44

fortapro.comproduction process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: fortapro.comproduction process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be
Page 2: fortapro.comproduction process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be
Page 3: fortapro.comproduction process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be
Page 4: fortapro.comproduction process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be

LOOKING FOR INTELLIGENT BUILDING SOLUTION?

INTERESTED IN “MEDICAL GRADE” FACILITY?

SAVE TIME AND MONEY?

APPRECIATE “GREEN BUILDING”?

OUR PROVEN COST-EFFECTIVE CONSTRUCTIONMETHODOLOGY CAN ADDRESS

YOUR EXPECTATIONS

Page 5: fortapro.comproduction process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be

5

Table of Contents

OUR PROFILE 7

WHAT IS A PREFABRICATED MODULAR SYSTEM? 11

TIME SAVING – REDUCED OVERALL CONSTRUCTION TIME 12

OVERALL COST SAVINGS 12

MINIMIZING ENVIRONMENTAL IMPACT OF THE CONSTRUCTION PROCESS ON THE SITE 13

SAFER CONSTRUCTION ENVIRONMENT 17

TYPICAL MODULES DIMENSIONS 19

INPATIENT DEPARTMENTS 21

INPATIENT UNIT 22

INTENSIVE CARE UNIT 24

EMERGENCY CENTER 26

OPERATING ROOM DEPARTMENT 29

DAYCARE CENTER 30

MEDICAL DIAGNOSTIC CENTER 32

MEDICAL WASTE AUTOCLAVE MODULAR UNIT 36

MRI UNITS 37

OTHER MODULAR SOLUTIONS 38

BATHROOM UNITS / WC PODS 40

ELDERLY PEOPLE HOME 41

TECHNICAL DESCRIPTION 42

Page 6: fortapro.comproduction process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be

6

Page 7: fortapro.comproduction process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be

7

Our Profile

Forta Pro features advanced off-site building methods offering healthcare facilities in a fast–track modular and construction solution with minimal disruption to the surrounding facilities operation. The advanced factory prefabrication enables Forta Pro to speed up the project timetable for the construction projects in a way which is not achievable by the on–site building technology. Strict quality control and inspection implemented in our modern factory and supported by Forta Pro multi–disciplinary professional team, provide a guaranteed comprehensive quality solution. Our modules can be defined as “Medical Grade” rooms which supports the medical activity in the facility.

Our experience involves planning, designing, construction and equipment supply to healthcare facilities with special attention to: • Inpatient Wards • Delivery rooms • Intensive Care Units/High Dependency Units (NICU, PICU, MICU) • Operating Theaters (General, Ultra clean, Septic, Hybrid) • Outpatient clinics, Consultant rooms Day care units, Chemotherapy, Pain management, xxDialysis, etc.• Administrative space • Physiotherapy, Rehabilitation centers • Imaging–Radiology • Laboratories, Logistics units and more • Bathroom and WC Pods

Healthcare is the sector which currently features the highest use of prefabricated modular constructions with the most notable growth in the future.

Page 8: fortapro.comproduction process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be

8

Page 9: fortapro.comproduction process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be

Our long term experience within the healthcare facility Design & Build sector ensures us to develop customized solutions from the very preliminary idea to the construction working plans, working directly with the client professional representative to address their specific needs and expectations.

For architects and owners, modular-prefabricated construction companies today can work with such levels of design and construction sophistication that will exceed all expectations, competing their conventional counter parts.

We can take a conventional design and create a modular version when required, so it’s never too late to explore the possibilities.

Forta Pro can provide services with a complete turn–key package solution: • Underground & Superstructure construction • Exterior shell with architectural facades • Interior civil/finishing works • HVAC, Electricity HV, LV, Plumbing, Medical gas, Lifts, pneumatic tubes system • Medical equipment • Furniture (Fixed & Mobile)

OUR PROFILE

9

Page 10: fortapro.comproduction process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be

10

Phase 1 Phase 2 Phase 3

Phase 4 Phase 5 Phase 6

Phase 7

Phase 10

Phase 8

Phase 11

Phase 9

Phase 12

Page 11: fortapro.comproduction process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be

11

Based on current reality, with less than 60% on-site construction projects delivered on time and less than 50% delivered to budget, the conventional on-site building systems do not address the main challenges in the construction industry. That explains why more and more investors are currently recognizing the need for a more promising building system that would provide higher efficiency, minimize environmental disruption and guarantee higher quality and lower costs together with overall time saving.

What is a Prefabricated Modular System?

This is a process that constructs a building off-site, under controlled plant conditions, using the same materials and designed to the same codes and standards as conventionally built facilities. Buildings are manufactured in “modules” and when put together on-site, reflect the same design intent and specifications as the most sophisticated traditionally built facility – without compromise.

Modular buildings, once assembled, are indistinguishable from their on-site built counterparts.

Structurally, modular buildings are even stronger than conventional structures because each module is engineered to independently withstand the rigors of transportation and craning onto foundations. Once together and sealed, the modules become one integrated wall, floor and roof assembly.

Building off-site ensures better construction quality management. Manufacturing plants have stringent QA/QC programs with testing protocols that promote superior quality in every step of the construction process.

Page 12: fortapro.comproduction process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be

12

Beyond quality management and quality assurance, modular construction offers many other benefits to owners, investors and users.

Time Saving – Reduced overall construction time

MODULAR CONSTRUCTION SCHEDULE

Design Engineering

Permits & Approvals

Site Development & FoundationsBuilding Construction at Factory

Install & Site Restoration Time Savings

SITE BUILT CONSTRUCTION SCHEDULE

Design Engineering

Permits & Approvals

Site Development & Foundations

Building Construction Site Restoration

Overall Cost Savings

The use of prefabrication construction methodology allows cost savings at every phase of the production process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be associated with installation efficiencies and the standardization of the spaces. Shorter construction time inducing lower overhead costs, earlier opening of the new facility generating higher rate of return on investment (ROI) and systematic production under strict QC\QA, hence reduced lost material and higher efficiency are all important parameters in the overall cost savings which are induced by using the prefabricated modular construction systems.

