PROCUREMENT METHODS AND PRIOR R (a) Goods/Works: All ICB contracts for Goods and Works; First two NCB contracts for Goods and First two NCB contracts for Works irrespec First Shopping contract for Goods and First Shopping contract for Works. b) Consultants services FIRMS: All contracts with consulting firms estimated to cost US$300,000 or more; First contract with consulting firms selected on the basis of Consultants Qualifications ( Individual Consultant All contracts with individual consultants estimated to US$50,000 or more All contracts with PIU staff irrespective of the cost of the contract; General: - The Terms of Reference for all consultant contracts with consulting firms and Short lists comprising entirely national consultants shall be for assignments below ICB NCB $ USD $ USD Goods Works Goods Works ICB NCB $ USD $ USD Goods Works Goods Works Procurement method thresh 1.000.000 5.000.000 < 1.000.000 <5.000.000 Prior review threshold All All First 2& >2.000.000;First 2&>10.000.000 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Procurement method threshold Prior review thresholddocuments.worldbank.org/curated/en/453121513229138987/pdf/122061-PROP... · PROCUREMENT METHODS AND PRIOR REVIEW THRESHOLDS First

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Procurement method threshold Prior review thresholddocuments.worldbank.org/curated/en/453121513229138987/pdf/122061-PROP... · PROCUREMENT METHODS AND PRIOR REVIEW THRESHOLDS First

PROCUREMENT METHODS AND PRIOR REVIEW THRESHOLDS

(a) Goods/Works:

All ICB contracts for Goods and Works; First two NCB contracts for Goods and First two NCB contracts for Works irrespective of the cost of the contract;

First Shopping contract for Goods and First Shopping contract for Works.

b) Consultants services

FIRMS:

All contracts with consulting firms estimated to cost US$300,000 or more; First contract with consulting firms selected on the basis of Consultants Qualifications (CQ)

Individual Consultant

All contracts with individual consultants estimated to US$50,000 or more 

All contracts with PIU staff irrespective of the cost of the contract;

General:

-       The Terms of Reference for all consultant contracts with consulting firms and individual consultants irrespective of their costs;

Short lists comprising entirely national consultants shall be for assignments below USD 300,000;

ICB NCB

$ USD $ USD

Goods Works Goods Works

ICB NCB

$ USD $ USD

Goods Works Goods Works

*Individual Consultant Prior Review only under exceptional circumstances

Procurement method threshold

≥1.000.000 ≥ 5.000.000 < 1.000.000 <5.000.000

Prior review threshold

All All First 2& >2.000.000;First 2&>10.000.000

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: Procurement method threshold Prior review thresholddocuments.worldbank.org/curated/en/453121513229138987/pdf/122061-PROP... · PROCUREMENT METHODS AND PRIOR REVIEW THRESHOLDS First
Page 3: Procurement method threshold Prior review thresholddocuments.worldbank.org/curated/en/453121513229138987/pdf/122061-PROP... · PROCUREMENT METHODS AND PRIOR REVIEW THRESHOLDS First

PROCUREMENT METHODS AND PRIOR REVIEW THRESHOLDS

First two NCB contracts for Goods and First two NCB contracts for Works irrespective of the cost of the contract;

First contract with consulting firms selected on the basis of Consultants Qualifications (CQ)

-       The Terms of Reference for all consultant contracts with consulting firms and individual consultants irrespective of their costs;

Short lists comprising entirely national consultants shall be for assignments below USD 300,000;

SHOPPING

$ USD

Goods Works

CONSULTANTS

$ USD

Firms Individual*

*Individual Consultant Prior Review only under exceptional circumstances

Procurement method threshold

≤ 100.000 ≤ 200.000

Prior review threshold

>1.000.000 > 300.000

Page 4: Procurement method threshold Prior review thresholddocuments.worldbank.org/curated/en/453121513229138987/pdf/122061-PROP... · PROCUREMENT METHODS AND PRIOR REVIEW THRESHOLDS First
Page 5: Procurement method threshold Prior review thresholddocuments.worldbank.org/curated/en/453121513229138987/pdf/122061-PROP... · PROCUREMENT METHODS AND PRIOR REVIEW THRESHOLDS First

Procurement Ref. #B&H Energy Efficiency Project-RS

Name of Assignment / Contract

Pla

n v

s./

Ac

tual

Estimated Amount

(US$)

Contracted Amount

(US$)

Contracted amount

financed from Loan

Contracted

amount financed

from VAT Typ

e-

Cate

go

ry

Procureme

nt Method

Review

by Bank

Prior /

Post

Document

preparation Days

Inte

rval

Expressio

n of

Interest Days

Inte

rval

Invitation

for Bids

/RFP Days

Inte

rval

Bid Opening

Days

Inte

rval

Evaluation

& Recomm. Days

Inte

rval

Contract

Award Days

Inte

rval

Start

Days

Inte

rval

Completio

n DateContractor

1 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

COMPONENT 1-SERVICES

3. SERVICES

Component 1.1, 1.2 and 1.3

BA-BEEP-CQ-08-CS-

14-5393BA-RS

Preparation of detailed energy audits, technical

design, works supervision and monitoring -

1. Student Center Trebinje

2. Elementary School "Sveti Sava" Bileca

3. Elementary School "Sveti Sava" Brod

4. Elementary School "Petar Kocic" Mrkonjic Grad5.

Elementary School "Aleksa Santic" Banja Luka;

6. SC "Đuro Radmanović" Novi Grad

7. Secondary School "28. juni" Istocno Novo Sarajevo;

8. Elementary School "Drinic" Drinic-Petrovac;

P CS CQ Prior 30/Nov/14 30 30/Dec/14 24 23-Jan-15 14 6-Feb-15 14 20-Feb-15 15 7-Mar-15 28 4-Apr-15 360 29-Mar-16

A CS CQ Prior 18/Feb/15 14 4/Mar/15 63 6-May-15 21 27-May-15 23 19-Jun-15 24 13-Jul-15 7 20-Jul-15 650 30-Apr-17

