional Korkot/Askorkot Pemandu Nasional -

Air Transport 51 2.182.000 111.282.000 49 59.531.000 - - 49 59.531.000 2 51.751.000 51.751.000

In land Transport in Jakarta - 200.000 - - - - - - - - - -

49 300.000 14.700.000 49 14.700.000 - - 49 14.700.000 - - -

OSA 348 100.000 34.800.000 348 34.800.000 - - 348 34.800.000 - -

TOT Pemandu Nasional Korkot/Askorkot (Maret -Juni 2018)

Air Transport 30 2.182.000 65.460.000 - - - - - - 30 65.460.000 65.460.000

In land Transport in Jakarta 30 300.000 9.000.000 - - - - - - 30 9.000.000 9.000.000

OSA 189 100.000 18.900.000 - - - - - - 189 18.900.000

TOT Pelatihan Program Lanjutan (SIM)

Air Transport - 2.182.000 - - - - - - - - - -

In land Transport in Jakarta - 200.000 - - - - - - - - - -

- 300.000 - - - - - - - - - -

OSA - 100.000 - - - - - - - - -

FOR COORDINATION MEETING

Air Transport - 2.182.000 - - - - - - - - - -

In land Transport - 200.000 - - - - - - - - - -

- 300.000 - - - - - - - - - -

Hotel Accommodation - 300.000 - - - - - - - - -

- 500.000 - - - - - - - - -

OSA - 100.000 - - - - - - - - -

2.1.2.5 TO OTHER LOCATION (By Request) 58.520.200 19.490.200 2.000.000 6.100.000 - - - 19.490.200 2.000.000 6.100.000 29.630.000 29.630.000 - 1.300.000

Air Transport 4 3.500.000 5.344.200 4 5.344.200 - - 4 5.344.200 - - -

18 2.182.000 39.276.000 11 10.646.000 - - 11 10.646.000 7 28.630.000 28.630.000

In land Transport - 200.000 - - - - - - - - - -

15 300.000 4.500.000 15 3.500.000 - - 15 3.500.000 - 1.000.000 1.000.000

Hotel Accommodation - 300.000 - - - - - - - - -

4 500.000 2.000.000 2 2.000.000 - - 2 2.000.000 2 -

OSA 74 100.000 7.400.000 61 6.100.000 - - 61 6.100.000 13 1.300.000

2.1.2.6 Local Transport for Coordonation 13.000.000 7.800.000 - 200.000 - - - 7.800.000 - 200.000 3.500.000 3.500.000 1.500.000 -

a. Tim Percepatan Jawa Tengah -

Transport 25 300.000 7.500.000 21 4.000.000 - - 21 4.000.000 4 3.500.000 3.500.000

Acomodation 5 300.000 1.500.000 - - - - - - 5 1.500.000

OSA 2 100.000 200.000 2 200.000 - - 2 200.000 - -

b. Transport TAPP Surakarta to Semarang 15 200.000 3.000.000 15 3.000.000 - - 15 3.000.000 - - -

c. Transport TAPP Kota Pekalongan to Semarang 4 200.000 800.000 4 800.000 - - 4 800.000 - - -

-

TOTAL DUTY TRAVEL PROVINCE CENTRAL JAVA 1.908.366.200 848.901.400 114.677.500 126.500.000 1.900.000 1.400.000 2.000.000 850.801.400 116.077.500 128.500.000 596.514.800 598.414.800 127.472.500 89.000.000

Page 24: PROGRAM KOTA TANPA KUMUH SATKER ...103.12.84.195/files/Media/Laporan/Contract Resume/osp5...NO KOMPOSISI BIAYA AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT

II. DIRECT REEIMBURSABLE COST

2.2. DUTY TRAVEL EXPENSES FOR D.I. YOGYAKARTA PROVINCE

Vol Unit Price

(IDR)

Total Amount

(IDR)

2.2.1 IN PROVINCE T A O Trans Acom OSA T A O Trans Acom OSA T A O Trans Acom OSA T A O Trans Acom OSA

2.2.1.1FOR SPOTCHECK PROVINCE TO KELURAHAN (3 % x No. of

Kelurahan) 4.600.000 900.000 - 1.800.000 - - - 900.000 - 1.800.000 300.000 - 1.600.000

a From Yogyakarta To Kulon Progo (8 kel x 3% = 1 kel)

Transport 8 50.000 400.000 6 300.000 - - 6 300.000 2 100.000

OSA 16 50.000 800.000 12 600.000 - - 12 600.000 4 200.000

b From Yogyakarta To Bantul (50 kel x 3% = 2 kel)

Transport 8 50.000 400.000 6 300.000 - - 6 300.000 2 100.000

OSA 16 50.000 800.000 12 600.000 - - 12 600.000 4 200.000

c From Yogyakarta To Sleman (75 kel x 3% = 3 kel)

Transport 8 50.000 400.000 6 300.000 - - 6 300.000 2 100.000

OSA 16 50.000 800.000 12 600.000 - - 12 600.000 4 200.000

UJI PETIK OSP KE KOTA DAN KELURAHAN

Kota Yogyakarta to Kab. Sleman

OSA 6 50.000 300.000 - - - - - - 6 300.000

Kota Yogyakarta to Kota Yogyakarta

OSA 6 50.000 300.000 - - - - - - 6 300.000

Uji Petik Korkot To Kelurahan :

1 KOTA YOGYAKARTA to KAB. SLEMAN

OSA 4 50.000 200.000 - - - - - - 4 200.000

2 KOTA YOGYAKARTA to KOTA YOGYAKARTA

OSA 4 50.000 200.000 - - - - - - 4 200.000

2.2.1.2SPOOTCHECK KOTA/KAB FOR ASS. CITY COORDINATOR

INFRA AND FM7.400.000 5.600.000 - - - - - 5.600.000 - - 1.200.000 - 600.000

A. For City Coordinator and Assistance City Coordinator

(197 Kel x 50%) x 3 26 50.000 1.300.000 26 1.300.000 - - 26 1.300.000 - -

Cost / Day Rp. 50.000.- 1 Day cover 2 kel

B. For Ass. City Coordinator Infrastructure and FM in the city

(197 Kel - 8 Kel luar kota) x 50%) x 7 60 50.000 3.000.000 60 3.000.000 - - 60 3.000.000 - -

Cost / Day Rp. 50.000.- 1 Day cover 2 kel

C. For City Coordinator Infrastructure and FM out of the town

a from Bantul To Kulon Progo

Transport 26 50.000 1.300.000 26 1.300.000 - - 26 1.300.000 - -

Periode Mei - Agustus 2017

Monitoring Tim Korkot Kota Yogyakarta di Dalam Kota

KEL/DESA KUMUH DI KOTA SKALA KOTA

Transport 10 50.000 500.000 - - - - - - 10 500.000

KEL/DESA NON KUMUH

Transport 2 50.000 100.000 - - - - - - 2 100.000

Monitoring Tim Korkot Kota Yogyakarta Ke (1) Bantul, (2) Sleman, (3) Kulon Progo

KEL/DESA KUMUH DI NON KOTA SKALA KOTA

1 Transport to Bantul 2 50.000 100.000 - - - - - - 2 100.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

2 Transport to Sleman 2 50.000 100.000 - - - - - - 2 100.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

3 Transport to Kulonprogo 2 50.000 100.000 - - - - - - 2 100.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

KEL/DESA NON KUMUH

1 Transport to Bantul 2 50.000 100.000 - - - - - - 2 100.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

2 Transport to Sleman 2 50.000 100.000 - - - - - - 2 100.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

3 Transport to Kulonprogo 2 50.000 100.000 - - - - - - 2 100.000

OSA 2 50.000 100.000 - - - - - - 2 100.000

2.2.1.3 FOR CB ACTIVITY BY ASKOT TO FASKEL 450.000 - - - - - - - - - 450.000 - -

a from Bantul To Kulon Progo

Transport 9 50.000 450.000 - - - - - - 9 450.000

NO. URAIAN

AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAK

Vol Total Amount (IDR) Vol Total Amount (IDR) Vol Total Amount (IDR) Vol Total Amount (IDR)

Page 25: PROGRAM KOTA TANPA KUMUH SATKER ...103.12.84.195/files/Media/Laporan/Contract Resume/osp5...NO KOMPOSISI BIAYA AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT

Vol Unit Price

(IDR)

Total Amount

(IDR)

NO. URAIAN

AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAK

Vol Total Amount (IDR) Vol Total Amount (IDR) Vol Total Amount (IDR) Vol Total Amount (IDR)

2.2.1.4 FROM KAB/KOTA TO TL OFFICE FOR COORDIANTION MEETING 1.400.000 650.000 - - - - - 650.000 - - 750.000 - -

a Bantul to Yogyakarta

Transport 10 50.000 500.000 5 250.000 - - 5 250.000 5 250.000

b Sleman to Yogyakarta

Transport 11 50.000 550.000 6 300.000 - - 6 300.000 5 250.000

c Kulonprogo to Yogyakarta

Transport 7 50.000 350.000 2 100.000 - - 2 100.000 5 250.000

2.2.1.5FROM PROVINCE TO REGIONAL FOR WORKSHOP &

COORDINATION MEETING AT OSP 40.650.000 11.500.000 - 7.600.000 - - - 11.500.000 - 7.600.000 7.500.000 9.600.000 4.450.000

Workshop OC / Coordination Meeting at OC

From Yogyakarta to Semarang

Transport 23 200.000 4.600.000 23 4.600.000 - - 23 4.600.000 - -

44 300.000 13.200.000 23 6.900.000 - - 23 6.900.000 21 6.300.000

OSA [ Fixed ] 41 50.000 2.050.000 41 2.050.000 - - 41 2.050.000 - -

100 100.000 10.000.000 60 5.550.000 - - 60 5.550.000 40 4.450.000

Acomodation - - - - - - - - -

Acomodation 32 300.000 9.600.000 - - - - - - 32 9.600.000

DUTY TRAVEL PELATIHAN SIM

Transport 4 300.000 1.200.000 - - - - 4 1.200.000

2.2.1.6FOR SEVERAL TRAINING & SPECIAL EVENT FROM KAB. TO

YOGYAKARTA 25.337.500 10.300.000 - - - - - 10.300.000 - - 14.737.500 - 300.000

For Training

Transport for Korkot &Askot (3 Kota/Kab) on OSP Consolidation

a From Bantul to Yogyakarta

Transport 14 50.000 700.000 6 300.000 - - 6 300.000 8 400.000

b From Sleman to Yogyakarta

Transport 16 50.000 2.900.000 14 700.000 - - 14 700.000 2 2.200.000

c From Kulon Progo to Yogyakarta

Transport 13 50.000 650.000 5 250.000 - - 5 250.000 8 400.000

d From Gunung Kidul to Yogyakarta

Transport - 50.000 - - - - - - - - -

DUTY TRAVEL FOR KBIK PROVINCE

a From Bantul to Yogyakarta

OSA 2 50.000 100.000 - - - - 2 100.000

b From Sleman to Yogyakarta

OSA 2 50.000 100.000 - - - - 2 100.000

c From Kulon Progo to Yogyakarta

OSA 2 50.000 100.000 - - - - 2 100.000

Inland Transport for SF, FK, FE, FS (10 Kota/Kab)