TIME SAVING–REDUCED OVERALL CONSTRUCTION TIME | OVERALL COST SAVING

Page 13: fortapro.comproduction process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be

13

MINIMIZING ENVIRONMENTAL IMPACT OF THE CONSTRUCTION PROCESS ON THE SITE | CONSTRUCTION WASTE

Minimizing Environmental Impact of the ConstructionProcess on the Site

Protecting the health of the patients is one of the biggest challenges to hospitals and other healthcare facilities during construction. Any construction project, no matter how well managed it is, will create at least some dust and debris. While this would not present a problem in most construction sites, in a hospital, dust and debris can be life-threatening if not handled properly.

Construction Waste

By Volume

wood 24%

cardboard 38%

drywall 11%

masonary 1%

metals 4%

other 22%

By Weight

wood 42%

cardboard 4%

drywall 26%

masonary 11%

metals 2%

other 15%

Removing approximately 80% of the building construction activity from the site location significantly reduces site disruption, noise pollution, air pollution, infection risks (infection control may be the most important consideration when it comes to hospital construction projects.) Thence, for hospitals, or other active businesses, reducing on-site construction activity and thereby eliminating a large part of the ongoing construction hazards, is a tremendous advantage.

As owners and designers look for more sustainable designs for improved environmental impact, modular construction is inherently a natural fit. Building in a controlled environment reduces waste. Waste is eliminated by recycling materials, controlling inventory and protecting building materials. This, along with improved quality management throughout the construction process and significantly less on-site activity and disturbance, promotes sustainability. Based on this evidence, the contribution of the modular prefabricated construction system to achieve “Green Building”.

Page 14: fortapro.comproduction process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be

14

Page 15: fortapro.comproduction process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be

15

Page 16: fortapro.comproduction process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be

16

Page 17: fortapro.comproduction process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be

17

Safer Construction Environment

Safety remains a major concern for the construction management. Construction by nature has a high degree of hazardous activities. The price of construction accidents is high in terms of both Costs and suffer.

Accidents add a burden of needless and avoidable expense. Direct costs include medical cost and compensation. Indirect hidden costs include: • Time lost from work by the injured party • Loss in earning power, economic loss to injured worker’s family • Loss of efficiency by breaking up crew • Cost to train new or replacement employees • Damage to equipment and tools • Loss of production • Cost incurred by delays • Overhead costs associated with disruption of work • Clean up and repair costs • Administrative costs of investigations and reports • Increased insurance premiums • Loss of future projects due to adverse publicity • Cost of fines

The indoor construction environment reduces the risks of accidents for workers as well as provides improved on–site working conditions, less noise and air pollution, less on–site traffic, turns the working zone into a safer environment with lower risks. Thus giving additional value to the contractor cannot be neglected.

SAFER CONSTRUCTION ENVIRONMENT

Page 18: fortapro.comproduction process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be

18

Page 19: fortapro.comproduction process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be

Typical Modules Dimensions

Our team is offering a variety of sizes and heights to address the client’s needs. Any bigger dimension can be supplied easily, as a smart combination of the basic modules!

TYPICAL MODULES DIMENSIONS

19

Page 20: fortapro.comproduction process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be

21

Inpatient Departments

Inpatient area is the part of the hospital which includes the nurse station, the patient accommodation areas, storage and public areas which are needed to carry out the nurse’s activities. This department should be designed in order: • To provide quality and efficient patient care with minimal nurse manpower • Construction and operational costs to be the reasonable without affecting the functionality • To provide the most desirable patient care environment • To provide necessary amenities for visitors

Patient wards may be of the following types: • General wards–internal and surgical wards, private wards–VIP, hotel style • Isolation wards • Pediatric wards • Gynecology wards • Postpartum (maternity) wards • Special units (chemotherapy)

INPATIENT DEPARTMENTS

Page 21: fortapro.comproduction process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be

