Upload
hacong
View
252
Download
7
Embed Size (px)
Citation preview
April 2018
1
Profile
Personal Data
Name: Frans van Steenveldt
Nationality: Netherlands
Residence: Wijchen, the Netherlands
Mobile: +31 (0)6 53 42 86 70
Email: [email protected]
Media:
Website: http://appliedplm.nl
Summary
I am a senior SAP Business and Application Consultant in the area of Product Data Management (PDM) and Product Lifecycle Management (PLM). The basis is formed by my extensive knowledge and hands-on experience in the domain of technical product-development and engineering processes. Extensive experience, detail focused, results oriented Business and IT professional with 15+ years in SAP PLM and 7+ years in SAP ABAP application development in intense customer-focused service industries. Demonstrated business intelligence to accurately assess situational challenges and transform creative ideas into repeatable technical solutions. I have a professional and pragmatic attitude in order to achieve the agreed targets/objectives. I have the drive and motivation to achieve high quality project deliverables while having a good understanding of the adjustment between business processes and IT solutions. During my professional career I have gained people-management and communication skills allowing me to work with people from different backgrounds in education, experience and culture. I have also hands-on experience in communications with globally outsourced resources. I am proficient at learning and applying new business and technological methodologies.
SAP Core Skills & Competences
Material Master Data Management (MM, BOM)
SAP Functional area’s (SAP MM/SD, SAP PP, SAP PM and SAP PS)
Document Management (DMS, Content Server, EasyDMS)
SAP R/3 Enterprise 4.7, ECC 5.0 and ECC 6.0 (EhP7)
Classification (including Variant Configuration)
Customizing Master Data (MM,DMS, ECM, BOM, iPPE, Variant Configuration, PM)
Integrated Product and process Engineering (iPPE, Product Structures and Assembly Structures)
ABAP program design and programming: ABAP Objects, Dialog, SAPScript, SmartForms, ALV, BAdI, Enhancement Framework, etc..
SAP PLM7.02 (WebUI, NWBC, Access Control Contexts)
WebUI: WebDynpro, Webservices (SOAP, ABAP-Proxies),
EH&S: Dangerous Goods Management, Phrase Management and Specifications
Business Workflow modeling and Workflow programming (BOR/ABAP Classes)
EHSM: Product Compliance (Automotive) Process / Data modeling (UML) Engineering Record / Process Layer Data Analysis / Data migration (LSMW) Engineering Change Management (ECM) Authorizations (Objects/Roles/Profiles) Business Rules Framework (BRF-Plus) Application, Process and End-user Training Guided Structure Synchronization (GSS,
EngineeringBOM → ManufacturingBOM) Interfaces between SAP and PLM (e.g.
Siemens TeamCenter, ENOVIA VPM) CAD-SAP Integration (CAD DESKTOP) ITIL-Processes
April 2018
2
Industry Experience
Railways High-Tech/Opto-electronics Medical Systems Electronics Engineering
Automotive Industrial Automation Oil & Gas Office Equipment
Additional Skills & Competences
Teamwork: Ability to work effectively in international team environments, including autonomous decision making and team leadership where necessary
Communication: Strong verbal and written communication skills
Organizational: Demonstrated ability to follow directions, act on own initiative where appropriate, handle pressure, manage project schedules and resources to meet deadlines and budgets
Problem Solving: Strong analytical skills as required in complex cross-disciplinary environments, business processes and systems
Creativity: Demonstrated skills in order to design/develop new systems or functionality including implementation in the productive systems
Interpersonal: Demonstrated ability to establish good working relationships
Qualifications & Educations
Title Organization Description
NET310 SAP Education Fundamentals of WebDynpro for ABAP
BC401 SAP Education ABAP Objects (OO Programming)
BIT611 SAP Education Business Workflow Programming
BIT601 SAP Education Business Workflow Modeling
BC400 SAP Education ABAP Workbench Foundations
MDM100 SAP Education SAP NetWeaver Master Data Management
SAP-LDM Atos Origin SAP PLM Lifecycle Data Management
PMA Atos Origin/ISES Project Management Academy
SCM QA Systems Software Configuration Management
SEM Philips Electronics Software Engineering Management
IBW IBW Utrecht Business Administration
HTS-I IHBO Venlo Bachelor Technical Computer Science
HTS-E HTS Den Bosch Bachelor Electronic Engineering
Languages
Language Proficiency Language Proficiency