a From Bantul to Yogyakarta

Transport 84 50.000 7.312.500 84 4.200.000 - - 84 4.200.000 (0) 3.112.500

b From Sleman to Yogyakarta

Transport 85 50.000 8.637.500 85 4.250.000 - - 85 4.250.000 0 4.387.500

c From Kulon Progo to Yogyakarta

Transport 12 50.000 987.500 12 600.000 - - 12 600.000 0 387.500

d From Gunung Kidul to Yogyakarta

Transport - 50.000 - - - - - - - - -

DUTY TRAVEL KONSOLIDASI PEMANDU DAN PELATIHAN TIM KORKOT

a From Bantul to Yogyakarta

Transport 1 50.000 50.000 - - - - 1 50.000

b From Sleman to Yogyakarta

Transport 1 50.000 50.000 - - - - 1 50.000

DUTY TRAVEL SF DAN FASKEL PELATIHAN TIM FASKEL

a From Bantul to Yogyakarta

Transport 25 50.000 1.250.000 - - - - 25 1.250.000

b From Sleman to Yogyakarta

Transport 35 50.000 1.750.000 - - - - 35 1.750.000

Special Event (by request)

1 From Bantul to Yogyakarta

Transport 5 50.000 250.000 - - - - - - 5 250.000

2 From Sleman to Yogyakarta

Transport 5 50.000 250.000 - - - - - - 5 250.000

3 From Kulon Progo to Yogyakarta

Transport 5 50.000 250.000 - - - - - - 5 250.000

4 From Gunung Kidul to Yogyakarta

Transport - 50.000 - - - - - - - - -

Page 26: PROGRAM KOTA TANPA KUMUH SATKER ...103.12.84.195/files/Media/Laporan/Contract Resume/osp5...NO KOMPOSISI BIAYA AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT

Vol Unit Price

(IDR)

Total Amount

(IDR)

NO. URAIAN

AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAK

Vol Total Amount (IDR) Vol Total Amount (IDR) Vol Total Amount (IDR) Vol Total Amount (IDR)

2.2.2 TO JAKARTA

2.2.2.1 FOR SEVERAL TRAINING TO JAKARTA BY REQUEST - - - - - - - - - - - - -

Air Transport - 2.268.000 - - - - - - - - -

In land Travel in Jakarta - 200.000 - - - - - - - - -

- 300.000 - - - - - - - - -

OSA - 100.000 - - - - - - - - -

For Koorkot and Faskel lokasi program kumuh ( 12 person )

Air Transport - 2.268.000 - - - - - - - - -

In land Travel in Jakarta - 200.000 - - - - - - - - -

OSA - 100.000 - - - - - - - - -

2.2.2.2 FOR EGM TO JAKARTA 105.280.000 35.202.400 - 6.800.000 - - - 35.202.400 - 6.800.000 54.677.600 - 8.600.000

Air Transport - - - - - -

EGM TA/SubTA Training 3 2.268.000 6.804.000 2 3.297.400 - - 2 3.297.400 1 3.506.600

EGM TA Sosialisasi 2 2.268.000 4.536.000 1 1.900.400 - - 1 1.900.400 1 2.635.600

EGM TA/SubTA MK/Sub TA RLF 4 2.268.000 9.072.000 3 5.134.700 - - 3 5.134.700 1 3.937.300

EGM TA/SubTA INFRA/Sub TA Safeguard 4 2.268.000 9.072.000 3 5.134.700 - - 3 5.134.700 1 3.937.300

EGM TA/SubTA Monev /Sub TA Legal HCU 4 2.268.000 9.072.000 3 5.134.700 - - 3 5.134.700 1 3.937.300

EGM TA/SubTA SIM 4 2.268.000 9.072.000 3 5.802.700 - - 3 5.802.700 1 3.269.300

EGM TA Local Goverment 3 2.268.000 6.804.000 1 1.900.400 - - 1 1.900.400 2 4.903.600

EGM TA Urban Planner 3 2.268.000 6.804.000 2 3.297.400 - - 2 3.297.400 1 3.506.600

In land Transport in Jakarta - 200.000 - - - - - - - - -

27 300.000 8.100.000 18 3.600.000 - - 18 3.600.000 9 4.500.000

OSA 98 100.000 9.800.000 68 6.800.000 - - 68 6.800.000 30 3.000.000

EGM Periode Maret - Juni 2018

Air Transport

EGM TA/SubTA Training 1 2.268.000 2.268.000 - - - - - - 1 2.268.000

EGM TA Sosialisasi 1 2.268.000 2.268.000 - - - - - - 1 2.268.000

EGM TA/SubTA MK/Sub TA RLF 1 2.268.000 2.268.000 - - - - - - 1 2.268.000

EGM TA/SubTA INFRA/Sub TA Safeguard 1 2.268.000 2.268.000 - - - - - - 1 2.268.000

EGM TA/SubTA Monev /Sub TA Legal HCU 1 2.268.000 2.268.000 - - - - - - 1 2.268.000

EGM TA/SubTA SIM 1 2.268.000 2.268.000 - - - - - - 1 2.268.000

EGM TA Local Goverment 1 2.268.000 2.268.000 - - - - - - 1 2.268.000

EGM TA Urban Planner 1 2.268.000 2.268.000 - - - - - - 1 2.268.000

In land Transport in Jakarta 8 300.000 2.400.000 - - - - - - 8 2.400.000

OSA 56 100.000 5.600.000 - - - - - - 56 5.600.000

2.2.2.3 FOR COORDINATION MEETING TO JAKARTA (by request) 39.180.000 13.911.300 1.955.000 2.800.000 - - - 13.911.300 1.955.000 2.800.000 11.068.700 9.045.000 400.000

Air Transport 10 2.268.000 22.680.000 8 12.211.300 - - 8 12.211.300 2 10.468.700

In land Transport in Jakarta 7 200.000 1.400.000 5 1.000.000 - - 5 1.000.000 2 400.000

3 300.000 900.000 3 700.000 - - 3 700.000 - 200.000

Hotel Accommodation - 300.000 - - - - - - - - -

22 500.000 11.000.000 3 1.955.000 - - 3 1.955.000 19 9.045.000

OSA 32 100.000 3.200.000 28 2.800.000 - - 28 2.800.000 4 400.000

2.2.2.4 FOR COORDINATION MEETING CITY COORDINATOR TO JAKARTA (by request) 63.460.000 11.244.600 - 3.600.000 - - - 11.244.600 - 3.600.000 40.115.400 - 8.500.000

TOT Pemandu Nasional Korkot/Askorkot Pemandu Nasional

Air Transport 11 2.268.000 24.948.000 6 9.444.600 - - 6 9.444.600 5 15.503.400

In land Transport in Jakarta - 200.000 - - - - - - - - -

11 300.000 3.300.000 6 1.800.000 - - 6 1.800.000 5 1.500.000

OSA 76 100.000 7.600.000 36 3.600.000 - - 36 3.600.000 40 4.000.000

TOT Pemandu Nasional Korkot/Askorkot (Maret - Juni 2018)

Air Transport 3 2.268.000 6.804.000 - - - - - 3 6.804.000

In land Transport in Jakarta 3 300.000 900.000 - - - - - 3 900.000

OSA 21 100.000 2.100.000 - - - - - 21 2.100.000

TOT Pelatihan Program Lanjutan (SIM)

Air Transport - 2.268.000 - - - - - - - -

In land Transport in Jakarta - 200.000 - - - - - - - -

- 300.000 - - - - - - - -

OSA - 100.000 - - - - - - - - -

FOR COORDINATION MEETING

Air Transport 6 2.268.000 13.608.000 - - - - 6 13.608.000

In land Transport - 200.000 - - - - - - -

6 300.000 1.800.000 - - - - 6 1.800.000

Hotel Accommodation - 300.000 - - - - - - -

- 500.000 - - - - - - -

OSA 24 100.000 2.400.000 - - - - 24 2.400.000

Page 27: PROGRAM KOTA TANPA KUMUH SATKER ...103.12.84.195/files/Media/Laporan/Contract Resume/osp5...NO KOMPOSISI BIAYA AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT

Vol Unit Price

(IDR)

Total Amount

(IDR)

NO. URAIAN

AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAK

Vol Total Amount (IDR) Vol Total Amount (IDR) Vol Total Amount (IDR) Vol Total Amount (IDR)

2.2.2.5 TO OTHER LOCATION (By Request) 12.400.000 4.985.900 - 1.000.000 - - - 4.985.900 - 1.000.000 6.414.100 - -

Air Transport 3 3.500.000 10.500.000 3 4.385.900 - - 3 4.385.900 - 6.114.100

In land Transport - 200.000 - - - - - - - - -

3 300.000 900.000 3 600.000 - - 3 600.000 - 300.000

Hotel Accommodation - 300.000 - - - - - - - - -

- 500.000 - - - - - - - - -

OSA 10 100.000 1.000.000 10 1.000.000 - - 10 1.000.000 - -

2.2.2.6 Local Transport for Coordonation - - - - - - - - - - - - -

Tim Percepatan DI Yogyakarta - 300.000 - - - - - - -

TOTAL DUTY TRAVEL PROVINCE D I YOGYAKARTA 300.157.500 94.294.200 1.955.000 23.600.000 - - - 94.294.200 1.955.000 23.600.000 137.213.300 18.645.000 24.450.000

