PROJECTSCompany YearLocation
Areva T&DAreva T&DAreva T&D
200920092010
TurkeyTurkeyTurkey
Areva T&DAreva T&DAreva T&DAlstom GridAlstom GridGE Grid
201020102010201120112015
TurkeyTurkeyTurkeyTurkeyTurkeyTurkey
Alstom Grid
Project Name
380kV Toscelik AIS Substation380kV Yolbulan AIS Substation154kV Batısökle Cement Production Plant AIS
154kV Boreas WPP154kV Mazı-3 WPP154kV Bahçe WPP154kV Soma-1 WPP154kV Soma-2 WPP154kV Pekim WPP
Ankara - Konya High Speed Train 2013Turkey
Alstom GridAlstom GridAlstom GridGE GridGE Grid
380kV Zetes-2 GIS380kV Zetes-3 GIS380kV Izdemir GIS
20112014201420152017
TurkeyTurkeyTurkeyTurkeyTurkey
Alstom GridGE GridGE GridGE GridGE GridGE GridGE GridGE Grid
380kV Cenal Karabiga GIS380kV Soma-B GIS
380kV TEİAŞ Yenikapı GIS380kV TEİAŞ Yenibosna GIS380kV TEİAŞ Erenköy GIS380kV TEİAŞ Belek GIS380kV TEİAŞ Çiğdem GIS380kV TEİAŞ Sağmalcılar GIS380kV TEİAŞ Ataşehir GIS380kV TEİAŞ Çağlayan GIS
20112015201620162016201720172017
TurkeyTurkeyTurkeyTurkeyTurkeyTurkeyTurkeyTurkey
GE GridBEST GE Grid
201620172017
AlbaniaGeorgiaTurkey
GE GridGE Grid
154kV Devoll Elbasan-2 AIS 154kV Marneuli AIS154kV TEİAŞ Alaşehir Havza AIS
380kV Samsung & Acwa Power CCPP154kV Kayalı CCPP
TurkeyTurkey
20152015
Type
Steel FactorySteel FactoryCement Factory
Wind Power PlantWind Power PlantWind Power PlantWind Power PlantWind Power PlantWind Power Plant
Railway
Thermal Power PlantThermal Power PlantThermal Power PlantThermal Power PlantThermal Power Plant
Gas Insulated SubstationGas Insulated SubstationGas Insulated SubstationGas Insulated SubstationGas Insulated SubstationGas Insulated SubstationGas Insulated SubstationGas Insulated Substation
Air Insulated SubstationAir Insulated SubstationAir Insulated Substation
Combined Cycle P. PlantCombined Cycle P. Plant
Scoope of: Scada / Automation, Telecommunication, Network, etc.
*The projects has been presented in following pages.
REFERENCE PROJECTS (1)
PROJECT NAME YEARMAIN CONTRACTOR / CUSTOMER
2013
TCDD ANKARA - KONYA Fast Train P
Burhaniye Municipality
ZETES-2 GI1200 MW 380kV GIS
YENİKAPI G154kV GIS
FACTORY CFACTORY154kV AIS
İZDEMİR GI350 MW380kV GIS
SCOPESupply, Design, Documentation, Engineering, Commissioning, FAT/SAT...
Substation Scada System( Areva / Alstom PACİS ). dundant Servers, 6 Clients, 18 BCU, 86 Protection lays, 4 154/27.5 KV TM, 4 Neutral Zone, 5 Siding Zone. condary Drawing.ergy Monitoring System.
rojectReReSeEn
2014
2014
2014
S /
2014
IS
2014
EMENT
S
Water Treatment Plant Control and Monitoring System (Siemens)
Substation Scada System( Areva / Alstom PACİS )
Event Recorder System (Micom C264)
Load Dispatching Center - RTU System (Areva / Alstom Micom C264)
Substation Scada System( Alstom DS Agile PACİS ) Micom C264 BCU SystemData Exchange Scope of DS Agile PACiS and ABB RTU SCADA Maintenance Issues
REFERENCE PROJECTS (2)
PROJECT NAME SCOPESupply, Design, Documentation, Engineering, Commissioning, FAT/SAT...
