February 24, 2006 1
Joint Program Executive Office for Chemical and Biological Defense
Product DirectorTest Equipment, Strategy and Support
March 9, 2006
Individual Protection ConferenceMarch 7-9, 2006
Nicole TrudelJPEOCBD
Chief, Test and [email protected]
February 24, 2006 2
Joint Program Executive Office for Chemical and Biological Defense
PD-TESS Mission
The Product Director Test Equipment, Test Equipment, Strategy, and Support Will Support the Strategy, and Support Will Support the
Milestone Decision Authority, Joint Milestone Decision Authority, Joint Project Managers, and the Test and Project Managers, and the Test and
Evaluation Community with the Evaluation Community with the Development of Test Capabilities to Development of Test Capabilities to
Adequately Test and Evaluate, Chemical, Adequately Test and Evaluate, Chemical, Biological, Radiological, and Nuclear Biological, Radiological, and Nuclear Defense Systems Throughout the Life Defense Systems Throughout the Life
Cycle Acquisition Process. Cycle Acquisition Process.
MISSION
February 24, 2006 3
Joint Program Executive Office for Chemical and Biological Defense
Background
• The CBDP received an unprecedented $443 M to support T&E infrastructure development and improvements through the FY06 Enhanced Planning Process.
• Efficiencies will be gained through a new organization, “PD TESS” established by the JPEOCBD to provide centralized planning, management and accountability for executing the newly approved Joint T&E investment strategy.
• The new funding will support execution of a prioritized list of projects vetted through the Joint T&E Executive for CBD that will close T&E capability gaps identified by the joint community.
• Planned T&E capabilities will allow JPEOCBD to develop and assess the newest technologies and provide the best force protection capability to warfighters.
February 24, 2006 4
Joint Program Executive Office for Chemical and Biological Defense
PD TESS Structure
T&E Strategy/FacilityDevelopment
T&E Strategy/FacilityDevelopment
ShapeShape
PD TESSPD TESS
Range SupportMAJ
Range SupportMAJ
DeputyMAJ
DeputyMAJ
AdministrativeAdministrative
ContractsContracts
BusinessAcquisition Manager
BusinessAcquisition Manager
SenseLaboratory (Chem)
SenseLaboratory (Chem)
SenseField
SenseField
Shield/SustainShield/Sustain Threat/SimulantThreat/Simulant
Bio StandoffChamber
Bio StandoffChamber
WSLAT ChamberWSLAT Chamber
Standard Unit ofMeasure
Standard Unit ofMeasure
Chem StandoffChamber
Chem StandoffChamber
NTA ChambersNTA Chambers
Dynamic TestChamber
Dynamic TestChamber
Test Grid & SafariTest Grid & Safari
SpectroradiometerSpectroradiometer
Stimulants andStimulators
Stimulants andStimulators
Synthetic TestEnvironment
Synthetic TestEnvironment
XYZ EffortsXYZ Efforts
ColPro AirflowMapping
ColPro AirflowMapping
LC / GCLC / GC
Threat AgentScience
Threat AgentScience
6.3 Coordination6.3 Coordination
SimulantDevelopment
SimulantDevelopment
Decon FacilityUpgrades
Decon FacilityUpgrades
MIST UpgradeMIST Upgrade
MannequinCapability
MannequinCapability
ColPro UpgradesColPro Upgrades
CBARTCBART
ASC & JABTUpgrades
ASC & JABTUpgrades
Modeling andSimulation
Modeling andSimulation
Bio Spectral Instr QA/QC
Bio Spectral Instr QA/QC
SenseLaboratory (Bio)
SenseLaboratory (Bio)
February 24, 2006 5
Joint Program Executive Office for Chemical and Biological Defense
Coordinated Planning Process
• Capability Gaps Identified by Commodity Areas.
• Vetting Completed by the TECMIPT AcrossCommodity Areas.
• Prioritization and Resourcing Recommendations are Formalized by the AO IPT.
• Infrastructure Investment Strategy Approved by the CBDP Executive Leadership.
