    ATTACHMENT 01:

    SINGLE PHASE LINE SIZING SPREADSHEET

    Client: PetroVietnam CNG Joint Stock Co.

    Project: CNG Filling Station Project

    Line Service:

    Line/Unit No: 4" 6"Units SI SI

    Flow type Mass MassDiameter Nominal 100 mm 350

    Standard volume Rate 12500 Sm3/h 12500Actual inlet Vol.flow 532.3 m3/h 532.3

    Mass Flow 10150 kg/h 10150Phase Gas Gas

    Temperature 30 C 30

    Pressure 22 Barg 22Molecular weight 19.19 19.19

    Compressibility 0.9339 0.9339Density 19.06 kg/m3 19.06

    Gas Density 19.06 kg/m3 19.06Viscosity 0.01177 cP 0.01177

    Design Margin 0 % 0q. engt s

    Fittings Eq.Lengh, m 10 0 10Pipe straight Lengh, m 100 m 100

    Total Eq.Lengh, m 110Elevation Change 0 m 0

    Type of Pipe Commercial Steel Commercial Steel

    pe c e u e c cCalculated value

    I.D, mm User Input User InputW.T, mm User Input User Input

    I.D/W.T, mm 102.26 6.02 154.051Static Head Loss Kpa 0 Kpa

    Reynolds No. 2981000Friction factor 0.01653Pressure drop Kpa/100m 49.96 Kpa/100m

    Velocity m/s 18 m/s

    Sizing criteria Max Velocity m/s 49.7 m/sPress. Drop/lengthVs Kpa/100m 11.0 Kpa/100m

    WARNINGS: Recheck

    Main Piping at upstream of Compressor (Piping_Seg 01/02)

    User can override WT/ID User can ove

    PIPING SIZING FOR CNG FILLING S

  • 7/28/2019 Process Sizing Rev.1-CNG

    2/21

    Date:

    Pre. By:

    Checked:

    mmSm3/hm3/hkg/h

    C

    Barg

    kg/m3kg/m3cP%q. engt s

    0m

    110m

    7.1120

    19790000.01536

    5.987.93

    49.711.0

    Good

    rride WT/ID

    TATION

  • 7/28/2019 Process Sizing Rev.1-CNG

    3/21

    SINGLE PHASE LINE SIZING SPREADSHEET

    Client: PetroVietnam CNG Joint Stock Co.Project: CNG Filling Station Project

    Line Service:

    Line/Unit No: 3" 4"Units SI SI

    Flow type Mass MassDiameter Nominal 80 mm 100

    Standard volume Rate 12500 Sm3/h 12500Actual inlet Vol.flow 45.79 m3/h 45.79

    Mass Flow 10150 kg/h 10150Phase Gas Gas

    Temperature 45 C 45Pressure 250 Barg 250

    Molecular weight 19.19 19.19Compressibility 0.8217 0.8217

    Density 221.6 kg/m3 221.6

    Gas Density 221.6 kg/m3 221.6Viscosity 0.02558 cP 0.02558

    Design Margin 0 % 0q. engt s

    Fittings Eq.Lengh, m 5 0 5Pipe straight Lengh, m 50 m 50

    Total Eq.Lengh, m 55Elevation Change 0 m 0

    Type of Pipe Commercial Steel Commercial Steelpe c e u e c c

    Calculated valueI.D, mm User Input User Input

    W.T, mm User Input User Input

    I.D/W.T, mm 58.42 15.24 87.325Static Head Loss Kpa 0 Kpa

    Reynolds No. 2401000Friction factor 0.01872Pressure drop Kpa/100m 79.97 Kpa/100m

    Velocity m/s 4.746 m/s

    Sizing criteriaMax Velocity m/s 16.6 m/s

    Press. Drop/lengthVs Kpa/100m 50.0 Kpa/100m

    WARNINGS: Recheck

    Main Piping (Header) at downstream of Compressor

    (Piping_Seg 03)