Dutch Native German Business Fluent
English Business Fluent French Basic
Career Summary
Period Company/Organization Roles
2008-today TMC Technology Executives Senior SAP PLM Business Consultant
1998-2008 Atos Origin Senior SAP PLM Business Consultant
1996-1998 Holec Projects Engineering Manager / Project Manager
1992-1996 Multin Technology Project Leader / Team Lead
1981-1992 Océ R&D Electronics Engineer / Team lead
April 2018
3
Assignment History / Detailed description
Company: Philips Healthcare; Eindhoven, The Netherlands
Period: Continuing since March 2018
Organization: Philips IT
Project Title: BlueHeart Programme (comprising different SAP implementation projects)
Role(s): IT Business Analyst PLM / SAP PLM Consultant
Project Context: The BlueHeart Programme is part of the Philips Integrated Landscape initiative were business processes and applications will be integrated into one IT-landscape. This includes also the integration of new business acquisitions.
Job Description: Prepare and conduct Quick Scans with Business Process Expert (BPE) in the SAP-PLM area. Analyze the (PLM) business processes. Determine, validate and document the (PLM) business requirements together with the BPE-PLM. Deliver business and SAP-template/kernel expertise for SAP-PLM. Partner with Data- & Technical teams and BPE-PLM to provide technical expertise for the solution. Participate in validation / integration tests and sign-off for production conversion. Deliver support during Key User Training, User Acceptance Testing and Go Live issue resolution. Active role in project evaluation and identification of lessons learned.
Job Activities: Activities include:
Participate in functional/technical tests of the current Windchill-SAP interface,
Evaluate the current eMatrix/ENOVIA-SAP interface and prepare suggestions to stabilize/improve,
Prepare a demo for a new Windchill-SAP interface based on SAP-ECTR (Engineering Control Center).
__________
Company: DB Systel GmbH (Deutsche Bahn), Frankfurt am Main (Hessen), Germany
Period: April 2017 – March 2018
Organization: DB-Netz (Railinfrastructure Maintenance)
Project Title: DVS Bestandspläne 4.0 (based on SAP Document Management System)
Project Context: DB-Netz is responsible for the maintenance of the rail-infrastructure throughout Germany. Rail-infrastructure objects are modeled as Functional Locations within SAP, including the related documentation. The DVS Bestandspläne 4.0 project is part of a larger program within DB-Netz intended to provide the DB-Netz field-engineers the latest and up-to-date documentation of these Functional Locations through the use of Mobile Devices. In order to be able to handle/process the mobile documents a new data-model was developed.
Role(s): SAP PLM Business Consultant, ABAP Consultant
Job Description: Together with business representatives design, develop and test the implementation of new data-models. These new data models must be defined
April 2018
4
for technical documentation and functional locations.
Job Activities: Activities included:
Design, development and test of a data cleanup tool for DB-Netz back-office engineers; the tool finds documents that do not have any assignment to a functional location and offers additional functions to detailed comparison and document assignment,
In cooperation with a third party, design, develop and test a migration and conversion tool; the tool will convert document originals and migrate the documents into the new data-model for documents,
Design, develop and test new master data attributes (the so-called ‘Sollplanzeichen’) assignment tools for Functional Locations; the tooling will allow the DB-Netz back-office engineers assigning the master data attributes to Functional Locations.
__________
Company: McLaren, Woking (Surrey), United Kingdom
Period: August 2015 – March 2017
Organization: McLaren IT (Center Of Excellence, CoE SAP-PLM)
Project Title: Accelerated ERP Deployment; SAP R5 Programme
Project Context: McLaren Automotive and SAP SE are implementing a new SAP system running on SAP HANA (with Enhancement Package 7). Included in this deployment program is the implementation of SAP PLM7.02 WebUI (Engineering Record/Process Layer, Product Structures (PSM), Assembly Structures (ASM), Product Structure Synchronization (PSS) into classical manufacturing BOM) and EHSM Product Compliance using IMDS (International Material Data System for automotive). The McLaren IT Center Of Excellence (CoE) teams will be responsible for maintaining the processes and the implemented solutions.