YEARMAIN CONTRACTOR / CUSTOMER
2015
2015
Ministry of Treasury and Finance
Scada System (Zenon)Energy Monitoring System
2015
Kayseri Municipality Water Treatment Plant Control and Monitoring System (Siemens)
2015
HeNan Roady Road Machinery Comp. KAZAKHISTAN
2015
KAYALI CCP 77,13 MW 154 KV Neutral Gas CCP
2015
DBATT14 YENİBOSNA GIS 380/154/33kV GIS
KARABİGA TEPP 1320MW 380kV TEPP GIS
Aspalt Plant Automation System (Siemens)
Substation Scada System (ABB MicroScada)Load Dispatching Center - RTU System (ABB RTU560 )National Control Center Telecommunication System (SDH, MUX, etc.) Primary Frequency Control TestReactive Power Control Test and Data Recording System
Secondary Drawing RevisionsProtection Relays Tests and Commissioning (Alstom/Areva Micom) Substation Scada System (Alstom/Areva PACİS)
Substation Scada System( Alstom / GE DS Agile PACİS ) Reaktive Power Control Test and Data Recording System Load Dispatching Center - RTU System (ABB RTU560 )Data Exchange Scope of DS Agile PACiS and ABB RTU TEİAŞ (NCC) National Control Center Telecommunication System (SDH, MUX, etc.)
REFERENCE PROJECTS (3)
PROJECT NAME YEARMAIN CONTRACTOR / CUSTOMER
2015
2016
Samsung & ACWA Power Kırıkkale CCP / 950 MW 380kV Nautral Gas CCP
2016
ZETES-3 GIS / 1320 MW 380KV GIS
2016
ADIGÜZEL-2 HEPP 154kV AIS
2016
ITM124 ERENKÖY 154/33kV GIS
2016
ITM89 ÇİĞDEM GIS 154/33kV GIS
DEVOLL-ELBASAN 2 154kV AIS
SCOPESupply, Design, Documentation, Engineering, Commissioning, FAT/SAT...
Load Dispatching Center - RTU System (ABB RTU560 )Substation Scada System( Alstom DS Agile PACİS ) National Control Center Telecommunication System (SDH, MUX, etc.) Network Installation (Fiber Optic, Ethernet, etc) OPGW/FO Splicing and Termination
Load Dispatching Center - RTU System (ABB RTU560 )Zenon Scada and ABB RTU data exchange engineering Network Installation (Fiber Optic, Ethernet, etc) OPGW/FO Splicing and Termination Issues
Load Dispatching Center - RTU System (ABB RTU560 )National Control Center Telecommunication System (SDH, MUX, etc.) Network Installation (Fiber Optic, Ethernet, etc) OPGW/FO Splicing and Termination
National Control Center Telecommunication System (SDH, MUX, etc.) Remote Access System of IEDs.Scada and Communication Settings of Protections (Micom, Vamp) Transformer Monitoring System (Alstom Ms3000)Network Installation (Fiber Optic, Ethernet, etc) OPGW/FO Splicing and Termination Issues
National Control Center Telecommunication System (SDH, MUX, etc.) Remote Access System of IEDs.Scada and Communication Settings of Protections (Micom, Vamp) Transformer Monitoring System (Alstom Ms3000)Network Installation (Fiber Optic, Ethernet, etc) OPGW/FO Splicing and Termination Issues
Micom C264 RTU System.IEDs (transducer, protection relay, analyzer etc) settings and communication issues.
REFERENCE PROJECTS (4)
PROJECT NAME YEARMAIN CONTRACTOR / CUSTOMER
2016
2017
SAĞMALCILAR GIS 380/33kV GIS
SCOPESupply, Design, Documentation, Engineering, Commissioning, FAT/SAT...
