24
Produkt- und Prozessaudit 0123-FORM-03-AUNDE Rev.: 24.02.2012 Entry screen Data input to create report Contract: Date: Reason for contract: Contract issued by (name, dep.): Auditor: Department: Lead auditor: Department: Suppl.-No.: Function: Name: Auditee DUNS-No.: Top management: Supplier/Organization: Production management: Street: Quality management: Production site (location): Customer support: Design/Development: Production site (postal code): Phone: Fax: Last audit results / certificates Certificate- / Audit base No.: Issue-Date: Conducted by: Result: Product group : First: Second: Third: Fourth Prod.-Gr.-No. (acc. catalog): a b c d Prod. Titel (acc. catalog): Please entry the results of the last audit in this boxes Process steps: Title: E1 - E10 Process step-No.: last audit: result Assessment element Process elements 1 um/one EU1 2 dois/two EU2 3 três /three EU3 4 quatro/four EU4 5 cinco/five EU5 6 seis/six EU6 7 sete/seven EU7 8 oito/eight Generic baseline Overall achievement 9 nove/nine PV EG 10 dez/ten ZI KO RI Product group 1 Product group 2 Product group 3 Product group 4 Process steps a Product group no. b Product group no. c Product group no. d Product group no. um/one x dois/two x três /three x quatro/four x cinco/five x seis/six x sete/seven x oito/eight x nove/nine x dez/ten x Company (short version): Distrubution 1 company: Distrubution 2 company: Distrubution 3 company: Distribution internally: Department Name 1.: 2.: 3.: 4.: 5.: 6.: 7.: 8.: 9.: 10.: Boxes in blue are entry boxes! Names of the auditees will be shown in sheet "explanation" organization: P2 (EPM) P3 (EPP) P4 (EPR) P5 (ELM) P6 (EPG) P7 (EK) Allocation of process steps to prduct group by using "X" in the boxes: ATTENTION !!! Calculation of product groups is not supported by this Excel tool. Here it is possible to calculate the assessment manually! Distribution at audited organization:

Process Audit Vda 6 3 Ims (2)

Embed Size (px)

DESCRIPTION

Auditoria VDA

Citation preview

Entry screenData input to create reportContract:Boxes in blue are entry boxes!Date:Auditform (ankreuzen):QM-Systemauditvor SOPProzeauditnach SOPProduktauditBeanstandungQualittsaudit D-TeileReason for contract:Contract issued by (name, dep.):Auditor:Department:Lead auditor:Department:Suppl.-No.:Function:Name:AuditeeNames of the auditees will be shown in sheet "explanation"DUNS-No.:Top management:Supplier/Organization:Production management:Street:Quality management:Production site (location):Customer support:Authorisied person of organization:Design/Development:Production site (postal code):Phone:Fax:Last audit results / certificatesCertificate- / Audit base No.:Issue-Date:Conducted by:Result:Product group :First:Second:Third:FourthProd.-Gr.-No. (acc. catalog):abcdProd. Titel (acc. catalog):Please entry the results of the last audit in this boxesProcess steps:Title: E1 - E10Process step-No.:last audit: resultAssessment elementProcess elements1um/oneEU1P2 (EPM)2dois/twoEU2P3 (EPP)3trs /threeEU3P4 (EPR)4quatro/fourEU4P5 (ELM)5cinco/fiveEU5P6 (EPG)6seis/sixEU6P7 (EK)7sete/sevenEU78oito/eightGeneric baselineOverall achievement9nove/ninePVEG10dez/tenZI10KORIAllocation of process steps to prduct group by using "X" in the boxes:Product group 1Product group 2Product group 3Product group 4Process stepsa Product group no.b Product group no.c Product group no.d Product group no.ATTENTION !!! Calculation of product groups is not supported by this Excel tool. Here it is possible to calculate the assessment manually!um/onexdois/twoxtrs /threexquatro/fourxcinco/fivexseis/sixxsete/sevenxoito/eightxnove/ninexdez/tenxDistribution at audited organization:Company (short version):Distrubution 1 company:Distrubution 2 company:Distrubution 3 company:Distribution internally:DepartmentName1.:2.:3.:4.:5.:6.:7.:8.:9.:10.:Berichtszusammenstellung:(Seitenzahl)(Anzahl Seiten)Deckblatt:Q-Fhigk1Proz.-Balken2FragenEingabeProzeAEingabe/BerechungAuswertung13Auswertung24Auswertung35Sofortmanahmen7Verbesserungsprogramm6QTP dt.8ProduktA9ProduktA210ProduktA311ProduktA412Erluterung13QTP engl.14Unterlieferanten15Nicht fr Direktlieferanten!!!Footer:CompanyCost unitName 1Name 2

