SNO Question Option 1
1 Which among below are the focus areas under operations maturity?
(a) Metrics culture
(b) Strong interface with COE and PE
(c) Process definition, Implementation and Compliance
(d) Recording customer complaints
(e) Conducting meetings
2 Which tool(s) is used for recording the audit findings? All of above
(a) Prolite
(b) Qsmart
(c) Wiki
(d) Remedy
3 Which function administers the six monthly IT IS business CSAT process? d
(a) Operations maturity
(b) DAG
(c) HR
(d) Finance
4 Which are the 3 phases in the transition framework? a, b, and e
(a) Planning
(b) Knowledge transfer
(c) Pilot and guided support
(d) Service operations
(e) Business relationship management
5 b
(a) Proposal
(b) Transition
(c) Formalization and Due diligence
(d) Service delivery
6 c
(a) Service operations
(b) Transition
(c) Formalization and Due diligence
(d) Service delivery
7 d
(a) Planning
(b) Pilot and guided support
All of above
Objective of this phase is to ensure Proposal terms and conditions are clearly understood by the delivery team and corresponding statement of work is agreed upon by all stakeholders’. Which phase is this?
Objective of this phase is to ensure effective transfer of all the information and knowledge required from customer/vendor to run offshore services independently by Cognizant Team. Which phase is this?
Cognizant Team starts handling tickets and circulates daily dashboard in which phase of transition?
(c) Knowledge transfer
d
(d) None of above
8 d
(a) Weekly
(b) Fortnightly
(c) Monthly
(d) Quarterly
9 The service capability of each engagement is evaluated and tracked using d
(a) Six Sigma score
(b) CSAT score
(c) Delivery maturity index
(d) Compliant register
10 a
(a) OM Quality person requires it
(b) Daily measurement triggers real-time corrective actions
(c) Because it needs to be considered for daily practice level SLA compliance score
(d) None of above
11 Which of the following statements is true for a service management plan (SMP)?
(a) Once approved the SMP is not revised.
(b) SMP requires a review whenever there are major changes.
(d) None of above
12 b
(a) Request fulfillment
(b) Release management
(c) Capacity management
(d) Incident management
13 b
(a) Availability of signed off run books or technical SOPs
(b) Daily dash board implemented
(c) KT execution as per plan.
(d) Process documents reviewed and signed-off
14 Which of the following is not an objective of problem management? c
(a) Minimize the impact of incidents that cannot be prevented
What is the frequency of the steady state phase Project management review (PMR) for large engagements?
Why is it important to daily measure the SLA/KPI performance and publish daily dashboard?
b
(c) It is necessary to update the Change Log on subsequent reviews and approvals of SMP
To restore normal service operation as quickly as possible and minimize the adverse impact on business operations is the objective of which ITIL process?
Which among the following is not an exit criterion for the Pilot and guided support phase?
(b) Preventing problems and resulting incidents
c
(c) Eliminating recurring incidents
15 What is best description of a known error? b
(a) Incident with causal analysis done
(b) A problem that has a documented root cause and a work around.
(c) Service request which has not been completed but scheduled
(d) Knowledge base with errors
16 The four stages of the Deming cycle are? a
(a) Plan-Measure-Monitor-Report
(b) Plan-check-React-Implement
(c) Plan-Do-Act-Audit
(d) Plan-Do-Check-Act
17 Which of the following is the correct sequence of activities for handling an incident? a
18 The goal of configuration management is to? b
(a) Account for all the financial assets of the organization
(c) Build service models to justify ITIL implementation
(d) Implement ITIL across the organization
19 Which among the following is not an aim of change management process? b
(a) Minimize impact of change related incidents
(c) All changes are handled in a prompt manner.
(d) All budgets and expenditure are accounted for
20 c
(a) Capacity management
(b) Supplier management
(c) Incident management
(d) Restoring normal service operations as quickly as possible and minimize the adverse impact on
(a) Identification, logging, categorization, prioritization, Initial diagnosis, Functional escalation, Investigation and diagnosis, Resolution and recovery, closure.
(b) Identification, prioritization, logging, categorization, Initial diagnosis, Functional escalation, Investigation and diagnosis, Resolution and recovery, closure.