Page 28: PROGRAM KOTA TANPA KUMUH SATKER ...103.12.84.195/files/Media/Laporan/Contract Resume/osp5...NO KOMPOSISI BIAYA AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT

II. DIRECT REEIMBURSABLE COST

2.3. OFFICE OPERATIONAL EXPENSESPROVINCE

Vol Unit Price

(IDR)

Total Amount

(IDR) Vol

Total Amount

(IDR) Vol

Total Amount

(IDR) Vol

Total Amount

(IDR) Vol

Total Amount

(IDR)

2.3.1 OFFICE RUNNING COST 1.402.300.000 1.295.342.281 23.200.000 1.318.542.281 83.757.719

2.3.1.1 OSP Office 180.000.000 157.092.281 4.000.000 161.092.281 18.907.719

a Propinsi Jawa Tengah (Semarang) 45,00 2.500.000 112.500.000 41,00 99.041.527 1,00 2.500.000 42,00 101.541.527 3,00 10.958.473 b Propinsi DI Yiogyakarta 45,00 1.500.000 67.500.000 41,00 58.050.754 1,00 1.500.000 42,00 59.550.754 3,00 7.949.246

2.3.1.2 City Coordinator Office 1.024.675.000 968.625.000 12.450.000 981.075.000 43.600.000

a Propinsi Jawa Tengah 917.500.000 865.250.000 11.500.000 876.750.000 40.750.000 Cluster 1 (7 korkot)Korkot Purbalingga (44 kelurahan) 29,50 950.000 28.025.000 29,50 28.025.000 - - 29,50 28.025.000 - -

Korkot Magelang (27 kelurahan) 29,50 950.000 28.025.000 29,50 28.025.000 - - 29,50 28.025.000 - -

Korkot Kota Magelang (17 kelurahan) - 950.000 - - - - - - - - -

Korkot Blora (45 kelurahan) 29,50 950.000 28.025.000 29,50 28.025.000 - - 29,50 28.025.000 - -

Korkot Temanggung (41 kelurahan) 29,50 950.000 28.025.000 29,50 28.025.000 - - 29,50 28.025.000 - -

Korkot Batang (39 kelurahan) 29,50 950.000 28.025.000 29,50 28.025.000 - - 29,50 28.025.000 - -

Korkot Brebes (38 kelurahan) 29,50 950.000 28.025.000 29,50 28.025.000 - - 29,50 28.025.000 - -

1 Korkot Kota Pekalongan (47 kelurahan) 44,50 950.000 42.275.000 40,50 38.475.000 1,00 950.000 41,50 39.425.000 3,00 2.850.000

2 Korkot Kab Semarang (177 kelurahan) 15,00 950.000 14.250.000 11,00 10.450.000 1,00 950.000 12,00 11.400.000 3,00 2.850.000

3 Korkot Kab Wonosobo (20 kelurahan ) 15,00 950.000 14.250.000 11,00 10.450.000 1,00 950.000 12,00 11.400.000 3,00 2.850.000

4 Korkot Demak ( 19 kelurahan) 15,00 950.000 14.250.000 11,00 10.450.000 1,00 950.000 12,00 11.400.000 3,00 2.850.000

5 Korkot Purworejo (27 kelurahan) 15,00 950.000 14.250.000 11,00 10.450.000 1,00 950.000 12,00 11.400.000 3,00 2.850.000

6 Korkot Kota Tegal (27 kelurahan) 15,00 950.000 14.250.000 11,00 10.450.000 1,00 950.000 12,00 11.400.000 3,00 2.850.000

Cluster 2 (11 korkot)Korkot Banyumas (85 kelurahan) 29,50 1.100.000 32.450.000 29,50 32.450.000 - - 29,50 32.450.000 - -

Korkot Kebumen (54 kelurahan) 29,50 1.100.000 32.450.000 29,50 32.450.000 - - 29,50 32.450.000 - -

Korkot Boyolali (61 kelurahan) 29,50 1.100.000 32.450.000 29,50 32.450.000 - - 29,50 32.450.000 - -

Korkot Sukoharjo (83 kelurahan) 29,50 1.100.000 32.450.000 29,50 32.450.000 - - 29,50 32.450.000 - -

Korkot Karanganyar (51 kelurahan) 29,50 1.100.000 32.450.000 29,50 32.450.000 - - 29,50 32.450.000 - -

Korkot Rembang (54 kelurahan) 29,50 1.100.000 32.450.000 29,50 32.450.000 - - 29,50 32.450.000 - -

Korkot Kudus (86 kelurahan) 17,50 1.100.000 19.250.000 17,50 19.250.000 - - 17,50 19.250.000 - -

Korkot Demak ( 19 kelurahan) 12,00 1.100.000 13.200.000 12,00 13.200.000 - - 12,00 13.200.000 - -

INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAKAMENDMENT CONTRACT NO. 20

NO. URAIAN

Page 29: PROGRAM KOTA TANPA KUMUH SATKER ...103.12.84.195/files/Media/Laporan/Contract Resume/osp5...NO KOMPOSISI BIAYA AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT

Vol Unit Price

(IDR)

Total Amount

(IDR) Vol

Total Amount

(IDR) Vol

Total Amount

(IDR) Vol

Total Amount

(IDR) Vol

Total Amount

(IDR)

INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAKAMENDMENT CONTRACT NO. 20

NO. URAIAN

Korkot Jepara (86 kelurahan) 29,50 1.100.000 32.450.000 29,50 32.450.000 - - 29,50 32.450.000 - -

Korkot Pati (86 kelurahan) - 1.100.000 - - - - - - - - -

7 Korkot Kendal (57 kelurahan) 44,50 1.100.000 48.950.000 40,50 44.550.000 1,00 1.100.000 41,50 45.650.000 3,00 3.300.000

8 Korkot Pemalang (79 kelurahan) 44,50 1.100.000 48.950.000 40,50 44.550.000 1,00 1.100.000 41,50 45.650.000 3,00 3.300.000

9 Korkot Kota Surakarta (51 kelurahan) 44,50 1.100.000 48.950.000 40,50 44.550.000 1,00 1.100.000 41,50 45.650.000 3,00 3.300.000

Korkot Banjarnegara - 1.100.000 - - - - - - - - -

Korkot Purworejo (27 kelurahan) - 1.100.000 - - - - - - - - -

Cluster 3 (4 korkot)Korkot Pati (101 kelurahan) 29,50 1.250.000 36.875.000 29,50 36.875.000 - - 29,50 36.875.000 - -

10 Korkot Kab Pekalongan (119 kelurahan) 44,50 1.250.000 55.625.000 40,50 50.625.000 1,00 1.250.000 41,50 51.875.000 3,00 3.750.000

Korkot Kab Tegal (116 kelurahan) 29,50 1.250.000 36.875.000 29,50 36.875.000 - - 29,50 36.875.000 - -

11 Korkot Kota Semarang (177 kelurahan) 44,50 1.250.000 55.625.000 40,50 50.625.000 1,00 1.250.000 41,50 51.875.000 3,00 3.750.000

Cluster 4 (1 korkot)Korkot Kab Klaten (212 kelurahan) 35,50 1.250.000 44.375.000 30,50 38.125.000 - - 30,50 38.125.000 5,00 6.250.000

b Propinsi DI Yogyakarta 107.175.000 103.375.000 950.000 104.325.000 2.850.000 (3 Kota/Kab)Cluster 1 (1 korkot)Korkot Kota Yogyakarta (45 kelurahan) 44,50 950.000 42.275.000 40,50 38.475.000 1,00 950.000 41,50 39.425.000 3,00 2.850.000

Cluster 2 (2 korkot)Korkot Sleman (75 kelurahan) 29,50 1.100.000 32.450.000 29,50 32.450.000 - - 29,50 32.450.000 - -

Korkot Bantul (50 kelurahan) 29,50 1.100.000 32.450.000 29,50 32.450.000 - - 29,50 32.450.000 - -

2.3.1.3 Assitant CD City Coordinator Office 197.625.000 169.625.000 6.750.000 176.375.000 21.250.000

a Propinsi Jawa Tengah 178.250.000 154.250.000 6.000.000 160.250.000 18.000.000 (12 Kota/Kab) 713,00 250.000 178.250.000 617,00 154.250.000 24,00 6.000.000 641,00 160.250.000 72,00 18.000.000

b Propinsi DI Yogyakarta 19.375.000 15.375.000 750.000 16.125.000 3.250.000 (1 Kota/Kab) 77,50 250.000 19.375.000 61,50 15.375.000 3,00 750.000 64,50 16.125.000 13,00 3.250.000

2.3.2 OFFICE SUPPLY & CONSUMABLE 511.737.500 465.867.399 9.450.000 475.317.399 36.420.101

2.3.2.1 OSP Office 78.750.000 67.329.899 1.750.000 69.079.899 9.670.101

a Propinsi Jawa Tengah (Semarang) 45,00 1.000.000 45.000.000 41,00 38.378.300 1,00 1.000.000 42,00 39.378.300 3,00 5.621.700

b Propinsi DI. Yogyakarta 45,00 750.000 33.750.000 41,00 28.951.599 1,00 750.000 42,00 29.701.599 3,00 4.048.401

2.3.2.2 City Coordinator Office 313.062.500 296.762.500 3.650.000 300.412.500 12.650.000

Page 30: PROGRAM KOTA TANPA KUMUH SATKER ...103.12.84.195/files/Media/Laporan/Contract Resume/osp5...NO KOMPOSISI BIAYA AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT

Vol Unit Price

(IDR)

