ROFORMA MATERIALES ELÉCTRICOS
CANTID
AD
DESCRIPCION P UNIT P. TOTAL
04 CABLE VULCANIZADO NTL N°12 250.00 1000.00
01 LLAVE TERMOMAGNETICA DE 32 A 50.00 50.00
02 LLAVES TERMOMAGNETICAS DE 25 A 40.00 40.00
01 INTERRUPTOR HORARIO 180.00 180.00
01 CINTAS VULCANIZANTES 40.00 40.00
01 CONTACTOR ELECTRICO 100.00 100.00
05 CINTAS AISLANTES 3M 5.00 25.00
01 TABLERO DE DISTRIBUCION 30X30 CON RIEL PARA
FIJAR INTERRUPTORES TERMOMAGNETICOS
120.00 120.00
10 LUMINARIAS TIPO ESFERA DE 70 WATTS 250.00 2500.00
01 PUESTA A TIERRA A TODO COSTO 1700.00 1700.00
03 CAJAS DE PASO OCTAGONAL CON TAPA 2.00 6.00
TOTAL 5817.00
EL IRON RIOA 03.
CANTID
AD
DESCRIPCION P UNIT P. TOTAL
01 MANO DE OBRA CALIFICADA EN
INSTALACION DE UN TABLERO METALICO
30!30CM SIN MURETE.
150.00 150.00
8/16/2019 PROFORMA YANTALO 2
2/2
10 MANO DE OBRA CALIFICADA POR
INSTALACION DE 10 FAROLES
40.00 400.00
10 MANO DE OBRA CALIFICADA EN
CABLEADO DE 10 FAROLAS.
"0.00 "00.00
10 MANO DE OBRA CALIFICADA EN
INSTALACION DE 10 FAROLAS CON
TIERRA.
10.00 100.00
TOTAL 1550.00
CANTID
AD
DESCRIPCION P UNIT P. TOTAL
10 TUBOS DE FIERRO GALVANIZADO 2.5#
01 TUBO DE FIERRO GALVANIZADO DE 1#1$2
"0.00 "00.00
10.00 100.00
TOTAL 1550.00
EL IRON RIOA 03.
CANTID
AD
DESCRIPCION P UNIT P. TOTAL
4 POSTES DE CONCRETO C.A.C. 8$200 %50.00 3000.00
10 40.00 400.00
10 MANO DE OBRA CALIFICADA EN
CABLEADO DE 10 FAROLAS.
"0.00 "00.00
10 MANO DE OBRA CALIFICADA EN
INSTALACION DE 10 FAROLAS CON
TIERRA.
10.00 100.00
TOTAL 1550.00