22

CONSULTANTROOM

CONSULTANTROOM

STAFFLOUNGE

STAFFLOUNGE

MDROOM

MDROOM

MANIPULATIONROOM

MANIPULATIONROOM

PROCIDUREROOM

PROCIDUREROOM

PATIENTLOUNGE

TROLLETHOLDING

IPIPIPIPIPIP

EMERGENCYSTAIRWAY

AUXILIARYROOM

STAFFWC

WC ENEMAROOM

ANTE AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

ANTE ENEMAROOM

WC STAFFWC

ANTEROOM

VISITORS LIFT HALL

HOSPITAL LIFT HALL

ANTEROOM

ANTEROOM

ANTEROOM

EMERGENCYSTAIRWAY

EMERGENCYSTAIRWAY

NURSESTATION

NURSESTATION

CORRIDOR

CORRIDOR

PATIENTLOUNGE

CORRIDOR

CORRIDOR

SOILED LIFT

IP IP IP IP IP IP IP IP IP IP IP IP IPIPIPIPIPIPIPIPIPIPIPIP

IPIPIPIPIPIP

Laminated flooring board

Syntetic carpet

Ceramic tile 100 x 100 mm

Ceramic tile 100 x 100 mm

Laminated flooring board

Ceramic tile 100 x 100 mm

Ceramic tile 100 x 100 mm

Inpatient Unit

CONSULTANTROOM

CONSULTANTROOM

STAFFLOUNGE

STAFFLOUNGE

MDROOM

MDROOM

MANIPULATIONROOM

MANIPULATIONROOM

PROCIDUREROOM

PROCIDUREROOM

PATIENTLOUNGE

TROLLETHOLDING

IPIPIPIPIPIP

EMERGENCYSTAIRWAY

AUXILIARYROOM

STAFFWC

WC ENEMAROOM

ANTE AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

ANTE ENEMAROOM

WC STAFFWC

ANTEROOM

VISITORS LIFT HALL

HOSPITAL LIFT HALL

ANTEROOM

ANTEROOM

ANTEROOM

EMERGENCYSTAIRWAY

EMERGENCYSTAIRWAY

NURSESTATION

NURSESTATION

CORRIDOR

CORRIDOR

PATIENTLOUNGE

CORRIDOR

CORRIDOR

SOILED LIFT

IP IP IP IP IP IP IP IP IP IP IP IP IPIPIPIPIPIPIPIPIPIPIPIP

IPIPIPIPIPIP

Laminated flooring board

Syntetic carpet

Ceramic tile 100 x 100 mm

Ceramic tile 100 x 100 mm

Laminated flooring board

Ceramic tile 100 x 100 mm

Ceramic tile 100 x 100 mm

CONSULTANTROOM

CONSULTANTROOM

STAFFLOUNGE

STAFFLOUNGE

MDROOM

MDROOM

MANIPULATIONROOM

MANIPULATIONROOM

PROCIDUREROOM

PROCIDUREROOM

PATIENTLOUNGE

TROLLETHOLDING

IPIPIPIPIPIP

EMERGENCYSTAIRWAY

AUXILIARYROOM

STAFFWC

WC ENEMAROOM

ANTE AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

ANTE ENEMAROOM

WC STAFFWC

ANTEROOM

VISITORS LIFT HALL

HOSPITAL LIFT HALL

ANTEROOM

ANTEROOM

ANTEROOM

EMERGENCYSTAIRWAY

EMERGENCYSTAIRWAY

NURSESTATION

NURSESTATION

CORRIDOR

CORRIDOR

PATIENTLOUNGE

CORRIDOR

CORRIDOR

SOILED LIFT

IP IP IP IP IP IP IP IP IP IP IP IP IPIPIPIPIPIPIPIPIPIPIPIP

IPIPIPIPIPIP

Laminated flooring board

Syntetic carpet

Ceramic tile 100 x 100 mm

Ceramic tile 100 x 100 mm

Laminated flooring board

Ceramic tile 100 x 100 mm

Ceramic tile 100 x 100 mm

Page 22: fortapro.comproduction process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be

23

CONSULTANTROOM

CONSULTANTROOM

STAFFLOUNGE

STAFFLOUNGE

MDROOM

MDROOM

MANIPULATIONROOM

MANIPULATIONROOM

PROCIDUREROOM

PROCIDUREROOM

PATIENTLOUNGE

TROLLETHOLDING

IPIPIPIPIPIP

EMERGENCYSTAIRWAY

AUXILIARYROOM

STAFFWC

WC ENEMAROOM

ANTE AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

ANTE ENEMAROOM

WC STAFFWC

ANTEROOM

VISITORS LIFT HALL

HOSPITAL LIFT HALL

ANTEROOM

ANTEROOM

ANTEROOM

EMERGENCYSTAIRWAY

EMERGENCYSTAIRWAY

NURSESTATION

NURSESTATION

CORRIDOR

CORRIDOR

PATIENTLOUNGE

CORRIDOR

CORRIDOR

SOILED LIFT

IP IP IP IP IP IP IP IP IP IP IP IP IPIPIPIPIPIPIPIPIPIPIPIP

IPIPIPIPIPIP

Laminated flooring board

Syntetic carpet

Ceramic tile 100 x 100 mm

Ceramic tile 100 x 100 mm

Laminated flooring board

Ceramic tile 100 x 100 mm

Ceramic tile 100 x 100 mm

CONSULTANTROOM

CONSULTANTROOM

STAFFLOUNGE

STAFFLOUNGE

MDROOM

MDROOM

MANIPULATIONROOM

MANIPULATIONROOM

PROCIDUREROOM

PROCIDUREROOM

PATIENTLOUNGE

TROLLETHOLDING

IPIPIPIPIPIP

EMERGENCYSTAIRWAY

AUXILIARYROOM

STAFFWC

WC ENEMAROOM

ANTE AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

ANTE ENEMAROOM

WC STAFFWC

ANTEROOM

VISITORS LIFT HALL

HOSPITAL LIFT HALL

ANTEROOM

ANTEROOM

ANTEROOM

EMERGENCYSTAIRWAY

EMERGENCYSTAIRWAY

NURSESTATION

NURSESTATION

CORRIDOR

CORRIDOR

PATIENTLOUNGE

CORRIDOR

CORRIDOR

SOILED LIFT

IP IP IP IP IP IP IP IP IP IP IP IP IPIPIPIPIPIPIPIPIPIPIPIP

IPIPIPIPIPIP

Laminated flooring board

Syntetic carpet

Ceramic tile 100 x 100 mm

Ceramic tile 100 x 100 mm

Laminated flooring board

Ceramic tile 100 x 100 mm

Ceramic tile 100 x 100 mm

CONSULTANTROOM

CONSULTANTROOM

STAFFLOUNGE

STAFFLOUNGE

MDROOM

MDROOM

MANIPULATIONROOM

MANIPULATIONROOM

PROCIDUREROOM

PROCIDUREROOM

PATIENTLOUNGE

TROLLETHOLDING

IPIPIPIPIPIP

EMERGENCYSTAIRWAY

AUXILIARYROOM

STAFFWC

WC ENEMAROOM

ANTE AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

ANTE ENEMAROOM

WC STAFFWC

ANTEROOM

VISITORS LIFT HALL

HOSPITAL LIFT HALL

ANTEROOM

ANTEROOM

ANTEROOM

EMERGENCYSTAIRWAY

EMERGENCYSTAIRWAY

NURSESTATION

NURSESTATION

CORRIDOR

CORRIDOR

PATIENTLOUNGE

CORRIDOR

CORRIDOR

SOILED LIFT

IP IP IP IP IP IP IP IP IP IP IP IP IPIPIPIPIPIPIPIPIPIPIPIP

IPIPIPIPIPIP

Laminated flooring board

Syntetic carpet

Ceramic tile 100 x 100 mm

Ceramic tile 100 x 100 mm

Laminated flooring board

Ceramic tile 100 x 100 mm

Ceramic tile 100 x 100 mm

INPATIENT DEPARTMENTS

Page 23: fortapro.comproduction process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be

24

Intensive Care Unit

Intensive Care Unit (ICU) is a dedicated facility for patients who require high levels of medical care and complex treatment. ICUs may be multi-disciplinary or single specialty units, such as: • Pediatric ICU • Neurology ICU • Burn care center/unit ICU

Page 24: fortapro.comproduction process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be

25

PRIVATEICU

ANTEROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

SEMIPRIVATEICU

SEMIPRIVATEICU

SEMIPRIVATEICU

SEMIPRIVATEICU

SEMIPRIVATEICU

SEMIPRIVATEICU

PRIVATEICU

ANTEROOM

PRIVATEICU

ANTEROOM

PRIVATEICU

ANTEROOM

CORRIDOR

CORRIDOR

PRIVATEICU

ANTEROOM

PRIVATEICU

ANTEROOM 1200

0

4000

4000 4000

1000

0

* 1 unit consists from 2 modules. Dimensions - 8 x 10 m.