(c) Identification, logging, Initial diagnosis, categorization, prioritization, Functional escalation, Investigation and diagnosis, Resolution and recovery, closure.
(d) Identification, Investigation, logging, categorization, Functional escalation, Prioritization, Initial diagnosis, Resolution and recovery, closure.
(b) Provide accurate information on configurations and their documentation to support all the other Service Management processes
(b) Standardized methods and procedures are used for efficient and prompt handling of changes
Business, service and component based considerations are handled as a sub-process of which ITIL process?
(d) Change management
c
21 c
(a) Capacity management
(b) Supplier management
(c) Availability management
(d) Change management
22 c
(a) Operations maturity
(b) Global information security (GIS)
(c) Finance
(d) HR
23 An Incident occurs when: All of the above
24 c
(a) Capacity management
(b) Supplier management
(c) Availability management
(d) Change management
25 The following is not a key activity of the IT service continuity process? c
(a) Business impact analysis
(b) Risk Assessment
(c) Testing strategy
(d) Monitoring service availability
26 Service level agreement is? c
(a) The part of the contract that specifies responsibility of each party
(b) An agreement between service provider and an internal organization
(c) An agreement between service provider and an external organization
(d) An agreement between service provider and their customer
27 c
(a) Critical success factor
(b) Key performance indicator
(c) Kano model
(d) Operational level agreement
Determining the vital business functions and impact arising from IT component failure is done in which ITIL process.
Which is the team from CTS that reviews the project specific BCP requirements and tests the BCP at defined frequency?
(a) A user is unable to access a service during service hours
(b) An authorized IT staff member is unable to access a service during service hours
(c) A network segment fails and the user is not aware of any disruption to service
(d) A user contacts the Service Desk about slow performance of an application.
Determining vital business functions and designing greater level of resilience is done by?
Important metric used to actively manage and report on the process, IT service or activity is called as?
28 A root cause analysis is to be done when? c
(a) There are SLA breaches
(b) Customer escalations
(c) Customer satisfaction survey is not meeting the expectations
(d) There are non-conformances reported in internal audit cycle
(e) None of above
(f) All of above
29 DMAIC are the phases of which methodology? c
(a) Six Sigma
(b) SIPOC
(c) Service Transformation
(d) IT IS
30 ESA project creation is carried out in which phase? c
(a) Proposal
(b) Formalization and due diligence
(c) Transition
(d) Delivery management
31 The risk exposure value is a factor of which parameters listed below? a, b, and c
(a) Probability
(b) Impact
(c) Detectability
(d) Skills of delivery manager
(e) Customer location
32 The delivery maturity index for a project is a factor of which parameters listed below? b, c
(a) SLA performance
(b) Escalations
(c) Knowledge management
(d) Risk Assessment
(e) Monetary Awards from customer
33 The technology maturity index for an engagement is assessed by which function? d
(a) Operations maturity
(b) COE (Committee of expertise)
(c) Production engineering
(d) NSS
34 b
(a) Operational level agreement
A formally negotiated agreement to identify expectations, clarify responsibilities and facilitate communication between service provider and customer, to provide a certain level of service is called as
(b) Project plan
b
(c) Service level agreement
(d) Work Order
35 b
(a) Operational level agreement
(b) Project plan
(c) Service level agreement
(d) Work Order
36 b
(a) SLA/KPI Operational definition document
(b) PMR
(c) Heat Map report
(d) Automation maturity index
37 b
(a) Risk and escalation report
(b) Transition status report
(c) Heat Map assessment report
38 Which are the mandated training(s)/certifications in IT IS practice?
(a) Qview
(b) Six Sigma yellow belt
(c) ITIL-CCP
(d) CSQA
(e) PMP
39 Which activity takes place immediately after recording and registering an incident? Analysis and diagnosis
40 Capacity Mgt
41 Which statement best describes the role of a service desk
42 Which activity is not a service desk activity? Registering incidents
A formally negotiated agreement to identify expectations, clarify responsibilities and facilitate communication between service provider and customer, to provide a certain level of service is called as
A document which explains the formulae details, exceptions, data source etc for a metrics is called as
Which report mentions the trending of DMI/AMI and TMI across verticals and engagements?
b
Which ITIL process has the objective to monitor the IT services by maintaining a logical model of the IT infrastructure and IT services?