Role(s): SAP PLM Application Consultant
Job Description: Within the SAP R5 Programme, system integrations test are being prepared (test-script/scenario’s, roles assignment, systems setup, etc.). To enable McLaren IT CoE to maintain the processes/systems, actual knowledge around business processes/solutions must be transferred from SAP Consulting into McLaren IT CoE.
Job Activities: Activities include:
Accommodate/support knowledge transfer of all SAP-PLM related business process/solutions into McLaren IT Center Of Excellence. Emphasis for SAP-PLM is on: Product Structures and Assembly Structures (EBOM),Engineering Records including Process Routes, Product Structure Synchronization into MBOM and EHSM Product Compliance including IMDS for automotive,
Manual client set-up (Integration tests, Production) activities,
Additional application development/modifications (functional/technical specifications, development),
Support integration tests: o Defect root-cause analysis, o Repair (ABAP(OO), Webdynpro Components) and unit testing, o Adjust functional/technical specifications
Support Data migration,
Prepare processes/systems for final Production Go-Live,
April 2018
5
End-user training,
Support offshore development team (Cognizant) in India,
2nd/3rd level user support after Go-Live (Phase 1 was April 4th, 2016 and Phase 2 was January 16th, 2017),
Design, Build & Maintain the SAP-VPM Interface Reconciliation Workbench; this customer-specific workbench allows users from CoE to synchronize the PSM/ASM-structures between SAP and ENOVIA VPM,
Design, Build & Maintain the Weight Calculation Module for PSM/ASM-structures; this new application allows the business users to calculate the actual weights of vehicles, based on their configurations and assembled components.
__________
Company: ProRail, Utrecht, The Netherlands
Period: April 2015 – August 2015
Organization: Competence Center ERP
Project Title: Validations in SAP PLM
Project Context: ProRail is responsible for the maintenance of the rail infrastructure of the public Netherlands Railways (Nederlandse Spoorwegen). Rail infrastructure objects (master data) are modeled in SAP Plant Maintenance as functional locations/equipments to support and allow operational maintenance processes. To ensure better/consistent master data, these objects will also be modeled in SAP-iPPE structures, representing rail infrastructure templates. From these template structures, new equipments (structures) can be automatically created. During creation, validation-steps (in SAP) must be implemented to ensure consistent master data.
Role(s): SAP PLM Application Consultant (iPPE, Variant Configuration, Enterprise Asset Management, Plant Maintenance)
Job Description: Investigate the possibilities to automate validations in SAP, while maintaining the master data for rail infrastructure objects/assets.
Job Activities: The activities include:
Prepare/conduct workshops with rail-infrastructure specialists,
Describe requirements and investigate/indicate the possible functional realization in SAP PLM and SAP-EAM,
As part of the solution for maintaining the validation rules, SAP Business Rules Framework (BRF-Plus) will also be investigated,
Prepare a Proof-of-Concept for the selected objects; this means additional customizing (iPPE, Variant Configuration), ABAP(OO, Webdynpro)-programming and testing.
__________
Company: DB Systel GmbH (Deutsche Bahn), Frankfurt am Main (Hessen), Germany
Period: May 2015 – July 2015
Organization: Archivierung & Dokumenten-Management-Systeme (T.SVC 43)
Project Title: WeDoiT System/process
April 2018
6
Project Context: DB Systel GmbH developed for Deutsche Bahn the WeDoiT System/process. The main objective of the WeDoiT is to maintain (historical) vehicle-configuration and -documentation. In order to minimize manual work and to improve data quality, the WeDoiT System will have a new interface to the main maintenance support system ISI to exchange vehicle data.
Role(s): SAP PLM Consultant, ABAP Consultant
Job Description: During the period I was assigned to the design of the new ISI-WeDoIT Interface.