INTENSIVE CARE UNIT

Page 25: fortapro.comproduction process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be

26

Emergency Center

Emergency services is the “front door” of the hospital, the portal of entry that interacts with the highest volume of patients requiring critical care.

AUXILIARYROOM

WAY TOHOSPITAL

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

US SUTURE CAST WAITING TRIAGE TRIAGENURSE

CONSULTANTROOM RECEPTION RECEPTION

INFO MAINENTERANCE

USGYN

AUXILIARYROOM

AUXILIARYROOM

WHEELCHAIR

CHANGEROOM

CHANGEROOM

SECURITYROOMWC WAITING WARDROBE

CT TECH. ROOM

MONITORROOM

MONITORROOM

X-RAY

WC

BARIUM SCRUBROOM

ANTEROOM

MODULETYPE “B”

MODULETYPE “A”

TRAUMA

AUXILIARYROOM

AUXILIARYROOM

EXPRESSLAB

CHIEFMD

CORRIDOR

OBSERVATION

CHIEFNURSE

MDROOM

STAFFLOUNGE

URGENTENTERANCE

40004000

8000

4000

4000

4000 4000

8000 8000

4000

4000

10 000

10 0

00

AUXILIARYROOM

WAY TOHOSPITAL

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

US SUTURE CAST WAITING TRIAGE TRIAGENURSE

CONSULTANTROOM RECEPTION RECEPTION

INFO MAINENTERANCE

USGYN

AUXILIARYROOM

AUXILIARYROOM

WHEELCHAIR

CHANGEROOM

CHANGEROOM

SECURITYROOMWC WAITING WARDROBE

CT TECH. ROOM

MONITORROOM

MONITORROOM

X-RAY

WC

BARIUM SCRUBROOM

ANTEROOM

MODULETYPE “B”

MODULETYPE “A”

TRAUMA

AUXILIARYROOM

AUXILIARYROOM

EXPRESSLAB

CHIEFMD

CORRIDOR

OBSERVATION

CHIEFNURSE

MDROOM

STAFFLOUNGE

URGENTENTERANCE

40004000

8000

4000

4000

4000 4000

8000 8000

4000

4000

10 000

10 0

00

Page 26: fortapro.comproduction process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be

27

AUXILIARYROOM

WAY TOHOSPITAL

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

US SUTURE CAST WAITING TRIAGE TRIAGENURSE

CONSULTANTROOM RECEPTION RECEPTION

INFO MAINENTERANCE

USGYN

AUXILIARYROOM

AUXILIARYROOM

WHEELCHAIR

CHANGEROOM

CHANGEROOM

SECURITYROOMWC WAITING WARDROBE

CT TECH. ROOM

MONITORROOM

MONITORROOM

X-RAY

WC

BARIUM SCRUBROOM

ANTEROOM

MODULETYPE “B”

MODULETYPE “A”

TRAUMA

AUXILIARYROOM

AUXILIARYROOM

EXPRESSLAB

CHIEFMD

CORRIDOR

OBSERVATION

CHIEFNURSE

MDROOM

STAFFLOUNGE

URGENTENTERANCE

40004000

8000

4000

4000

4000 4000

8000 8000

4000

4000

10 000

10 0

00

AUXILIARYROOM

WAY TOHOSPITAL

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

US SUTURE CAST WAITING TRIAGE TRIAGENURSE

CONSULTANTROOM RECEPTION RECEPTION

INFO MAINENTERANCE

USGYN

AUXILIARYROOM

AUXILIARYROOM

WHEELCHAIR

CHANGEROOM

CHANGEROOM

SECURITYROOMWC WAITING WARDROBE

CT TECH. ROOM

MONITORROOM

MONITORROOM

X-RAY

WC

BARIUM SCRUBROOM

ANTEROOM

MODULETYPE “B”

MODULETYPE “A”

TRAUMA

AUXILIARYROOM

AUXILIARYROOM

EXPRESSLAB

CHIEFMD

CORRIDOR

OBSERVATION

CHIEFNURSE

MDROOM

STAFFLOUNGE

URGENTENTERANCE

40004000

8000

4000

4000

4000 4000

8000 8000

4000

4000

10 000

10 0

00

EMERGENCY CENTER

Page 27: fortapro.comproduction process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be

28

Page 28: fortapro.comproduction process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be

Operating Room Department

Forta Pro offers several types of operating rooms including General Surgery and Ultra Clean Surgery. Each of these is presented in a comprehensive autonomous solution of Induction room, Scrubbing room, Operating Theatre and Technical zone. The prefabricated solution dimensions, layouts and architectural design can be easily customized to address the clients’ specific needs. The prefabricated modules can easily be installed in existing hospital with minimal interference to the daily routines. The solution can be permanent or on a temporary base, for example when renovation process is performed at the existing OT.

We propose rooms such as: • Minimal invasive Procedure room• General Surgery Operating room • Endoscopy/Laparoscopy Operating room• Ophthalmology and E.N.T. Operating room • Ultra clean Operating Theaters (Orthopaedic/ cardiac/ open heart/ Hybrid / Neurosurgery) • Angiograph /Cath labs

OPERATING ROOM DEPARTMENT

29

Page 29: fortapro.comproduction process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be

30

CONSULTANTROOM

CONSULTANTROOM

CONSULTANTROOM

PROCEDURE

PROCEDURE PROCEDURE STAFFLOUNGE

PROCEDUREPROCEDUREMD ROOMSTAFFLOUNGE

WAITINGAREA

WAITINGAREA

WARDROBE

MAINENTERANCE

CHILDREN’S DEPARTMENTADULT DEPARTMENT

WAITINGAREA

WAITINGAREA

WAITINGAREA

WAITINGAREA

WAITINGAREA

WAITINGAREA

AUXILIARYROOM

CONSULTANTROOM

CONSULTANTROOM

CONSULTANTROOM

CONSULTANTROOM

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

RECEPTION RECEPTIONINFO

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

PLAYROOMFOR

CHILDREN

RETAILFAMILYDOCTOR

PROCEDURE FAMILYDOCTOR

FAMILYDOCTOR

FAMILYDOCTOR

FAMILYDOCTOR

FAMILYDOCTOR

4000

3000

7000

10 0

00

CONSULTANTROOM

CONSULTANTROOM

CONSULTANTROOM

PROCEDURE

PROCEDURE PROCEDURE STAFFLOUNGE

PROCEDUREPROCEDUREMD ROOMSTAFFLOUNGE

WAITINGAREA

WAITINGAREA

WARDROBE

MAINENTERANCE

CHILDREN’S DEPARTMENTADULT DEPARTMENT

WAITINGAREA

WAITINGAREA

WAITINGAREA

WAITINGAREA

WAITINGAREA

WAITINGAREA

AUXILIARYROOM

CONSULTANTROOM

CONSULTANTROOM

CONSULTANTROOM

CONSULTANTROOM

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

RECEPTION RECEPTIONINFO

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

PLAYROOMFOR

CHILDREN

RETAILFAMILYDOCTOR

PROCEDURE FAMILYDOCTOR

FAMILYDOCTOR

FAMILYDOCTOR

FAMILYDOCTOR

FAMILYDOCTOR

4000

3000

7000

10 0

00

Page 30: fortapro.comproduction process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be