National Control Center Telecommunication System (SDH, MUX, etc.) Remote Access System of IEDs.Scada and Communication Settings of Protections (Micom, Vamp) Transformer Monitoring System (Alstom Ms3000)Network Installation (Fiber Optic, Ethernet, etc) OPGW/FO Splicing and Termination Issues
2017
BELEK GIS /154kV GIS
National Control Center Telecommunication System (SDH, MUX, etc.) Remote Access System of IEDs. Scada and Communication Settings of Protections (Micom, Vamp) Transformer Monitoring System (Alstom Ms3000)Network Installation (Fiber Optic, Ethernet, etc) OPGW/FO Splicing and Termination Issues
2017
ITM 172 ALAŞEHİR HAVZA 154kV AIS
Substation Scada System (GE DS Agile / PACİS ) BCU Systems (Micom C264) database engineering.Scada Adaptation of GE and ABB Protections.IEC61850 Protections, PRP Network.
2017
ITM 159 ATAŞEHİR 380/33kV GIS
2017
TCDD ANKARA - KONYA Fast Train Project
National Control Center Telecommunication System (SDH, MUX, etc.) Remote Access System of IEDs.Scada and Communication Settings of Protections (Micom, Vamp) Transformer Monitoring System (Alstom Ms3000)Network Installation (Fiber Optic, Ethernet, etc) OPGW/FO Splicing and Termination Issues.
Substation Scada System (Areva / Alstom PACİS) *Scada System Maintenance Contract for 3 years.
ITM 161 ÇAĞLAYAN GIS 380/154/33kV GIS
National Control Center Telecommunication System (SDH, MUX, etc.) Remote Access System of IEDs.Scada and Communication Settings of Protections (Micom, Vamp) Transformer Monitoring System (Alstom Ms3000)Network Installation (Fiber Optic, Ethernet, etc) OPGW/FO Splicing and Termination Issues.
REFERENCE PROJECTS (5)
PROJECT NAME YEARMAIN CONTRACTOR / CUSTOMER
2017
2017
MARNEULİ AIS 154kV AIS
SCOPESupply, Design, Documentation, Engineering, Commissioning, FAT/SAT...
Substation Secondary Design and Drawing.Acceptance procedures of documents.
2018
TOSÇELİK IRON AND STEEL PLANT 380/33kV AIS
Load Dispatching Center - RTU System (ABB RTU560 )BCU Systems (Micom C264) database engineering.Substation Scada System (PACiS - Ds Agile)Scada Adaptation of GE F650, L90, Micom C264, Micom P14x, P64x. Data exchange between Factory Automation System and PACiS.
2018
PETKİM ALİAĞA WPP 154KV/33kV AIS
Substation Scada System for 154kV/34kV SS (ABB MicroScada) Optical Fiber Network Installation for Wind Turbines and Substation CCTV Security System for Wind Turbines and SubstationIP Phone Exchance for Wind Turbines and Substation
2018
SOMA-B THERMAL POWER PLANT 380/154/33kV TEPP
2019
BATMAN-2 AIS154kV AIS
Substation Scada System (GE DS Agile / PACİS )Load Dispatching Center - RTU / Gateway System IEC61850 Protections, PRP Network.
KOCATEPE WPP154kV AIS
Load Dispatching Center - RTU System (ABB RTU560 )BCU Systems database engineering.
Event Recorder System (Micom C264)
REFERENCE PROJECTS (6)
PROJECT NAME YEARMAIN CONTRACTOR / CUSTOMER
2019
ÖKSÜT GOLD MINE154kV AIS
SCOPESupply, Design, Documentation, Engineering, Commissioning, FAT/SAT...
Substation Scada System (GE DS Agile / PACİS )Load Dispatching Center - RTU / Gateway System IEC61850 Protections, PRP Network.
ALAŞEHİR SS380/154/33kV AIS
DS Agile Database engineering and revision.Firmware upgrade of Micom C264 BCUs.Version upgrade of DS Agile.