    User can override WT/ID User can ove

  • 7/28/2019 Process Sizing Rev.1-CNG

    4/21

    Date:Pre. By:

    Checked:

    mmSm3/hm3/hkg/h

    CBarg

    kg/m3

    kg/m3cP%q. engt s

    0m

    55m

    13.490

    16060000.01726

    9.8782.124

    16.650.0

    Good

    rride WT/ID

  • 7/28/2019 Process Sizing Rev.1-CNG

    5/21

    SINGLE PHASE LINE SIZING SPREADSHEET

    Client: PetroVietnam CNG Joint Stock Co. Date:Project: CNG Filling Station Project Pre. By:

    Line Service:Checked:

    Line/Unit No: 2" 3"Units SI SI

    Flow type Mass MassDiameter Nominal 50 mm 80 mm

    Standard volume Rate 2500 Sm3/h 2500 Sm3/hActual inlet Vol.flow 117.7 m3/h 117.7 m3/h

    Mass Flow 2029 kg/h 2029 kg/hPhase Gas Gas

    Temperature 29.56 C 29.56 CPressure 20 Barg 20 Barg

    Molecular weight 19.19 19.19

    Compressibility 0.9425 0.9425Density 16.99 kg/m3 16.99 kg/m3Gas Density 16.99 kg/m3 16.99 kg/m3

    Viscosity 0.01187 cP 0.01187 cPDesign Margin 0 % 0 %

    Eq.Lengt s Eq.Lengt s

    Fittings Eq.Lengh, m 2 0 2 0Pipe straight Lengh, m 20 m 20 m

    Total Eq.Lengh, m 22 22Elevation Change 0 m 0 m

    Type of Pipe Commercial Steel Commercial SteelPipe Sc e u e Sc 40 Sc 40

    Calculated valueI.D, mm User Input User Input

    W.T, mm User Input User InputI.D/W.T, mm 52.502 3.912 77.927 5.486

    Static Head Loss Kpa 0 Kpa 0Reynolds No. 1152000 775900

    Friction factor 0.01936 0.01799Pressure drop Kpa/100m 73.61 Kpa/100m 9.493

    Velocity m/s 15.33 m/s 6.957

    Sizing criteriaMax Velocity m/s 51.8 m/s 51.8

    Press. Drop/lengthVs Kpa/100m 11.0 Kpa/100m 11.0

    WARNINGS: Recheck Good

    Piping at upstream of 01 Compressor

    User can override WT/ID User can override WT/ID

  • 7/28/2019 Process Sizing Rev.1-CNG

    6/21

    SINGLE PHASE LINE SIZING SPREADSHEET

    Client: PetroVietnam CNG Joint Stock Co.Project: CNG Filling Station Project

    Line Service:

    Line/Unit No: 1" 2"Units SI SI

    Flow type Mass MassDiameter Nominal 25 mm 50

    Standard volume Rate 2500 Sm3/h 2500Actual inlet Vol.flow 9.157 m3/h 9.157

    Mass Flow 2029 kg/h 2029Phase Gas Gas

    Temperature 45 C 45Pressure 250 Barg 250

    Molecular weight 19.19 19.19Compressibility 0.8217 0.8217

    Density 221.6 kg/m3 221.6

    Gas Density 221.6 kg/m3 221.6Viscosity 0.02558 cP 0.02558Design Margin 0 % 0

    Eq.Lengt s

    Fittings Eq.Lengh, m 3.5 0 3.5Pipe straight Lengh, m 35 m 35

    Total Eq.Lengh, m 38.5Elevation Change 0 m 0

    Type of Pipe Commercial Steel Commercial SteelPipe Sc e u e Sc 160 Sc 160

    Calculated valueI.D, mm User Input User Input

    W.T, mm User Input User Input

    I.D/W.T, mm 20.701 6.35 42.85Static Head Loss Kpa 0 KpaReynolds No. 1355000

    Friction factor 0.02423Pressure drop Kpa/100m 740.9 Kpa/100m

    Velocity m/s 7.558 m/s

    Sizing criteriaMax Velocity m/s 16.6 m/s

    Press. Drop/lengthVs Kpa/100m 50.0 Kpa/100m

    WARNINGS: Recheck

    Piping at downstream of 01 Compressor

    User can override WT/ID User can ove

  • 7/28/2019 Process Sizing Rev.1-CNG

    7/21

    Date:Pre. By:

