1
PRO5310102 www.provia-auto.com Doc 000113 | © ProVia (05/2018) EN Assignment plan NO. COLOUR FUNCTION Ø 1 Red Solenoid valve Positive 4 2 Black ECU Positive 1.5 3 Yellow ECU Negative 1.5 4 Brown Solenoid valve Negative 4 5 White Warning device 1.5 6 Green/white CAN H 1.5 7 Brown/white CAN L 1.5 Assembly 1 2 3 4 5 6 7 1. Loosen screws (6) of the strain relief (7). 2. Unscrew end cap (5) from the cable gland (3). 3. Guide cable through end cap (5). 4. Guide cable through seal (4) and cable gland (3) (observe installation position of seal). 5. Strip cable approx. 50 mm. 6. Strip approx. 7 mm of insulation from the individual cores. 7. Remove the contact insert (2) from the connector housing (1). 8. Guide individual cores into the contact bore of the contact insert (2) according to the assignment plan. 9. Secure individual cores with screws in contact holes on contact insert (2). 10. Insert the contact insert (2) into the connector housing (1) as far as it will go along the guide groove. 11. Screw the cable gland (3) into the connector housing (1). 12. Insert seal (4) into cable gland (3). 13. Screw the end cap (5) onto the cable gland (3). 14. Fix the cable to the strain relief (7) with screws (6). 15. Carry out visual Inspection and functional test.

PRO5310102 Connector7-Pin 24V EN

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

PRO5310102

www.provia-auto.comDoc 000113 | © ProVia (05/2018)

ENAssignment plan

NO. COLOUR FUNCTION Ø

1 Red Solenoid valve Positive 4

2 Black ECU Positive 1.5

3 Yellow ECU Negative 1.5

4 Brown Solenoid valve Negative 4

5 White Warning device 1.5

6 Green/white CAN H 1.5

7 Brown/white CAN L 1.5

Assembly1 2 3 4 5 6 7 1. Loosen screws (6) of the strain relief (7).

2. Unscrew end cap (5) from the cable gland (3).

3. Guide cable through end cap (5).

4. Guide cable through seal (4) and cable gland (3) (observe installation position of seal).

5. Strip cable approx. 50 mm.

6. Strip approx. 7 mm of insulation from the individual cores.

7. Remove the contact insert (2) from the connector housing (1).

8. Guide individual cores into the contact bore of the contact insert (2) according to the assignment plan.

9. Secure individual cores with screws in contact holes on contact insert (2).

10. Insert the contact insert (2) into the connector housing (1) as far as it will go along the guide groove.

11. Screw the cable gland (3) into the connector housing (1).

12. Insert seal (4) into cable gland (3).

13. Screw the end cap (5) onto the cable gland (3).

14. Fix the cable to the strain relief (7) with screws (6).

15. Carry out visual Inspection and functional test.