Total Amount

(IDR) Vol

Total Amount

(IDR) Vol

Total Amount

(IDR) Vol

Total Amount

(IDR) Vol

Total Amount

(IDR)

INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAKAMENDMENT CONTRACT NO. 20

NO. URAIAN

a Propinsi Jawa Tengah 284.237.500 268.937.500 3.400.000 272.337.500 11.900.000 Cluster 1Korkot Purbalingga (44 kelurahan) 29,50 250.000 7.375.000 29,50 7.375.000 - - 29,50 7.375.000 - -

Korkot Magelang (27 kelurahan) 29,50 250.000 7.375.000 29,50 7.375.000 - - 29,50 7.375.000 - -

Korkot Kota Magelang (17 kelurahan) - 250.000 - - - - - - - - -

Korkot Blora (45 kelurahan) 29,50 250.000 7.375.000 29,50 7.375.000 - - 29,50 7.375.000 - -

Korkot Temanggung (41 kelurahan) 29,50 250.000 7.375.000 29,50 7.375.000 - - 29,50 7.375.000 - -

Korkot Batang (39 kelurahan) 30,50 250.000 7.625.000 29,50 7.375.000 - - 29,50 7.375.000 1,00 250.000

Korkot Brebes (38 kelurahan) 29,50 250.000 7.375.000 29,50 7.375.000 - - 29,50 7.375.000 - -

1 Korkot Kota Pekalongan (47 kelurahan) 44,50 250.000 11.125.000 40,50 10.125.000 1,00 250.000 41,50 10.375.000 3,00 750.000

2 Korkot Kab Semarang (177 kelurahan) 15,00 250.000 3.750.000 11,00 2.750.000 1,00 250.000 12,00 3.000.000 3,00 750.000

3 Korkot Kab Wonosobo (20 kelurahan ) 15,00 250.000 3.750.000 11,00 2.750.000 1,00 250.000 12,00 3.000.000 3,00 750.000

4 Korkot Demak ( 19 kelurahan) 15,00 250.000 3.750.000 11,00 2.750.000 1,00 250.000 12,00 3.000.000 3,00 750.000

5 Korkot Purworejo (27 kelurahan) 15,00 250.000 3.750.000 11,00 2.750.000 1,00 250.000 12,00 3.000.000 3,00 750.000

6 Korkot Kota Tegal (27 kelurahan) 15,00 250.000 3.750.000 11,00 2.750.000 1,00 250.000 12,00 3.000.000 3,00 750.000

Cluster 2Korkot Banyumas (85 kelurahan) 29,50 300.000 8.850.000 29,50 8.850.000 - - 29,50 8.850.000 - -

Korkot Kebumen (54 kelurahan) 29,50 300.000 8.850.000 29,50 8.850.000 - - 29,50 8.850.000 - -

Korkot Boyolali (61 kelurahan) 29,50 300.000 8.850.000 29,50 8.850.000 - - 29,50 8.850.000 - -

Korkot Sukoharjo (83 kelurahan) 29,50 300.000 8.850.000 29,50 8.850.000 - - 29,50 8.850.000 - -

Korkot Karanganyar (51 kelurahan) 29,50 300.000 8.850.000 29,50 8.850.000 - - 29,50 8.850.000 - -

Korkot Rembang (54 kelurahan) 29,50 300.000 8.850.000 29,50 8.850.000 - - 29,50 8.850.000 - -

Korkot Kudus (86 kelurahan) 17,50 300.000 5.250.000 17,50 5.250.000 - - 17,50 5.250.000 - -

Korkot Demak ( 19 kelurahan) 12,00 300.000 3.600.000 12,00 3.600.000 - - 12,00 3.600.000 - -

Korkot Jepara (86 kelurahan) 29,50 300.000 8.850.000 29,50 8.850.000 - - 29,50 8.850.000 - -

Korkot Pati (86 kelurahan) - 300.000 - - - - - - - - -

7 Korkot Kendal (57 kelurahan) 44,50 300.000 13.350.000 40,50 12.150.000 1,00 300.000 41,50 12.450.000 3,00 900.000

8 Korkot Pemalang (79 kelurahan) 44,50 300.000 13.350.000 40,50 12.150.000 1,00 300.000 41,50 12.450.000 3,00 900.000

9 Korkot Kota Surakarta (51 kelurahan) 44,50 300.000 13.350.000 40,50 12.150.000 1,00 300.000 41,50 12.450.000 3,00 900.000

Korkot Banjarnegara - 300.000 - - - - - - - - -

Page 31: PROGRAM KOTA TANPA KUMUH SATKER ...103.12.84.195/files/Media/Laporan/Contract Resume/osp5...NO KOMPOSISI BIAYA AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT

Vol Unit Price

(IDR)

Total Amount

(IDR) Vol

Total Amount

(IDR) Vol

Total Amount

(IDR) Vol

Total Amount

(IDR) Vol

Total Amount

(IDR)

INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAKAMENDMENT CONTRACT NO. 20

NO. URAIAN

Korkot Purworejo (27 kelurahan) - 300.000 - - - - - - - - -

Cluster 3Korkot Pati (101 kelurahan) 29,50 500.000 14.750.000 29,50 14.750.000 - - 29,50 14.750.000 - -

10 Korkot Kab Pekalongan (119 kelurahan) 44,50 500.000 22.250.000 40,50 20.250.000 1,00 500.000 41,50 20.750.000 3,00 1.500.000

Korkot Tegal (116 kelurahan) 29,50 500.000 14.750.000 29,50 14.750.000 - - 29,50 14.750.000 - -

11 Korkot Kota Semarang (177 kelurahan) 44,50 500.000 22.250.000 40,50 20.250.000 1,00 500.000 41,50 20.750.000 3,00 1.500.000

Cluster 4Korkot Kab Klaten (212 kelurahan) 34,50 725.000 25.012.500 32,50 23.562.500 - - 32,50 23.562.500 2,00 1.450.000

b Propinsi DI Yogyakarta 28.825.000 27.825.000 250.000 28.075.000 750.000 (3 Kota/Kab)Cluster 1

1 Korkot Kota Yogyakarta (45 kelurahan) 44,50 250.000 11.125.000 40,50 10.125.000 1,00 250.000 41,50 10.375.000 3,00 750.000

Cluster 2Korkot Sleman (75 kelurahan) 29,50 300.000 8.850.000 29,50 8.850.000 - - 29,50 8.850.000 - -

Korkot Bantul (50 kelurahan) 29,50 300.000 8.850.000 29,50 8.850.000 - - 29,50 8.850.000 - -

2.3.2.3 Assitant CD City Coordinator Office 119.925.000 101.775.000 4.050.000 105.825.000 14.100.000

a Propinsi Jawa Tengah 108.000.000 92.550.000 3.600.000 96.150.000 11.850.000 (14 Kota/Kab) 720,00 150.000 108.000.000 617,00 92.550.000 24,00 3.600.000 641,00 96.150.000 79,00 11.850.000

b Propinsi DI Yogyakarta 11.925.000 9.225.000 450.000 9.675.000 2.250.000 (1 Kota/Kab) 79,50 150.000 11.925.000 61,50 9.225.000 3,00 450.000 64,50 9.675.000 15,00 2.250.000

2.3.3 COMMUNICATION COST 425.000.000 372.557.976 7.300.000 379.857.976 45.142.024

2.3.3.1 OSP Office 45.000.000 30.457.976 1.000.000 31.457.976 13.542.024

a Propinsi Jawa Tengah (Semarang) 45,00 500.000 22.500.000 41,00 15.326.294 1,00 500.000 42,00 15.826.294 3,00 6.673.706

b Propinsi DI. Yogyakarta 45,00 500.000 22.500.000 38,00 15.131.682 1,00 500.000 39,00 15.631.682 6,00 6.868.318

2.3.3.2 City Coordinator Office 299.400.000 273.600.000 3.600.000 277.200.000 22.200.000

a Propinsi Jawa Tengah( 26 Kota/Kab)( 23 Kota/Kab) 893,00 300.000 267.900.000 811,00 243.300.000 11,00 3.300.000 822,00 246.600.000 71,00 21.300.000

b Propinsi DI Yogyakarta(3 Kota/Kab) 105,00 300.000 31.500.000 101,00 30.300.000 1,00 300.000 102,00 30.600.000 3,00 900.000

2.3.3.3 Assitant CD City Coordinator Office 80.600.000 68.500.000 2.700.000 71.200.000 9.400.000

a Propinsi Jawa Tengah(12 Kota/Kab) 726,00 100.000 72.600.000 623,00 62.300.000 24,00 2.400.000 647,00 64.700.000 79,00 7.900.000

Page 32: PROGRAM KOTA TANPA KUMUH SATKER ...103.12.84.195/files/Media/Laporan/Contract Resume/osp5...NO KOMPOSISI BIAYA AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT

Vol Unit Price

(IDR)

Total Amount

(IDR) Vol

Total Amount

(IDR) Vol

Total Amount

(IDR) Vol

Total Amount

(IDR) Vol

Total Amount

(IDR)

INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAKAMENDMENT CONTRACT NO. 20

NO. URAIAN

b Propinsi DI Yogyakarta(1 Kota/Kab) 80,00 100.000 8.000.000 62,00 6.200.000 3,00 300.000 65,00 6.500.000 15,00 1.500.000

2.3.4 INTERNET 67.500.000 47.935.339 1.500.000 49.435.339 18.064.661

2.3.4.1 OSP Office 67.500.000 47.935.339 1.500.000 49.435.339 18.064.661

a Propinsi Jawa Tengah (Semarang) 45,00 750.000 33.750.000 41,00 25.210.839 1,00 750.000 42,00 25.960.839 3,00 7.789.161

b Propinsi DI. Yogyakarta 45,00 750.000 33.750.000 39,00 22.724.500 1,00 750.000 40,00 23.474.500 5,00 10.275.500

2.3.5 BOP Tim Percepatan 36.000.000 36.000.000 - 36.000.000 -

a Propinsi Jawa Tengah (Semarang) 9,00 3.000.000 27.000.000 9,00 27.000.000 - - 9,00 27.000.000 - -

b Propinsi DI. Yogyakarta 3,00 3.000.000 9.000.000 3,00 9.000.000 - - 3,00 9.000.000 - -