P143580-BA-BEEP-

CQ-09-CS-14-

5393BA-RS

Preparation of detailed energy audits, technical

design, works supervision and monitoring -

1. Hospital Foča

2. Hospital Zvornik

P CS CQ Post 30/Nov/14 150 29/Apr/15 24 23-May-15 14 6-Jun-15 14 20-Jun-15 15 5-Jul-15 28 2-Aug-15 300 28-May-16

A CS CQ Post 30/Nov/14 162 11/May/15 79 29-Jul-15 14 12-Aug-15 13 25-Aug-15 21 15-Sep-15 3 18-Sep-15 590 30-Apr-17

BA-BEEP-CQ-11-CS-

14-5393BA-RSPreliminary Energy Audit for 50 new buildings P CS CQ Post 5/Mar/15 5 10/Mar/15 18 28-Mar-15 14 11-Apr-15 7 18-Apr-15 7 25-Apr-15 7 2-May-15 119 29-Aug-15

A CS CQ Post 5/Feb/15 13 18/Feb/15 76 5-May-15 14 19-May-15 31 19-Jun-15 25 14-Jul-15 7 21-Jul-15 139 7-Dec-15

P143580-BA-BEEP-

5393BA-QBS-CS-14-

16-RS

Preparation of technical design and works supervision

for retrofitting of public buildingsP CS QBS Prior 24/Aug/15 10 3/Sep/15 78 20-Nov-15 44 3-Jan-16 16 19-Jan-16 28 16-Feb-16 7 23-Feb-16 490 27-Jun-17

A CS CQ Post 24/Aug/15 10 3/Sep/15 134 15-Jan-16 42 26-Feb-16 77 13-May-16 6 19-May-16 7 26-May-16 730 26-May-18

P143580-BA-BEEP-

5393BA-CQ-CS-14-

17-RS

Technical design audit P CS CQ Post 1/Feb/16 5 6/Feb/16 24 1-Mar-16 14 15-Mar-16 14 29-Mar-16 15 13-Apr-16 45 28-May-16 21 18-Jun-16

A CS CQ Post 6/Feb/16 5 11/Feb/16 53 4-Apr-16 14 18-Apr-16 17 5-May-16 6 11-May-16 0 11-May-16 91 10-Aug-16

BA-BEEP-CQ-15-CS-

14-5393BA-RSSocial monitoring and evaluation P CS CQ Post 25/Dec/14 5 30/Dec/14 18 17-Jan-15 14 31-Jan-15 7 7-Feb-15 7 14-Feb-15 7 21-Feb-15 1134 31-Mar-18

A CS CQ Post 25/Dec/14 55 18/Feb/15 99 28-May-15 14 11-Jun-15 14 25-Jun-15 36 31-Jul-15 10 10-Aug-15 1025 31-May-18

P143580-BA-BEEP-

5393BA-CQ-CS-15-

30-RS

Preparation of detailed energy audits, technical

monitoring before and after and technical

documentation for energy labels for retrofitted public

buildings

P CS CQ Post 28/Aug/15 5 2/Sep/15 68 9-Nov-15 21 30-Nov-15 7 7-Dec-15 7 14-Dec-15 7 21-Dec-15 490 24-Apr-17

A CS CQ Post 28/Aug/15 5 2/Sep/15 68 9-Nov-15 21 30-Nov-15 90 28-Feb-16 24 23/Mar/16 0 23-Mar-16 730 23-Mar-18

P143580-BA-BEEP-

5393BA-CQ-CS-14-

14-RS

Technical design audit for new buildings P CS CQ Post 5/Oct/16 14 19/Oct/16 14 2-Nov-16 14 16-Nov-16 14 30-Nov-16 5 5-Dec-16 1 6-Dec-16 60 4-Feb-17

A CS CQ Post 5/Oct/16 14 19/Oct/16 40 28-Nov-16 14 12-Dec-16 3 15-Dec-16 6 21-Dec-16 0 21-Dec-16 76 7-Mar-17

P143580-BA-BEEP-

5393BA-CQ-CS-17-

52-RS

Preparation of technical documentation for energy

labels for retrofitted public buildings

P CS CQ Post 10/Apr/17 8 18/Apr/17 14 2-May-17 14 16-May-17 14 30-May-17 5 4-Jun-17 1 5-Jun-17 90 3-Sep-17

A

P143580-BA-BEEP-

5393BA-CQ-CS-17-

56-RS

Preparation of technical documentation for energy

labels for retrofitted public buildings (Faculty of

Science)

P CS CQ Post 10/Apr/17 8 18/Apr/17 14 2-May-17 14 16-May-17 14 30-May-17 5 4-Jun-17 1 5-Jun-17 90 3-Sep-17

A

To Be Allocated P

TOTAL COMPONENT 1 - SERVICES P

Contracted SERVICES A

To Be Contracted A

COMPONENT 2

Page 6: Procurement method threshold Prior review thresholddocuments.worldbank.org/curated/en/453121513229138987/pdf/122061-PROP... · PROCUREMENT METHODS AND PRIOR REVIEW THRESHOLDS First

P143580-BA-BEEP-

5393BA-IC-CS-14-18-

RS

Individual consultant for preparation of Study on

development of scalable financing mechanism -Public

ESCO

P CS IC Post 9/Sep/17 5 14-Sep-17 N/A 7 21-Sep-17 1 22-Sep-17 2 24-Sep-17 1 25-Sep-17 90 24-Dec-17

A 21/Aug/17 11 1-Sep-17 N/A 2 3-Sep-17 1 4-Sep-17 60 3-Nov-17 10 13-Nov-17 105 26-Feb-18

P143580-BA-BEEP-

5393BA-IC-CS-17-51-

RS

Individual consultant for review of Study on

development of scalable financing mechanism -Public

ESCO

P CS IC Post 4/Jun/17 5 9-Jun-17 N/A 7 16-Jun-17 1 17-Jun-17 2 19-Jun-17 1 20-Jun-17 120 18-Oct-17

A

P143580-BA-BEEP-

5393BA-IC-CS-15-33-

RS

Study on collecting savings P CS IC Post 15/Dec/15 5 20/Dec/15 18 7-Jan-16 14 21-Jan-16 14 4-Feb-16 15 19-Feb-16 7 26-Feb-16 180 24-Aug-16