    Checked:

    mmSm3/hm3/hkg/h

    CBarg

    kg/m3

    kg/m3cP%Eq.Lengt s

    0m

    38.5m

    8.73806547000.02049

    16.491.764

    16.650.0

    Good

    rride WT/ID

  • 7/28/2019 Process Sizing Rev.1-CNG

    8/21

    Formulate Used

    Re = (10000 x Dp x Vt x a )/

    Vt = Q / A

    a =( M x P) /( 8,3145 x (T + 273) x Z )

    A = x Dv x HH =4 x Dv

    Assume Droplet Dp = 10 microns

    Q = (C x s) / a

    Flow Actual Area Gas filter Diameter Diamet Mass Viscosity Pressu Tempe Z Velocity Density Gas R

    rate flow Capacity Calc Choi Droplet Mole Actual Stand.

    Sites Sm3/hr m3/min m2 3/min/m2 mm mm microns /(kg.mol cP kPa(g) deg C unitless m/s kg/m3 kg/sm3

    C Q A B (Vt) Dv Dv(* Dp MW P T z Vt a s

    NG Filling Station 12,500 9.06 0.71 12.70 238 273 10.0 19.19 0.01193 2200 30.00 0.9375 0.211 18.680 0.814 1

    Note:

    eparator can by any length, but the ratio of seam-to-seam length to the diameter of the vessel H / Dv usually in the range of 2:1 to 4:1

    Calculation choice ratio H / Dv : 4/1The approximate filter capacity have been refered from Fig. 7-16/7-13 _Engineering Data Book ( Approximate Gas Filter Capacity)

    ATTACHMENT 02FILTER SIZING FOR CNG FILLING STATION

  • 7/28/2019 Process Sizing Rev.1-CNG

    9/21

  • 7/28/2019 Process Sizing Rev.1-CNG

    10/21

  • 7/28/2019 Process Sizing Rev.1-CNG

    11/21

    hoi

    mm

    H*

    905

  • 7/28/2019 Process Sizing Rev.1-CNG

    12/21

  • 7/28/2019 Process Sizing Rev.1-CNG

    13/21

  • 7/28/2019 Process Sizing Rev.1-CNG

    14/21

  • 7/28/2019 Process Sizing Rev.1-CNG

    15/21

  • 7/28/2019 Process Sizing Rev.1-CNG

    16/21

    Formular Used

    z = - 0,0023 x (P +1,01325 ) + 0,9949

    Q = (A x s) / a

    = (MW *P) / ( R x T x Z )

    A = (A x 125%)

    Flow Flow Actual Mol.Wt Pressure Temperature. Compres Density Gas Meter

    rate rate 125% Flow sibility Actual Stand. Size

    Sites Sm3/hr Sm

    3/hr m

    3/hr kg/mol barg deg C Kg/am3 Kg/sm3 mm

    A A Q MW P T z a s d

    CNG Filling Station 12500 15625 679.125 19.19 22 30 0.9375 18.68 0.814 150

    Note:

    The meter turbine and flow meter shall be sizing to ensure that maximum expecting gas velocity and flowrate will be less than about 80% of recommended

    manufacture maximum value.

    ATTACHMENT 02FLOWMETER SIZING FOR CNG FILLING STATION

  • 7/28/2019 Process Sizing Rev.1-CNG

    17/21

  • 7/28/2019 Process Sizing Rev.1-CNG

    18/21

  • 7/28/2019 Process Sizing Rev.1-CNG

    19/21

    Nor

    pipe

    mm

    100

  • 7/28/2019 Process Sizing Rev.1-CNG

    20/21

  • 7/28/2019 Process Sizing Rev.1-CNG

    21/21