Upload
virginia-thompson
View
214
Download
4
Embed Size (px)
Citation preview
P R O F. L A U R E N C E F O L L I O T L A L L I O T
PUBLIC PROCUREMENT POLICIES AND PRACTICES
2
PROCUREMENT SYSTEMS: THINKING OUTSIDE THE BOX
Agenda• Why regulate
procurement? • Understanding legal
procurement context and broader procurement issues
• Understanding International public procurement context
• Focus on Fraud and corruption
WHY REGULATE PUBLIC PROCUREMENT?
PUBLIC PURCHASING: A GROWING GLOBAL ACTIVITY
• World Total, around $ 4 000 Billions
• 2 000 Billions Euros for European Union (2011)
• $ 600 Billions US Federal Government (2011)
5
1.1. WHY REGULATE PUBLIC PROCUREMENT ?
• An administrative function that exists in every country and goes beyond public purchasing:• Legal and economic objectives• Public sector reforms, Governance reforms• Financial reform• Social dimension• International perspective, Trade
IMPACTS ON ECONOMIC GROWTH ?
What?
• Public investment, infrastructures,
• Services• Goods• Trade, exports and
imports• Total, in general, 15 et 20
% of GDP• (18,3 % of EU GDP)
How?
• Stimulus package in developed countries
• Savings on public spending
• Development, Aid• Reshaping the
private sector• Sustainable
development
NEW REQUIREMENTS: WHY PUBLIC PROCUREMENT POLICIES MUST CHANGE
• Governance:• Accountability• Transparency, Information of civil society
• Competition, equal access• Performance
• Professionalization of procurement staff• Audit, controls
• Innovations:• E-procurement procedures• Framework contracts
• Integrity• Anti-corruption• Anti-collusion, debarment
7
NEW (CONTRADICTORY ?) ISSUES
• Efficiency versus integrity?• Transparency versus confidentiality?• New financing ? (PPPs)• Access of foreign companies, competition,
Protectionnism?• SMEs, • Sustainable procurement, • Socio-economic policies in favor of disadvantaged
groups
I. UNDERSTANDING INTERNATIONAL CONTEXT AND PUBLIC PROCUREMENT
STANDARDS
10
INTERNATIONAL INSTRUMENTS ADDRESSING PROCUREMENT • Binding instruments:• *UNCAC• *Government Procurement Agreement (WTO)• *Regional Procurement provisions: EU
Directives, WAEMU, COMESA• *Regional Trade agreement: e.g. NAFTA• *Bilateral treaties (BTA, BIT)
World Bank (& other MDBs) Guidelines• Soft Law instruments:
• UNCITRAL Model Law on procurement• OECD/DAC methodology• FIDIC
11
COVERAGE ?
• Mainly procurement process : standardization of the administrative process/formation of the contract
• From a competition angle
• Contract administration and management remain domestically ruled• Exception Bank’s
SBDs/GCC, FIDIC, (UNCITRAL) Legislative Guide on PFI, future UNCITRAL work?
12
A. UNITED NATIONS CONVENTION ON ANTI-CORRUPTION (UNCAC) ART. 9
• 148 State parties ; • Entry into force December 14 2005
“1. Each State Party shall, in accordance with the fundamental principles of its legal system, take the necessary steps to establish appropriate systems of procurement, based on transparency, competition and objective criteria in decision-making, that are effective, inter alia, in preventing corruption. “ (…)
13
B. GPA (WTO)
• Plurilateral (v. multilateral) Agreement between 43 WTO countries
• Treaty signed in 1994, Renegotiation in 2006, ratified in 2011
• Goal: promote international trade by opening the procurement markets to the member states,
• country by country approach
14
GPA
Albania
Negotiating accession = 9
Georgia Jordan
Kyrgyz RepublicMoldova Oman Panama
Ukraine China
Observers = 13 countriesArgentina, Australia, Bahrain, Cameroon, Chile, Colombia, Croatia, India, Mongolia, New Zealand, Saudi Arabia, Sri Lanka, Turkey
Current members = 43 countries
Armenia, Canada, EU + (28 countries)
Hong Kong China, Iceland, Israel, Japan, Korea,
Liechtenstein, Netherlands with Aruba, Norway,
Singapore, Switzerland, Chinese Taipei, United
States
15
HARMONIZATION AROUND THE GPA PROVISIONS?
• - Above thresholds (e.g.: $5,000,000 for construction contracts)
• - Open, selected tendering, restricted tendering
• - International Advertisement• - Time frame for bid preparation• - Challenge/complaint system
• - Award criterion: Most advantageous tender or/ price
16
C. EU FRAMEWORKGOAL: BUILDING THE INTERNAL MARKET
- Directive 2004/18/EC (“classic Directive)
Directive 2004/17/EC (“utilities” Directive)
• Binding for their objectives: advertisement at the EU level (in 22 languages)
• Applying above thresholds: aligned with the GPA’s
• New Directives to be enacted soon
17
54 COUNTRIES CONCERNED BY THE EU FRAMEWORK…
• - EU Procurement Directives providing a legal framework
(quite detailed) mandatory for 27 member states;
• +EEA Agreement= 3 countries: Norway, Liechtenstein and Iceland.• • - Part of the “acquis communautaire” to be implemented by
acceding countries
• 3 Candidates countries: Croatia, Turkey, Macedonia
• + 5 potential candidates: Albania, Bosnia and Herzegovina, Montenegro, Serbia as well as Kosovo under UN Security Council Resolution 1244/99.