First point of contact for the customer
43 A service desk receives different type of calls. Which if the following is an incident?
44
45 A, b, and c only
a. To ensure there are clear release and deployment plans
b. To ensure that skills and knowledge are transferred to operations and support staff
d. To provide cost justifiable IT capacity that is matched to the needs of the business
46 The priority of an incident refers to?
47 Which of the following is not an example of a service request?
48 Incident management has a value to the business by?
Information about roll-out of a specific application
Which process is responsible for discussing reports with the customer showing whether services have met their targets?
Continual service improvement
Which of the following are the objectives of release and deployment management process?
c. To ensure there is minimal unpredicted impact on production services, operations and support
Service level agreement is The part of contract that specifies responsibility of each party
The relative importance of the incident based on impact and urgency
User calls to order a toner cartridge
Helping control infrastructure cost of adding new technology
49 Which of the following best describes the purpose of event management?
50 Change
51 Which of the following is NOT an objective of problem management?
52 Which of the following best describes a major incident?
53 Urgency
54
55 A problem management is an Proactive process
56 Which of the following tasks is a part of proactive problem management
57 When is a known error identified?
The ability to detect events, make sense of them and determine appropriate control action
An Incident or Problem for which the root cause is known and for which a temporary Work-around or a permanent alternative has been identified is called as
Minimize the impact of incidents that cannot be prevented
A complex incident which requires a root cause analysis before any workaround can be found
A measure of how long it will be until an incident, problem or change has a significant impact on the usiness is a definition of
A process to notify all stakeholders, opening a dedicated bridge and updating stakeholders on the progress, implementing decisions taken in the call, contacting COEs/SMEs if the issue is not resolved is defined in
Problem management process
Making a change to resolve a problem
When the cause of problem is known
58 Incident classification
59 Of which ITIL process are reliability, serviceability and maintainability components?
60 Resilience
61 Availability management
62 Availability management
63 How a change that must be made quickly is called? Fast change
64 What is a request to replace something within the IT infrastructure called? Replacement request
65 Request for change
66
67
68 When is a back-out plan invoked?
69 What is the first activity when implementing a release?
70 Some of the invitees for the transition kick-off meeting are VP-IT IS
71 Planning
72 a, b, and c
b. Transfer of knowledge between onshore and offshore teams
c. Obtain call/ticket history and baseline figures
What is the use of additional technical expertise in the incident management process called?
IT service continuity management
The ability of a Configuration Item or IT Service to resist Failure or to Recover quickly following a Failure is called as
Which ITIL process is responsible for determining the hardware necessary in order to support an application?
An analysis is made regarding the expansion of the customer information database. The result indicates that the mainframe disk capacity must be increased to accommodate the expected growth of the database in the foreseeable future. Which process is responsible for sharing this information on time, to make sure that the available disk space is sufficient?
What is the term used for a fully described and approved change that does not have to be evaluated by change management each time?
Which ITIL process carries out a risk analysis on the possible threats to and vulnerabilities of the IT infrastructure?
Configuration management
What does the term ‘detail level’ mean in context of the configuration management data base?
Relationship between the different configuration items
When it is found that something went wrong when building a change
Designing and building a release
Contract review, Resource/Infrastructure requirements review and set-up, establishing transition governance are carried out in which stage of the transition process?
Few activities carried out in the KT Phase of the transition are
a. Organize Quiz / Tests to evaluate the effectiveness of knowledge acquisition by the team
d. Obtain information on interfaces and handoffs with third party vendors.
a, b, and c
e. Publish daily dashboard on ticket/call handling performance.
73 Which of the following statements about a standard change is INCORRECT?
74 The three sub-processes of capacity management are:
75 Which of the following statement are correct? A only
76 The following options are considered within which process? Incident management
a. Big bang Vs phased
b. Push and Pull
c. Automated Vs manual
77 Which statement best describes a problem? One or more known errors
78 In which cases must a review take place after implementation of a change?
Change management
Which process is responsible for this?