2019
TRAINING PROJECTS (7)
TRANING TYPE
THEORETICAL PRACTICAL ENGINEERING
MAIN CONTRACTOR / CUSTOMER
SCOPE
PRACTICAL
ENGINEERING
THEORETICAL PRACTICAL ENGINEERING
THEORETICAL PRACTICAL ENGINEERING
THEORETICAL PRACTICAL ENGINEERING
THEORETICAL PRACTICAL ENGINEERING
THEORETICAL PRACTICAL ENGINEERING
Scada System General ViewCommunication ProtocolsAlstom PACiS / GE DS Agile Micom IEDs (RTU, Protection and Automation Products) Softwares of Alstom / GE
Alstom PACiS / GE DS Agile Connection to IEDs Setting Parametres and Download Configurations System Settings Micom IEDs - IEC61850 Configuration
Alstom PACiS / GE DS Agile Detailed Database Engineering (SCE, SMT, IED Conf. etc.) Application on site.
Alstom PACiS / GE DS Agile All Theoritical Traning Application on test platform
ABB MicroScada EngineeringABB RTU560 Engineering
Copadata / ZENON All Teoric Traning Application on test platform
ABB MicroScada EngineeringABB RTU560 Engineering
ABB MicroScada EngineeringABB RTU560 Engineering
Alstom / GE PACiS GatewayABB RTU560 Engineering
THEORETICAL PRACTICAL ENGINEERING
PRODUCTS
PROJECT NAMEMAIN CONTRACTOR / CUSTOMER
SCOPESupply, Design, Documentation, Installation, FAT/SAT, etc.
Fiber Optic Patchcords Manufacturing for IEDs (Protection Relays). Factory Acceptance Test (FAT) and Site Acceptance Test (SAT). Installation and Cabling on site.Supply and installation of Coaxial cables for PLCs (Power Line Carrier). OPGW/FO Splicing and Termination Works.
Fiber Optic Patchcords Manufacturing for IEDs (Protection Relays). Factory Acceptance Test (FAT) and Site Acceptance Test (SAT). Installation and Cabling on site.Supply and installation of Coaxial cables for PLCs (Power Line Carrier). OPGW/FO Splicing and Termination Works.
Fiber Optic Patchcords Manufacturing for IEDs (Protection Relays). Factory Acceptance Test (FAT) and Site Acceptance Test (SAT). Installation and Cabling on site.Supply and installation of Coaxial cables for PLCs (Power Line Carrier). OPGW/FO Splicing and Termination Works.
Fiber Optic Patchcords Manufacturing for IEDs (Protection Relays). Factory Acceptance Test (FAT) and Site Acceptance Test (SAT). Installation and Cabling on site.Supply and installation of Coaxial cables for PLCs (Power Line Carrier). OPGW/FO Splicing and Termination Works.
ITM 155 BELEK154kV GIS
ITM 161 ÇAĞLAYAN 380kV GIS
ITM 215 BURSA DOĞU GIS 380kV GIS
ITM SAĞMALCILAR GIS 154kV GIS
ITM 186 BURSA GIS 154kV GIS
ITM 206 GÜZYURDU 154kV AIS
ITM OSMANİYE AIS154kV AIS
ITM 235 GİRESUN 154kV GIS
ITM 265 KIZILIRMAK 154kV GIS
ITM 274 ALİAĞA-1 154kV GIS
ITM 217 TAŞOLUK 154kV GIS
NETWORK PROJECTS (8)
Boş SayfaBoş SayfaBlank PageBlank Page04_Projects.pdfBoş SayfaBoş SayfaBlank PageBlank PageBlank PageBlank PageBlank PageBlank Page
A5 - CV - vER1.pdfBoş SayfaBoş SayfaBlank PageBlank Page04_Projects.pdfBoş SayfaBoş SayfaBlank PageBlank PageBlank PageBlank PageBlank PageBlank Page
Boş SayfaBoş SayfaBoş SayfaBoş SayfaBoş SayfaBoş SayfaBoş Sayfa