A 20/Jun/16 14 4-Jul-16 N/A 16 20-Jul-16 7 27-Jul-16 13 9-Aug-16 0 9-Aug-16 304 9-Jun-17

P143580-BA-BEEP-

5393BA-IC-CS-15-34-

RS

Technical assistance on ESCO model piloting P CS IC Post 17/Aug/17 5 22-Aug-17 N/A 7 29-Aug-17 1 30-Aug-17 2 1-Sep-17 1 2-Sep-17 150 30-Jan-18

A

P143580-BA-BEEP-

5393BA-IC-CS-15-35-

RS

Study on the macroeconomic impact of energy

efficiency measures P CS IC Post 17/Aug/17 5 22-Aug-17 N/A 7 29-Aug-17 1 30-Aug-17 2 1-Sep-17 1 2-Sep-17 90 1-Dec-17

A

P143580-BA-BEEP-

5393BA-SH-NCS-14-

19-RS

Study tour on scalable financing mechanisms P NCS SH Post 1/Dec/17 5 n/a 18 6-Dec-17 14 20-Dec-17 7 27-Dec-17 7 3-Jan-18 7 10-Jan-18 7 17-Jan-18

A

P143580-BA-BEEP-

5393BA-IC-CS-14-20-

RS

Trainings for municipal energy management/labelling,

other trainings (multiple)P CS IC Post 20/Sep/17 5 25/Sep/17 18 13-Oct-17 14 27-Oct-17 7 3-Nov-17 7 10-Nov-17 2 12-Nov-17 90 10-Feb-18

A

P143580-BA-BEEP-

5393BA-IC-CS-14-21-

RS

Preparation of TORs for IC (information system) P CS IC Post 7/Aug/17 5 12/Aug/17 5 17-Aug-17 7 24-Aug-17 1 25-Aug-17 5 30-Aug-17 2 1-Sep-17 20 21-Sep-17

A

P143580-BA-BEEP-

5393BA-IC-CS-17-53-

RS

Development of information system concept (IC

energy expert)P CS IC Post 10/Sep/17 5 15/Sep/17 5 20-Sep-17 7 27-Sep-17 1 28-Sep-17 5 3-Oct-17 2 5-Oct-17 60 4-Dec-17

A

P143580-BA-BEEP-

5393BA-IC-CS-17-55-

RS

Development of information system concept (IC

Programming expert)

P CS IC Post 10/Sep/17 5 15/Sep/17 5 20-Sep-17 7 27-Sep-17 1 28-Sep-17 5 3-Oct-17 2 5-Oct-17 60 4-Dec-17

A

P143580-BA-BEEP-

5393BA-QBS-CS-14-

23-RS

Preparation of data base-software of information

systemP CS QBS Post 15/Oct/17 10 25/Oct/17 30 24-Nov-17 7 1-Dec-17 16 17-Dec-17 28 14-Jan-18 7 21-Jan-18 120 21-May-18

A

P143580-BA-BEEP-

5393BA-IC-CS-17-60-

RS

Individual consultant for review and supervision of

data base-softver of information systemP CS IC Post 10/Jan/18 5 15/Jan/18 5 20-Jan-18 7 27-Jan-18 1 28-Jan-18 5 2-Feb-18 2 4-Feb-18 120 4-Jun-18

A

BA-BEEP-CQ-22-CS-

14-5393BA-RSCommunication activities P CS CQ Prior 1/Jan/15 5 6/Jan/15 18 24-Jan-15 14 7-Feb-15 14 21-Feb-15 15 8-Mar-15 7 15-Mar-15 600 4-Nov-16

A CS CQ Prior 3/Jan/15 46 18/Feb/15 76 5-May-15 14 19-May-15 10 29-May-15 6 4-Jun-15 7 11-Jun-15 934 31-Dec-17

P143580-BA-BEEP-

5393BA-IC-CS-16-37-

RS

Individual consultant for preliminary energy audit of 3

buildingsP CS IC Post 14/Apr/16 11 25-Apr-16 N/A 7 2-May-16 1 3-May-16 1 4-May-16 0 4-May-16 30 3-Jun-16

A 14/Apr/16 11 25-Apr-16 N/A 4 29-Apr-16 4 3-May-16 1 4-May-16 0 4-May-16 30 3-Jun-16

P143580-BA-BEEP-

5393BA-IC-CS-16-46-

RS

Individual consultant for preliminary energy audit of 2

buildingsP CS IC Post 1/Dec/16 11 12-Dec-16 N/A 7 19-Dec-16 1 20-Dec-16 1 21-Dec-16 0 21-Dec-16 31 21-Jan-17

A 1/Dec/16 8 9-Dec-16 N/A 13 22-Dec-16 4 26-Dec-16 4 30-Dec-16 0 30-Dec-16 31 30-Jan-17

P143580-BA-BEEP-

5393BA-IC-CS-16-47-

RS

Individual consultant for preliminary energy audit of 3

buildingsP CS IC Post 31/Dec/16 10 10-Jan-17 N/A 7 17-Jan-17 1 18-Jan-17 1 19-Jan-17 0 19-Jan-17 31 19-Feb-17

A 10/Jan/17 6 16-Jan-17 N/A 4 20-Jan-17 0 20-Jan-17 0 20-Jan-17 0 20-Jan-17 31 20-Feb-17

P143580-BA-BEEP-

5393BA-IC-CS-17-50-

RS

Individual consultant for preliminary energy audit of 3

buildingsP CS IC Post 20/Jan/17 3 23-Jan-17 N/A 10 2-Feb-17 0 2-Feb-17 8 10-Feb-17 0 10-Feb-17 28 10-Mar-17

A 23/Jan/17 10 2-Feb-17 N/A 5 7-Feb-17 1 8-Feb-17 2 10-Feb-17 0 10-Feb-17 28 10-Mar-17