79 An issue resulting in a financial loss to the customer or a work stopper issue is a Level 1 escalation
80 Solution database
81 The Automation Maturity index for an engagement is assessed by which function? NSS
82 PMR
A standard change is one for which the approach is pre-authorized by change management
Business, service and component capacity management
a. Problem management can support service desk by providing known errors to speed up the incident resolution.
b. Problem management provides information to service level management about the impact of changes.
If another incident of the same type occurs again
It is important for the operation of a given application that the version of the software installed on each of the computers on the network is the same.
An up-to date database containing carefully written articles of tickets which have been resolved overtime by technical specialists and which has an excellent information retrieval system (search engine), and a well designed content format and classification structure is
IT IS Projects reports the SLA compliance, Customer Complaints & any project issues, if any on a daily basis in the form of a
83 A customer-based Service Level Agreement structure includes:
84
85 1 & 2 only
(1) One Incident to one Problem
(2) One Incident to many Problems
(3) Many Incidents to one Problem
86 At what point does an Incident turn into a Problem? When it is urgent
87 The wording of SLAs and OLAs should be:
88 The process to implement SLAs comprises of the following activities in sequence:
89 Check, Plan, Do, Act
An SLA covering all Customer groups and all the services they use
Which of the following metrics is most relevant in determining the value added by Problem Management to the Service Desk?
The number of Problems raised
Within a CMDB, which relationships are most likely to exist between Incidents and Problems?
Does Problem Management depend ENTIRELY on having a mature Incident Management process in place?
Yes, because without a mature Incident Management process in place there is no reliable information available
Technically focused, so that they may be understood by IT professionals
Draft SLAs, catalogue services, review underpinning contracts and OLAs, draft SLRs, negotiate, agree SLAs
Which of the following represents the four stages of the Demming cycle in the correct order
90 One of the key objectives of Metrics group(SMG) is to
91 Baseline
92 PMR stands for Peer Management Review
93 The suggestion RCA techniques for any SLA deviation is/are Pareto Analysis ONLY
94 PE
95 1
96 IT IS QView is aligned to ITIL V3 LifeCycle 1
97 What is the RACI model used for?
98 Which are the missing Service Operation processes from the following?
1. Incident Management
2. Problem Management
3. Access Management
4?
5 ?
9 Establishing Governance is a part of which Transition Phase Knowledge Transfer
99 Infrastructure Readiness is a part of Pilot & Guided Phase 1
100 SMP stands for Service Management Plan
101 Effectiveness of Transition is measured as part of DashBoard
102 Resource Identification is a part of which Transition Phase Knowledge Transfer
103 It is equally important to understand the Customer Infrastructure during the KT Phase 1
104 OM
105 Statement
Define KPIs that reflect efficiency and effectiveness of the operations
Combination of two or more measures used to compare processes, projects, products. E.g. Productivity, Seat Utilization etc is defined as
The group that is involved in defining & maintaining the Technical procedures to run day to day activities required to support the service at an operations or procedural level is
OM facilitates productivity and automation initiatives in various deliveries along with COE and PE teams.
Documenting the roles and relationships of stakeholders in a process or activity.
Event management and Request Fulfillment
Transition CSAT survey is administered to Customer to obtain feedback on Transition by
A business agreement between organization and the customer, forming the basis for project execution.
106 1
107
108 During the Transition Phase, Risk updation is a part of 1 and 2 only
(a) Transition ScoreCard
(b) Deployment & Effectiveness ScoreCard
(c) Transition PMR
(d) Transition Workbook
109 The objective of the Change Management process is most accurately described as?
110 The Information Security Policy should be available to which groups of people?
111
112 Of which ITIL process are Reliability, Serviceability and Maintainability components?
113 The ISO standard for IT service management is ISO 20000
114 Risk
115 First call resolution % is a typical metrics for a Problem management
116 Mean time to resolve/repair is a typical metrics for a Incident management
117 Configuration items discrepancy % is a typical metrics for a Change management
118 Which of the following is NOT an agenda item in the PMR Project metrics
Contract/ SoW Should are reviewed by technical, finance and legal groups before submitting to customer.