• - Guidance for all countries looking for accession• Turkey started accession negotiations on 3 October 2005• + 16 EU neighbors
18
D. SOFT LAW INSTRUMENTS:
• I. UNCITRAL Model Law on procurement• (United Nations Commission For International
Trade Law)• Agreed in 1994 revised in 2011• No binding provisions but recommendations• Drafted by an expert group and approved by
UNCITRAL Committee• II. OECD/DAC methodology for assessing
national procurement systems (MAPS)
19
E. WORLD BANK PROCUREMENT GUIDELINES (2011)
• Designed to cover the big (above threshold) contract awarded by a Borrower-country under a Bank’s financed project
• GL for works, supplies, non-consultant services and GL specific for Consultants
• Open competition default method• Allow for domestic preferences• + SBDs• +General Conditions of Contract (GCC) to govern the
execution/administration of the contract
• Master Bidding Documents, Procurement of goods and User’s Guide (to cover the execution of the contract)
PRINCIPLES OF THE WB PROCUREMENT POLICIES
• Four main principles: • the need for economy and efficiency, • the interest in having all eligible bidders having equal
opportunity to compete,• the desire to encourage the development of domestic
industries, • the importance of the transparency of the procurement
process.
P R O F. L A U R E N C E F O L L I O T L A L L I O T
FRAUD, CORRUPTION AND CONFLICT OF INTERESTS IN PUBLIC
PROCUREMENT
CORRUPTION AND THE PUBLIC ADMINISTRATION: A NEW FOCUS
• During the 1990s, the governments of several important countries (Italy, Japan, Brazil, others) fell because of corruption.
• “Measures” of corruption became available.• Some governments and international institutions
started to react to corruption.• Various surveys indicated that political parties,
parliaments and some public institutions were the sectors more exposed to corruption.
• “Transparency International” and the “Corruption Perception Index”, (CPI), since 1995.
23
CORRUPTION AND THE PUBLIC ADMINISTRATION: HOW ?
• Fighting corruption in the public sector• Budgeting and public expenditures• Public employment and management• Public sector innovation and e-government• Regional development• Regulatory policy• Risk management• Integrity in Public Procurement • ://www.oecd.org/gov/fightingcorruptioninthepublic
sector/integrityinpublicprocurement.htm
24
PUBLIC PROCUREMENT: THE MOST VULNERABLE GOVERNMENT ACTIVITY TO CORRUPTION (OECD 2007).
HOW?
• Favoretism;• Restricted Authorizations and Licenses:i. Controls and inspections to small enterprises.ii. Bureaucratic obstacles to small entrepreneurs.iii. Differential costs between small and large
enterprise. Use of facilitatorsiv. Forced “charitable” contributions.
CORRUPTION AND OTHER OFFENCES
• “corrupt practice”• “fraudulent practice”• “collusive practice”• “coercive practice”• "obstructive
practice"
Paragraph 1.16 of the Procurement Guidelines and paragraph 1.19 of the Consultant Guidelines
Targets:-corruption,
-anti-competitive behavior -to protect Bank’s investigation.
CONFLICT OF INTERESTS PLAY IN TWO WAYS:
Passive = existing situation known or unknown by the entity/person but not used to produce any advantage
Active = conflict of interest is effectively used to produce directly or indirectly an advantage
CASE STUDY:
Two short-listed Firms A and B submit proposals in which they are associated with the same Firm C. C is a well-known firm in the privatization telecommunication sector. A is associated with C in the form of a joint venture; B is associated with C in the form of a sub-consultancy. The standard request for proposals indicates that the short-listed firms cannot associate between themselves but can associate with outside firms in order to complement their expertise.
• Question: What type of offence here ?• Can firm C participate in these two proposals?
29
SANCTIONS
30
WB LIST OF OFFENCES
• “corrupt practice”• “fraudulent practice”• “collusive practice”• “coercive practice”• "obstructive practice"
Paragraph 1.16 of the Procurement Guidelines and paragraph 1.19 of the Consultant Guidelines
Targets:-corruption, -anti-competitive behavior -”-”-to protect Bank’s investigation.
31
32
33
DOMESTIC PROVISIONS
• Link contract/law ?• Where are the Corruption and fraud issues taken
care of? • Procurement Law?• Competition Law?• Criminal Law?• Civil service Law: disciplinary sanctions?• Anti-corruption Law?