Job Activities: Activities included:
With business representatives, determine the functional requirements of the new ISI-WeDoIT Interface,
Create the technical design and write the technical specification for the ISI-WeDoIT Interface.
__________
Company: SAP Turkey, Istanbul, Turkey
Period: January 2015
Organization: SAP Turkey Education
Project Title: SAP PLM170 training
Role(s): SAP PLM Application Consultant/Trainer
Job Description: Provide employees of customer of SAP Turkey with a thorough understanding of SAP iPPE functionality, including customization for iPPE.
Job Activities: The activities included:
Preparation of the training sessions (presentations/exercises),
Conduct training PLM170 (Integrated Product/Process Engineering (iPPE)within PLM).
__________
Company: McLaren, Woking (Surrey), United Kingdom
Period: August 2014 – December 2014
Organization: McLaren IT/Cognizant
Project Title: Accelerated ERP Deployment Programme
Project Context: McLaren Automotive and SAP SE are implementing a new SAP system running on SAP HANA (with Enhancement Package 7). Included in this deployment program is the implementation of SAP PLM7.02 WebUI (Engineering Record/Process Layer, Product Structures (PSM), Assembly Structures (ASM) and Guided Structure Synchronization (GSS)) and EHSM Product Compliance.
Role(s): SAP PLM Application Consultant, ABAP Consultant
Job Description: Currently, McLaren Automotive uses a legacy system MAXIM which has an online asynchronous interface with ENOVIA VPM/CATIA (Virtual Product Modeling). The current MAXIM2VPM-interface must be replaced with a new interface: SAP-VPM/CATIA. Product- and Assembly-Structures based on iPPE-
April 2018
7
Structures must be replicated online in VPM/CATIA.
Job Activities: Design and implementation of a new SAP-VPM/CATIA Interface application:
Design of the software architecture, based on ABAP Objects,
Create technical specifications including unit test specifications,
Implement new SAP2VPM Interface core functions using ABAP Objects (ABAP-Interfaces, Class-Hierarchies, etc.),
Implement connection to SAP-PI using ABAP-Proxies,
Design and implement exception handling (Class-Exceptions),
Design and implement application logging,
Design/implement/integrate new Webdynpro Components,
Implement Enhancements in standard PLM7.02 Webdynpro,
Execute technical/unit tests,
Execute functional tests,
Support offshore development team (Cognizant) in India. __________
Company: Carl Zeiss AG, Oberkochen (Baden-Württemberg), Germany
Period: March 2014 – October 2014
Organization: Global SAP PLM & CAD support
Project Title: SAP PLM7.02 (WebUI) implementation
Project Context: Carl Zeiss AG implemented an Engineering Change Management (ECM) process based on the Engineering Record/Process Layer in SAP PLM7.02 (running on SAP ECC6.0 with Enhancement Package 6). End users are accessing SAP PLM7.02 functions through NetWeaver Business Client (NWBC) 4.0. Furthermore Carl Zeiss has also implemented SAP Embedded Search (SES) using the SAP-TREX search-engine.
Role(s): SAP PLM Application Consultant, ABAP Consultant
Job Description: Support, test and enhance the rollout of the new ECM process to other lines of business. Investigate and implement performance improvement measures.
Job Activities: Activities included:
Development of enhanced PLM7.02 ECM-Process functionality,
Create functional- and technical specifications,
Failure analysis and solution proposals,
Implement solutions (Customizing, ABAP OO),
Execute technical- and functional tests,
Design/implement performance improvement measures (report to delete table entries),
Roll-out support,
End-user support. __________
Company: DB Systel GmbH (Deutsche Bahn), Frankfurt am Main (Hessen), Germany
Period: March 2013 – August 2014
April 2018
8
Organization: Archivierung & Dokumenten-Management-Systeme (T.SVC 43)
Project Title: WeDoiT System/process
Project Context: DB Systel GmbH developed for Deutsche Bahn the WeDoiT System/process. The main objective of the WeDoiT is to maintain (historical) vehicle-configuration and -documentation. The WeDoiT System/process then allows the user to retrieve actual or historical configuration-information including valid documents. WeDoiT is based on SAP-iPPE Structures, where the different vehicle types and configurations (e.g. the high-speed ICE train) are modeled in various iPPE Product Variant Structure (PVS) models.