The Agreement containing terms and conditions and description of services which may be used in absence of Master Agreement to serve as contractual documents –
Master Business Agreement
Ensuring that all changes are recorded, managed, tested and implemented in a controlled manner
Senior business managers and all IT staff
The spell check module of a word-processing software package contains a number of errors. The Development department has corrected these errors in a new version. Which process is responsible for ensuring this updated version is tested?
Configuration Management
IT Service Continuity Management
The cumulative effect of the chances of uncertain occurrences adversely affecting project objectives is a
119 Which among the following is not a KPI for service level management
120 Which among the following a NOT a parameter in the delivery maturity index? SLA performance
121 Recovery time objective
122 Change
123 Definitive software library
124 Ticket review is done because It is mandated by OM QR
125 QMS
126 Which of the following is correct with regards to organization quality objectives/
127
128 Operations Maturity group has a strong interface with; TCG and PE team
129 Quality and productivity organization structure includes: IT IS SEG
130
131 Service strategy
132 Service strategy
Number of services covered by SLAs
The total time elapsed from the time of disaster until IT infrastructure and data is recovered and project can resume operations is the
A collection of one or more changes that includes new and/or changed configuration items that are tested and then introduced into the live environment is a
Term used to describe a secure compound in which the definitive authorized versions of all software CIs are stored and protected is
What is Q view?
Exceed customer expectation
QView processes are compliant to : ISO 20000 and ITIL Framework
Proposal phase of the IT IS Process framework belongs to which ITIL process areas? Service strategy & Service design.
Formalization and Due diligence phase of IT IS Process framework belongs to which ITIL process areas?
Knowledge transfer of IT IS Process framework belongs to which ITIL process areas?
133 Service strategy
134 Resource identification is a part of which phase of Transition lifecycle? Planning Phase
135 Project Planning is done during which phase of Transition lifecycle? Planning Phase
136 CSAT is done during which phase of Transition lifecycle? Planning Phase
137 CSAT is administered during the KT phase of the Transition ? TRUE or FALSE TRUE
138 How is the transition progress tracked in an engagement D&E Scorecard
139 Daily Dashboards are initiated during Steady State
140 Audits are conducted only during steady state TRUE
141 RFP stands for Response For proposal
142 Deployment parameters in the D&E scorecard are : (i), (ii) & (iii)
(i) Governance
(ii) Customer reports
(iii) Process Documentation
(iv) CritSit Management
143 Effectiveness parameters in the D&E scorecard are : (i), (ii) & (iii)
(i) Governance
(ii) Customer reports
(iii) Process Documentation
(iv) CritSit Management
144 PMR is conducted only during steady state TRUE
145 TCG leads are not a part of Transition Governance meetings TRUE
146 Quality Representative
147 MSA stands for Major Supplier Agreement
148 LOI stands for Level Of Investigation
149 CRITSIT Management is done during which phase Deployment
150 BusinessImpact Understanding presentation is done during ? Planning Phase
Pilot and guided support of IT IS Process framework belongs to which ITIL process areas?
Preparing Transition Plan in line with SoW and obtain customer sign off is responsibility of
151 Transition Planning activities? Obtain sales handover
152 Non-disclosure agreement signed at the start of interaction with the customer TRUE
153 Input for Knowledge Transfer phase is Project plan
154 Process & Technical SOP documentation are done during? Planning Phase
155 During Knowledge Transfer first draft of SMP is prepared TRUE
156 Objective of Pilot & Guided Support phase is? start shadowing
157 What is purpose of Cognizant's Policy
158 Qview is hosted on?
159 What are the challenges related to Business and IT allignment
160 What are the challenges in Insufficient Collabration? Compliance and control
161 In which stage is the Start up audit conducted? Transition phase
162 PM/ PL
163 What are the 3 phases of Transition Phase Transition Planning
164 What does DMI stand for? Delivery Maturity Index
165 Run books contain information about: Technical Procedures
166 Transition C-Sat is conducted at the end of which phase? Due-Deligence
Provides Vision and approach
https://c20ecosystem.cognizant.com
Large teams and people issues
Which group administers the Business C-sat survey
167 Q-View is a : Reporting Tool
168 The ISO standard applicable for IT IS is? ISO 20000
169 RACI Stands for
170 SAG team key objective is ? Assurance
171 SEG team key objective is ? Engineering
172
Qview Process are compliant to:
173
Multi-location support
174
Which are the Short cycle Time IT service management Challenges Changing architectures
175
Why do we need Qview?