&LProdukt- und Prozessaudit&L0123-FORM-03-AUNDE Rev.: 24.02.2012&C&AEntrada de dados para criar relatrioContrato:Data:Razo para contrato:Contrato emitido por (nome, departamento):Auditor:Auditor lderN -FornecedorN- de DUNSFornecedor,OrganizaoRua:Unidade de produo(Local)Representante da direoUnidade de produo(cdigo postal)Telefone:Fax:Departamento:Departamento:Funa:Alta direo:Gerente de procuoGesto de qualidadeSuporte ao cliente:Design/ desenvolvimentoNome:AuditadoOs quadros em azul so caixas de entrada:Nomes dos auditados sero mostrados na folha "explicao"Resultados da ltima auditoria//certificadosCertificado-/N de auditoria base:Data da emisso:Conduzido por:ResultadoProduto-Grupo-N(catlogo acc.)Ttulo do produto(catlogo acc.)Grupo do produto:Primeiro:Segundo:Terceiro:Quarto:Etapas do Processo:Ttulo:E1 - E 10N da etapa do processo:Favor entrar com os resultados da ltima auditoria nestes quadros/caixasltima auditoria:resultadoElemento de avaliaoElementos do processoReferncia genricaRealizao/Aproveitamento global/geralAlocao de etapas do processo para o grupo de produto usando X nos quadros/caixas:Etapas do processoGrupo do produto 1N do grupo do produtoGrupo do produto 2N do grupo do produtoGrupo do produto 3Grupo do produto 4c N do grupo do produtoN do grupo do produtoATENO!!! O clculo dos grupos do produto no suportado pela ferramenta deste Excel.Aqui possvel calcular a avaliao manualmente!DepartamentoQualidadeComprasDesenvolvimentoNomeRodap:EmpresaUnidade de custoNome 1Nome 2Distribuio na organizao auditada:Empresa (verso resumida/curta);Distribuio 1 empresa:Distribuio 2 empresa:Distribuio 3 empresa:Distribuio internamente:OrganizaoKopfzeile & Seitenzahl setzen