P143580-BA-BEEP-

5393BA-IC-CS-17-67-

RS

Individual consultant for detailed energy audit of one

kindergartenp CS IC Post 20/Nov/17 5 25/Nov/17 N/A 14 9-Dec-17 14 23-Dec-17 2 25-Dec-17 0 25-Dec-17 30 24-Jan-18

A

P143580-BA-BEEP-

5393BA-SS-CS-17-72-

RS

Consultant for establishing collection of savings P CS SS Post 20/Dec/17 5 25/Dec/17 N/A 14 8-Jan-18 14 22-Jan-18 2 24-Jan-18 0 24-Jan-18 30 23-Feb-18

Workshop 1 CS SOE

Technical advisers (multiple) CS IC

Workshop 2 CS SOE

To be allocated

TOTAL COMPONENT 2

Contracted COMPONENT 2 A

To be Contracted

Page 7: Procurement method threshold Prior review thresholddocuments.worldbank.org/curated/en/453121513229138987/pdf/122061-PROP... · PROCUREMENT METHODS AND PRIOR REVIEW THRESHOLDS First

COMPONENT 3

P143580-BA-BEEP-

5393BA-IC-CS-15-25-

RS

Accountant/Disbursement Specialist P CS IC Prior 29/Apr/15 5 4-May-15 5 9-May-15 7 16-May-15 1 17-May-15 5 22-May-15 3 25-May-15 1310 25-Dec-18

A 29/Apr/15 16 15-May-15 N/A 7 22-May-15 5 27-May-15 20 16-Jun-15 46 1-Aug-15 1248 31-Dec-18

P143580-BA-BEEP-

5393BA-IC-CS-15-26-

RS

Procurement Manager P CS IC Prior 22/May/15 5 27-May-15 5 1-Jun-15 7 8-Jun-15 1 9-Jun-15 5 14-Jun-15 3 17-Jun-15 1287 25-Dec-18

A 5/Jun/15 5 10-Jun-15 7 17-Jun-15 1 18-Jun-15 0 18-Jun-15 867 1-Nov-17 0 1-Nov-17 241 30-Jun-18

P143580-BA-BEEP-

5393BA-IC-CS-15-31-

RS

Procurement Manager P CS IC Prior 7/Aug/15 5 12-Aug-15 N/A 7 19-Aug-15 1 20-Aug-15 12 1-Sep-15 0 1-Sep-15 180 28-Feb-16

A 7/Aug/15 5 12-Aug-15 N/A 7 19-Aug-15 1 20-Aug-15 12 1-Sep-15 0 1-Sep-15 791 31-Oct-17

P143580-BA-BEEP-

5393BA-IC-CS-15-32-

RS

Building Expert P CS IC Post 20/Aug/15 5 25-Aug-15 N/A 7 1-Sep-15 1 2-Sep-15 2 4-Sep-15 1 5-Sep-15 1213 31-Dec-18

A 20/Aug/15 5 25-Aug-15 N/A 7 1-Sep-15 1 2-Sep-15 2 4-Sep-15 1 5-Sep-15 1213 31-Dec-18

P143580-BA-BEEP-

5393BA-IC-CS-15-27-

RS

Building Expert P CS IC Post 22/May/15 5 27-May-15 5 1-Jun-15 7 8-Jun-15 1 9-Jun-15 5 14-Jun-15 3 17-Jun-15 1287 25-Dec-18

A 5/Aug/15 5 10-Aug-15 N/A 7 17-Aug-15 1 18-Aug-15 5 23-Aug-15 8 31-Aug-15 1218 31-Dec-18

P143580-BA-BEEP-

5393BA-IC-CS-15-28-

RS

Communication and Coordination Expert P CS IC Post 1/Jun/15 5 6-Jun-15 5 11-Jun-15 7 18-Jun-15 1 19-Jun-15 5 24-Jun-15 3 27-Jun-15 183 27-Dec-15

A 1/Jun/15 10 11-Jun-15 N/A 7 18-Jun-15 1 19-Jun-15 5 24-Jun-15 7 1-Jul-15 914 31-Dec-17

P143580-BA-BEEP-

5393BA-IC-CS-15-29-

RS

Operations officer P CS IC Post 12/Jan/17 5 17-Jan-17 N/A 7 24-Jan-17 1 25-Jan-17 5 30-Jan-17 2 1-Feb-17 514 30-Jun-18

A

P143580-BA-BEEP-

5393BA-IC-CS-17-61-

RS

Engineer for PIU P CS IC Post 12/Aug/17 5 17-Aug-17 N/A 7 24-Aug-17 1 25-Aug-17 5 30-Aug-17 2 1-Sep-17 300 28-Jun-18

P143580-BA-BEEP-

5393BA-IC-CS-17-62-

RS

Engineer for PIU P CS IC Post 12/Sep/17 5 17-Sep-17 N/A 7 24-Sep-17 1 25-Sep-17 5 30-Sep-17 2 2-Oct-17 270 29-Jun-18

P143580-BA-BEEP-

5393BA-IC-CS-17-63-

RS

Accountant/Administrative Assistant P CS IC Post 14/Oct/17 5 19-Oct-17 N/A 7 26-Oct-17 1 27-Oct-17 5 1-Nov-17 0 1-Nov-17 241 30-Jun-18

TOTAL COMPONENT 3 P

Contracted Component 3 A

To be Contracted

P

A

GRAND TOTAL CONSULTANT SERVICES

GRAND TOTAL CONSULTANT SERVICES CONTRACTED

GRAND TOTAL CONSULTANT SERVICES TO BE CONTRACTED

Page 8: Procurement method threshold Prior review thresholddocuments.worldbank.org/curated/en/453121513229138987/pdf/122061-PROP... · PROCUREMENT METHODS AND PRIOR REVIEW THRESHOLDS First

Procurement Ref. #B&H Energy Efficiency Project-RS

Name of Assignment / Contract

Pla

n v

s.

/

A

ctu

al

Estimated Amount

(US$)Contracted Amount(US$)

Contracted amount

financed from Loan

Contracted amount

financed from VAT

Ty

pe

-Ca

teg

ory

Procure

ment

Method

Review

by Bank

Prior /

Post

Document

preparation

Da

ys

In

terv

al

Invitation for

Bids

Da

ys

In

terv

al

Bid Opening

Da

ys

In

terv

al

Evaluation &

Recomm.