176The objective of Daily Dashboard is to? SLA Compliance
177
Proposal
178Practice level Daily dashboard is : Internal Report
179 Audit Findings are logged in ? Q-view
180
Six Sigma Initiatives are a part of : Pilot and guided Support
181 In IT IS Process framework which are the ITIL activities Proposal
Responsible, accountable, Conuslted , Infomed
ISO 20000 and ITIL Framework
Which one is people and Process challenge ?
Helps control costs and risks that can potentially damage customer relationships
Which phase has the Objective to ensure Proposal terms and conditions are clearly understood by the delivery team and corresponding statement of work is agreed upon by all stakeholders
Option 2 Option 3 Option 4 Option 5
a, b and c a, b, and e 2
c and d b None of above 3
b a None of above 3
b, c and d c, d an e a, b and c 4
a c d 3
b a d 2
c b a 3
Correct Option
None of above
c b a 3
b a c 4
b a c 4
b and c d c 2
2
a d c 3
a c d 3
a b d 4
b and c d a
a b d 4
a d c 1
c b d 4
c b d 1
a d c 1
a d c 3
d b a 4
d b a 4
d b a 1
d b a 3
1 and 4 only 2 and 3 only None of the above 1
d b a 1
d b a 2
d b a 2
d b a 3
d b a f 5
d b a 4
d b a 3
b and c d and e b 2
a, b, and c b and d d and e a, b, c, and d. 5
c b a 3
c d a 2
c d a 2
c d a 2
c d a 4
c a 2
4
Classification Matching Solving and restoring 2
Change Mgt Configuration Mgt Financial Mgt 3
1
Solving a problem Applying temporary fixes 2
c a a, b and c
Primary deck of Service desk is to investigate problems
It ensures that the agreed IT service is available
It ensures that the telephone is always manned.
Relating an incident to a known error
3
Service level management Availability management 3
All of above A and c only A, c and d only 1
4
1
2
4
A notification that a new toner cartridge has been installed
A system message that a printer is not working
A request to install a new book keeping package
Business relationship management
An agreement between service provider and an internal organization
An agreement between service provider and an external supplier
An agreement between service provider and their customer
The speed with which the incident needs to be resolved
The number of staff that will be assigned to work on the incident so that it is resolved in time
The escalation path that would be followed to ensure resolution of incident
User calls because they would like a change to application functionality.
Manager submits a request for a new employee to be given access to an application
A user logs onto an internal website to download a licensed copy of software from a list of approved options.
Enabling users to resolve problems
Helping to align people and process for a delivery of service
Contributing to the reduction of impact.
1
Problem Known error Event 3
4
4
Impact Priority MTTR 1
Service desk process 2
Reactive process None of the above 3
3
1
The ability to implement monitoring tools
The ability to monitor and control the activities of technical staff
The ability to report on the successful delivery of services by checking the uptime of infrastructure services
Preventing problems and resulting incidents from happening
Eliminating recurring incidents
Restoring normal service operation as quickly as possible and minimizing adverse impact on business
An incident that requires large number of people to resolve
An incident that is so complex that the service desk takes longer than five times the normal time to log it.
The incident which has high impact on the business.
Critical situation management process
Change management process
Both reactive and proactive process
Registering frequently occurring errors
Analyzing trends Managing known errors
When the incident has been sent to problem management
When the problem is known
When the problem has been resolved.