Role(s): SAP PLM/iPPE Consultant, ABAP Consultant
Job Description: During the period I had three assignments:
1. Investigate/improve PDN WeDoiT System/process performance.
After two years of operation, the WeDoiT System suffers from a decreased performance.
2. Development/implementation of a new search for documents stored in the WeDoiT system.
3. Development/implementation of the DPC (DokumentenPrüfCenter). The DPC is a documents inspection process, where documentation from the supplier is submitted to a quality inspection process. The quality inspection process is controlled/monitored by a customer specific DPC-dashboard program supported by customer workflow processes.
Job Activities: Activities included:
WeDoiT System/process performance
Investigation of WeDoiT system performance,
Provided solutions in restructuring the iPPE-Structures and adjustments of dependent processes,
Preparation and ABAP-programming of the iPPE-restructuring programs,
Adjust iPPE-customizing and adjust supporting customer programs.
Document search:
Develop the programming- and technical test specifications for the Extended Document Search (Erweiterte Suchhilfe),
Performed the technical tests and made the necessary adjustments in the report program (ABAP, ALV-screens).
DokumentenPrüfCenter:
Create functional- and programming-specifications for the DPC (DokumentenPrüfCenter),
Development of new BOR (Business Object Repository) objects including the required ABAP programming,
Modeling and implementation of the customer workflows using SAP Business Workflow,
Execute technical- and functional tests,
Support offshore development team in India. __________
Company: DAF Trucks, Eindhoven, The Netherlands
Period: December 2009 (intermediate assignment)
Organization: IT-Department
April 2018
9
Project Title: SAP-PLM/iPPE overview training
Role(s): SAP PLM Application Consultant/Trainer
Job Description: Provide employees of DAF Trucks with a thorough understanding of SAP PLM functionality.
Job Activities: The activities included:
Preparation of the training sessions (presentations/examples),
Conduct training PLM100 (Overview SAP Lifecycle Data Management),
Conduct SAP–iPPE training (integrated Product and Process Engineering). __________
Company: Siemens Energy Oil&Gas, Duisburg (NordRhein-Westfalen), Germany
Period: September 2008 – March 2013
Organization: Siemens Energy Oil&Gas IT-Department, SAP PLM Application team
Project Title: ATLAS-Project (SAP)
Project Context: In 2006 Siemens Energy Oil&Gas started the ATLAS-project. The main objective of the ATLAS-project is to harmonize existing business processes in the different locations of the Siemens Energy Oil&Gas division. Also, the ATLAS SAP-Template was developed in order to implement/support the harmonized business processes.
I joined the ATLAS-project in September 2008 during the roll-out preparation phase for Finspang (Sweden).
The ATLAS SAP-system went live in October 2009 in Finspang (Sweden). The locations Görlitz and Nürnberg (both in Germany) went live in May 2011. The locations Duisburg (DE)/Hengelo (NL)/Erlangen (DE) went live in October 2102, and finally, the last site Brno (Czech Republic) went live in February 2013.
Role(s): SAP PLM Application Consultant, ABAP Consultant, SAP PLM Support Consultant
Job Description: Advise the SAP PLM business team on feasibility of proposed business solutions and implement these solutions.
Actively support the ATLAS-maintenance/support group in solving incidents after the initial go-live of the ATLAS-system.
Job Activities: SAP PLM Application Consultant:
Advise the SAP PLM (and related) business team on feasibility of proposed business solutions,
Prepare functional specifications, technical/programming specifications, customization specifications and test specifications,
Customizing and customizing tests,
Perform functional/technical tests for the RICEFW objects (Reports, Interfaces, Customizing, Enhancements, Forms and Workflows),
ABAP programming including ABAP OO (ABAP Objects),
Workflow modeling and workflow programming,
Preparing training and knowledge-transfer material,
Conduct ‘train-the-trainer’ knowledge-transfer sessions,
Prepare data migration/conversion specifications (using also LSMW) in the area of PLM master data (Material Master, Documents, BOM, ECM, etc.),
Conduct communications with global outsourcing.