Da

ys

In

terv

al

Contract

Award

Da

ys

In

terv

al

Start

Da

ys

Ex

ec

uti

on

Completion

DateContractor

1 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

1.WORKS

P143580-BA-BEEP-

5393BA-NCB-W-14-1-

RS

1. Secondary School "28. juni" Istocno Novo

Sarajevo

2. Elementary School "Sveti Sava" Brod

P W NCB Post 5-Jun-16 5 10-Jun-16 28 8-Jul-16 14 22-Jul-16 14 5-Aug-16 6 11-Aug-16 60 10-Oct-16

Lot 1 A W 5-Jun-16 5 10-Jun-16 28 8-Jul-16 37 14-Aug-16 4 18-Aug-16 26 13-Sep-16 77 29-Nov-16

Lot 2 A W 5-Jun-16 5 10-Jun-16 28 8-Jul-16 37 14-Aug-16 4 18-Aug-16 26 13-Sep-16 91 13-Dec-16

P143580-BA-BEEP-

5393BA-NCB-W-14-2-

RS

1. Elementary School "Aleksa Santic" Banja Luka;

2. Elementary School "Petar Kocic" Mrkonjic

Grad; 3.

Elementary School "Drinic" Drinic-Petrovac

P W NCB Post 5-Jun-16 5 10-Jun-16 28 8-Jul-16 14 22-Jul-16 14 5-Aug-16 6 11-Aug-16 60 10-Oct-16

Lot 1 A W 5-Jun-16 5 10-Jun-16 28 8-Jul-16 37 14-Aug-16 22 5-Sep-16 8 13-Sep-16 98 20-Dec-16

Lot 2 A W 5-Jun-16 5 10-Jun-16 28 8-Jul-16 73 19-Sep-16 1 20-Sep-16 15 5-Oct-16 222 15-May-17

Lot 3 A 5-Jun-16 5 10-Jun-16 28 8-Jul-16 37 14-Aug-16 22 5-Sep-16 8 13-Sep-16 61 13-Nov-16

P143580-BA-BEEP-

5393BA-NCB-W-14-3-

RS

1. Student Center, Academy of Fine Arts and the

Faculty of Production and Management, Trebinje,

2. Elementary School "Sveti Sava" Bileca

P W NCB Post 4-Jun-16 5 9-Jun-16 28 7-Jul-16 14 21-Jul-16 14 4-Aug-16 6 10-Aug-16 60 9-Oct-16

Lot 1 A W 4-Jun-16 5 9-Jun-16 28 7-Jul-16 38 14-Aug-16 4 18-Aug-16 17 4-Sep-16 209 1-Apr-17

Lot 2 A W 4-Jun-16 5 9-Jun-16 28 7-Jul-16 57 2-Sep-16 3 5-Sep-16 13 18-Sep-16 120 16-Jan-17

COMPONENT 1

Component 1.1 - education

Page 9: Procurement method threshold Prior review thresholddocuments.worldbank.org/curated/en/453121513229138987/pdf/122061-PROP... · PROCUREMENT METHODS AND PRIOR REVIEW THRESHOLDS First

P143580-BA-BEEP-

5393BA-NCB-W-16-

38-RS

1. Elementary School "Sveti Sava" Kozarska

Dubica, 2.

Kindergarten ''Pčelica'' Kozarska Dubica, 3.

Secondary School ''Djuro Damjanović'' Novi Grad

P W NCB Post 5-Jun-16 5 10-Jun-16 28 8-Jul-16 14 22-Jul-16 14 5-Aug-16 6 11-Aug-16 60 10-Oct-16

Lot 1 A W 5-Jun-16 5 10-Jun-16 28 8-Jul-16 37 14-Aug-16 4 18-Aug-16 18 5-Sep-16 91 5-Dec-16

Lot 2 A W 5-Jun-16 5 10-Jun-16 28 8-Jul-16 56 2-Sep-16 3 5-Sep-16 15 20-Sep-16 61 20-Nov-16

Lot 3 A W 5-Jun-16 5 10-Jun-16 28 8-Jul-16 56 2-Sep-16 3 5-Sep-16 15 20-Sep-16 101 30-Dec-16

P143580-BA-BEEP-

5393BA-NCB-W-16-

39-RS

Faculty of Sciences Banja Luka P W NCB Post 12-Jun-16 5 17-Jun-16 31 18-Jul-16 14 1-Aug-16 14 15-Aug-16 6 21-Aug-16 90 19-Nov-16

A W 12-Jun-16 5 17-Jun-16 31 18-Jul-16 46 2-Sep-16 3 5-Sep-16 22 27-Sep-16 296 20-Jul-17

P143580-BA-BEEP-

5393BA-NCB-W-16-

40-RS

Elementary School ''Nikola Tesla'' Prnjavor P W NCB Post 12-Jun-16 4 16-Jun-16 28 14-Jul-16 14 28-Jul-16 14 11-Aug-16 6 17-Aug-16 90 15-Nov-16

A W 12-Jun-16 4 16-Jun-16 28 14-Jul-16 31 14-Aug-16 4 18-Aug-16 18 5-Sep-16 217 10-Apr-17

P143580-BA-BEEP-

5393BA-NCB-W-16-

41-RS

Gymnasium "Filip Visnjic" Bijeljina P W NCB Post 12-Jun-16 4 16-Jun-16 28 14-Jul-16 14 28-Jul-16 14 11-Aug-16 6 17-Aug-16 90 15-Nov-16

A W 12-Jun-16 4 16-Jun-16 28 14-Jul-16 31 14-Aug-16 16 30-Aug-16 6 5-Sep-16 217 10-Apr-17

P143580-BA-BEEP-

5393BA-NCB-W-16-

43-RS

Elementary School ''Danilo Borkovic'' Gradiska P W NCB Post 5-Jul-16 4 9-Jul-16 30 8-Aug-16 14 22-Aug-16 14 5-Sep-16 6 11-Sep-16 90 10-Dec-16