Functional escalation Problem analysis 2
Service level management Problem management Availability management 4
Resistance Repeatability Toughness 1
Capacity management Change management 2
Capacity management Change management Security management 2
Urgent change An unplanned change Standard change 2
Request for change Request for release Service request 2
Service request Standard change Urgent change 3
Problem management Capacity management. 2
2
2
Testing a release 3
VSL DL TCG and OM team All of above 5
Knowledge transfer Pilot and guided support 1
a, b, c, d and e b and c all except e All of above. 4
Resolution and recovery of incident
Configuration management
IT service continuity management
The depth of database structure
The quantity of stores configuration items
The location of the Configuration item
When it is found that something went wrong when implementing a change
When it is found that something went wrong when scheduling resources
When it is found that something went wrong when testing a change.
Compiling the release schedule
Communicating and preparing the release.
a, b, c, d and e b and c all except e All of above. 4
4
1
B only Both A and B Neither of above. 1
Release management 2
3
Always Randomly 2
Network management Release management 4
Level 2 escalation Level 3 escalation. 3
Change database Configuration database 1
COE Production engineering Operations maturity 3
MetBook Daily Dashboard SLA Assessment Report 3
Each standard change is granted by the nominated authority for that change
Standard changes are usually low risk and well-understood
Standard changes are only raised using the request fulfillment process.
Supplier, service and component capacity management
Supplier, service and technology capacity management
Business, capacity, technology and component capacity management
Service asset and configuration management
A known cause of one or more disruptions
An unknown cause of one or more incidents
A known error with one or more incidents.
At the request of the person who submitted the change request
Configuration management
Capacity management database
4
2
2 & 3 only 1 & 3 only All of them 3
3
Never 4
3
4
Act, Plan, Do, Check Plan, Do, Check, Act Act, Check, Do, Plan 3
SLAs for each service that are Customer-focused and written in business language
An SLA for each service type, covering all those Customer groups that use that Service
An SLA with each individual Customer group, covering all of the services they use
The number of Known Errors identified
The number of Problems correctly categorized
The number of RFCs raised
No, because the quality of Incident Management information is of little importance to proactive Problem Management
No, because progress can still be made on solving long-standing Problems
Yes, because trend analysis cannot be undertaken without a lot of accurate Incident Management information
When it is a Major Incident If the person reporting the incident is very senior
A mixture of business, technical and legal language, so that they can be understood by everyone
Clear and concise, leaving no room for ambiguity.
Legally worded as they must be contractually binding
Draft SLAs, review underpinning contracts and OLAs, negotiate, catalogue services,
Review underpinning contracts and OLAs, draft SLAs, catalogue services, negotiate, agree SLAs
Catalogue services, establish SLRs, review underpinning contracts and OLAs, negotiate service levels, agree SLAs
Define & Maintain 1
Metrics Request Measure 2
Project Metrics Review 3
FishBone Diagram ONLY SIP 2
OM TCG PE, OM & TCG 3
0 1
0 1
1
1
Steady State Planning Pilot & Guided Phase 3
0 2
1
MetBook Transition WorkBook D&E ScoreCard 4
Steady State Planning Pilot & Guided Phase 3
0 1
Transition Manager PE COE 2
Contract Clause Letter 2
Identify opportunities for Service Improvement
Drive Six Sigma & Lean Projects
Performance Management Review
Project Management Review
Pareto Analysis & FishBone Diagram
Defining requirements for a new service or process
Analyzing the business impact of an incident
Creating a balanced scorecard showing the overall status of Service Management.
Event Management and Service Desk
Facilities Management and Event Management
Change Management and Service Level Management.
Service Management Process
Software Management Process
Service Management Project
0 1
Master Service Agreement Statement of Work Letter of Intent 4
4
1
3
4
Problem Management Availability Management 4
ISO 9000 ISO 14000 ISO 9004 1
Issue Problems Concerns 1
Service desk Change management Access management 2
Change management Capacity management Availability management 1
Availability management Incident management 2
Profitability Service improvements 4
2 only 1, 2 and 3 only All of the above.
Ensuring that changes to IT infrastructure are managed efficiently and effectively
Ensuring that all changes have appropriate back-out plans in the event of failure
Protecting services by not allowing changes to be made.
Senior business managers, IT executives and the Security Manager
All customers, users and IT staff
Information Security Management staff only.
Incident Management Problem Management Release Management.