TOTAL OF OFFICE OPERATIONAL EXPENSES 2.442.537.500 2.217.702.995 41.450.000 2.259.152.995 183.384.505

Page 33: PROGRAM KOTA TANPA KUMUH SATKER ...103.12.84.195/files/Media/Laporan/Contract Resume/osp5...NO KOMPOSISI BIAYA AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT

II. DIRECT REEIMBURSABLE COST2.4 OFFICE EQUIPMENT EXPENSES

VolUnit Price

(IDR)

Total Amount

(IDR) Vol

Total Amount

(IDR) Vol

Total Amount

(IDR) Vol

Total Amount

(IDR) Vol

Total Amount

(IDR)

2 OSP OFFICE 381.440.108 370.615.000 - 370.615.000 10.825.108

2.4.1.1 Propinsi Jawa Tengah (Semarang) 248.548.898 239.920.000 - 239.920.000 8.628.898

a Desktop Computer 5 5.000.000 25.000.000 5 25.000.000 - - 5 25.000.000 - -

b Laptop/Notebook 5 5.500.000 27.500.000 5 27.500.000 - - 5 27.500.000 - -

c Printer Laser Jet 1 2.000.000 2.000.000 1 2.000.000 - - 1 2.000.000 - -

d Printer Color A3 1 3.000.000 3.000.000 1 3.000.000 - - 1 3.000.000 - -

e Digital Camera 1 1.250.000 1.250.000 1 1.250.000 - - 1 1.250.000 - -

f GPS tools - 3.500.000 - - - - - - - - -

g LCD Projector 1 4.500.000 4.500.000 1 4.500.000 - - 1 4.500.000 - -

h Scanner 1 1.000.000 1.000.000 1 1.000.000 - - 1 1.000.000 - -

i Equipment Maintenance (Include existing equipment) - 3.000.000 - - - - - - - - -

1 15.548.898 15.548.898 1 14.795.000 - - 1 14.795.000 - 753.898

Pengadaan Equipment Tim Percepatan Jateng - - - - - - - - - - -

j Peta Citra Satelit ( scala 1 : 5000 ) - 100.000.000 - - - - - - - - -

k Laptop (rental) 36 1.750.000 63.000.000 36 63.000.000 - - 36 63.000.000 - -

l Desktop Computer / PC (rental) 45 1.250.000 56.250.000 45 56.250.000 - - 45 56.250.000 - -

m Printer A3 (rental) 18 500.000 9.000.000 18 9.000.000 - - 18 9.000.000 - -

n Alat Ukur (rental) 1 40.500.000 40.500.000 1 32.625.000 - - 1 32.625.000 - 7.875.000

2.4.1.2 Propinsi DI. Yogyakarta 132.891.210 130.695.000 - 130.695.000 2.196.210

a Desktop Computer 5 5.000.000 25.000.000 5 25.000.000 - - 5 25.000.000 - -

b Laptop/Notebook 5 5.500.000 27.500.000 5 27.500.000 - - 5 27.500.000 - -

c Printer Laser Jet 1 2.000.000 2.000.000 1 2.000.000 - - 1 2.000.000 - -

d Printer Color A3 1 3.000.000 3.000.000 1 3.000.000 - - 1 3.000.000 - -

e Digital Camera 1 1.250.000 1.250.000 1 1.250.000 - - 1 1.250.000 - -

f GPS tools - 3.500.000 - - - - - - - - -

g LCD Projector 1 4.500.000 4.500.000 1 4.500.000 - - 1 4.500.000 - -

h Scanner 1 1.000.000 1.000.000 1 1.000.000 - - 1 1.000.000 - -

i Equipment Maintenance (Include existing equipment) - 3.000.000 - - - - - - - - -

1 12.391.210 12.391.210 1 11.695.000 - - 1 11.695.000 - 696.210

Pengadaan Equipment Tim Percepatan DI Yogyakarta - - - - - - - - - - -

j Peta Citra Satelit ( scala 1 : 5000 ) - 100.000.000 - - - - - - - - -

k Laptop (rental) 12 1.750.000 21.000.000 12 21.000.000 - - 12 21.000.000 - -

l Desktop Computer / PC (rental) 15 1.250.000 18.750.000 15 18.750.000 - - 15 18.750.000 - -

m Printer A3 (rental) 6 500.000 3.000.000 6 3.000.000 - - 6 3.000.000 - -

n Alat Ukur (rental) 1 13.500.000 13.500.000 1 12.000.000 - - 1 12.000.000 - 1.500.000

TOTAL OF OFFICE EQUIPMENT EXPENSES 381.440.108 370.615.000 - 370.615.000 10.825.108

INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAK

NO. URAIAN

AMENDMENT CONTRACT NO. 20

Page 34: PROGRAM KOTA TANPA KUMUH SATKER ...103.12.84.195/files/Media/Laporan/Contract Resume/osp5...NO KOMPOSISI BIAYA AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT

II. DIRECT REEIMBURSABLE COST2.5 RENTAL EXPENSES

Vol Unit Price

(IDR)

Total Amount

(IDR) Vol

Total Amount

(IDR) Vol

Total Amount

(IDR) Vol

Total Amount

(IDR) Vol

Total Amount

(IDR)

2.5.1 OSP OFFICE SPACE (including furniture, AC etc) 473.625.000 426.675.000 46.950.000 473.625.000 -

space/m2 mth

2.5.1.1 Jawa Tengah (Semarang) 266 8 10.765,00 25.000 269.125.000 9.724,00 243.100.000 1.041,00 26.025.000 10.765,00 269.125.000 - -

2.5.1.2 DI. Yogyakarta 160 8 6.740,00 25.000 168.500.000 5.903,00 147.575.000 837,00 20.925.000 6.740,00 168.500.000 - -

2.5.1.3 For City Coordinator (29 Korkot) 29 8 - - - - - - - - - - -

For City Coordinator (29 Korkot) 26 8 - - - - - - - - - - -

4-D Office / Studio Tim Percepatan Jawa Tengah 1.080,00 25.000 27.000.000 1.080,00 27.000.000 - - 1.080,00 27.000.000 - -

Office / Studio Tim Percepatan DI Yogyakarta 360,00 25.000 9.000.000 360,00 9.000.000 - - 360,00 9.000.000 - -

2.5.2VEHICLES (Minimun Y 2010 - Included driver, O

& M, Insurance etc) for OSP Office 1.230.000.000 1.122.000.000 24.000.000 1.146.000.000 84.000.000

unit mth

2.5.2.1 Jawa Tengah (Semarang) 3 8 115,50 6.000.000 693.000.000 107,50 645.000.000 2,00 12.000.000 109,50 657.000.000 6,00 36.000.000

2.5.2.2 DI. Yogyakarta 2 8 77,50 6.000.000 465.000.000 69,50 417.000.000 2,00 12.000.000 71,50 429.000.000 6,00 36.000.000

4-C Vehicles Rental Tim Percepatan Jawa Tengah 9,00 6.000.000 54.000.000 7,50 45.000.000 - - 7,50 45.000.000 1,50 9.000.000

Vehicles Rental Tim Percepatan DI Yogyakarta 3,00 6.000.000 18.000.000 2,50 15.000.000 - - 2,50 15.000.000 0,50 3.000.000

2.5.3VEHICLES (Minimun Y 2010 - Included driver, O

& M, Insurance etc) for City Coordinator Office 5.778.000.000 5.472.000.000 72.000.000 5.544.000.000 234.000.000

2.5.3.1 Jawa Tengah unit mth

( 26 Kota/Kab) 26 8

( 23 Kota/Kab) 23 24 858,00 6.000.000 5.148.000.000 811,00 4.866.000.000 11,00 66.000.000 822,00 4.932.000.000 36,00 216.000.000

2.5.3.2 DI. Yogyakarta

(3 Kota/Kab) 3 8 105,00 6.000.000 630.000.000 101,00 606.000.000 1,00 6.000.000 102,00 612.000.000 3,00 18.000.000

2.5.4

MOTORCYCLE (Minimun Y 2010 - Included O &

M, Insuranc For Assistant CD Mandiri of City

Coordinators

320.800.000 276.400.000 10.800.000 287.200.000 33.600.000

2.5.4.1 Jawa Tengah unit mth

(12 Kota/Kab) 12 8 721,00 400.000 288.400.000 624,00 249.600.000 24,00 9.600.000 648,00 259.200.000 73,00 29.200.000

2.5.4.2 DI. Yogyakarta

(1 Kota/Kab) 1 8 81,00 400.000 32.400.000 67,00 26.800.000 3,00 1.200.000 70,00 28.000.000 11,00 4.400.000

TOTAL OF RENTAL EXPENSES 7.802.425.000 7.297.075.000 153.750.000 7.450.825.000 351.600.000

INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAKINVOICE LALUAMENDMENT CONTRACT NO. 20

NO. URAIAN

Page 35: PROGRAM KOTA TANPA KUMUH SATKER ...103.12.84.195/files/Media/Laporan/Contract Resume/osp5...NO KOMPOSISI BIAYA AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT

II. DIRECT REEIMBURSABLE COST2.6 REPORTING EXPENSES

Vol. Unit Price

(IDR)

Total Amount

(IDR) Vol

Total Amount

(IDR) Vol

Total Amount

(IDR) Vol

Total Amount

(IDR) Vol

Total Amount

(IDR)

2.6.1 REGULAR REPORT Time Eks 27.750.000 18.750.000 750.000 19.500.000 8.250.000

a Inception Report 1 15 15 50.000 750.000 15 750.000 - - 15 750.000 - -

b Monthly Report 4 15 390 25.000 9.750.000 315 7.875.000 15 375.000 330 8.250.000 60 1.500.000

c Quarterly Report 2 15 195 25.000 4.875.000 165 4.125.000 15 375.000 180 4.500.000 15 375.000

d Annual Report 1 15 15 50.000 750.000 - - - - - - 15 750.000

e Draft Final Report 1 20 40 50.000 2.000.000 20 1.000.000 - - 20 1.000.000 20 1.000.000

f Final Report (Indonesia & English) 1 40 80 100.000 8.000.000 40 4.000.000 - - 40 4.000.000 40 4.000.000

g Executive Summary (Indonesia & English)1 40 65 25.000 1.625.000 40 1.000.000 - - 40 1.000.000 25 625.000