A W 5-Jul-16 4 9-Jul-16 30 8-Aug-16 25 2-Sep-16 3 5-Sep-16 24 29-Sep-16 202 19-Apr-17

P143580-BA-BEEP-

5393BA-NCB-W-16-

44-RS

Elementary School ''Dositej Obradovic'' Doboj P W NCB Post 5-Jul-16 4 9-Jul-16 30 8-Aug-16 14 22-Aug-16 14 5-Sep-16 6 11-Sep-16 90 10-Dec-16

A W 5-Jul-16 4 9-Jul-16 30 8-Aug-16 14 22-Aug-16 14 5-Sep-16 6 11-Sep-16 230 29-Apr-17

Page 10: Procurement method threshold Prior review thresholddocuments.worldbank.org/curated/en/453121513229138987/pdf/122061-PROP... · PROCUREMENT METHODS AND PRIOR REVIEW THRESHOLDS First

P143580-BA-BEEP-

5393BA-NCB-W-17-

54-RS

Reconstruction of public buildings

Lot 1: Gymnasium "Sveti Sava" Prijedor P W NCB Post 26-Feb-17 4 2-Mar-17 28 30-Mar-17 14 13-Apr-17 14 27-Apr-17 14 11-May-17 90 9-Aug-17

A W 26-Feb-17 4 2-Mar-17 28 30-Mar-17 22 21-Apr-17 19 10-May-17 22 1-Jun-17 92 1-Sep-17

Lot 3: Primary School "Mladen Stojanovic" Laktasi P W NCB Post 26-Feb-17 4 2-Mar-17 28 30-Mar-17 14 13-Apr-17 14 27-Apr-17 14 11-May-17 60 10-Jul-17

A W 26-Feb-17 4 2-Mar-17 28 30-Mar-17 22 21-Apr-17 19 10-May-17 22 1-Jun-17 92 1-Sep-17

Lot 4: Primary School "Sveti Sava" Zvornik P W NCB Post 26-Feb-17 4 2-Mar-17 28 30-Mar-17 14 13-Apr-17 14 27-Apr-17 14 11-May-17 120 8-Sep-17

A W 26-Feb-17 4 2-Mar-17 28 30-Mar-17 22 21-Apr-17 19 10-May-17 22 1-Jun-17 122 1-Oct-17

P143580-BA-BEEP-

5393BA-NCB-W-17-

57-RS

Reconstruction of heating system in Gymnasium

"Sveti Sava" Prijedor, NP Kozara and PS "Sveti

Sava" Zvornik

P W NCB Post 6/Apr/17 5 11-Apr-17 28 9-May-17 1 10-May-17 7 17-May-17 2 19-May-17 45 3-Jul-17

A W 6/May/17 6 12-May-17 28 9-Jun-17 3 12-Jun-17 35 17-Jul-17 22 8-Aug-17 45 22-Sep-17

P143580-BA-BEEP-

5393BA-NCB-W-17-

58-RS

Reconstruction of Primary School “Nemanja

Vlatkovic” SipovoP W NCB Post 24-Nov-17 4 28-Nov-17 28 26-Dec-17 14 9-Jan-18 14 23-Jan-18 22 14-Feb-18 90 15-May-18

P143580-BA-BEEP-

5393BA-NCB-W-17-

65-RS

Reconstruction of sanitary blocks for a number of

primary schoolsP W NCB Post 1-Dec-17 4 5-Dec-17 28 2-Jan-18 14 16-Jan-18 14 30-Jan-18 22 21-Feb-18 90 22-May-18

P143580-BA-BEEP-

5393BA-NCB-W-17-

70-RS

Reconstruction of Primary School “Vuk Stefanovic

Karadzic” Banja LukaP W NCB Post 1-Dec-17 4 5-Dec-17 28 2-Jan-18 14 16-Jan-18 14 30-Jan-18 30 1-Mar-18 90 30-May-18

P143580-BA-BEEP-

5393BA-NCB-W-17-

71-RS

Reconstruction of roof for Primary School “Dositej

Obradovic” DobojP W NCB Post 1-Dec-17 4 5-Dec-17 28 2-Jan-18 14 16-Jan-18 14 30-Jan-18 30 1-Mar-18 90 30-May-18

To Be Allocated

SUBTOTAL Component 1.1: P

Contracted Component 1.1: A

Page 11: Procurement method threshold Prior review thresholddocuments.worldbank.org/curated/en/453121513229138987/pdf/122061-PROP... · PROCUREMENT METHODS AND PRIOR REVIEW THRESHOLDS First

P143580-BA-BEEP-

5393BA-NCB-W-14-4-

RS

1. Hospital Foča P W NCB Prior 1-Dec-15 7 8-Dec-15 30 7-Jan-16 1 8-Jan-16 21 29-Jan-16 28 26-Feb-16 120 25-Jun-16

A W 23-Feb-16 7 1-Mar-16 28 29-Mar-16 21 19-Apr-16 3 22-Apr-16 52 13-Jun-16 306 15-Apr-17

P143580-BA-BEEP-

5393BA-NCB-W-15-5-

RS

1. Hospital Zvornik P W NCB Prior 1-Dec-15 7 8-Dec-15 30 7-Jan-16 1 8-Jan-16 21 29-Jan-16 28 26-Feb-16 120 25-Jun-16

A W 17-Feb-16 7 24-Feb-16 29 24-Mar-16 22 15-Apr-16 67 21-Jun-16 43 3-Aug-16 270 30-Apr-17

P143580-BA-BEEP-

5393BA-NCB-W-15-6-

RS

1. Building "A" - Psychotherapy, Prijedor P W NCB Post 1-Oct-17 5 6-Oct-17 30 5-Nov-17 1 6-Nov-17 15 21-Nov-17 28 19-Dec-17 120 18-Apr-18

P143580-BA-BEEP-

5393BA-NCB-W-16-

42-RS

JZU Helth Center - Polyclinic, Banja Luka P W NCB Post 12-Jun-16 4 16-Jun-16 28 14-Jul-16 14 28-Jul-16 14 11-Aug-16 6 17-Aug-16 90 15-Nov-16