Service Level Management
Configuration management
Organization BES survey compliance
4
Knowledge management Ticket creation automation 3
Recovery point objective BCP Objective. 1
Release Incident Request. 2
Definitive hardware stores CMDB 1
It is a template in qview 3
A template Process A document 1
All of the above 4
ISO 9001 : 2000 All of the above 4
Vertical and horizontals Third party vendors 1
IT IS SAG IT IS SMG All of the above 4
1
Service design Service transition Service Operations 2
Service design Service transition Service Operations 3
Number of SLAs where the agreed service levels are fulfilled
Number of Services where SLAs are backed up by corresponding OLAs/ UCs
Number of resources which have cleared ITIL v3.
Risk management
SKMS (Service knowledge management system).
To verify if the incident classification/resolution process is followed as per guidelines.
Meet specific product quality requirements.
Delivered within the budgeted cost.
CMMI Level 5 ver 1.2 and ISO 27001 (Security processes)
Service design and Service Transition
Service Transition & Service operations
Service strategy & Service Operation
Service design Service transition Service Operations 3
KT All of the above 1
KT All of the above 1
KT All of the above 3
0 2
Weekly report Transition PMR Transition Governance 1
KT phase Project planning phase Pilot & Guided Support 4
0 2
Request for Proposal Request for policy Request for project 2
(ii) & (iii) (i) & (iii) All of the above 3
(ii) & (iii) (ii) & (iv) All of the above 3
0 2
0 1
Delivery Lead Transition Manager Operations Manager 3
Master Service Agreement 2
Letter Of Intent Line Of Initiation Letter Of Investigation 2
Effectiveness 2
KT All of the above 1
Pilot & Guided Support Phase
Pilot & Guided Support Phase
Pilot & Guided Support Phase
Management Supplier Agreement
Master Supplier Agreement
Pilot & Guided Support Phase
Contract review All of the above 4
0 1
Transition Plan SOW All of the above 2
KT All of the above 3
0 1
All of the above 4
Tells us how to do Provides tools, format all the above 1
3
Changing architectures Weak Tool support 2
Compliance and control None of the above 4
Service Initiation phase None of the above 2
Service Desk OM Third - Party None of the above 3
Knowledge Transfer Pilot & guided Support Option 1 and 2 above All of the above 4
Delivery Monthly Index Delivery Monitory Index Delivery Monthly Indicator 1
BCP Guidelines Transition Process Ticket Status 1
Pilot and guided Support Steady State operations After 1st Audit 2
Resource and transition planning
Pilot & Guided Support Phase
ram up providing support to customer
Measuring, tracking & reporting of SLAs & KPIs
Tells us what to do
https://c20system.cognizant.comhttps://cognizant20ecosystem.cognizant.comhttps://c20ecosys.cognizant.comhttps://c2ecosystem.cognizant.com
Convergence of strategy, governance and management
Measuring IT in business value outcomes
Large teams and people issues
Steady state Operation Phase
Continous Improvement Phase
Feedback Tool Audit Tracker 3
ISO 9000 ISO 14000 ISO 9004 1
1
Audit Accountable 1
Effectiveness Enabling 1
ISO 9001 : 2000 CMMI Level 5 ver 1.2 ISO 27001 All of the above
4
Multi-location support
1
Communication Option 1 and 2 above All of the above
3
Option 1 and 3 above All of the above
4
Customer Complaints SIP's Option 1 and 2 above Option 1 and 3 above4
Due Diligence Transition Knowledge Transfer Pilot and Guided support
2
Customer Report None of the above1
Q-smart Audit Tracker Daily Dashboard 2
Steady State Operations Customer Relationship Mgmt
2
Service Support Service Delivery Business Relationship Mgm Option 2 and 3 above 5
Process Document Repository
Responsible, auditable, Conuslted , Infomed
Review, auditable, Conuslted , Infomed
Review,accountable, Conuslted , Infomed
Faster time to resolve incidents
Balancing stability v. responsiveness
Balancing stability v. responsiveness
Set of industry best practices to increase the likelihood of achieving service excellence
Based on ITIL Framework and ISO 20000
Continous Improvement Process