2.6.2 SPECIAL REPORT Time Eks 14.625.000 6.058.345 250.000 6.308.345 8.316.655

a Performance Evaluation of OSP 2 15 120 25.000 3.000.000 60 1.500.000 - - 60 1.500.000 60 1.500.000

b Training Activity Report 1 50 200 25.000 5.000.000 - - - - - - 200 5.000.000

c Complaint Resolution Follow-up Report 8 5 205 25.000 5.125.000 190 4.558.345 10 250.000 200 4.808.345 5 316.655

d Workshop Findings and Results 1 20 60 25.000 1.500.000 - - - - - - 60 1.500.000

42.375.000 24.808.345 1.000.000 25.808.345 16.566.655

NO. URAIAN

TOTAL REPORTING EXPENSES

INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAKAMENDMENT CONTRACT NO. 20

Page 36: PROGRAM KOTA TANPA KUMUH SATKER ...103.12.84.195/files/Media/Laporan/Contract Resume/osp5...NO KOMPOSISI BIAYA AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT

3.1 BREAKDOWN OF TRAINING ACTIVITY

Vol. Unit Price

(IDR)

Total Amount

(IDR) Vol

Total Amount

(IDR) Vol

Total Amount

(IDR) Vol

Total Amount

(IDR) Vol

Total Amount

(IDR)

3.1.1 IN REGIONAL LEVELS (Semarang) Time/

Event Days Ptcp Instr 6.000.000 6.000.000 - 6.000.000 -

a Rakor OSP 2 2 6 4 20 250.000 5.000.000 20 5.000.000 - - 20 5.000.000 - -

- Kits 10 10 50.000 500.000 10 500.000 - - 10 500.000 - -

- Speaker honorarium 4 1 500.000 500.000 1 500.000 - - 1 500.000 - -

3.2.2 IN PROVINCIAL LEVELS Time/

Event Days Ptcp Instr 868.103.000 868.103.000 - 868.103.000 -

a OSP Consolidation Jawa Tengah 2 1 283 3 276 100.000 27.600.000 276 27.600.000 - - 276 27.600.000 - -

b OSP Consolidation DI. Yogyakarta 2 1 39 3 42 100.000 4.200.000 42 4.200.000 - - 42 4.200.000 - -

c Special Training for Kelurahan Facilitators (Technic) 1 3 472 6 - 200.000 - - - - - - - - -

d Special Training for Kelurahan Facilitators (Economic) 1 3 265 5 - 200.000 - - - - - - - - -

e Special Training for Kelurahan Facilitators (Social) 1 3 396 5 - 200.000 - - - - - - - - -

f Special Training for Senior Facilitators 1 3 265 5 - 200.000 - - - - - - - - -

g Konsolidasi Pemandu Pelatihan Penguatan Pemda dan Stakeholder 1 2 22 - 200.000 - - - - - - - - -

h Pelatihan Penguatan Pemda dan Stakeholder 1 5 295 4 - 360.000 - - - - - - - - -

i Konsolidasi Pemandu Pelatihan Penguatan Askot dan Fasilitator 1 2 103 4 - 200.000 - - - - - - - - -

j Pelatihan Penguatan Askot dan Fasilitator 1 5 1.608 9 - 200.000 - - - - - - - - -

k Konsolidasi Pemandu Pelatihan PLPBK 2 2 22 44 200.000 8.800.000 44 8.800.000 - - 44 8.800.000 - -

l Pelatihan Dasar PLPBK (Lokasi baru tahun 2012) 1 6 279 4 - 200.000 - - - - - - - - -

m Pelatihan Penguatan PLPBK (Lokasi baru tahun 2012) 1 4 279 4 - 200.000 - - - - - - - - -

n Pelatihan Dasar PLPBK (Lokasi baru tahun 2013) 1 6 369 4 2.202 200.000 440.400.000 2.202 440.400.000 - - 2.202 440.400.000 - -

o Pelatihan Penguatan PLPBK (Lokasi baru tahun 2013) 1 4 369 4 - 200.000 - - - - - - - - -

p Pelatihan Tim Teknis PLPBK (Lokasi Baru tahun 2013) 1 4 112 4 448 360.000 158.503.000 448 158.503.000 - - 448 158.503.000 - -

q Konsolidasi Pelatihan Khusus Fasilitator 1 1 22 4 26 200.000 5.200.000 26 5.200.000 - - 26 5.200.000 - -

rTraining for City Coordinators Assistants (Infrastructure, Economic,

Community Dev, MIS, Urban Planner) 1 3 220 7 681 200.000 136.200.000 681 136.200.000 - - 681 136.200.000 - -

s Pelatihan Dasar PLPBK 1 6 481 37 426 200.000 85.200.000 426 85.200.000 - - 426 85.200.000 - -

t Pelatihan Penguatan PLPBK 1 4 481 37 - 200.000 - - - - - - - - -

u Narasumber PLPBK 4 4 500.000 2.000.000 4 2.000.000 - - 4 2.000.000 - -

v Konsolidasi Pemandu Pelatihan KSB 2 1 6 3 - 200.000 - - - - - - - - -

w Pelatihan Dasar KSB 1 6 68 12 - 200.000 - - - - - - - - -

x Pelatihan Penguatan KSB 1 3 68 12 - 200.000 - - - - - - - - -

y Narasumber 4 - 500.000 - - - - - - - - -

3.2.3 In City/Regency Levels Time/

Event Days Ptcp Instr - - - - -

a Thematic Discussion / Reflection of KBP 1 1 862 2 - 75.000 - - - - - - - - -

bConsolidation of Kelurahan Facilitators, City Coordinators Assistants & City

Coordinators 2 1 1.543 - - 25.000 - - - - - - - - -

c Speaker honorarium 2 - 500.000 - - - - - - - - -

1 IN REGIONAL LEVELS Time/

Event Days Peserta Instr 18.600.000 18.600.000 - 18.600.000 -

a Rakor OSP 2 2 14 2 64 250.000 16.000.000 64 16.000.000 - - 64 16.000.000 - -

- Kits 2 14 2 32 50.000 1.600.000 32 1.600.000 - - 32 1.600.000 - -

- Speaker honorarium 2 2 500.000 1.000.000 2 1.000.000 - - 2 1.000.000 - -

NO. URAIAN

INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAKAMENDMENT CONTRACT NO. 20

Page 37: PROGRAM KOTA TANPA KUMUH SATKER ...103.12.84.195/files/Media/Laporan/Contract Resume/osp5...NO KOMPOSISI BIAYA AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT

Vol. Unit Price

(IDR)

Total Amount

(IDR) Vol

Total Amount

(IDR) Vol

Total Amount

(IDR) Vol

Total Amount

(IDR) Vol

Total Amount

(IDR)

NO. URAIAN

INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAKAMENDMENT CONTRACT NO. 20

2 IN PROVINCIAL LEVELS Time/

Event Days Ptcp Instr 1.558.150.000 1.558.150.000 - 1.558.150.000 -

a.1 OSP Consolidation Jawa Tengah 2 1 60 2 124 100.000 12.400.000 124 12.400.000 - - 124 12.400.000 - -

a.2 OSP Consolidation Yogyakarta 2 1 25 2 54 100.000 5.400.000 54 5.400.000 - - 54 5.400.000 - -

b.1 Konsolidasi Pemandu Pelatihan Penguatan Program Lanjutan 1 1 144 8 90 200.000 15.750.000 90 15.750.000 - - 90 15.750.000 - -

b.2 Pelatihan Penguatan Program Lanjutan 1 5 1.453 144 7.485 200.000 1.497.000.000 7.485 1.497.000.000 - - 7.485 1.497.000.000 - -

c.1 Konsolidasi Pemandu Pelatihan Pemerintah Daerah 1 1 25 5 - 200.000 - - - - - - - - -

c.2 Pelatihan Pemerintah Daerah 1 3 226 25 - 360.000 - - - - - - - - -

d Pelatihan SIM 1 3 40 8 138 200.000 27.600.000 138 27.600.000 - - 138 27.600.000 - -

e Pelatihan Dasar PLPBK 1 6 - - - - - - - - - - - - -

f Pelatihan Penguatan PLPBK 1 3 262 27 - 200.000 - - - - - - - - -

g Pelatihan Tim Teknis Pemda 1 4 130 10 - - - - - - - - - - -

3.3.3 In City/Regency Levels Time/

Event Days Ptcp Instr 45.575.000 45.575.000 - 45.575.000 -

a Thematic Discussion / Reflection of KBP, city changer, FK BKM 2 1 800 80 - 75.000 - - - - - - - - -

bConsolidation of Kelurahan Facilitators, City Coordinators Assistants & City

Coordinators 3 1 1.453 96 1.827 25.000 45.575.000 1.827 45.575.000 - - 1.827 45.575.000 - -

c Speaker honorarium 12 - 500.000 - - - - - - - - -

Time/

Event Days Ptcp Instr

B Regional (OC/OSP) 7.000.000 - - - 7.000.000

1 Konsolidasi OC/OSP 2 2 7 2 - 250.000 - - - - - - - - -

- Kits 2 9 2 - 50.000 - - - - - - - - -

- Speaker honorarium 2 2 2 - - 500.000 - - - - - - - - -

- - - - - - - -

2 Konsolidasi OC/OSP (Pembahasan Final Report 1 2 14 - 28 250.000 7.000.000 - - - - - - 28 7.000.000

C Provinsi Time/

Event Days Ptcp Instr 6.697.816.667 4.624.250.000 - 4.624.250.000 2.073.566.667

1 Konsolidasi / KBIK Provinsi 2 2 78 4 296 100.000 29.600.000 296 29.600.000 - - 296 29.600.000 - -

Konsolidasi / KBIK Provinsi (Periode April-Agt 2017) 1 2 53 4 114 100.000 11.400.000 114 11.400.000 - - 114 11.400.000 - -