A W 12-Jun-16 4 16-Jun-16 28 14-Jul-16 31 14-Aug-16 16 30-Aug-16 6 5-Sep-16 217 10-Apr-17

P143580-BA-BEEP-

5393BA-NCB-W-17-

54-RS

Reconstruction of public buildings, Lot 5: Hospital

FočaP W NCB Post 26-Feb-17 4 2-Mar-17 28 30-Mar-17 14 13-Apr-17 14 27-Apr-17 14 11-May-17 180 7-Nov-17

A W 26-Feb-17 4 2-Mar-17 28 30-Mar-17 22 21-Apr-17 19 10-May-17 22 1-Jun-17 182 30-Nov-17

P143580-BA-BEEP-

5393BA-NCB-W-17-

54-RS

Reconstruction of public buildings, Lot 6: JZU

Hospital Trebinje P W NCB Post 26-Feb-17 4 2-Mar-17 28 30-Mar-17 14 13-Apr-17 14 27-Apr-17 14 11-May-17 180 7-Nov-17

A W 26-Feb-17 4 2-Mar-17 28 30-Mar-17 22 21-Apr-17 19 10-May-17 22 1-Jun-17 183 1-Dec-17

P143580-BA-BEEP-

5393BA-NCB-W-17-

54-RS

Reconstruction of public buildings, Lot 7: Hospital

Foča (roof)P W NCB Post 26-Feb-17 4 2-Mar-17 28 30-Mar-17 14 13-Apr-17 14 27-Apr-17 14 11-May-17 60 10-Jul-17

A 26-Feb-17 4 2-Mar-17 28 30-Mar-17 22 21-Apr-17 157 25-Sep-17 22 17-Oct-17 61 17-Dec-17

P143580-BA-BEEP-

5393BA-NCB-W-17-

64-RS

Reconstruction of heating system in JZU Hospital

Trebinje

P W NCB Post 5-Jul-17 4 9-Jul-17 28 6-Aug-17 14 20-Aug-17 14 3-Sep-17 14 17-Sep-17 60 16-Nov-17

To Be allocated

SUBTOTAL Component 1.2: P

Contracted Component 1.2: A

P143580-BA-BEEP-

5393BA-NCB-W-17-

54-RS

Reconstruction of public buildings, Lot 2: JU NP

"Kozara" PrijedorP W NCB Post 26-Feb-17 4 2-Mar-17 28 30-Mar-17 14 13-Apr-17 14 27-Apr-17 14 11-May-17 60 10-Jul-17

A 26-Feb-17 4 2-Mar-17 28 30-Mar-17 22 21-Apr-17 19 10-May-17 22 1-Jun-17 60 31-Jul-17

P143580-BA-BEEP-

5393BA-NCB-W-17-

66-RS

Reconstruction of public building, one

Kindergarten P W NCB Post 16-Jan-18 4 20-Jan-18 28 17-Feb-18 14 3-Mar-18 7 10-Mar-18 14 24-Mar-18 60 23-May-18

To Be Allocated

SUBTOTAL Component 1.3:

Contracted Component 1.3: A

TOTAL WORKS:

TOTAL WORKS CONTRACTED:

TO BE CONTRACTED

2.GOODS

P143580-BA-BEEP-

5393BA-SH-G-15-7-

RS

IT equipment P G SH Post 3/Oct/15 5 8-Oct-15 14 22-Oct-15 1 23-Oct-15 7 30-Oct-15 2 1-Nov-15 30 1-Dec-15

A 3/Oct/15 5 8-Oct-15 14 22-Oct-15 6 28-Oct-15 2 30-Oct-15 1 31-Oct-15 30 30-Nov-15

P143580-BA-BEEP-

5393BA-SH-G-14-10-

RS

Vehicle P G SH Post 15/Sep/17 5 20-Sep-17 14 4-Oct-17 1 5-Oct-17 7 12-Oct-17 2 14-Oct-17 60 13-Dec-17

A 11/Sep/17 7 18-Sep-17 15 3-Oct-17 9 12-Oct-17 20 1-Nov-17 2 3-Nov-17 90 1-Feb-18

P143580-BA-BEEP-

5393BA-SH-G-14-13-

RS

Metering equipment P G SH Prior 1/Dec/15 5 6-Dec-15 14 20-Dec-15 1 21-Dec-15 7 28-Dec-15 2 30-Dec-15 170 17-Jun-16

A 14/Feb/16 5 19-Feb-16 14 4-Mar-16 14 18-Mar-16 4 22-Mar-16 0 22-Mar-16 14 5-Apr-16

P143580-BA-BEEP-

5393BA-SH-G-14-24-

RS

Database-hardware P G SH Post 1/May/16 5 6-May-16 14 20-May-16 1 21-May-16 7 28-May-16 2 30-May-16 150 27-Oct-16

A 23/Nov/16 5 28-Nov-16 15 13-Dec-16 9 22-Dec-16 4 26-Dec-16 0 26-Dec-16 50 14-Feb-17

P143580-BA-BEEP-

5393BA-SH-G-17-68-

RS

Supply of goods for reconstruction of PU High

School Center "Petar Kočić", SrbacP G SH Post 20/Nov/17 5 25-Nov-17 14 9-Dec-17 1 10-Dec-17 4 14-Dec-17 1 15-Dec-17 14 29-Dec-17

A

P143580-BA-BEEP-

5393BA-SH-G-17-69-

RS

Supply of metering equipment for 5 buildings P G SH Post 20/Nov/17 5 25-Nov-17 14 9-Dec-17 1 10-Dec-17 4 14-Dec-17 1 15-Dec-17 14 29-Dec-17

Component 1.3-social

Component 1.2-health

Page 12: Procurement method threshold Prior review thresholddocuments.worldbank.org/curated/en/453121513229138987/pdf/122061-PROP... · PROCUREMENT METHODS AND PRIOR REVIEW THRESHOLDS First