Assessment matrixVDA 6.3 Process Audit: Assessment Matrix without product group calculationContract:0EntyGenerikberechnungYes/NoBewertung EinzelfragenADevelopmentProzessverantwortungZieleverfolgungKommunikationRisikoorientierungGeneric baselineP2Project managementAchievement levels [%]G1G2G3G42.12.2*2.32.42.5*2.62.7*PVZIKORIP2PVPM2.12.5*ZIPM2.32.6KOPM2.2*2.32.7*RIPM2.12.2*2.42.5*2.62.7*A888101066EPM80%977898107867886888101066i.OP3Planning the product and process developementProductProcess3.13.2*3.33.43.53.13.2*3.33.43.5P3PVPP3.33.3ZIPP3.13.43.13.4KOPP3.2*3.2*RIPP3.13.1.3.53.5.A1010101010EPdP100%1010101010EPzP100%EPP100%1010101011010192110101010101010101010101010101010i.O.P4Carrying out the prduct and process developmentProductProcessProduktProzessProduktProzessProduktProzessProduktProzess4.14.24.34.44.5*4.6.4.7.4.8.4.9.4.14.24.34.44.5*4.6.4.7.4.8.4.9.P4PVPR4.34.9.4.34.9.ZIPR4.24.34.44.7.4.8.4.24.34.44.7.4.8.KOPR4.6.4.8.4.9.4.6.4.8.4.9.RIPR4.14.5*4.14.5*An.b.10101010n.b.n.b.108EPdR97%8101010101010108EPzR96%EPR97%91099110108981910810810101010n.b.1010101010109.2n.b.108101089.3333333333n.b.10810i.O.BSerial production0.9855.1*5.25.35.4*5.5*5.65.7P5PVLM5.7ZILM5.3KOLM5.2RILM5.1*5.4*5.5*AP5Supplier management101041010810ELM89%104101070628911041010101010i.O.P6Process analysis production1 Process input2 Work content / Process sequence3 Process support4 Material Ressources5 Process effectiveness level6 Process result / outputProcess step achievement level7 Transport and part handlingGeneric baselineProzessverantwortungZieleverfolgungKommunikationRisikoorientierung6.1.1*6.1.26.1.36.1.46.1.56.2.1*6.2.26.2.3*6.2.4*6.2.56.2.66.3.16.3.2*6.3.36.4.16.4.2*6.4.36.4.46.5.16.5.26.5.3*6.5.4*6.6.1*6.6.26.6.36.6.46.1.26.1.36.1.46.2.56.2.66.4.46.6.26.6.3G1G2G3G4P6Frage6.1.1*6.3.16.3.2*6.4.3P66.2.26.5.16.5.26.6.1*6.1.1*6.1.26.1.46.1.56.3.36.5.16.5.26.6.26.6.36.6.46.2.1*6.2.26.2.3*6.2.4*6.3.2*6.4.2*6.5.3*6.5.4*6.6.1*i.O.Process step 1:um/oneE1PVZIKORIProcess step 1:Process step 1:A81010108106101088108881010108886101081088%10101088101089899PV1810810ZI 168810KO181010888810810RI110610108108610Process step 2:dois/twoE29Process step 2:89Process step 2:9n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.PV2n.b.n.b.n.b.n.b.ZI 2n.b.n.b.n.b.n.b.KO2n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.RI1n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.Process step 3:trs /threeE3n.b.Process step 3:n.b.n.b.Process step 3:n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.PV3n.b.n.b.n.b.n.b.ZI 3n.b.n.b.n.b.n.b.KO3n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.RI1n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.Process step 4:quatro/fourE4n.b.Process step 4:n.b.n.b.Process step 4:n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.PV4n.b.n.b.n.b.n.b.ZI 4n.b.n.b.n.b.n.b.KO4n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.RI1n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.Process step 5:cinco/fiveE5n.b.Process step 5:n.b.n.b.Process step 5:n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.PV5n.b.n.b.n.b.n.b.ZI 5n.b.n.b.n.b.n.b.KO5n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.RI1n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.Process step 6:seis/sixE6n.b.Process step 6:n.b.n.b.Process step 6:n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.PV6n.b.n.b.n.b.n.b.ZI 6n.b.n.b.n.b.n.b.KO6n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.RI1n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.Process step 7:sete/sevenE7n.b.Process step 7:n.b.n.b.Process step 7:n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.0%PV7n.b.n.b.n.b.n.b.ZI 7n.b.n.b.n.b.n.b.KO7n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.RI1n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.Process step 8:oito/eightE80n.b.Process step 8:n.b.n.b.Process step 8:n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.PV8n.b.n.b.n.b.n.b.ZI 8n.b.n.b.n.b.n.b.KO8n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.RI1n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.Process step 9:nove/nineE9n.b.Process step 9:n.b.n.b.Process step 9:n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.PV9n.b.n.b.n.b.n.b.ZI 9n.b.n.b.n.b.n.b.KO9n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.RI1n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.Process step 10:dez/tenE10n.b.Process step 10:n.b.n.b.Process step 10:n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.PV10n.b.n.b.n.b.n.b.ZI 