2 Konsolidasi Pemandu Pelatihan Fasilitator 1 2 100 4 192 250.000 48.000.000 192 48.000.000 - - 192 48.000.000 - -

3 Pelatihan Fasilitator

a. In Class training 1 6 1.434 94 8.112 250.000 2.028.000.000 8.112 2.028.000.000 - - 8.112 2.028.000.000 - -

b. On the job training (praktek lapang) 1 2 1.434 94 2.704 250.000 676.000.000 2.704 676.000.000 - - 2.704 676.000.000 - -

c. Sewa Moda Transportasi 42 3.500.000 147.000.000 42 147.000.000 - - 42 147.000.000 - -

4 Pelatihan perencanaan bagi TAPP (Khusus 4 Kota /44 kel) 1 6 48 4 208 250.000 52.000.000 208 52.000.000 - - 208 52.000.000 - -

5 Konsolidasi Pemandu Pelatihan khusus untuk Fasilitator 1 2 16 4 40 250.000 10.000.000 40 10.000.000 - - 40 10.000.000 - -

6 Pelatihan khusus untuk fasilitator

a. In Class training 1 4 63 12 180 250.000 45.000.000 180 45.000.000 - - 180 45.000.000 - -

b. On the job training (praktek lapang) 1 2 63 12 60 250.000 15.000.000 60 15.000.000 - - 60 15.000.000 - -

c. Sewa Moda Transportasi 2 3.500.000 7.000.000 2 7.000.000 - - 2 7.000.000 - -

7Pelatihan Perhitungan luasan Kumuh untuk Fasilitator (lokasi Penanganan

kumuh 44 Kel/Desa)1 2 51 8 - 250.000 - - - - - - - - -

8 Pelatihan Pokja PKP 4 2 22 8 - 350.000 - - - - - - - - -

Perekrutan Korkot, Askot CDM, Askot Bid, FS dan Faskel

TRAINING PERIODE JANUARI - SEPTEMBER 2016

Page 38: PROGRAM KOTA TANPA KUMUH SATKER ...103.12.84.195/files/Media/Laporan/Contract Resume/osp5...NO KOMPOSISI BIAYA AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT

Vol. Unit Price

(IDR)

Total Amount

(IDR) Vol

Total Amount

(IDR) Vol

Total Amount

(IDR) Vol

Total Amount

(IDR) Vol

Total Amount

(IDR)

NO. URAIAN

INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAKAMENDMENT CONTRACT NO. 20

9 Jawa Tengah

a. Korkot 1 2 42 60 250.000 15.000.000 60 15.000.000 - - 60 15.000.000 - -

b. Askot CD Mandiri 1 2 63 18 250.000 4.500.000 18 4.500.000 - - 18 4.500.000 - -

c. Askot Bidang 1 2 104 188 250.000 47.000.000 188 47.000.000 - - 188 47.000.000 - -

d. Senior Faskel 1 1 251 230 100.000 23.000.000 230 23.000.000 - - 230 23.000.000 - -

e. Fasilitator 1 1 1.003 812 100.000 81.200.000 812 81.200.000 - - 812 81.200.000 - -

f. Penggandaan Soal 1 1 1.463 1.400 10.000 14.000.000 1.400 14.000.000 - - 1.400 14.000.000 - -

10 DI Yogyakarta

a. Korkot 1 2 6 6 250.000 1.500.000 6 1.500.000 - - 6 1.500.000 - -

b. Askot CD Mandiri 1 2 6 8 250.000 2.000.000 8 2.000.000 - - 8 2.000.000 - -

c. Askot Bidang 1 2 15 30 250.000 7.500.000 30 7.500.000 - - 30 7.500.000 - -

d. Senior Faskel 1 1 26 26 100.000 2.600.000 26 2.600.000 - - 26 2.600.000 - -

e. Fasilitator 1 1 103 102 100.000 10.200.000 102 10.200.000 - - 102 10.200.000 - -

f. Penggandaan Soal 1 1 156 150 10.000 1.500.000 150 1.500.000 - - 150 1.500.000 - -

11 Konsolidasi Pemandu Pelatihan Fasilitator (Periode April-Agt 2017) 1 2 38 4 78 250.000 19.500.000 78 19.500.000 - - 78 19.500.000 - -

Konsolidasi Pemandu Pelatihan Fasilitator (tambahan 3 lokasi Jateng) 1 2 8 2 - 250.000 - - - - - - - - -

12 Pelatihan Fasilitator (Periode April-Agt 2017) 1 8 581 38 3.920 250.000 980.000.000 3.920 980.000.000 - - 3.920 980.000.000 - -

Pelatihan Fasilitator (tambahan 3 lokasi) 1 7 139 8 - 250.000 - - - - - - - - -

13 Pelatihan Khusus Asmandat (Periode April-Agt2017) 1 3 19 4 - 250.000 - - - - - - - - -

14 Konsolidasi Pelatihan Khusus Tim Korkot (Gelombang 2)

OSP-5 Jawa Tengah 1 1 26 - 250.000 - - - - - - - - -

OSP-5 DI Yogyakarta 1 1 - - 250.000 - - - - - - - - -

15 TOT dan Pelatihan Khusus Tim Korkot (Gelombang 2)

OSP-5 Jawa Tengah 1 5 70 - 250.000 - - - - - - - - -

OSP-5 DI Yogyakarta 1 5 - - - - - - - - - - - -

16 Konsolidasi Pelatihan Khusus Tim Fasilitator

OSP-5 Jawa Tengah 1 1 68 38 250.000 9.500.000 38 9.500.000 - - 38 9.500.000 - -

OSP-5 DI Yogyakarta 1 1 8 15 250.000 3.750.000 15 3.750.000 - - 15 3.750.000 - -

17 Pelatihan Khusus Fasilitator

OSP-5 Jawa Tengah 1 5 408 1.090 250.000 272.500.000 1.090 272.500.000 - - 1.090 272.500.000 - -

OSP-5 DI Yogyakarta 1 5 47 240 250.000 60.000.000 240 60.000.000 - - 240 60.000.000 - -

18 Coaching Penyiapan Keg Infrastruktur , 1 kali - Jateng 1 3 69 - 207 100.000 20.700.000 - - - - - - 207 20.700.000

19 Coaching Penyiapan Keg Infrastruktur , 1 kali - DI Yogyakarta 1 3 13 - 39 100.000 3.900.000 - - - - - - 39 3.900.000

Konsolidasi / KBIK Provinsi Jateng (Periode Maret-Juni 2018) 1 2 44 2 92 200.000 18.400.000 - - - - - - 92 18.400.000

Konsolidasi / KBIK Provinsi DIY (Periode Maret-Juni 2018) 1 2 13 2 30 200.000 6.000.000 - - - - - - 30 6.000.000

20 Konsolidasi Pelatihan Tim Fasilitator

OSP-5 Jawa Tengah 1 2 64 - 128 250.000 32.000.000 - - - - - - 128 32.000.000

OSP-5 DI Yogyakarta 1 2 8 - 16 250.000 4.000.000 - - - - - - 16 4.000.000

21 Pelatihan Tim Fasilitator ( 4 in class, 2 OJT)

- OSP-5 Jawa Tengah 1 6 956 64 6.120 250.000 1.530.000.000 - - - - - - 6.120 1.530.000.000

- OSP-5 DI Yogyakarta 1 6 109 8 702 250.000 175.500.000 - - - - - - 702 175.500.000

Page 39: PROGRAM KOTA TANPA KUMUH SATKER ...103.12.84.195/files/Media/Laporan/Contract Resume/osp5...NO KOMPOSISI BIAYA AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT

Vol. Unit Price

(IDR)

Total Amount

(IDR) Vol

Total Amount

(IDR) Vol

Total Amount

(IDR) Vol

Total Amount

(IDR) Vol

Total Amount

(IDR)

NO. URAIAN

INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAKAMENDMENT CONTRACT NO. 20

- Sewa Moda Transportasi Jawa Tengah 2 32 64 3.500.000 223.066.667 - - - - - - 64 223.066.667

- Sewa Moda Transportasi DI Yogyakarta 2 4,0 8 3.500.000 28.000.000 - - - - - - 8 28.000.000

22 Pelatihan SIM (Cluster Jateng)

OSP-5 Jawa Tengah dan DIY 1 4 28 4 128 250.000 32.000.000 - - - - - - 128 32.000.000

D Kota/Kabupaten 510.275.000 70.475.000 19.300.000 89.775.000 420.500.000

1 Konsolidasi /KBIK Kabupaten 4 1 1.406 - 1.283 25.000 32.075.000 1.283 32.075.000 - - 1.283 32.075.000 - -

2 Diskusi tematik di Kota/Kabupaten 2 1 780 - - 75.000 - - - - - - - - -

- -

3 Coaching clinic 5 kali 65 1 196 - - 100.000 - - - - - - - - -

3a Coaching clinic 5 kali - Jateng 60 1 175 - - 100.000 - - - - - - - - -

Coaching clinic 5 kali - Jateng 5 1 280 - 219 100.000 21.900.000 219 21.900.000 - - 219 21.900.000 - -

3b Coaching clinic 5 kali - DIY 5 1 21 - - 100.000 - - - - - - - - -

Honor Narasumber 65 1 - 3 33 500.000 16.500.000 33 16.500.000 - - 33 16.500.000 - -

4a Coaching clinic Evaluasi Target KPI dan Opr serta Pemeliharaan Jateng 1 2 849 - 1.698 100.000 169.800.000 - - 193 19.300.000 193 19.300.000 1.505 150.500.000

4b Coaching clinic Evaluasi Target KPI dan Opr serta Pemeliharaan DIY 1 2 101 - 202 100.000 20.200.000 - - - - - - 202 20.200.000

5a Coaching clinic Persiapan BDI dan Pengadaan barang dan Jasa Jateng 1 2 849 - 1.698 100.000 169.800.000 - - - - - - 1.698 169.800.000

