Profile of Little Pond Sewer Service Area
• Approximately 1450 parcels
• Approximately 1274 single family homes
• 66% (841) second homes/rental
• 34% (433) owner-occupied principal residences
Annualized Septic Costs vs. Sewer Costs for Little Pond Homeowners
Summary of Estimated Costs
Annualized Avoided Costs
Annualized Sewer Costs
Pump out: every 3 years @$300
$100 0
New leach field: every 20 years @ 5% ($10,000)
$800 0
One-time hook up: 20yrs @5% ($2500 to $4000)
0 $200 - $325
Electricity for grinder pumps
0 $25
Sewer usage charge/year 0 $300
TOTAL COST:(WITHOUT BETTERMENT)
$900 $525 - $650
Calculating Betterment Scenarios: Three Key Components
1. $41,000,000: capital cost of construction
2. 1600 Sewer Equivalent Units (SEUs based on 1984 Policy)
3. Percentage of capital cost paid by property owners - to be determined by Town Meeting with Board of Selectmen recommendation
$41 million ÷ 1600 SEUs = $25,625 per SEU
Betterment Options for Selectmen
Percent of Total
Project Cost
Total Owedper SEU
Annual Cost if Paid over
30 years
Annual Cost if Paid over
20 years
Total Dollars Reimbursed
to Town
0% 0 0 0 0
25% $ 6,406 $214 $320 $10.2M
50% $12,812 $427 $640 $20.5M
70% $17,938 $598 $897 $28.7M
100% $25,625 $854 $1281 $41.0M