    Determine grossrequirement offinish products

    Determine netrequirement offinish product

    Develop masterproductionschedule

    Explode BoM to

    find gross request

    Determine netparts requirement

    Sales orderforecast

    Inventory inhand

    Compparts

  • 8/8/2019 Production Planning and control (PPC)

    3/14

    Adjustrequirement forscrap allowance

    Schedule/release order

    aggregate

    All levelexplode

    Issueplannedorder

    Compare

    plan order

    Scrapallowance

    yes

  • 8/8/2019 Production Planning and control (PPC)

    4/14

    ` Process Planning is a process of establishingthe shortest and the most economical paththat is to be followed from a point it is

    received as a raw material in the shop flooruntil it is completed as finished product.

  • 8/8/2019 Production Planning and control (PPC)

    5/14

    ` The document which gives the processplanning is called as process sheet.

    ` Input to the process planning

    1. Drawing2. Machine capacity chart

    3. Available tooling

  • 8/8/2019 Production Planning and control (PPC)

    6/14

    ` Factors to be considered in process planning

    1. Order quantity

    2. Delivery component

    3. Skill of manpower4. Other resources

  • 8/8/2019 Production Planning and control (PPC)

    7/14

    1. Study the component drawing

    2. Draw the list of machine

    3. Prepare the list of operation

    4. Fix up the sequence of operation5. Insert auxiliary operation

    6. Write down route sheet

  • 8/8/2019 Production Planning and control (PPC)

    8/14

    1. Continuous and mass production

    2. Batch production

    3. Job order production

  • 8/8/2019 Production Planning and control (PPC)

    9/14

    ` It concerns the physical release ofmanufacturing order and allocation of jobsto work men on different machine with

    drawing material and tools for such a jobfrom stores and delivery in advance toshops

  • 8/8/2019 Production Planning and control (PPC)

    10/14

    ` Release of manufacturing order

    ` Stores issue

    ` Return the surplus material

    ` Tool issues` Shop and inter departmental transport

    ` Inspection

    ` Coordination with scheduler

  • 8/8/2019 Production Planning and control (PPC)

    11/14

    ` It is a process of checking actualperformance against production plan andreporting the deviation

    ` Number of factors that push schedule of themark are

    1. delay in material receipt

    2. Excessive absentism

    3. Strikes

  • 8/8/2019 Production Planning and control (PPC)

    12/14

    ` Collecting information from manufacturingshop

    A. Physical count

    B. Daily production reportC. Job card

    D. Detachable ticket

  • 8/8/2019 Production Planning and control (PPC)

    13/14

    ` Recording progress of work and comparisonof actual progress against plan

    1. Progress card

    2. Display board3. Network updating

  • 8/8/2019 Production Planning and control (PPC)

    14/14

    ` Expediting to rush up remaining operation

    ` Communicating anticipated delays to salesdepartment and customers