Page 1 of 3 Issue No : 4

Title: HACCP for Whole Milk Powder (Reg.) & ‘Instant’ FCP

FLOWCHART

Date: 1/3/06 Approved by: Jim O’Neill Pat O’Leary

WHOLE MILK INTAKE CCP 1 Antibiotics

Buffer silos 7/8 (Filters) Cooled & stored SILOS 9AND 10 SEPARATOR SKIM CREAMDISPATCHED PLANT 1 PLANT 2 BY TANKER SILO 1, 2, 3, 4, or SILO 5,6 or 14 STANDARDISATION OF FAT(Batching Silo) BALANCE TANK

FLOW DIVERION VALVE ( DSI & PASTEURISATION ) CCP 2

EVAPORATION

Antibiotic milk disposed of to effluent

Condensate used in external lorry wash.

Daily Milk tanker washes to

effluent. Tankers flushed to silo prior to CIP with mains water.

First stage of CIP uses recovered rinse water. Lactol detergent is also

recovered.

CIP of silos and lines to effluent. Recovered rinse water

and Lactol used.

Separator desludges and CIP to effluent.

CIP of silos and lines to effluent. Lines/silo flushes

recovered

CIP Evaporator and contaminated condensate and

seal water to effluent

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 12-12-2006:02:17:33

Page 2: Process Flow Diagram-milk Powder

Page 2 of 3 Issue No : 4

Title: HACCP for Whole Milk Powder (Reg.) & ‘Instant’ FCP

FLOWCHART

Date: 1/3/06 Approved by: Jim O’Neill Pat O’Leary

(Filters) WHOLE MILK CONCENTRATE

DRIER FEED TANK

SHELL AND TUBE HEATER

HOMOGENISER (with Filter)

DRYERFINES RETURNED TO ATOMISER/INST (INSTANT ONLY)

FINES RETURNED TO INSTANTISER ONLY FOR REGULAR.

INSTANTISER BED

CCP 6 Lecithin addition (for ‘Instant FCP’ only)

-Plant 1 or 2

Uncontaminated cooling water seal water and condensate to

SW-2 Conductivity & Turbidity

probes control divert valves.

Air emissions to A2-1, A2-2 & A2-3 for No.1 Plant Cyclones

capture fines.

A2-4 for No.2 Plant ‘Via Bag filter

Drier washes to effluent

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 12-12-2006:02:17:33

Page 3: Process Flow Diagram-milk Powder

Page 3 of 3 Issue No : 4

Title: HACCP for Whole Milk Powder (Reg.) & ‘Instant’ FCP

FLOWCHART

Date: 1/3/06 Approved by: Jim O’Neill Pat O’Leary

SIEVE CCP 3

POWDER SILOS

(A) (B) FROM SILOS 4,5,6 BULK BAGS (1 TONNE) (POWDER STORAGE SILOS)

SCREW CONVEYOR

METAL DETECTOR CCP 4

AIR (BAG INFLATION)

FILLING (TO BULK BAGS)

SAMPLED CCP 5

WEIGHED/SEALED/LABELLED

STORAGE

DISPATCH

(A) FROM STORAGE SILOS 3,4,5,6 FOR 25KG BAGS

SCREW CONVEYOR

SIEVE CCP 3A

MAGNET

BAGGING HOPPER

FILLING & SAMPLING CCP 5

SEALING

STITCHING

CODING

METAL DETECTOR CCP4

(WRAPPING)

STORAGE

DISPATCH

Bag toppings & contaminated packaging to landfill

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 12-12-2006:02:17:33