31

Daycare Center

CONSULTANTROOM

CONSULTANTROOM

CONSULTANTROOM

PROCEDURE

PROCEDURE PROCEDURE STAFFLOUNGE

PROCEDUREPROCEDUREMD ROOMSTAFFLOUNGE

WAITINGAREA

WAITINGAREA

WARDROBE

MAINENTERANCE

CHILDREN’S DEPARTMENTADULT DEPARTMENT

WAITINGAREA

WAITINGAREA

WAITINGAREA

WAITINGAREA

WAITINGAREA

WAITINGAREA

AUXILIARYROOM

CONSULTANTROOM

CONSULTANTROOM

CONSULTANTROOM

CONSULTANTROOM

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

RECEPTION RECEPTIONINFO

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

PLAYROOMFOR

CHILDREN

RETAILFAMILYDOCTOR

PROCEDURE FAMILYDOCTOR

FAMILYDOCTOR

FAMILYDOCTOR

FAMILYDOCTOR

FAMILYDOCTOR

4000

3000

7000

10 0

00

CONSULTANTROOM

CONSULTANTROOM

CONSULTANTROOM

PROCEDURE

PROCEDURE PROCEDURE STAFFLOUNGE

PROCEDUREPROCEDUREMD ROOMSTAFFLOUNGE

WAITINGAREA

WAITINGAREA

WARDROBE

MAINENTERANCE

CHILDREN’S DEPARTMENTADULT DEPARTMENT

WAITINGAREA

WAITINGAREA

WAITINGAREA

WAITINGAREA

WAITINGAREA

WAITINGAREA

AUXILIARYROOM

CONSULTANTROOM

CONSULTANTROOM

CONSULTANTROOM

CONSULTANTROOM

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

RECEPTION RECEPTIONINFO

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

PLAYROOMFOR

CHILDREN

RETAILFAMILYDOCTOR

PROCEDURE FAMILYDOCTOR

FAMILYDOCTOR

FAMILYDOCTOR

FAMILYDOCTOR

FAMILYDOCTOR

4000

3000

7000

10 0

00

Page 31: fortapro.comproduction process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be

32

Page 32: fortapro.comproduction process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be

33

Medical Diagnostic Center

Page 33: fortapro.comproduction process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be

