Capital Improvement Program
Procurement & Delivery Strategy
December 16, 2021
1
Introduction
Over the past decade, LAWA has embarked on a transformational Capital Improvement Program to deliver “Gold Standard” facilities, and provide a world class guest experience at LAX and VNY airports.
LAWA has already begun executing over $10 billion in construction:• Landside Access Modernization Program (LAMP)• Midfield Satellite Concourse (MSC)• Runway Safety Area (RSA) Improvements• Terminal Development Improvement Program (TDIP)
With those programs nearing completion, LAWA is preparing to launch our final wave of capital investments before the 2028 Summer Olympic Games arrive in Los Angeles.
Upcoming Capital ProjectsLAWA’s upcoming Capital Projects may include, but not be limited to;
• Airside Improvements Program (ATMP Airfield Improvements, Runway Rehabilitation, etc.)• Baggage Improvements Program (BOP Phase 2, BHS Connectivity, Remote Baggage Check, etc.)• Cargo Redevelopment Program (Century Cargo Complex, Imperial Cargo Complex, etc.)• Land Use Improvement Program (LAX Northside, Van Nuys, Central Receiving, etc.)• Landside Improvements Program (ATMP Roadways, Mobility Improvements, etc.)• LAX Commercial Development Program (CTA West Station, Common Use Lounges, etc.)• LAX Landscaping Program (CTA Landscaping, Parks & Plazas, etc.)• Terminal Development Program (Concourse 0, MSC South, TBIT Optimization, Terminal 2/5 Refresh, Terminal 9, etc.)• Wayfinding Enhancement Program (Digital Dynamic Roadway Signage, Terminal & Gate Renaming, GPS-Integration, etc.)
Alternate Delivery Methods – Past ProjectsProject Delivery MethodAirport Police Facility
Progressive Design-Build(PDB)
ITF WestMSC NorthReceiving Station XTerminal Vertical CoresAutomated People Mover Design-Build-Finance-Operate-Maintain
(DBFOM)Consolidated Rental Car Facility
Bradley West Construction Manager At Risk(CMAR)MSC North Enabling
LAMP Roadways, Utilities & Enabling Design-Build CMAR(Hybrid)LAMP Utilities & Landside Enabling
Central Utility Plant Design-Build(DB)Terminal 4-TBIT Connector
Terminal 1 Modernization
Lease & Acquisition(L&A)
Terminal 1.5Terminal 2/3 ModernizationTerminal 3-TBIT ConnectorTerminal 4/5 ModernizationTerminal 6 ModernizationTerminal 7/8 Modernization
LAWA – along with the global construction industry – has evolved to include a wide variety of alternative delivery methods.
This allows the owner to tailor each Contract to address the unique challenges & opportunities that each project presents.
LAWA has awarded over $12 Billion in Alternate Delivery Method Contracts since 2009 (listed to the right).
Our peers throughout the transportation sector are experiencing the same trend, including CalTrans (I-405 Widening, > $1B), LA-Metro (Expo Line, > $2B), and many more.
See Past LA City Ordinances 182086, 182347, 184889, 184936, 184937, 185282, 185576, etc.
Alternate Delivery Methods – Known Benefits
ConstructionDesign & Permitting Construction Procurement Mobilization
Alternate Delivery Methods (ADM)
Early Work Packages
18 Months 6 Months 6 Months 48 Months
Main Work Packages
Final Work Packages
48 Months
Total Duration ≈ 60 Months
Design & Permitting18 Months
Mobilization
Design-Procurement
ADM Procurement
12 Months
Total Duration ≈ 78 Months
RISK
RISK
RISK
RISK
Sample:Large Project, > $1B+
Key ADM Benefits Early Onboarding of Delivery Team Builder Influences Phasing Plans Constructability Influences Design Allows Early Construction Packages Competitive Pricing of each Package Earlier Opportunities to Mitigate Risk
Alternative Delivery Methods – Upcoming ProjectsUpcoming Projects
• ATMP Enabling Projects
• ATMP Roadway & Mobility Improvements
• Baggage Optimization Program – Phase 2
• Concourse 0
• CTA Commercial Development
• LAX Airfield Improvements
• LAX Landscaping Improvements
• MSC South
• Terminal 9
• Wayfinding Enhancement Program
Potential Project Delivery Methods
• Construction Manager (CM)
• Construction Manager at Risk (CMAR)
• Design-Bid-Build (DBB)
• Design-Build (DB)
• Design-Build-Finance-Operate-Maintain (DBFOM)
• Ground Lease / Developer
• Lease & Acquisition
• Multiple Prime (MP)
• Progressive Design-Build
• Public Private Partnership (P3)
7
Upcoming RFP
MSC South Project
MSC South – Project Overview
Building Data:• Two stories, no basement• Approximate building area 150,000 SF
Programmatic Functions• 8 ADG III Gates & Holdrooms• Restrooms• Airline Operation Space• LAWA Support Space• Baggage Make Up• Concessions
Airfield Improvements• Hydrant fueling• GSE charging
MSC – LA City Ordinance 182086
MSC South – Request For Proposals (RFP)
Delivery Method: Construction Manager At Risk (CMAR)
Scoring & Selection ProcessStage Evaluation Criteria Possible Points
0 Administrative Requirements Pass / Fail
1 Minimum Qualifications Pass / Fail
2 Technical Proposal 300
3 Final Interview 400
4 Financial Proposal 300
Grand Total 1,000
Notes1) LAWA may “Shortlist” after each Stage.2) Scores will carry over from Stage 1 to Stage 2 to Stage 3.3) The Grand Total Scores (up to 1,000 possible points) will form the basis for final selection.
MSC South – Next Steps
BOAC BRIEFING
PUBLISH RFP
BOAC AWARD CONTRACT
January 2022(Today)
PROPOSALS DUE
March 2022 April 2022
D E S I G N
PRECONSTRUCTION SERVICES AND GMP NEGOTIATIONS CONSTRUCTION (APPROX. 20 MONTHS)
NOV ‘21 NOV ‘22 AUG ‘24MAY ‘22
PROCUREMENT
12