10n.b.n.b.n.b.n.b.KO10n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.RI1n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.Einzelfragen P6=n.b.n.b.n.b.n.b.AAssessment of sub-elements in the process analysis (mean value stages 1 - n)96.1.1*6.1.26.1.36.1.46.1.56.2.1*6.2.26.2.3*6.2.4*6.2.56.2.66.3.16.3.2*6.3.36.4.16.4.2*6.4.36.4.46.5.16.5.26.5.3*6.5.4*6.6.1*6.6.26.6.36.6.46.1.26.1.36.1.46.2.56.2.66.4.46.6.26.6.3810101081061010881088810101088861010810EPG88%10101088101087 Transport and part handlingEu192%Eu287%Eu387%Eu495%Eu575%Eu695%Eu793%P7-Einzel7.1*7.27.3*7.47.57.6P7PVK7.57.6P7ZIK7.3*7.4KOK7.27.3*7.47.5RIK7.1*AP7Customer support / Customer satisfaction/ Service101010101010EK100%101010106060100110101010101010101010101010Eu1..Eu7=Achievement level against generic baseline:PVZIKORIC95%82%92%93%E1..En=Overall achievement level EG:Overall achievement levelAAchievement level:Classified:Classified:Classifiedepm0.80.8ED [%]92%Aepp1192%Bepr0.97ez0.89EP[%]92%Bepg0.88ek1Note: Entry "n.b." = question not assessed. Per assessed element 2/3 of all questions must be assessed.Classification results (A,B,C) must be reviewed by the auditor bearing in mind the downgrading rules!QuestionAverage at *partly assessment *questionsPartly assessment questin with 0 pointsP22.1no *2.282.3no *2.4no *2.5102.6no *2.76P3P2AA3.1kein *3.2103.3kein *3.4kein *3.5kein *P4P3AA4.1kein *4.2kein *4.3kein *4.4kein *4.5104.6kein *4.7kein *4.8kein *4.9kein *P5P4AA5.1105.2kein *5.3kein *5.4105.5105.6kein *5.7kein *P5AAP6Prozesschritte6.1123456789106.1.188n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.6.1.2kein *kein *kein *kein *kein *kein *kein *kein *kein *kein *kein *6.1.3kein *kein *kein *kein *kein *kein *kein *kein *kein *kein *kein *6.1.4kein *kein *kein *kein *kein *kein *kein *kein *kein *kein *kein *6.1.5kein *kein *kein *kein *kein *kein *kein *kein *kein *kein *kein *6.26.2.11010n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.6.2.2kein *kein *kein *kein *kein *kein *kein *kein *kein *kein *kein *6.2.31010n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.6.2.41010n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.6.2.5kein *kein *kein *kein *kein *kein *kein *kein *kein *kein *kein *6.2.6kein *kein *kein *kein *kein *kein *kein *kein *kein *kein *kein *6.36.3.1kein *kein *kein *kein *kein *kein *kein *kein *kein *kein *kein *6.3.288n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.6.3.3kein *kein *kein *kein *kein *kein *kein *kein *kein *kein *kein *6.46.4.1kein *kein *kein *kein *kein *kein *kein *kein *kein *kein *kein *6.4.21010n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.6.4.3kein *kein *kein *kein *kein *kein *kein *kein *kein *kein *kein *6.4.4kein *kein *kein *kein *kein *kein *kein *kein *kein *kein *kein *6.56.5.1kein *kein *kein *kein *kein *kein *kein *kein *kein *kein *kein *6.5.2kein *kein *kein *kein *kein *kein *kein *kein *kein *kein *kein *6.5.388n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.6.5.466n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.6.66.6.11010n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.6.6.2kein *kein *kein *kein *kein *kein *kein *kein *kein *kein *kein *6.6.3kein *kein *kein *kein *kein *kein *kein *kein *kein *kein *kein *6.6.4kein *kein *kein *kein *kein *kein *kein *kein *kein *kein *kein *P7P6AAAn.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.n.b.7.110123456789107.2kein *7.3107.4kein *7.5kein *7.6kein *WENN(MIN(G58;N58;R58;W58;AB58;AG58;AV58)= 80 - 90% conditionally quality-capable; C = 0 - < 80% not quality-capable.Report contain additional assessment question regarding VDA 6.3 questionaire?O Yes O NoAudit history / CertificatesAudit baseDateCarried outResultDistribution:Participants:1. Timings for improvement plan:---for actions see "improvement plan" and/or "immediate actions"Auditor:Leadauditor:Forwarding to third parties accepted: O Yes O No00Signed for organization:00

&LProdukt- und Prozessaudit&L0123-FORM-03-AUNDE Rev.: 24.02.2012&C&AAvaliao do relatrio de auditoria da capacidade de qualidadeOrganizao auditada (Fornecedor):Local:N do FornecedorContrato emitido por:Razo para contrato:Data:N do contrato:Processo / Produtondice de avaliaoClassificadoAlcanado /RealizadoGrupo de produtoResultados-Encontrados / Requisitos:Escala de classificao:A = 90 - 100%qualidade-compatvel; B >=80 - 90% qualidade-compatvel de forma condicional; C = 0-