34

CONCRETEFUNCTIONALDIAGNOSTIC

FUNCTIONALDIAGNOSTIC

FUNCTIONALDIAGNOSTIC

FUNCTIONALDIAGNOSTIC

ULTRASOUND

CORRIDORCORRIDOR

CORRIDOR

PATIENT DRESSINGROOM

PATIENT DRESSINGROOM

PATIENT DRESSINGROOM

CONTROL ROOMCONTROLROOM

MRI MAMMOGRAPHYSTAFFLOUNGE

CORRIDOR

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

WAITINGAREA

WAITINGAREA

BIOMATERIALCOLLECTOR

RECEPTION

IMAGING DIAGNOSTICS

FUNCTIONAL DIAGNOSTICS MAINENTERANCE

LABORATORY

SURGICAL DIAGNOSTICS ENDOSCOPY DEPARTMENT

THERAPY DEPARTMENT STOMATOLOGY

ADMINISTRATION

CONCRETE

LAB LAB LAB

CORRIDOR

CORRIDOR

LAB SANITARYROOM

STAFFLOUNGE

WAITINGAREA

WAITINGAREA

WAITINGAREA

WAITINGAREA

CORRIDOR

CORRIDOR CORRIDOR CORRIDOR

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

CONCRETE

DANTIST DANTIST DANTIST DANTIST

STAFFLOUNGE

CONCRETE

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

CORRIDOR CORRIDOR

CONSULTANTROOM

CONSULTANTROOM

CONSULTANTROOM

CONSULTANTROOM

CONSULTANTROOM

CONSULTANTROOM

CONSULTANTROOM

CONSULTANTROOM

WAITINGAREA

WAITINGAREA

FAMILYDOCTOR

FAMILYDOCTOR

PROCEDURE

FAMILYDOCTOR

FAMILYDOCTOR

ADMINISTRATION ADMINISTRATION ADMINISTRATION ADMINISTRATIONPROCEDURE

CONCRETE

INFO

WAITINGAREA

ULTRASOUND WARDROBEBLOOD

RECIPENTROOM

EXPRESSSTERILIZATION

ROOM

CONCRETE

STAFFLOUNGE

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

INFO

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

STAFFLOUNGE

WAITINGROOM

MDROOM

MDROOM

RECOVERYROOM

STORAGEROOM

WAITINGAREA

WAITINGAREA GASTROSCOPY

CORRIDOR

CORRIDOR

CONCRETE

CONCRETE

COLONOSCOPY

WC

SECRETARYAUXILIARY

ROOM

EXPRESSWASHING/

DISINFECTIONROOM

GYNEKOLOGISTPROCEDURE

ROOM

GYNEKOLOGISTMD

ROOM

UROLOGISTPROCEDURE

ROOM

UROLOGISTMD

ROOM

WAITINGAREA

ENTROOM

ENTROOM

MDROOM

OPHTHALMOLOGISTLASERROOM

CORRIDOR CORRIDOR

CORRIDOR CORRIDOR

OPHTHALMOLOGISTUS

ROOM

OPHTHALMOLOGISTROOM

OPHTHALMOLOGIST

ROOM

WAITINGAREA

DARK

ROO

M

DARK

ROO

M

MDRECORDS

ROOM

AUXILIARYROOM

STAFFLOUNGEWAITING

AREA

WAITINGAREA

MDRECORDS

ROOM

X-RAY ROOM

WAITINGAREA

INFO

CONCRETEFUNCTIONALDIAGNOSTIC

FUNCTIONALDIAGNOSTIC

FUNCTIONALDIAGNOSTIC

FUNCTIONALDIAGNOSTIC

ULTRASOUND

CORRIDORCORRIDOR

CORRIDOR

PATIENT DRESSINGROOM

PATIENT DRESSINGROOM

PATIENT DRESSINGROOM

CONTROL ROOMCONTROLROOM

MRI MAMMOGRAPHYSTAFFLOUNGE

CORRIDOR

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

WAITINGAREA

WAITINGAREA

BIOMATERIALCOLLECTOR

RECEPTION

IMAGING DIAGNOSTICS

FUNCTIONAL DIAGNOSTICS MAINENTERANCE

LABORATORY

SURGICAL DIAGNOSTICS ENDOSCOPY DEPARTMENT

THERAPY DEPARTMENT STOMATOLOGY

ADMINISTRATION

CONCRETE

LAB LAB LAB

CORRIDOR

CORRIDOR

LAB SANITARYROOM

STAFFLOUNGE

WAITINGAREA

WAITINGAREA

WAITINGAREA

WAITINGAREA

CORRIDOR

CORRIDOR CORRIDOR CORRIDOR

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

CONCRETE

DANTIST DANTIST DANTIST DANTIST

STAFFLOUNGE

CONCRETE

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

CORRIDOR CORRIDOR

CONSULTANTROOM

CONSULTANTROOM

CONSULTANTROOM

CONSULTANTROOM

CONSULTANTROOM

CONSULTANTROOM

CONSULTANTROOM

CONSULTANTROOM

WAITINGAREA

WAITINGAREA

FAMILYDOCTOR

FAMILYDOCTOR

PROCEDURE

FAMILYDOCTOR

FAMILYDOCTOR

ADMINISTRATION ADMINISTRATION ADMINISTRATION ADMINISTRATIONPROCEDURE

CONCRETE

INFO

WAITINGAREA

ULTRASOUND WARDROBEBLOOD

RECIPENTROOM

EXPRESSSTERILIZATION

ROOM

CONCRETE

STAFFLOUNGE

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

INFO

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

STAFFLOUNGE

WAITINGROOM

MDROOM

MDROOM

RECOVERYROOM

STORAGEROOM

WAITINGAREA

WAITINGAREA GASTROSCOPY

CORRIDOR

CORRIDOR

CONCRETE

CONCRETE

COLONOSCOPY

WC

SECRETARYAUXILIARY

ROOM

EXPRESSWASHING/

DISINFECTIONROOM

GYNEKOLOGISTPROCEDURE

ROOM

GYNEKOLOGISTMD

ROOM

UROLOGISTPROCEDURE

ROOM

UROLOGISTMD

ROOM

WAITINGAREA

ENTROOM

ENTROOM

MDROOM

OPHTHALMOLOGISTLASERROOM

CORRIDOR CORRIDOR

CORRIDOR CORRIDOR

OPHTHALMOLOGISTUS

ROOM

OPHTHALMOLOGISTROOM

OPHTHALMOLOGIST

ROOM

WAITINGAREA

DARK

ROO

M

DARK

ROO

M

MDRECORDS

ROOM

AUXILIARYROOM

STAFFLOUNGEWAITING

AREA

WAITINGAREA

MDRECORDS

ROOM

X-RAY ROOM

WAITINGAREA

INFO

Page 34: fortapro.comproduction process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be