TOTAL GOODS: P

GOODS CONTRACTED: A

TO BE ALLOCATED

Consulting Services

Contracted

Contracted

to be contracted

Total COMPONENT 3

COMPONENT 3

Contracted

Total COMPONENT 1

COMPONENT 2

Contracted

to be contracted

SUMMARY

Total COMPONENT 2

COMPONENT 1

to be contracted

Works and Goods

to be contracted

GRAND TOTAL

Contracted

to be contracted

Page 13: Procurement method threshold Prior review thresholddocuments.worldbank.org/curated/en/453121513229138987/pdf/122061-PROP... · PROCUREMENT METHODS AND PRIOR REVIEW THRESHOLDS First
Page 14: Procurement method threshold Prior review thresholddocuments.worldbank.org/curated/en/453121513229138987/pdf/122061-PROP... · PROCUREMENT METHODS AND PRIOR REVIEW THRESHOLDS First
Page 15: Procurement method threshold Prior review thresholddocuments.worldbank.org/curated/en/453121513229138987/pdf/122061-PROP... · PROCUREMENT METHODS AND PRIOR REVIEW THRESHOLDS First
Page 16: Procurement method threshold Prior review thresholddocuments.worldbank.org/curated/en/453121513229138987/pdf/122061-PROP... · PROCUREMENT METHODS AND PRIOR REVIEW THRESHOLDS First
Page 17: Procurement method threshold Prior review thresholddocuments.worldbank.org/curated/en/453121513229138987/pdf/122061-PROP... · PROCUREMENT METHODS AND PRIOR REVIEW THRESHOLDS First
Page 18: Procurement method threshold Prior review thresholddocuments.worldbank.org/curated/en/453121513229138987/pdf/122061-PROP... · PROCUREMENT METHODS AND PRIOR REVIEW THRESHOLDS First
Page 19: Procurement method threshold Prior review thresholddocuments.worldbank.org/curated/en/453121513229138987/pdf/122061-PROP... · PROCUREMENT METHODS AND PRIOR REVIEW THRESHOLDS First
Page 20: Procurement method threshold Prior review thresholddocuments.worldbank.org/curated/en/453121513229138987/pdf/122061-PROP... · PROCUREMENT METHODS AND PRIOR REVIEW THRESHOLDS First
Page 21: Procurement method threshold Prior review thresholddocuments.worldbank.org/curated/en/453121513229138987/pdf/122061-PROP... · PROCUREMENT METHODS AND PRIOR REVIEW THRESHOLDS First
Page 22: Procurement method threshold Prior review thresholddocuments.worldbank.org/curated/en/453121513229138987/pdf/122061-PROP... · PROCUREMENT METHODS AND PRIOR REVIEW THRESHOLDS First
Page 23: Procurement method threshold Prior review thresholddocuments.worldbank.org/curated/en/453121513229138987/pdf/122061-PROP... · PROCUREMENT METHODS AND PRIOR REVIEW THRESHOLDS First
Page 24: Procurement method threshold Prior review thresholddocuments.worldbank.org/curated/en/453121513229138987/pdf/122061-PROP... · PROCUREMENT METHODS AND PRIOR REVIEW THRESHOLDS First
Page 25: Procurement method threshold Prior review thresholddocuments.worldbank.org/curated/en/453121513229138987/pdf/122061-PROP... · PROCUREMENT METHODS AND PRIOR REVIEW THRESHOLDS First
Page 26: Procurement method threshold Prior review thresholddocuments.worldbank.org/curated/en/453121513229138987/pdf/122061-PROP... · PROCUREMENT METHODS AND PRIOR REVIEW THRESHOLDS First
Page 27: Procurement method threshold Prior review thresholddocuments.worldbank.org/curated/en/453121513229138987/pdf/122061-PROP... · PROCUREMENT METHODS AND PRIOR REVIEW THRESHOLDS First
Page 28: Procurement method threshold Prior review thresholddocuments.worldbank.org/curated/en/453121513229138987/pdf/122061-PROP... · PROCUREMENT METHODS AND PRIOR REVIEW THRESHOLDS First
Page 29: Procurement method threshold Prior review thresholddocuments.worldbank.org/curated/en/453121513229138987/pdf/122061-PROP... · PROCUREMENT METHODS AND PRIOR REVIEW THRESHOLDS First
Page 30: Procurement method threshold Prior review thresholddocuments.worldbank.org/curated/en/453121513229138987/pdf/122061-PROP... · PROCUREMENT METHODS AND PRIOR REVIEW THRESHOLDS First
Page 31: Procurement method threshold Prior review thresholddocuments.worldbank.org/curated/en/453121513229138987/pdf/122061-PROP... · PROCUREMENT METHODS AND PRIOR REVIEW THRESHOLDS First
Page 32: Procurement method threshold Prior review thresholddocuments.worldbank.org/curated/en/453121513229138987/pdf/122061-PROP... · PROCUREMENT METHODS AND PRIOR REVIEW THRESHOLDS First
Page 33: Procurement method threshold Prior review thresholddocuments.worldbank.org/curated/en/453121513229138987/pdf/122061-PROP... · PROCUREMENT METHODS AND PRIOR REVIEW THRESHOLDS First

No.Procurement

Ref. #

B&H Energy Efficiency Project-RS

Name of Assignment / Contract

Estimated Amount

(US$)

Contracted

Amount(US$)

Typ

e-C

ate

go

ry

Procure

ment

Method

Review

by Bank

Prior /

Post

Document

preparation

Days In

terv

al

Expression

of Interest

Days In

terv

al

Invitation for

Bids/RFP

Days In

terv

al

Bid Opening

Days In

terv

al

Evaluation &

Recomm.

Days In

terv

al

Contract

Award

Days In

terv

al

Start

Days In

terv

al

Completion

DateContractor

Commited

US$

Disbursed

US$NOTE

1 2 12/14/2017 0:30 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

INCREMENTAL COSTS

1 Translation

1 Audit

3 Other operational costs (travel, office supply,

maintenance, representation, car insurance,

driver, bank fees, advertisement, courier, office

phone, professional magazines, fuel for office car)

4 Trainings and educations

5 Accounting software

6 Project management software

TOTAL INCREMENTAL COSTS