5b Coaching clinic Persiapan BDI dan Pengadaan barang dan Jasa DIY 1 2 101 - 202 100.000 20.200.000 - - - - - - 202 20.200.000

6a Coaching clinic Persiapan DED Jateng 1 3 207 207 200.000 41.400.000 - - - - - - 207 41.400.000

6b Coaching clinic Persiapan DED DIY 1 3 92 92 200.000 18.400.000 - - - - - - 92 18.400.000

TOTAL OF TRAINING ACTIVITY 9.711.519.667 7.191.153.000 19.300.000 7.210.453.000 2.501.066.667

Page 40: PROGRAM KOTA TANPA KUMUH SATKER ...103.12.84.195/files/Media/Laporan/Contract Resume/osp5...NO KOMPOSISI BIAYA AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT

IV. SOCIALIZATION ACTIVITY EXPENSES

VolUnit Price

(IDR)

Total Amount

(IDR) Vol

Total Amount

(IDR) Vol

Total Amount

(IDR) Vol

Total Amount

(IDR) Vol

Total Amount

(IDR)

4.1.PROVINCIAL LEVELS

(Prov Jawa Tengah, DIY)- - - - -

4.1.1.Lokakarya Review

Propinsi/midterm

Prov/

City/ RegDays

Time/

EventPtcp - - - - -

a Workshop Activities

- Propinsi Jawa Tengah 1 2 1 95 - - - - - - - - - - -

- Propinsi DI. Yogyakarta 1 2 1 30 - - - - - - - - - - -

b Press Conference 2 1 1 10 - - - - - - - - - - -

c Provincial Key Speakers 2 1 1 3 - - - - - - - - - - -

d Workshop Kits 1 1 1 148 - - - - - - - - - - -

4.1.2 Workshop Media

a Workshop Activities 2 2 1 20 - - - - - - - - - - -

b Provincial Key Speakers 2 1 1 2 - - - - - - - - - - -

c Workshop Kits 2 1 1 25 - - - - - - - - - - -

4.1.3 Penulisan Artikel / Berita 2 1 2 1

4.1.4. TV Talkshow 2 1 1 1

2 1 1 1 - - - - - - - -

4.2. CITY/REGENCY LEVELSProv/City/

RegDays

Time/E

ventPtcp 457.850.000 397.850.000 - 397.850.000 60.000.000

4.2.1 Lokakarya Review /midterm 110.400.000 110.400.000 - 110.400.000 -

Workshop Activities 39 2 1 35 910 100.000 90.800.000 910 90.800.000 - - 910 90.800.000 - -

Press Conference 39 1 1 10 130 100.000 13.000.000 130 13.000.000 - - 130 13.000.000 - -

Provincial Key Speakers 39 1 1 2 22 300.000 6.600.000 22 6.600.000 - - 22 6.600.000 - -

4.2.2 Lokakarya Orientasi PLPBK

Workshop Activities 6 1 1 35 - - - - - - - - - - -

Press Conference 6 1 1 10 - - - - - - - - - - -

Provincial Key Speakers 6 1 1 2 - - - - - - - - - - -

4.2.3 Radio Talkshow 39 1 2 - 36 500.000 18.000.000 36 18.000.000 - - 36 18.000.000 - -

4.2.4 Media Field Visit 39 1 1 - 16 500.000 8.000.000 16 8.000.000 - - 16 8.000.000 - -

4.2.5 Articles/News 39 1 2 - 13 500.000 6.500.000 13 6.500.000 - - 13 6.500.000 - -

4.2.6 Exibithion 39 1 1 - 12 5.000.000 60.000.000 12 60.000.000 - - 12 60.000.000 - -

1 PROVINCIAL LEVELS - - - - -

1.1 Lokakarya Sosialisasi Kumuh

NO. URAIAN

INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAKAMENDMENT CONTRACT NO. 20

Page 41: PROGRAM KOTA TANPA KUMUH SATKER ...103.12.84.195/files/Media/Laporan/Contract Resume/osp5...NO KOMPOSISI BIAYA AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT

VolUnit Price

(IDR)

Total Amount

(IDR) Vol

Total Amount

(IDR) Vol

Total Amount

(IDR) Vol

Total Amount

(IDR) Vol

Total Amount

(IDR)

NO. URAIAN

INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAKAMENDMENT CONTRACT NO. 20

a Kegiatan Lokakarya 2 2 1 100 - - - - - - - - - - -

- Propinsi Jawa Tengah 1 2 1 95 - - - - - - - - - - -

- Propinsi DI. Yogyakarta 1 2 1 33 - - - - - - - - - - -

b Press Conference 2 1 1 20 - - - - - - - - - - -

c Nara Sumber Provinsi 2 1 1 8 - - - - - - - - - - -

d Kits Lokakarya 2 2 1 128 - - - - - - - - - - -

1.2 Workshop Media

a Kegiatan Workshop 2 2 1 20 - - - - - - - - - - -

b Narasumber Workshop 2 1 1 6 - - - - - - - - - - -

c Kits Workshop 2 1 1 40 - - - - - - - - - - -

1.3 Penulisan Artikel / Berita 2 1 2 1 - - - - - - - - - - -

1.4 TV Talkshow 2 1 2 1 - - - - - - - - - - -

2 CITY/REGENCY LEVELS - - - - -

2.1 Lokakarya Sosialisasi Kumuh

- Kegiatan Lokakarya 39 2 1 60 - - - - - - - - - - -

- Press Conference 39 1 1 10 - - - - - - - - - - -

- Nara Sumber Provinsi 39 1 1 8 - - - - - - - - - - -

2.4 Lokakarya PLPBK 6 1 1 60 - - - - - - - - - - -

2.5 Radio Talkshow 39 1 4 - - - - - - - - - - - -

2.5 Media Field Visit 39 1 2 - - - - - - - - - - - -

2.6 Penulisan Berita 39 1 4 - - - - - - - - - - - -

2.5 Exhibition 39 1 2 - - - - - - - - - - - -

B PROVINCE LEVELProv/City/

RegDays

Time/E

ventPtcp 124.600.000 124.600.000 - 124.600.000 -

1 Lokakarya Provinsi

a. Accomodation 2 2 1 142 284 350.000 99.400.000 284 99.400.000 - - 284 99.400.000 - -

b. Resources Person 2 2 1 3 12 500.000 6.000.000 12 6.000.000 - - 12 6.000.000 - -

c. Kits 2 1 152 304 50.000 15.200.000 304 15.200.000 - - 304 15.200.000 - -

d. Press Conference 2 1 1 10 20 200.000 4.000.000 20 4.000.000 - - 20 4.000.000 - -

C CITY/REGENCY LEVELS 130.350.000 70.350.000 - 70.350.000 60.000.000

1 Lokakarya

a. Accomodation 39 1 1 50 - 100.000 - - - - - - - - -

- 150.000 - - - - - - - - -

SOCIALIZATION ACTIVITY EXPENSES, PERIODE JANUARI - SEPTEMBER 2016

Page 42: PROGRAM KOTA TANPA KUMUH SATKER ...103.12.84.195/files/Media/Laporan/Contract Resume/osp5...NO KOMPOSISI BIAYA AMENDMENT CONTRACT NO. 20 INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT

VolUnit Price

(IDR)

Total Amount

(IDR) Vol

Total Amount

(IDR) Vol

Total Amount

(IDR) Vol

Total Amount

(IDR) Vol

Total Amount

(IDR)

NO. URAIAN

INVOICE LALU INVOICE SAAT INI INVOICE S/D SAAT INI SISA KONTRAKAMENDMENT CONTRACT NO. 20

b. Resources Person 39 1 1 3 - 300.000 - - - - - - - - -

d. Kits 39 1 55 - 25.000 - - - - - - - - -

2 Lokakarya Khusus

a. Accomodation 6 1 1 50 - 100.000 - - - - - - - - -

300 150.000 45.000.000 300 45.000.000 - - 300 45.000.000 - -

b. Resources Person 6 1 1 3 18 300.000 5.400.000 18 5.400.000 - - 18 5.400.000 - -

c. Press Conference 6 1 1 3 18 100.000 1.800.000 18 1.800.000 - - 18 1.800.000 - -

d. Kits 6 1 55 330 25.000 8.250.000 330 8.250.000 - - 330 8.250.000 - -

3 Penayangan di TV Berita daerah 2 2 1 7.500.000 7.500.000 1 7.500.000 - - 1 7.500.000 - -

4 Pengembangan Newsletter 39 4 50 8 1.600 1.500 2.400.000 1.600 2.400.000 - - 1.600 2.400.000 - -

5 Exhibition 39 1 - 5.000.000 - - - - - - - - -

Exhibition (Maret - Juni 2018) LS 1 2 30.000.000 60.000.000 - - - - - - 2 60.000.000

D Workshop Tim Percepatan - - - - -

1 Workshop ( Forum Konsultasi ) 4 2 4 32 - 350.000 - - - - - - - - -

4.3 579.400.000 565.000.000 - 565.000.000 14.400.000

4.3.1 67 5.000.000 335.000.000 65 335.000.000 - - 65 335.000.000 2 -

4.3.2 44 5.000.000 29.400.000 44 26.400.000 - - 44 26.400.000 - 3.000.000

4.3.3 44 5.000.000 45.000.000 44 39.600.000 - - 44 39.600.000 - 5.400.000

4.3.3 44 15.000.000 170.000.000 44 164.000.000 - - 44 164.000.000 - 6.000.000

4.3.4 - 10.000.000 - - - - - - - - -

1.037.250.000 962.850.000 - 962.850.000 74.400.000

Penyusunan Dokumen RPLP/RTPLP

Tenaga Ahli Pendamping Masyarakat

Sosialisasi Tingkat Kelurahan

Forum Konsultasi dan Uji Publik

Peralatan Survey, dukungan FGD/rembug dan Penggandaan dokumen

RTPLP dan Peta

Penguatan Masyarakat / TIPP atau DED (opsional)

TOTAL OF SOCIAL ACTIVITY