35

CONCRETEFUNCTIONALDIAGNOSTIC

FUNCTIONALDIAGNOSTIC

FUNCTIONALDIAGNOSTIC

FUNCTIONALDIAGNOSTIC

ULTRASOUND

CORRIDORCORRIDOR

CORRIDOR

PATIENT DRESSINGROOM

PATIENT DRESSINGROOM

PATIENT DRESSINGROOM

CONTROL ROOMCONTROLROOM

MRI MAMMOGRAPHYSTAFFLOUNGE

CORRIDOR

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

WAITINGAREA

WAITINGAREA

BIOMATERIALCOLLECTOR

RECEPTION

IMAGING DIAGNOSTICS

FUNCTIONAL DIAGNOSTICS MAINENTERANCE

LABORATORY

SURGICAL DIAGNOSTICS ENDOSCOPY DEPARTMENT

THERAPY DEPARTMENT STOMATOLOGY

ADMINISTRATION

CONCRETE

LAB LAB LAB

CORRIDOR

CORRIDOR

LAB SANITARYROOM

STAFFLOUNGE

WAITINGAREA

WAITINGAREA

WAITINGAREA

WAITINGAREA

CORRIDOR

CORRIDOR CORRIDOR CORRIDOR

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

CONCRETE

DANTIST DANTIST DANTIST DANTIST

STAFFLOUNGE

CONCRETE

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

CORRIDOR CORRIDOR

CONSULTANTROOM

CONSULTANTROOM

CONSULTANTROOM

CONSULTANTROOM

CONSULTANTROOM

CONSULTANTROOM

CONSULTANTROOM

CONSULTANTROOM

WAITINGAREA

WAITINGAREA

FAMILYDOCTOR

FAMILYDOCTOR

PROCEDURE

FAMILYDOCTOR

FAMILYDOCTOR

ADMINISTRATION ADMINISTRATION ADMINISTRATION ADMINISTRATIONPROCEDURE

CONCRETE

INFO

WAITINGAREA

ULTRASOUND WARDROBEBLOOD

RECIPENTROOM

EXPRESSSTERILIZATION

ROOM

CONCRETE

STAFFLOUNGE

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

INFO

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

STAFFLOUNGE

WAITINGROOM

MDROOM

MDROOM

RECOVERYROOM

STORAGEROOM

WAITINGAREA

WAITINGAREA GASTROSCOPY

CORRIDOR

CORRIDOR

CONCRETE

CONCRETE

COLONOSCOPY

WC

SECRETARYAUXILIARY

ROOM

EXPRESSWASHING/

DISINFECTIONROOM

GYNEKOLOGISTPROCEDURE

ROOM

GYNEKOLOGISTMD

ROOM

UROLOGISTPROCEDURE

ROOM

UROLOGISTMD

ROOM

WAITINGAREA

ENTROOM

ENTROOM

MDROOM

OPHTHALMOLOGISTLASERROOM

CORRIDOR CORRIDOR

CORRIDOR CORRIDOR

OPHTHALMOLOGISTUS

ROOM

OPHTHALMOLOGISTROOM

OPHTHALMOLOGIST

ROOM

WAITINGAREA

DARK

ROO

M

DARK

ROO

M

MDRECORDS

ROOM

AUXILIARYROOM

STAFFLOUNGEWAITING

AREA

WAITINGAREA

MDRECORDS

ROOM

X-RAY ROOM

WAITINGAREA

INFO

CONCRETEFUNCTIONALDIAGNOSTIC

FUNCTIONALDIAGNOSTIC

FUNCTIONALDIAGNOSTIC

FUNCTIONALDIAGNOSTIC

ULTRASOUND

CORRIDORCORRIDOR

CORRIDOR

PATIENT DRESSINGROOM

PATIENT DRESSINGROOM

PATIENT DRESSINGROOM

CONTROL ROOMCONTROLROOM

MRI MAMMOGRAPHYSTAFFLOUNGE

CORRIDOR

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

WAITINGAREA

WAITINGAREA

BIOMATERIALCOLLECTOR

RECEPTION

IMAGING DIAGNOSTICS

FUNCTIONAL DIAGNOSTICS MAINENTERANCE

LABORATORY

SURGICAL DIAGNOSTICS ENDOSCOPY DEPARTMENT

THERAPY DEPARTMENT STOMATOLOGY

ADMINISTRATION

CONCRETE

LAB LAB LAB

CORRIDOR

CORRIDOR

LAB SANITARYROOM

STAFFLOUNGE

WAITINGAREA

WAITINGAREA

WAITINGAREA

WAITINGAREA

CORRIDOR

CORRIDOR CORRIDOR CORRIDOR

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

CONCRETE

DANTIST DANTIST DANTIST DANTIST

STAFFLOUNGE

CONCRETE

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

CORRIDOR CORRIDOR

CONSULTANTROOM

CONSULTANTROOM

CONSULTANTROOM

CONSULTANTROOM

CONSULTANTROOM

CONSULTANTROOM

CONSULTANTROOM

CONSULTANTROOM

WAITINGAREA

WAITINGAREA

FAMILYDOCTOR

FAMILYDOCTOR

PROCEDURE

FAMILYDOCTOR

FAMILYDOCTOR

ADMINISTRATION ADMINISTRATION ADMINISTRATION ADMINISTRATIONPROCEDURE

CONCRETE

INFO

WAITINGAREA

ULTRASOUND WARDROBEBLOOD

RECIPENTROOM

EXPRESSSTERILIZATION

ROOM

CONCRETE

STAFFLOUNGE

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

INFO

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

AUXILIARYROOM

STAFFLOUNGE

WAITINGROOM

MDROOM

MDROOM

RECOVERYROOM

STORAGEROOM

WAITINGAREA

WAITINGAREA GASTROSCOPY

CORRIDOR

CORRIDOR

CONCRETE

CONCRETE

COLONOSCOPY

WC

SECRETARYAUXILIARY

ROOM

EXPRESSWASHING/

DISINFECTIONROOM

GYNEKOLOGISTPROCEDURE

ROOM

GYNEKOLOGISTMD

ROOM

UROLOGISTPROCEDURE

ROOM

UROLOGISTMD

ROOM

WAITINGAREA

ENTROOM

ENTROOM

MDROOM

OPHTHALMOLOGISTLASERROOM

CORRIDOR CORRIDOR

CORRIDOR CORRIDOR

OPHTHALMOLOGISTUS

ROOM

OPHTHALMOLOGISTROOM

OPHTHALMOLOGIST

ROOM

WAITINGAREA

DARK

ROO

M

DARK

ROO

M

MDRECORDS

ROOM

AUXILIARYROOM

STAFFLOUNGEWAITING

AREA

WAITINGAREA

MDRECORDS

ROOM

X-RAY ROOM

WAITINGAREA

INFO

OPERATING ROOM DEPARTMENT

Page 35: fortapro.comproduction process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be

36

Medical Waste Autoclave Modular Unit

A relocatable unit accommodating Medical Waste Autoclave (MWA),designed for small, medium and large scale hospitals.

This units is a collaboration based product ,together with “Tuttnauer” a worldwide leading manufacturer of sterilization and infection control machines, in order to allow any health care facility a comprehensive responsibility of the in house produced bio hazard (bio–medical) waste without dependency on outsourced services and with fulfillment of international codes.• This solution is an easy on–site installation which removes the transportation of waste to an

external treatment facility • Chemical free process• Clean and environmentally safe technology • Sterilized medical waste can be transferred to the general municipal waste treatment area or

can be buried as landfilled

These MWA Modular unit can be supplied in 10 variable models with different waste volume capacities (250 liter–1300 liter ).

WASTE STORAGEBEFORE DISPOSING

17.5 m2

(extremely hazardous waste,health-care wastes)

WASTE STORAGEBEFORE DISPOSING

17.5 m2

(dangerous (risky)health-care wastes)

TECHNICAL SERVICEROOM 7.5 m2

WASTERECEPTION

5 m2

CARTS WASHINGROOM9 m2

JANITORROOM4.5 m2

JANITORROOM4.5 m2

DISPOSING & WASTEPRESS ROOM

22 m2

STAFFLOUNGE ROOM

14 m2

STAFFCHANGE ROOM

7 m2

WC & SHOWER13 m2

WASTES STORAGEAFTER DISPOSING

9 m2

CLEAN CHARTSHOLDING ROOM

9 m2

DISPOSAL WASTERECEIVING

5 m2

PRESS

REVERSEOSMOSYS &

COMPRESSORROOM13 m2

STAFFENTERANCE

8.5 m2 STERILIZER6.5 m2

10000

4000

4000

4000

4000

4000

4000

10000

MEDICAL WASTE UNIT

Page 36: fortapro.comproduction process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be

37

MRI Units

Forta Pro offers Magnetic Resonance Centre for existing facilities expansion, as external “self-containing” unit, on top of existing buildings or any other kind or assembly option.