February 24, 2006 6
Joint Program Executive Office for Chemical and Biological Defense
JRO CBRN JCIDS
If No Material Solution
Joint Project
Manager
ChemChem Bio Bio Defense Defense SystemSystem
JSTO
S&T/ CB S&T/ CB TechnologiesTechnologies
System T&E WIPT
T&E T&E Strategy/ Strategy/
TEMPTEMP
JPEOCBD
ApproveApprove
Vet/ Vet/ RecommendRecommend
JPM NBC CA
AO IPT
PrioritizePrioritize
T&E Executive IPT
ApproveApprove
T&E Capabilities
& Methodology
IPT
SuperviseSupervise
T&E Capabilities
PD TESS
ExecuteExecute
JPMs
Safe & Safe & Effective Effective
Systems to Systems to the the
WarfightersWarfighters
Technology Development
Strategy
T&E T&E StrategiesStrategies
Annual Updates at the T&E Review
Transition Quarterly ReviewsTransition Quarterly Reviews
T& E Capabilities Project Development & Strategy Approval Process
JPM PROGRAM REQUIREMENTS DRIVE THE PROCESSJPM PROGRAM REQUIREMENTS DRIVE THE PROCESS
February 24, 2006 7
Joint Program Executive Office for Chemical and Biological Defense
Test Capability GapsVetting Process
JPM-IS JPM-DC JPM-IP JPM-CP JPM-BD JPM-CA
Information Systems Decontamination Protection Bio Detection Chem
Detection
TECMIPT
February 24, 2006 8
Joint Program Executive Office for Chemical and Biological Defense
S&T Thrust JPM Independent Testers
PTA
Solution
SHIELDSHIELD
Today Desired
• Swatch Testing– Traditional Chemical Agents – DPG/ECBC
(SMARTMAN, Boot, Glove)– Simulants – Natick, ECBC and DPG
• Filter Testing– Traditional Chemical Agents – ECBC and DPG– Simulants – ECBC and DPG
• Limited full CB system performance simulant testing (MIST) – DPG
• IPE Model• Agent/Simulant Correlation• Standardized list for TIC Threats and battlefield contaminants• Full system simulant testing (IPE Test Grid)• Traditional and Biological agent testing (Sweating Articulated Mannequin)• Swatch and Filter Agent (TIC/TIM and NTA) testing• T/RH variation• Cartesian grid• Air flow mapping• Air quality• Field operational effects capability
Individual Protection Equipment (IPE)Commodity Capability Package
• Agent (Chem, Bio, TIC, NTA) and Simulant Swatch Qualification
• Agent (Chem, Bio, TIC, NTA) and Simulant Filter Qualification
• IPE System Model Validation
• IPE Model• Agent/Simulant Correlation• Standardized list for TIC Threats
and Battlefield Contaminants• Air flow mapping under ensemble• Cartesian grid• Air quality measurement and
control• Field operational effects capability
• Full System Networked Field Simulant Testing
• Model accreditation
T&EInvestment
Strategy
• Full System CB Simulant Testing at DPG• NTA Swatch and Filter Testing at ECBC• Traditional Agent and TIC/TIM (swatch
and filter) Testing at ECBC and DPG
• Full System Traditional Agent Testing at DPG (mannequin)• Swatch Chemical Simulant Testing at Natick
February 24, 2006 9
Joint Program Executive Office for Chemical and Biological Defense
6.4/6.5
CA7 (DPG)
SHIELDSHIELDFY11FY06 FY07 FY08 FY09 FY10
Individual Protection Equipment (IPE)Capability Gaps
Capability Gaps:
• Live agent testing
• Movement in suit over time as it affects performance
• Modeling of IPE system performance
Lab Equipment (FY06):A. Water Jet Cutting Machine precision sample cutting machineB. High Performance Liquid Chromatography lab test equipmentC. ElectrophoresisD. Perkin-Elmer FluorometerE. Versatile Test Glove Box
Support Software/IT Equipment (FY11):A. Test/Training Enabling Architecture
(TENA) compliance
SupportSoftwaret/IT Equipment (FY06):A. Test Data Management ArchitectureB. Lab Info Management System (LIMS)C. Advanced Real-Time Monitoring
NTA Facility
6.3 Base and Supplemental6.3 Supplemental (FY08):A. IPE Air Flow MappingB. IPE Force ApplicationC. TIC/Battlefield ContaminantsD. IPE Overarching ModelE. Agent Simulant Correlation
6.3 Base Efforts (FY06):A. NTA Chemistry
6.3 Supplemental (FY07):A. Droplet Particle Size
6.3 Supplemerntal Efforts (FY06):A. NTA Methodology
IPE XYZ Grid Dev
IPE Mannequin Development
Upgrade MIST Chamber
February 24, 2006 10
Joint Program Executive Office for Chemical and Biological Defense
Questions?
http://www.jpeocbd.osd.mil/
February 24, 2006 11
Joint Program Executive Office for Chemical and Biological Defense
BACKUPSBACKUPS
February 24, 2006 12
Joint Program Executive Office for Chemical and Biological Defense
Acronym Key
AO – Action OfficerASC - Active Standoff Chamber Bio – BiologicalCBART – Chemical Biological Agent Resistant TestsCBD – Chemical Biological DefenseCBDP – Chemical Biological Defense ProgramCBRN – Chemical, Biological, Radiological, NuclearChem - ChemicalCOLPRO – Collective Protection DPG – Dugway Proving GroundECBC – Edgewood Chemical Biological CenterFY06 – Fiscal year 2006IPE – Individual Protection equipmentIPT – Integrated Process TeamJABT – Joint Ambient Breeze TunnelJCIDS – Joint Capabilities Integration and Development SystemJPEOCBD – Joint Program Executive Office for Chemical and Biological DefenseJPM – Joint Project ManagerJPM-BD – Joint Project Manager, Biological DefenseJPM-CA – Joint Project Manager, (NBC) Contamination AvoidanceJPM-CP – Joint Project Manager, Collective ProtectionJPM-DC – Joint Project Manager, DecontaminationJPM-IP – Joint Project Manager, Individual ProtectionJPM-IS – Joint Project Manager, Information Systems
February 24, 2006 13
Joint Program Executive Office for Chemical and Biological Defense
Acronym Key (Cont.)
JRO – Joint Requirement OfficeJSTO – Joint Science and Technology OfficeLC/GC - Liquid Chromatograph/Gas Chromatograph MIST - Man-in-Simulant Test NBC – Nuclear, Biological, ChemicalNBC CA – Nuclear, Biological, Chemical Contamination AvoidanceNTA - Non Traditional Agent PD TESS – Product Director, Test Equipment, Strategy, and SupportPTA – Primary Test ActivityQA/QC – Quality Assurance and Quality ControlS&T – Science & TechnologyT&E – Test & EvaluationTECMIPT – Test & Evaluation Capabilities and Methodology IPTTENA – Test/Training Enabling ArchitectureTIC – Toxic Industrial ChemicalTIM – Toxic Industrial MaterialT/RH – Temperature/Relative HumidityWIPT – Working Integrated Process TeamWSLAT – Whole System Live Agent Testing