SAP PLM Application Support Consultant:
April 2018
10
Actively support the ATLAS-maintenance/support group in solving incidents,
Problem analysis/solving, debugging and ABAP programming including ABAP OO (ABAP Objects), ALV-screens, SAP Dynpro, Smartforms, BAdI, Enhancement Framework, IDoc Interface/ALE, etc.,
SAP Workflow modeling and workflow programming,
End-user support.
During this project I was able to gain knowledge in the following SAP areas: SAP-MM/SD, SAP-PP, SAP-PM, SAP-PS and some functions of SAP-EH&S.
__________
Company: SAP Turkey, Istanbul, Turkey
Period: July 2008
Organization: SAP Turkey Education
Project Title: SAP PLM training
Role(s): SAP PLM Application Consultant/Trainer
Job Description: Provide employees of various customers (end-users, application support, etc.) of SAP Turkey with a thorough understanding of SAP PLM functionality.
Job Activities: The activities included:
Preparation of the training sessions (presentations/exercises),
PLM 100 (Overview Lifecycle Data Management),
PLM 120 (Document Management),
PLM 130 (Classification),
PLM 150 (Change Management and Configuration Management). __________
Company: Aesculap AG & Co KG. (BRAUN); Tuttlingen (Baden-Württemberg), Germany
Period: April 2008 – July 2008
Organization: Competence Center CAD- and R&D Solutions
Project Title: Testing SAP EasyDMS 6.0 SupportPackage 10
Role(s): SAP PLM Application Consultant
Project Context: Aesculap has implemented SAP PLM (ECC 6.0) for supporting their product development process and is also using SAP-EasyDMS and the SAP-CAD-integration with CATIA V5.
Job Description: Analyze and test new SAP EasyDMS functionality for direct use in the product development (business) processes.
Actively support the support-team in solving incidents specifically around SAP EasyDMS.
Job Activities: The activities included:
Test SAP EasyDMS,
Actively support the support group in solving incidents. __________
April 2018
11
Assignment History / Overview (> 10 years)
Period: February 2005 - March 2008
Company: Philips Healthcare; Best, The Netherlands
Project Title: Various SAP PLM projects
Role(s): SAP PLM Application Consultant
Period: October 2005 -December 2005
Company: Atos Origin; Veldhoven, The Netherlands
Project Title: SAP-PLM training (internal project)
Role(s): SAP PLM Application Consultant/Trainer
Period: July 2004 - February 2005
Company: ASML Lithography; Veldhoven, The Netherlands
Project Title: Systems Configuration Management program (various projects)
Role(s): SAP PLM (lead) Application Consultant
Period: February 2004 - July 2004
Company: Atos Origin; Veldhoven, The Netherlands
Project Title: Development of the SAP Enterprise Product Data Portal (internal project)
Role(s): SAP PLM (lead) Consultant
Period: December 2003 - February 2004
Company: Philips Consumer Electronics; Eindhoven, The Netherlands
Project Title: PLM Consulting and functional tests of ECM2 PDM-system
Role(s): PDM/PLM Consultant
Period: July 2003 – November 2003
Company: Philips Medical Systems; Best, The Netherlands
Project Title: Investigate SAP-iPPE functionality
Role(s): SAP PLM Consultant
Period: January 2003 - July 2003
Company: Atos Origin; Veldhoven, The Netherlands
Project Title: SAP-PLM in Product Development (internal project)
Role(s): SAP PLM Consultant
Period: January 2002 – July 2002
Company: Philips Lighting; Eindhoven, The Netherlands
Project Title: PDML-project implementation assessment
Role(s): PLM/PDM Consultant
Period: January 2001 – January 2002
Company: Philips Lighting; Eindhoven, The Netherlands
Project Title: International roll-out of PDML-system
Role(s): Project manager
Period: October 2000 – December 2000
Company: Origin/Philips Lighting; Eindhoven, The Netherlands
Project Title: Hand-over of PDML to Application Management and Managed Operations
Role(s): Project manager