The use of modular constructions gives plenty of advantages, however, in hospital expansions or additions the most significant benefit is the uninterrupted operation of the medical institution. The hospital doesn’t stop its routine operation due to construction works – it could even be expanded without the usual construction site, because the largest amount of work is done at the Forta Pro factory.

Modules with the complete interior furnishing and infrastructure are manufactured at the factory, so that there is minimal onsite work to be carried out, such as foundations, modular assembly and façade decoration.

The modular construction of MR units offers savings of financial resources and time. This flexible solution is environmentally friendly, as it considerably reduces the amount of construction waste.

MRI UNITS

Page 37: fortapro.comproduction process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be

Other Modular Solutions Strict quality control and inspection implemented in our modern factory and supported by Forta Pro multi–disciplinary professional team, provide a guaranteed comprehensive quality solution for: • Residential houses• Hotels• Commercial buildings• Public buildings • Inbuilt WC rooms (PODs); Forta Pro propose up to 20 floors buildings. • Prefabricated fully equipped modules, with all furniture and equipment installed on factory • “Turn Key” solutions

38

Page 38: fortapro.comproduction process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be

39

Page 39: fortapro.comproduction process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be

40

Bathroom units / WC Pods

Forta Pro manufactures prefabricated bathroom units and WC Pods for the healthcare market. The Pods are designed, built under controlled and QA’d conditions and shipped as a complete assembled unit from our factory. The Pods structure is made from steel profiles, with high performance interior panels or any other finishes according to the customer request. The Pods provide excellent fire and acoustic rating possibilities, and are completed with all accessories as per client specification.

Forta Pro can also provide specific clinical finishes with level access floors and fully equipped with seats and handrails for disabled accessibility.

All Pods are built in accordance with the current regulations in the countries of destination to ensure that every detail is compliant, especially plumbing and electrical systems.

The key advantages of using Forta Pro Prefabricated Pods are:

1. Faster- Prefab bathroom pods accelerate the construction timeline with an efficient on-site installation and no punch list.

2. Quality- The factory production makes it possible to raise the level of quality and product reliability, thanks to continuous production control and robust final testing procedures.

3. Simple- The Bathroom Pods designed using 3D modeling for onsite compatibility, delivered, installed and connected to the building’s mechanical systems.

4. Safe- Fewer employees at the work site can reduce incidents and potentially general liability insurance.

Page 40: fortapro.comproduction process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be

Elderly People Home

Forta Pro offers unique know-how for elderly people home design and production. Our team of expert designers and engineers has accumulated long-term worldwide working experience.

Our modules are manufactured in a weather-controlled indoor environment. We place great attention to weather protection and insulation to create extremely energy-efficient product that is very economical to heat or cool. Interior flooring options include carpet, vinyl, wooden floors or any other choice to match customers needs. Exterior facades and finishes are available to match your architectural desires.

The offered prefabricated modules offer a complete, turn-key solution with emphasis on elderly people needs, safety and well-being, including: • Easy navigation created with physical challenges in mind• Wheelchair access through all doorways• Kitchen and bathroom adapted for wheelchair access• Elevated toilets• Reinforcing behind bathroom walls for optional handrails

OTHER MODULAR SOLUTIONS

41

Page 41: fortapro.comproduction process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be

42

TECHNICAL DESCRIPTION

The Structure

A computer designed steel structure planned to withstand the required “live loads”, Seismic and regional climatic loads (wind, snow, temp’) and fire rated protection cover, all are aimed to meet the international standards. Our structure is planned to offer: • Maximum corrosion resistance • Maximum mechanical endurance • Maximum recycled material use • Minimal self weight • Each module is independently structured to withstand full set of external loads, thus, by installing oithe modules into one combined structure, the overall structure endurance is increased • Fire resistance

Flooring Systems

• We can offer flooring system made of: • PVC\linoleum • Wood\parquet • Ceramic tiles • Granite porcelain • Terrazzo tiles • Epoxy resin floors

Wall Systems

The walls are built by multi-layer cement and gypsum boards system which supplies the required partition, acoustics, fire protection standards.As a finishing covering layer, we can offer one of the following options: • Stainless steel panels • Galvanized steel panels HPL PVC • Anti-bacterial paint system, decorative paint system • Cement board decorative

Page 42: fortapro.comproduction process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be

43

Ceiling Systems

We can fit each room requirements by offering an architectural ceiling solution which address the technical needs. • Gypsum board• Acoustic panels: different perforation levels • Wood panels• Metal panels• Clean ceiling panels • All option with removable segments to allow accessibility to technical system above

Doors & Windows

• Hinged doors • Sliding doors • Hermetic doors • Fire rated doors • X–Ray shielded door • Aluminum double glazing with inserted venetian blinds • Aluminum with thermal glazing

Exterior Cladding

• Cement (with/without color pigment) panels • Natural stone • Aluminum-glass panels • Plaster • Wood panels

In Door Installed Fixtures

• Inpatient/ICU/Staff sinks • OR’s staff scrubbing sinks • Nurse computer station • OR clock • Nurse call systems • Handrail assistance systems • Flush wall installed cabins • Pass through cabins • Control panels

Page 43: fortapro.comproduction process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be

44

• Clean area illumination fixtures • General and special areas illumination • Mirrors • Soap/gloves/paper dispenser • Clean area illumination fixtures • General and special areas illumination • Mirrors • Soap/gloves/paper dispenser

Electro Mechanical Systems

H.V.A.C • H.E.P.A• Laminar flows system • F.C.U (2PU/4PU) • AHW • Chillers/Air/ Water cooling system• Heating system (Electrical/Gas)• Exhaust air units

Medical Gas System

• O2, VAC, N2O, CAir, MedAir, CO2, N2, SCV • Head wall (I.P) Pendants (ICU, OR)

High Voltage/Low/I.T. System

• Grounding systems • Transformers • Diesel/Gas generators • U.P.S • Switchboards • Cables system • Life supporting areas systems • C.C.T.V

General Systems

• Elevators (Service, Clean/Soiled, Public, Staff ) • Pneumatic tube system (P.T.S) • Furniture (Stainless steel, wood, HPL, MDF, etc.)

Page 44: fortapro.comproduction process due to mass production, for example: material savings at the procurement stage and labor savings at the construction phase additional savings can be

[email protected]

1a Melngaila Street, Riga, Latvia+371 67 32 32 34