    ROFORMA MATERIALES ELÉCTRICOS 

    CANTID

    AD

    DESCRIPCION P UNIT P. TOTAL

    04 CABLE VULCANIZADO NTL N°12 250.00 1000.00

    01 LLAVE TERMOMAGNETICA DE 32 A 50.00 50.00

    02 LLAVES TERMOMAGNETICAS DE 25 A 40.00 40.00

    01 INTERRUPTOR HORARIO 180.00 180.00

    01 CINTAS VULCANIZANTES 40.00 40.00

    01 CONTACTOR ELECTRICO 100.00 100.00

    05 CINTAS AISLANTES 3M 5.00 25.00

    01 TABLERO DE DISTRIBUCION 30X30 CON RIEL PARA

    FIJAR INTERRUPTORES TERMOMAGNETICOS

    120.00 120.00

    10 LUMINARIAS TIPO ESFERA DE 70 WATTS 250.00 2500.00

    01 PUESTA A TIERRA A TODO COSTO 1700.00 1700.00

    03 CAJAS DE PASO OCTAGONAL CON TAPA 2.00 6.00

    TOTAL   5817.00

     

    EL IRON RIOA 03.

    CANTID

    AD

    DESCRIPCION P UNIT P. TOTAL

    01 MANO DE OBRA CALIFICADA EN

    INSTALACION DE UN TABLERO METALICO

    30!30CM SIN MURETE.

    150.00 150.00

  • 8/16/2019 PROFORMA YANTALO 2

    2/2

    10 MANO DE OBRA CALIFICADA POR

    INSTALACION DE 10 FAROLES

    40.00 400.00

    10 MANO DE OBRA CALIFICADA EN

    CABLEADO DE 10 FAROLAS.

    "0.00 "00.00

    10 MANO DE OBRA CALIFICADA EN

    INSTALACION DE 10 FAROLAS CON

     TIERRA.

    10.00 100.00

    TOTAL   1550.00

     

    CANTID

    AD

    DESCRIPCION P UNIT P. TOTAL

    10 TUBOS DE FIERRO GALVANIZADO 2.5#

    01 TUBO DE FIERRO GALVANIZADO DE 1#1$2

    "0.00 "00.00

    10.00 100.00

    TOTAL   1550.00

    EL IRON RIOA 03.

    CANTID

    AD

    DESCRIPCION P UNIT P. TOTAL

    4 POSTES DE CONCRETO C.A.C. 8$200 %50.00 3000.00

    10 40.00 400.00

    10 MANO DE OBRA CALIFICADA EN

    CABLEADO DE 10 FAROLAS.

    "0.00 "00.00

    10 MANO DE OBRA CALIFICADA EN

    INSTALACION DE 10 FAROLAS CON

     TIERRA.

    10.00 100.00

    TOTAL   1550.00